HomeMy WebLinkAbout11 - Rivo Alto Replacement - Finley Bulkhead Repair - 26th St. Tide Gate Structure - Bulkhead Improv - Via Lido Wall ReplacmentCITY OF NEWPORT BEACH
CITY COUNCIL STAFF REPORT
Agenda Item No. 11
September 11, 2007
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
Frank Tran
949 - 644 -3340 or ftran @city.newport- beach.ca.us
SUBJECT: RIVO ALTO COPING REPLACEMENT; FINLEY AVENUE AT 36TH
STREET BULKHEAD REPAIR; 26TH STREET TIDE GATE STRUCTURE
AND BULKHEAD IMPROVEMENTS; AND VIA LIDO WALL
REPLACEMENT - AWARD OF CONTRACT NO. 3657
RECOMMENDATIONS.
1. Approve the construction drawings and specifications.
2. Award Contract No. 3657 to John S. Meek Co., Inc. for the Total Bid Price of
$836,000.00, and authorize the Mayor and the City Clerk to execute the contract.
3. Establish an amount of $83,600 (10 %) to cover the cost of unforeseen work.
4. Approve transfer of $139,000 from Account No. 7231- C5100836, Ocean Pier
Repairs, to Account No. 7231- C5100887 for 26"' Street Tide Structure and
Bulkhead Improvements, and transfer of $281,000 from Account No. 7231-
05100836, Ocean Pier Repairs, to Account No. 7231- C5100738 for Via Lido Crib
Wall Replacement, geotechnical testing and project contingency.
DISCUSSION:
At 10:00 a.m. on August 24, 2007 the City Clerk opened and read the following bid for
this project:
BIDDER
Low John S. Meek Co., Inc.
TOTAL BID AMOUNT
$836,000.00*
* Corrected Bid Amount
The low bid amount is 39% above the Engineers Estimate of $600,000. This project
consists of specialty work for bulkhead repair and replacement. John S. Meek Co. (Meek)
is highly qualified to perform this type of work, possesses a Califomia State Contractors
License Classification "A" as required by the project specifications, and has satisfactorily
completed similar projects for the City including the recently completed Newport and
Balboa Piers repair projects.
Rivo Alto Coping Replacement; Finely Avenue at 36°i Street Bulkhead Repair; 2e Street Tide Gate Stricture and
Bulkhead Improvements; and Via lido Wall Replacement —Award of Contract No. 3657
September 11, 2007
Page: 2
There are four projects to be completed under this Contract:
1. Rivo Alto Coping Replacement: This project includes removing and
reconstructing a concrete coping and fence atop the bulkhead located at the east
end of the Rivo Alto channel.
2. Finley Avenue at 36th Street Bulkhead Repair: This project Consists of repairing
or reconstructing bulkheads at the Finley Avenue street end at 36th Street.
3. 26th Street Tide Gate Structure and Bulkhead Improvements: This project
includes removing and reconstructing a concrete bulkhead, coping, tie rods,
anchor blocks; and constructing an electrically operated tide gate drainage
structure.
4. Via Lido Wall Replacement: This design -build project consists of removing the
existing crib wall adjacent to Via Lido at the approach to the Lido Isle bridge,
designing and constructing a segmental retaining wall (SRW) or a mechanically
stabilized earth (MSE) wall at the Contractor's choice.
Pursuant to the Contract Specifications, the Contractor will have 175 consecutive
working days to complete the work.
Environmental Review:
This project is exempt from the California Environmental Quality Act (CEQA) pursuant
to Section 15301 of the CEQA Implementing Guidelines. This exemption covers the
maintenance and alteration of existing public facilities with negligible expansion of the
facilities in areas that are not environmentally sensitive.
Public Notice:
The Notice Inviting Bids was advertised in the City's official publication and in
construction industry publications. Prior to starting work two City prepared notices are
distributed by the contractor to both residents and businesses. The first notice will be
distributed ten days before work in the area and the second notice 48 hours prior to
starting work in the area.
Geotechnical and Material Testing:
In addition to the contract costs, $11,500 is budgeted for geotechnical consulting and
material testing services. These services will be performed by Harrington Geotechnical
Engineering under an On-Call Professional Services Agreement. An estimated $1,100
is budgeted for printing and other incidentals.
Funding Availability:
The FY07 /08 CIP budget includes $512,200 for these four projects. $420,000 in additional
funds is required to award this project. It is recommended that this amount be transferred
from the Ocean Pier Repairs project which has a budget of $500,000. Since FY 05/06
repairs were recently completed at the piers, the FY 07/08 Ocean Pier Repair project is not
urgent and is presently scheduled to be awarded in June 2008 with construction starting in
September 2008.
Rivo Alto Coping Replacement; Finely Avenue at 3e Street Bulkhead Repair; 2e Street Tide Gate Structure and
Bulkhead Improvements; and Via Lido Wall Replacement —Award of Contract No. 3657
September 11, 2007
Page: 3
It is further recommended that $139,000 be transferred to Account No. 7231- C5100887 for
26th Street Tide Structure and Bulkhead Improvements and $281,000 be transferred to
Account No. 7231- C5100738 for Via Lido Crib Wall Replacement, geotechnical consulting
and testing, and project Contingency.
