HomeMy WebLinkAbout3.0 - Review of Preliminary Capital Improvement Program - PA2007-131 CITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT June 4, 2009 Agenda Item No. 3 SUBJECT: Review of Preliminary Capital Improvement Program (PA2007-131) PLANNER: Melinda Whelan, Assistant Planner (949) 644-3221, mwhelan cbcitV.newport-beach.ca.us PROJECT SUMMARY The annual review of the Preliminary Fiscal Year 2009-2010 Capital Improvement Program to determine consistency with the General Plan and Coastal Land Use Plan, and to make recommendations to the City Council concerning the proposed public works projects. RECOMMENDATION Conduct a review of the Preliminary Fiscal Year 2009-2010 Capital Improvement Program (CIP), make recommendations as necessary, and report to the City Council that the projects of the CIP are consistent with the policies of the General Plan and Coastal Land Use Plan. DISCUSSION Introduction The CIP serves as a plan for the provision of public improvements, special projects, on- going maintenance programs, and the implementation of the City's master plans. The Engineering Services Division of the Public Works Department is responsible for the CIP projects, including the planning, design, construction, and inspection. Pursuant to Section 707 (c) of the City Charter, the Planning Commission is required to make recommendations to the City Council concerning proposed Public Works' projects. In addition, Section 65401 of the California Government Code states that the Planning Commission shall review proposed Public Works' projects for consistency with the General Plan and Coastal Land Use Plan and report the results of this review to the City Council. AnalVsis The Preliminary Fiscal Year 2009-2010 CIP lists a total of 72 projects, a majority of which involve the repair and maintenance of existing public improvements and facilities. Review of Preliminary Capital Improvement Program June 4, 2009 Page 2 These projects are consistent with General Plan policies that require the proper maintenance of existing facilities and improvements. Projects that involve new construction, the expansion or removal and replacement of existing facilities, or renovations and improvements to existing facilities are analyzed below in terms of their consistency with the General Plan and the Coastal Land Use Plan. The projects listed in rows that are shaded represent new projects for the Fiscal Year 2009-2010 CIP. A copy of the CIP worksheet for each of the projects listed below is attached to this report as Exhibit 1. A copy of the entire Preliminary Fiscal Year 2009-2010 CIP may be found online at: http://www.city.newport-beach.ca.us/Accounting/Budget/2010/Budget CIP 09- 10 web.pdf CIP Pg.# Project Title Planning Document Comments Policies HB 7.2 and NR16.3 and CLUP Policy 3.2.2-5 call for support and implementation of cooperative management of the Upper Newport Bay Ecological Reserve and County and State Beaches and Parks by cooperating with Orange County, California Department of Fish and Land Use Element Game, U.S. Fish and Wildlife Service, local Harbor and Bay Element universities and colleges, nonprofits, and 1 Back Bay Science,Center Administrative Wing Natural Resources volunteer organizations to improve resource Element management, implement resource- Coastal Land Use Plan enhancement projects, and expand opportunities for passive public access, recreation,and education. Policy HB 7,5 calls for promotion of facilities in and around Upper Newport Bay to adequately serve as water quality and estuarine education and research programs (same as NR 16.6). Policy LU 6.1.1 and 6.1.2 call for the 2 City Hall and Park Design Land Use Element provision and development of government Recreation Element administrative facilities to serve the needs of the residents. Policy LU 6.1.1 calls for adequate facilities Land Use Element to serve the needs of the residents. 5 Oasis Senior Center Rebuild Recreation Element Policy R 1.9 calls for the provision of a senior center that meets the needs of the senior population. Policy LU 2.1 calls for residential serving land uses that support the needs of 6 Santa Ana Heights Equestrian Facilities Land Use Element residents, including recreational activity that is in balance with community natural resources,and open spaces. Review of Preliminary Capital Improvement Program June 4, 2009 Page 3 CIP Pg.