Loading...
HomeMy WebLinkAbout05 - Newport Coast Community CenterCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 5 July 11, 2006 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Lloyd Dalton, Project Engineer 949 - 644 -3328 or Idalton @city.newport- beach.ca.us SUBJECT: NEWPORT COAST COMMUNITY CENTER —AMENDMENT NO.2 TO PROFESSIONAL SERVICES AGREEMENT WITH PACIFIC SOILS ENGINEERING, INC. RECOMMENDATION: Approve Amendment No. 2 to Professional Services Agreement with Pacific Soils Engineering, Inc., and authorize the Mayor and City Clerk to execute the Amendment. DISCUSSION: On November 12, 2002, the City Council approved a Professional Services Agreement with Pacific Soils Engineering, Inc. (Pacific Soils) for $47,500 to provide geotechnical investigative services for the Newport Coast Community Center. Amendment No. 1 added $10,000 to the agreement on November 4, 2004. Preliminary geotechnical investigations were completed by Pacific Soils for a total cost of $35,958.38. These encumbrances have been closed and remaining contract amounts were returned to the fund balance. The City Council recently approved the construction contract and budget for the Newport Coast Community Center on April 25, 2006. Geotechnical services are required during precise grading and on -site construction phases of this construction. Pacific Soils has submitted a proposal to amend its scope of services and fee in an amount not to exceed $35,500 to provide precise grading and on -site construction geotechnical services. Since the increase is more than 25% of the original contract amount, City Council approval is required per Council Policy F -14. Staff concurs that the fee of $35,500 is appropriate for the needed additional tasks and recommends Council approval. Environmental Review: This project was found to be categorically exempt from the provisions of CEQA per Section 15332, Class 32, pertaining to urban infill development projects. A Notice of Exemption was filed with the County Clerk and posted on March 30, 2005 for 30 days. Newport Coast Community Center — Amendment No. 2 to Agreement with Pacific Soils Engineering, Inc. July 11, 2006 Page 2 Public Notice: Not applicable at this time. Funding Availability: There are sufficient funds available in the following account for the project: Account Description Account Number Amount Newport Coast Community Center 7298- C5100705 $35,500 Prepared by: Submitted by: ° fv Lloyd Iton Stephen G. Badum f Proj ,Jon Public Works Director Attachment: Amendment No. 2 to the Professional Services Agreement AMENDMENT NO.2 TO PROFESSIONAL SERVICES AGREEMENT WITH PACIFIC SOILS ENGINEERING, INC. FOR NEWPORT COAST COMMUNITY CENTER THIS AMENDMENT NO. 2 TO PROFESSIONAL SERVICES AGREEMENT, entered into this day of , 2006, by and between the CITY OF NEWPORT BEACH, a municipal corporation, (hereinafter referred to as "City ") and PACIFIC SOILS ENGINEERING, INC., a California corporation, whose address is 3002 Dow Avenue, Suite 514, Tustin, California 92780 (hereinafter referred to as "Consultant'), is made with reference to the following: RECITALS A. On November 12, 2002, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "Agreement ", for geotechnical services for the Newport Coast Community Center, hereinafter referred to as "Project'. B. On November 4, 2004, the City entered into Amendment No. 1 to reflect professional services not included in Agreement and to extend the term of Agreement to December 31, 2005. C. City now desires to retain and compensate Consultant for construction phase geotechnical services not contemplated in the original Professional Services Agreement and Amendment No. 1, and to extend the term of agreement to December 31, 2007. D. City and Consultant mutuall desire to amend Agreement, hereinafter referred to as Amendment No. 2, as provided below: NOW, THEREFORE, the parties hereto agree as follows: 1. Consultant shall be compensated for professional services performed pursuant to this Amendment No. 2 in accordance with "Exhibit A" dated May 31, 2006, and attached hereto. 