There may be some opportunities to reduce project costs. Staff will work with Meek to
explore lower cost options for excavation and dewatering. As the Via Lido Wall
Replacement is a design /build task, staff will meet with Meek once the design is
completed to check that construction costs are reasonable. A lower cost will be
negotiated if warranted. Any cost savings at the end of this project will be returned to
the Ocean Pier Repairs project budget. Supplemental funds for the Ocean Pier Repair
project will be considered during the preparation of the FY 08/09 CIP budget.
Upon approval of the Budget Amendment, there will be sufficient funds available in the
following accounts for the project:
Account Description
Rivo Alto Coping Replacement
Finley Avenue at 36th St. Bulkhead
26"' St. Tide Structure and Bulkhead
Via Lido Wall Replacement
Via Lido Wall Replacement
Proposed uses are as follows:
Vendor
John S. Meek Co., Inc.
John S. Meek Co., Inc.
Harrington Geotechnicaf Engr
Various
Prepared by:
0
Frank Tran
Associate Civil Engineer
Account Number
7231- C5100837
7231- C2502000
7231- C5100887
7231- C5100738
Amount
$ 108,000.00
75,000.00
389,000.00
281,000.00
7013- C5100738 79,200.00
Total: $ 932,200.00
Purpose Amount
Construction Contract $ 836,000.00
Construction Contingency 83,600.00
Materials Testing 11,500.00
Printing and Incidentals 1,100.00
Total: $ 932,200.00
Attachments: Project Location Map
Bid Summary
Budget Amendment
Submitted by:
hen . Badum
Public Works Director
iliiii ..,
x
' pip yy
�
IN ♦ -�►
RM 'IN 11
Noll
��� �����, � i■�i ■iii
1
..G .
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
TITLE: Via Lido Wall Replacement and Other Bulkhead Improvements Project BID LOCATION: City Clerk's Office - City Hall
CONTRACT NO.: C-3657 DATE: 24 -Aug -07 TIME: 10:OOAM
ENGINEER'S ESTIMATE: $600,000.00 BY: Frank Tran CHECKED: DATE: 08/2412007
PROJECT MANAGER: Frank Tran
` Bid read as $837,000.00
F:lUsers\PBWZhared%Contracts%FY 07- 081Via Lido Wall Replacement & Other Bulkhead Improvements Project C- 3657SID SUM C•3657ads Page 1
JOHNS. MEEK CO. INC.
ITEM
I DESCRIPTION
QUANTITY
UNIT
AMOUNT
UNIT
AMOUNT
UNIT
AMOUNT
UNIT
AMOUN
1
Mobilization
1
LS
$60,000.00
$60,000.00
$75,000.00
$75,000.00
2
Rivo Alto Coping Replacement
1
LS
$65,000.00
$65,000.00
$64,000.00
$64,000.00
3
Finley Avenue at 36th Street Bulkhead 'Repair
1
LS
$60,000.00
$60,000.00
$58,000.00
$58,000.00
4
26th Street Tide .Gate Structure and Bulkhead Improvements
1
LS
$293,000.00
M3,000.00
$369,000.00
$369,000.00
5
Via Lido Wall Replacement
1
LS
$120,000.00
$120,000.00
$265,000.00
$265,000.00
6
Provide As -Built Plans
1
LS
$2,000.00
$2,000.00
$5,000.00
$5,000.00
EE
600 000.00
LOW
$836,000.00
2ND
3RD
` Bid read as $837,000.00
F:lUsers\PBWZhared%Contracts%FY 07- 081Via Lido Wall Replacement & Other Bulkhead Improvements Project C- 3657SID SUM C•3657ads Page 1
City of Newport Beach
BUDGET AMENDMENT
2007 -08
EFFECT ON BUDGETARY FUND BALANCE:
Increase Revenue Estimates
X Increase Expenditure Appropriations AND
Transfer Budget Appropriations fX
SOURCE:
from existing budget appropriations
from additional estimated revenues
from unappropriated fund balance
EXPLANATION:
NO. BA- 08BA -010
AMOUNT: $420,000.00
Increase in Budgetary Fund Balance
Decrease in Budgetary Fund Balance
No effect on Budgetary Fund Balance
This budget amendment is requested to provide for the following:
To transfer expenditure appropriations from the Ocean Pier Repair account for several projects including the Via Lido
Wall Replacement, various bulkhead repairs and improvements, etc.
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Account
REVENUE ESTIMATES (3601)
FundlDivision Account
Description
Description
Amount
Debit Credit
EXPENDITURE APPROPRIATIONS (3603)
Description
Division Number 7231 Tidelands - Capital
Account Number C5100836 Ocean Pier Repairs $420,000.00
Division Number 7231 Tidelands - Capital
Account Number C5100887 26th St. Tidal Structure/Bulkhead $139,000.00
Division Number 7231 Tidelands - Capital
Account Number C5100738 Via Lido Crib Wall Replacement $281,000.00
Division Number
Account Number
Division Number
Account Number
` Automatic System Entryy -```��
Signed: l
F ncial Approval: Administrativ Services Director Date
Signed:
Administrative Appro :City Manager e
Signed:
City Council Approval: City Clerk Date