# Project Title Planning Document Comments The medians are currently watered manually. The project includes a new irrigation system connected to the City's 7 Avocado Avenue Medians Renovation Natural Resources automated system. This is consistent with Element Policy NR 1.1, which calls for the use of water­efricient landscaping and irrigation. Water-efficient shrubs and groundcover should be used. Policy S 4.2 supports and encourages the seismic retrofitting and strengthening of essential facilities such as hospitals and schools to minimize damage in the event of 11 Bridge Seismic Retrofit Construction Safety Element seismic or geologic hazards. Circulation Element Policy CE 2.2.1 calls for providing safe roadway conditions by adhering to nationally recognized improvement standards and uniform construction and maintenance practices. Irvine Avenue Realignment—University to Design is consistent with Policy CE 2.1.4, 19 Bristol Circulation Element which calls for this improvement of the intersection. Design is consistent with Policy CE 2.1.4, 20 Jamboree Road Bridge Widening Circulation Element which calls for this improvement to the intersection and bridge. Design and widening of Jamboree Road at the intersection of MacArthur Blvd. is 21 Jamboree Road Improvements Circulation Element consistent with Policy CE 2.1.4 for roadway Bristol/Fairchild improvements to this major road in order to provide efficient movement of goods and people within the City. The medians are currently watered manually. The project includes an irrigation system connected to the City's automated 31 Westcliff Drive Medians Renovation Natural Resources system. This is consistent with Policy NR Element 1.1, which calls for the use of water— efficient landscaping and irrigation. Water- efficient shrubs and groundcover should be used. This project is consistent with the following Bayside Waterfront Walkway to Balboa Island Harbor and Bay Element policies calling for expanding public access 33 Bridge Coastal Land Use Plan to and along the shoreline: HB 1.2, HB 6.1; and CLUP Policies 3.1.1-1,3.1.1-2, 3.1.1-9, and 3.1.1-26. Neighborhood Traffic Management Pursuant to Policy CE 2.2.5, traffic calming 34 Improvements Circulation Element improvements will need to balance safety, quality of life,and efficiency. This project is consistent with the following policies calling for the expansion and 35 River Avenue Pedestrian Coastal Access Harbor and Bay Element enhancement of public access to the Improvements Coastal Land Use Plan shoreline: HB 1.2, HB 6.1; and CLUP Policies 3.1.1-1, 3.1.1-2, 3.1.1-9, and 3.1.1- 26. Review of Preliminary Capital Improvement Program June 4, 2009 Page 4 F36Trafffic itle Planning Document Comments Policy CE 2.3.4 calls for monitoring of traffic conditions, considering additional nal Modernization:Phases 4 and 7 Circulation Element improvements in areas with operations issues, such as intersections with heavy turn volumes. CLUP Policy 2.8.6-3 and Policy HB 13.6 call for a comprehensive beach replenishment program to assist in Coastal Land Use Plan maintaining beach width and elevations. 42 Coastal Sand Replenishment Cooperative Harbor and Bay Element Project(County) Natural Resources CLUP Policy 4.2.4-2 and Policy NR 15.1 Element call for monitoring dredging projects within the region to identify opportunities to reduce disposal costs and utilize dredge spoils for beach nourishment. CLUP Policies 4.2.5-2 and 4.2.5-4 and Coastal Land Use Plan Policy NR 11.5 allow eelgrass restoration 44 Eelgrass Mitigation Bank Natural Resources sites to serve as mitigation sites for Element eelgrass removal resulting from dock and channel dredging projects. Coastal Land Use Plan CLUP Policy 3.3.2-7 and Policies HB 6.3, 46 Mooring Layout Design Harbor and Bay Element HB 6.4, and Policy R 8.3 encourage the Recreation Element provision and expansion of moorings. CLUP Policy 3.3.2-7 calls for expanding 48 Public Docks Access Improvements Coastal Land Use Plan and enhancing facilities for dinghy docks, where feasible. Policy HB 6.4 calls for the enhancement of 49 Rhine Channel Wharf Repair and Public Dock Harbor and Bay Element guest and public facilities for transient boaters. Policy R 1.9 calls for developing Sunset 50 Sunset Ridge Park Recreation Element Ridge Park as an active park with playfelds, picnic areas, a playground, and other facilities. CLUP Policy 4.1.3-3 and Policy NR 10.8 call for the preparation of natural habitat protection regulations for Buck Gully for the Coastal Land Use Plan purpose of providing standards to ensure Buck Gully Canyon Stabilization and Flood both the protection of the natural habitats in 51 Control Natural Resources these areas and of private property rights. Element Include standards for the placement of structures, native vegetation/fuel modification buffers, and erosion and sedimentation control structures. Policy NR 2.1 calls for the increase of recycled water in the City by continuing to provide financial incentives,staff assistance and training opportunities for customers, Natural Resource and expand recycled water infrastructure 52 Irrigation—Citywide Central Computer System Element and programs,when feasible. Coastal Land Use Plan CLUP Policy 4.3.2-24 calls for the use of weather- and moisture-based irrigation controls to reduce runoff, direct and encourage water conservation. Review of Preliminary Capital Improvement Program June 4, 2009 Page 5 CIP Pg.