HomeMy WebLinkAbout06 - Irvine Ave and Dover Dr 24 in. Water Main-ContractCITY OF NEWPORT BEACH
CITY COUNCIL STAFF REPORT
Agenda Item No. 6
September 11, 2007
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
Andy Tran
949 -644 -3315 or atran @city.newport - beach.ca.us
SUBJECT: IRVINE AVENUE AND DOVER DRIVE 24" WATER MAIN - CONTRACT
NO. 3708 — APPROVAL OF AMENDMENT NO. 1 'TO ON -CALL
PROFESSIONAL SERVICES AGREEMENT WITH ARROYO
GEOTECHNICAL FOR SUPPLEMENTAL MATERIALS TESTING AND
GEOTECHNICAL SERVICES
RECOMMENDATION:
Approve Amendment No. 1 to On -Call Professional Services Agreement (PSA) with
Arroyo Geotechnical for supplemental materials testing and geotechnical services
specifically for the Irvine Avenue and Dover Drive 24" Water Main contract.
DISCUSSION:
The Irvine Avenue and Dover Drive 24" Water Main contract was awarded to Vadnais
Corporation on June 13, 2006. As part of the contract, $50,000 was established for
materials testing and geotechnical services. An On -Call Professional Services
Agreement with Arroyo Geotechnical was approved by the City Council at its June 27,
2006 meeting.
Currently, the contract is 75% complete. During construction, several unforeseen
utilities and excessive groundwater conditions were encountered causing delays. In
order to continue with the materials testing and geotechnical services for this project,
Arroyo Geotechnical is requesting an additional $31,980. In accordance with the On-
Call PSA with Arroyo. Geotechnical, costs in excess of $50,000 require City Council
approval. Staff is recommending the approval of Amendment No. 1 to the On -Call PSA
with Arroyo Geotechnical specifically for the completion of materials testing and
geotechnical services on the Irvine Avenue and Dover Drive 24" Water Main contract.
Irvine Avenue and Dover Drive 24" Water Main —Contract No. 3708— Approval of Amendment No. Ito On -Call Professional
Services Agreement with Arroyo Geotechnical for Supplemental Material Testing and Geotechnical Services
September 11, 2007
Page 2
Environmental Review:
City staff has reviewed the project and has determined that the project is exempt from
the California Environmental Quality Act (CEQA) pursuant to Section 15302 of the
CEQA Implementing Guidelines. This exemption covers the maintenance and
alteration of existing public facilities with negligible expansion of facilities in areas that
are not environmentally sensitive.
Funding Availability:
Sufficient funds are available in the following account for the project:
Account Description Account Number Amount
Water Transmission Main 7501- C5500386 $31,980
Improvements
Prepared by: Submitted by:
Andy Tran, P.E. , phelili G. Badum ph.
Senior Civil Engineer Pub' Works Director
Attachments: Amendment No. 1 to On -Call Professional Services Agreement
AMENDMENT NO.1
TO
ON -CALL PROFESSIONAL SERVICES AGREEMENT
WITH ARROYO GEOTECHNICAL
SPECIFICALLY FOR THE IRVINE AVENUE AND DOVER DRIVE 24" WATER MAIN
CONTRACT NO.3708
THIS AMENDMENT NO, 1 TO THE ON -CALL PROFESSIONAL SERVICES
AGREEMENT, entered into this day of 2007, by and
between the CITY OF NEWPORT BEACH, a municipal corporation, (hereinafter
referred to as "City") and ARROYO GEOTECHNICAL, a California Corporation whose
address is 1515 South Sunkist Street, Suite E, Anaheim, California, 92806
( "Consultant "), and is made with reference to the following:
RECITALS
A. On June 27, 2006, CITY and CONSULTANT entered into an On -Call
Professional Services Agreement, hereinafter referred to as "Agreement',
to provide on -call professional services for the various Capital
Improvement Program projects, hereinafter referred to as "Project ". This
Agreement is scheduled to expire on June 30, 2008.
B. City desires to enter into this Amendment No. 1 to reflect additional
services not included in the Agreement.
C. City desires to compensate Consultant for additional professional services
needed for the Irvine Avenue and Dover Drive 24" Water Main contract.
D. City and Consultant mutually desire to amend Agreement specifically for
the Irvine Avenue and Dover Drive 24" Water Main, Contract No. 3708,
hereinafter referred to as "Amendment No. 1 ", as provided here below.