2. Total additional compensation to Consultant for services performed pursuant to this Amendment No. 2 for all work performed in accordance with this Amendment No. 2, including all reimburseable items and subconsultant fees, shall not exceed Thirty Five Thousand and Five Hundred Dollars ($35,500). 3. The term of Agreement shall be extended to December 31, 2007. 4. Except as expressly modified herein, all other provisions, terms, and covenants set forth in Agreement shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 2 on the date first above written. APPROVED AS TO FORM: Jc-t-- c• lc.� Assis ant City Attorney for the City of Newport Beach ATTEST: LaVonne Harkless, City Clerk Attachment: Exhibit A CITY OF NEWPORT BEACH, A Municipal Corporation M Don Webb, Mayor for the City of Newport Beach Pacific Soils Engineering, Inc.. By: 0 (Financial Officer) Title: Print Name: f: \users \pbvAshared \agreements \fy 05-06 \pacific soils amendment 2.doc EXHIBIT A ®_ PACIFIC SOILS ENGINEERING, INC. 3002 DOW AVENUE, SUITE 510, TUSTIN. CALIFORNIA 92780 TELEPHONE: (714) 730 -2122. FAX: (714) 730-5191 CITY OF NEWPORT BEACH May 31, 2006 3300 Newport Blvd. Proposal No. 06 -5-019 P.O. Box 1768 Work Order 500601 -G Newport Beach, California 92658 -8915 Attention: Mr. Lloyd Dalton Subject: COST ESTIMATE FOR GEOTECHNICAL SERVICES During Precise Grading and On -Site Constructioj��(', Newport Coast Community Center City of Newport Beach, California � pepart�(e�t References: See Appendix Pub110 *011.6 s 01A geUCh GIN of Gentlemen: Pacific Soils Engineering, Inc. (PSE) is pleased to present this cost estimate to provide geotechnical consulting services in support of development of the subject site. The scope of this proposal is based on a review of the referenced reports; discussions with representatives of the City of Newport Beach; presumed schedules and phasing; and this firm's experience with similar projects. The following is a description of tasks that are considered a part of the scope of work to be conducted by PSE during site development. ITEM -1: Precise Grading The geotechnical consulting and testing services to be provided during precise grading of the subject site will consist of the following: full -time observation and testing during precise grading operations; laboratory testing of representative soil samples; preparation and submittal of one (I) precise grading report documenting PSE's observations and laboratory test results collected during precise grading as well as presenting final geotechnical design parameters and recommendations. PSE's engineer will attend weekly project meetings prior to construction and during grading as requested. Based on an assumed time of 15 working days to complete precise grading, the total estimated cost is $22,500.00 for the above scope of work. CORPORATE HEADQUARTERS LOS ANGELES COUNTY RIVERSIDE COUNTY TEL (714) 220.0770 TEL: (310) 325 -7272 w (323) 775 -8771 TEL: (951) 582 -0170 FAX: (714) 220.9589 FAX: (714) 220-9589 FAX: (951)582 -0178 SAN DIEGO COUNTY TEL (858) 580 -1713 FAX: (858) 580 -0380 Proposal No. 06 -5 -019 May 31, 2006 ITEM -2: On -Site Construction Page 2 The geotechnical observation and testing services to be provided during on -site construction operations will encompass the following: building and retaining wall footing excavations; building slab presaturation verification; utility lateral trench backfill (storm drain, sewer, water, joint utility area drains); curb and gutter and parking area subgrade compaction; base material compaction; asphalt laydown operations; and exterior flatwork subgrade compaction and presaturation. Observation and testing services during on -site