# Project Title Planning Document Comments Policy NR 1.1 calls for water conservation measures that limit water usage, prohibit activities that waste water or cause runoff, and require the use of water-efficient Natural Resource landscaping and irrigation in conjunction 53 Irrigation—Smart Controller Program Element with new construction projects. Coastal Land Use Plan CLUP Policy 4.3.2-24 calls for the use of weather- and moisture-based irrigation controls to reduce runoff, direct and encourage water conservation. CLUP Policy 4.3.2-3 and Policies HB 8.6 Coastal Land Use Plan and NR 3.6 call for participation in 54 Newport Coast Runoff Reduction Program Harbor and Bay Element watershed-based runoff reduction efforts Natural Resources with the Regional Board Water Quality Element Control Board, the County of Orange, and upstream cities. Both the General Plan and the Coastal Land Use Plan call for the preparation of a Harbor and Bay Element Harbor Area Management Plan (HAMP) 55 Upper Bay Comprehensive Resource Natural Resources that will provide a comprehensive approach Management Plan Element to the management of the resources of Coastal Land Use Plan Newport Bay, including the Upper Bay. Found in Policy HB 10.3, Policy NR 11.1, and CLUP Policy 4.2.5-7. - - Policy NR 2.1 calls for the increase of recycled water in the.City by continuing to provide financial incentives,staff assistance and training opportunities for customers, Eastbluff Park Reclaimed Water Irrigation Natural Resources and expand recycled water infrastructure 58 Project Element and programs,when feasible. Coastal Land Use Plan CLUP Policy 4.3.2-24 calls for the use of weather- and moisture-based irrigation controls to reduce runoff, direct and encourage water conservation. Policy NR 19. Allowsexisting wells to be used; if needed,for water injection systems -._ - -- that increase oil extraction. -- Natural Resources 70 Oil Field Improvement Program Element CLUP Policy 2.6-6 calls for encouragement Coastal Land Use Plan of coastal-dependent industrial facilities to locate or expand within existing sites and permit reasonable long-term growth where consistent with the Coastal Land Use Plan. CONCLUSION The Preliminary Fiscal Year 2009-2010 CIP is consistent with the General Plan and the Coastal Land Use Plan. Environmental Review None required. Review of Preliminary Capital Improvement Program June 4, 2009 Page 6 Public Notice None required. Prepared by: Submitted by: Melinda Whelan David Lepo Assistant Planner Planning Direct6r EXHIBIT: 1 . Fiscal Year 2009-2010 Capital Improvement Program Worksheets Exhibit No. 1 i Back Bay Science Center Administrative Wing Requesting Department: Public Works Category: Facilities Back Bay Science Center is a multi-agency facility consisting of three buildings totaling approximately 12,000 s.f. and is located on Shellmaker Island in the State of California's Upper Newport Bay Ecological Reserve. Following construction of the Back Bay Science Center, the City entered into an agreement to accept funds from the California Department of Fish and Game (DFG) to complete tenant improvements to the administrative wing of the center. Improvements include constructing five office spaces, installing a wall divider to create a conference room, purchasing a conference table and chairs for the Administration Building and purchasing tables and chairs for the Teaching Lab. Location: 600 Shellmaker Road Funding: Back Bay Science Center (California Department of Fish and Game) Schedule FY 2009-10 Complete Design WA Design/Environmental $0 Award Contract WA Right-of-Way, Land Acquisition $0 Complete Construction TBD Construction $0 Other $147,904 Total $147,904 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Back Bay Science Center 7457 C1002020 $147,904 $0 $0 $0 $0 $0 TOTAL $147,904 $0 PROJECT TOTAL $147,904 1 City Hall and Park Design Requesting Department: Public Works Category: Facilities This project includes the development of conceptual and ultimate design documents for the proposed new City Hall facility and adjacent park on Avocado Avenue next to the Central Library. The work effort also includes the preparation and processing of necessary environmental documents to support the design effort. Location: 1000 Block Avocado Avenue Funding: Major Facilities Master Plan Schedule FY 2009-10 Complete Design Winter2009/10 Design/Environmental $6,000,000 Award Contract Winter 2010/11 Right-of-Way, Land Acquisition $0 Complete Construction Fall 2012 Construction $0 Other $0 Total $6,000,000 FUNDING SOURCE DIVISION NO. PROJECT N0. REBUDGET$ BUDGET$ Ma'or Facilities Master Plan 7410 C1002009 $1,000,000 $5,000,000 $0 $0. $0 $0 TOTAL $1,000,000 $5,000,000 PROJECT TOTAL $6,000,000 2 a ' Oasis Senior Center Rebuild Requesting Department: Public Works Category: Facilities Construction of a new Oasis Senior Center facility at its current site began in Spring 2009 and is expected to be completed by Fall 2010. This project provides for incidental construction related expenses and the building's furniture, fixtures and equipment and gym and computer lab equipment. Location: 800 