Loading...
HomeMy WebLinkAboutSS3 - General Fund User Fee StudyAgenda Report #SS3 April 22, 2008 CITY OF NEWPORT BEACH GENERAL FUND USER FEE STUDY FINDINGS APRIL,, 2008 PREPARED BY: `PRM POBt.IC RF.sou RCF MAAACRNIEN1 GROUP, I.LC 455 Capitol Mali. Suite 600, Sacramento. CA 95814 Tele: 91 &882 -2118 Fax: 919 - 4433411 W W W.Prmarouv.n Providing PIofmlonat Services to Government A Subsidiary of MGT of America, Inc. MGT 0•AM($Et R, ix {, w .matamer.co TABLE OF CONTENTS Section Page I. Executive Summary 1 Introduction 1 Study Scope & Objectives 1 Study Findings 2 Methodology 4 Economic & Policy Considerations 6 Recovery Level Comparison 7 11. Building Department 8 111. Planning Department 15 IV. Public Works . Engineering Division 20 V. Police Department 25 VI. Fire Prevention and EMS 31 VII. Recreation & Senior Services Department 43 VIII. Revenue Division 54 IX. Code & Water Quality Enforcement Division 60 X. Utilities Division 63 XI. Library Department 66 XII. Citywide Copy / Public Records Charges 68 XIII. Flat Fee comparison 72 Appendix A — Hourly and overhead rates 76 Appendix B — Building Valuation 91 1. EXECUTIVE SUMMARY INTRODUCTION Public Resource Management Group (PRM) is pleased to present the City of Newport Beach (City) with this summary of findings for the cost of services study for fee - related activities. The City has not undertaken a detailed cost of services study since 1996. Since that time, the City has made cost of living adjustments to the original calculations, but has largely maintained the fee structure that had been adopted. The City is interested in accurately reporting the true cost of providing various fee - related services, and exploring the possibilities of modifying current fees to better reflect the increasing cost of providing services over time. The City contracted with PRM to perform this cost analysis using the adopted 2006 -2007 fiscal year budget and staffing information. Additionally, all other staff information was provided through the period ending December 2007. Fees should be reviewed on a regular basis and adjusted in accordance with established city policies on user fee cost recovery. Typically a detailed study, such as this, is undertaken every 3- 5 years with CPI adjustments in the intervening years. This report is the culmination of the past twelve months work between PRM and city management and staff. PRM would like to take this opportunity to acknowledge all city management and staff who participated on this project for their efforts and coordination. Their responsiveness and continued interest in the outcome of this study contributed greatly to the success of this study. STUDY SCOPE AND OBJECTIVES This study included a review of fee - for - service activities within the following departments /divisions: • Building • Planning • Pubic Works - Engineering • Police • Fire — Prevention and EMS • Recreation & Senior Services • Revenue • Code & Water Quality Enforcement • Utilities • Library The study was performed under the general direction of the Revenue Manager with the participation of the above - mentioned departments and divisions. The primary goals of the study were to: • Define what it costs the city to provide various fee - related services. • Determine whether there are any opportunities to implement new fees. • Identify service areas where the City might adjust fees based on the full cost of services and other economic or policy considerations. • Develop revenue projections based on recommended increases (or decreases) to fees. • Provide comparative data for local jurisdictions and other PRM clients. The information summarized in this report addresses each of these issues and provides the City with the tools necessary to make informed decisions about proposed fee adjustments and the resulting impact on general fund revenues. Page 1 STUDY FINDINGS While the purpose of this study is to identify the cost of fee - related activities, one of the outcomes of the analysis is to provide a complete picture of the full cost of all services offered. It is necessary to identify all costs, whether fee - related or not, so that there is a fair distribution of all citywide and departmental overhead costs (discussed in the following section of this report) across all activities, thereby ensuring a definitive relationship between the cost of the service and the fee that is charged. No service should be burdened with costs that cannot be directly or indirectly linked to that service. Therefore, the first task in this study is to separate the fee - for - service activities from the non -fee activities. Some non -fee related activities are appropriately funded by general fund monies (or other special revenue or impact fee sources), such as most public safety services or capital improvement projects. The costs of these other services are identified and set aside from the user fee services. Exhibit I below displays the split of the total costs of each department (including citywide and departmental overhead) into either user fee - related or other service costs. Of the $74.4 million in total costs analyzed, $33.9 million (or 46 %) of that total is related to user fee services. It is this $33.9 million that is the focus of this study and represents the total potential for user fee related revenues for the City. Total Costs by User Fee Area Exhibit I Source • Fiscal Year 2006 -2007 The next exhibit (following page) identifies the source of funds for the user fee services. Exhibit II breaks down the $33.9 million in user fee services between costs that are currently recovered through user fee charges and the remaining subsidy. Overall, the City is experiencing a 35% cost recovery level for its fee - related services. Within each department, current cost recovery levels range from 4% for Revenue to 82% for Fire Prevention. The information about individual fees may be found in subsequent sections of this report. Page 2 Revenue $1,844,983 $490,256 27% $1,354,727 73% Engineering $5,558,206 $783,520 14% $4,774,686 86% Utilities $963,067 $487,958 51% $475,109 49% Recreation $9,097,846 $6,417,497 71% $2,680,349 29% Library $6,563,193 $634,220 10% $5,928,973 90% Planning $3,053,238 $2,401,472 79% $651,766 21% Fire - Prevention $1,876,512 $1,020,064 549k $856,448 46% Fire - EMS $14,879,944 $14,863,809 100% $16,135 0% Police $23,988,902 $1,111,810 5% $22,877,092 95% Code Enforcement $984,253 $52,217 5% $932,036 95% Building $5,618,540 $5,618,540 100% $0 0% Total: 1 $74,428,684 1 $33,881,363 46% $40,547,321 54% The next exhibit (following page) identifies the source of funds for the user fee services. Exhibit II breaks down the $33.9 million in user fee services between costs that are currently recovered through user fee charges and the remaining subsidy. Overall, the City is experiencing a 35% cost recovery level for its fee - related services. Within each department, current cost recovery levels range from 4% for Revenue to 82% for Fire Prevention. The information about individual fees may be found in subsequent sections of this report. Page 2 Source of Funds — User Fee Activites — Exhibit 11 Source - Fiscal Year 2006 -2007 grm ffit�kul'. ff i 13:..� e artmerft' x i Revenue $490,256 $19;261 4% $470,995 96% Engineering $783,520 $482,913 62% $300,607 38% Utilities $487,958 $179,418 37% $308,540 63% Recreation $6,417,497 $2,735,227 43% $3,682;270 57% Library $634,220 $30,150 5% $604,070 95% Planning $2,401,472 $1,494,624 62% $906,848 38% Fire - Prevention $1,020,064 $834,692 82% $185,372 18% Fire - EMS $14,863,809 $2,142,389 14% $12,721,420 86% Police $1,111,810 $247,933 22% $863,877 78% Code Enforcement $52,217 $6;300 12% $45,917 88% Buildin $5,618,540 $3,849,402 69% $1;769,138 31% Total: $33,881,363 $12,022,309 35% $21,859,054 65% Exhibit II indicates that user fees recover 35% of full cost, leaving 65% or $21;859,054 to be funded by other funding sources. This $21.9 million represents a "window of opportunity" for the City to increase fees and general fund revenues, with a corresponding decrease in the subsidization of services by the general fund. While it is not likely (nor would PRM recommend) that the City completely recover all costs through increased or new fees, it is possible for the City to implement moderate increases to current fees and new fees for some services. The study's primary objective is to provide the City's decision - makers with basic data needed for setting fees. This report details the full cost of services, and presents proposed fees and projected revenues based on recommended user fee cost recovery levels. Recommendations were based upon careful consideration of the results of the cost analysis, historical cost recovery levels, and market comparisons of other cities. Page 3 Exhibit III below summarizes the financial analysis of the City's user fee program. It is estimated that adoption of the recommended cost recovery policy would increase the specified fee revenue by $5,698,087 (a 47% increase over the revenue currently being collected for these activities by the City on an annualized basis). This would bring the overall cost recovery level up to 52% for these activities. Exhibit III User Fee Revenue Analysis - Recommended Revenues - Source - Fiscal Year 2006 -2007 METHODOLOGY A cost of service study analyzes two components of costs: the direct costs associated with providing each fee- for-service activity, and the indirect costs that support these activities. A brief discussion of each of these components follows. (A complete, detailed report of calculations is provided as an attachment to this report). Direct Costs. The direct costs associated with fee - for - service activities were analyzed in great detail in this study'. PRM worked with staff within each of the ten divisions to develop the analysis that is summarized in the following sections of this report. The fiscal year 2006 -2007 adopted budget was used to identify direct costs. The first step in the process was to identify staff time spent directly on each of the user fee activities. Each staff person involved in the user fee services identified time spent to complete each task associated with all user fee services.. Annual volume statistics were also gathered in order to develop total annual workload information. Salary and benefit dollars were assigned to the time estimates to come up with the direct staff costs. Indirect Costs. A proportionate share of other operating expenses and internal department administrative costs were layered onto the direct costs as departmental overhead. Citywide overhead costs coming from the cost allocation plan (described below) were also added in as indirect overhead. These two items were components of the indirect costs: 1) departmental overhead, and 2) citywide overhead. The cost of each activity is then compared to the fee currently charged, and the extent of cost recovery is identified. Page 4 Revenues µ 5 1I>d " `-f *'3ftii Lr`�t.t® 6 !- t ° v�&�d I�!r i : B �,y =.. s, �S�elkr I �'!sli' {r - n � + 'i Bill "��# ,�! '".: i� p a N :, - ,.f! '4% 9 5 - Revenue $490,256 $470,995 96 %° $19,261 $490,256 100% $470,995 2445% Engineering $783,520 $300,607 38% $482,913 62% $725,683 93% $242,770 50% Utilities $487,958 $308,540 63% $179 -,416 37% $490,970 101% $311,552 174% Recreation $6,417,497 $3,682,270 57% $2,735,227 43% $3,413,530 53% $678,303 25% Library $634,220 $604,070 95% $30,150 5% $30,1.50 5% $0 0% Planning $2,401,472 $906,848 38% $1;494,624 62% $2,383,696 99% $889,072 59% Fire - Prevention $1,020,064 $185,372 18% $834,692 82% $1,020,064 100% $185,372 - 22% Fire -- EMS $14,863,809 $12,721,420 86% $2,142;389 14% $2,804,534 19% $662,245 31% Police $1,111,810 $863,877 78% $247,933 22% $844,642 76% $596,709 241% Code Enforcement $52,217i $45,917 88% $6,300 12% $52,217 100% $45,917 729% .Building $5,618,540 $1,769,138 31% $3,849,402 69% $5,464;554 97% $1,615,152 42% Total: $33,881,363 $21,859,054 65% $12,022,309 35% $17,720,396 52%1 $5,698,087 47% METHODOLOGY A cost of service study analyzes two components of costs: the direct costs associated with providing each fee- for-service activity, and the indirect costs that support these activities. A brief discussion of each of these components follows. (A complete, detailed report of calculations is provided as an attachment to this report). Direct Costs. The direct costs associated with fee - for - service activities were analyzed in great detail in this study'. PRM worked with staff within each of the ten divisions to develop the analysis that is summarized in the following sections of this report. The fiscal year 2006 -2007 adopted budget was used to identify direct costs. The first step in the process was to identify staff time spent directly on each of the user fee activities. Each staff person involved in the user fee services identified time spent to complete each task associated with all user fee services.. Annual volume statistics were also gathered in order to develop total annual workload information. Salary and benefit dollars were assigned to the time estimates to come up with the direct staff costs. Indirect Costs. A proportionate share of other operating expenses and internal department administrative costs were layered onto the direct costs as departmental overhead. Citywide overhead costs coming from the cost allocation plan (described below) were also added in as indirect overhead. These two items were components of the indirect costs: 1) departmental overhead, and 2) citywide overhead. The cost of each activity is then compared to the fee currently charged, and the extent of cost recovery is identified. Page 4 Cost Allocation Plan. Many of the costs that support all city programs and services are budgeted in centralized activities such as 1) Administrative Services, which provides payroll, budgeting, accounting and information systems support, 2) General Services, which provides building maintenance and custodial services, and 3) City Manager, which provides public information and general government support services. The costs of these activities and other centralized services are considered indirect overhead that support fee - for - service activities, as well as other programs and functions within the city. As part of this study, PRM developed an indirect cost allocation plan that identifies and distributes these indirect costs to all operating programs and functions within the City's organizational structure. The cost allocation plan takes a detailed approach to analyzing indirect costs. PRM interviewed staff and analyzed data within each central activity to determine: 1. What indirect support functions are provided (e.g. payroll, legal services, building maintenance, etc). 2. How to allocate centrally budgeted personnel and other operating expenses into these functions. 3. Which departments receive benefit from these services (e.g. payroll services benefit all departments that have budgeted staff, City Hall maintenance benefits all departments that are housed within City Hall). 4. How to identify the best method of allocating these costs to the users (e.g. information technology services are allocated based on the number of users and applications in each department). The end result of this analysis is the allocation of all indirect costs to all operating departments and programs. The indirect costs are then added to the direct costs to determine the full cost of all city operations — whether fee - related or not. This accounting exercise is important in that it can result in an increase in general fund revenues for reimbursement of support for user fee services and state or federally funded programs. The next section is a discussion about economic and policy considerations which may help facilitate the discussion on what cost recovery levels are appropriate for Newport Beach. To assist in that discussion, PRM offers the following comments relative to what we have seen in other agencies: • Development - related fees (planning and building) generally should have high cost recovery levels (at or close to 100 %). Exceptions may be made for services such as appeal fees, or those provided exclusively to residential applicants. • Recreation and other community services fees generally have very moderate cost recovery levels. Many programs continue to be provided free of charge, regardless of cost. Youth and seniors programs tend to have the lowest cost recovery levels (15% to 50 %). Miscellaneous classes tend to have moderate cost recovery levels (50% to 85 %), and adult sports programs have higher cost recovery levels (60% to 85 %). • No fee should be set higher than 100% cost recovery, without disclosure about the reasons why (e.g. a fine or penalty element, or the acknowledgement of one activity subsidizing another). • If the proposed fee increase is significant, many agencies will opt to phase in the increase over a period of three to five years. • Comprehensive reviews should be undertaken every three to five years, with minor cost of living adjustments made on an annual basis. Page 5 ECONOMIC & POLICY CONSIDERATIONS Calculating the true cost of providing city services is a critical step in the process of establishing user fees and corresponding cost recovery levels. Although it is the most important factor, other factors must also be given consideration. City decision - makers must also consider the effects that establishing fees for services will have on the individuals purchasing those services, as well as the community as a whole. The following economic and policy issues help illustrate these considerations. • It may be a desired policy to establish fees at a level that permits lower income groups to participate in services that they might not otherwise be able to afford. • A consideration of community -wide benefit versus specific benefit should be considered for certain services (e.g. teen after - school programs). • In conjunction with the second point above, the issue of who is the service recipient versus the service driver should also be considered. For example, code enforcement activities benefit the community as a whole, but the service is driven by the individual or business owner that violates city code. • Elasticity of demand is a factor in pricing certain city services; increasing the price of some services results in a reduction of demand for those services, and vice versa. • Public sector agencies have a monopoly on providing certain services within its boundaries, such as development - related services. However, other services, such as recreation leagues and classes, may be provided by neighboring communities, and therefore demand for these services can be highly dependent on what else may be available at lower prices. • Pricing services can encourage or discourage certain behaviors. Some examples of this would be to establish a low fee for a water heater permit to encourage homeowners to ensure their water heater is properly installed, or setting false alarm response fees on an incremental scale to discourage multiple false alarm calls. • It may be impractical to establish a cost recovery system for some services or the collection of fees may be costly and difficult to administer. Some of the fees that are charged after a service has been provided might fall under this category, for example. false alarm response fees and code enforcement violations. • A portion, 25%, of city staff long range planning costs were reallocated across current planning activities. Many cities chose to include higher amounts or none at all. The Finance Committee recommended that the considerable consultant costs related to the General Plan update should not be included in calculating planning costs. • This study analyzed approximately 428 individual fee or program areas. Seventy -six fees were decreased, while twenty -seven remained the same. Please note the statistics do not reflect the fact that many Recreation services were analyzed on a program basis, but contain multiple individual fees (of which most were not increased). Page 6 COST RECOVERY COMPARISONS The chart below displays various city recovery levels. These numbers were taken from recent PRM clients. In order to provide Newport Beach with the greatest "apples to apples" comparison, please note that these clients have undertaken the same study as Newport Beach, using the same processes and methodologies. PLANNING POLICE Recovery rates current recommended Campbell _current 26% 50% Chino Hills _ 12% 50% Cupertino n/a 100% Emeryville 34% 100% Huntington Beach 84% 100% La Habra 51% n/a La Mesa 54% _ 89% Long Beach 71% 99% Los Alamitos _ 7% --- - 53% Los Gatos — . - - - 65% --- - - -- - 100% Placer County n/a 100% Whittier 41% 74% Pittsburg 1.96% _ 49% Santa Barbara 78% n/a Redlands ---38% - - - 78% 99% POLICE RPE - PREVEN77ON Recovery rates current recommended Folsom 15% 68% Hollister 61% 98% Huntington Beach 69% 79% La Habra. 