HomeMy WebLinkAbout08 - C-3496 - Mariners Library & Tennis CourtsCITY OF NEWPORT BEACH
CITY COUNCIL STAFF REPORT
Agenda Item No.
October 10, 2006
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
Stephen G. Badum
949 -644 -3311 or sbadum@city.newport- beach.ca.us
SUBJECT: DONNA AND JOHN CREAN MARINERS BRANCH LIBRARY AND
TENNIS COURTS — COMPLETION AND ACCEPTANCE OF CONTRACT
NO. 3496
RECOMMENDATIONS:
1. Accept the work.
2. Authorize the City Clerk to file a Notice of Completion.
3.. Authorize the City Clerk to release the Labor and Materials bond 35 days after
the Notice of Completion has been recorded in accordance with applicable
portions of the Civil Code.
4. Release the Faithful Performance Bond one (1) year after Council acceptance.
DISCUSSION:
On January 11, 2005, the City Council authorized the award of the Donna and John
Crean Mariners Branch Library and Tennis Courts contract to Howard S. Wright
Construction. The contract provided for the construction of a new joint use library at
Mariners Elementary School designed to serve as both the Mariners Branch Library and
the school library for the Mariners Elementary School of the Newport-Mesa Unified
School District (NMUSD) with the purpose of providing enhanced services for the
community and the school.
Additional funds were appropriated by the City Council on June 28, 2005 to cover the
cost of unforeseen .work and to provide for furniture, fixtures and equipment The
contract has now been completed to the satisfaction of the Public Works Department.
Donna and John Crean Mariners Branch Library — Completions and Acceptance of contract No. 3496
October 10. 2006
Page: 2
A summary of the contract cost is as follows:
Original bid amount:
Total amount of change orders:
Final contract cost:
$5,490,000
535.982
$6,025,982
The final overall construction cost, including change orders, was 9.76% percent over the
Council approved contract amount of $5,490,000. Thirteen change orders in the
amount of $535,982 were issued on this project as delineated in Attachment A. Of this
amount, $21,322 represents unforeseen conditions, $339,725 represents architectural
or engineering adjustments to the library, $20,674 represents architectural or
engineering adjustments to the tennis courts, and $154,261 represents owner upgrades
as requested by City staff or City Council. The total construction cost is $6,025,982.
Other Project Costs:
In addition to the primary construction contract, this project involved other project
expenses from various funding sources, including private donations and transfers from
the General Fund and Building Excise Tax Fund. Total project expenses are
summarized as follows:
Construction
Architectural Services
Construction Management
Geotechnical Services
Utilities, Permits and Insurance
Construction Incidentals
Furniture, Fixtures, Equipment
Library Incidentals
Total Project Cost
$6,025,982.31
$ 520,811.29
$ 181,272.52
$ 47,631.50
$ 84,710.81
$ 23,969.60
$ 398,924.57
$ 8.490.43
$7,291,793.03
As well, on February 14, 2006, the City Council authorized the award of the Mariners
Library Left Turn Lane contract for the construction of a left turn pocket, including
asphalt paving, concrete curb, and a small block wall, off of Irvine Avenue to provide
access to the new Donna and John Crean Mariners Library. This work was completed
at a cost of $74,805.40, including related geotechnical services and landscaping.
Environmental Review:
The project was determined to be exempt from the California Environmental Quality Act
(CEQA) pursuant to Section 15332 (Class 32, In -Fill Development Projects) of the CEQA
Implementing Guidelines at the time the project was authorized by the City Council.
Council approved a Notice of Exemption for this project on June 11, 2002.
Donna and John Crean Mariners Branch Library — Completions and Acceptance of Contract No. 3496
October 10, 2006
Page: 3
Funding Availability:
Funding sources included. a $3.18 million S
private donations and supplements from the
amendment, sufficient funds are available i n
portion of this project:
St
Account Description
Mariners Library Fund
Contributions,- Park Grant
Library grant, Proposition 40 Park grant,
General Fund. Upon approval of the budget
the following accounts for the construction
Account Number Amount
7451- C5100661 $5,725,381.39
7251- C4120734 $300,600.92
Total: $6,025,982.31
All work was completed by April 19, 2006, the scheduled completion date.