Marguerite Avenue Funding: Major Facilities Master Plan Schedule FY 2009-10 Complete Design Winter 2008/09 Design/Environmental $0 Award Contract Winter 2008/09 Right-of-Way, Land Acquisition $0 Complete Construction Fall 2010 Construction $0 Other $1,700,000 Total $1,700,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Major Facilities Master Plan 7453 C1002007 $1,700,000 $0 $0 $0 $0 $0 TOTAL $1,700,000 $0 PROJECT TOTAL $1,700,000 5 Santa Ana Heights Equestrian Facilities Requesting Department: City Manager Category: Facilities This project provides for the design of equestrian facilities in Santa Ana Heights, including up to three horse arena/rings and related infrastructure (footings, water quality protective measures, landscaping, seating area, and more). The project will be constructed on land owned by the Orange County Flood Control District (OCFCD). The completed project will be managed by the Back Bay Equestrians, a local non-profit equestrian group, with City oversight. Location: East of the Santa Ana/Delhi Flood Control Channel between Mesa Drive and Upper Newport Bay in Santa Ana Heights Funding: Santa Ana Heights Schedule FY 2009-10 Complete Design TBD Design/Environmental $0 Award Contract TBD Right-of-Way, land Acquisition $0 Complete Construction TBD Construction $0 Other $18,730 Total $18,730 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Santa Ana Heights 7459 C5100866 $18,730 $0 $0 $0- $0 $0 TOTAL $18,730 $0 PROJECT TOTAL $18,730 6 19th Street and Bay Avenue Tidal Structure and Valve Requesting Department: General Services Category: Streets and Drainage This project provides for the installation of a new 24-inch valve, stainless steel interior ladder and access door, and relocation of the control cabinet to be closer to the valve. The current valve is opened and closed an average of twenty days per month, is constantly submerged in salt water and is instrumental in keeping the area between Balboa Boulevard and Bay Avenue on Balboa Peninsula dry during high tide episodes. Location: 19th Street and Bay Avenue Funding: Tide and Submerged Lands Schedule FY 2009-10 Complete Design Spring 2010 Design/Environmental $0 Award Contract Spring 2010 Right-of-Way, Land Acquisition $0 Complete Construction W inter 2010/11 Construction $100,000 Other $0 Total $100,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Tide and Submerged Lands 7012 C2502006 $0 $100,000 $0 $0 $0 $0 TOTAL $0 $100,000 PROJECT TOTAL $100,000 Bridge Seismic Retrofit Construction Requesting Department: Public Works Category: Streets and Drainage This project will retrofit three City-owned bridges that are deemed "subject to collapse" according to Caltrans' analytical procedures. The City has completed a seismic study of the bridges and has been notified by Caltrans to proceed with the project. Plans and specifications have been prepared by a consultant. Construction will be performed by a private contractor. This project maybe eligible for increased programmed funds from FHWA and State Proposition 1 B funding which could offset the amount of Gas Tax funding needed. Location: Jamboree Road over San Diego Creek (east and west) and Goldenrod Avenue pedestrian bridge over Bayside Drive Funding: Gas Tax and Contributions (FHWA) Schedule FY 2009-10 Complete Design Spring 2008 Design/Environmental $0 Award Contract Summer 2009 Right-of-Way, Land Acquisition $0 Complete Construction Summer 2010 Construction $1,584,500 Other $0 Total $1,584,500 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Gas Tax 7181 C5100695 $312,400 $0 Contributions 7251 C5100695 $1,272,100 $0 $0 $0 TOTAL $1,584,500 $0 PROJECTTOTALI $1,584,500 11 Irvine Avenue Realignment - University Drive to Bristol Street Requesting Department: Public Works Category: Streets and Drainage This project provides the City's portion of the funding for the realignment of Irvine Avenue. Plans and specifications were administered by the County of Orange and construction is being performed by a private contractor under County administration. Location: Irvine Avenue - University Drive to Bristol Street South Funding: Transportation and Circulation and CIOSA Schedule FY 2009-10 Complete Design Summer 2007 Design/Environmental $0 Award Contract Summer 2007 Right-of-Way, Land Acquisition $0 Complete Construction Summer 2009 Construction $1,804,142 Other $0 Total $1,804,142 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Transportation and Circulation 7261 C5100470 $329,142 $0 CIOSA 7432 05100470 $1,475,000 $0 $0 $0 TOTAL $1,804,142 $0 PROJECT TOTAL $1,804,142 19 LP Jamboree Road Bridge Widening Requesting Department: Public Works Category: Streets and Drainage This portion of the project will provide funding to obtain the right-of-way for the improvements to widen the roadway on Jamboree Road over State Route 73. This estimated $5.5 million construction project is presently underfunded. Design and permitting are underway. Location: Jamboree Road - MacArthur Boulevard to