10% n/a La Mesa 45% 55% __ Lemoore _ 52% 87% Los Alamitos _ 39% 70% Long Beach 25% 96% Whittier 64% 70 %° Pittsburg 59% 62% Santa Barbara 32% not In scope Redlands 79% 97% - ��{{�� 3Jl Yt1k Pe, (,r�7�ti�4 iv'r v' r vv —._ ;.icb m. 11 RPE - PREVEN77ON ENGINEER/NG Recovery rates current recommended Folsom 29% 100% Hollister 55% 99% Huntington Beach 56% T 68% La Habra - 22% /a Long Beach - 94% _n _ 94% Lemoore 73% 100% La Mesa 88% 99% Redlands 22% 33% iewtportBea t —.. s, ,. T _' k 10 look ENGINEER/NG Recovery rates current Recovery rates Redondo Beach current recomme, Campbell 55% 63% Chino Hills 70% 66% Cupertino n/a 100% Emeryville 81% 100 0/1 Huntington Beach 86% 1000/ La Habra 29% n/a La Mesa 76% 97% Long Beach 53% 72% Los Alamitos 24% 92% Los Gatos 91% 100 0G Placer County n/a 100 0G Whittier 52 %° 1000/ Pittsburg 78% 82% Santa Barbara 62% n/a RECREA77ON Recovery rates current Recovery rates Redondo Beach current recommended Antioch 69% 69% Folsom 40% 44% Hollister 64% 74% Huntington Beach 62% 64% Irvine 28% n1a La Habra 48% n1a Long Beach 44% 59% Los Alamitos 55% 56% La Mesa 49% 60% Whittier 21% 296/6 Pittsburg 26% 29% Santa Barbara 43% n1a Redlands 16 %° 16% BUILDING Page 7 Recovery rates current recommended Redondo Beach 80% n/a Los Alamitos 82% 94% Huntington Beach 91% 98% Dublin 70% 100% Long Beach 77% 100% La Mesa 95% 100% r Page 7 II. BUILDING FINDINGS AND RECOMMENDATIONS The Building Department provides a variety of services at the request of property owners and developers seeking to build or modify a structure. The Department reviews building plans and inspects construction to ensure the plumbing, mechanical, electrical and structural codes are adhered to. The total costs of all building services, including departmental and citywide overhead is $5,618,540. These costs are currently offset by $3,849,402 in revenue. A 69% recovery. Building permit and plan review fees generate a majority of the department's revenue. Building permit fees are based on the valuation (value) of the proposed construction project. Building permit fees are used to offset the costs of inspecting and documenting building construction. Currently, plan review fees are set equal to 72% of the permit fee, except for tract home non -model units, which are set at a low 25% to recognize the economies of scale realized when checking many similar tract housing plans. Building permit fees are calculated based on the department's fee matrix, which translates project construction valuations into fees. Construction valuations are based on 2006 building valuation data (BVD) factors as published in Building Standards Magazine. This analysis includes the mid -year staffing adjustments which were approved in December of 2007. Highlights from the analysis: The purpose for this analysis is twofold. First, it justifies fees for the purposes of reconciling to City Council that building fees are directly proportionate to the cost of providing services. Second, it justifies the fees for the purpose of showing compliance with the State of California Attorney General's Opinion No. 92 -506. In this opinion the Attorney General determined that municipalities may not rely solely on valuation -based fee schedule but must demonstrate that valuation -based fees do not exceed the reasonable cost of providing service. All proposed fee adjustments for the Building Department are equal to or less than the reasonable cost of providing service and accordingly comply with Attorney General Opinion No. 92 -506. Appendix B presents a revised building permit fee table. Valuation categories have been added at the upper scale to eliminate revenue surpluses on high - valuation projects. Projects in Newport Beach are more complex than those processed by a typical city. Residential projects may involve basements, shoring, dewatering, fire alarm and sprinkler systems, sea walls and boat dock construction. This added complexity level must be reflected and recovered through the City's fee structure. • PRM worked with Department staff to develop a time study detailing the average time requirement for each service. Fully- burdened labor costs were then incorporated to find the full cost of each service. If all fee categories are adjusted to existing policy levels it is estimated that $1,615,152 additional revenue will be realized annually. We caution that this figure is based on fiscal year 2006/07 construction activity. If construction activity declines significantly, this figure will also decline. The summary charts on the following pages display current fees, full cost and recommendations for each individual fee analyzed. Pages 9 through 11 display per unit information and pages 12 through 14 show annualized information used for revenue projections. Page 8 USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach v m m m m Recommendations Existing City Policy Proposed ChtOYy, Policy Service Name Service Type Annual Volume Current Fe % of Full Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Subsidy @ Policy Level 1 Special Inspector Oro. inal Licenses Each Test Fee 50 $106 117% $91 -$15 100% 100% rFee@Policy $0 2 Special Inspector Licenses Renewal Fee 110 $80 140% $57 -$23 t00% 100% $0 3 Record Mana ement- 8.5x11 Fee 77,249 $1 61% $1 $0 100% ___ 100% $0 4 Record Management • r sheet of drawin Fee 18,644 $2 117% $2 $0 t00% _ $_0 5 Authorization to duplicate record drawings Fee 7 $50 108% $46 -$4 _ 100% ______100% 100% $50 _ _ $0 6 Appeals Board Heating Fee 3 _ $887 14% _ $5,260 100% 150% $3,070 7 Modification To UBC /Alt. Materials 8 Methods Eac Fee 150 $200 82% __$6,147 $243 $43 100% 100% $240 __$0 $0 8 Hazardous Material Disclosure Fee 250 $25 183% $14 -$11 100% 100% $10 $0 9 Flood Zone Determination Fee 5 $25 54% $47 $22 100% 100% $50 $0 10 Temporary Certificate of Occupancy Fee 12 $213 117% $182 -$31 100% 100% $180 $0 11 Extension of Temporary Certificate of Occupancy Fee 4 $106 150% $71 -$35 100% 100% $70 $0 12 Certificate of Occupant Fee 30 $106 150% $71 •$35 delete Delete from fee schedule -old process 13 Residential Budding Report - SFR Fee 969 $177 120% $148 -$29 79% 100% $150 _ $0 14 Residential Building Report - Duplex Fee 68 $213 123% $173 -$40 79% 100% $170 $0 15 Residential Building Report • Re4nsp Fee 100 $106 138% $77 -$29 79% 100% $80 $0 16 Preliminary Plan Review Hourly 90 $1061 hi Na $167 Na 45% 100% $170 $0 17 RepetitWe Structural Plan Check Fee 1 25% of PC Na $2,944 Na 100% 100% 25% of PC $0 18 Determination of Unreasonable Hardship Fee 70 $104 44% $234 $130 100% 100% $230 $0 19 Grading Permit/Plan Check -1 -200 Cubic Yds Fee 102 $876 75% $1,174 $298 71% 100% $1,170 $0 20 Grading Permit/Plan Check -950 Cubic Yds Fee 85 $1,152 109% $1,059 -$93 71% 100% $1,060 $0 21 Grading PermitlPtan Check - 100,000 Cubic Yds ( Fee 1 $10,408 209% $4,980 - $5,428 71% 100% $4,980 $0 22 Drain a Permit/Plan Check Fee 117 $254 54% $472 $218 100% 100% $470 $0 v m m m m USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach --- Building 200 &2007 - T w 0 0 Recommendations Existing City Proposed atoy, Polic Service Name Service Type Annual Volume Current F % of Full Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Level I %) Fee @ Policy Level Subsidy @ Policy Level 23 Water QualM mt Plan lnpection/Review (1131 -2 Fee 25 $631 _ 32% $1,967 $1,336-.-- 100% 100% $1,970 $0 24 Plan Check Extension Fee 354 $50 95% $53 $3-- 100% 100% $50 $0 25 Waste M mt Admin Fee Inspections To GS 139 $0 _ 0% $14 $14 100% 100% $10 _ $0 26 Plan Check Revisions Hourly 500 $1061 hr r1a $473 n/a 100% 100% $146 $0 27 Grease Disposal License Fee 1 1 $536 88% $612 $761 100% 100% $610 $0 28 Fire Sprinkler TI Fee 199 $260 60% $435 $175 100% 100% $430 29 Fire Alarm TI Fee 171 $404 81% $498 $94 100% 100% $500 _$0 $0 30 Fire Sprinkler House Fee_ 64 $434 81% $535 $101 100% 100% _ _ _ $0 31 Fite Sprinkler 10,000 Sq. FL Bldg. Fee 8 $1,813 78% _ _ $2,336 $523 100% 100% __$540 $2,340 $0 32 Fite Alam 10,000 Sq. Ft. Bldg. Fee 2 $1,715 130% $1,324 -$391 100% 100% $1,320 $0 33 Residential New -Large (3209 -2005) Fee 30 $7,081 -68% $10,479 _ - $3,398 _ 100% 100% $0 34 Residential New -Small Fee 90 $4,466 _ 57% $3,352 100% 100% - ,$10,480 $7,820 _ $0 35 Commercial New-Large (1131 -2006 ) Fee 1 $123,195 214% _$7,818 $57,609 - $65,586 100% 100% $57,610 _ $0 36 Commercial New -Small Fee 10 $8,822 77% $11,476 $2,654 100% 100% $11,480 _ $0 37 Residential Addition Fee 193 $2,121 67% $3,162 $1,041 100% 100% _ $3,160 $0 38 Remodel Medium Fee 37 $2,753 81% $3,418 $665 100% 100% $3,420 $0 39 Remodel Small Fee 885 $1,063 73% $1,449 $386 100% 100% $1,450 $0 40 Tenant Improvement Large Fee 12 $5,615 116% $4,834 -$781 100% 100% $4,830 $0 41 Tenant Improvement Small Fee 253 $914 51% $1,792 $878 100% 100% $1,790 $0 42 Harbor Pier Plan Check/Inspection (Maximus Fee 1 Na Na n/a Na Na n/a n/a Na 43 Pool Small Fee 88 $718 85% $846 $128 100% 100% $850 $0 T w 0 0 d, t f e, USER FEE STUDY SUMMARY SHEET - PER UNIT INFORMATION - Newport Beach Building 2006 -2007 # Due fo lowocourorrcrs ofths category, bme a bFinafes are not available. Recommend fee remain a125% ofogt Anal plan check. a Plan chedrandinspection fees will be ldend0ed separately for these services. b Cost Inckrdes estimated UNih'es bme to periodically undog oratn. c This revenue accrues to the fim Department. d This service categoryac'dresses tnspedims, Trot assodated with a larger project Examples indude re-roofs, fence permAs, signs and drainage. e Proposedpoikyfor waterheaterpermis s 50% cost recovery. f Thase permitcategones were analyzed on a program basis, recommended lee adjustments will be made to all permils to the permtl category. Ths 1s why the annual volume is istad as f. v m Recommendations Ex/sting City Po /ic Proposed Qjoyv Po /icy Service Name Service Type Annual Volume Current F % of Full Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level I %) Cost Recovery Policy Level I %) Fee @ Policy Level Subsidy @ Policy Level 44 Pool Large Fee 69 $1,157 84% $1,372 $215 100% 100% $1,370 $0 45 Miscellaneous Permits Fee 1 $47,229 47% $100,115 $52,886 100% _ 100% ------ _ $100,120 $0 46 Solitary Electrical Permits Fee _ 1 $50,760 31% $164,605 $113,845 100% 100% $164,610 $0 47 Solitary Plumbing Permits Fee 1 $51,075 27% $189,534 $138,459 100% 100% $189,530 _ $0 48 Solitary Mechanical Permits Fee 1 $32,460 31% $105,262 $72,802 100% 100% $105,260 $0 # Due fo lowocourorrcrs ofths category, bme a bFinafes are not available. Recommend fee remain a125% ofogt Anal plan check. a Plan chedrandinspection fees will be ldend0ed separately for these services. b Cost Inckrdes estimated UNih'es bme to periodically undog oratn. c This revenue accrues to the fim Department. d This service categoryac'dresses tnspedims, Trot assodated with a larger project Examples indude re-roofs, fence permAs, signs and drainage. e Proposedpoikyfor waterheaterpermis s 50% cost recovery. f Thase permitcategones were analyzed on a program basis, recommended lee adjustments will be made to all permils to the permtl category. Ths 1s why the annual volume is istad as f. v m USER FEE STUDY SUMMARY SHEET TOTAL PROGRAM INFORMATION- Newport Beach Building 2006 -2007 m N Recommendations Existing City Polly Proposed City Poiic Service Name Service Type Revenue @ Current Fee % of Full Cost Revenue @ 100% Full Cost Current Subsid y Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 1 Special Inspector Original Licenses Each Test _ -_ Fee $5,300 117% _ $4,528 -$772 100% 100% $4,500 -$800 2 Special Inspector Licenses Renewal Fee __$8,800 _140% _ $6,280 ___ -- __ - $2,520 -- __ -.._ 100% --------- 100% $6,600 _$2,200 3 Record Management - 8.5 x 11 Fee $38,625 61% $63,670 $2_5,046 ___ 100% __ 100% _ $38,625 4 Record Management - per sheet of drawing Fee $37,288 117% $31,973 - $5,315 100% 100% __$77,249 $37,288 _ $0 5 Authorization to duplicate record drawings Fee $350 108% $324 -$26 100% 100% $350 $0 6 Appeals Board Hearin Fee $2,661 14% $18,440 $15,779 100% 50% $9,210 $6,549 7 Modification To UBC /Ah. Materials & Methods Eac Fee $30,000 82% $36,415 $6,415 100% 100% $36,000 $6,000 8 Hazardous Material Disclosure Fee $6,250 183% $3,418 - $2,832 100% 100% $2,500 - $3,750 9 Flood Zone Determination Fee $125 54% $233 $108 100% 100% $250 $125 10 Temporary Cenfficate of Occupancy Fee $2,556 117% $2,189 -$367 100% 100% $2,160 _ 4396 11 Extension of Temporary Certificate of Occupancy Fee $424 150% $283 $141 t00% 100% $280 -$144 12 Certificate of Occupancy Fee n/a Na n/a n/a n/a Na n/a _ n/a 13 Residential Building Report - SFR Fee $171,513 120% $143,015 - $28,498 79% 100% $145,350 _ - $26,163 14 Residential Building Report - Duplex Fee $14,484 123% $11,781 $2,703 79% 100% $11,560 - $2,924 15 Residential Building Report - Reins Fee $10,600 138% $7,697 - $2,903 79% 100% $8,000 - $2,600 16 Preliminary Plan Review Hourly $9,540 64% $15,002 $5,462 45% 100% $15,300 $5,760 17 Repetitive Structural Plan Check Fee $2,944 100% $2,944 $0 100% 100% $2,944 _ $0 18 Determination of Unreasonable Hardship Fee $7,280 44% $16,395 $9,115 100% 100% $16,100 $8,820 19 Grading Permit/Plan Check -1 -200 Cubic Yds Fee $89,352 75% $119,757 $30,405 71% 100% $119,340 $29,988 20 Grading Permit/Plan Check -950 Cubic Yds Fee $97,920 $90,000 - $7,920 _ 71% 100% $90,100 $7,820 21 Gradin Permit /Plan Check• 100,000 Cubic Yds Fee $10,408 -109% 209% $4,980 - $5,428 71% 100% $4,980 - $5,428 22 ina Pemit/Pian Check Fee $29,718 54% $55,170 $25 452 100% 100% $54 990 $25 272 m N USER FEE STUDY SUMMARY SHEET -TOTAL PROGRAM INFORMATION - Newport Beach 20062007 m m m Recommendations Existing City Policy Pro oosed city Policy Service Name Service Type Revenue @ Current Fee % of Full Cost Revenue @ 100% Full Cost Current Subsid y Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 23 Water QualM mt Plan In ionlReview 1131 -2 Fee $15,775 32% $49,187 $33,412 100% 100% $49,250 24 Plan Check Extension Fee $17,7d0 95% _ _ $18,631 $931 100% _ 100% $17,700 __$33,475 $0 25 Waste M mt Admin Fee Inspections To GS $0 0% _ $1,901 _ $1,901 _ _ t00% 100% $1,390 $1,390 26 Plan Check Revisions _ Hourly_ $171,720 73% ___$23.6,401 _ $64,681 _100% 100% $72,963 - $98,757 27 Grease Disposal License Fee $536 88% _ $612 $76 100% 100% $610 $74 28 Fire Sprinkler TI Fee $51,740 60% $86,544 $34,804 _ 100%100% _ $85,570 $33,830 29 Fire Alarm TI Fee $69,084 81% $85,084 _ $16,000 _ 100% 100% _ $85,500 $16,416 30 Fire Sprinkler House Fee $27,776 81% $34,267 $6,491 100% _ 100% $34,560 $6,784 31 Fire Sprinkler 10,000 Sq. Ft. Bldg. Fee $14,504 78% $18,686 $4,182 100% 100% $18,720 $4,216 32 Fire Alam 10,000 Sq. Ft. Bldg. - Fee $3,430 130% $2,648 -$782 100% 100% $2,640 $790 33 Residential New -Large (3209 -2005) Fee $212,430 68% $314,384 $101,954 _ 100% 100% $314,400 $101,970 34 Residential New-Small Fee $401,940 57% $703,599 $301,659 100% 100% $703,800 $301,860 35 Commercial New-Large (1131 -2006 ) Fee $123,195 214% $57,609 - $65,586 100% 100% $57,610 - $65,585 36 Commercial New-Small Fee $88,220 77% $114,758 $26,538 100% 100% $114,800 $26,580 37 Residential Addition Fee $409,353 67 %, $610,2361 $200,883 _ 100% 100% $609,880 $200,527 38 Remodel Medium Fee $101,861 81% $126,453 $24,592 100% 100% $126,540 $24,679 39 Remodel Small Fee $940,755 73% $1,282,367 $341,612 100% 100 %, $1,283,250 $342,495 40 Tenant Improvement Large Fee $67,380 116% $58,003 - $9,377 100% 100% $57,960 - $9,420 41 Tenant Improvement Small Fee $231,242 51% $453,261 $222,019 1001y. 100% $452,870 $221,628 42 Harbor Pier Plan Check/Inspection (Maximus) Fee Na We We n/a Na n/a We n1 43 Pool Small Fee $63,184 85% $74,477 $11293 100% 100% $74,800 $11,616 m m m USER FEE STUDY SUMMARY SHEET -TOTAL PROGRAM INFORMATION - Newport Beach Building 2006 -2007 -- - — Total User Fees Recommendations Existing City Po /ic Proposed Cil4yr Potic Service Name Service Type Revenue @ Current Fee % of Full Cost Revenue @ 100% Full Cost Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 44 Pool Large _ Fee $79,833 84% $94,653 $14,820 100% 100% $94,530 0% 45 Miscellaneous Permits Fee $47,229 47% $100,115 $52,886 100% 100% $100,120 _$14,697 46 Solitary Electrical Permits Fee $50,760 31% $164,605 $113,8451 1000 100% $164,610 $113,850 47 Solitary Plumbing Permits Fee $51,075 27% $189,534 $138,459 100% 100° %^ $189,530 $138,455 48 Solitary Mechanical Permits Fee $32,460 31%I $105,262 $72,802 100% 100% $105,260 $72,800 Total User Fees $3,849,402 $5,618,540 $1,769,137 $5,464,554 $1,615,152 %of Full Cost 69% 100% 31°% 97% 29°% Total Other Services $0 $0 $0 $0 $0 % of Full Cost 0% 0% 0% 0°% 0% Department Totals $3,849,402 $5,618,540 $1,769,137 $5,464,554 $1,615,152 %of Full Cost 69% 100% 31°% 97% 29°% v m a A III. PLANNING FINDINGS AND RECOMMENDATIONS The Planning department provides services related to land use within the city limits. This includes: processing of all zoning and land use applications, preparation of special studies associated with long -range land use objectives and working with the development community to facilitate new projects. The total cost of all Planning services Including overhead and non -fee services) is $3,053,238. The current fee structure for the Planning department is a combination of flat fee and hourly rate services. For most services a flat fee is charged, however more complex services are charged by hourly rates. The current hourly rate structure was calculated by grouping, averaging and weighting positions and the complexity of the work being performed. PRM agrees with the weighting methodology and purposes two new hourly rates - $119.00 for detailed review projects and $151.00 for advanced review projects. A listing of services charged by hourly rates can be seen on the following two pages. The following is a review of findings and recommendations • Fee - for - service costs total $2,401,472 and are offset by current revenues of $1,494,624. This translates into an overall user fee cost recovery rate of 62 %. • Ministerial reviews are currently charged at $75 per hour. However, this rate is only recovering 63% of the fully burdened costs of $119 per hour. It is recommended that this fee level be increased to reflect 100% recovery. • Discretionary reviews are higher complexity projects and therefore reviewed by more experienced staff. The current hourly rate of$135 per hour recovers 89% of the fully burdened costs. It is being recommended that the recovery level for advanced reviews be adjusted to 100 %. This would increase the rate to $151 per hour. • The current recovery for flat fee services ranges from 3% (off -site parking agreements) to 299% (Christmas tree and pumpkin lot permits). • Long range / advanced planning costs were analyzed on a yearly basis. These costs reflect city staff costs only and do not include any consultant costs. Twenty -five percent of yearly costs were reallocated across current planning activities. • If all current recommendations are approved, the Planning department could generate an additional $889,072 in general fund revenue. This would increase the fee related services recovery from 62% to 99 %. The summary charts on the following pages display current fees, full cost and recommendations for each individual fee analyzed. Pages 16 and 17 display per unit information. Pages 18 and 19 show annualized information used for revenue projections. Page 15 USER FEE STUDY SUMMARY SHEET - PER UNIT INFORMATION - Newport Beach - -- Planning _ -- -- - 2006.20M m o+ Recommendavons Existing City Polk Pm sect citoyVI Palic Service Name Service Type Annual Volume Cunent Fee %of Full Cost 100% of Full rest Current Subsidy Cost Recovery Polity Level ( %) Cast Recovery Polity Level ( %) Fee @ Policy Level Subsidy @ Policy Level 1 Accoasoiy, Outdoor Dining Fee 1 $530 16% $3,316 $2,786 100% 100% 100% $3,316 $1,306 $0 $0 2 Amateur Radio &Satellite Dish Antenna Pen _ Fee 1 $180 14% $1,306 $1,126 100% 3 Amendments - Zoni &Planned Communil How 8 $14,243 85% $16,836 $2,593 100% _ 100% $16,836 $0 4 Amendments - General Plan _Hounly 6 $13,556 95 %_$15,958 $2,402 100% 100% $15,958 $0 7 Appeals to City Council &PC Fee 5 $340 5% $7,165 $6,825 50% 5D% $3,582 _ 9 A oval in Concept Fee 106 $360 _ $291 100% 100% $651 10 Christmas Tree and Pumpkin Lots _ Fee 1 $180 _55% 299% _ _ _$651 $60 -$120 100% 100% $60 -$0 $0 11 Certificate of Compliance Fee 13 $530 94% $562 _ _ $32 _____ 100% 100% $562 _ $0 12 Coastal Residential Development Permit Hourly 4 $5,231 87% $5,985 $753 100% 100% $5,985 _ $0 13 Compliance Levers/ Minor Records Resesur Fee 38 $90 27% $329 $239 100% _ 100% $329 $0 14 Condominium Cornersion Permit Fee 40 $1,070 90% _ $1,193 $123 100% 100% $1,193 $0 15 Creative /Comprehensive Sign Permit He 12 $3,206 102% $3,155 452 _ 100% 100% $3,155 $0 17 Development Plan / Site Plan He 1 $6.615 96% $6,856 $241 100% 100% $6,856 s0 18 Director /Stag Approval Fee 19 $450 21% $2,155 $1,705 Na 100% $2,155 $0 21 Hedta Sign ReAew Fee 1 $800 40% $2,005 $1,205 100% 100% $2,005 m 23 Lot Lim Adjustment /Lot Merger Fee 22 $710 55% $1,296 $586 100% 100% $1,296 $0 25 Modfication Permit Fee 132 $1,070 49%1 $2,1851 $1,115 100% 100% $2,185 $0 26 O8 -Site Parking Agreement Fee 3 $135 3% $4,454 $4,319 100% 100% $4,454 $0 28 Sign Exception Permit Fee 1 $135 0% $0 -$135 100% 100% $135 _ $0 30 Subdivisions - Parcel Map Fee 66 $710 24% $2,242 100% 100% $2,952 $0 31 SubdMsions- Tentative Tract l Vesting Map Hourly 4 $7,718 94% _$2,952 $8,242 $524 100% 100%1 'S ,242 $0 33 Telecom Permit - Council Hourly 2 53,308 101% $3,275 432 Na 100% $3275 $0 34 Telecom Permit - Director Ho 12 $1,283 119% $1,081 -$202 Na 100% $1,081 $0 35 Temporary Uses Fee 1 $710 52% $1365 $655 100% 100% 1365 $0 m o+ ai aJ b) d) eJ eJ eJ eJ USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach 200 &2007 a) LLrrenlaeawMls an average based on S135houdymte. b) Currant feet ere /is an avarage based on$75haMyrafe. C) fits service is MYMOVYas&4 Menafine accurate lime esdmates ano r*rava)aba. The CRY acwnmeMs keep/ng the cumarstfee aver d) 25% offtse coats wive reasocesed aaoss cmrewplanning acdviies. s) The costs ofMeseservices wsns bansarmd Ind i,&.ded /n dwanalis . to, Recreation (Special Even[y and Revemre (Business lJoense mvaw). Please note. The fee fame ldbwing services wff condmro to be Margedon an houdybesm Amendmanls - Planned Rewdensa/ Development Amendment -Zone Code Appeals to Plerming Comndssion Deva/opmentAgiaement Envinbrmena/Oxument Genera /P/anAmendmem Panned Commun/ry An andn>em Plan Sit Plan Review Subdivisions- Vestal Temadve Map Tmhk Shw WUse Pemdt- Panned Residenda/ Development PtnniV Pan Check- Datayadmvtw V Recommendations EAisfing City Policy Proposed C/ Po //c Service Name Smice Type Annual Volume Cument Fee % of FWI Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Fee @ Policy Level Subsidy @ Polio/ I Level 38 Use Permit - Plannin Commission Hourly 6 $23,396 95% $24,616 $1,221 100% 100% $24,616 $0 39 Use Permit- Planning Director Fee 22 _ $2,000 108% $1,860 -$140 100% 100% $1,860 $0 40 Variance Hourly 3 $8,510 93% $9,166 $657 100% 100% $9,166 $0 41 Planning Plan Check - Counter Check Fee 950 $40 33% _ $122 100% 100% $122 42 Planning Plan Check• Detailed Review Hourly 270 $2,313 64% $3,599 ___$82 $1,286 _ 100% _ 100% $3,599 _ _ _ --SO $0 431-0n Mn fee 1_ _. $0 ----0% $334,989 na 0% $0 $_3_34,989 44 Record Mane amen[ Mn fee 1 _ $0 0% _$334,989 --- so $0 nib _ D% _ $0 $0 45 All other activity Non fee 1 $0 0% $166,058 _$166,058 Na 0% $0 $166,058 46 Special Event Level l 1 l 01! 