HomeMy WebLinkAbout05 - Dover Drive SidewalkCITY OF NEWPORT BEACH
CITY COUNCIL STAFF REPORT
Agenda Item No. 5
April 24, 2007
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
Robert Stein
949 -644 -3322 or rstein @city.newport- beach.ca.us
SUBJECT: DOVER DRIVE SIDEWALK — APPROVAL OF AMENDMENT TO
PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING,
INC., FORMERLY KNOWN AS VAN DELL AND ASSOCIATES
RECOMMENDATIONS:
Approve Amendment No. 4 to Professional Services Agreement with VA Consulting,
Inc., formerly known as Van Dell and Associates for a not to exceed amount of $5,455
and authorize the Mayor and City Clerk to execute the Amendment.
DISCUSSION:
On May 25, 2004, Council approved a Professional Services Agreement with VA
Consulting of Irvine California, for the design of the Dover Drive sidewalk at a contract
price of $69,838. Along with preparing the final construction documents, VA Consulting's
professional services included preparing sidewalk design alternatives, conducting a
geotechnical evaluation, preparing and processing jurisdictional agency permits including
a Coastal Development Permit, and preparing the environmental documentation for the
Project.
During the design process, the City asked the Consultant to consider additional options
for the sidewalk design to consider alternate alignments with various retaining wall
alternatives. Over the last two years, three contract amendments were approved by staff:
• On February 22, 2005, City and Consultant entered into Amendment No. 1 to the
Agreement, in which Consultant's scope of work was expanded to provide
additional engineering and geotechnical services for the Project, including a
proposal to shore up the existing slope above Dover Drive, at the Cliff Drive
intersection. The additional compensation under Amendment No. 1 was $6,000.
• On August 9, 2005, City and Consultant entered into an Amendment No. 2 to the
Agreement, in which Consultant's scope of work was expanded to provide
additional design and consulting services for the project, including analysis of the
sidewalk and retaining wall alternatives for the slope above Dover Drive,
preparation of the final design of the boardwalk portion of the project, and project
Dover Drive Sidewalk— Approval of Amendment to Professional Services Agreement with VA Consulting, Inc.
April 24, 2007
Page 2
management and coordination services. The additional compensation under
Amendment No. 2 was $9,900.
• On April 4, 2006; City and Consultant entered into an Amendment No. 3 to the
Agreement, in which Consultant's scope of work was expanded to revise the
alignment of the proposed sidewalk and curb and gutter adjacent to the slope
above Dover Drive, and prepare revised exhibits for the environmental document
and resource agency permit applications. The additional compensation under
Amendment No. 3 was $3,960.
The design is now complete; however VA Consulting has had to expend additional
effort working with the jurisdictional agencies to gain approvals. Staff recommends
additional funds to compensate the consultant for this extra effort. Below is the status
of the project permits.
➢ California Department of Fish and Game issued a 1602 approval in June, 2006.
➢ The Army Corps of Engineers (ACOE) determined that the habitat adjacent to
Dover Drive is an isolated wetland and therefore an ACOE 404 permit is not
required and has issued a jurisdictional delineation letter.
➢ The Regional Water Quality Control Board will not require a 401 certification.
➢ California Coastal Commission (CCC) received the City's permit application in
August 2006 and we received comments in December. Supplemental
information was submitted and CCC staff indicates the application package is
now complete. In the next month, we are hoping to hear that our project has
been agendized of an upcoming Commission meeting.
Environmental Review:
On June 27, 2006, Council adopted a Resolution approving the Mitigated Negative
Declaration (MND) for Dover Drive Sidewalk Project.
Public Notice:
The public will be informed of the Coastal Commission hearing once that date is
determined.
Dover Drive Sidewalk — Approval of Amendment to Professional Services Agreement with VA consulting, Inc.
April 24, 2007
Page 3
Funding Availability:
Sufficient funds are available in the following account for the project:
Account Description
Transportation and Circulation
Prepared by:
\ n
Robert Stein, P.E.
Principal Civil Engineer
Attachments: Amendment No.
Exhibit
Account Number Amount
7261- C5100854 $5,455
Total: $5,455
Submitted
Works Director
AMENDMENT NO. 4
TO
PROFESSIONAL SERVICES AGREEMENT
WITH VA CONSULTING, INC.
