HomeMy WebLinkAboutM2013-0008rpt, Worksheet for Building Combo Permit Application o� e�
f-'" Comm1 F— Residential City of Newport Beach - Building Divis' - '_
NOTE: PLAN CHECK FEE DUE AT TIME OF 1 _ `Foa"�
r—Building I— Grading '"Drainage ` Elec j- Mech
j Plum Cuvd l
Project Address (Not mailing address)
FIppr uite,No
Description of Work
Use
Qom, ,'�^ � I ,
l�lJ���
# Units (if Res
)# Stonesl F
Valuation $ $'ICD
Material/Labor (�J
N I Remodel SF Garage/New/Add ;
OWNER'S NAME Last lW ?_M J %_1 �M First � I�
Owner's Address
Owner's E-mail Address
!Jacquelyn.chung@sbcglobal.net
City Newport Beach State California
Zip lr6t_21�� Telephone 949.631.3121
APPLICANT'S NAME Last Swift
First !Pete
Applicant's Address
Applicant's E-mail Address
2027 Placentia Avenue
Jacquelyn.chung@sbcglobal.net
City iCost a Mesa State kali ornia
Zip :92627 Telephone�949 631.3121
ARCHITECT/DESIGNER'S NAME Last I
First F��__ _ Lic. No.
Architect/Designer's Address
Architect/Designer's E-mail Address
I
City State
'
Zip Telephoned
ENGINEER'S NAME Last Bazley
First ITim Lic. No. P619
Engineer's Address
Engineer's E-mail Address
2500 Via Cabrillo Marina Unit 200
Jacquelyn.chung@sbcglobal.net
City San Pedro State. California
zip Telephone 949.631.3121
CONTRACTOR'S NAME/COMPANY Swift Slip Dock and Pier Builders Lic. No. 797052 Class
Contractor's Address
Contractor's E-mail Address
2027 Placentia AvenueJacquelyn.chung@sbcglobal.net
City Costa Mesa State ;Calii ornia
Zip ,9262 Telephone 949.631.3121
ENERGY P/C FEE $ FIRE P/C FEE $
PERMIT NO.
GRADING P& FEE $ . PLANNING P/C FEE $
PLAN CHECK NO. L��-ZC31�
ELEC/PLUM/MECH P/C FEE $
PLAN CHECK FEE $
DEVELOPMENT #
TOTAL FEES PAID $
CITY OF
NEWPORT BEACHUPPER I
A
NEWPORT "O ®J
riT� ll�� BRY s''
X
BRY
p�C1rIC 4C PIER
P
VICINITY MAP
WEST
JETTY
Easy
JETTY SOUNDINGS ARE EXPRESSED IN FEET AND DENOTE
ELEVATIONS BASED ON MEAN 'LOWER LOW WATER.
30"
I PROJECT LINE
HARBORRESOURCES DIV.
NEWPORTCITY OF
F ----INE— --
T -- —
I
I I
I N
I
—REP10VE .-,D REPLACE
I I _
I I
I
�\OaNS I \ I
�0��. east\C�� —EXISixrvC 72- SO. CONC- PILE P
60
e ;�r� i
R and I I EXJS VC-- ; ; a' crAiC_,/A ra =a
—EXisrrk� . EP ;O PEM4.W IN z
i
?I Iz
I°
I0.
c I j
�I Iz
k
I
RPPLICRNT'S NRME 4—flt3 NFMAP ADDRESS3—j—j �/l y DRTE 2.2-7• 1-e
l
�
w
w
r
z
w m4¢'�°
w„ N
uw
z s,» z
w
�,
0
U
;w
z
G
� z;e
a
�z�
Z
w
.z
T
!. 0
LL o >
J
J
z
=C3
U
o
oz
UtJ
F
a
O
'i,<
0
�
J
U
¢ N
>
Cit
'r
U
CL
-
UJ
O
;?�
0
ui U
O B
�^q
z ff r
ff
z
� .. K
C a U
z COd
_22
w ,
O
w
O 9
�
n
fet I
m O
n
m m
r
�
m
D
w
I
�
ma
m
La
S%1 Oxa
_
�i
8
()In
Z O
O ..
tP
IO
O
o,
N Nm
1,2
�l •as a
oA
n
a
C. •.
0 >.
C
i
O
r
r
O
0 `,s
y
Y.d
N
o
n
�
to
wx
i
o
y-
su
iTt
6/
Sel I er Buyer --Zxz�e &
Cate Application Received: 1'1�11�;Date Fee Received*
Request for Inspection made by:
Escrow Co. Date
Escrow Officer gsdrow
V
Address Phnne:
Date Inspection made:—/, Deficiency corrected:
DeticienCy Letter sent:
Transfer completed: Date
Inspection:
1. Location
2. Plumbing: 6"(-,'/
3. Electrical:
4. s rtru c tural:
5,OTHER:
REMARKS:
inspected bY,
?E,
Ar? �
JUNE 3, 1391
IWATER AND ELECTRICAL NEED TO EITHER BE BROUGHT UP TO CODE OR
REMOVED INTERIORLY, IF REMOVED T WATER PIPE AND ELECTRICAL
CONDUIT MUST BE OUT OFF FLUSH WITH THE BULKHEAD AND THE HOLE IN THE
BULKHEAD FILLED WITH AN EPDXY CAULKING,
/I
SEW Pp�T
CITY OF NEWPORT BEACH.
> r)
P.O. BOX 1768, NEWPORT BEACH, CA 92659-1768
June 3, 1991
Mariners Escrow
4 Corporate Plaza
Newport Beach, CA 92660
Re: Escrow 7417 JJ, Julia
Sirs
The City of Newport Beach Marine Department has received a remsest
to transfer pier permit 0152-333 for the property located at 333
East Bay Front, Newport Beach, CA. The facility was inspected on
6/3/91.
We cannot transfer the pier permit until the following
deficiency(ies) has/have been corrected and WE HAVE BEEN NOTIFIED
OF THE CORRECTION:
The water and electrical supply to the dock need to either be
brought up to code or removed entirely. If removed, the water pipe
and electrical conduit must be cut off flush with the bulkhead and
the hole in the bulkhead must be filled with an epoxy caulking.
The City Harbor Permit Policies state:
10.D. "At the time of transfer, all harbor structures
shall be inspected for compliance with the City's minimum
plumbing, electrical and structural requiremenmts, and
the conditions of the existing permit. All structural
deficiencies must be corrected prior to transfer of the
permit."
A permit for plumbing or electrical work must be obtained from the
Building Department of the City.
PLEASE ADVISE THIS DEPARTMENT WHEN THE ABOVE DEFICIENCIES HAVE BEEN
CORRECTED. When we have been notified, the structure will again be
inspected and when the requirements have been met the pier permit
will be transferred. Included in requirements for transfer of the
pier permit is the $275 transfer fee and the signed transfer card.
You can telephone 714-644-3044 to request a reinspection of the
structure. If you have questions, please call this number.
Tony Melum, Tidelands Administrator`
3300 Newport Boulevard, Newport Beach
September 20, 1974
E��+'�t �p 4Y C
-Helen Robertson
333 E. Bay Front
:Balboa Island, CA 92662
Dear Ms. Robertson:
r<y
. a d L a7% D ' 7
1
Cit' :