NOW, THEREFORE, the parties hereto agree as follows:
1. Consultant shall be compensated for services performed pursuant to this
Amendment No. 1 according to "Exhibit A" dated August 29, 2007,
attached hereto.
2. Total additional compensation to Consultant for services performed
pursuant to this Amendment No. 1 for all work performed in accordance
with this Amendment, including all reimburseable items and subconsultant
fees, shall not exceed Thirty One Thousand Nine Hundred and Eighty
Dollars ($31,980.00).
3. Except as expressly modified herein, all other provisions, terms, and
covenants set forth in Agreement shall remain unchanged and shall be in
full force and effect.
IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 1 on
the date first above written.
APPROVED AS TO FORM:
4 � Cam_
jCd✓ City Attomey
for the City of Newport Beach
ATTEST:
M
LaVonne Harkless,
City Clerk
CITY OF NEWPORT BEACH,
A Municipal Corporation
Mayor
for the City of Newport Beach
CONSULTANT:
In
(Corporate Officer)
Title: President
Print Name: Ross Kahiabani
(Financial Officer)
Title:
Print Name:
Attachments: Exhibit A - Scope of Services
Exhibit B — Schedule of Billing Rates
f :\users\pbw\sharedlagreements \fy 07- 08\arroyo -iwine -dover 24 water main -amend 1.doc
AXIM ARROYO
%VI GEOTEtHNICAL
August 20,1006
City of Newport, Beach
3300 Newport Blvd.
Public Works Department
Newport geach, CA 9268-8015
1515 South Sunidst-Stre6t, Stille E
Anaheim, California.92,$06
714/04.3318 fax 7141634-3372
w V.arroyogeotechriicalxorn
Proposed Budget No. AB 06.05113
Attn'. Ur. Andy, Tran
Subject- Proposed Special Inspection -and Geotechnical Services
"ne Avenue and l)00T Drive WAter.Majo.linprovements Project,
NvwPloft Beach, CA
Supplonten. I Work Attihorii-ation
A=y.o GwWmicaL is pleased to present this supplemental propbsol to.: provide special . inspection
and .gdq oaJscmcQs during thc construction of ft lnme Avenue and Dover Drive Water Main
Improvement : Project. This proposal includes our: understaUdiftg4lhe pi0jed, our proposed sdbp6 of
work, pr000sed,kes, important asguniptions-and limitations, and.a summary:of testing fees:
The 24'? water main replacement is a pproximately 7.5 I in lengt} : Confiluouslosp ecdoo is
required for all. welding anal, dye p testing All olorins�p"ofts: are :thbe periodieunless;
speciflogUy . requested oth6twi I sb. V& will Supply one 'inspector on,. site perf6rming, one type of
inspection,only.'However, to help contain costs; our inspector cart t"t 1 disciplines; suWjOci:16-thi!�
city's approval. We understood that this . is a PUVAHJKG 3- GE. project.
Respecffidly submitted,
Arroyo Getitechnical
Joe Ritchey
Operations Manager
Attachments:
Breakdown of Btimated:Fee
Distribution: (1) Addressee
RosaKWabiqu, P.Fj G.E.
Pr%ident/CEO
Members of',
Engineering • Material Testing * Inspection AS =.r=
ARROYO
GEOTECHNICAL
Exhibit A
scope a work
Our huttrly rates retteet the antieipatetl. prevailing wage ritte.in effect a s of date' of this .
supplemenittl propusat. The special inspection and geotechnical portion of the project will
uvertttho, hotr>`s are not ittel fled, in this 'ra osal.:0ur Proposed Weekends, holidays;, anY�
ultimately depen approved construction schedule.
p p scQge of octal inspectoori and
geotecbuicalservioes arebased onthe:required cominuousinspection of all welding and dye
p'exietrarn [egg;
$00" W0990at "d Gautiechntt a1; dos
Fro�'d�ttdeacthl' itlspecton au8 gcptechnitral :tertrio�s inn an as- it�doci bossy iactndaii
veri)'y�al#.material,or mill certtlleat3oius.; Field.tests will" be performed m -suelt a wa�tliat
interssiked.patO0S map witness suoh tests in orderto deterat ne the adequacy of i iutalnrtfatcaials
for use en the PMje .
galls tecfbttieAatl diirlrig earEltvur}rt :grading and ntili#ies trsnolt fiackfill.:Our teeliitieiart witl
run, felE .Abn6ity'tests to document the quality otbaehfdl compaction to evaluate compliance
with the:ptoteei specifications.
