HomeMy WebLinkAbout12 - Buck Gully Wetlands & Maintenance Road Repairs at 5th StreetCITY OF NEWPORT BEACH
CITY COUNCIL STAFF REPORT
Agenda Item No. 12
October 24, 2006
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
Robert Stein, P.E.
949 - 644 -3322 or rstein @city.newport- beach.ca.us
SUBJECT: BUCK GULLY WETLANDS AND MAINTENANCE ROAD REPAIRS AT
5T" STREET — REJECT BIDS FOR CONTRACT NO. 3778
RECOMMENDATION:
Reject the sole bid.
DISCUSSION:
At 2:00 p.m. on October. 12, 2006 the City Clerk opened and read the following bids for
this project:
BIDDER
Low G.C.I. Construction, Inc.
BIDDER
Low G.C.I. Construction, Inc.
BIDDER
Low G.C.I. Construction, Inc.
BASE BID AMOUNT
'$359,350.59
Corrected Bid Amount is $359,305.50
ADDITIVE BID AMOUNT
$ 20,000.00
TOTAL BID AMOUNT
$379,305.50
The corrected low total bid amount is 287% above the Engineer's Estimate of $122,000.
The disparity between the estimate and the actual bid price reflects the specialized work
involved, limited number of contractors able to bid, and concerns about how construction
might be impacted by the rainy season. The low bidder, G.C.I Construction, Inc.,
possesses a California State Contractors License Classification "A° as required by the
project specifications. The Contractor has satisfactorily completed similar projects for
the City of Newport Beach.
Project Description:
A maintenance access road leads into Buck Gully near the intersection of 5t' Avenue
and Poppy Avenue. At the canyon bottom, there is a roadway crossing a creek that is
severely degraded and the crossing must be used cautiously. Immediately upstream
and downstream of the roadway crossing, the streambed has experienced significant
Buck Gully Wetlands and Maintenance Road Repairs ale Street— Reject Bids for Contract No. 3778
October 24, 2006
Page: 2
erosion due to the overall erosion of Buck Gully that has occurred over the past 15
years.
The proposed design includes installation of gabion drop structures to stabilize the
creek bed and to create wetland areas. The design calls out for roadway headwalls,
roadway cap and storm drain culverts to be replaced or refurbished. The project
requires permits from the Army Corps of Engineers, Regional Water Quality Control
Board and California Department of Fish and Game. These permit applications have
been submitted, however, agency permits and approvals have not yet been received.
The' project falls outside the jurisdiction of the California Coastal Commission. The area
does fall within the Natural Communities Conservation Planning (NCCP). area and the
NCCP administrator, the Nature Reserve of Orange County, has been notified about
this proposed project.
The project is broken down into two phases as described below:
• Phase 1 includes repair of the existing concrete "Arizona" roadway creek
crossing, repair of the culverts running under the crossing, stabilization of the
creek bed with gabion drop structures, and creation of wetland areas upstream
and downstream of the crossing.
• Phase 2 includes installation of a temporary irrigation system, planting of native
California wetland and upland plant species, including trees, shrubs, cuttings;
hydroseeding and providing and all other landscaping and revegetation tasks as
required to complete the project.
The roadway and wetlands construction tasks pose some difficulties as much of the work
Will occur in the creek bed necessitating surface water control and dewatering. Water
quality protection measures will need to be implemented during the duration of the project
In addition to difficulties that could be triggered by the approaching rainy season,
construction prohibitions exist from April 1 to September 30 to accommodate the
nesting season for certain endangered bird species. Therefore, October 151 would have
been the best time to begin this construction to try.to avoid these impacts. Per the
Contract Specifications the Contractor would have 75 consecutive working days to
complete the work.
Funding from the Buck Gully Restoration grant provides $85,000 for this project: $17,000
has already been spent on engineering design services. It is likely that the grant funds
will be lost as the project will now not be built before the grant deadline of March 31,
2007.
Staff will recommend that construction funding be included in next fiscal year's CIP.
The project would be rebid in July 2007 so that construction could begin on October 15r.
Staff expects that more contractors will bid on the project if the construction is less likely
to be impacted by the rain season, and that the cost for the project will be significantly
below the GCI bid.
Buck Gully Wetlands and Maintenance Road Repairs at 5" Street — Reject Bids for Contract No. 3778
.October 24, 2006
Page: 3
Funding Availability:
The following funds are currently available for the project:
Account Descriation Account Number Amount
. General Fund 7014- C5100659 $48,160
Environmental Contributions 7255- C5100659 $68,000
Total: $116,160
Clearly there are insufficient funds available to fund the project as bid.
Prepared by:
ti�
Robert ein
Principal Civil Engineer
Attachments: Project Location Map
Bid Summary
Submitted by:
I-AN
PROJECT AFEAS
,i
N.T.S.