Bayview Avenue Funding: Transportation and Circulation and Measure M Competitive Schedule FY 2009-10 Complete Design Winter 2008/09 Design/Environmental $0 Award Contract Spring 2010 Right-of-Way, Land Acquisition $391,240 Complete Construction Spring 2011 Construction $951,400 Other $0 Total $1,342,640 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Transportation and Circulation 7261C5100784 $276,240 $0 Measure M Competitive 7284 C5100784 $115,000 $951,400 $0 $0 TOTAL $391,240 $951,400 PROJECT TOTAL $1,342,640 20 6- i Jamboree Road Improvements Bristol / Fairchild Requesting Department: Public Works Category: Streets and Drainage This project includes the widening of Jamboree Road at the intersection of MacArthur Boulevard, between Bristol North and Fairchild Road, as called for in the General Plan. The project provides for an additional northbound lane on Jamboree Road through the MacArthur Boulevard intersection and an additional southbound left turn lane from Jamboree Road onto MacArthur Boulevard. Location: Jamboree Road -from Bristol Street North to Fairchild Road Funding: Transportation and Circulation and Measure M Competitive (IIP) Schedule FY 2009-10 Complete Design Fall 2009 Design/Environmental $237,640 Award Contract Spring 2010 Right-of-Way, Land Acquisition $661,600 Complete Construction Winter 2010/11 Construction $0 Other $0 Total $899,240 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Transportation and Circulation 7261 C2002019 $232,800 $0 Measure M Competitive 7284 C2002019 $4,840 $661,600 $0 $0 TOTAL $237,640 $661,600 PROJECT TOTAL $899,240 21 Westcliff Drive Medians Renovation Requesting Department: General Services Category: Streets and Drainage This project will renovate approximately 6,900 square feet of deteriorated curb in the planter area of the Westcliff Drive medians, between Irvine Avenue and Dover Drive. Currently, the medians are watered manually with a water truck multiple times a week. This generates runoff onto City streets, is an inefficient irrigation of plants, and negatively affects the health of the plants. The project includes replacement of damaged curb, construction of an irrigation system connected to the City's automated system, and installation of new shrubs and groundcover. The trees currently in place would be retained. Location: Westcliff Drive - Irvine Avenue to Dover Drive Funding: General Fund i Schedule FY 2009-10 Complete Design Spring 2009 Design/Environmental $0 Award Contract Summer 2009 Right-of-Way, Land Acquisition $0 Complete Construction Fall 2009 Construction $82,000 Other $0 Total $82,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ General Fund 7013 C2002014 $0 $82,000 $0 $0- $0 $0 TOTAL $0 $82,000 PROJECT TOTAL $82,000 31 oc` i Bayside Waterfront Walkway to Balboa Island Bridge i Requesting Department: Public Works Category: Traffic This project provides for the design of an accessible pedestrian connection between the Bayside Drive Waterfront walkway and Marine Avenue at Balboa Island Bridge. The walkway will be built in conjunction with a private waterfront construction project at 919 Bayside Drive. Location: Bayside Drive and Marine Avenue Funding: Tide and Submerged Lands Schedule FY 2009-10 Complete Design TBD Design/Environmental $0 Award Contract TBD Right-of-Way, Land Acquisition $0 Complete Construction TBD Construction $0 Other $40,000 Total $40,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Tide and Submerged Lands 7231 C5100894 $40,000 $0 $0 $0- $0 $0 TOTAL $40,000 $0 PROJECT TOTAL $40,000 33 1 Neighborhood Traffic. Management Improvements Requesting Department: Public Works Category: Traffic This project provides for construction of various traffic control channelization improvements, such as raised islands, road bumps, pavement markings, restriping, and other minor improvements to enhance traffic safety and manage neighborhood traffic according to Council Policy criteria. Projects will be identified by staff through neighborhood traffic studies. Plans and specifications will be prepared by a consultant and/or Public Works staff. Work will be performed by a private contractor and City crews. Location: Citywide Funding: General Fund and Transportation and Circulation Schedule FY 2009-10 Complete Design Spring 2009 Design/Environmental $0 Award Contract Spring 2009 Right-of-Way, Land Acquisition $0 Complete Construction Fall 2009 Construction $178,000 Other $0 Total $178,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ General Fund 7013 C3001004 $150,000 $0 Transportation and Circulation 7261 C3001004 $28,000 $0 $0 $0 TOTAL $178,000 $0 PROJECT TOTAL $178,000 34 i ! River Avenue Pedestrian Coastal Access Improvements i Requesting Department: Public Works Category: Traffic This project provides for improvements for pedestrian circulation and coastal access. Pursuant to an agreement with the Coastal Commission, the City is required to construct coastal access improvements with funds generated through the permit