Prepared by:
/ t"
Jams ollard
AdOthistrative Manager
Attachment A: List of Change Orders
Submitted by:
teph G. Badum
Public Works Director
MARINERS LIBRARY.0 -3496 Attachment A
LIST OF CHANGE ORDER REQUESTS
ITEM I
DESCRIPTION
UN-
A & E
A & E
OWNER
TOTALS
I El
FORSEENS
LIBRARY
T- COURTS
UPGRADES
1
REMOVE TREES NOT SHOWN ON DRAWINGS
806
806
2
ADDITIONAL GRADING TO REMOVE PURCHED WATER
11,889
11,889
3
RAIN DELAYS
0
0
4R
UPSIZE TENNIS COURT FENCEING FOOTINGS
19,868
19,868
5
ADDED HOR WATER LINE
0
6
ADD INSTA HOT HEATERS
2,924
2,924
7 JADDED
DRAIN LINE AT FIRE RISER
0
8 ITIME
EXTENTION FOR RAIN DELAYS
0
0
9
CHANGE SPIRAL TO RECTANGULAR DUCT
5,585
5,585
10
SBC PHONE CONDUIT CHANGES
8,305
1
8,305
11
CONCRETE GRADE BEAMS
48,230
48,230
12
ADDED STRUCTURAL STEEL
1,281
1,281
13A
DRYWALL AT RETURN AIR PLENUM
0
13B
DRYWALL AT RETURN AIR PLENUM
0
14
EXTENDED GENERAL CONDITIONS
0
15
REMOVAL OFTRANSITEPIPING
1,128
1,128
. 16
ADDITION OF OUTLETS AND DATA TELEPHONE
11,794
11,794
17
LIGHT FIXTURE ADDITIONS
0
18
1 INCREASE SOFFITS FOR ROUGH -INS
0
19
GRADE OUSIDE OF LIMITS
0
20
FLASHING AT BASE OF BUILDING
0
21
UNDERGROUND OF HVAC PIPING
0
22
DUCT RETURN AIR IN LIEU OF PLENUM
35,532
35,532
23
WELDING OF WEB STIFFNERS
5,620
5,620
24
INCREASE ASPHALT SECTION
1,700
1,700
25
ADDED GLAZING AT BOOK DETETION EQUIPMENT
0
26
ADD FLOOR DRAINS AT RESTROOMS
3,076
3,076
27
REBAR DETAILING AT COLUMNS
466
466
28
STRUCTURAL BEAM POCKETS
2,714
2,714
29
IREMOVAL OF UTILITY POLES
1 752
752
30
IMETAL STUDS DECREASE SPACING
668
668
31
CHANGE PRECAST DESIGN
- 13,550
- 13,550
32
PLYWOOD SHEAR PANEL CHANGES
1,062
1,062
33A
JADDED DOWNSPOUTS
1,409
1,409
33B
I PITCH POCKET AT LOUVER POSTS
4,232
4,232
34
HYDRO SEED AT BIOSWALES
500
500
35
ADDED DETAIL SD6
0
0
36
GUTTER DETAIL CHANGE
1,664
1,664
37A
ADD LIGHTPOLE AND REPLACE SIDEWALK
0
37B
ADD LIGHTPOLE AND REPLACE SIDEWALK
20,802
20,802
38
EDGE BLOKING AT ROOF CRICKETS
0
39
TOUNGE AND GROOVE IN LIEU OF EDGE BLOCKING
0
40A
SHEAT METAL BEAM COVERS
2,511
2,511
40B
COLUMN CAPS, BEAM AND ANGLE COVERS
13,259
13,259
41
CHANGE TWO LIGHTS AT ENTRANCE
845
845
42
MECHOSHADE WIRELESS
6,975
6,975
43
PRE - ACTION CREDIT
-3,950
-3,950
44
CHANGE LIGHT FIXTUE DETAILS
2,080
2,080
45
ICHANGE FINISH ON LIGHT FIXTURES
1,011
1,011
46
JADDED PLYWOOD IN ATTIC SPACE