175 $0 0% $201 $201 We 0% _ EO $20_1 47 Special Event Level II %S rt 125 _ $0 0% $502 $502 We 0% $0 $502 48 Special Event Level III %Support 20 $0 0% $1,019 $1,019 Na 0% $0 49 Business License review %S art 5449 $0 0% $6 $6 Na 0% _ $0 _$1,019 $6 a) LLrrenlaeawMls an average based on S135houdymte. b) Currant feet ere /is an avarage based on$75haMyrafe. C) fits service is MYMOVYas&4 Menafine accurate lime esdmates ano r*rava)aba. The CRY acwnmeMs keep/ng the cumarstfee aver d) 25% offtse coats wive reasocesed aaoss cmrewplanning acdviies. s) The costs ofMeseservices wsns bansarmd Ind i,&.ded /n dwanalis . to, Recreation (Special Even[y and Revemre (Business lJoense mvaw). Please note. The fee fame ldbwing services wff condmro to be Margedon an houdybesm Amendmanls - Planned Rewdensa/ Development Amendment -Zone Code Appeals to Plerming Comndssion Deva/opmentAgiaement Envinbrmena/Oxument Genera /P/anAmendmem Panned Commun/ry An andn>em Plan Sit Plan Review Subdivisions- Vestal Temadve Map Tmhk Shw WUse Pemdt- Panned Residenda/ Development PtnniV Pan Check- Datayadmvtw V USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach 2006 -2007 10 m m Recommendations Existing City Polic Pro osed city Policy Service flame Service YP Type Revenue @ Current Fee % of Full Cost Revenue @ 100% Full Cost Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 1 Accessory Outdoor Dining $530 $3,316 $1,306 $2,786 $1,126 100°16 100% 100% $3,316 $1,306 $2,786 $1,126 _ 2 Amateur Radio &Satellite Dish Antennae _Fee_ Fee $180 _16% 14% 3 Amendments - Zonin &Planned Commu Hourly $113,940 _ 85% $134,688 $20,748 100% 100_% $134,688 $20,748 4 Amendments - General Plan -Hourly $81,338 _ 85% $95,747 $14,409 100% _ 100% $95,747 $14,409 7 Appeals to City Council &PC Fee $1,700 5% $35,823 $34,123 50% 50% $17,912 $16,212 9 A royal in Concept Fee $38,160 55% $68,956 $30,796 100% $68,956 $30,796 10 Chnstmas Tree and Pumpkin Lots Fee $180 299% $60 $120 _100% 100% 100% $60 •$120 11 Certificate of Compliance Fee $6,890 94% $7,308 $418 _ 100% 100% $7,308 $418 12 Coastal Residential Development Permit Hour $20,925 87% $23,938 $3.013 100% 100% $23,938 $3,013 13 Compliance Letters / Minor Records Reset Fee $3,420 27% $12,495 $9,075 100% 100% $12,495 $9,075 14 Condominium Conversion Permit _Fee $42,800 90% $47,705 $4,905 _ 100% $47,705 $4,905 15 Creative / Com rehersive Sign Permit _ Hou $38.475 102% $37,855 -$620 _ 100% ____100% 100% $37,855 -$620 17 Development Plan /Site Plan Hourly $6,615 _ __ 96% $6,856 $261 100% _ _ 10_0% _ $6,856 $241 18 Director I Staff Approval Fee $8,550 _ 21% $40,950 $32,400 we 100% $40,950 $32,400 21 Heritage S' nReview Fee $800 40% $2,005 $1,205 100% _ 100% $2,005 $1,205 23 Lot Lino Adjustment I Lot Merger Fee $15,620 55% $28,512 $12,892 100% 100% $28,512 $12,892 25 Modification Permit Fee $161,260 49% $288,415 $147,175 100% 100% $288,415 $147,175 26 Off-Site Parki A mement Fee $405 3% $13,363 $12,958 100% 100% $13,363 $12,958 28 Sign Exception Permit Fee $135 0% $0 -$135 100% 100% $135 $0 30 Subdivisions - Parcel Ma Fee $46.860 24% $194,846 $147,986 100% 10� $194,846 $147,986 31 Subdivisions - Tentative TTMHou $30,870 94% $32,966 $2,096 100% 100% $32,966 $2,096 33 Telecom Permit - Council $6615 101% $6,550 -$65 n/a 100% $6,550 •$65 34 Telecom Permit- Director $15390 119% $12,966 - $2,424 Na 100% $12,966 $2,424 35 Tem on Uses $710 52% $1365 $655 100% 100% $1,365 $655 38 Use Permit- Planni Co $140,373 95% $147,698 $7,325 100% 100% $147,698 $7,325 39 Use Permit - Plannl Dir $44000 108% $40923 -$3077 100% 100% $60923 $3,077 10 m m USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach Planning 2006.2007 Total User Fees Recommendations ExIstIng City PoACT Proposed City Policy Service Name Revenue Currerd Fee %af Full Cost Revenue @ 100% Fun Cost Current Subsidy Cast Recovery Policy Level (%) Cost Recovery Policy Level (% Revenue @ Policy Level Increased Revenue 40 Variance _ $651,766 _ _._ $25,529 93% __$27,499 _ _ $1,970 _ __100% _ 100% __ $27,499 $1,970 _ 41 Planning Plan Check - Counter Check_ $1,494,624 $38,000 33% $115,696 $77,696 100% 100% $115,696 $77,696 42 Planning Plan Check - Detailed Review rHou $624,375 64% $971,663 _ $347,288 100% 100% $971,663 $347,288 43 Lon Ran ePlannirg $0 0% $334,989 $334,989 Na 0% $0 $0 44 Record Mane ement $0 0% $0 $0 Na 0% $0 $0 45 All other aaiv' $0 0% $166,058 $166,058 Na 0% $0 $0 46 Special Event level l XSU rt $0 0.00% $35,158 $35,158 We 0% $0 $0 47 Special Event Level ll X Su rt $D 0.00% $62,783 $62,783 Na 0% $0 $0 48 Special Event Level 111 XSU A $0 0.00% $20,383 $20,383 Na 0% $0 $0 49 Business License review %Support $0 0.00% $32,394 $32,394 Na 1 0% $0 $0 Total User Fees $1,494,624 $2,401,472 $906,848 $2.383996 $889.072 %of Full Cow 62% 100% 38% 99% 37% Total Other Services $0 $651,766 $651,766 $0 $0 %of Full Cost 0% 100% 100% 0% 0% Department Totals $1,494,624 $3,053,238 $1,558,614 $2,383,696 $889,072 %of Full Cast 49% 100% 51% 78% 29% V m m IV. PUBLIC WORKS - ENGINEERING FINDINGS AND RECOMMENDATIONS The Public Works department is responsible for the planning, construction and maintenance of the City's infrastructure; including buildings, parks, landscaping, and utilities. The department Is comprised of six divisions: 1) Engineering, 2) Infrastructure Master Planning, 3) Traffic Planning and Engineering, 4) CIP Design and Construction, 5) Development Services, and 6) Public Right of Way Permitting. For purposes of this study, PRM focused only on labor-based user fee services. Therefore, although this analysis included all components of costs associated with user fees, including citywide overhead, department administration and other direct operating costs, it did not include all the costs of the department in its entirety. The majority of user fee services are provided by the Engineering division. However, other divisions such as Traffic Planning and Engineering also participate in some fee-related services and their costs are also included in this analysis. The total costs analyzed, including non fee activity, is $5,558,206. Fee related activities total $783,520 and are offset by $482,913 in current revenue. Highlights from the analysis: • Map Check fees — city staff have proposed structural changes for these fees. Staff feel strongly that the size of the map (i.e. parcel vs tract) does not determine the processing time, but rather whether the project is simple, moderate or complex. The proposed changes are as follows: Current Structure Proposed Structure Parcel Map Check $850 Simple Map $340 Tract Map Check $2,834 Moderate Map $2,110 Complex Map $3,170 • Street Closure Permit fees — these fees are currently set above actual cost. These fees must be reduced to actual cost, resulting in an $11,000 revenue decrease. • Overall, based on existing cost recovery policy, annual fee revenue is projected to increase by $242,770. The summary charts on the following pages display current fees, full cost and recommendations for each individual fee analyzed. The first summary chart displays per unit information and second chart shows annualized information used for revenue projections. Page 20 USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach Public Works - Engineering _- — - -- - 2006 -2007 -- - - -- - V m N Recommendations ExtstIng City Polic P ed City Polic Service Name Service Type Annual Volume Current Fee % of Full Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level I %) Cost Recovery Policy Fee @ Policy, Level Subsidy @ Policy Level 1 Encroachment Permit Without Other DetJDiv .Review Fee 435 $127 51% $249 $122 88% 88% $220 $0 2 Encroachment Permit With Other Dept./Div. Review Fee 146 $241 48% $502 $261 57% 57% $290 $0 3 Encroachment 8 En g. Agreement Pre Fee 4 $278 34% $829 $551 100% 100% $830 _ 4 Document Recordation Fee Fee 90 $101 53% $189 $88 100% 100% $190 --,-$0 $0 5 Engineering Feld inspection Fee 1,976 $82.50 1Ins 60% $137 $55 100% 100% $140Ms ,$0 6 Utilities Field Inspection Fee 447 $82.5011ns _ 45% $181 $99 _ 100% 100% $180fins _ _ $0 7 Lot Line Adjustment Checking Fee Fee 17 _ $808 _ 82% _ $991 _ $183 100% 100% $990 $0 8 Easement Deed Research., Reviews./Processing Hourly 2 Hourly Na $195 nla 100% 100% $100 _ $0 9 Certificate of Compliance Review Fee 2 $383 - Hrly Over 3 I 145% $264 -$119 100% 100 %$260 +hri <3hr _ $0 10 StraeL Easement and Vacation Processing. Fee Fee 5 $425 + Hrly Over hre 48% $889 $464 100% 100 %$890 +hr <ghr _$0 11 Covenant Agreement. Research & Review. Fee Hourly 1 Houd Na $195 n/a 100% 100% $100 $0 12 Traffic Subdivision Plan Check Hourly 200 Hourly n/a $195 We 100% 100% $100 $0 13 Traffic Control Plan Check - 8.5 x 11 400 $13 27% $46 $34 100% 100% $50 $0 14 Traffic Control Plan Check -24x36 40 $97 /hr, 112 hr min 77% $127 $30 100% 100% $104 $0 15 Traffic Stu 10 $135 /hou 70% $193 $58 100% 100% $95 _ $0 16 Plan Check wi% Pre- Permit Review 20 Hou n/a $195 n/a 100% 100% $100 $0 22 Sidewalk CaI6 Encr. Permit- 1 $67 20% $340 $273 100% 100% $340 $0 23 Sidewalk CatB Encr. Pormh- T2nsfer 1 $34 23% $146 $113 100% 100% $150 $0 26 CO in AUTOCAD Format Fee 15 $22 28% $78 $56 100% 100% $80 $0 27 P. W. Design Criteria, Special Provisions 8 Drawings CPRA 20 $13 n/a n/a n/a addressed in public records analysis _ 28 Blueprints/Bond Copies 1 -5 sheets CPRA 20 $3.70 +$67 /hr of Tech Rose n/a n1a Na addressed in public records analysis 29 Blueprints/Bond Copies - 5 more I CPRA 1 50 IBlue printer Invoices Direct n1al We Na addressed In public records analysis 30 Cenladine Ties and Benchmark Sheets - 1 -5 copies I CPRA 1 250 1 $2 n/a n/a n/a addressed in public records analysis V m N b c c c c b d e e e USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach Public. Works _Engineering_ 2006- 2007 - - - a Staff recrommend d e e service Was be changedlo P011c W0ft PWject Rewew". b Thesefess are resbicled by the Cabfom/a Pubic Recur &Actandam addressed/n a separate sedm d 7bsseamdamagedeposes. St ffr mmendsdepositamountsremabruncharged. d The fee x s/mllarto Me "work wbhout a penne "chargedbyMe Sul/d9V Division. e /fhwrormoresubmiba/s are reguhed, 50% of the oiVhw1fee welbeassacsedhxenmordmlypnoe Ing I Staff c n end Meseservke Mles be changed to Engh7 ah g Review" N d N N Recommendations ExIsting City Pofic Proposed Cit Potic Service Name Service Type Annual Volume Current Fee % of Full Cost 100 %of Full Cost Current Subsidy Cast Recovery Policy Level ( %) Cost Recovery policy Level Fee @ Policy Level Subsidy ve Policy Level 31 Centerline Ties and Benchmark Sheets 610 copies CPRA 275 $4 n/a We n/a addressed in public remrd_s_analysis 32 Escrow Account Administration _ Fee 5 $134 49% $272 $138 100% 100% $270 $_0 33 Records of Survey Review Fee 125 $82.50 /hr 37% $225 $142 100% 100% $88 $0 34 Monitorina Wells Fee 5 $300 66% $453 100%100% $450 $0 35 Special Request/Research Non PRA Hourly 17 Hourly nla $195 _$153 n/a 100% 100% $100 $0 36 Crane Deposk Deposit 50 $1,000 n/a Na rue We n/a _ n/a We 37 Underground Utilities ( <100 LF) Deposit 100 $624 for < 100 LF nla n/a n/a n/a n/a _ n/a We 38 Underground Utilities 100+ LF Deposit 12 $2,080 for> 100 LF Na Na n/a n/a n/a _ n/a n/a 39 Improvements Required B City Deposit 4 Determined by Public Works Na n/a n/a n/a n/a __ n/a n/a 40 Street Closure Permit _ Fee- 1,000 $61 131% $46 -$15 100% 100% _ $50 _ $0 41 Temporary No Paddng Sign CPRA 3,000 $1 _ n/a n/a _ n/a _ addressed in public records analysis 42 Public Works Invesfigation New Fee 1 $0 0% _ $485 _ $485 100% 100% $190 $0 43 Ma Check -Sim le Restructure 18 $850 248% $343 4507 _ 100% 100% _ $340 _ $0 44 Map Check - Moderate Restructure 18 $8501 40%1 $2,112 $1,262 100% 100% _ $2,110 $0 45 Map Check -Complex Restm aure 18 $2,8 34 89% $3,173 $339 100% 100% $3,170 _ $0 46 Non Fee Azdvity Non Fee 1 $0 0% $4,774,686 $4,774,686 n/a We n/a Na a Staff recrommend d e e service Was be changedlo P011c W0ft PWject Rewew". b Thesefess are resbicled by the Cabfom/a Pubic Recur &Actandam addressed/n a separate sedm d 7bsseamdamagedeposes. St ffr mmendsdepositamountsremabruncharged. d The fee x s/mllarto Me "work wbhout a penne "chargedbyMe Sul/d9V Division. e /fhwrormoresubmiba/s are reguhed, 50% of the oiVhw1fee welbeassacsedhxenmordmlypnoe Ing I Staff c n end Meseservke Mles be changed to Engh7 ah g Review" N d N N USER FEE STUDY SUMMARY SHEET -TOTAL PROGRAM INFORMATION - Newport Beach Public Works - Engineering 2006 -2007 N tV Recommendations Existing City Proposed City Po {ic Service Name Service Type Revenue @ Current Fee % of Full Cost Revenue @ 100% Full Coal Current subsidy Cost Recovery Policy Level (%) Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 1 Encroachment Permit Without Other Dept. /Div. Review Fee $55,245 51% $108,441 $53,196 88% 88% $95,700 $40,455 2 Encroachment Permit With Other Dept. /Div. Review Fee $35,186 48% $73,341 $38,155 57% _ 57% $42,340 _ $7,154 3 Encroachment & Eng. Agreement Prep Fee $1,112 34% $3,315 $2,203 100% 100% $3,320 4 Document Recordation Fee Fee $9,090 53% $17,029 $7,939 100% 100% $17,100 _ __$2,208 5 Engineering Field Inspection Fee - $163,020 60% $271,247 $108,227 100% 100% $271,247 _$8,010 $108,227 6 Utilities Field Inspection Fee __ $36,878 45% $81,121 $44,244 100% 100% $81,121 $44,244 7 Lot Line Adjustment Checking Fee Fee _ $13,736 82% $16,850 $3,114 100% 100% $16,830 $3,094 8 Easement Deed Research., Reviews./Processing Hourly n/a We We n/a 100% 100% n/a n/a 9 Certificate of Compliance Review Fee $766 145% _ $529 -$237 100% 100% $529 4237 Processing. 10 Street. Easement and Vacation Pro Fee Fee $2,125 48% $4,446 $2,321 100% 100% $4,446 $2,321 11 Covenant Agreement. Research & Review. Fee Hourly n/a n1a n/a n/a 100% 100% n/a n/a 12 Traffic Subdivision Plan Check Houdy We We n/a We 100% 100% We n/a 13 Traffic Control Plan Check- 8.5x11 Fee 27 %. $18,590 $13,590 100% 100%[$20,000 _ $15,000 14 Traffic Control Plan Check -24x36 Fee _$5,000 77% $5,062 $1,182 100% 100% $4,160 $280 15 Traffic Study Fee __$3,880 $1,350 70% $1,926 $576 100% 100% -$400 16 Plan Check with Pre -Permit Review Hourly n/a n/a n/a n/a 100% 100% _____$950 n/a __ n/a 22 Sidewalk Caf6 Encr. Permit- p Fee $67 20% $340 $273 100 °h 100 °k $340 $273 23 Sidewalk Caf6 Encr. Permit - Transfer Fee $34 23 °� $146 $113 100 °h 100% $150 $117 26 CD In AUTOCAD Format Fee $330 28% $1,169 $839 100% 100% $1,200 $870 27 P. W. Design Cdteria, Special Provisions & Drawings CPRA n/a n/a n/a n/al addressed in public records analysis 28 Blueprints/Bond Copies 1 - 5 sheets CPRA We n/al We n/a addressed in public records analysis 2 Iuepnnte Cd pies -5 more CPRA n/a n/a n/a n/a addressed in public records analysis end m erlBBenchmark Sheets- 1 •5 copies 30entnTs ano CPRA n/a n/a addressed in public records analysis N tV USER FEE STUDY SUMMARY SHEET -TOTAL PROGRAM INFORMATION - Newport Bea ch_ Public Works - Engineering 9nnaanm Total User Fees Recommendations Existing City Poiic Proposed City Policy Service Name Service Type Revenue @ Current Fee % of Full Cost Revenue @ 100% Full Cos Current Subsidy Cost Recovery Policy Levei ( °b) Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 31 Centerline Ties and Benchmark Sheets 6 -10 copies CPRA We We Na n/a addressed, in public records analysis 32 Escrow Account Administration Fee $670 __- 49% $1,358 $688 100% _t00% $1,350 _ $680 33 Records of Surve Review Fee $10,313 _ 37% $28,078 $17,766 100% $11,000 ___$688 _ 34 Monitoring Wells Fee $1,500 66 °h $2,267 $767 100%_____ __ -- 100% ___ $2,250 _ $750 35 Special RequestlResearch (Non PRA) Hour) _ n/a _. n/a n/a _ Na _100% _ _ 100% n/a __da 36 Crane Deposit Deposit n/a n/a n/a n/a n/a n/a n/a We 37 Underground Utilities <100 LF Deposit n/a n/a n/a n/a n/a _ We We We 38 Underground Utilities 100 +L Deposit n/a n/a We We n/a n1al n/a n/a 39 Improvements Required By City Deposit n1a n/a Na n/a We _ n/al n1al We 40 Street Closure Permit Fee $61,000 131% $46475 -$14,525 100% 100% $50,000 - $11,000 41 Temporary No Parking Signs CPRA n/a We n/a We addressed in public records analysis 42 Public Works Investigation New Fee $0 0% $485 $485 100% 100% $490 $490 43 Map Check - Simple Restructure $15,300 248% $6,171 - $9,129 100% 100% $6,120 - $9,180 44 Map Check- Moderate Restructure $15,300 40% $38,017 $22,717 100% 100% $37,980 $22,680 45 Map Check- Complex Restructure $51,012 89% $57,116 $6,104 100% 100% $57,060 $6,048 46 Non Fee Activity Non Fee $0 0% $4,774,6861 $4,774,686 We n/a We n/a Total User Fees $482,913 $783,520 $300,607 $725,683 $242,770 % of Full Cost 62% 100% 38% 93% 50% Total Other Services $0 $4,774,686 $4,774,686 $0 $0 % of Full Cost 0% 100% 100% 0% 0% Department Totals $482,913 $5,558,206 $5,075,294 $725,683 $242,770 p%of Full Cost 9% 100 °h 91 °b 13% 50% V. POLICE FINDINGS AND RECOMMENDATIONS The majority of costs incurred for Police services are not related to user fee services. $22.8 million of the $24 million total operating costs have been identified and set aside as "all other non -fee services ". Theses "non -fee services" are public safety related and are supported by the general fund. Service costs related to fee activities totals $1,111,810 and are currently offset by $247,933 in revenue — an overall cost recovery level of 22 %. A brief discussion of some of the services provided by Police that are recovered through user fees follows • Many police fee services are set by statute; therefore the recommended fee level may not be at 100 %. • Alarm applications, both unmonitored and monitored, are showing an over recovery and it is recommended that the fee levels be reduced to $33 and $50, respectively. • The single largest potential revenue source is the creating a fee for the permitting and licensing of ABC (establishments selling alcohol) permits. The city currently issues approximately 350 permits a year at no cost. This results in a general fund subsidy of $224,431, $641 each. • If all fee recommendations are adopted, a potential $844,642 in fee revenue could be realized. The summary charts on the following pages show the results of this department's cost analysis. The first two pages provide information on a per unit basis. The third and fourth pages provide total annual information by multiplying the per -unit fees and costs by the volume of activity in order to project out total annual costs and revenues. Page 25 a) m m m w USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - City of Newport Beach Police .. 2006/07 Recommendations FxxsZng City Pole Pro ed C/t Polio Service Name Service Type Armual Volme Current Fee %of Fu8 Can 100% of Full Cost Current Subsidy Cost Recovery Policy Level I %) Cost Recovery Policy Level I %) Fee @ Polity Level Subsidy @ Polley Level 7 Civil Subpoena Hou l 50 $0 0% $86 $86 100% 100% $86 _$0 _ _ _ 2 Initial Concealed Weapom Permit State set 3 $0 0% $694 _ $694 n/a 100% $694 —_ $a 3 Concealed Weapon Pa mit Renewal State set 5 $0 0% $519 $519 Na 700% $519 _ $0 d Environmental Services rte Houd 13 $100 34% $293 $193 100% 100% $293 $0 5 Bike Licenses Fee 425 $4 36% $11 $7 17% 17% $2 _ $9 6 Finger Printin Fee 540 _ $28 126% $22 -$6 100% 100% $22 $0 7 Re - Arrest, Crime, Traffic P * 10400 _ $4 14% $30 $25 Na $0 $4 $25 10 Clearance Letters Houdy 180 __- $0 0% $22 $22 100% 100% $22 $0 11 City Jail Booking Fee, Fee 1 _ $200 109% $183 $17 — _ 100% 100% $183 $0 12 VeNde Re mossien State set 360 $15 91% $17 $2 100% 91% $15 $2 _ 13 VeNde Release Fee 200 $38 171% $22 _ $16 100% 100% $22 _ $0 14 Impound Fee - d cats Fee 585 $35 33% $107 $72 Na 100% $107 $0 15 Impound Fee - small arimals Fee 65 $18 16% $107 $90 Na 100% $107 $0 24 Animal Ins - kennel tic 4-9 dods Restructure 1 $74 29% $257 $183 100% 100% $257 $0 25 Anmal Ins -kernel Oc 10.29 dogs Restructure 3 $74 26% $286 $212 100% 100% $286 $0 26 Animal Insp - kermel do 3059 dos Restructure 7 $74 24% _ $314 _ $240100% _ 100% $314 $0 27 Anmal Insp - kervud Oc 60- dogs Resu"L 0e 1 $74 22% $343 $269 100% $343 _ $0 28 Animal ins - shop Fea 4 $74 86% $86 $12 100% $86 $0 29 Animal ire - tbellied D Fee 1 $187 218% $86 -$101 100% 100% $86 $0 31 Animal Imp - wild animal permit Houd 10 $0 0% $86 $86 $86 $0 32 Subpoena Duoes Tecum Page * 480 $0 0% $66 $66 100% $66 $0 33 Alarm ka6en- umnordtoved Fee 45 $70 212% $33 -$37 anta 100% $33 $0 34 NarmA lication- monitored Fee 10 $70 141% $50 $20 100% $50 $0 35 AIamAhordtor Fee Fee 1 $216 90% $240 $24 100% $240 $0 36 Triennial Renewal Fee - residential Fee 1737 $32 94% $34 $2 100% $34 $0 37 Annual Renewal Fee -comm. Fee 1473 $27 53% $51 $24 100% $51 $0 38 MonBO SI n -tale nk Fee 2 $17 158% $11 $6 700% $17 Sol USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - City of Newport Beach - - -_ Police _-- _ - - -,— 2006/07 Recommendations Existing City Poky Proposed CityPolic Cost Recovery Policy Level I%) Cost Recovery Policy Level (%) Fee @ Policy Level Subsidy @ Policy Level $11 $0 100% $119 $0 _._..