FOR ENVIRONMENTAL CONSULTING SERVICES FOR
DOVER DRIVE SIDEWALK PROJECT
THIS AMENDMENT NO. 4 TO PROFESSIONAL SERVICES AGREEMENT, entered
into this day of , 2007, by and between the CITY OF
NEWPORT BEACH, a municipal corporation, (hereinafter referred to as "City') and VA
CONSULTING, INC., (formerly known as Van Dell and Associates), a California
corporation whose address is 17801 Cartwright Road, Irvine, California, 92614
(hereinafter referred to as "Consultant "), is made with reference to the following:
RECITALS
A. City is planning to install a new sidewalk on the easterly side of Dover Drive from
Cliff Drive to 16th Street, adjacent to the Castaways Park in the City of Newport
Beach (hereinafter referred to as the "Project ").
B. On July 12, 2004, City and Consultant . entered into a Professional Services
Agreement for Consultant to provide design and consulting services for the
Project (hereinafter referred to as the "Agreement "). Among other things,
Consultant agreed to prepare sidewalk design alternatives, conduct a
geotechnical evaluation, process a Coastal Development permit and prepare the
environmental documentation for the Project. The City agreed to pay Consultant
$69,838.00 for the services under the Agreement. The Agreement was
scheduled to expire on December 31, 2005.
C. On February 22, 2005, City and Consultant entered into an Amendment No. 1 to
the Agreement, in which Consultant's Scope of Work was expanded to provide
additional engineering and geotechnical services for the Project, including a
proposal to shore up the existing slope above Dover Drive, at the Cliff Drive
Intersection. The additional compensation due Consultant under Amendment
No. 1 was $6,000.00.
D. On August 9, 2005, City and Consultant entered into an Amendment No. 2 to the
Agreement, in which Consultant's Scope of Work was expanded to provide
additional design and consulting services for the Project, including analysis of the
sidewalk and retaining wall alternatives for the slope above Dover Drive,
preparation of the final design of the Boardwalk portion of the Project, and
project management and coordination services. The additional compensation
due Consultant under Amendment No. 2 was $9,900.00. The term of the
Agreement was also extended to June 30, 2006.
E. On April 4, 2006, City and Consultant entered into an Amendment No. 3 to the
Agreement, in which Consultant's Scope of Work was expanded to revise the
alignment of the proposed sidewalk/curb and gutter adjacent to the slope above
Dover Drive, and prepare revised exhibits for the environmental document and
resource agency permit applications. The additional compensation due
Consultant under Amendment No. 3 was $3,960.00. The term of the Agreement
was also extended to December 31, 2006.
F. City now desires that Consultant perform additional services for the Project,
including working with Regional Water Quality Control Board staff regarding the
need for a Clean Water Act 401 Water Quality Certification and responding to
comments from the Califomia Coastal Commission staff.
G. City desires to enter into this Amendment No. 4 to compensate Consultant for
these additional services, which were not included in the Agreement or the prior
Amendments.
H. City and Consultant mutually desire to amend Agreement, hereinafter referred to
as "Amendment No. 4 ", as provided herein below.
NOW, THEREFORE, the parties hereto agree as follows:
1. Consultant shall perform the services outlined in the Scope of Work,
which is attached hereto as "Exhibit A" and incorporated herein by this
reference.
2. City shall pay Consultant for the services on a time and expense not -to-
exceed basis in accordance with the provisions of this Section and the
Schedule of Hourly Rates.attached hereto as "Exhibit B," and incorporated
herein by this reference. In no event shall Consultant's compensation for
all work performed pursuant to this Amendment No. 4, including all
reimbursable items and subconsultant fees, exceed Five Thousand,
Four Hundred and Fifty -Five Dollars and no /100 ($5,455.00).
3. The term of the Agreement shall be extended to December 31, 2007.
4. Except as expressly modified herein, all other provisions, terms, and
covenants set forth in Agreement shall remain unchanged and shall be in
full force and effect.
2
IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 4 on
the date first above written.