revenues from property owners of oceanfront encroachments. The focus of this project is to construct a 6-ft wide sidewalk and plant parkway street trees within the City's 10-ft parkway on the south side of River Avenue from Balboa Boulevard to 49th Street. Construction work will be performed by a private contractor. Location: River Avenue - Balboa Boulevard to 49th Street Funding: General Fund Schedule FY 2009-10 Complete Design Spring 2009 Design/Environmental $0 Award Contract Summer 2009 Right-of-Way, Land Acquisition $0 Complete Construction Fall 2009 Construction $1,086,900 Other $0 Total $1,086,900 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ General Fund 7028 C3002004 $1,086,900 $0 $0 $0 $0 $0 TOTAL $1,086,900 $0 PROJECTTOTALI 7$1,086,900 35 Traffic Signal Modernization: Phases 4 and 7 Requesting Department: Public Works Category: Traffic Traffic Signal Modernization is a multi-year, multi-phased program to update the City's traffic signal system to allow the implemention of real time adjustments for the efficiency of traffic flow during peak hours, special events, construction activities, and emergencies. Phases 4 and 7 of this program provides for the modernization of traffic signal equipment in the areas of Balboa Peninsula, Superior Avenue and Irvine Avenue. This work also includes installation of new CCTV cameras at select locations and extensive fiber communications and rewiring of traffic equipment cabinets. Design will be completed by a consultant. Location: Balboa Peninsula, Superior Avenue and Irvine Avenue Funding: Transportation and Circulation and Measure M Turnback Schedule FY 2009-10 Complete Design Winter2009/10 Design/Environmental $230,000 Award Contract Spring 2010 Right-of-Way, Land Acquisition $0 Complete Construction Winter 2010/11 Construction $900,000 Other $0 Total $1,130,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Transportation and Circulation 7261 C3002006 $0 $630,000 Measure M Turnback 7281 C3002006 $o $500,000 $0 $0 TOTAL $0 $1,130,000 PROJECT TOTAL $1,130,000 36 R� Coastal Sand Replenishment Cooperative Project (County) Requesting Department: City Manager Category: Parks, Harbors and Beaches The County of Orange expects to have beach quality sand available from its dredging projects at the Newport Harbor Patrol facility and Talbert Marsh. This project provides funding to spread, grade and blend the available sand with existing beach material to replenish beaches at China Cove and Balboa Island. Location: n/a Funding: Tide and Submerged Lands Schedule FY 2009-10 Complete Design NIA Design/Environmental $0 Award Contract N/A Right-of-Way, Land Acquisition $0 Complete Construction N/A Construction $0 Other $30,000 Total $30,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Tide and Submerged Lands 7231 C4802001 $30,000 $0 $0 $0 $0 $0 TOTAL $30,000 $0 PROJECT TOTAL $30,000 42 N Eelgrass Mitigation Bank Requesting Department: City Manager Category: Parks, Harbors and Beaches This project will fund the maintenance of eelgrass (Zostera marina) mitigation banks in the Upper and Lower Newport Bays. Planting mitigation banks is necessary to provide cost effective and safe navigation (via dredging) in and around piers, docks and marinas. This project will assist the City's efforts to develop a Harbor Area Management Plan (RAMP) to protect and enhance beneficial uses of Newport Bay. Costs will be recovered when State agencies grant permission to sell mitigation credits to harbor permittees. This project will also provide for the annual monitoring of existing eelgrass resources. Location: Entire Lower Bay and a portion of Upper Bay (De Anza and Castaways) Funding: Tide and Submerged Lands Schedule FY 2009-10 Complete Design TBD Design/Environmental $0 Award Contract TBD Right-of-Way, Land Acquisition $0 Complete Construction TBD Construction $0 Other $129,000 Total $129,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Tide and Submerged Lands 7231 C2370522 $129,000 $0 $0 $0 $0 $0 TOTAL $129,000 $0 PROJECT TOTAL $129,000 44 Mooring Layout Design Requesting Department: City Manager Category: Parks, Harbors and Beaches The Army Corps of Engineers, City, and County of Orange collectively delineated mooring areas in Newport Bay over 60 years ago. Since then, the moorings have ventured outside of the original perimeter boundaries and have caused problems with safe navigation and dredging of federal navigation channels. A new layout needs to be designed that places all existing moorings within approved boundaries and provides for the construction of ten new moorings. The proposed plan will have a public outreach element to ease problems anticipated with implementation. Location: Mooring areas in Lower Newport Bay Funding: Tide and Submerged Lands Schedule FY 2009-10 Complete Design N/A Design/Environmental $0 Award Contract NIA Right-of-Way, Land Acquisition $0 Complete Construction N/A Construction $0 Other $98,400 Total $98,400 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Tide