0
47
JANTI GRAFFITI AT PRECAST
0
48
IPAINT SHEET METAL ADDS
2,437
2,437
49
ELECTRICAL ADDITIONS AT LANDSCAPE
1,143
1,143
50
SUNSHADE ATTACHMENT
24,224
24,224
51
ROOF FRAMING CHANGES
10,856
10,856
52
SHEETMETAL CHANGES
4,282
4,282
53
DUCT WOORK CHANGES AT COMMUNTY ROOM
1,737
1,737
54
CAMERA MONITOR SYSTEM
28,452
28,452
55
POWER FOR ROLL DOWN DOORS
1,440
1,440
MARINERS LIBRARY C -3496 Attachment A
LIST OF CHANGE ORDER REQUESTS
ITEM
DESCRIPTION
UN-
A & E
A & E
OWNER
TOTALS
FORSEENS
LIBRARY
T- COURTS
UPGRADES
56
PLASTER TO ROOF DETAILS
.0
57
GUTTER DETAIL CHANGES
1 3,589
3,589
58
TRELLIS ATTACHMENT
24,186
24,186
59
SWITCHGEARMODIFICATIONS
348 -
348
60
IWATER HEATER GAS TO ELECTRIC
1,654
1,654
61
STRUCTURAL DRAG BRACING CHANGES
1,091
1,091
62
BOOK RETURN COVER CHANGE
-650
-650
63
TSTAT ELEVATION CHANGE
1,863
1,863
64
RELOCATE LIGHT FIXTURES
1,528
1
1,528
65
1 HEADER CHANGES AT AUTO SLIDERS
595
5951
1
68
FRAMING CHANGES A CLEARSTORY
691
691
67
INCREASE SOFFIT AT COMMUNITY ROOM
0
68
BOOK SHELF BACKING
5,773
5,773
69
IMECKO SHADE POCKET CONFLICTS
17,129
17,129
70
GAS LINE EETENTION
1,671
1,671
71
REVISED HOLD DOWNS
712
712
72
JADDED OVERFLOW SCUPPERS
0
73
1 BOOK DETECTION OUTLETS
690
690
74
CONDUITS FOR TELEIDATA
2,107
2,1071
1
75
GRAVITY VENT
2,390
2,390
78
JACCESS PANELS REFRAME AND MOVE ELECTRICAL
7,605
2,605
77A
JADDED GRADING; WALKWAYATSCHOOL
19,920
19,920
776
LANDSCAPING @ SCHOOL FENCE
10,121
10,1211
1
78
IZ -CLIPS FOR WALL PANELS
0
79
RE -FRAME DOOR FRAMES
1,520
1,520
80
ADDED TREES AT TENNIS COURTS
0
81
CHANGE FIRE EXTINGGUSHER LOCATIONS
0
82
1 REGRADE AT NORTH AND EAST OF BUILDING
2,847
2,847
83
IMISCELLANEOUS FRAMING
447
447
84
IRESURVEY DRIVE APPROACH SCHOOL CHANGES
421
421
85
IPLUMBING HVAC SOFFIT CHANGES
1,000
1,000
ELECTRICAL CHANGES CHANGES
850
850
87
CHANGES AT ROLL DOWN DOORS
940
940
88
IREMOVE LIGHT POLE FOUNDATIONS
4,600
4,600
89
IRELOCATE CLEAN -OUT ATSIDWALK
1,422
1,422
90
ACCESS PANELS AT ROOF
1,089
1,089
91
FUNNEL DRAIN AT RISER
0
92A
I DEMO DUG -OUT GRADE TO DRAIN
0
92B
I DEMO DUG -OUT GRADE TO DRAIN
3,990
3,990
93A
RESET ACT WIRES AND WALL MOLD
1,133
1,133
94
ADDTWOLIGHTATTREEWELLS
1,681
1,681
95
JADD LIGHT AT MONUMENT SIGN
1,515
1,515
96
IREVISE PICKET SPACING AT ROD -IRON FENCES
1,778
1,778
97
ADDED JOIST CLIPS AND PLYWOOD PER INSPECTOR
