Loading...
HomeMy WebLinkAbout05 - Back Bay Drive Roadway Maintenance Project - Completion and Acceptance of Contract No. 6005 (CAP15-0041)CTY OF F NEWPORT BEACH City Council Staff Report TO: FROM: PREPARED BY: PHONE: TITLE: ABSTRACT: April 28, 2015 Agenda Item No. 5 HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL David A. Webb, Public Works Director- (949) 644 -3330, dawebb @newportbeachca.gov Brad Sommers, Senior Civil Engineer (949) 644 -3326 Back Bay Drive Roadway Maintenance Project — Completion and Acceptance of Contract No. 6005 (CAP15 -0041) At the February 10, 2015 meeting, the City Council awarded the Back Bay Drive Roadway Maintenance Project to Pavement Coatings Company for a total contract amount of $182,098.20. This work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after this Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following account: Account Description Account Number Amount Back Bay Drive Roadway Project 7014- C3002032 $ 96,132.91 Slurry Seal Program 7013- C2001011 $ 86,712.50 Total: $ 182,845.41 5 -1 DISCUSSION: Awarded Contract Amount Overall Contract Cost /Time Summary Actual Final Cost at Contingency % Due to % Due to Completion Allowance Contract Directed Unforeseen Change Change $182,098.20 1 $182,845.41 10% or less 1.0% 1 -1.7% 2.7% Allowed Contract Time (days) 30 Actual Time (days) 22 The contract has now been substantially completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: Actual cost of bid items constructed: Total non -bid item Change Orders: Final contract cost: The Back Bay Drive Roadway Maintenance Project rejuvenated revised striping and signage layout from Shellmaker Road to project included construction of a slurry pavement coat over the new striping and signage. 182,098.20 177,878.19 4,967.22 182,845.41 the roadway surface and implemented a Eastbluff Drive. To accomplish this, the existing asphalt surface and installation of The revised striping and signage on Back Bay Drive provides better guidance to all users (pedestrians, cyclists and motorists), enhances the "trail" feel of the roadway, reduces sign pollution and helps to calm traveler speeds. All roadway users have maintained the same access as before the project (both northbound and southbound travel for pedestrians and cyclists and northbound travel for motorists). Revision to the striping and signage of this section of Back Bay Drive has completed a Tier 1 Project in the recently adopted Bicycle Master Plan. One change order in the amount of $4,967.22 (2.7 %) was issued. During the project, the City's storm drain contractor required sole access to a portion of Back Bay Drive to complete a critical task ahead of the planned schedule. This task required Pavement Coatings Company to pull off the worksite on a planned work day. The change was authorized to cover expenses incurred by delaying the pavement contractor's labor, materials, and equipment. A summary of the project schedule is as follows: Estimated Completion Date per 2015 Baseline Schedule N /A" Estimated Project Award for Construction N /A' Actual Project Award 2/10/2014 *This project was Contract Completion Date Per Notice To Proceed 3/25/2015 added after Actual Substantial Construction Completion Date 3/13/2015 creation of the baseline schedule. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15302 (replacement of existing facilities involving negligible expansion of capacity) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. 5 -2 NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Description Attachment A - Location Mao 5 -3 ATTACHMENT A MM UPPER NEWPORT BAY --- ------- � 1 ,, Back Bay Drive CITY OF NEWPORT BEACH Roadway Maintenance Project PUBLIC WORKS DEPARTMENT Shellmaker Road to Eastbluff Drive C -6005 04/28/2015 5 -4