Loading...
HomeMy WebLinkAbout10 - Superior Avenue Median ImprovementsCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 10 March 11, 2008 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Andy Tran 949 - 644 -3315 or atran @city.newport- beach.ca.us SUBJECT: Superior Avenue Median Improvements —Completion and Acceptance of Contract No. 3794 RECOMMENDATIONS: 1. Accept the completed contract work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond 1 year after Council acceptance. DISCUSSION: On September 25, 2007, the City Council authorized the award of the Superior Avenue Median Improvement project to GMC Engineering, Inc. The contract provided for the construction of new landscaped medians on Superior Avenue from Ticonderoga Street to Dana Road. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $634,118.50 Actual amount of bid items constructed: $629,989.80 Total amount of change orders: $11,439.25 Final contract cost: $641,429.05 The decrease in the amount of actual bid items constructed over the original bid amount resulted from the reduction of plant material. As part of the original contract, the contractor was required to lay out a sample 200 feet of plant material for City approval. During our review, we noticed that some of the plants were too close together. Upon consultation with the landscape architect, staff made a field adjustment which reduced the number of plants to allow for proper growth. This resulted in a cost savings in plant material. The final overall construction cost including three change Superior Avenue Median Improvements - Completion and Acceptance of Contract No. 3794 March 11, 2008 Page 2 orders was 1.2 percent over the original bid amount. The three change orders are as follows: Change Description Amount Order 1 Temporary striping and changeable message boards to $5,478.00 im rove safety and traffic conditions 2 Deletion of thermoplastic striping — In anticipation of the <$1,449.00> pavement rehabilitation project, staff opted to go with paint in lieu of thermoplastic. 3 a) Abandoned an existing water service $7,410.25 b) Upgraded sprinkler heads to prevent leakage c Removal of temporary striping Total Project Change Orders $11,439.25 In addition to the primary construction contract, this project involved other project expenses for material testing. Total project expenses are summarized as follows: Construction $641,429.05 Landscape Design — TCLA, Inc. $28,310.00 Material Testing — Harrington Geotechnical $6,500.00 Construction Inspection $3,193.65 Incidentals $715.80 Total Project Cost $680,148.50 Environmental Review: The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Implementation Guidelines at the time the project was authorized by the City Council. This exemption covers the repair, maintenance and minor alteratign,of existing public facilities with negligible expansion. Funding Availability: Funds for the construction contract were expended from the following accounts: Account Description Gas Tax Gas Tax Contributions Wastewater Enterprise Account Number 7181- C5100302 7181- C5100870 7251- C5100870 7531- C5600292 Total: Amount $90,000.00 $304,499.90 $199,929.15 $47,000.00 $641,429.05 The original completion date was January 23, 2008. All work was substantially completed by this date. Prepared by: Andy Tran Senior Civil Engineer Submitted by: e en adum ublic orks Director