construction will be on a part-time basis. These services will be provided on an as- needed, on -call basis as requested by the project superintendent. A final soils report documenting the on -site construction activities will be prepared. It is assumed that only one (1) final soil engineering report encompassing the entire project will be necessary. Laboratory testing and associated office support will be provided during on -site construction. Based on an assumed time of 80 hours of part-time soils technician time during on -site construction, the total estimated cost is $13,000.00 for the above scope of work. This proposal assumes that the project is characterized as "Public Works" by the State Department of Industrial Relations and, therefore, would fall under the current interpretation of the California prevailing wage law. Therefore, the project is subject to a higher pay rate for soils technicians to comply with State law and, therefore, a higher billing rate. The hourly rates for soils technicians used in preparation of this cost estimate have incorporated the higher billing rate associated with "Public Works" projects and prevailing wage law. During site development and on -site construction operations, eight -hour days and five -day workweeks have been incorporated into this cost estimate. Should the contractor elect to work in excess of eight hours a day or should they work Saturdays, Sundays or Holidays, an overtime factor 1-' /a times the hourly rate will be applied. ITEM -1: Precise Grading ITEM -2: On -Site Construction SUMMARY GRAND TOTAL PACIFIC BOILS ENGINEERING, INC. $ 22,500.00 S 13,000.00 $ 35,500.00 Proposal No. 06 -5 -019 May 31, 2006 Page 3 The above costs are based upon assumed times to complete the various tasks. It is also assumed that meetings with your staff and/or consultants will be required. However, due to the unknown nature of the number or frequency of meetings, additional conference time will be billed in accordance with the attached FEE SCHEDULE. Fees will be billed on a time and materials basis, utilizing the attached FEE SCHEDULE, but will not exceed the estimated amount unless the scope of the project changes or without your prior authorization. Pacific Soils Engineering, Inc. appreciates the opportunity to present this proposal. Should you have any questions, please contact the undersigned at our Tustin Office. Respectfully submitted, PACIFIC SOILS ENJIINEERING, INC. 'eo' V STEVEN L. SUP Civil Engineering Associate Reviewed by: 72a RONALD A. REED T Manager of Geotechnical Services Distribution:(I) Addressee SURARA- 06S -0 t9, May 3l, 2006, (Newport Coast Community Center City of Newport Beech) Attachment: Fee Schedule AUTHORIZED BY: Title Date PACIFIC SOILS ENGINEERING, INC. =N 9 T Proposal No. 06 -5 -019 May 31, 2006 APPENDIX References Page 4 Department of the Army, U.S. Army Corps of Engineers, Engineer Manual No. 1110 -1 -1904, dated September 30, 1990. John A. Sayers and Associates, 1993, Rough Grading Geotechnical Report, Newport Ridge, Lots "M ", "Q ", and 8 Portions of Lot 10 and Newport Ridge Drive East from Station 46+60 to 65 +00, and Including Crib Wall Number 2 and Gas Mitigation Trench Construction, Tract 14509, Orange County, California, For Coastal Community Builders, W.O. 340 -2 -69, dated September 10, 1993. NMG Geotechnical, Inc., 1995, Geotechnical Report of Observation and Testing of Precise Grading for a Portion of Newport Ridge Community Park, Including Entry Plaza, Tennis Courts, Basketball Courts, Play Fields and Park Areas, Newport Coast, County of Orange, California, Project. Number 94075 -1, dated May 19, 1995. Pacific Soils Engineering, Inc., 2003a, Geotechnical Investigation, Proposed Newport Coast Community Center, Northwest Comer of Newport Coast Drive and San Joaquin Hills Road, City of Newport Beach,. California, W.O.500601, dated March 7, 