and Submerged Lands 7231 C2371772 $98,400 $0 $0 $0- $0 $0 TOTAL $98,400 $0 PROJECT TOTAL $98,400 46 Public Docks Access Improvements Requesting Department: City Manager Category: Parks, Harbors and Beaches This project proposes to reconfigure the public docks at Fernando Street, 15th Street and 19th Street to allow increased dinghy tie-ups. Providing dinghy berthing at these heavily used docks has been a priority for the Harbor Commission during the past several years. Location: Public docks at Fernando Street, 15th Street and 19th Street Funding: Tide and Submerged Lands Schedule FY 2009-10 Complete Design Winter 2008/09 Design/Environmental $0 Award Contract Summer 2009 Right-of-Way, Land Acquisition $0 Complete Construction Fall 2009 Construction $176,825 Other $0 Total $176,825 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Tide and Submerged Lands 7231 C4402000 $176,825 $0 $0 $0 $0 $0 TOTAL $176,825 $0 PROJECT TOTAL $176,825 48 s Rhine Channel Wharf Repair and Public Dock Requesting Department: Public Works Category: Parks, Harbors and Beaches This project provides for repairs to the Rhine Channel Wharf and construction of anew 100' x 8'dock for transient boater use at Rhine Wharf. The wharf has deteriorated and its strength has been compromised. Providing a transient boater dock in this area is a high priority for the Harbor Commission. A private contractor will be retained to complete the repairs and new construction. Location: Rhine Channel adjacent to Lido Park Drive Funding: Tide and Submerged Lands and Contributions(919 Bayside development) j Schedule FY 2009-10 Complete Design Summer 2009 Design/Environmental $0 Award Contract Fall 2009 Right-of-Way, Land Acquisition $0 Complete Construction Spring 2010 Construction $568,900 Other $0 Total $568,900 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Tide and Submerged Lands 7231 C5100921 $328,900 $0 Contributions 7251 C5100865 $240,000 $0 $0 $0 TOTAL $568,900 $0 PROJECT TOTAL $568,900 49 Sunset Ridge Park Requesting Department: Public Works Category: Parks, Harbors and Beaches This project will provide a new park in West Newport with active and passive uses. The City purchased property from Caltrans in 2006, prepared a preliminary Park Concept Plan in Spring 2008, and authorized the completion of plans and specifications to construct the park along with associated environmental documentation and Coastal Commission permitting in December 2008. Construction of the park, entry road and traffic signal at Coast Highway will begin this fiscal year. Location: West Coast Highway and Superior Avenue Funding: Major Facilities Master Plan Schedule FY 2009-10 Complete Design Winter2009/10 Design/Environmental $200,000 Award Contract Winter 2009/10 Right-of-Way, Land Acquisition $0 Complete Construction Spring 2011 Construction $9,800,000 Other $0 Total $10,000,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDOET$ Major Facilities Master Plan 7412 C5100515 $0 $10,000,000 $0 $0 $0 $0 TOTAL $0 $10,000,000 PROJECT TOTAL $10,000,000 50 i Buck Gully Canyon Stabilization and Flood Control i Requesting Department: Public Works Category: Water Quality and Environmental The primary goal of this project is to reduce erosion which currently threatens bank stability and habitat along the gully. The project is also aimed to enhance wetland and riparian habitat to reduce the load of sediments and associated contaminants being transported through Buck Gully into adjacent environmentally sensitive areas. Grant funding is being sought to construct this project. Location: Buck Gully Funding: General Fund Schedule FY 2009-10 Complete Design Summer 2009 Design/Environmental $40,000 Award Contract Summer 2009 Right-of-Way, Land Acquisition $0 Complete Construction Summer 2010 Construction $1,100,000 Other $0 Total $1,140,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ General Fund 7014 C5002002 $1,140,000 $0 $0 $0 $0 $0 TOTAL $1,140,000 $0 PROJECTTOTALI $1,140,000 51 Irrigation - Citywide Central Computer System Requesting Department: General Services Category: Water Quality and Environmental This project provides for the installation of an irrigation computer system and necessary equipment at a selection of City park satellite locations. Various elements of the system were installed in previous phases at other locations. The long-term goal is to have all parks linked to a central computerized irrigation system to better monitor and conserve water. Location: Citywide Funding: Water Enterprise Fund Schedule FY 2009-10 Complete Design WA Design/Environmental $0 Award Contract N/A Right-of-Way, Land Acquisition $0 j Complete Construction NIA Construction $0 Other $90,000 Total $90,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Water Enterprise 7503 C5500637 $0 $90,000 $0 $0- $0 $0 i TOTAL $0 $90,000 PROJECT TOTAL $90,000 52 CY CK Irrigation - Smart Controller Program Requesting Department: Public Works Category: Water Quality and Environmental