APPROVED AS TO FORM:
By. A °1^ - -Cc �-
Aaron C. Harp
Assistant City Attorney
for the City of Newport Beach
ATTEST:
M
LaVonne Harkless,
City Clerk
Attachments: Exhibit A — Scope of Work
Exhibit B — Fee Schedule
CITY OF NEWPORT BEACH,
A Municipal Corporation
By:
Steve Rosansky
Mayor
City of Newport Beach
VA CONSULTING, INC.:
(Corporate Officer)
Title:
Print Name:
By:
(Financial Officer)
Title:
Print Name:
f:%users\obMshared\agreements \fy 06 -0AVA Consulting, Inc.l -clover sidewalk - amendment 4.doc
9
EXHIBIT "A"
CITY OF NEWPORT BEACH
DOVER DRIVE SIDEWALK PROJECT
ADDITIONAL SERVICES
SCOPE OF SERVICES
1. Additional Permitting
This task provides for additional time required to obtain project approval from RWQCB
and CCC. We have assumed 8 hours of additional staff time for coordination and follow -
up with the RWQCB and 24 hours of additional staff time for coordination and
preparation of response to comments received from the CCC. Attendance and travel for
participation at CCC hearings have not been provided for in this estimate. At this time,
we do not anticipate that CCC hearings will be required. If CCC hearings are required,
we will submit additional request for authorization.
2. Project Management and Meetings
This task provides project management, coordination and attendance at additional
meetings with Environmental sub - consultant and City. We have assumed 4 hours for
project management and coordination and 4 hours for attendance at 2 additional
meetings for a total of 8 hours.
3. Reimbursabies
This task provides for cost of reproduction of submittals and exhibits, messenger
services and mileage, etc.
C� W Shcfte'j4ab�Wi.W �q Wp FkS0.KtIfA_I]OtO0.0oc
EXHIBIT 11B"
CITY OF NEWPORT BEACH
DOVER DRIVE SIDEWALK PROJECT
ADDITIONAL SERVICES
PROPOSED FEES
1. Additional Permitting ..............................
2. Project Management and Coordination..
3. Reimbursabl es ........ ...............................
TOTAL FEES ..................... ...............................
C. a.M YM BetlNplykV0Vi1'Y.eYnnl ENWg54Tm .0 WB FWIULKMCOLIMM6
VA CONSULTING, INC.
2006 Fee Schedule
%aff ctaxisificatton
P81daril-.........< .. . ................ ....... ...... ......... ...... .... ............... . .... ..... . .. ................... .... --siS5
DIMW preabsowtolsion mapager ........................... ...... ...... . ......... .. ........................... ... ..... - Vn
Sr. MM PfWAIODWIM PMIdant/ exac, C"CW . .... ........... ............. . .... .... ................ ... ..... .31400
DIII)CIEW ...... ....... . ... . ......... . .................... .. . ............ ......................... .. . . ........ ....... .... ...... -sm
8wkwPMsdtMsriager . . ........ .................... .. ....... . ... .. . ....... - ........... .... .....
PF*fs Manager— ........ .................................. . . ..... ................... ...... —.—: ........ .......
Assistant Project Manager a_ ........... ............. ......... ..... . .............. m ...... . ................... . ---- 0440
SenbarProloot ErdneoMonkir O"Fgn Sup"oMmlor Plariner--- . .. . . . .....
78=�
AssWant EnghwWA"IsW PMnrw .....
RaisOmb and Processing Coo(dinato....,
Sst�r CARD Twhmfolam- .... ...................
Junior Engtnser.......... ...............................
CAM Tachn1clan .. ...................... .......... -
Sa" WA ........... .._ ...... ........_......._... .._.._.........._......._..._ —w
SufM and Mepi*g Todmi*n ........ ............ ..... . . . ....... .... ......... .............._....__...._..._. «.__.670
...................... . ...... ... ........ .. ...... .......... ... ...... ....... . ...... . ....... .. —
2-Mon M Crew ...................... . . .................... . . ...... . ............ . ................ .......... . ............ Sits
I-Main WS Crave....._____._...._. ............ ... ....... .............. ........................................... .
... . ... ...... ... I ....... I I ..... -.1 ..... ......... . ..... WD
Not
T. kmige ml he pp000ffid ibr op oWm m6o ne 4rd OMM =WW&Mmp, i"m m4*or0pWbb wpimmWAftm
2 OWMI. %flem r"ust4ed by the C&M WAII boaemhvrpd ate Me of 135%41901 MOMM ftW1Y 1AWL
VdHbs sffivJwr9W ataffiteof 114% uFft $MAIM hoWlyffi5siv,
TIto al'"at OW pin *%IA
(IM915
Ctlloonlwnta P 6a[WprakMne wl klmlpwarylftm