___ 100% $902 $0 °b $1,053 $0 ._100% 100% —100 100% $935 $0 100% 100% _ $79 $0 100% _ _ 100% $902 $0 100% 100% $550 $0 Na 100% $9 $0 Na 100% $75 $0 Na 100% $47 $0 Na 100% $641 $o Na 100% $151 $0 No 0% $0 $100 We 0%1 $0 $100 Na 0% $0 $74 Na 0% $0 $74 0% 0% $0 $22,342,738 Na 0% $0 Na 0% $0 Na _ 0% _ $0 A$1,178 _ Na 0% _ $0 aJ 77ec bdapey ednwYec (theaverageamountpaidwmport 7ria current /ee sbudure isaperpage +lime caMU/aNOn. 7)wcostd' la � yed reged Meawrege costs fo produce a report b) Ther"t1ratsea/aimleesina 12mon thperiodan :freeofchaW..TheaidissS50Ane, the 4m isa$10017M with each additiontin easing $25 0 The costs lordresesuppmtservices ueie trdnsfemodandmakIdadin the Revenue aneows. d) The costs lorthesesuppwrt css wsve "mfersad andixNded in Me Reveation anelysis. v m m N V USER FEE STUDY SUMMARY SHEET TOTAL PROGRAM INFORMATION - City of Newport Beach -- Police 2006!07 m m m N W Rea7mmendaayons Existing City Proposed Ci Poli Service Name Servke Type Revenue @ Cunent Fee % of Fug Cost Revenue 100% Full Cost Guam Subsidy Cost Recovery Policy Leval ( %) Revenue Policy Level Inaease0 Revenue 1 Civil Subpoena Houd $0 0% $4,316 $4.316 $2,083 100% Na $4,316 $2083 $4,316 $2,083 2 Ini0al Concealed Weapons Permft State set $0 0% $2,083 3 Concealed Weapon Permit Rerstwal Slateset $0 0% $2,595 - $2,595 _ Na _ - -- $2,595 $2,595 4 Ernironmental Service Blifi Houd $1,300 34% $3,812 _ $2,512 100% $3,812 $2,512 5 Bike Lkenses Fee $1,700 36% $4,688 $2,988 17% _ $797 $903 6 F' er PdnBn Fee $15,066 126% $11,914 -$3,152 100% $11,914 ..x$3,152 7 Reports - A rest, Crime, Traffic Page • $44,200 14% $306,920 $262,720 we 14% $44,200 $0 10 Clearance Letters Hourly $0 0% $3,971 $3,971 100% 100% $3,971 $3,971 11 City Jag Booking F" Fee $200 109% $183 317 100% 100% $183 _ S17 12 Vehicle Repossession State set $5,400 91% 85,957 $557 100% 91% $5,400 $D 13 Vehicle Release Fee $7,560 171% &1,413 _ 100% t00% $4.413 33,147 14 Impound Fee. dog, cats Fee $20,475 33% $62,673S42,198 ___$3.147 Na 100% $62,673 _ $42,198 15 Impound Fee - small animals Fee $1,138 16% $6,964 $5,826 Na 100% $6,964 $5,826 24 Animal In -kernel Oc 4A dogs Restmckre $74 29% $257 _ $183 100% 100% $257 _ $183 25 Animal lisp - kennel Oc 10-29 do RestWCWre $222 26% $857 $635 100% 100% $857 $635 26 Animal In - kennel Sc 3039 dogs RestnxWre $518 24% $2,200 $1,692 100% 100% $2,200 $1,682 27 Animal In - kennel Ile 601 dogs %stnxWre $74 22% $3431 $269 100% 100% $343 $269 28 Animal in et shop Fee $296 86% $343 847 100% 100% $343 $47 29 Animal lnsp - pot bellied pig Fe9 $187 218% $86 3101 100% 100% $86 3101 31 Animal In -wiltl animal em8 Houd $0 0% $857 $857 100% 100% $857 $857 32 Su ena Duces Tecum P $0 0% $31,770 $31,770 we 100% $31,770 $31,770 33 Alam AmAcallon - unm bred Fee $3150 212% 1489 -$1661 Na 100% $1489 •$1661 m m m N W USER FEE STUDY SUMMARY SHEET TOTAL PROGRAM INFORMATION - City of Newport Beach _ - - -- Police .2006/07 V m m m N m Recommendations Existfng City Polk) Pro osed citoylpolicy Service Name Service Type Revenue @ Current Fee %af Full Cost Revenue @ 100% Full Cost Crarem Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Leval I %) Revenue @ Policy Level Increased I Revenue 34 Alarm Applicetkn- monitored _ Fee $700-- 141% $496 4204 rda 100% 5496 •$204 35 Alaml- Monitor Fee _ _ _ Fee $216 - 90% _ $240 $24 nla 100% $240 $24 36 Tdermial Renewal Fee- residen8al Fee $56,094 94% $59,488 $3,394 Na 100% $59,488 $3,394 37 Annual Renewal Fee - Comm. Fee $39,624 53% __$74,830 _ $35,207 Na 100% $74,830 38 Monitoring Sign - telo mic Fee $35 158% $22 413 Na 100% $22 _$35.2_07 -$13 39 Monitoring Decals Fee $11 51% $22 $11 Na 100% $22 - - -_ $11 40 Substance Abuse Pmgrem Fee $3,070 26% _ _ _ $11,880 $8,810 Na $11,880 $8,810 41 Massage lacese•ledmiGan Fee $39,710 __ 46% $85,717 $46,007 100% _100% 100% $85,717 $4_6,007 42 Massage Ucess -o tor Fee $3,703 50% _ $7,369 $3,666 100% _ 100% _ $7,369 43 Massage Ucenss - off remises Fee $31 3% $935 $905 100% 100% $935 __$3,666 44 Massage License - transfer Fee $784 35% $2,211 $1,427 100% 100% $2,211 _$905 $1,427 45 Massa Liceree - hoasec Fee 52,046 _ 38% $5,414 $3,368 100% 100% $5,414 _ $3,368 46 Massa License - mare er Fee $350 6% $5.504 $5,154 100% 100% $5.504 _ 47 2nd hand /Pawn dealer- tag check New fee $0 0% $7,943 $7,943 Na 100% $7,943 _$5,154 $7,943 48 Sexual offender agisbard Now fee $0 0% $3,008 $3,008 Na 100% $3,008 _ $3,008 49 NARC re Isoam New fee $0 0% $7,069 $7,069 Na 100% $7069 $7,069 51 ABC license Now fee $0 0% $224,4311 $224,431 rda 100% $224,431 $224.431 52 Laud Disbebance res o-a New fee $0 0% $156,539 $156,539 Na 100% $156,539 $156,539 54 False Alann- bi0abie Fm $0 0% $85,276 585,276 Na 0% $0 $0 55 False Alarm- non billable Non fee $0 0% $290 943 $290 943 Na 0% $0 $0 V m m m N m USER FEE STUDY SUMMARY SHEET TOTAL PROGRAM INFORMATION - City of Newport Beach Police inntvrn Total User Fees Recommendations Existing City RoAcp city Policy Service Name Service Type Revenue @ Current Fee %of FWI Cost Revenue @ 100% FUR Cost Cumere Subsidy Cost Recovery Policy Level I %) Cost Recovery Po$cy Level ( %) Revenue @ Poky Level Increased Revenue 56 Live Entertainment Pemih Support $0 0% $74 $74 Na 0% _ _ 0% $0 $0 _. _ _ 57 Dance Permit Support _ $0 _ 0% _ $74 _ — $74 - Na _ , _ $0 $0 _ _ 58 AO other PtMic Safety ac6vn Non fee _ _ $0 _ _ _._ 0% $22,342,738 $22,342,738 _ _0% — 0% __ $0 $0 59 Special Ewnllevel 1 _ $0 0% $25,767 $25,767 _ Na --- _0% - $0 $0 _ 60 Special Evers level —Support __Support $0 _ _ a% $110,429 $110,429 Na 0%_ $0 $0 _ 61 Special Event level 3 Support $0 0% $20,613 $20,613 Na _0% $0 so fit OCTAP meetings - VoWdes for lire rl $0 0% $1,178 $1,178 Na 0% $0 $0 Total User Fees $247,933 %of Full Cost 22% Total ONer Services $0 % of FUR Cost 0% Department Totals $247,933 %of Full Cost 1% m m m .J $1,111,810 $863,877 100% 78% $22,877,092 $22.877,092 100% 100% $23,988,902 $23,740,969 100% 99% $84.642 $596,709 76% 241% $0 $0 0% 0% $84.642 $596,709 4% 241% V1. FIRE PREVENTION AND EMS FINDINGS AND RECOMMENDATIONS The Newport Beach Fire Department provides fire protection, rescue, emergency medical, and hazardous materials control and response services to the community. While most of the Fire department's services are suppression or non -fee related, there is a small portion that is fee related. The prevention and inspection fees are necessary in order to provide the public with the maximum protection from loss of life and property through fire. It is imperative that thorough and periodic inspections be made of commercial buildings and multi -unit residential structures. Engine companies and the fire prevention personnel conduct these inspections. At that time, they take steps to protect the lives and property of residents by eliminating the potential causes of fire and improving the awareness of the public towards fire prevention and safety. Additionally, fee services are also imposed by the Fire EMS division. These fees are designed to recover the cost of basic and advanced life support calls. The total costs of Fire Prevention are $1,876,512. These costs include all appropriate departmental and citywide overhead costs. Fee related costs total $1,020,064 and currently recover 82% through user fees. All Fire EMS services (including non fee services) total $14,879,944. The fee related costs of $14,863,809 are offset by $2,142,389 in revenue. This results in a recovery level of 14 %. Highlights from the analysis: • While the overall recovery for prevention fees is at 82 %, the individual recovery levels greatly vary. • Program changes in the hazardous materials permitting process has resulted in a current over - recovery of costs. Many of the hazardous materials permits are recommended at a significantly reduced fee. • Most development related plan check and inspection fees are charged as a percentage of the building permit. Therefore the recommended recovery levels displayed on the following pages are listed as percentages. • The fee for EMS basic life support is being recommended at $846. This would be an increase of $72 to the current $774 fee. • EMS advanced life support currently charges $894 per response. The recommended new fee level is $1,008. • Adjusting the EMS fees to 100% recovery could, in theory, increase EMS revenue by $8,612,420 per year. However, the City receives significantly less for these services due to Medicare payment limitations, resident /non- resident fee structure differential and the City's exempting fire medic subscribers from EMS charges. The City's EMS charges have historically been tied to the Orange County Fire Authority and rates charged by the private sector for similar services. Based on the historical recovery of charges, and the factors listed above, the potential increase in EMS revenue is being estimated at $662,245. • If all Prevention fee adjustments are approved an increase of $185,373 could be generated. This would increase Prevention revenue to $1,020,064. The summary charts on the following pages show the results of this departments cost analysis. Pages 31 -35 provide prevention information on a per unit basis. Pages 36-39 display the same prevention information in an annualized format. After the prevention summaries, you will find the EMS analysis in the same per unit followed by annual format. Total annual information is created by multiplying the per -unit fees and costs by the volume of activity in order to project out total annual costs and revenues. Page 31 a) USER FEE STUDY SUMMARY SHEET - PER UNIT INFORMATION - Newport Beach Fire Department 2006 -2007 - - -- -- - — -- -D m m m w N Recommendations -ExIsfing City Poicy Pro ed City Pdic Service Name Service Type Annual Volume Current Fee %of Full Cost 100 %of Full Cost Current Subsidy Cost Recovery Polity Level I %) Cost Recovery Poli Levef % Fee @ Policy Level Subsidy @ Polity Level 1 Plan Check Commercial Percentage 111 40% 199% $873 Na 100% 100% 20% $0 2 Plan Check Residential - New Dev. >2 units & 51, s.f. Percentage 1 2.25% 199% $292 Na 100% 100% _ _ 1.13% $0 3 Inspection Commercial Lump Sum All Commercial Percentage 688 70% Na 100% 100% 50% _ _ _ $0 4 Inspection Residential -Over 2 units & Sk s.f. Percentage 200 2.25% _ - ,140% ____$274 $242 $305 Na $280 _ 100% 100%-- 100% 100% __1_.61% _ _ _ $0 $0 5 Permit/Insp. Residential Fire Alarm & Life Safety System Fee _ 29 _ $25 ______140% 8% 6 Plan Check Residenf�al Fire Alarm 8 Life Safety Systems Percentage 1 25% 199% $376 _ _ Na _ 100% 100% _ _ _$305 73% _ $0 7 Permit/Ins ion Special Fire Protection Equipment Bldg Pmt 20 equal to bldg print _ _ _ 140% S431 Na 100% _ 100% 72% $0 8 Plan Check Special Fire Protection Equipment Force go 15 72% 199% _ $208 nfa 100% 100% 36 % $0 9 PermiUlnspection Fixed Fire Extinguishing System Bldg Pmt 5 equal to bld mH 140% $305 Na 100% 100% 72% $0 10 Plan Check Fhmd Fire Extinguishing Systems Percentage 30 72% 199% $397 Na 100% 100% 36% $0 11 PermlUlnsp. Commercial Fire Alarm &Life Safety Systems Bldg Pmt 30 equal to bldg prmt 140% 5368 We 100% 100% 72% $0 12 Plan Check Commercial Fire Alarm & Life Safety System Percentage 30 72% 199% $3971 Na 100% 100% 36% $0 13 Inspection Fuel Modification Change to Existing Plan Fee 1 $130 19% $667 $537 100% 100% $667 $0 14 Plan Check Expedite Request Fee 1 1 $130 57% $229 $99 100% 100% $229 $0 15 Inspection Expedite Request Fee 1 $130 48% $274 $144 100% 100% $274 $0 16 Special Event Expedite Request Fee 10 $394 88% $448 $54 100% 100% $448 $0 17 Off-Hours Inspection Request Fee 12 $130 48% $274 $144 100% 100% $274 _ $0 18 Weekend Or Holiday Inspection Request Fee 10 $130 8% $1,568 $1,438 100% 100% $1.568 $0 19 Special Event. Pre -Event Inspection Services Fee 40 $130 58% $224 $94 100% 100% $224 $0 20 Site Inspection, Increase Or Evaluation Of Occ. Load Fee 6 $252 105% $241 -$11 100% 100% $241 $0 21 Nuisance Abatement5ervice Actual 1 $210 27% $774 $564 100% 100% $774 $0 22 Special Event Fire Dept. Stand-by Personnel Fee 5 $131 24% $541 $410 100% 100% $541 $0 23 Commercial Tenant Improvements New fee 250 $0 0% $242 $242 100% 100% $242 $0 24 Enforcement ins ion New fee 20 1 $0 _ 0% $537 $537 100% 100% $537 $0 -D m m m w N USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach Fire Department 2006 -2007 V m m m w w Recommendations ExistIng City Proposed City Pol' Service Name Service Type Annual Volume Current Fee %ol Full COat 100% of Full Cos[ Current Subsidy Cog Recovery Policy Level ( %) Cost Recovery Policy Level Fee @ Policy Level Subsidy Policy Level 25 Excessive_ Time Inspection Newfee 1 _$0 0% $242 _ $242100% $242 $0 26 New OCCUean�_ Fee 1 $130 82% $158 _ $28 100% _100% 100% $158 $0 27 Pre•submittsl, Review Fee 62 $130 25% $528 $398 100% 100% $528 _ $0 28 Fire, Life Safety Orlal Hazard Consultation Fee 25 $130 34% $382 $252 _ 100% 100% $382 $0 29 Closure Report Review Fee 1 $251 _ 159% _ $158 _ $93 100% 100% $158 $0 30 RMPP Consultation Review Done By OC CUPA 1 _ $0 0% $0 $0 100% _ 100% $0 $0 31 Temporary Change Of Use _ 1 _ $153 34% $444 $291 100% 100% 5444 $0 32 Fire Lane Plan Review (Fire Master Plan) 12 $153 _ 23% $652 _ $499 100% 100%-- $652 $0 33 Fuel Modification Plan Revision Review Change to Existing Plan)__— kBldPmt 2 $153 33% _ Wit $308 100% 100% $461 $0 34 Permit/Inspection ion Tank Installation Or Removal 2 equal to bl rmt 140% $368 n/a __ 51% _ 100% 72% $0 35 Plan Check Tank Installation Or Removal 4 72 % 199% $230 n!a 51% 100% 36% $0 36 Pern itgnspection Hazardous Materials Pipin 2 e ual to bld prmt 140% $242 ma 51% 100% 72% $0 37 Plan Check Hazardous Materials Piping Percents e 1 72% 199% $3871 ma 51% 100% 36% $0 38 Article/Annual Permits Fee 136 $132 44% $297 $165 100% 100% $297 $0 39 Article/Single Evens Fee 62 $66 15% $432 $366 100% 100% $432 $0 40 Special Events Level 3 Fee 12 $197 54% $368 $171 100% 100% $368 $0 41 Retail Store Haz Mat Disclosure Inspection Fee 2 $281 35% $794 $513 100% 100% $794 $0 42 Medical Gas Permit Initial Filing <1000 c.L Fee 10 $70 10% $734 $664 100% 100% $734 $0 43 Medical Gas Permit Information Change Filirg <1000 c.f. Fee 1 $70 10% $734 1 U64 100% 100% $734 $0 44 Aboveground Storage Tank Permit Fee 7 $159 22% $734 $575 51% _ 100% $734 $0 45 Places Of Assembly 50.299 occu Fee 153 $139 19% $729 $590 100% 100% $729 $0 46 Places O/ Assembly 300A99 occup Fee 13 8210 29% $729 $519 100% 100% 8729 $0 47 Places Of Assemb 1000ormoreoccu Fee 1 $276 38% $729 $453 100% 100% $729 $0 48 Clinics, Offices, and Treatment Facilities Fee 10 $135 19% $729 $594 1 00% 100% $729 $0 V m m m w w USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - NeW Beach Fire Department 2006 -2007 -- m Recommendations Existing City PolxjA sed city Policy Service Name Service Type Annual Volume Current Fee %of Full Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level I %) Cost Recovery Policy Level Fee @ Policy Level Subsidy @ Policy Level 49 Care Facilities 7 -99 occup Fee 4 $208 29% _$729 $521 100% 100% $729 _ __$0 50 Care Facilities 100.199 occup Fee 5 $415 57% $729 _ $314 100% _ 100% _ _ f_ $729 _ _ $0 51 Care Facilities 200 or more occup Fee 1 $623 _ 85 %� $729 $106 100% 100% _$729 $0 52 Hospitals And Convalescent Facilities 1-99 beds Fee 3 $1,688 232% 5959 100% 100% _ $729 $0 53 Hospitals And Convalescent Facilities 100 -199 beds Fee 1 $2,531 347% _$729 51,802 100% 100% $729 _ $0 54 Hospitals And Convalescent Faclites 200 or more beds Fee 1 1 $3,375 61% __$729 ___$2,196 100% 100% _$5,571 $0 55 Hotels/Motels 50-299 morns Fee 4 $138 19% __$5,571 $729 - $591 100% 100% _ $729 _ _ $0 _ _ 56 Hotels/Motels 300 or more rooms Fee 5 $208 29% _ _ _ $729 _ - $521 100% 100% $729 $0 57 Da Care Facilities Fee 8 $194 27% _ _ $729 $535 100% 100% $729 $O 58 High Rise Buildings Fee 29 $1,756 46% $3,833 $2,077 100% 100% $3,833 $0 59 Residential High Rise Buildings Fee 4 $982 26% $3,833 $2,851 100% 100% $3,833 _$0 60 Gasoline/Service Stations, Per Site Fee 18 $209 _ 28% $734 $525 100% 100% $734 _$0 1.2 Chem. Greatest Single Chemical Amount 55 -1,000 Gals. Liquid, 200- 1,000 Cu. Ft. Gas, Or 500 -1,000 Lbs. Solid. Quantity 61 Ranges For Acutely Hazardous Materials Begin With Zero. Fee 69 $236 _ 43% _ $543 $307 100% 100% $543 - $0 1.2 Chem. Greatest Single Chemical Amount 1.001 - 10,000 Gals. Liquid, 62 1,001.5,1100 Cu. Ft. Gas, Or 1.00 1-5.000 Lbs. Solid Fee 22 $410 76% $543 $133 100% _ 100% $543 $0 1 -2 Chem. Greater Than 10,001 Gals. Liquid, 5,001 Cu. Ft. Gas, Or 5,001 63 Lbs. Solid Fee 5 $550 101% $543 •$7 100% 100% $543 $0 3-0 Chem. Greatest Single Chemical Amount 55 -1,000 Gals. Liquid, 200- 1,000 Cu. Ft. Gas, Or 500 -1,000 Lbs. Solid. Quantity 64 Ranges For Acutely Hazardous Materials Begin With Zero. Fee 10 $334 62% $543 $209 100% 100% $543 $0 3-4 Chem. Greatest Single Chemical Amount 1,001 - 10,000 Gals. Liquid, 65 1, 001 -5,000 Cu. FL Gas, Or 1,001 -5,000 Lbs. Solid Fee 7 $501 92% $543 $42 100% 100% $543 $0 3-0 Chem. Greater Than 10,001 Gals. Liquid, 5,001 Cu. Ft. Gas, Or 5,001 66 Lbs. Solid Fee 1 $647 119% $543 5104 100% 100% $543 $0 55 Chem. Greatest Single Chemical Amount 55 -1,000 Gals. Liquid, 200- 1,000 Cu. Ft. Gas, Or 500 -1,000 Lbs. Solid. Quantity 67 Tges For Acutely Hazardous Materials Begin With Zero. Fee 3 $431 68% $632 $201 100% 100% $632 $0 m USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach ._ ---- . Fire Department - -..- -- 20062007 m m no Recommendations Existing City Polic PmposedCityPo/i Service Name Service Type Annual Volume Curren[ Fee %of Full Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level l %) Cost Recovery Policy Level Fee Policy Level Subsidy Policy Level 5.6 Chem. Greatest Single Chemical Amount 1,001 - 10,000 Gals. Liquid. 68 1,001.5,000 Cu. Ft. Gas, Or 1,001 -5,000 Lbs. Solid Fee 2 $606 96% $632 $26 _ 100% 100% $632 $0 5-6 Chem. Greater Than 10,001 Gals. Liquid. 5,001 Cu. Ft. Gas, Or 5,001 _ _ _ ---- 69 Lbs. Solid Fee 5 8740 _ _ 118% $632 $112 100% 100% $63_2 $0 7 -10 Chem. Greatest Single Chemical Amount 55 -1,000 Gals. Liquid, 200- _ _ 1,000 Cu. Ft. Gas, Or 500 -1,000 Lbs. Solid. Quantity, 70 Ranges For Acutely Hazardous Materials Begin With Zero. Fee 1 $626 97% $648 $22 100% 100% $648 $0 7 -10 Chem. Greatest Single Chemical Amount 1,001 - 10,000 Gals. Liquid. 71 1,0015,000 Cu. Ft. Gas, Or 1,001.5,000 Lbs. Solid Fee 2 $800 123% $648 $152 100% 100% $648 _ " -- $0 7 -10 Chem. Greater Than 10,001 Gals. Liquid, 5,001 Cu. Ft. Gas, Or 5,001 _ 72 LbS. Solid Fee 1 $939 145% 8648 -$291 100% 100% $648 $0 11 -14 Chem. Greatest Single Chemical Amount 55 -1,000 Gals. Liquid, 200 -1,000 Cu. Ft. Gas, Or 500 -1,000 Lbs. Solid. Quantity 73 Ranges For Acutely Hazardous Materials Begin With Zero. Fee 1 $821 111% $742 $79 100% 100% $742 $0 11 -14 Chem - Greatest Single Chemical Amount 1,001 - 10,000 Gals. Liquitl, 74 1,001 -5,000 Cu. Ft. Gas, Or 1,001 -5.000 Lbs. Solid Fee 1 $995 134% $742 $253 100% 100% $742 $0 11 -14 Chem. Greater Than 10,001 Gals. Liquid, 5,001 Cu. Ft. Gas, Or 5,001 75 Lbs. Solid Fee 1 81,134 153% $742 4392 100% 100% $742 $0 15-20 Chem. Greatest Single Chemical Amount 55 -1.000 Gals. Liquid, 200.1,000 Cu. Ft. Gas, Or 500-1,000 Lbs. Sold. Quantity 76 Ranges For Acutely Hazardous Materials Begin With Zero. Fee 1 $1,113 137% $815 -$298 100%-.- 100% $815 $0 15 -20 Chem. Greatest Single Chemical Amount 1,001 - 10,000 Gals. Liquid. 77 1,001 -5,000 Cu. Ft. Gas, Or 1,001.5,000 Lbs. Solid Fee 1 81,287 155% $831 $456 100% 100% $831 $0 15-20 Chem. Greater Than 10,001 Gets. Liquid. 5,001 Cu. Ft. Gas, Or 5,001 " 78 Lbs. Solid Fee 1 $1,426 172% $831 $595 100% 100% $831 $0 21 -40 Chem. Greatest Single Chemical Amount 55.1,000 Gals. Liquid. 200- 1,000 Cu. Ft. Gas, Or 500 -1,000 Lbs. Solid. Quantity 79 Ranges For Acutely Hazardous Materials Begin With Zero. Fee 1 $2,087 242% $862 41,225. 100% 100% $862 $0 m m no USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach Fire Department_ 2006.2007 aJ This foealso inGUdes a $1.10perdevice charge in e�idon ro the dose amount. b) The first two false alarm responses in a 12 month period are free of charge. A $75 fine is charge starting with the thud false al arm - $150 for the foudh, $ 200 for the 6fih and each subsequent occurrence increases $25 V m m m Recommendations Ci ! o Servim Annual 100 % of Full Current Cost Recovery Fee @ Policy Subsidy @ Servire Name Type Volume Current Fee % of Full Cost Cosl Subsidy Policy Level Level Pol'ky Level 21-40 Chem. Greatest Single Chemical Amoum 1.001 - 10,000 Gals. Liquid. 7FRemyery 1 001 -5.000 Cu. Ft. Gas. Or 1,001 -5,000 Lbs. Solitl 80 Fee 1 $2.261 262% . $862 _-$1.399 ,,.100% $862 $0 21-40 Chem. Greater Than 10.001 Gals. Liquid, 5.001 Cu. Ft. Gas. Or 5.001 81 Lbs. Solid Fee 1 $2.400 278% $862 - $1.538 % -----100% $862 __$0 >40 Chem. Greatest Single Chemical Amount 55 -1.000 Gals. Liquid. 200- 1.000 Cu. Ft. Gas, Or 500 -1,000 Lbs. Solid. Quantity 82 Ranges For Acutely Hazardous Materials Begin With Zero. Fee 1 $2.087 190% $1.098 -$989 ---100% 100% $1,098 so >40 Chem. Greatest Single Chemical Amount 1.001 - 10.000 Gals. Liquid, 1,001 -5.000 Cu. Ft. Gas. Or 1.001.5.000 Lbs. Solid 100% $1,098 83 Fee 1 $2,261 206% $1.098 - $1;163 _ 100% _$0 _ >40 Chem. Greater Than 10.001 Gals. Liquid. 5.001 Cu. Ft, Gas, Or 5.001 84 Lbs. Solid Fee 1 $2.394 218% $1.098 $1.296 100% 100% $1.098 $0 85 Engine Comp an Ins 'on Non -fee 1 $0 0% $202 $202 Na _ 0% $0 $202 86 Fake Alarm response Fine 1156 $0 0% $160 $160 100% $160 $0 87 Omer Prevention activity Iltlkntl. Fire Lane. Su training) Non -fee 1 $0 0% $671,282 $671,282 Na 0% $0 $671.282 aJ This foealso inGUdes a $1.10perdevice charge in e�idon ro the dose amount. b) The first two false alarm responses in a 12 month period are free of charge. A $75 fine is charge starting with the thud false al arm - $150 for the foudh, $ 200 for the 6fih and each subsequent occurrence increases $25 V m m m USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach File Department 2006 -2007 -_ -- V m m w V Recnmmendatians Isti Ci Pdic P ed CI' Rtc Service Name Service Type Revenue @ Cunem Fee %of Fug Cost Revenue @ 100% Full Cost Current Subsitl y Cost Recovery POCy Level ( %) Cost Recovery Potty Level ( %) Revenue @ Pofi yLevel Ixreased Revenue 1 PemilNnsp, Residential Fee Alarm 8 Life Safety Syamma ._ Fee $731 8% Y8,8sl $8,118 100% 100% $8.849 $8,118 2 Plan Check annual Pe,centage $249.881 199% $125.83] 612A044 _ _ 100% 100% $125,837 - $124.044 3 Inspecdon ennuel _ Percen a $361389 140% $259.041 .