1,363
1,383
98
1EXTEND SUNSHADES
1,339
1,339
99
ISTEEL GIRTS AT MECHANICAL WELLS
4,742
4,742
100
IFIRE ALARM POWER REQUIREMENTS
450
450
101
ISPLIT UP LIGHT FIXTURE TYPE D
555
555
102
JADDED EXTERIOR LIGHTING
0
103
ADDED MOTOR FOR MECKO SHADES
6,926
1
1
6,926
104
ISIGNAGE AT CHILDERNS TOWER
1,811
1,811
104A
ADDITIONAL INTERIOR SIGNAGE
2,237
2 237
105
TILE AROUND CHANGING TABLES &PANELS
1,473
1,473
106
REVISE WALLS FOR RECESS STANDARDS
0
107
ADD POWER FOR AND REVISE MILLWORK
-
1,813
1,813
107B
PAINT & PATCH FOR ADDED OUTLETS -
773
773
108
ADD FLAG POLE
1 4,504
4,504
109
ADDED MILLWORK AT SLIDING DOOR
3,228
1 3,229
110
MATERIAL PRICE CHANGES FOR A/C
1,935
1 1,935
MARINERS LIBRARY C -3496 Attachment A
LIST OF CHANGE ORDER REQUESTS
ITEM
- DESCRIPTION
UN-
A & E
A & E
OWNER
TOTALS
FORSEENS
LIBRARY
T- COURTS
UPGRADES
111
IGRADING PER CLARIFICATION DRAWING
11,970
11,970
112
JADDED GRAZNIAS -
-
188
188
113
IREFRAME INTERIOR BOOK RETURN
0
114
ELECTRIC FOR GAS COOK TOP
406
406
115
ADDED DOOR CLOSERS
1,000
1.,000
116
CUT DOWN CHAIR RAIL FOR MECKO SHADES
1 2,300
2,300
117
ADDED SMOKE DETECTOR IN COMPUTOR ROOM
1,436
1,436
118
DUCT HOOD AT KITCHENETTE
171
171
119
EXIT SIGN CREDIT
0
120
FF &E DAMAGE
0
121
CLOSE -UP MECKO SHADE POCKET
1,004
1,004
122
1 REROUTE BOOK DETECTION WIRING
1,523
1,523
123
DRYWALL & PAINT AT ACCESS PANELS -
3,904
3,904
124
MISCELLANEOUS REQUEST BY PUBLIC WORKS -
641
641
125
STAINLESS WEATHER HOODS AT BOOK DROP
464
464
126
ADDED FENCING AT SCHOOL
6,277
6,277
127
REVISE COOK TOP
551
551
128
FIRE ALARM CHANGES
1,336
1,336
129
IWALK OFF MAT CHANGES
1 4,997
4,997
130
CARPET AT ACCESS PANELS
736
736
131
EXTERIOR LIGHTING -
10,407
- 10,407
132 1
CITY TO- KEY LOCKS
-626
-626
133
CHILDRENS RESTROOMS LOCK CHANGES
1,209
1,209
134
ADD HVAC IN PHONE ROOM
985
985
135
HVAC VALVES
34,421
34,421
136
HYDRO SEED Al BALL FIELD
6,980.
6,980
137
HARDWARE EXITING CHANGES
-
2,583
2,583
138
IBASE AT FIRE RISER ROOM
1,290
1,290
139
ISLUDDER STRIP AT WALK -OFF MAT
485
485
140
ROOL DOWN DOOR TRIM -OUT
363
363
141
FIRE RISER TEST CONECTION
963
963
142
COBLES AT DRAINS
482
482
143
FIX LEAKING POTS
5,381
5,381
'
,.F3.OUED�,G, #<J.G£- W'F3LJ� f3 -- _AE = ,... `�
'"- 2.T322
ORIGINAL CONTRACT -
5,490,000
AMENDED CONTRACT
PROJECTED FINAL COST
6,025,982