Loading...
HomeMy WebLinkAboutSS3 - Siren SystemApp - ow qlm 1"j", mss% ;yl I T-128 Swen Sound coverage Map W City of Nawl Beach IlE im Lcp�tmrlt M �P MA WS, �b *Fire St a city d N �.f Blll ci& ll, cw ' A� A O.l M.--1 bt IM V. N�pli.l�,-.l.0nw T- 135jnu:'CUenl�um TS} A R--. tiuil A ml Nle� C'7lA� Q I Mill 2 *Fire St La P7WM iff-I T- 135jnu:'CUenl�um TS} La P7WM iff-I -�— � K. ,�,I?. Item Oty. Model Description Unit Extended Price Mechanical Siren Equipment I 3 T -128 Tempest -128 Rotating Siren 128 dB 48v DC UL Listed $ 6,248.65 $ 18,745.96 2 3 TEMPESTw AUDC AC +DC Motu Control 128 -UL Listed N2MA 4 $ 41129.87 12 389.62 3 3. RTU- 2001 'DC Door flit RTU, Universal Controller, Panel Mount DC. Tempest- MC's $ 1233.33 $ 3,700.00 4 3 PM -4 Pole Mount - TL m st 128 166.13 $ 498.40 5 12 BATT -1 BaIfa , 12V, Da o.Oroup.24.- CEM F4-M- F or Equ1V.) $ 119.08 $ 1,428.92 6 1 3 1 KIT- FSK- 32 -AC -E FSK Format Card, for DG Electronic Sirens 120:93 362.80 7 3 SENSORS - Current Current Sensor, Tem est- Series 73.53 $ 220.88 8 3 KIT -ARR -2 Li htnin Arraster, BA .Feed, VHF, PL -259 $ 93.23 $ 279.69 9 3 IP Interface Internet Base IP control interface 250.00 750.00 19 11 Command Center 12 1 CSG960-FSK Central Station Controller -960. FSK Format 4,013.27 4.013.27 13 1 KIT- 960-Elect Kit, . Central Station Controller -960, For Electronic Sirens $ 165.18 166.16 14 1 IP Interface Internet Base IP control interface 250.00 250.00 15 16 Recommended Optional Equipment 17 Command and Control Sofhvare i 8 1 GP- 3000 -0onlig DELL CompuLerlT" Management Software Pre loaded to Dell windows Based w.' 17" Flat Screen $ 5,348.87 19 Solar Panels 20 2 ,SOLAR -4 Solar Array (4) Panels and mounting bracketwith Regulators for TEMPEST $ 3,592.69 21 Landline Activation w,' CSC -960 22 4 LLIC -1 DTMF dial in modem card tu for lantlline (Mechanical 33933 23 10 LLIC -2 DTMF dial in modem card forlandline (Electronic) $ 339.40 24 1 LLCT -10 Landline. Card Tray -up to 10 (Price is with no cards) $ 75233 25 26 3 Freight FOB from W I to CA Is sirens) $ 450.50 $ 1,35150 27 28 1 Commissioning of Installed Sirens stem 3000.09 3000.00 0001k6'd $ 47.157.22 S Pro ctTotals -US Funds' �` $ 47:157:22 25% Lim with Order c $ IT'Am w Standard Terms and Conditions: All Equipment Accounts are 25% due at time of order. (Engineering, Mobilization 8 Acquisition), 65% due Net 30 days upon shipment of equipment It project is turn key installation contract and balance due Net 30 days if equipment only purchase. On Turn Key Contracts, 10 %retainage Net 10 days upon final startup and test of system. Freight Charges: FOB Factory, Milwaukee Wisconsin unless otherwise stated in contract requirements. Freight charges will be prepaid and invoiced. Title and risk of loss passes to buyer at FOB Paint Ouoted PrIms: Valid for 30 days from date of quotation. installation services: if installation services are provided in contract, all change orders will be authorized in writing before work Is performed outside of the scope of the contract. If during installation of a system we encounter rock that cannot be removed by standard drift and pier methods, all work will stop and the customer will be notified of the situation before work resumes. Special equipment required to penetrate the rock or other site conditions as well as relocation of the site.'pole will continue on a cost plus basis one authorized in writing by the customer. These are standard ASG Terms and Conditions and are not reflective of negotiated or proposed contract language under invitations to bid or final requests for proposals. All international orders require a full wire transfer of funds to our bank in Milwaukee, WI.