$102,348 100% $259.041 - $102,348 13 I-ec6on Fuel Moth -011 Change to Existing Flan _Fee _ $130 19% $667 $537 _ __100% 100% 100% $667 _ $537 14 Plan Check Expecfne Regues Fee $130 _5]% $229 _ $99 100% 100% $229 $99 151nspaCUOn Expedke Request Fee $130 48% 4214 $144 100% 100% $274 _ $144 16 Special Ent E Wm Ps guest Fee $3.940 88% $4.483 $543 __ __ 100% 100% $4483 $543 17 O14Hours Inn coon Request _ .,_ Fee $1,560 48% $3,283 $1,723 100% 100% $3.283 $1,723 18 Weekend Or Hohday Inspection Request Fee $1.300 8% $15.678 $14,378 _ 100% 100% $15,678 _ $14,378 19 S (Event, Pre-Event Ina don Servees Fee $5200 58% $8.956 $3766 100% 100% $8.966 $3,766 20 SRe lnsec0n, loc"se Or Evaluation Of OCC. Lool Fee $1.512 105% $1,444 -$68 100% 100% $1.444 468 21 Nuisarxie Abatement Service Ac sd _$210 21% $774 $564 100% 100% _ $774 $564 22 SpedOl Event Fire Dept, Ston6by Personnel Fee $655 24% $2,705 $2,050 100% 100% $2,705 $2.050 23 Commercis Tenant lm mvements New tee $0 0% $60.502 $60.502 _ 100% 100% $60,502 $60,502 24 Eidorcementlns ection _ Newtee $0 0% $10,]3] $10,]3] 100% 100% $10337 $10.]3] 25 Excessive Time Inspection leefee $0 0% $242 $242 100% 100% 5242 $242 26 New Occepan Fee $130 &2%1 158 $28 100% 100% $158 $28 27 Pre- ai&miaal Review Fee $8,060 25% $32,710 $24.650 100% 100%1 $32,710 524,650 28 Rre, Lde Safety Or S octal HMM Consu8e8on Fee $3250 34%1 49,544 $6,294 100% 100% $9.544 $6,294 29 Closure Repon Review Fee $251 159% $158 493 100% 100% $158 493 30 RMPP COnsuhetion Review Ome By OC CUPA Actual $0 0% 40 $0 100% 100% $0 $0 31 Teropolary Change Of Use Fee $153 34% 8440 $291 100% 100% $444 $291 32 Fine lane Plan Review re Maser Plan) Fee $1.836 23% $7.825 $5.989 100% 100% $7,825 $5.989 Fuel Modification Pan Revision Review Chan to Usgnq Plan Fee $306 33% $922 $616 100% 100% $616 V m m w V USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach Fire Deparbrertt 2006 -2007 m m m u m Ekatlng c1ty Poli wed city Folk Service Name Service Type Revenue Current Fee %bif FWI Cost Revenue @ 100% Fun Cog Cumem Subsidy Cast Recovery Policy Level ( %I Cost Recovery Policy Level ( %) Revenue @ Policy Level Irtmased Revenue 38 Artco/Annual Permits Fee $17,952 44% $40.348 522.396 100% 100% $40,348 $22,396 _ _ _ _ _ _ 39 Ay,cls i eEvents Fee $4,092 15% _ $22,708 100% _ _100% $26.800 $22.708 40 Special Events Le 3� - _ —�— vel Fee $2,364 54%---- _ .__$26,800 __$4.411 $2.047 100% ____ __.._ 100% _ $4,411 ___ $2,047 41 Retail Score Haz Mm Disclosure Inspection Fee $562 35% $1,589 $1,027 100% 100% $1,589 $1,027 42 Medical Gas Permit Initial Filing <1000 c.f. Fee $700 10% _ $7.340 $6,640 100% 100% $7.340 $6,640 43 Medical Gas Permit Information Chump Filing <1000 c.f. Fee $70 10% $]34 $664 100% _ 100% $734 $664 44 Altimegnxind Suinalie Tank Permit Fee $1,113 22% $5.138 $4,025 51% _ 100% $5.138 $4,025 45 Places Of Assemb 50-299 occuD Fee $21267 19% $111,489 $90222 100% 100% $111.489 $90722 46 Places Of Assem 300 -999 occup Fee $2,730 29% $9.473 _ $6,743 100% 100% $9,473 $6.743 47 Places Of Assembly 1000 or more omup Fee $276 38% $729 $453 100% 100% $729 $453 48 Clinics. Offices, and Treatment Faciftea Fee $1,350 19% _ $7,297 $5.937 100% 100% $7,287 $5.937 49 Core Facades 7.99 occup Fee $832 29% $2.916 52.083 100% 100% $2.915 52,083 50 Care Facilities 100 -199 occup Fee 52,075 57% _ ____$3.643 _ $1.568 100% 100% $3,643 $1,568 51 Care Fea9tas 200 or mom occuue Fee $623 85% $729 $106. 100% 100% 100% 100% $729 $106 52 Hospitals And Convalescent Facilities 1-99 beds Fee $5,064 _ 232% __ $2.186 _ $2,878 $2,186 - $2.878 53 Hospitals Andl Convalescent Facilities 100 -199 beds Fee 347% $729 $1,802 100% 100% $729 31.803 54 Hospitals And Convalescent Facilities 200 or more beds Fee _$2,531 $3.375 61% SS.S71 100% _ 100% $5,571 $2.196 55 HotelslMatels 50-299 rooms Fee $552 19% $2,915 __$2.195 $2.363 100% 100% $2,915 $2,363 56 Hmelsa8ote %300 er more mains Fee $1.040 29% $3.643 $2.603 100% 100% 43,1543 52,603 57 Day Core Faclides Fee $1.552 27% $5329 $4.277 100% 100% $5,829 $4.277 58 Hip Rise SO3din s Fee $50,924 46% $111,166 $60.242 100% 100% $111,166 $60.242 59 Residential Ifigh Rise euild s Fee $3.928 25% $15.333 $11,405 100% 100% $15.333 $11,405 W OasoBrelService Stebbins. Per Site Fee $3,762 28% 513212 $9.450 100% 1001. 513212 $9450 m m m u m -0 i0 m m USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - NeW_Port Beach _ Re De_partm_ent - - - - -- 2006 - 2007 - - - -- - - - - -- Recommendations E-fttw City Pniic Pm posed City Pofrc Service Name Service Typo Revenue @ Current Fee % of FWI Cost Revenue @ 100% Fup QOSI Current Subsidy Cost Recovery PoNcy Level I %) Cost Recovery Palicy Level ( %) Revenue @ Policy Level Increased Revenue 14 Chem. Greatest Single Chemical Amount 55 -1.000 Gels. Liquid. 200. 1,000 Cu. FL Gas. Or 5004.000 Lbs. Said. Quantity 61 Ranges For Acmely Hazardous Materials Bepin With Zam. Fee $16.2_8.4 43% $37.458 _ $21.174 100% 100% $37,458 $21.174 _ _ 1 -2 Chem. Greatest Single Chemical Amount 1,001 - 10.000 Gals. Liquid. 62 1. 001.5.000 Cu. R Gas. Or 1.001-5,000 Las. Solid Fas $9.020 76% $11.943 $2.923 100% 100% $2.923 _$11_943 1 -2 Chem. Greater Than 10.001 Gals. liquid. 5.001 Cu. Ft Cos. Or 5,001 63 Lbs. Solid 34 Chem. Greatest Single Chem cal Amount 55 -1.000 Cats. Liquid. 200- Fes $2.750 101% $2.714 -$36 100% 100% $2,714 436 1.000 Cu. Ft Gas, Or 500 -1.000 Lbs, Solid Oustr ty 64 Ran es For Ac,tety Hazardous Maerials Begin With Zem. Fee $3.340 62% $5,429 $2.089 100% 100% SSA29 $2.089 _ 34 Chem. Greatest Single Chemical Amount 1.001 - 10.000 Gets. Liquid. 65 1.001 -5.000 Cu. Ft. Gas. Or 1.001 -5.000 Lbs. Solid Fee 1 $3.507 92% $3.800 $293 100% 100% $3.800 $293 3 4 Chem. Greater Than 10.001 Gals, Liquid. 5.001 Cu. Ft. Gas. Or 5.001 66 lbs. Solid Fee $64] 119% $543 4104 100% 100% E543 3104 5-6 Chem. Greatest Single Chemical Amount 55 -1.000 Gets. Liquid. 200. 1,000 Cu. Ft Gas. Or 500 -1.000 Lbs. Solid. Quantity W Range¢ Far Acutery Hazardous Materials Begin Wth Zero. Fee $1,293 68% $1.8% $603 100% 100% $1,896 $603 54 Chem. Greatest Single Chemical Amount 1.001 - 10.000 Gals. Liquid. 68 1, 001 -5.000 Cu. FL Gas, Or 1.001 -5.000 Lbs. Solid Fee $1,212 96% $1.264 $52 100% 100%1 $1.264 $52 55 Chaco. Greater Than 10.001 Gals. Liquid. 5.001 Cu. Ft. Gas, Or 5.001 69 Lbs. Solid Fee $3.720 118% $3.160 4560 100% 100% $3.160 -$560 7 -10 Chem. Greatest Single Chemical Amount 55 -1,000 Gals. Lquitl. 200- - 1.000 Cu. Ft. Gas. Or 500 -1.000 Lb.. Solid. Quantity 70 Ranges For Acutely Hazadous Materials Begin With Zem. Fee $626 97% $648 $22 100% 100% $648 $22 7 -10 Chem. Greatest Single Chemical Amount 1.001 - 10.000 Gels. Liquid. 71 1,001 -5,000 Cu. F. Gas, Or 1.001 -5.000 Lbs. Solid Fee $1.600 123% $1.296 4304 100% 100% $1.296 4304 7.10 Chem. Greater Than 10.001 Gals. Liquid. 5.001 Cu. Ft. Gas. Or 5.001 _ 72 Lbs. Solid Fee $939 145% $648 4291 100% 100% Will -$291 11 -14 Chem. Greatest Single Chemical Amount 55 -1.000 Gals. liquid. 200 -1,000 Cu. Ft. Gas, Or 500.1.000 Lbs. Solid Quantity 73 Reties For Acutely Hazardous Materials Begin With Zem. Fee $821 $742 479 100% 100% $742 -$79 _111% 11 -14 Chem - Greatest Single Chemical Amount 1,001 - 10.000 Gels. liquid. 74 1,001.5.000 Cu. Ft Gas, Or 1.001- 5.000Las. Solid Fee $995 134% $742 3253 100% 100% $742 4253 11 -14 Chem, Greater Than 10.001 Gals. Liquid. 5.001 Cu. R. Gas. Or 5.MI 75 lbs. Solitl Fee I $1,134 153% S742 -$392 100% 100% $742 4392 15 -20 Chaco. Cramest Single Chemical Amount 55 -1.000 Gals. Liquid. 200.1,000 Cu. FL Gas, 01 500-1,000 Lbs. Solid. Quantity 76 Re es For Acute Hazardous Materials Bein WW Zem. Fee $1113 13]% 5815 3298 100% 100% E815 4298 USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - Newport Beach Fire Department 7006-2007 - - - - -- Totel User Fels Recommendations E�isfiw City P %Dosed City Po/ky $1.020.064 $185,373 Service Name Type C rteM Fee % of Fun Cost Reverat @ 100% Current Subsidy Coat fi.coveXlPOlicy F o YRe soggy RR� ue @ In earsw 15-20 Chem. Greatest Single Chemical Amount 1,001 - 10.000 Gala. Liquid, $187.490 % of Fun Cost 0% 100% 100% 22% 22% DepadmenlTotaia $834,692 77 1. 001 -5.000 Cu. R. Gas. Or 1.001.5.000 Lb.. Solid Fee $1,287 155% $831 -$456 100% 100% $831 -$456 15 -20 Chem, Giaaler Than 10001 Gals. Liquid, 5.001 Cu. Ft. Gas. Or 5.001 78 Los. Solid Fee $1,426 172% $831 -$595 100% 100% $831 -$595 21 40 Chem. Greatest Single Chemical Amount 561,000 Gals. Liquid. 200. 1.000 Cu. FL Gas. Or 500.1,000 Los, Solid. Guanury 79 RantestForA ly Hazardous Materials Begin With Zero. Fee $2.087 242% $862 - $1,225 100% 100% $862 - $1.225 21 40 Chem. Greatest Single Chemical Amount 1,001 - 10.000 Gels. Liquid 811. 1. 001 -5.00 Cu. Ft. Gas, Or 1,0015,000 Los, Solid Fee $2261 262% $862 $1.399 100% 100% $862 - $1,399 21 40 Chem. Greater Than 10.001 Gals. Liquid. 5.001 Cu. R. Gas. Or 5.001 81 Lb.. Solid Fee $2.400 278% $862 $1.538 100% 100% $862 - $1,538 .40 Chem. Greetest Single Chemical Amount 561,000 Gala. Liquid, 200- 1.000 Cu. Ft Ges. Or 500- 1,0001bs. Solid. Ouanuty 82 Rattles For AcsAsly Hazardous Materials Begin With Zem. Fee $2,087 190% $1.098 -$989 100% 100% $1,098 3989 s40 Chem. Greatest Single Chemical Amount 1.001 - 10.000 Gels. Liquid. 83 1, 001 -5,000 Cu. Ft. Gas. Of 1.0016.000 Los. Solid Fee $2.261 206% $1.098 $1,163 100% 100% $1.098 $1,163 >Q Chem. Greater Than 10.001 Gets, Uquid. 5,001 Cu. Ft Gel, Or 5,001 84 Lbs.Sond Fee $2.394 218% $1,098 - $1,296 100% 100% $1,098 31,296 85 Engine Company Inspection WiMee $0 0% $2D2 $202 We 0% $0 $0 86 False Alarm response Wine $0 0% $184.963 $184.963 0% 100% $184,963 $184.963 87 Other Prevention activi 00indiand. Fire Lane. Supp training) Non -lea $0 0% $671,2821 $671.282 Na 0% i0 $0 Totel User Fels 5830.692 $1.020064 $185,373 $1.020.064 $185,373 %of Full Cost 82% 100% 18% 100% 18% Total Other Services $0 $856,447 $856.447 $187.490 $187.490 % of Fun Cost 0% 100% 100% 22% 22% DepadmenlTotaia $834,692 $1.876.512 $1.041820 $1,207554 $372.862 %of Full Cog 44% 100% 56% 64% 20% T m Q m O aJ a) 6J 9 m m m A USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - _ Newport Beach Fire De rtmern -EMS 2006/2007 aJ The cvnerrtfee listed includes a v nspo/t fm ofSM2, which "or by the Orange County Board ofSuperviscn; 6J EMS training and adminisbarion was realbcated across me ACS and &S fee services as an overhead. cJ EMSsandbytimewascakulatedandwlWatedrothe ACSand&Sfeservicesasanoverhead. Recommendations Existing City Poli Pro sed City Poli Cy Service Name Service Type Annual Volume Current Fee %of Full Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Fee @ Policy Level Subsidy @ Policy Level 1 Avea eALS response Fee 5381 $894 62% $547 69% 70% $1,008 $433 2 Average BLS response Fee 6301 $774 69% _ _$1,441 $t,t26 _ $354 65% 75% __ ___ $846 $282 3 Training and EMS Admin Overhead 1 $0 0% $0 _ $0 We 0% $0 $0 4 Non Medical Responses Non-/ee 240 $0 0% $67 $67 We 0% $0 $67 5 Standby Overhead 1 $0 0% $0 $0 n/a 0% $0 $0 aJ The cvnerrtfee listed includes a v nspo/t fm ofSM2, which "or by the Orange County Board ofSuperviscn; 6J EMS training and adminisbarion was realbcated across me ACS and &S fee services as an overhead. cJ EMSsandbytimewascakulatedandwlWatedrothe ACSand&Sfeservicesasanoverhead. USER FEE STUDY SUMMARY SHEET - PER UNIT INFORMATION - Newport Beach Fire Department - EMS 2006/2007 Total User Fees $2,147,389 $14,863,809 $5,176,221 Recommendations ExIstIng City PolicT ed CityPolic Service Name Service Type Revenue C Current Fee %af FUll Cosl Revenue o 100% Full Cast Current Subsidy y Cost Recovery Policy Level( %) Cost Recovery Polity Level I%) Revenue Pol' icy' Level Increased Revenue 1 Average ALS response Fee $4,810,614 62% $7.756,128 $2,945,514 69% 70 %_$5_424,048 $613,434 2 Average BLS response Fee $4,876,974 69% $7,107,681 $2,230,707 65% 75% $5,330,761 _ $453,787 3 Training and EMS Admin Overhead $0 0% $0 $0 Na 0% $0 _ $0 4 Non Medial Responses Non -fee $0 0% $16,135 $16,135 Na 0% $0 $0 5 Standb Overhead $0 0% $0 $0 Ne 0% $0 $0 Total User Fees $2,147,389 $14,863,809 $5,176,221 ,iz904,634 $662,245 %ef Full Cost 14% 100% 35% 19% 31% Total Other Services $0 $16,135 $16,135 $D $0 %of Full Cost 0% 100% 100% 0% 0% Department Totals $2142,389 $14,879,944 $5,192.356 $2,804,634 $667,248 %of Full Cost 14% 100% 35% 19% 4% Nora: fiescNe /rewiwe(o!e/s081er/rom 0repofenNe/lorv4�us reasons -The Ciryreceives rignificen0y/essloftlrese seMCesduero Medicerppeymertt /imimliois, resiO�f/nanM/ee di8enn�landMe CiryB erenrptlig oy8re medxsubsaYbers )rem EMSChargas, fiesetadois wore wns/demHand/ndrMedln McPOtanBa/ #wMasedMm,ueamounN. The f2.7 m18bn8stedon tvnentrevm�uere!lerLr Me acYUe /rovenne regyivedin FYZ00G2007. v m A N VII. RECREATION & SENIOR SERVICES FINDINGS AND RECOMMENDATIONS The Recreation and Senior Services department is composed of thirteen budgeted divisions. Some divisions are 100% non -fee related and were not included in the analysis. The cost analysis for Recreation was done on a total program basis, grouping several individual services into like program areas. Seasonal changes and the changing popularity of programs make a cost analysis for each individual activity impractical. Similar to the city wide exhibit charts displayed in executive summary of this report, table I below displays the split of the total costs of each division (including citywide and departmental overhead) into either user fee - related or other service costs. Of the $9 million in total costs analyzed, $6.4 million (or 71 %) of that total is related to user fee services. It is this $6.4 million that is the focus of this study and represents the total potential for user fee - related revenues for the City. Table I Total Costs by User Fee Area The next table (following page) identifies the source of funds for the user fee services. Table II breaks down the $6.4 million in user fee services between costs that are currently recovered through user fee charges and the remaining subsidy. Overall, the department is experiencing a 43% cost recovery level for its fee - related services. Within each division, current cost recovery levels range from 8% for OASIS /Sr. Transportation to 71% for Fee Classes. Page 43 Source - Fiscal Year 2006 -2007 Facilities $720,210 $210,900 29% $509,310 71% Oasis / Sr. Transportation $1,982,284 $1,203,690 61% $778,594 39% Adult Sports $651,217 $651,217 100% $0 0% After School / Youth camps $856,630 $856,630 100% $0 0% Aquatics $658,977 $658,977 100% $0 0% Fee Classes $2,008,275 $2,008,275 100% $0 0% Support Services $2,068,726 $676,281 33% $1,392,445 67% Youth Sports $151,527 $151,527 100% $0 0% Total: $9,097,846 $6,417,497 71% $2,680,349 29% The next table (following page) identifies the source of funds for the user fee services. Table II breaks down the $6.4 million in user fee services between costs that are currently recovered through user fee charges and the remaining subsidy. Overall, the department is experiencing a 43% cost recovery level for its fee - related services. Within each division, current cost recovery levels range from 8% for OASIS /Sr. Transportation to 71% for Fee Classes. Page 43 Source of Funds - User Fee Activites - Table II Source - Fiscal Year 2006 -2007 Facilities $210,900 $134,000 64% $76,900 36% Oasis / Sr. Transportation $1,203,690 $95,000 8% $1,108,690 92% Adult Sports $651,217 $439,808 68% $211,409 32% After School / Youth camps $856,630 $165,102 19% $691,528 81% Aquatics $658,977 $208,844 32% $450,133 68% Fee Classes $2,008,275 $1,435,125 71% $573,150 29% Support Services $676,281 $220,815 33% $455,466 67% Youth Sports $151,527 $36,533 24% $114,994 76% Total: $6,417,497 $2,735,227 43% $3,682,270 57% Table III below summarizes the financial analysis of the department's user fee program. It is estimated that adoption of the recommended cost recovery policy would increase the specified fee revenue by $678,303 (a 25% increase over the revenue currently being collected for these activities by the department on an annualized basis). This would bring the overall cost recovery level up to 53% for these activities. User Fee Revenue Analysis - Recommended Revenues - Table III Source - Fiscal Year 2006.2007 Annualized program summaries for each division follow on the next nine pages. Each summary displays the current revenue and costs generated by each program. Please note that the Support Services summary is shown in both per unit and annualized formats. All other programs are displayed in an annual basis only. Page 44 USER FEE STUDY SUMMARY SHEET -TOTAL PROGRAM INFORMATION - Agency: Newport Beach Department: Recreation - Aduft Sports Fiscal Year 2006/2007 Total User Fees Recommendations Existing City ed City Policy Service Name Service Type Revenue @ Current Fee % of Full Cost Revenue @ 100% Full Cast Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 1 Soccer Fee $45,600 49% $92,758 $47,158 85% 70% $64,931 $19,331 2 Softball Fee . $169,505 91% $186,082 $16,577 85% 100% $186,082 $16,577 3 Basketball Fee $202,366 62% $327,619 $125,253 _ 85% 85% $278,477 $76,111 4 Volisyball Fee $17,175 48% $35,500 $18,325 85% 60% $21,300 $4,125 5 Drop-in Volleyball Fee $5,162 56% $9,257 $4,095 85% 60% $5,554 $392 Total User Fees $439,808 $651,217 $211,409 $556,344 $116,536 % of Full Cost 68% 100% 32% 85% 18% Total Other Services $0 $0 $0 $0 $0 %of Full Cost 0% 0% 0% 0% 0% Department Totals $439,808 $651,217 $211,409 $556,344 $116,536 % of Full Cost 68% 100% 32% 85% 18% ro b m m a u USER FEE STUDY SUMMARY SHEET TOTAL PROGRAM INFORMATION - Agency: Newport Beach Department: Recreation -_After School /Camp Program Fiscal Year: 2006/2007 Total User Fees Recommendations ExIsting City Poll Pro osed City Policy Service Name Service T Revenue @ Current Fee % of Full Cost Revenue @ 100% Full Cost Current Subsidy Cost Recovery Policy ry y Level ( %) Cost Recovery ry Policy Level ( %) Revenue Policy @ cY Level ncreased Revenue 1 Vacation Cam Inter, Spring, Pres Fee $17,690 29% $61,963 _ _ _ _ _ $44,273 Na 30% $18,589 $899 3 Summer Recess Cam Fee $96,227 31% $311,661 $215,434 _ _ Na___ _ _ 30% $93.498-----,-$2,729 81% 5 KfdSceneAfter-SchoolProgmm Fee $48,825 10% $466,155 $417,330 Na__ _ 20% $93,231 $44,406 6 Teen Program Fee $2,360 14% $16,850 $14,490 n/a 15% $2,528 $168 Total User Fees $165,102 $856,630 $691,528 $207,846 $42,744 %of Full Cost 19% 100% 81% 24% 5% Total Other Services $0 $0 $0 $0 $0 %of Full Cost 0% 0% 0% 0% 0% Department Totals $165,102 $856,630 $691,528 $207,846 $42,744 %of Full Cost 19% 100% 81% 24% 5% m m m Cd u USER FEE STUDY SUMMARY SHEET -TOTAL PROGRAM INFORMATION - Agency: _ Newport Beach Department _ Recreation - Aquatics _ Fiscal Year. 2006/2007 Total User Fees Recommendations Existing City Proposed CityPoli Service Name Service Type Revenue @ Current Fee %af Full Cost Revenue @ 100% Full Cost Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 1 CDM pool Fee $25,630 41% $62,005 $36,375 85% 35% $21,702 33,928 2 Water Polo Fee $102,520 41% $248,019 $145,499 85% 35% 100% $15,713 3 Lap Swim Fee $15,344 25% $60,755 $45,411 85% 50% __ __ ___$8_6,807 $30,377 ___ _- $15,033 4 Rentals Fee $3,510 8% $45,755 $42,245 85% 8% _ $3,510 $0 5 Lessons Fee $61,618 25% $242,4431 $180,825 85% 40% $96,977 $35,359 6 Aerobics Fee $222 0% $0 -$222 85%1 Eliminate $0 3222 Total User Fees $208,844 $658,977 $450,133 $239,373 $30,529 %of Full Cost 32% 100% 68% 36% 5% Total Ot1w Services $0 $0 $0 $0 $0 %of Full Cost 0% 0% 0% 0% 0% Department Totals $208,844 $658,977 $450,133 $239,373 $30,529 %of Full Cost 32% 100% 68% 36% 5% N m A V USER FEE STUDY SUMMARY SHEET TOTAL PROGRAM INFORMATION - Agency: City of Newport Beach Department: _ Recreation - Facilites Fiscal Year. 2006/2007 Total User Fees Recommendations Existing City Proposed Citoy, Polic Service Name Service Type Revenue @ Current Fee ull Cost Revenue @r 100% Full Cast Current Subsidy Cost Recovery Policy Level % ( ) Cost Recovery Policy Level Y Y ( °% Revenue @ Policy Level Increased Revenue 1 Park Rentals Fee $0 47% $47,711 $25,511 85% 80% $38,169 $15,969 2 FacBh Rentals Fee _ _$22,200 $51,800 95% r $54,374 $2,574 85% 95% $51,800 $0 3 Park Patrol Fee $60,000 55% $108,814 $48,814 85% 85% $92,492 $32,492 4 Pla round Maintenance Non fee $0 0% $193,958 $193,958 0% $0 $0 5 Custodial Non fee $0 0% $274,352 $274,352 0% _0% _0% $0 $0 6 Pool Rental Support $0 _ 0% $15,000 _ $15,000 0% _ 0% __- $0 $0 7 Ball Field Rental support $0 0% $26,000 $26,000 0% %% $0 $0 Total User Fees $134,000 $210,900 $76,900 $182,461 $48,461 % of Full Cost 64% 100% 36% 87% 23% Total Other Services $0 $509,310 $509,310 $0 $0 %of Full Cost 0% 100% 100% 0% 0% Department Totals $134,000 $720,210 $586,210 $182,461 $48,461 %of Full Cost 19% 100% 81% 25% 7% v a A USER FEE STUDY SUMMARY SHEET TOTAL PROGRAM INFORMATION - Agency: Newport Department: Recreation - Fee Classes Fiscal Year. 2006/2007 Total User Fees Recommendations Existing City Policy Proposed City Policy Service Name Service T Revenue @ Current Fee %of Full Cost Revenue @ 100% Full Cost Current Subsidy Cost Recovery Policy Level % ( ) Cost Recovery Policy Level k oY (° Revenue @ Policy Level Increased Revenue 1 Fee Classes Fee $1,435,125 71% $2,008,275 $573,150 85% 75% $1,506,2061 $71,081 Total User Fees $1,435,125 $2,008,275 $573,150 $1,506,206 $71,081 %of Full Cost 71% 100% 29% 75% 4% Total Other Services $0 $0 $0 $0 $0 %of Full Cost 0% 0% 0% 0% 0% Department Totals $1,435,125 $2,008,275 $573,150 $1,506,206 $71,081 %of Full Cost 71% 100% 29% 75% 4% v m m a USER FEE STUDY SUMMARY SHEET -TOTAL PROGRAM INFORMATION - Agency: Newport Beach Department Recreation_ - Oasis & Sr. Services_ Fiscal Year: 2006/2007 Total User Fees Recommendations Existing City Policy Proposed City Policy Service Name Service Type Revenue @ Current Fee %of Full Cost Revenue @ 100% Full Cost Current Subsidy Cost Recovery ali ry Level ( %) Cost Recovery ry Policy Level ( %) Revenue Pali @ Level Increased Revenue 1 Oasis Classes _ Fee $50,000 11% $472,204 $422,204 85% 11% $50,000 $0 2 Oasis Rentals Fee $25,000 69% $36,328 $11,328 n/a 95% $34,511 $9,511 3 Oasis Social Services Non fee $0 0% $543,477 $543,477 _ 0% 0% 4 Oasis Meals Non fee $0 0% $0 $0 _ n/a _ _ 0% _ _ $0 _ _ _ _ _ _ $0 5 Oasis Customer Outreach Non fee $0 0% $105,998 $105,998 o% O% $0 _ $0 6 Friends of OASIS Non fee $0 0% $24,633 $24,633 n/a 0% $0 _ $0 7 Oasis Transportation Fee $20,000 3% $695,158 $675,158 30% 3% $20,000 $0 8 Oasis All other activity I Non fee $0 0% $104,487 $104,487 0% 0% $0 $0 Total User Fees $95,000 $1,203,690 $1,108,690 $104,511 $9,511 %of Full Cost 8% 100% 92% 9% 1% Total Other Services $0 $778,594 $778,594 $0 $0 %of Full Cost 0% 100% 100% 0% 0% Department Totals $95,000 $1,982,284 $1,887,284 $104,511 $9,511 % of Full Cost 5% 100% 95% 5% 0% v m N O a, b) a. b) a, b) USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - _ Cit of Newport Beach Recreation - Support Services - -- — 2006/2007 m m m N a) Includes supportkom Planning and Potze for their review. The Fire department has their own fee. b) These services have resident and non - resident fee levels. Level 1 resident is $190, level ll resident is $395andleveill1 resident is $1,120. Note. Anylevel 1, 2 or 3 special event that requires review time more than double the average (used for fee calculation) may be charged additimathouily fees. Recommendatlons x/st/ng City Poicc Proposed City Pollcy Service Name Service Type Annual Volume % of Full Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level ( %) cost Recovery Policy Level ( %) Fee @ Policy Level Subsidy @ Policy Level 1 Special Event - level 1 Fee 175 41% $925 $550 100% 80% $740 $185 2 Special Event-level2 Fee 125 r$2,255 27% $3,188 $2,343 100% 80% $2,550 $638 3 Special Event-level3 Fee 20 43% $4,933 $2,793 100% 80% $3,947 $987 4 Bundled level 182 Fee 3 39% $5,767 $3,512 100% 80% $4,613 $1,153 5 Department support Non -fee 1 0% $1,392,445 $1,392,445 0% 0% $0 $1,392,445 m m m N a) Includes supportkom Planning and Potze for their review. The Fire department has their own fee. b) These services have resident and non - resident fee levels. Level 1 resident is $190, level ll resident is $395andleveill1 resident is $1,120. Note. Anylevel 1, 2 or 3 special event that requires review time more than double the average (used for fee calculation) may be charged additimathouily fees. USER FEE STUDY SUMMARY SHEET - PER UNIT INFORMATION - - - -- City of Newport Beach -- -- -- Recreation - Support Services 2006/2007 — --- - -__ -- _- ---- ----- .__- -_ -... Recommendations Existing City Policy Pro sed Ci Pollc Service Name Service Type Revenue @ Current Fee % of Full Cast Revenue @ 100% Full Cost Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Lew] ( %j Revenue @ Policy Level Increased Revenue 1 Special Event - level 1 Fee $65,625 41% $161,842 $96,217 t00% 80% $129,474 $63,849 2 Special Event - level 2 Fee $105,625 27% $398,475 _ $292,850 _ 100% _ 80% $318,780 89% 3 Special Event - level 3 Fee _ $42,800 43% $98,664 _ 100% 80% _ $78,931 _$213,155 $36,131 ----$36,131 4 Bundled level 182 Fee $6,765 39% $17,300 _$55,864 $10,535 100% 80% $13,840 _- $7,075 5 Department support Non -fee $0 0% $1,392,445 $1,392,445 090 0% $0 $0 Total User Fees $220,815 $676281 $455,466 $541,025 $320,210 %of Full Cost 33% 100% 67% 80% 47% Total Other Services $0 $1,392,445 $1,392,445 $0 $0 % of Full Cost 0% 100% 100% 0% 0% Department Totals $220,815 $2,068,726 $1,847,911 $541,025 $320,210 %of Full Cost 11% 100% 89% 26% 15% v w m a N N Agency: Department: Fiscal Year Service Name 1 Basketball- winter 2 Youth Flag Footbal 3 Tiny League Footb; 4 Track and Field T a N W USER FEE STUDY SUMMARY SHEET -TOTAL PROGRAM INFORMATION - City of Newport Beach Recreation - Youth Sports 2006/2007 ervice Type Revenue @ Current Fee % of Full Cast Revenue @ 100% I Full Cost Current Subsidy Fee $8,058 42% $19,114 $11,05, Fee $11,760 _ 20% _ $59,083 $47,32: Fee $1,160 56% $2,070 $911 Fee $5,455 40% _ $13,719 $8,26, Fee $4.500 9% 151 6421 347.14' Recommendations xist/ng Cit y Polk Proposed City Policy Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 85% 50% $9,557 50% 85% 50% _ $29,541 --.-$1,499 85% 50% $1,035 _ _$_17,781 4125 85% 50% $6,860 _ $1,405 85% 50% $25,821L__ $21,_3_21 85% 50% $2,950 '$2,650 Total User Fees $36,533 $151,527 $114,994 $75,764 $39,231 % of Full Cost 24% 100% 76% 50% 26% Total Other Services $0 $0 $0 $0 $0 % of Full Cost 0% 0% 0% 0% 0% Department Totals $36,533 $151,527 $114,994 $75,764 $39,231 % of Full Cost 24% 100% 76% 50% 26% VIII. REVENUE FINDINGS AND RECOMMENDATIONS The Revenue division is responsible for overall revenue administration including development, recovery, and analysis. This plays a key role in the City's ability to maintain consistent service levels. Staff members monitor proposed legislative changes that affect the City's revenue streams. They often take a lead role in mounting opposition against bills that have detrimental impact on municipal services. The Revenue division does have services for which they charge a fee, however the greatest percentage of their time is supporting other departments. These support costs were identified and allocated as an overhead in the citywide cost allocation plan. Support for municipal billings was identified and analyzed in this study and transferred to the cost allocation plan. The total costs of the Revenue division are $1,844,983, of which $490,256 is user fee related. Currently, the Revenue Division is recovering 4% of fee related costs. This translates into a current revenue level of $19,261. Individual adjustments have been recommended to increase the recovery level. Highlights from the analysis: • Currently, there is a $25 fee listed on the master fee schedule for business license initial applications, however this fee is not being charged. The city processes 5,449 new business licenses every year. The full cost of providing this service was calculated at $42 per unit. This results in annual general fund subsidy of $230,672. A fee of $42 is being recommended. • Similar to the initial business license application, there is a current fee of $5 listed for business license renewals, but it is not being charged. By not charging a fee, the general fund is subsidizing this program by $140,035 per year. This translates to a $5 per unit cost for each of the 27,421 business license's renewed each year. • On the following pages, all services (costs) displayed as water support, were transferred into the water allocation. These costs to the general fund can be recovered through the annual cost allocation plan charges. • If all recommendations are approved a potential increase of $470,996 in general fund revenue could be recognized. The summary charts on the following pages show the results of this departments cost analysis. The first two pages provide information on a per unit basis. The subsequent three pages display the same revenue information in an annualized format. Total annual information is created by multiplying the per -unit fees and costs by the volume of activity in order to project out total annual costs and revenues Page 54 USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - __ Newport Beach Admin Svcs - Revenue 2006/07 S N m W N N Remmmendafions Existing City POf Proposed QvP011cy Servim Name Service Type e Curmnl Fee %of Full Cosl 100% of FWI Cost Carvers Subsidy Cosa RemveryPoew Level( %) Cosl Recovery .,,q Lem,( %) Fee @Policy Lem Subsidy @Policy Leval 1 BL Initial plsation Process Fee $0 0% $42 542 Ne 100% $42 so 2 BL Renewal Pmmss Fee $0 0% S5 S5 Ne 100% $5 $0 3 0 Uwnse PerM.bt Fee rA�o.f $1.50 33% 54.49 $2.99 0% 100 %54 $0 4 0 License - Neutered Per M.0t Fee $0.75 17% $4.49 $3.74 __ ^ 0% 100% $4 $0 5 D LkznsaT Roplecemaee Fee 52.80 65% $4.28 $1.48 0% 1W% $4 $0 6 BL Reprint Fee S10 66% $15 $5 0% 100% _ $15 7 Second Hand Dealer Permit Fee $179 304% $59 4120 100% 100% S59 $0 8 Second Hated! p aler Renewal Fee 6 $14 44% 532 $18 100% 100% S32 $0 9 VMidas For He. Cadficam Fee 2 $21D 40% $527 $317 100% 100% 5527 so 10 VeMde 6u Hire-Each Vehicle Fee 10 $63 75% $84 5100 100% 100% $84 SO 11 Aon W Vehtdes For Hire- First Vehlde Fee 2 $IQI 277% $51 489 100% 100% $51 $0 12 Annual Vehicles For Hiro- Add]. Velnde Fee 8 $15 30% $51 $35 100% 100% 551 $0 13 VeNdes For Hire43rwers Penns Fee 5 $49 29% $168 $119 100% 100% $168 $0 14 VeNtlas For H9e4twors Permil Renewal Fee 5 41420 14% 5101.15 $86.95 100% 100% $101 $0 18 F've Arms Sales Pamlb Fee 1 $21 36% S59 S38 100% 100% Me so 19 Neva Rack poo,i% Fee 8 $21 37% 557 136 100% 16e% $57 $0 M AdWt Orrented Business PemAts Fm 1 51.406 1950% b72 41.334 100% V)D% $72 $0 21 Escort Semce Psm# Fee 1 $1,042 328% 5318 4724 100% 100% i $318 $0 22 Escpd Seivica . E.plolf. Fee 1 $155 S6% $275 $120 100% 100% $275 SO M Live Entatalnmenl PenNl Fee 1 $141 66% 5215 b74 :% 100% 3215 Perot 24 Do. Pero Fee 1 5141 66% U15 $74 100% 100% b219 $0 S N m W N N USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION- ___ Newport Beach _ Admin Svcs •Revenue 2006/07 a/ Cununay not — WsIeasMedub has 4ce amaze 0d$25,1 2 ) ens A6lramwal/ be Mem servEes. ROIYa1 ar, ftyam note 1.Vy1semp dwyoe. horse Services also lnalucb PolmONngmNewauppwt Revrommendatbns EII.A.g 01y Polk Pm sedCRy Polley Service Noma Servka Typo Annual Volume Currant Fes %af Full Cast 1W %MFWI Cast Cmmnt Subsidy COW Rewvery Polley Level( %) Cost Recovery POlky Leval( %) Fee @Pa9cy Lde subsidy 0 Policy Level 25 Shan Tenn LO Permits Fm 650 $0 0% $88 $8S 100% 100% $88 SO 26 Konnal Pannivs Fes 5 ___ $74 _ _ _ _ 70% $106 _ 100% $106 $0 27 G.IW OW ofBuNoess Parmit_Ini8a1 F ee / S32.50 35% $92.12 ___02 $59.62 __1.00% Na 100% $92 $0 28 Go OW of IlWemees Penllt- Renewal _ Naw fee 1 _ _ _ $0 _ _ 0% $83 _ $83 _ Na 100% $83 _ $0 29 FPm P,aduolmn Pemut App%catian_Wne F4n Liais Newfsa _111 0% _ _ _ _ Na _. IW% $46 _ $0 30 Font PmducOon Permit ApplieMian- Without FiM Li Fea 36 _$0 _ $14992% _$46__$46 $4]0 $321 _. W. 100% $490 $0 31 Shan Tern Lodguo Pemits - New Newfee 40 .----so 0% _ _ $65 $65 nla 100% _ $0 36 Review M Spetial P.cins,,n Doals Monts Fee 1 $0 _ 0% $T1 $22 _ Na 100% _$65 $92 _ f0 37 Solid Waster PenthA Ilratian Fea 2 $382 _ 2076% $18 5364 Na 100% $18 30 M Gamic Application rocessitV Fee Nawf,s / 0 0% $26 _ Na lW% $26 $0 39 Faulting fkarin Nonfee 140 $0 0% $54 _S26 S54 Na 0% SO $54 40 Morin 1nnitn s Non feo 75 $0 0% $101 5101 Na 0% SO $101 41 011-10 ch fee Fea 60 $10 73% $14 $4 Na 100% $14 _ SO 42 UTOT Pnoc,assin, Cho _ New One 60 $0 0% $19 $19 Na 100% $19 _ $0 44 CT Processing Chm New fee 2 $0 0% $18 $18 100% $18 $0 45 Pa review process Nan fee 5200 $0 0% $44 $44 _Na Na 0% $0 S44 SO Water billi s- cumawa, snoom Water 6u on 1 SO 0% $91.593 $91,593 Na 0% SO $91.593 51 Wmm ShutOBTa process Wwmsuppan 2601 f0 0% $10 $10 Na 0% SO $10 52 Waltr Melar Che &Pmcass WwmsupPmt 1 SO 0% $24 $24 Na 0% $0 E24 53 ConswctionWamNwn e,Sernce wwm won 1 $0 0% $16 $16 Na 0% SO $16 54 ConsbuCbn Water Metw WoOn uppon 72 $0 0% $28 $28 Na 0% SO 1128 % Watm Service Connection Fea Watm su n 180 f0 0% 531 $31 n/a 0% $0 $31 56 Wmm Sarvica Emablishmanf Fee Ware, Wppan 1200 $0 0% S21 $21 Na 0% $0 $21 57 Deb uent Wale,TUm On Ch ama0 Were, support 120 $0 0% $114 $114 Na 0% $0 $114 58 Doirguora Wale, TUm an Ch. 4 p., Watar as, On 15 $0 0% $114 5114 Na 0% $ $114 59 Dafpund Wafer Turn an Char suct Da, water$Pon 20 $0 0% $114 $114 Na 0% $0 $114 60 Garemld support Non fee 1 f0 0% $943.66] $943.66] Na 0% SO 11943.667 a/ Cununay not — WsIeasMedub has 4ce amaze 0d$25,1 2 ) ens A6lramwal/ be Mem servEes. ROIYa1 ar, ftyam note 1.Vy1semp dwyoe. horse Services also lnalucb PolmONngmNewauppwt b/ Pkau nMe Memban adWdnW /ee M4wS'edbytln mm l4raon. cl 170, 4: aallo.* fee wylrh ran be rn-TW ff. eGYI/aatlO^ 4r submdmd m do, skit ctonta». dl PbuellMBtlmmffian eddMamltlm/ge d815pwhwrAm of Pbme nMe Mwekan addakvralarmpe MrHda Sartdee. lln chege bepmllOMe mnMCaNVrwubaMWm/s. � !/ These sarixslnWdeauppprt au4krPO0ce revimv. tp DI Thuxrvkel�MrMea supya7m�fv Police anNP/ambgmview. �i USER FEE STUDY SUMMARY SHEET TOTAL PRORGRAM INFORMATION - _ Admin Svcs - Revenue 2006/07 -D or N V Exerang C& Polkyj ed CityPolicy S.M. Narita Service Typo Revenue @ Current Fee %of Fu8 Cost Revenue @ 100% Full Cost Current Subsidy Cost Recovery Policy Level ( %I Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 1 BL Initial Application Process Fee $0 0% $230,672 n /a 100 %__,___$230,672 $230,672 2 RL Renewal Process Fee $0 0% __.__$230,672 $162,035 $142,035 nb _ 100% __$162.035 $142,035 3 Dog License Per Month Fee $959 33% $2.870 $1,912 0% 100% $2.870 $1,912 d Dog License- Neubred Per Month Fee $3,426 17% _ $20,504 $17,080 0% 100% $20,506 $17,080 5 Dog Licem, Tn tteptactursant Fee $42 65% $66 $22 0% 100% $66 $22 6 SL Reprint Fee $2,600 66% $3,919 $1319 0% 100% $3,919 $1,319 7 Second Hand Dealer Pemt Fes $179 304% $59 4120 100% 100% $59 -$120 8 Second Hand Dealer Renewal Fee 1114 44% _ $190 $106 100% 100% _ $190 $106 9 Vehicles For Hire Certificate Fee $420 40% _ $1,053 $633 100% 100% $1,053 $633 10 Vehicle for Hire -Each Vehicle Fee $630 75% _ $860 $210 100% 100% $860 $210 11 Annual Vehicles For Him. Rrst Vehicle Fee $280 277% $101 -$179 100% 100% _ $101 -$179 12 Annual Vehicles For Hire -Addl. Vehicle Fee $123 30% $405 $281 100% 100% _ $405 $281 13 Vehicles For Hire -DNveh Peimlt Fee $245 29% _ $940---- _ $595 100% 100% S840 ___$595 14 Vehicles For Hire -Drh ees Perm Renewal Fee $71 14% $506 5435 100% 100% $506 $435 18 Fire Arms Saks Permh Fes S21 36% $59 _ $38 100% 100% $59 S38 19 News Racir Perms Fee $168 37% $456 $288 100% 100% $456 $288 20 Adult Oriented Business Permbr Fee $1,406 1950% $72 - $1,334 100% 100% $72 41,334 21 Eacorl Service Pormh Fee $1,042 328% _ 5318 -$724 100% 100% 5318 4724 22 Escort Sarvioa­Par Ernployee Fm $155 56% $275 $120 100% 100% $275 $120 23 Live Entertainment Permh Fee $141 66% $215 $74 100% 100% $215 $76 24 Dance Perm Fes $141 66% $215 $74 100% 100% $215 $76 -D or N V USER FEE STUDY SUMMARY SHEET TOTAL PRORGRAM INFORMATION - Newport Beach Admin Svcs - Revenue 2006ro7 a eo Recommendations Ex1SbngCftyPo14 Proposed Cd Po/cy Servoe Name Servos Type CuRevenue t Fee %of Full COSt R�wenu @100% Currant Subsidy Cost R � `%y POGq Cost Revenue @ Policy Revenue 25 Short Term Lodging Peones Fee $0 0% $57,168 100% 100% $57,168 $57,168 26 Kennel Permits Fee $370 70% $530 _ _$57,168 $160 _ 100% 100% $530 _ $160 27 Goina Outof Business Permb - Initial Fee $33 35% $92 _ _ $60 _ We 100% $92 _ $60 28 Going Outof Busimm Permb- Renewal New fee _ $0 0% $83 $83 _ We 100% $83 _ _ $83 29 Film Production PermB Raton -With Fite Liaiv New fee $0 0% $5,084 _ $5,084 Na 100% $5.084 $5,084 30 FR. Producton Penrnt Applimtion- WNrout Film Li Fee $5,364 32% $16,920 $11,556 Na 100% $16,920 _ 31 Short Term LodgiN Permits - New New fee $0 0% $2,591 $2,591 We 100% $2,591 _$11,556 $2,59_1 36 Review of Spedal Package Deals Hotels Fee $0 0% $72 $72 rue $72 $72 37 Solid Waste Permit Application Fee $764 2076% $37 -$727 nla $37 -5727 38 Gemic 8caton Pmcassin Fee Now tea $0 0% $26 $26 We $26 $26 39 Party Hearings Non fee $0 0% $7,493 $7,493 Na $0 $0 40 Admin Henri Non fee $0 0% $7,551 $7,551 Na ro,%%l $0 $0 41 Be Lie change be Fee $600 73% $821 $221 Na $821 $221 42 UTOT Piomssi Cba a New tae $0 0% $1,131 $1,131 rva $1,131 $1,131 44 CT Pmcessin Cha a New, fee $0 0% $37 $37 rVa $37 $37 45 Parkin mvlew mceas Non fee $0 0%1 $227788 _ 788 n/a $0 $0 a eo USER FEE STUDY SUMMARY SHEET -TOTAL PRORGRAMINFORMATION- Newport Beach Admin Svcs - Revenue - -- . - 2006107 Service Name Service Type Revenue @ Current Fee I %of Full Cost Revenue @ 100% Full Lost Current Subsidy 50 Water b01in9s- cusmmer -Port —_- __ Water sup h $0 0% - _ 0% 0% $91,593 $25,725 $24 $91.59; $25,72' $24 51 Water Shut -OB Tap Process_ Waer su oa $0 - -__ 52 Water Meter Check Process —_— Water su oh _ $0 53 Cpnsfiy bm Water Jumper Service Watsrsupport $0 0% $16 $tE Recommendations EXISAny City Pof Pro ad City Pont Lost Recovery Polity Level ( %) Cost Recovery Polley Level ( %) jRwenue@Poliq I Level Increased Revenue We o% $o so - Na _ 0% _..._ -- $0 $0 ._ - -_- _. .... —. $0 $0 _ Na 0% Na 0% 0% $0 Na 0% _10 $0 $0 We 0% _ $0 $0 Na 0% $0 $0 Na 0% $0 $0 Na 0% $0 $0 Na 0% $0 $0 We 0% $0 $0 Total User Fees $19,261 $490,256 $470,996 $490,256 $470.996 Is of F0 st 4% 100% %% 100% 2445% Total OWT services $0 $1,354,727 $1,354,727 $0 $0 Is of FURL st 0% 100% 100% 0% 0% Department Totals $19.261 $1,844,983 $1,825,722 $490,256 $470,996 Is of Pon cost 1% 100% 99% 27% 2445% V m to IX. CODE & WATER QUALITY ENFORCEMENT FINDINGS AND RECOMMENDATIONS Code and Water Quality Enforcement operates as a division of the City Manager's department. This section describes the City's cost of providing code enforcement services that may be recovered through imposition of a fee. The total costs of all Code and Water Quality Enforcement service (including overhead and non fee activity) is $984,253. The current fee related costs of $52,217 are offset by $6,300 in revenue, which is a recovery level of 12 %. Code and Water Quality Enforcement is responsible for maintaining community preservation and protecting property values. This is done through public education and enforcement of the City's ordinances. The Code and Water Quality Enforcement division investigates complaints about various code violations. Investigators issue warnings and citations for violations such as abandoned vehicles, property maintenance and zoning violations. Code and Water Quality Enforcement officers react to complaints received from the community in both residential and commercial neighborhoods. Cities typically use code enforcement fees as a means to encourage compliance with city ordinances. State law allows cities to recover costs associated with the process of abating property deemed to be a public nuisance. Health and Safety code section 187980.8 addresses the abatement of dwellings while Government Code sections 38771 -5 address non - dwelling nuisances. These codes allow for 100% cost recovery fees. This study identified and assigned costs to one existing and three new fee services. Highlights and notes from the analysis follow: • Water Quality Inspection, High /Medium/Low — Code and Water Quality Enforcement staff inspect approximately 800 locations annually, currently without compensation. These services are currently being subsidized by the general fund in the amount of $45,736 per year. • The recommended fee levels for the three water quality inspections are; $47 for low risk, $407 for medium risk and $173 for high risk. These fees have been recommended at 100% cost recovery. • Development related code enforcement costs, $207,602, were transferred and included in the Planning analysis. • Implementing all recommended fee adjustments will increase revenues for this division by a total of $45,917. The summary sheets that follow on pages 58 and 59 show the results of this analysis. Page 58 provides information for each Code and Water Quality Enforcement service on a per unit basis. The fees for each service have been rounded up or down to the nearest whole dollar. Page 59 multiplies the per unit information by the annual volume of applications in order to display annual cost /revenue figures. Page 60 a) USER FEE STUDY SUMMARY SHEET - PER UNIT INFORMATION - _ City of Newport Beach Water & Code EMorcement 2006/2007 a) These casts were tmnsfened and Included o the P/arming analysis. v m m w T Recommendations Existing City Policy Proposed City Polic Service Name Service Type Annual Volume Current Fee % of Full Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Fee @ Policy Level Subsidy @ Policy Level 1 WO Insp - High New fee 60 $0 0% $173 $173 _ 0% 100% $173 $0 2 WO Insp - Med New fee 1 _ $0 0% $407 $407 __ 0% 100% $407 _ $0 3 WO Insp - Low New fee 750 $0 0% $47 $47 0% 100% $47 _ _ $0 4 WoMP Plan Review Fee 20 $315 97% $324 $9 i^ 100% 100% $324 $0 5 Code Ent- Development related X- Support 1 $0 0% $207,602 $207,602 _ 0% 0% $0 $207,602 6 Code Ent - Nuisance abatement Non fee 1 $0 0% $413,733 $413,733 0% 0% $0 $413,733 7 C Building Inspections Non fee 1 $0 0% $7,741 $7,741 0% 0% $0 $7,741 8 All other activity Non fee 1 $0 0% $302,960 $302,960 0% 0% $0 $302,960 a) These casts were tmnsfened and Included o the P/arming analysis. v m m w T USER FEE STUDY SUMMARY SHEET -TOTAL PROGRAM INFORMATION - — City of Newport Beach Water & Code Enforcement 2006/2007 Service Name ExIsfing City Po/icy Service I Revenue @ % of Full Cost Revenue @ 100% Current Subsidy 0% 100% Type Current Fee 0% Full Cost $407 r -High 0% New fee $0 0% $10,377 $10,37 r - Med $180 New fee $0 n% Uft7l tern Review related 6 Code Ent - Nuisance 7 Citv Buildina Insoecti Non fee Recommendations ExIsfing City Po/icy Pro sed City Po /ic Cost Recovery Policy Level I %) Cost Recovery Policy Level I %) Revenue @ Policy Level Increased Revenue 0% 100% $10,377 100% 0% 100% $407 __$_1_0,377 $407 0% 100% $34,952 $34,952 100% 100% $6,480 $180 0% 0% $0 _ F $0 0% 0% $0 $0 0% 0% $0 $0 0% 0% $0 $0 Total User Fees $6,300 $52,217 $45,917 $52,217 $45,917 % of Full Cost 12% 100% 88% 100% 88% Total Other Services $0 $932,036 $932,036 $0 $0 % of Full Cost 0% 100% 100% 0% 0% Department Totals $6,300 $984,253 $977,953 $52,217 $45,917 % of Full Cost 1% 100% 99% 5% 5% v m m m m N X. UTILITIES FINDINGS AND RECOMMENDATIONS This section analyzes the cost of providing fee - related utilities services to the public. This analysis does not address monthly water or sewer service rates, but rather services not used by all customers. A common example is a fee for shutting off water for non - payment of a utility bill. The total costs of all Utility services analyzed is $963,067. This amount includes all appropriate overhead and non fee activities. Fee related costs total $487,958 and currently recover 37% through fees, $179,418. Highlights from the analysis: • The analysis recommends institution of four new fees: ➢ Construction Water Jumper Service ➢ Construction Water Meter ➢ Water Shut -off ➢ Meter Test Audit The Utilities department receives substantial support from the Revenue division on fee - related services and these costs have been included in proposed fees. Staff recommends full cost recovery for all Utilities user fees. Adjustment of fees to full cost recovery will result in an estimated $311,552 additional revenue annually. The summary charts on the following pages display current fees, full cost and recommendations for each individual fee analyzed. The following page displays per unit information, while the subsequent page shows annualized information used for revenue projections. Page 63 a,d a,d b,d d d d c,d d USER FEE STUDY SUMMARY SHEET PER UNIT INFORMATION - ?wport Beach lily User Fees 2006 -2007 Service Name Service Type Annual Volume Current Fee % of Full Cost 100% of Full Cost Current Subsidy Cost Recovery Policy Level ( %) Cost Recovery Policy Level I%) Fee @ Policy Level Subsidy @ Policy Level 1 Construction Water Jumper Service _ New Fee 10 $0 32% $79 $79 100% 100% $80 $0 2 Construction Water Meter New Fee 69 $0 9% _ $91 __ _ $91 _ 100% 100% $90 $0 3 Water Service Installation Fee Hourly 61 _HOUr1 n/a $157 _ n/a _ _ 100% $160 $0 4 Water Service Establishment Fee Fee 1,896 $35 46% $76 _ $41 _ _100% 100% 100% $80 $0 5 Water Turn on - Same Day before 4 p.m. Fee 805 $75 36% $208 $133 100% 100% $210 _ _ _ $0 6 Water Turn on - After Same Da Fee 15 $55 26% $208 $153 _ 100% 100% $210 $0 7 Water Turn on - Same Day after p.m. Fee 45 $95 39% $244 _ $149 100% 100% _ $0 8 New Sewer Connection Fee - City Fee 152 $250 135% $185 -$65 100% 100% _$240 $180 _ 9 New Sewer Connection Fee -CSDOC Fee 1 $2,250 n/a n/a n/a _ _$0 Eliminate - service obsolete 11 Water Shut-offs (Non-Payment) New Fee 151 $0 0% $101 $101 100% 100% $100 $0 12 Water Shut -offs to placement) New Fee 844 $0 0% $45 $45 100% 100 °k $40 $0 13 Meter Test (Audit) New Fee 633 $0 0% $101 $101 100% 100% $100 $0 14 Non Fee Activity Non Fee 1 $0 0% $475,110 $475,110 n/a 0% $0 _ $475,110 a These proposed service fees analyze the establishment cost, not the month /yrate. b Current fee is 125% of/aborand rnatena /s. Meter costs are billed in addition. Current meter prices: 314 inch = $3294, 1 inch = $81.25,' 1.51nch = $200, 2 inch = $303.12 c Cost includes two hourminimum labor charge. d The Revenue Division provides $157,601 of support among these services . m m m A USER FEE STUDY SUMMARY SHEET TOTAL PROGRAM INFORMATION - awport Beach ity User Fees 2006 -2007 Service Name Service Type Revenue @ Current Fee % of Full Cost Revenue @ 100% Full Cost Current Subsidy 1 Construction Water Jumper Service New Fee $0 0% $790 $790 2 Construction Water Meter New Fee $0 0% $6,282 $6,282 3 Water Service Installation Fee Hourly $9,583 100% $9,583 $0 4 Water Service Establishment Fee Fee $66,360 46% $144,137 $77,777 5 Water Turn on - Same Day before p.m. Fee 100% 36% $167,733 $107,358 6 Water Tum on -After Same Day Fee 26% $3,125 $2,300 7 Water Tum on -Same Da atter4 .m. Fee 39% $10,966 $6,691 8 New Sewer Connection Fee -Cif Fee r$60,375 135% $28,076 $9,924 9 New Sewer Connection Fee -CSDOC Fee n/a n/a _- We 11 Water Shutoffs Non- Payment New Fee 0% $15,290 $15,290 12 Water Shutoffs (tag placement) New Fee $0 0% -_ $37,7711 $37,771 13 Meter Test (Audit ) New Fee $0 0% $64,2041 $64,204 14 Non Fee Activity Non Fee $0 0% $475,1101 $475,110 T m m rn Total User Fees $179,418 $487,958 $308,540 $490,970 $311,552 %of Full Cost 37% 100% 63% 101% 64% Total Other Services $0 $475,110 $475,110 $0 $0 %of Full Cost 0% 100% 100% 0% 0% Department Totals $179,418 $963,067 $783,649 $490,970 $311,552 %of Full Cost 19% 100% 81% 51% 32% XI. LIBRARY FINDINGS AND RECOMMENDATIONS The Library department provides information services, reading materials and educational resources to residents of all ages. The largest components of the department are areas of public service including; circulation, reference, youth services and periodicals. Most of the services provided by the Library are free to the public and completely subsidized by the general fund. However, approximately 10% of the library's operations are associated with fee - related services such as rental items, and meeting room rentals (However, 95% of meeting room rentals are consumed by the City). The total cost of all Library operations is $6,563,193. Service costs related to fee activities totals $634,220 and are currently offset by $30,150 in revenue — an overall cost recovery level of 5 %. This is not an unusually low cost recovery level for this type of service. Library services are extremely elastic in that even moderate increases to fees can often result in a significant drop in demand for services. Local jurisdictions tend to heavily subsidize these services in an effort to make them available and accessible to the community as a whole. No changes to the current fee schedule are being recommended. The summary chart on the following page displays annualized cost and revenue numbers. Page 66 USER FEE STUDY SUMMARY SHEET -TOTAL PROGRAM INFORMATION - City of Newport Beach -- Library --_--- - 2006/07 - - -- - Total User Fees Recommendations Exisling City Lo Pro osed Q10y, Polic Service Name Service Type Revenue @ Current Fee % of Full Cast Revenue @ 100% Full Cost Current Subsid y Cost Recovery Policy Level ( %) Cost Recovery Policy Level ( %) Revenue @ Policy Level Increased Revenue 1 Meeting Room Rentals _Fee $150 __0.2% $83,911 $83,761 n/a 0.2% $150 $0 2 Rentals - bookIvideo Fee $30,000 5% $550,309 $520,309 88% 5% $30,000 $0 3 Arts and Cultural Services Non -Fee $0 0% $258,415 $258,415 0% 0% $0 $0 4 General Lib2 Operations Non -Fee $0 0% $5,670,557 $5,670,557 0% 0% $0 $0 Total User Fees $30,150 $634,220 $604,070 $30,150 $0 %of Full Cost 5% 100% 95% 5% 0% Total Other Services $0 $5,928,973 $5,928,973 $0 $0 %of Full Cost 0% 100% 100% 0% 0% Department Totals $30,150 $6,563,193 $6,533,043 $30,150 $0 % of Full Cost 0% 100% 100% 0% 0% 9 m m m W V X11. CITYWIDE COPY/ PUBUC RECORDS CHARGE The City of Newport Beach has a number of fees on its fee schedule that fall under the umbrella of the California Public Records Act (Govt. Code §§ 6250- 6276.48). The Public Records Act (PRA) outlines the following: 1. A definition of what information comprises a public record, 2. What public agencies fall under the requirements, 3. How public records must be made available, 4. How agencies may establish fees for public records, and 5. How public records may be obtained. This study focuses on the fourth item above, calculating the costs of providing copies of public records. The PRA outlines a number of prohibitions against recovering costs for certain services, e.g. charging an "inspection" or "processing" fee is prohibited if the public record is provided for viewing only; and charges for research, review or deletion are also unallowed. Additionally, the PRA allows public agencies to charge fees that are "limited to 'statutory fees' set by the Legislature (not by local ordinance) or the 'the direct cost of duplication', usually 10 to 25 cents per page." Most public agencies that PRM works with charges fees calculated based on the direct cost of duplication. ALLOWABLE COSTS The City's master fee schedule includes a number of PRA request fees for copies provided in a variety of mediums, paper copy, photographs, tapes, maps, etc. Fees are currently displayed in one of two ways: 1. Materials costs plus 100% Ld Hourly (hourly labor rates), charged at $2.00 per 5 minute Increment 2. Fixed fee for copies that are made by outside services, with no city administrative fee charged. PRM recommends that the City continue this basic methodology, with two adjustments. First, the hourly labor rate should only include salary and benefit costs (no indirect overhead), and the cost per 5 minute increment should be increased from $2.00 to $3.00. Second, there should be a distinction made for copies made at the counter (typically small volume) versus copies made at the print shop (usually high volume). Copies made at the counter would be charged using the first method, above. Copies made at the print shop would be charged as materials plus a flat administrative fee of $10.00 which would cover the time spent to take the order, process payment, walk the order over to the print shop, and retrieve it when complete. The information on the following page outlines how the allowable costs have been calculated for the labor components, and also lists the materials expenses. PPM recommends that the City's fee schedule continues to list fees as "Materials plus..." so that it can recover actual costs, as they may increase periodically. Page 68 PUBLIC RECORDS REQUEST CALCULATIONS Labor Expense 1. Fully burdened hourly rates vs. salary+benefits only. Research requests vs. providing copies of public records. Fully burdened hourly rates calculated for MIS, City Attorney's Office, Fiscal Services, etc. 2. Copies made at the counter. Current fee is $0.06/$0.65 per page plus $2.00 per 5 minutes of service. Recommended fee would be Materials cost plus $3.00 per 5 minutes of service. 5 minutes of service fee based on the following: Hrly rate Rate per sal +benes 5 min incr Fiscal Clerk $33.33 $2.78 Senior Fiscal Clerk $38.36 $3.20 Average $35.85 $2.99 3. Copies made at the print shop (usually high volume). Current fee is $0.06/$0.65 per page plus $2.00 per 5 minutes of service. Materials cost plus $10 administrative fee. Admin fee includes time spent to take order & receive $$, walk order to print shop & retrieve. Materials Expense 8.5 x 11 black & white copy Hrly rate cost per 8.5 x 11 color copy sal +benes event 11 x 17 black & white copy Fiscal Clerk 3 min $33.33 $11.67 11 x 17 color copy Admin Asst 10 min $50.63 $8.44 CD + case $10.10 Materials Expense 8.5 x 11 black & white copy $0.08 8.5 x 11 color copy $0.16 11 x 17 black & white copy $0.16 11 x 17 color copy $0.32 CD + case $0.47 DVD + case $0.93 Audio tape $0.35 Video tape $2.19 Atlas Books & Maos -- Sent out for duplication. Outside jobs are billed at actual cost; no admin fee charged. Municipal Code copies -- Muni code books and supplements are copied in- house. Fees are calculated based on # of pages. Page 69 UNALLOWABLE COSTS One item of note for these calculations is that there are no indirect overhead costs attached to the proposed fees for PRA requests. While all other fees included in this analysis include indirect costs, the PRA specifically prohibits this. PPM has calculated the indirect costs associated with providing public records, for informational purposes only. The indirect costs would include costs associated with the labor costs of making the copies, and the costs associated with the City Attorney's Office to review each request and assist in the processing. 1. For each 5 minute increment of time spent on making copies, $1.00 of overhead is expended to support the direct labor. 2. For each administrative fee charged for processing copies made at the City's print shop, an additional $3.81 of overhead is expended to support the direct labor. 3. Finally, the City Attorney's Office reviews approximately 60 PRA requests each year. Each request may take anywhere from 30 minutes to 8 hours of attorney time to process, costing the City approximately $15.100 annually. The information on the following page identifies the unallowable indirect costs that the City of Newport Beach expends to process PRA requests. Page 70 UNALLOWABLE COSTS OF PRA REQUESTS Labor Expense 1. Fully burdened hourly rates vs. salary+benefits only. Research requests vs. providing copies of public records? Fully burdened hourly rates calculated for MIS, City Attorney's Office, Fiscal Services, etc. 2. Copies made at the counter. Current fee is $0.06/$0.65 per page plus $2.00 per 5 minutes of service. Recommended fee would be Materials cost plus $3.00 per 5 minutes of service. 5 minutes of service fee based on the following: Hrly rate Rate per Unallowable sal +benes 5 min incr Indirect Costs Fiscal Clerk $33.33 T2 .78 $0.96 Senior Fiscal Clerk $38.36 $3.20 $1.10 Average $35.85 $2.99 $1.03 3. Copies made at the print shop (usually high volume). Current fee is $0.06/$0.65 per page plus $2.00 per 5 minutes of service. Materials cost plus $10 administrative fee. Admin fee includes time spent to take order & receive $$, walk order to print shop & retrieve. Hrly rate cost per Unallowable sal +benes event Indirect Costs Fiscal Clerk 3 min 33.33 $1.67 0.57 Admin Asst 10 min $50.63 $8.44 $3.24 25 $10.10 $3.81 City Attorney review of PRA Requests 4. Part-Time Attorney and/or Paralegal review all PRA requests to determine: . Is the information available? . Is the information requested a public record? . Which department should appropriately handle the request? . Should any part of the document be redacted? Approximately 60 requests per year, as follows: # of Req : Atry Time Hrl Rate Cost / Req Annual Cost 10 10 8 i 4 $ 85.09 $ 85.09 $ 681 $ 340 $ 6,807 $ 3,403 25 2 $ 85.09 $ 170 $ 4,254 15 0.5 $ 85.09 $ 43 $ 638 Total Annual Cost: $ 15,103 Page 71 XIII. FLAT FEE COMPARISON The following pages display a comparison of current Newport Beach fee levels to that of surrounding jurisdictions. Page 72 COMPARISON SURVEY - CITY OF NEWPORT BEACH RECREATION & SENIOR NEWPORTBEACH- HUNTINGTON SERVICES CURRENT BEACH LOSALAMITOS IRVINE COSTA MESA ANAHEIM Adult Softball - cost per session $580 Ms. /$630 non -res. $420 $399 $540 $400 $439 - session duration 10 weeks 11 weeks 10 weeks 10 weeks 8 weeks 10 weeks -umpire fees included $15/game/team additional fee included $120 Swimming Classes $48 residents, $51 non- -cost per session $72 $45 residents $50 $36 $391$45 - session duration 4 lessons 5 weeks @ 2 days/wk 9 lessons 4 weeks Q 2 days/wk 4 weeks Q 2 daysAvk 10 classes Youth Sports Programs • Pee Wee Sports - cost per session $25-$145 $40 /$45/$50' $45-$80 $42-$80 free $35-$40 - season duration 4 weeks - 8 weeks 4w 19-10w 06 coke 4 weeks - 10 weeks 3 weeks - 4 weeks 9 weeks 8 weeks Adult Dance Classes -cost per session $59 -$115 $50 -$126 $17 -$69 $40 -$99 $50/$75 $12 -$64 - session duration 3 weeks - 6 weeks 4 weeks -11 weeks 5 weeks - 10 weeks 2 weeks - 6 weeks 4 weeks 110 weeks 4 weeks - 14 weeks Youth Gymnastics Classes $1021$156 - cost per session $65 $95 $71/$95 plus $5 non - residents $48-$70 ' session duration 5 weeks 9 weeks 3 weeks -4 weeks 12 weeks 6 weeks Preschooler Play Classes in including dance/gymnastics) - cost per session $40-$150 $40-$70 $85 $66 $19-$68 $1851$261 - session duration 4 weeks - 11 weeks 5 weeks /10 weeks 6 weeks 5 weeks 3 weeks - 10 weeks 8 weeks Q 213 days/wk Day Camp Programs - cost per session $120-$278 $135 (city staffed) $26-$220 $113-$138 $66/$110 - session duration 1 week 1 week 2 days - 1 week 1 week 1 week Tennis Classes - Adult - cost per session $36/$63 $64 $75/$105 $48-$72 $55 $70 - session duration 4 / 6 classes 8 classes 6 classes 4 classes 6 classes, 1/2 hour 8 classes Tennis Classes - Youth - cost per session $55 $32 I $40 / $54 $75/$105 $48-$96 $30/$55 $25/$39 - session duration 5 classes 8 classes 6 classes 4 classes 6 classes 112 hr & 1 hr 5 classes Field Rentals - hourly rate without lights N/A $15/$25 $3 -$80 $16 -$37 $20!$25/$35 $15 -$145 - houdy rate with lights $25/$35 add' $5 -118x $27-$72 $30/$40 add'i $14/$21 hr Cancellation Fees $10 -$30 $5 $5 $20 $5 v m m a. V W COMPARISON SURVEY- CITY OF NEWPORT BEACH POLICE NEWPORTBE4CH- HUNTINGTON IRVINE ORANGECOUNTY COSTA MESA CYPRESS FIRE CURRENT BEACH ANAHEIM FIREAUTHOR/TY COSTA MESA DANA POINT Underground tank install permit equal bldgminrmit, $131 $1,192.00 $750 up to 10 hours $1,070.00 $165 - all UFC $319.00 False alarm response N/A $100 -1st2 free $50 -1st3 free $50 -tat is free permits $130 -1st2 free Above ground tank install permit equal bldg $131 $716.00 $146 per 3/4 hour $1,020.00 $165 - all UFC permits $298.00 Clearance letter minpermit, $41.00 $15.00 $20.00 $25.00 $15- Verification letter Stand pipe inspection/permit equal bldg permit, 30 $346.00 $53 per 1/2 hour $750.00 $165 - all UFC $289.00 min$1 permits Sprinkler system - commercial equal bldg permit $130 $370 +$6 /head $100 per l2 hour P $340.00 $165 -aII UFC permits $313 Q00 heads _ Fire alarm system - single family $25.00 $185 + $15 1device $100 per 12 hour $690.00 $165 - all UFC permits $247.00 Spray booth equal bldg permit, $130 $463.00 $160.00 $570.00 $165 - all UFC permits $234.00 min Chemical protection system $370.00 _ $145 +,75 per page N/A $165. all UFC permits $229.00 POLICE NEWPORT BEACH - CURRENT HUNTINGTON BE4CH IRVINE SANTA ANA COSTA MESA CYPRESS Vehicle release $38.00 $164.00 N/A $130 or $180 for 30-day N/A $40 or $1BO for DUI Fingerprint $27.90 $15.00 . $10.00 $23.00 $10.00 N/A False alarm response N/A $100 -1st2 free $50 -1st3 free $50 -tat is free $180. 1st 2 free $130 -1st2 free Vehicle equipment correction sign off N/A $0 / $10 non - residents $0.00 $10.00 N/A $5.00 Clearance letter actual costs - hourly $41.00 $15.00 $20.00 $25.00 $15- Verification letter Alarm system annual permit $216.00 $36.00 Free $29.00 N/A NIA v m m m A NEWPORT8E4CH- HUNTINGTON FOUNTAIN Utilities CURRENT BEACH DANA POINT IRVINE LONG BE4CH VALLEY Water Service Establishment $35 $17 + Deposit $75 -$125 included in the water svc $15 included in the water svc $15 included in the water svc Deposit -$25 included in the water svc $35 +$35 deposit included in the water svc included in the water svc Sewer Connection Fee est. fee est fee est. fee est. fee est. fee est, fee v m m m A m m COMPARISON SURVEY - CITY OF NEWPORT BEACH NEWPORTBE4CH- HUNTINGTON FOUNTAIN Public Works CURRENT BE4CH COSTA MESA VALLEY IRVINE ANAHEIM Encroachment Permits $127-$278 8% of constr costs + $430.00 $250.00 $65-$392 $1,081 deposit; charged Variance $135/hr. ZA: $2,446; PC: $3,455 $1,495 $2,960 $2,989 hourly Parcel Map Check $850.00 $2,041.00 $85 per hour $815.00 $5,500- $18,450 $3,001 deposit; charged CUP's _$3,366 houdy__ Tract Map Check $2,834.00 $20881 or $100 per lot $85 per hour $815.00 $5,500- $18,450 $3,001 deposit; charged Lot Line Ad'ustmentlMe er hourly $100,000 project plan check $721 $5,635 + $750 per sheet $704 $1,135 + $565 each add' $1,345 per acre of . hourly at $101 - $123 pe Public Improvement Plan Check Hourly >3 $ 85 per hour submittal im rovement hour Public Improvement Inspection $82.50/ Inspection 8% of improvement $120 per hour $305 +$80 each addl $120 + $6018cre each hourly at $93 - $129 per $1,000,000 project plan check $3,963 costs $4,281 inspection add'I over 3 acres hour NEWPORTBEACH- HUNTINGTON FOUNTAIN Building CURRENT BEACH DANA POINT LONG BEACH LAGUNA BEACH RIVERSIDE $100,000 project bldg permit $1,001 $819 $1,006 $903 $1,161 $640 Variance $135/hr. ZA: $2,446; PC: $3,455 $1,495 $2,960 $2,989 $1,500 $500,000 project bldg permit $3_155 $2,611 $900 - $1,450 $2,623 $4,700 $2,039 CUP's _$3,366 $1,500 $1,000,000 project bldg permit $5,504 $4,514 $6,116 $4,773 $7,655 $3,640 Lot Line Ad'ustmentlMe er $100,000 project plan check $721 $623 $704 $768 $755 $640 1$500,000 project plan check $2,272 $1,984 $2,356 $2,230 $3,055 $2,039 $135/hr. $4,323 Dev Review -$810; Precise plan: $3,830 Committee: $4,822; $1281hr. $1,000,000 project plan check $3,963 $3,432 $4,281 $4,057 $4,976 $3,640 NEWPORT BEACH - HUNTINGTON FOUNTAIN Planning CURRENT BEACH COSTA MESA VALLEY LONG BEACH IRVINE New. $4,522; Remodel: $128Ihr. initial deposit Variance $135/hr. ZA: $2,446; PC: $3,455 $1,495 $2,960 $2,989 $1,500 $2,000 $1,973- $20,153 $900 - $1,450 $3,455 $7,461 $128/hr. inifial deposit CUP's $1,500 $710 $552 $705 $1,575 $2,095 $128/hr. Lot Line Ad'ustmentlMe er resident: $1,2871 all $670 resident: $880 / all Applicant $2,960; 3rd $128/hr. inifial deposit Appeal to Planning Commission $600 others: $1,569 others: $1,975 Party: $50 $245 $135/hr. $4,323 Dev Review -$810; Precise plan: $3,830 Committee: $4,822; $1281hr. Site Plan Review S ific Rvw- $1,450 Plann Comm: $9.966 $135 /hr. $21,150 +$30 per lot $1,300 $4,580 $4,445 +$100I1ot initial $128 /hr. initial deposit Tentative Tract Ma APPENDIX A - HOURLY AND OVERHEAD RATES Position 1 Associate Civil Eng 2 Sr. Eng Tech 3 PW Inspector 4 Sr. PW Inspector 5 Survey Instrument Wkr 6 City Surveyor 7 Principal Engineer 8 City Engineer 9 Tech aide 0 Transp and Devel Manager 1 Principal Engineer 2 Senior Engineer 3 Associate Civil Eng i4 Junior Civil Engineer 5 Traffic Eng Tech CITY OF NEWPORT BEACH ENGINEERING FISCAL YEAR 2006/2007 Full Cost Hourly Rates Annual $ 89,578 $ 68,529 $ 69,783 $ 78,794 $ 73,765 $ 78,663 $ 114,047 $ 133,533 $ 25,896 $ 133,533 $ 115,145 $ 98,783 $ 86,350 $ 68,502 $ 70,260 $ 20,489 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 35.91% is applied to hourly salary rate. Hourly overhead rate of 103.86% is applied to hourly salary plus benefits. Page 76 Benefits Overhead Total Salary $ 49.77 $ 17.87 $ 70.24 $ 137.88 $ 38.07 $ 13.67 $ 53.74 $ 105.48 $ 38.77 $ 13.92 $ 54.72 $ 107.41 $ 43.77 $ 15.72 $ 61.79 $ 121.28 $ 40.98 $ 14.71 $ 57.84 $ 113.54 $ 43.70 $ 15.69 $ 61.69 $ 121.08 $ 63.36 $ 22.75 $ 89.43 $ 175.54 $ 74.19 $ 26.64 $ 104.71 $ 205.53 $ 14.39 $ 5.17 $ 20.31 $ 39.86 $ 74.19 $ 26.64 $ 104.71 $ 205.53 $ 63.97 $ 22.97 $ 90.29 $ 177.23 $ 54.88 $ 19.71 $ 77.46 $ 152.05 $ 47.97 $ 17.22 $ 67.71 $ 132.91 $ 38.06 $ 13.66 $ 53.72 $ 105.44 $ 39.03 $ 14.02 $ 55.10 $ 108.14 $ 11.38 1 $ 4.09 1 $ 16.07 1 $ 31.54 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 35.91% is applied to hourly salary rate. Hourly overhead rate of 103.86% is applied to hourly salary plus benefits. Page 76 Bldg Dept Spclst/Office Asst Records Spclst Dept Assistant Admin Assistant Inspection Res Records Insp Student Aide - Insp Plan Check' Subtrade Plans Examiner Permit Tech Deputy Bldg Official CITY OF NEWPORT BEACH BUILDING AND SAFEPY FISCAL YEAR 2006/2007 Full Cost Hourly Rates Annual $ 45,442 $ 48,053 $ 51,196 $ 63,758 $ 141,450 $ 85,225 $ 58,746 $ 19,639 $ 104,998 $ 92,072 $ 62,614 $ 123,948 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 35.17% is applied to hourly salary rate. Hourly overhead rate of 75.12% is applied to hourly salary plus benefits. Page 77 Benefits Overhead Total Sala $ 25.25 $ 8.88 $ 25.63 $ 59.76 $ 26.70 $ 9.39 $ 27.11 $ 63.19 $ 28.44 $ 10.00 $ 28.88 $ 67.32 $ 35.42 $ 12.46 $ 35.97 $ 83.84 $ 78.58 $ 27.64 $ 79.79 $ 186.01 $ 47.35 $ 16.65 $ 48.08 $ 112.08 $ 32.64 $ 11.48 $ 33.14 $ 77.25 $ 10.91 $ 3.84 $ 11.08 $ 25.83 $ 58.33 $ 20.51 $ 59.23 $ 138.08 $ 51.15 $ 17.99 $ 51.94 $ 121.08 $ 34.79 $ 12.23 $ 35.32 $ 82.34 $ 68.86 $ 24.22 $ 69.92 1 $ 163.00 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 35.17% is applied to hourly salary rate. Hourly overhead rate of 75.12% is applied to hourly salary plus benefits. Page 77 :Assistant in Assistant ning Tech I Analyst stant Planner )ciate Planner for Planner fining Director CITY OF NEWPORT BEACH 271 O PLANNING FISCAL YEAR 2006/2007 Full Cost Hourly Rates Annual $ 43,607 $ 48,833 $ 63,758 $ 49,965 $ 76,594 $ 62,574 $ 70,356 $ 89,227 $ 136,004 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 39.23% is applied to hourly salary rate. Hourly overhead rate of 134.2% is applied to hourly salary plus benefits. Annual Rate - Dept Avg $ 75,482 $ 41.93 $ 16.45 $ 78.35 $ 136.74 Review $ 65,831 $ 36.57 $ 14.35 $ 68.34 $ 119.26 o, �1A a AR e3 1 18.21 $ 86.75 $ 151.40 Comparison to current rates Current Pro osed Recova % % Ministerial Review 151 $ 75 $ 119 63 63 % Discretion Review $ 135 $ Page 78 Salary Benefits Overhead $ 24.23 $ 9.50 $ 45.27 $ 27.13 $ 10.64 $ 50.69 7,3875 $ 35.42 $ 13.89 $ 66.18 $ 27.76 $ 10.89 $ 51.87 $ 42.55 $ 16.69 $ 79.51 $ 34.76 $ 13.64 $ 64.96 $ $ 39.09 $ 15.33 $ 73.03 $ $ 49.57 $ 19.45 $ 92.62 $ $ 75.56 $ 29.64 $ 141.18 $ Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 39.23% is applied to hourly salary rate. Hourly overhead rate of 134.2% is applied to hourly salary plus benefits. Annual Rate - Dept Avg $ 75,482 $ 41.93 $ 16.45 $ 78.35 $ 136.74 Review $ 65,831 $ 36.57 $ 14.35 $ 68.34 $ 119.26 o, �1A a AR e3 1 18.21 $ 86.75 $ 151.40 Comparison to current rates Current Pro osed Recova % % Ministerial Review 151 $ 75 $ 119 63 63 % Discretion Review $ 135 $ Page 78 Facilities Maint Wkr 11 Groundsworker11 Sr. Rec Leader I Park Patrol Ofcr Lead Park Patrol Ofoer 7114ec clerk 8 Sr. Svcs Mgr 9 Rec Leader 10 Rec Coord 11 Sr Svcs Van Driver 12 Rec Spclst 13 Asst Rec Coord m Instructor Lifeguard CITY OF NEWPORT BEACH RECREATION & SR SERVICES DEPARTMENT FISCAL 2006/2007 Full Cost Hourly Rates Annual $ 44,318 $ 51,376 $ 30,765 $ 32,052 $ 42,659 $ 45,914 $ 21,178 $ 94,497 $ 22,839 $ 53,463 $ 35,922 $ 37,842 $ 37,329 $ 23,488 $ 27,385 $ 37,072 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 32.37% is applied to hourly salary rate. Hourly overhead rate of 142.62% is applied to hourly salary plus benefits. Page 79 Benefits Overhead Total Salary $ 24.62 $ 7.97 $ 46.48 $ 79.07 $ 28.54 $ 9.24 $ 53.88 $ 91.66 $ 17.09 $ 5.53 $ 32.27 $ 54.89 $ 17.81 $ 5.76 $ 33.62 $ 57.19 $ 23.70 $ 7.67 $ 44.74 $ 76.11 $ 25.51 $ 8.26 $ 48.15 $ 81.92 $ 11.77 $ 3.81 $ 22.21 $ 37.79 $ 52.50 $ 16.99 $ 99.11 $ 168.60 $ 12.69 $ 4.11 $ 23.95 $ 40.75 $ 29.70 $ 9.61 $ 56.07 $ 95.39 $ 19.96 $ 6.46 $ 37.68 $ 64.09 $ 21.02 $ 6.81 $ 39.69 $ 67.52 $ 20.74 $ 6.71 $ 39.15 $ 66.60 $ 13.05 $ 4.22 $ 24.63 $ 41.91 $ 15.21 $ 4.92 $ 28.72 $ 48.86 $ 20.601$ 6.67 $ 38.88 1 $ 66.14 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 32.37% is applied to hourly salary rate. Hourly overhead rate of 142.62% is applied to hourly salary plus benefits. Page 79 Position 2 Computer Network Coord 3 Applications Coord 4 Electronics Spdst 5 Fiscal Svcs Mgr 6 Civilian Supv 7 CSO / Sr 8 Dispatcher I Sr. 9 CPU App Dev Analyst 0 CPU Sys Mgr i1 Rangemaster i2 Station Ofcr 3 Video Producer i4 MIS Spclst/Tech / Reserve Officer I Control Ofcr /Sr. I Supv Crime Analyst icopter Mechanic I Sr. nody Officer Miles Maint Wkr CITY OF NEWPORT BEACH POLICE DEPARTMENT FISCAL 2006/2007 Full Cost Hourly Rates Annual $ 86,682 $ 89,221 $ 103,500 $ 85,111 $ 100,976 $ 76,406 $ 52,636 $ 65,143 $ 79,279 $ 125,001 $ 65,830 $ 56,948 $ 85,111 $ 49,229 $ 158,966 $ 136,049 $ 115,473 $ 41,124 $ 67,980 $ 76,226 $ 67,161 $ 76,167 $ 69,171 $ 66,247 $ 32,360 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 52.03% is applied to hourly salary rate. Hourly overhead rate of 99.02% is applied to hourly salary plus benefits. Page 80 SEEM Benefits Overhead NINE= Total Salary $ 48.16 $ 25.05 $ 72.49 $ 145.71 $ 49.57 $ 25.79 $ 74.62 $ 149.97 $ 57.50 $ 29.92 $ 86.56 $ 173.98 $ 47.28 $ 24.60 $ 71.18 $ 143.07 $ 56.10 $ 29.19 $ 84.45 $ 169.73 $ 42.45 $ 22.08 $ 63.90 $ 128.43 $ 29.24 $ 15.21 $ 44.02 $ 88.48 $ 36.19 $ 18.83 $ 54.48 $ 109.50 $ 44.04 $ 22.91 $ 66.30 $ 133.26 $ 69.45 $ 36.13 $ 104.54 $ 210.12 $ 36.57 $ 19.03 $ 55.06 $ 110.66 $ 31.64 $ 16.46 $ 47.63 $ 95.73 $ 47.28 $ 24.60 $ 71.18 $ 143.07 $ 27.35 $ 14.23 $ 41.17 $ 82.75 $ 88.31 $ 45.95 $ 132.95 $ 267.21 $ 75.58 $ 39.32 $ 113.78 $ 228.69 $ 64.15 $ 33.38 $ 96.57 $ 194.10 $ 22.85 $ 11.89 $ 34.39 $ 69.13 $ 37.77 $ 19.65 $ 56.85 $ 114.27 $ 42.35 $ 22.03 $ 63.75 $ 128.13 $ 37.31 $ 19.41 $ 56.17 $ 112.89 $ 42.32 $ 22.02 $ 63.70 $ 128.03 $ 38.43 $ 19.99 $ 57.85 $ 116.27 $ 36.80 $ 19.15 $ 55.40 $ 111.36 $ 17.98 $ 9.35 $ 27.06 $ 54.39 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 52.03% is applied to hourly salary rate. Hourly overhead rate of 99.02% is applied to hourly salary plus benefits. Page 80 Engineer uty Chief alion Chief I. Assistant uty Fire Marshal Marshal Prevention Specialist ,ention Plans Examiner guard Officer guard Captain guard Battalion Chief guard Boat Captain guard 1/11 /111 CITY OF NEWPORT BEACH FIRE DEPARTMENT FISCAL 2006/2007 Full Cost Hourly Rates Annual $ 61,039 $ 80,529 $ 81,949 $ 99,881 $ 166,001 $ 127,099 $ 47,424 $ 116,374 $ 140,393 $ 86,579 $ 92,870 $ 63,187 $ 88,549 $ 115,040 $ 92,886 $ 38,794 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 55.26%6 is applied to hourly salary rate. Hourly overhead rate of 86.1 % is applied to hourly salary plus benefits. Page 81 Benefits mm Overhead Total Salary $ 33.91 $ 18.74 $ 45.33 $ 97.98 $ 44.74 $ 24.72 $ 59.80 $ 129.26 $ 45.53 $ 25.16 $ 60.86 $ 131.54 $ 55.49 $ 30.66 $ 74.17 $ 160.32 $ 92.22 $ 50.96 $ 123.27 $ 266.46 $ 70.61 $ 39.02 $ 94.39 $ 204.01 $ 26.35 $ 14.56 $ 35.22 $ 76.12 $ 64.65 $ 35.72 $ 86.42 $ 186.80 $ 78.00 $ 43.10 $ 104.26 $ 225.35 $ 48.10 $ 26.58 $ 64.29 $ 138.97 $ 51.59 $ 28.51 $ 68.97 $ 149.07 $ 35.10 $ 19.40 $ 46.92 $ 101.42 $ 49.19 $ 27.18 $ 65.76 $ 142.13 $ 63.91 $ 35.31 $ 85.43 $ 184.65 $ 51.60 $ 28.51 $ 68.98 $ 149.10 is 21.55 1 $ 11.91 $ 28.81 1 $ 62.27 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 55.26%6 is applied to hourly salary rate. Hourly overhead rate of 86.1 % is applied to hourly salary plus benefits. Page 81 Librarian 1 Librarian II Librarian 111 rk 1 /11 Clerk tural Arts Coord CITY OF NEWPORT BEACH LIBRARY DEPARTMENT FISCAL. 2006/2007 Full Cost Hourly Rates Annual 58,576 66,518 76,193 21,950 40,352 36,261 44,168 62,977 mommummmmmmm Salary Benefits Overhead Total $ 32.54 $ 10.57 $ 56.99 $ 100.10 $ 36.95 $ 12.00 $ 64.72 $ 113.67 $ 42.33 $ 13.75 $ 74.13 $ 130.21 $ 12.19 $ 3.96 $ 21.36 $ 37.51 $ 22.42 $ 7.28 $ 39.26 $ 68.96 $ 20.15 $ 6.54 $ 35.28 $ 61.97 $ 24.54 $ 7.97 $ 42.97 $ 75.48 $ 34.991$ 11.36 $ 61.27 1 $ 107.62 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 32.48% is applied to hourly salary rate. Hourly overhead rate of 132.19% is applied to hourly salary plus benefits. Page 82 CITY OF NEWPORT BEACH WATER & CODE ENFORCEMENT DEPARTMENT FISCAL 2006/2007 8 Wtrshed Spclst Division Mgr Full Cost Hourly Rates Annual Salary $ 69,975 $ 64,187 $ 90,021 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 39% is applied to hourly salary rate. Hourly overhead rate of 89.93% is applied to hourly salary plus benefits. Page 83 Fiscal Clerk / Sr. Fiscal Spclst License Insp Revenue Auditor Revenue Mgr Income Contract Admin Hearing Ofcr Student Aide CITY OF NEWPORT BEACH REVENUE DIVISION FISCAL. 2006/2007 Full Cost Hourly Rates Annual $ 45,019 $ 56,410 $ 58,745 $ 63,003 $ 123,949 $ 83,609 $ 61,318 $ 22,631 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 39.13% is applied to hourly salary rate. Hourly overhead rate of 68.59% is applied to hourly salary plus benefits. Page 84 Salary Benefits Overhead Total $ 25.01 $ 9.79 $ 23.87 $ 58.67 $ 31.34 $ 12.26 $ 29.91 $ 73.51 $ 32.64 $ 12.77 $ 31.14 $ 76.55 $ 35.00 $ 13.70 $ 33.40 $ 82.10 $ 68.86 $ 26.95 $ 65.71 $ 161.52 $ 46.45 $ 18.18 $ 44.33 $ 108.95 $ 34.07 $ 13.33 $ 32.51 $ 79.90 $ 12.57 $ 4.92 $ 12.00 $ 29.49 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 39.13% is applied to hourly salary rate. Hourly overhead rate of 68.59% is applied to hourly salary plus benefits. Page 84 CITY OF NEWPORT BEACH 0611 RESOURCE MANAGEMENT ADMINISTRATION FISCAL YEAR 2006/2007 Admin Assistant Deputy Admin Services Director Admin Services Director Full Cost Hourly Rates Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 34.51% is applied to hourly salary rate. Hourly overhead rate of 38.36% is applied to hourly salary plus benefits. Admin Assistant Deputy Admin Services Director Admin Services Director Hourly Rates for Public Records Act Requests 19.42 ! $ 70.06 38.28 $ 138.07 44.78 $ 161.53 Annual onmemismim MERENIMEM I1��iMllfli +III Illilll�i� it j l; Salary Salary Benefits $ 67,758 $ 37.64 $ 12.99 $ $ 133,533 $ 74.19 $ 25.60 $ $ 156,229 $ 86.79 $ 29.95 $ Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 34.51% is applied to hourly salary rate. Hourly overhead rate of 38.36% is applied to hourly salary plus benefits. Admin Assistant Deputy Admin Services Director Admin Services Director Hourly Rates for Public Records Act Requests 19.42 ! $ 70.06 38.28 $ 138.07 44.78 $ 161.53 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 34.51 % is applied to hourly salary rate. No overhead costs are included Page 85 Annual Salary Salary Benefits Overhead Total $ 67,758 $ 37.64 $ 12.99 — $ 50.63 $ 133,533 $ 74.19 $ 25.60 — $ 99.79 $ 156,229 $ 86.79 $ 29.95 — $ 116.75 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 34.51 % is applied to hourly salary rate. No overhead costs are included Page 85 Fiscal Clerk Fiscal Clerk, Senior Mail Processing Clerk Mail Processing Clerk, Senior Fiscal Specialist Graphics & Printing Specialist Printing Services Supervisor Inventory Analyst Buyer, Senior Pkg Meter Supervisor Pkg Meter Service Worker Fiscal Operations Manager Fiscal Clerk, P!r Pkg Meter Svc Wkr, Prr CITY OF NEWPORT BEACH 0620 FISCAL SERVICES FISCAL YEAR 2006/2007 Full Cost Hourly Rates Annual $ 42,655 $ 49,089 $ 33,761 $ 48,494 $ 62,280 $ 49,275 $ 56,475 $ 54,807 $ 75,475 $ 75,358 $ 49,807 $ 112,279 $ 33,765 $ 36,395 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 40.65% is applied to hourly salary rate. Hourly overhead rate of 34.48% is applied to hourly salary plus benefits. 1 Fiscal Clerk 2 Fiscal Clerk, Senior 3 Mail Processing Clerk 4 Mail Processing Clerk, Senior 5 Fiscal Specialist 6 Graphics & Printing Specialist 7 Printing Services Supervisor 8 Inventory Analyst 9 Buyer, Senior 10 Pkg Meter Supervisor 11 Pkg Meter Service Worker 12 Fiscal Operations Manager 13 Fiscal Clerk, Prr 14 Pkg Meter Svc Wkr, Prr Hourly Rates for Public Records Act Requests Annual $ 42,655 $ 49,089 $ 33,761 $ 48,494 $ 62,280 $ 49,275 $ 56,475 $ 54,807 $ 75,475 $ 75,358 $ 49,807 $ 112,279 $ 33,765 $ 36,395 Salary Benefits Overhead Overhead ME Total Total Salary $ 23.70 $ 9.63 $ 11.49 $ 44.82 $ 27.27 $ 11.09 $ 13.23 $ 51.59 $ 18.76 $ 7.62 $ 9.10 $ 35.48 $ 26.94 $ 10.95 $ 13.07 $ 50.96 $ 34.60 $ 14.07 $ 16.78 $ 65.45 $ 27.38 $ 11.13 $ 13.28 $ 51.78 $ 31.37 $ 12.75 $ 15.22 $ 59.35 $ 30.45 $ 12.38 $ 14.77 $ 57.59 $ 41.93 $ 17.05 $ 20.34 $ 79.31 $ 41.87 $ 17.02 $ 20.31 $ 79.19 $ 27.67 $ 11.25 $ 13.42 $ 52.34 $ 62.38 $ 25.36 $ 30.25 $ 117.99 $ 18.76 $ 7.63 $ 9.10 $ 35.48 $ 20.22 1 $ 8.22 1 $ 9.81 1 $ 38.25 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 40.65% is applied to hourly salary rate. Hourly overhead rate of 34.48% is applied to hourly salary plus benefits. 1 Fiscal Clerk 2 Fiscal Clerk, Senior 3 Mail Processing Clerk 4 Mail Processing Clerk, Senior 5 Fiscal Specialist 6 Graphics & Printing Specialist 7 Printing Services Supervisor 8 Inventory Analyst 9 Buyer, Senior 10 Pkg Meter Supervisor 11 Pkg Meter Service Worker 12 Fiscal Operations Manager 13 Fiscal Clerk, Prr 14 Pkg Meter Svc Wkr, Prr Hourly Rates for Public Records Act Requests Annual $ 42,655 $ 49,089 $ 33,761 $ 48,494 $ 62,280 $ 49,275 $ 56,475 $ 54,807 $ 75,475 $ 75,358 $ 49,807 $ 112,279 $ 33,765 $ 36,395 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 40.65% is applied to hourly salary rate. No overhead costs are included Page 86 Benefits Overhead ME Total Salary $ 23.70 $ 9.63 - $ 33.33 $ 27.27 $ 11.09 - $ 38.36 $ 18.76 $ 7.62 -- $ 26.38 $ 26.94 $ 10.95 - $ 37.89 $ 34.60 $ 14.07 -- $ 48.67 $ 27.38 $ 11.13 -- $ 38.50 $ 31.37 $ 12.75 - $ 44.13 $ 30.45 $ 12.38 - $ 42.83 $ 41.93 $ 17.05 - $ 58.98 $ 41.87 $ 17.02 - $ 58.89 $ 27.67 $ 11.25 - $ 38.92 $ 62.38 $ 25.36 - $ 8774 $ 18.76 $ 7.63 - $ 26.38 $ 20.22 1 $ 8.22 -_ 1 $ 28.44 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 40.65% is applied to hourly salary rate. No overhead costs are included Page 86 Technician Specialist Operations Coordinator Apps Analyst, Sr Apps Coordinator Specialist, Sr Applications Analyst wm/Network Coordinator wm Specialist Manager Technical Aide CITY OF NEWPORT BEACH 0680 MIS FISCAL YEAR 2006/2007 Full Cost Hourly Rates Annual $ 53,730 $ 62,154 $ 72,095 $ 95,975 $ 63,756 $ 95,975 $ 85,778 $ 108,727 $ 81,176 $ 70,071 $ 95,975 $ 74,631 $ 123,949 $ 23,483 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 38.54% is applied to hourly salary rate. Hourly overhead rate of 44.57% is.applied to hourly salary plus benefits. 1 MIS Technician 2 GIs Technician 3 GIS Analyst 4 GIS Coordinator 5 MIS Specialist 6 MIS Operations Coordinator 7 MIS Apps Analyst, Sr 8 MIS Apps Coordinator 9 MIS Specialist, Sr 0 MIS Applications Analyst Telecom Specialist MIS Manager PW Technical Aide Hourly Rates for Public Records Act Requests Annual $ 53,730 $ 62,154 $ 72,095 $ 95,975 $ 63,756 $ 95,975 $ 85,778 $ 108,727 $ 81,176 $ 70,071 $ 95,975 $ 74,631 $ 123,949 $ 23,483 Salary Benefits Overhead Overhead Total Total $ 29.85 $ 11.50 $ 18.43 $ 59.79 $ 34.53 $ 13.31 $ 21.32 $ 69.16 $ 40.05 $ 15.43 $ 24.73 $ 80.22 $ 53.32 $ 20.55 $ 32.92 $ 106.79 $ 35.42 $ 13.65 $ 21.87 $ 70.94 $ 53.32 $ 20.55 $ 32.92 $ 106.79 $ 47.65 $ 18.36 $ 29.43 $ 95.45 $ 60.40 $ 23.28 $ 37.30 $ 120.98 $ 45.10 $ 17.38 $ 27.85 $ 90.32 $ 38.93 $ 15.00 $ 24.04 $ 77.97 $ 53.32 $ 20.55 $ 32.92 $ 106.79 $ 41.46 $ 15.98 $ 25.60 $ 83.04 $ 68.86 $ 26.54 $ 42.52 $ 137.92 $ 13.05 $ 5.03 1 $ 8.06 $ 26.13 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 38.54% is applied to hourly salary rate. Hourly overhead rate of 44.57% is.applied to hourly salary plus benefits. 1 MIS Technician 2 GIs Technician 3 GIS Analyst 4 GIS Coordinator 5 MIS Specialist 6 MIS Operations Coordinator 7 MIS Apps Analyst, Sr 8 MIS Apps Coordinator 9 MIS Specialist, Sr 0 MIS Applications Analyst Telecom Specialist MIS Manager PW Technical Aide Hourly Rates for Public Records Act Requests Annual $ 53,730 $ 62,154 $ 72,095 $ 95,975 $ 63,756 $ 95,975 $ 85,778 $ 108,727 $ 81,176 $ 70,071 $ 95,975 $ 74,631 $ 123,949 $ 23,483 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 38.54% is applied to hourly salary rate. No overhead costs are included Page 87 Salary Benefits Overhead Total $ 29.85 $ 11.50 -- $ 41.35 $ 34.53 $ 13.31 - $ 47.84 $ 40.05 $ 15.43 - $ 55.49 $ 53.32 $ 20.55 - $ 73.87 $ 35.42 $ 13.65 - $ 49.07 $ 53.32 $ 20.55 - $ 73.87 $ 47.65 $ 18.36 - $ 66.02 $ 60.40 $ 23.28 - $ 83.68 $ 45.10 $ 17.38 - $ 62.48 $ 38.93 $ 15.00 - $ 53.93 $ 53.32 $ 20.55 - $ 73.87 $ 41.46 $ 15.98 - $ 57.44 $ 68.86 $ 26.54 - $ 95.40 $ 13.051 $ 5.03 1 - 1 $ 18.07 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 38.54% is applied to hourly salary rate. No overhead costs are included Page 87 CITY OF NEWPORT BEACH 0210 CITY CLERK FISCAt_YEAR 2006/2007 Full Cost Hourly Rates Annual Position Salary 1 Deputy City Clerk $ 67,453 2 City Clerk $ 112,970 hrYei�r.iirl i i i 3 3 t ti l Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 37.99% is applied to hourly salary rate. Hourly overhead rate of 89.85% is applied to hourly salary plus benefits. Hourly Rates for Public Records Act Requests Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 37.99% is applied to hourly salary rate. No overhead costs are included Page 88 Assistant n Assistant Exec Asst to City Manager City Manager Assistant City Manger CITY OF NEWPORT BEACH 0310 CITY MANAGER FISCAL YEAR 2006/2007 Full Cost Hourly Rates Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 33.69% is applied to hourly salary rate. Hourly overhead rate of 40.26% is applied to hourly salary plus benefits. Page 89 Annual Salary $ 50,093 $ 63,758 $ 76,362 $ 210,197 $ 164,146 Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours. Hourly benefit rate of 33.69% is applied to hourly salary rate. Hourly overhead rate of 40.26% is applied to hourly salary plus benefits. Page 89 Dept Assistant Assistant City Attorney Deputy City Attorney - Litigation Admin Assistant to City Attorney Attorney ity City Attorney - Part Time CITY OF NEWPORT BEACH 0510 CITY ATTORNEY FISCAL. YEAR 2006/2007 Full Cost Hourly Rates Annual Salary $ 51,196 $ 143,773 $ 123,949 $ 64,223 $ 180,550 $ 120,120 Hourly salary rate is calculated by dividing annual salary by 1,800 productive ho0rs. Hourly benefit rate of 30.45% is applied to hourly salary rate. Hourly overhead rate of 37.06% is applied to hourly salary plus benefits. Page 90 Benefits Overhead Total Salary $ 28.44 $ 8.66 $ 13.75 $ 50.85 $ 79.87 $ 24.32 $ 38.62 $ 142.81 $ 68.86 $ 20.97 $ 33.29 $ 123.12 $ 35.68 $ 10.86 $ 17.25 $ 63.79 $ 100.31 $ 30.54 $ 48.50 $ 179.35 $ 66.73 $ 20.32 $ 32.27 1 $ 119.32 Hourly salary rate is calculated by dividing annual salary by 1,800 productive ho0rs. Hourly benefit rate of 30.45% is applied to hourly salary rate. Hourly overhead rate of 37.06% is applied to hourly salary plus benefits. Page 90 APPENDIX B - BUILDING VALUATION The proposed building valuation table/ fee schedule can be found on the following page. The two subsequent pages display the current fee schedule. Proposed Building Permit Fee Table Project Construction Valuation Fee $1.00 To $2,000.00 $72.00 $2,001.00 To $25,000.00 $72.00 For First $2,000 + $13.90 For Each additional $1,000 Or Fraction Thereof, To and including $25,000 $25,001.00 To $50,000.00 $398.00 For First $25,000 + $10.00 For Each additional $1,000 Or Fraction Thereof, To and including $50,000 50,001.00 To $100,000.00 $652.00 For First $50,000 + $6.90 For Each additional $1,000 Or Fraction Thereof, To and including $100,000 $100,001.00 To $500,000.00 $1,001.00 For First $100,000 + $5.30 For Each additional $1,000 Or Fraction Thereof, To and including $500,000 $500,001.00 To $1,000,000.00 $3,155.00 For First $500,000 + $4.60 For Each additional $1,000 Or Fraction Thereof, To and including $1,000,000 $1,000,000.00 To $5,000,000.00 $5,504.00 For First $1,000,000 + $3.10 For Each additional $1,000 Or Fraction Thereof, To and including $5,000,000 $5,000,000.00 To $10,000,000.00 $17,904.00 For First $5,000,000 + $2.00 For Each additional $1,000 Or Fraction Thereof, To and including $10,000,000 $10,000,000.00 and up $27,904.00 For First $10,000,000 + $1.55 For Each additional $1,000 Page 91 Building Valuation Data - 2006 Cost per squat Coat per Square I Cost per Square Occupancy and Type Foot, Average Occupancy and Type Foot, Average Occupancy and Type Foot, Average 1. APARTMENT HOUSES: Type I or II F.R.* (Good) Type V - Masonry (Good) Type V - Wood Frame (Good) Type I- Basement Garage 2. BANKS: Type I or II F.R." Type II - 1 -Hour Type II - N Type III -1 -Hour Type III- N Type V -1 -Hour Type V -N 3. CHURCHES: Type I or II F.R. Type II -1 -Hour Type II- N Type III -1 -Hour Type III -N Type V -1 -Hour Type V -N 4. CONVALESCENT HOSPITALS: Type I or II F.R.* Type II -1 -Hour Type III -1 -Hour Type V -1 -Hour S. DWELLINGS: Type V -Wood Frame (Good) Basements finished Basements (not finished) 6. FIRE STATIONS: Type I or II F.R. Type II -1 -Hour Type 11 -N Type III -1 -Hour Type III -N Type V -1 -Hour Type V -N $125.50 $102.00 $94.25 $43.00 $170.25 $125.50 $121.50 $138.50 $133.50 $125.50 $120.25 $114.00 $85.75 $81.50 $93.25 $89.00 $86.25 $82.00 $160.00 $111.00 $113.75 $107.25 $106.25 $99.25 $40.25 $131.50 $86.50 $81.75 $94.75 $90.75 $89.00 $84.25 °Add shoring cost where applicable * Add 0.5 percent to total cost for each story over three. Deduct 20 percent for shell -only buildings. ** *Deduct 11 percent for mini-warehouses, HOTELS AND MOTELS: Type I or 11 F.R. Type 111 -1 -Hour Type III -N Type V -1 -Hour Type V -N MEDICAL OFFICES: Type I or 11 F.R. Type 11 -1 -Hour Type II -N Type III -1 -Hour Type III -N Type V -1 -Hour Type V -N OFFICES * *: Type I or II F.R. Type II -1 -Hour Type II -N Type III -1 -Hour Type III -N Type V -1 -Hour Type V -N PRIVATE GARAGES: Wood Frame Masonry Open Carports . PUBLIC BUILDINGS: Type I or II F.R. Type II -1 -Hour Type II -N Type III -1 -Hour Type III -N Type V -1 -Hour Type V -N PUBLIC GARAGES: Type I or II F.R. Type I or II Open Parking* Type II -N Type III -1 -Hour Type III -N Type V -1 Hour $116.25 $100.50 $96.00 $87.75 $86.00 $137.50 $106.00 $100.75 $115.00 $107.00 $103.75 $100.00 $122.75 $82.25 $78.25 $88.75 $84.75 $83.25 $78.25 $28.00 $31.50 $19.00 $142.00 $115.00 $110.00 $119.25 $115.25 $109.25 $105.25 $56.25 $42.25 $32.25 $42.50 $37.75 $38.75 RESTAURANTS: Type III -1 Hour Type III -N Type V -1 -Hour Type V -N SCHOOLS: Type I or II F.R. Type II -1 Hour Type 111 -1 -Hour Type III -N Type V -1 -Hour Type V -N 16. SERVICE STATIONS: Type II -N Type III -1 -Hour Type V -1 -Hour Canopies STORES: Type I or 11 F.R.* Type II -1 -Hour Type II -N Type III -1 -Hour Type III -N Type V -1 -Hour Type V -N THEATRES: Type I or 11 F.R. Type III -1 -Hour Type III -N Type V -1 -Hour Type V -N WAREHOUSES**°: Type I or II F.R. Type II or V -1 -Hour Type 11 or V -N Type III -1 -Hour Type III -N Page 92 $112.00 $108.25 $102.50 $98.50 $128.00 $87.25 $93.50 $89.75 $87.50 $83.50 $77.25 $80.50 $68.75 $32.25 $94.75 $58.00 $56.75 $70.50 $66.25 $59.25 $54.75 $126.25 $92.00 $87.75 $86.50 $82.00 $56.75 $33.75 $31.50 $38.25 $36.25 Building Valuation Data 2006 - Continued Occupancy and Type Coat per squan Fool, Average Oc pancy and Type Cost per square Foot, Avenge O=pamy and Type Coat per Square Foot, Average 19. HARBOR CONSTRUCTION: 22. TENANT IMPROVEMENT (Tp: 26. WOOD FENCE per sq.fL $3.50 Dodos (per sq.ft.) $35.25 Office/Retail Services (TI) per square foot Piers (per sq.lineal foot) $35.25 Type I or II construction 27. RETAINING WALLS $10 - $16 per sq.ft. Gangways (per lineal ft) $117.25 (multi -story building) $29.25 of wall depending on height of wall: Seawalls (per lineal foot) $1,759.50 All other types of 0.4' hi $11.75 Piles (each) $2,932.50 construction $23.50 4'1 " -10' hi $14.00 Earth anchor tiebacks Medical Offices (TI) 10'1 "+ hi $17.75 (per tieback) $1,782.50 Type I or II construction $35.25 Tieback repair (per tieback) $586.50 All other construction $29.25 26. Skylights (each) $586.50 Tieback replacement (per tieback) $2,300.00 23. POOL/SPA per sq.ft. $47.00 29. LoftlStorage per sq.fL $23.50 20. PATIOS $ RES. REMODEL: 24. DECKIBALCONIES per sq $17.50 30. Carport Enclosure p /sq.ft $14.00 Patio Covers: Light Weight (per sq.ft.) $8.75 26. BLOCK WALLS per sq.ft. $9.50 31. