HomeMy WebLinkAboutSS2 - Irvine Ranch Water DistrictAgenda Item No. SS2
July 25, 2006
W ares D-STRICT
Briefing for Newport Beach City Council
July 25, 2006
I7°°°�' l About Irvine Ranch Water District
WATERDISTRKT
R D
Service
Area
0
UNINCORPORATED
COUNTY
ORANGE
LAKE
FOREST
TUSTIN
SANTA IRVINE
ANA
COSTA
MESA LAGUNA
BEACH
unxcoxrort�no
caurm
NEWPORT
BEACH
• Core Services:
• Water
• Wastewater
• Urban Runoff Treatment
• Recycled Water
• Population Served: 324,500
including Newport Coast
and Santa Ana Heights
• Service Connections: 92,800
• Size of District: 179 square
miles
1 2
E DIC RANCH Projects In or Affecting Newport Beach
• Buck Gully Runoff Reduction Project
• Synthetic Turf Demonstration Sites
• Newport Coast Drive Force Main Project
• San Joaquin Reservoir
• Natural Treatment System Update
2 3
IRVINE IC RANCH Buck Gully Runoff Reduction Project
• IRWD conducted pre- retrofit
flow and water quality
monitoring at four locations
in the Buck Gully watershed
• Last spring, 56 weather -
based irrigation controllers
installed at six sites within
the Buck Gully watershed
• Installed devices control
irrigation for nearly 90% of
landscaped area in the Buck
Gully
3 4
IRVINE IC RANCH Buck Gully Runoff Reduction Project
• Flow monitoring equipment installed at:
• All six retrofit sites
• Fifth Street & Poppy
• Little Corona Beach
• Collecting weekly dry season flow data
and water quality samples
• City doing parallel runoff reduction work
in Buck Gully (Pelican Hill)
• IRWD and City staff coordination efforts
• Analysis of data in Fall 2006 / Winter
2007
• Final Report in Spring 2007
4 5
IRVINE RICT Synthetic Turf Demonstration Project
• Synthetic turf installed at
IRWD's Sand Canyon
office as demonstration
• IRWD also partnered with
cities to develop other
demonstration sites:
• Newport Beach
• Irvine
• Lake Forest
■ Tustin
5 6
EDICT Synthetic Turf Demonstration Project
• City of Newport Beach demonstration site
■ 1,320 square feet of synthetic turf at Bonita Canyon Sports Park
■ Articles in the O. C. Register, Irvine World News, IRWD's "Pipelines"
■ City's "Clean Water Newport" Website
■ IRWD's Website
IRYIHERANCH Newport Coast Drive Force Main Project
WATERWRKT
• Project to replace sewer main between Ridge
Park and Pelican Hill Road North
• Schedule for Project Completion:
• Install Shoring
• Tie into Lift Station
■ Construct Manhole (in Bike Lane)
■ Final Pave and Sidewalk Repairs
■ Complete Landscaping
July 28
August 7
August 18
August 21
August 28
7 8
IRVINE RANCH
WATERDIS ICT San Joaquin Reservoir
• Converted empty drinking
water reservoir to
recycled water reservoir
• Capacity: 1 billion gallons
• Retrofit construction
completed February 2005
• Work this coming winter
includes improving
access roads from Ford
Road and from Chambord
Road
8 9
W Natural Treatment System - San Joaquin Marsh
• IRWD's San Joaquin Marsh
improves water quality in
Upper Newport Bay
• Marsh system removes
from San Diego Creek Pci
approximately:
■ 75,000 pounds of nitrogen
per year
■ 10,000 pounds of
phosphorus per year
■ 3,000 pounds of trash per
year
• In addition, nearly 50,000
tons of sediment are
removed from San Diego
Creek
9 10
Slide 10
PCl Paul Cook, 07/25/2006
11
ED�KT) Natural Treatment System Update
Newport
m
0
Tustin A
e. 1O u
a Irvine a� �••
r �
!i A-10 jqk• Fyiresr
• 31 additional wetlands in San Diego
Creek Watershed
• Now constructed/ hydroseeded:
■ Quail Springs (Shady Canyon Dr. & 405)
■ Laguna Plain Wetland (Laguna Cyn. Rd. & 405)
■ Needlegrass Marsh (Quail Hill area)
■ Turtle Ridge North (Shady Cyn. Near Bonita Cyn.)
• Final design underway on additional
sites:
—El Modena Park, Orange
— Caltrans Yard, Irvine
— Cienega site, Irvine
— Woodbridge In -Line Basins
10 12
W UDM) Irvine Ranch Water District
Questions?
11 13