Loading...
HomeMy WebLinkAboutS21 - Dover Drive Sidewalk VA ConsultingCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. s21 January 22, 2008 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Robert Stein 949 - 644 -3322 or rstein @city.newport - beach.ca.us SUBJECT: DOVER DRIVE SIDEWALK — APPROVAL OF AMENDMENT NO. 6 TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC., FORMERLY KNOWN AS VAN DELL AND ASSOCIATES RECOMMENDATION: Approve Amendment No. 6 to Professional Services Agreement with VA Consulting, Inc., formerly known as Van Dell and Associates for a not to exceed amount of $19,430 and authorize the Mayor and City Clerk to execute the Amendment. DISCUSSION: The California Coastal Commission (CCC) has reviewed and approved this project. However, it is requiring modification of the design and the preparation of a mitigation plan. Under this Amendment, VA Consulting will perform these tasks and process the changes with the CCC in order to obtain the Coastal Development Permit. On May 25, 2004, Council approved a Professional Services Agreement with VA Consulting of Irvine California, for the design of the Dover Drive sidewalk at a contract price of $69,838. Along with preparing the final construction documents, VA Consulting's professional services included preparing sidewalk design alternatives, conducting a geotechnical evaluation, preparing and processing jurisdictional agency permits including a Coastal Development Permit, and preparing the environmental documentation for the .Project. During the design process, the City asked the Consultant to consider additional options for sidewalk design to consider alternate alignments with various retaining wall alternatives. Over the last 33 months, five Amendments were approved by Council: • On February 22, 2005, Amendment No. 1 to the Agreement was approved in which Consultant's scope of work was expanded to provide additional engineering and geotechnical services for the Project, including a proposal to shore up the existing slope above Dover Drive, at the Cliff Drive intersection. The additional compensation under Amendment No. 1 was $6,000. Dover Drive Sidewalk — Approval of Amendment to Professional Services Agreement with VA Consulting, Inc. January 22, 2008 Page 2 • On August 9, 2005, Amendment No. 2 was approved in which Consultant's scope of work was expanded to provide additional design and consulting services for the project, including analysis of the sidewalk and retaining wall alternatives for the slope above Dover Drive, preparation of the final design of the boardwalk portion of the project, and project management and coordination services. The additional compensation under Amendment No. 2 was $9,900. On April 4, 2006, Amendment No. 3 was approved in which Consultant's scope of work was expanded to revise the alignment of the proposed sidewalk and curb and gutter adjacent to the slope above Dover Drive, and prepare revised exhibits for the environmental document and resource agency permit applications. The additional compensation under Amendment No. 3 was $3,960. On April 24, 2007, Amendment No. 4 was approved in which Consultant's scope of work was revised to allow for additional assistance with outside jurisdictional agencies and processing permits. The additional compensation. due Consultant under Amendment No. 4 was $5,455. The term of the Agreement was also extended to December 31, 2007. On October 3, 2007, Amendment No. 5 in the amount of $15,850 was approved in which Consultant's scope of work was revised to include additional services for working with Regional Water Quality Control Board staff regarding the need for a Clean Water Act 401 Water Quality Certification and responding to comments from the California Coastal Commission staff. Environmental Review: On June 27, 2006, Council adopted a Resolution approving the Mitigated Negative Declaration (MND) for Dover Drive Sidewalk Project. Public Notice: The public was informed of the Coastal Commission hearing on this project which occurred on November 8, 2007. Funding Availability: Sufficient funds are available in the following account for the project: Account Description Transportation and Circulation ared by: Robert Stein, P.E. Assistant City Engineer Attachment: Amendment No. 6 Account Number Amount 7261- C5100854 $19,340.00 Total: $19,340.00 Submitted by: G. Badum Works Director AMENDMENT NO. 6 TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC., FOR ENVIRONMENTAL CONSULTING SERVICES FOR DOVER DRIVE SIDEWALK PROJECT THIS AMENDMENT NO. 6 TO PROFESSIONAL SERVICES AGREEMENT, entered into this day of , 2008, by and between the CITY OF NEWPORT BEACH, a municipal corporation, (hereinafter referred to as "City ") and VA CONSULTING, INC., (formerly knows as Van Dell and Associates, a California corporation whose address is 17801 Cartwright Road, Irvine, California, 92614 ( "Consultant "), and is made with reference to the following: RECITALS A. On July 12, 2004, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "Agreement', for design and consulting services for the Dover Drive Sidewalk Project, hereinafter referred to as "Project ". B. City and Consultant have entered into five separate Amendments of the Agreement, the latest dated April 24, 2007. Per Amendment No. 4, the Agreement expired on December 31, 2007. C. City desires to enter into this Amendment No. 6 to reflect additional services not included in the Agreement or prior Amendments and to extend the term of the Agreement to June 30, 2009. D. City desires to compensate Consultant for additional professional services needed for Project. E. City and Consultant mutually desire to amend Agreement, hereinafter referred to as "Amendment No. 6 ", as provided here below. NOW, THEREFORE, the parties hereto agree as follows: 1. Consultant shall be compensated for services performed pursuant to this Amendment No. 6 according to "Exhibit A" dated December 26, 2007, attached hereto. 