I7ravide eid:nnd/nr.laboratotj tgatittgas required:by A I.d=dards; for the following
l��taz "mNa)$
i Steen 4drequred)
Prom,
ulspectpr'ttoordinatioty rest. aitiug, and admtnistsatix!e support servioes, including ::
Inspector dispat'A,scheduling and coordination
Reporting Of tttnpletecl lahozaltatp tests (i .e. tis-day results foz morW)
- Re¢?tirCtng (updats) ofotr going tests (ie. 7p and "offsehedule" bi+eaks)
Provide f /QC a id project>management (by our opera[ ions: manager) to assure compliance by
our personnel with istablisbed methods-and procedwcs,
• We will promptlysubiitit daily
field inspection reports indicating informatioit.pertinent to the
inspections perfometi and their compliance or non- compliance to the project documents and
applicable codes. These will be provided to the owner /dient'for review,
• Any inspectioir or fieldtesiing activity performed outside of "the'scope contained herein will
be approved.irt advance in writing by the City, and chargbitaceording:.to.our attached
schedule of fees for this specific:project.
Engineering Material Testing Impection
MA ARROYO
W GEOTECHNICAL
4 Safety shall be Provided b -
y contractor, : (ade0ate ventilatiou,shoring and air quality).
'Upon agreement with Client, wa will. establish a pa ss wor&protedtod, on -lima :rd porti ing site on
Arroyd's wduitt (WwwAlmyogeotechnical.com). This o"h6 p4ge will enable y
our pro*t
manager or its &!st9nf(tCd.personndlAo: log in and view the latest,looject infbrtnatidn, which
may include confacts,nnd. pbqno.,, A
j.status of each project task�
relmurph0tos, daRY rePorts, 10sting and ihtecti6aresdift. The information will be
accessible only to th& Client*S:staff and all.Arfoyo' sp team ueffib,
No additional fees will mg-eharged.for the above on4inwservim
$4edtd
Arroyo Geote6finiod is.prepd
am 1, o begin 'our W : t
0-jk ignnWigtely U_pon reW
i0it :of ydiif signed
Am . orpabou and Notice To #xumed. ;We woold hpprdciaft tit least 72 hmus advance notice -fbr
s0be4tifing Of AM Oemomel at die : commencernent of construction; wovk themiter may be
scheduled with 21 notice.
thgIn6eeing . MatedalTestirig • jfjspecflnn
M&ARROYO
GEOTECHNICAL
Exhibit B
Prepogod.Fco: THIS IS A PREVAILING WAGE RATE. PROJECT.
'Me Proposed fee for $ pecial Inspection. and Geotechnical Servibcs, it T!birty- One Thousand Nine
Ron and Eighty Dollars (SM,980;00)� The fee for gebtechnioal and Inspection scrvicos.tq,
complete the above.project, and the assumptions: we made alp priv! I dod in the-aftolied *orkshcot-
no actual foes will be charged, on a
W1Q1 fW (bat the structural steel porfion of job unit %koA
ppr04dOtbly 25 4#ys to, complete
hated, Woft *dder on site welding approximately two complete welds'per day.
SuppitnientO Work Autbodid.don
Plroposed. Budget- Inspection 84 Geotechnical Servim
Irvine Avenue disdDoverDAOW
Netwo" Bear e,
L IM, .$ t'W1
unit
ouaiv*'
Ride.
cost
Corifixinuals Inspection Field
Wd jt�Pq
jP A Mppqy-26 v' ghr hour days)
Hours
208
t65..00.
$13,5ROW60,
2.
Hours
40
$59.W
V2160M'00
I Gmteohniett) Services
twidg,afidpaving (Appo4,22 dkinfibyrdays)
Hours
176,
S75.00.
W,200_00
4..A*WxkiArafi*Q Services
ftervision, Dispatch,, Q/A & Q/C
Hours
Engineering Review
Hours
8
$460M,
$1;280600
TOTAL —
$31,986,60
The I rhde bEcharges is Teased on the 2006 Materials Inspecdon and MatpriWsvTesdug'Fee Schedule, prepared
specifically far irvine.Ave. and Dover Dr. Water Main Improvement, dated 5/22/06. The speciai rate for an AWC-
CWI:1ICB0-cerufiWi :spccial deputy. inspector fm this project is $597hour at, a daily four -hour minimum. Any hours
w.orke-din excess of the four-hour minimum or begins before noon and extends into afternoon wi I I - I be charged aftbe
eight--hourdai ' lyrate.. Same -day cancellations will be charged as.a two -hour minimunL Additional inspectors,
.overtime, and . materiat testing not stated above will be provided as repested With fees As pteswopd-lin the attached, fee
scheftle. Our. smMces.are dependent upon the contractor's wank k scbeduie. The above- proposonudgct is based on the
Special TestingScope,of Work. WdAndet to the construction schedule resulting:in additional hourftrips, or tests are
—subject to additional fees as rates shown in the above-budget.