^OF ovED
C -3778
DATE,
BUCK GULLEY WETLANDS AND
MAINTENANCE ROAD REPAIRS AT 5 T" ST. DaAw,wa gyro. EXHIBIT A
TITLE: Buck Gulley Water Quality Wetlands and Maintenance Road
CONTRACT NO.: C3778
ENGINEER'S ESTIMATE: $122,000.00
PROJECT MANAGER: Stephen Luy
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
BID LOCATION: City Clerk'sOffiice - City Hall
DATE: 12.Oct -06 TIME: 2:OOP.M.
BY: Stephen Luy CHECKED: Shari Rooks DATE: 12- Oct -06
As Bid Amt.
" Corrected Bid Total
Additives Rid Items
3t19,35U.59
QUANTITY - I UNIT I AMOUNT I UNIT I AMOUNT
A111 Inte raI Color Concrete Headwall & Ca
En ineer's Estimate
G.C.I Construction
ITEM
DESCRIPTION
QUANTITY
UNIT
AMOUNT
UNIT
AMOUNT
1
Mobilization (5 %)
1
L.S.
7,259.00
7,259.00
29,000.00
29,000.00
2
Erosion Control, BMP & SWWP (Phase 1)
7,040
S.F.
0.501
3,520.00
3.20
22,528.00
3
Construction Survey Staking Project Phase
1
L.S.
2,500.00
2,500.00
4,000.00
4,000.00
4
Clearing and Grubbing Project Phase 1
3,800
S. F.
2.001
7,600.00
3.00
11,400.00
5
Remove Creek Crossing Concrete Pavemeni
560
C.Y.
10.001
5,600.00
5.00
2,800.00
6
Plug Storm Drain Pipes with PCC
5
C.Y.
300.00
1.500.001
320.00
1,600.00
7
Remove Storm Drain Pipe atSecondary SD
40
L.F.
15.001
600.001
33.00
1,320.00
8
Export Rip-Rep and Concrete from Job Site
37
C.Y.
100.001
3.700.001
120.00
4,440.00
9
Export Earthwork
210 1C.Y.
30.00
6.300.001
40.00
8, ,400.00
10
Excavation
320
C.Y.
25.00
8,000.00
20.00
6,400.00
11
Tree Removal
2
Ea.
200.00
400.00
600.00
1,200.00
12
Creek Water Diversion and Dewatering P -1
1
L.S.
5,000.00
5,000.00
15,000.00
15,000.00
13
Gabion Installation Phase 1
34
Ea.
400.00
13,800.00
900.00
30,600.00
14
Envirolog Installation Phase 1
68
Ea.
135.00
9,180.00
600.00
40,800.00
15
Green Gabion Installation Phase 1
36
Ea.
225.00
8,100.00
800.00
28,800.00
16
Reno Mattress Installation (Phase 1 )
12
Ea.
200.001
2,400.00
160000
19,200.00
17
Unclassified Fill (project Phasel )
110
C.Y.
20.00
2,200.00
35.00
3,850.00
18
Rehabilitation of 24 -Inch RCP SD P -1
2 .
Ea.
1,000.00
2,000.00
800.00
1,600.00
19
Const. Headwall Struct. and Conc. Road Ca
40
C.Y.
400.00
16,000.00
1,500.00
60,000.00
20
Finish Grading (Phase 1 )
7,050
S. F.
0.15
1,057.50
1.30
9,165.00
21_]Temporary
Irrigation System Phase 2
1
L.S.
5,600.00
5.600.001
31,000.00
31,000.00
22
TRooted Cutting Plant Mat. Phase2 Willow
816
Ea.
4.00
3,264.00
13.00
10,608.00
23
One Gallon Container Stock (Phase 2
585
Ea.
5.00
2,925.00
20.00
11,700.00
24
Hydroseed(Phase2 )
12,630
S. F.
0.15
1,894.50
0.15
1,894.50
25
1120-Day Plant Establishment
1
L.S.
1800.00
1,800.00
2000.00
2 000.00
Total Bid Base
I EE
122 000.00
LOW
359 305.50
As Bid Amt.
" Corrected Bid Total
Additives Rid Items
3t19,35U.59
QUANTITY - I UNIT I AMOUNT I UNIT I AMOUNT
A111 Inte raI Color Concrete Headwall & Ca
1
LS.
2500.00
2,500.00
5,000.00
- 5 000.0
AB2 Provide Stone/Coble Texture for Headwall
1
LS
5000.00
5,000.00
15 000.00
15,000.00
Total Additive Bid
Total Bid
EE 7 500.00 LOW U UUU.UU
EE 129,500.00 LOW 315 ,305.50
f:\users\pbMsharedreontract\00 -01 \\BID SUMMARY Page 1