j This project provides funding for property owners to install new weather based irrigation controllers. These controllers meter out the proper amount of water to plants based on a set of parameters including weather conditions, sunlight, soil type, plant type, property slope and the precipitation rate of the valve. Other work could include creating incentives for residents to upgrade leaking and inefficient irrigation systems. Location: Citywide Funding: General Fund and Contributions (Cal-Fed Grant) Schedule FY 2009-10 Complete Design N/A Design/Environmental $0 Award Contract N/A Right-of-Way, Land Acquisition $p Complete Construction N/A Construction $0 Other $200,000 Total $200,000 FUNDING SOURCE DIVISION N0. PROJECT NO. REBUDGET$ BUDGET$ General Fund 7014 C5100969 $100,000 $0 Contributions 7255 C5100969 $100,000 $0 $0 $0 TOTAL $200,000 $0 PROJECTTOTALI $200,000 53 Newport Coast Runoff Reduction Program Requesting Department: Public Works Category: Water Quality and Environmental The project was established to fulfill anticipated grant match commitments to reduce runoff in Newport Coast. Grant funding is being sought. Urban runoff is a significant problem along Newport Coast and has led to areas of the Newport Coast being classified as a Critical Coastal Area (CCA). Location: Newport Coast Funding: General Fund Schedule FY 2009-10 Complete Design N/A Design/Environmental $0 Award Contract N/A Right-of-Way, Land Acquisition $0 Complete Construction WA Construction $0 Other $114,820 Total $114,820 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ General Fund 7014 C5002003 $114,820 $0 $0 $0 $0 $0 TOTAL $114,820 $0 PROJECT TOTAL $114,820 54 Ri Upper Bay Comprehensive Resource Management Plan Requesting Department: City Manager Category: Water Quality and Environmental This project begins the development of a Comprehensive Resource Management Plan (CRMP) to look at Newport Bay and its adjacent lands and properties without limitation to jurisdictional boundaries. The CRIMP would address management of Newport Bay facilities, habitat restoration and species protection, educational and interpretative opportunities, public access, sediment management, TMDL activities, scientific studies, and water quality protection. The CRIMP would combine existing and outdated management plans into a single document to address common issues. Funding is also programmed for a study in concert with Newport Bay Naturalists and Friends. Location: Newport Bay Funding: General Fund Schedule FY 2009-10 Complete Design N/A Design/Environmental $0 Award Contract N/A Right-of-Way, Land Acquisition $0 Complete Construction N/A Construction $0 Other $96,000 Total $96,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ General Fund 7014 C5002017 $96,000 $0 $0 $0 $0 $0 TOTAL $96,000 $0 PROJECT TOTAL $96,000 55 J3 Eastbluff Park Reclaimed Water Irrigation Project Requesting Department: Public Works Category: Water This project provides for the replacement of the irrigation system at Eastbluff Park to allow for the use of reclaimed water. The project also calls for connection to Orange County Water District's (OCWD) Green Acres Reclaimed Water System. The project plans and specifications were prepared and finalized in 1999. Minor modifications will be needed to get this project ready to bid. Construction will be performed by a private contractor. Location: Eastbluff Park and Bonita Creek Park Funding: Water Enterprise Fund Schedule FY 2009-10 Complete Design Summer 2009 Design/Environmental $0 Award Contract Summer 2009 Right-of-Way, Land Acquisition $0 Complete Construction Spring 2010 Construction $500,000 Other $0 Total $500,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Water Enterprise 7501 C6002006 $0 $500,000 $0 $0 $0 $0 TOTAL $0 $500,000 PROJECT TOTAL $500,000 59 Oil Field Improvement Program Requesting Department: Utilities Category: Miscellaneous This project provides for modifications and improvements to the City's existing oil wells, oil pumping equipment, tank farm production, storage facilities, water injection wells and oil, water, and gas transmission lines associated with the City's tidelands oil field. The program will focus on the continued waterflooding of the existing oil layers in an effort to maximize production and increase revenues from this operation. Plans for reuse of the gas generated from the oil field will also be reviewed and developed. Plans and specifications will be prepared by private consultants and staff. Any construction or work will be performed by a private contractor. Location: West Newport Oil Field Funding: Tide and Submerged Lands Schedule FY 2009-10 Complete Design TBD Design/Environmental $0 Award Contract TBD Right-of-Way, land Acquisition $0 Complete Construction TBD Construction $430,000 Other $0 Total $430,000 FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET$ BUDGET$ Tide and Submerged Lands 7231 C5400053 $430,000 $0 $0 $0 $0 $0 TOTAL $430,000 $0 PROJECT TOTAL $430,000 70