Engineering - MijterialTesting • Inspection
Task
32*100
isolos
330110
33011$
330120
330125
A015b
3,36135
330140
Task
331200
331202
;T3121D.4
3,11106
34108
331219
33124
3-11222
1412:24
3,31226
3,31229
331
33:1232
M1234
33)IM
331230
331240
331242
3 . 3 . ti6i)
33VIO
3'31'8$0
klIft
Task
3)Uoo
331302
331306
331310
331,320
331322
331324
3313,36
131340
331S42,
Materials TcWn.g.J,-'1hsp"l,i0n
SCHEIbULE,0F FEES - Prevailing Wage
City of Newport lie2cll
011-(':111 Mak�rials'festing and Geotechnica'I'Vesting Services
Pirgfessianal Services
Engibeer
1evlcwof File.s for I FinaL-eter Of Affidavit (rdip-2 hours)
g"itU it , ReView for'Complibume w ith
P . roject Plans and Spedfications
Services
—terials (Flield)
'Paelminvater -Technician
Moisture 7 , )esting - Technician
Technician Laboratory
Caring and Sizing (Iff hotnt)
Coring Concrcie, Masonry or Asphal( in Field
Sa,Mng Concrete, Masonry at Asphalt ivi Field
Pull-out"fest on'Embodded dolts; Anchors; Dowels; and Splay'Wires
Pick-up and Delivery - Standard
T6chnician Travel Time (340rni; radius of Anallefin Ifib)
Price & I hour SIR10—cIALIL419
150
110
90
90
65
40
10 ca
100 ...
Price S I hour Swear Ikute
100
59-
90
501
83
-59.
75
(19
75
60
75
6�
75
Magnetic Particle Inspection
7!i
49
73
do
75
60
15
-A
75
0
75
�jl
Quote
75
610
Quote
75
40
.Quote
75
0
75
75
�54
15
Price $ ✓.hou —Samad 9m
75
59-
75
501
75
-59.
65
(19
65
60
Quote
6�
Quote
Magnetic Particle Inspection
15
fin
45
Radibgraphic Testing
45
Task
Noift-Destructive Testing (NDT)
Price S / hour
- qsta—lLak,
Sjj
331400
Ultrasonic Insp#tIon
75
65,
331402
0Yc Peric . Ir , a , nt Inspection
75
6�
331404
Magnetic Particle Inspection
75
fin
331410
Radibgraphic Testing
Quote
331412
Travel Charge
Quoterhour or nine
331414
Truck Charge
Quotc/day
M1416 Film
331420 �
Task
330500
330502
j30' 44
130506
330521
32 590
330550
336552
330558.
0909
Task
law
3m
JAW
um
A"
M9
33"30
13040
Method
ASTM C-39
ASTM C-495
.ASTM C-42
ASTM C-42
ASTM C467
ASTM Cm"4
ASTM C-856
ASTM C 1084
MothAd
AgN:0,180
AMU Giaq,
ASTM CAA19
ANU,Cn 140
AM C-140
AMU: t� W
ASTM "26
A47M U447
AgiU t*7
riff film
Quole
Prig e$,ea.
240
:30
125
3
35
35
Mote
'Quote
Price &M
2;0,
2b.
V
t8
Ins
L50
Usk
&tcdl Reinforcement
Method
pricelea. 4pcgi4l wi
,!!to
TeasiletI L WIEW 9
ASW AAA
US
W970%
TlZoHeltsf,WQ 7Ud,ciu
ASTK A-370
42
Sag
Bead ,st� W L kb. :
�eNo.
As$taA-370
f5o
330746
d � dow
ATh4 A-370
4A,
330"S
prokesdak Milt COft0katesloer sjic and Beat?..
Unit Wekht (Dtnsftv)
15
Usk
13052
ER
330760 ME
pdw
Im
S ftam
-!Wm
gi•
ama,
MIL
Task
Tm ess
Aulbod
I PrIce4ekh
334770
Pi -caress Wire (each cnble)
ASTM. A-416
US
Samolo Preunmflon
42
30B7_'74-
Prestress Ca61c.. 7 W.1ri (BrsAing:Strcav(hIMod4Jvs of 14'asliciitel
ASTM A416
f5o
Firetlroofin.1r
Method
Price S
Unit Wekht (Dtnsftv)
UBC Std: 1=6
moo.
