HomeMy WebLinkAboutSS3 - Siren SystemApp -
ow qlm 1"j",
mss%
;yl
I
T-128 Swen
Sound coverage Map
W City of Nawl Beach
IlE
im Lcp�tmrlt
M
�P
MA
WS, �b
*Fire St
a city d N �.f Blll ci& ll,
cw ' A�
A O.l M.--1 bt IM
V. N�pli.l�,-.l.0nw
T- 135jnu:'CUenl�um TS}
A R--.
tiuil
A ml Nle� C'7lA� Q
I Mill
2
*Fire St
La P7WM
iff-I
T- 135jnu:'CUenl�um TS}
La P7WM
iff-I
-�— � K. ,�,I?.
Item
Oty.
Model
Description
Unit
Extended Price
Mechanical Siren Equipment
I
3
T -128
Tempest -128 Rotating Siren 128 dB 48v DC UL Listed
$ 6,248.65
$ 18,745.96
2
3
TEMPESTw AUDC
AC +DC Motu Control 128 -UL Listed N2MA
4
$ 41129.87
12 389.62
3
3.
RTU- 2001 'DC Door
flit
RTU, Universal Controller, Panel Mount DC. Tempest-
MC's
$ 1233.33
$ 3,700.00
4
3
PM -4
Pole Mount - TL m st 128
166.13
$ 498.40
5
12
BATT -1
BaIfa , 12V, Da o.Oroup.24.- CEM F4-M- F or Equ1V.)
$ 119.08
$ 1,428.92
6 1
3 1
KIT- FSK- 32 -AC -E
FSK Format Card, for DG Electronic Sirens
120:93
362.80
7
3
SENSORS
- Current
Current Sensor, Tem est- Series
73.53
$ 220.88
8
3
KIT
-ARR -2
Li htnin Arraster, BA .Feed, VHF, PL -259
$ 93.23
$ 279.69
9
3
IP Interface
Internet Base IP control interface
250.00
750.00
19
11
Command Center
12
1
CSG960-FSK
Central Station Controller -960. FSK Format
4,013.27
4.013.27
13
1
KIT- 960-Elect
Kit, . Central Station Controller -960, For Electronic Sirens
$ 165.18
166.16
14
1
IP Interface
Internet Base IP control interface
250.00
250.00
15
16
Recommended Optional Equipment
17
Command and Control Sofhvare
i 8
1
GP- 3000 -0onlig DELL
CompuLerlT" Management Software Pre loaded to Dell
windows Based w.' 17" Flat Screen
$ 5,348.87
19
Solar Panels
20
2
,SOLAR -4
Solar Array (4) Panels and mounting bracketwith
Regulators for TEMPEST
$ 3,592.69
21
Landline Activation w,' CSC -960
22
4
LLIC -1
DTMF dial in modem card tu for lantlline (Mechanical
33933
23
10
LLIC -2
DTMF dial in modem card forlandline (Electronic)
$ 339.40
24
1
LLCT -10
Landline. Card Tray -up to 10 (Price is with no cards)
$ 75233
25
26
3
Freight FOB from W I to CA Is sirens)
$ 450.50
$ 1,35150
27
28
1
Commissioning of Installed Sirens stem
3000.09
3000.00
0001k6'd
$ 47.157.22
S
Pro ctTotals -US Funds'
�`
$ 47:157:22
25% Lim with Order c $ IT'Am w
Standard Terms and Conditions:
All Equipment Accounts are 25% due at time of order. (Engineering, Mobilization 8 Acquisition), 65% due Net 30 days upon shipment
of equipment It project is turn key installation contract and balance due Net 30 days if equipment only purchase. On Turn Key
Contracts, 10 %retainage Net 10 days upon final startup and test of system. Freight Charges: FOB Factory, Milwaukee Wisconsin
unless otherwise stated in contract requirements. Freight charges will be prepaid and invoiced. Title and risk of loss passes to buyer
at FOB Paint Ouoted PrIms: Valid for 30 days from date of quotation. installation services: if installation services are provided in
contract, all change orders will be authorized in writing before work Is performed outside of the scope of the contract. If during
installation of a system we encounter rock that cannot be removed by standard drift and pier methods, all work will stop and the
customer will be notified of the situation before work resumes. Special equipment required to penetrate the rock or other site
conditions as well as relocation of the site.'pole will continue on a cost plus basis one authorized in writing by the customer. These are
standard ASG Terms and Conditions and are not reflective of negotiated or proposed contract language under invitations to bid or final
requests for proposals. All international orders require a full wire transfer of funds to our bank in Milwaukee, WI.