2003. Pacific Soils Engineering, Inc., 2003b, Geotechnical Investigation, Proposed Newport Coast Community Center, Northwest Comer of Newport Coast Drive and San Joaquin Hills Road, City of Newport Beach, California, W.O.500601, dated March 7, 2003, Revised March 24, 2003. Pacific Soils Engineering, Inc., 2004, Supplemental Geotechnical Investigation and Grading Plan Review, Proposed Newport Coast Community Center, Northwest Corner of Newport Coast Drive and San Joaquin Hills Road, City of Newport Beach, California, W .O. 500601 A, dated December 22, 2004. Pacific Soils Engineering, Inc., 2005a, Response to the City of Newport Beach Geotechnical Report Review Checklist Dated July 26, 2005, Newport Coast Community Center, City of Newport Beach, California, W.O. 50060 1 -A, dated November 17, 2005. Pacific Soils Engineering, Inc., 2005b, Response to the City of Newport Beach Review of Geotechnical Response, Dated November 29, 2005, Newport Coast Community Center, City of Newport Beach, California, W.O. 500601 -A, dated January 27, 2006. PACIFIC SOILS ENGINEERING, INC. ❑PACIFIC SOILS ENGINEERING, INC. 0 3002 DOW AVENUE. SUITE 514, TUSTIN. CALIFORNIA 92780 TELEPHONE: (714) 730 -2122, FAX: (714) 730 -5191 FEE SCHEDULE FOR SERVICES RENDERED (EFFECTIVE MAY 29, 2005) THE FOLLOWING CHARGES WILL APPLY IN ADDITION TO THE ABOVE: (a) Equipment Rental (b) Blueprints/Reproduction/Reports (c) Per Diem and Travel Expenses on Out -of -Town Jobs (d) Field Vehicles ($7.00 per hour) (e) Nuclear Gauge Equipment (when used) — ($6.00 per hour) includes 5 -layer laboratory maximum density ** per contract agreement fee schedule�5 -05) CORPORATE HEADQUA TERS LOS ANGELES COUNTY RIVERSIDE COUNTY SAN DIEGO COUNTY TEL (714122G-0770 TEL: (310( 325 -7272 or (323( 775 -6771 TEL: (951) 582 -0170 TEL (858) 560 -1713 FAX: (7141220-9689 FAX: (714)220 -8689 FAX ". (9511582 -0176 FAX*. (858) 560-0390 Principals (consultations) $ I60.00/hr. Project Engineers and Geologists $ 140.00/hr. Civil Engineers & Engineering Geologists (registered) $ I I5.00/hr. Civil Engineering & Engineering Geology Associates $ 88.00/hr. Civil Engineering & Engineering Geology Assistants $ 78.00/hr. Senior Soils Technicians $ 72.00/hr. Senior Soils Technicians (Prevailing Wage Project) $ 84.00/hr. Soils Technicians $ 64.00/hr. Soils Technicians (Prevailing Wage Project) $ 78.00/hr. Laboratory Technicians $ 64.00/hr. Associate Soils Technicians $ 60.00/hr. Technical Illustrator $ 60.00/hr. CAD Illustrator $ 78.00/hr. Expert Witness (Research) $ 200.00/hr. Expert Witness (Testimony) $ 300:00/hr. LABORATORY I) Lab. Max. Density $ 128.00 13) Atterberg Limits $ 128.00 2) Direct Shear $ 128.00 Atterberg Limits with 3) Swell Test $ 32.00 Shrinkage Limits $ 192.00 4) Hydrometer $ 48.00 14) Permeability Quote 5) Sieve $ 64.00 15) "R" -Value $ 416.00 6) Full Gradation $ 128.00 16) Moisture & Density $ 16.00 7) Sand Equivalent $ 64.00 Moisture Only $ 16.00 8) Consolidation $ 128.00 Density Only (rock or 9) Unconfined Compression chunk samples) $ 64.00 (Soil) $ 64.00 17) Concrete Testing ** (Rock) $ 128.00 18) Ring Pressed for 10) Triaxial Shear — Time Only Moisture & Density $ 16.00 11) C.B.R. $ 288.00* 19) A.S.C.E. Swell Index $ 96.00 12) Specific Gravity $ 64.00 20) Durability Index $ 192.00 THE FOLLOWING CHARGES WILL APPLY IN ADDITION TO THE ABOVE: (a) Equipment Rental (b) Blueprints/Reproduction/Reports (c) Per Diem and Travel Expenses on Out -of -Town Jobs (d) Field Vehicles ($7.00 per hour) (e) Nuclear Gauge Equipment (when used) — ($6.00 per hour) includes 5 -layer laboratory maximum density ** per contract agreement fee schedule�5 -05) CORPORATE HEADQUA TERS LOS ANGELES COUNTY RIVERSIDE COUNTY SAN DIEGO COUNTY TEL (714122G-0770 TEL: (310( 325 -7272 or (323( 775 -6771 TEL: (951) 582 -0170 TEL (858) 560 -1713 FAX: (7141220-9689 FAX: (714)220 -8689 FAX ". (9511582 -0176 FAX*. (858) 560-0390