331802
Cohesion/Adhesion
LJBC $-t6.7 -6
75/hr,
311230
SOOW lospectidu Fireprourin
UiL
Task
Moisture Teat
Metkad
priep $
DUO
MoiitureTests
AS74:E4907
50 eg.
n2gg
Moisture
Retest
ASTM E-1907
331306
Moisture Testing- Technician
7511ir.
(15
19
5')
Fee Sohsdulo - Personnel
jamory,
ARROYO GEOTECHMICAL
Fee Schedule - Laboratory
January 1, 2006
Special For City of fdewpod Beach
"Ideiffiirca60
ri, and.Irirla Pru9W S 41
In -Situ Moisture and Density (ASTM D2937) ._... .........
18.00
Grain Size Analysis (ASTM D422)
Sieve Only (3" to 9200) ........................ .........................65,00'
..... 70.00
Sieve and Hydrometer....._........ .... ........_ ............. _ ...
100.00
Percent Passing 920D Sieve (ASTM D1140) .............
45.00
Atterberg I.imils (ASTM D4318)
220.00
Will Point ...... ...................... _ ........ _ ........ _ ....... _.......
60.00
OnePoint_ ...... _ ...... _ ................... _. ........ _.I._._._..
66.00
Specific Gravity (ASTM D854) ... ......... ...._... ... I........
50,00
Sand Equivalent (ASTM D2419 ) ......... .......... 4 ...... _
65.00
''"= 'rGoinpaciio _Tafirlr_ ear)ngrSCfeng(i%:' � '"
Modified Proctor Compaction (ASTM D1557)
Method A or B (4" Mol d).......... ..................... .....
__...... 150.0D
Method A or B (5" Mold). ... .......... ....... ...._......._............175.00
Compaction. California 216 ......................... _ .... .____....150.00
..... 70.00
California Searing Ratio CBR (ASTM 01883)
3 paints .._.... ....- __ ............. _._....�.__ ».....__...._......460.00
,..... 100.00
R -Value ............. ............... _. ...... _ ...... ...............
220.00
Totvane/Pockel Penetrometer ........ ... _ ...................
... 15.00
Direct Shear - per point
Consolidated - Grained (ASTM 03080) _ ......... ..........
..... 70.00
Residual..._.. _... _.........._.... _.........._... ........_ ...... ......._..100.00
Unconfined Compression (ASTM 02166) ........... ...
,..... 100.00
Unconsolidated- Undmined(U,U)
12500
tr,l^f. Zjv`r
�Ginso: Udalidn/Goilapse- attd�we f��TesP§
Consolida0on (ASTM D2435)
8load Increments W /one time - rate .. .............._.... ..... 140.00
Additional load Increment ............................... .___._ 20.00
Additional Time rate per load increment ........... _._... 40.00
Single point (collapse test) ....... _ ......... ................ 40.00
Single load Swell (ASTM D4546)
Ring sample, field moisture ................. ............».__._.. 60.00
Ring eample, air dried ........ _ ......... ......._._............... 60.00
Remolded sample per specimen ............ _._.......... 40.00
Expansion Index (ASTM D4829/USC.29- 2) ......... ._ 100.00
Constant Head (ASTM D2434) ..... _ ...................... 226.00
Falling Head Flexible Wall (ASTM 05084).. ...... ....... 275.00
Tdaxlal Permeability (EPA 9100) ...... _..___._.. „... »...325.00
Conasivlly (pH, resistivity, sulfates, chlorldes).__... 150.00
Organic conlenl (ASTM D2974) .................... . .... ....... 60.00
Unit rates pmeenled are for routinely performed geotechnlcel and construction material laboratory tests. Dlhertesis can be performed In our
laboratory, Including mck core, sail cement, and soll Ilme tests. Additional tests Wit he quoted on request,
V1075 'rbTRTaie
s presented herein assume samples are uncontaminated and do not contain
heavyme ,ara s, carcinogens, orvolalileorganiccompounds that can be measured byan OVA or PIDWIliconcenlra0ansgreaterlhan
50 ppm. Arroyo will not accept conlaminaled samples. Uncontaminated samples mll be disposed of 30 days after presentation or test
results.