2. Total additional compensation to Consultant for services performed pursuant to this Amendment No. 6 for all work performed in accordance with this Amendment, including all reimburseable items and subconsultant 2 - fees, shall not exceed Nineteen Thousand, Three Hundred Forty and 001100 Dollars ($19,340.00). 3. The term of the Agreement shall be extended to June 30, 2009. 4. Except as expressly modified herein, all other provisions, terms, and covenants set forth in Agreement shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 6 on the date first above written. APPROVED AS TO FORM: rim— ✓�- City Attorney for the City of Newport Beach ATTEST: in LaVonne Harkless, City Clerk CITY OF NEWPORT BEACH, A Municipal Corporation M Homer Bludau for the City of Newport Beach CONSULTANT: (Corporate Officer) Title: Print Name: (Financial Officer) Title: Print Name: Attachments: Exhibit A — Scope of Services Exhibt B = Fee Summary Exhibit C — Schedule of Billing Rates f:\users\pbvvAshared \agreements \fy 07 -08\va consulting -lover sidewalk- mend -6.doc - 3 VJL CONSULTING December 26, 2007 Mr. Robert Stein City of Newport Beach Public Works Department 3300 Newport Boulevard Newport Beach, CA 92660 Dear Mr. Stein: Exhibit A This letter is a change order request for additional environmental, permitting and design services related to the Dover Drive Sidewalk Project for the City of Newport Beach (our Agreement dated July 12, 2004). This request is for additional services associated with processing the California Costal Commission (CCC) permit and modifications to project plans and contract documents required to incorporate CCC conditions. These activities include time to coordinate with City and CCC staff for preparation of modifications to CCC permit exhibits and revisions to plans and contract documents. The total cost to perform the additional tasks described above is $19,340. A detailed scope of services (Exhibit "A "), and fees (Exhibit `B ") are included with this request. We will perform these services on a time and materials not -to- exceed basis in accordance with the attached fee schedule (Exhibit "C "). Please indicate your approval of this change order by signing in the space provided below and returning a copy to our office. If you have any questions, please feel free to contact John Wolter at (951) 340 -0030 or me at (949) 474 -1400. MPWkam cc: Steve Luy John Wolter Contracts Approved by: Robert Stein Date: VA Consulting, Inc. Corporate Office Orange County Division 17801 Cartwright Road Irvine, CA 92614 Phone 949.474.1400 Fax 949.261.8482 EXHIBIT "A" CITY OF NEWPORT BEACH DOVER DRIVE SIDEWALK PROJECT ADDITIONAL SERVICES SCOPE OF SERVICES California Costal Commission (CCC) Permit Processing This task includes the preparation of modification to CCC application exhibits required by CCC staff and requested by City staff. 2. Habitat Restoration and Monitoring Plan Preparation This task includes preparation of interpretive sign language and final habitat restoration and monitoring plans as required by the CCC permit conditions. 3. Revisions to Plans and Contract Documents This task includes the incorporation of CCC conditions to reduce the Boardwalk width to five (5) feet. The additional work also includes revisions to Sheets 1, 5 and 6 for new caisson locations and construction notes; revisions to Sheets 3 and 4 for new structural and framing details; revisions to the structural calculations package and edits to the specifications and bed schedule to incorporate the habitat planting plans and boardwalk modifications. 4. Project Management and Conditions This task includes project management and coordination with the environmental sub - consultant, CCC staff and City staff to finalize the CCC permit approval and incorporate the CCC conditions into the final contract documents. We have assumed 8 hours for project management and 4 hours for attendance at 2 meetings for a total of 12 hours. %:1Pr'ggc 73ttI�"e 0Nr RepyeetJT .tl EXHIBIT "B" CITY OF NEWPORT BEACH DOVER DRIVE SIDEWALK PROJECT ADDITIONAL SERVICES FEES 1. California Costal Commission (CCC) Permit Processing .......... ............................... $4,980 2. Habitat Restoration and Monitoring Plan Preparation ............... ............................... $5,400 3. Revisions to Plans and Contract Documents ............................ ............................... $7,050 4. Project Management and Conditions ........................................ ............................... $1,860 5. Reimbursables ............................................................................... ............................... $50 TOTALFEES ..................................................................................... ............................... $19,340 _Offtce+'irt. Ir- iine'• Cavnrpb Rancho Mozrgv EXHIBIT "C" VA CONSULTING, INC. FEE SCHEDULE 2007 Staff Classification Civil Engineering and Planning Services Hourly Rate President............................................................................................................ ............................... $190 Division President/Division Manager ......................:................ ............................... ...........................$173 Sr. Vice President/Vice President/ Exec. Director .................. ............................... ...........................$163 Director.............................................................................................................. ............................... $160 SeniorProject Manager .......................................................... ............................... ...........................$155 ProjectManager ...................................................................... ............................... ...........................$147 AssistantProject Manager ...................................................... ............................... ...........................$142 Senior Project Engineer /Senior Design Supervisor /Senior Planner ...................... ...........................$137 Project Engineer /Design Supervisor ....................................... ............................... ...........................$132 Senior Design Engineer /Senior Designer ............................... ............................... ...........................$122 Design Engineer / Planner ........................................................ ............................... ...........................$117 Designer...........................................................................:................................. ............................... $110 Assistant Engineer /Assistant Planner ..................................... ............................... ...........................$100 Research and Processing Coordinator ................................................................... ............................$95 SeniorCAD D Technician ..................................................................................... ............................... $90 JuniorEngineer .................................................................................................... ............................... $85 CADDTechnician ................................................................................................... ............................$80 EngineeringIntern ................................................................................................... ............................$70 OfficeSupport/ Clerical ............................................................................................ ............................$69 Field Survev and Maopino Services Director of Survey and Mapping .............................................. ............................... ...........................$158 Managerof Field Survey .........................................................-.....................-........ ............................... $130 Surveyand Mapping Associate ...............................................-................................. ............................... $95 Surveyand Mapping Technician .............................................................-................. ............................... $75 3-Man GPS Crew .................................................................................................... ............................... $225 2-Man GPS Crew .... ............................... ........................... $200 1-Man GPS Crew ............................... ............................... Special Services Litigation....................................... ............................... Notes: .................................. ............................... ..........- ...................... ............................... $170 ............................ ........................... $400 and 2. Overtime, when requested by the client, will be surcharged at a rate of 135% of the standard hourly rates. Sundays and holidays Will be surcharged at a rate of 170% of the standard hourly rates. 3. Reprographics, messenger service, travel (including lodging and meals), and other direct expenses Will be charged at cost plus 10%. The services of outside consultants will be charged at cost plus 15% to cover administration and overhead. 4. In-house reprographics charges: B &W Bond copies $1.001sq.ft, Color Bond $6.00/sq.fL 5. Mileage will be billed at standard mileage rates set by IRS. 2007 rates currently listed at $0.485 per mile. MAKE EDULEMIBITC_MAV2W.E G -OO/IE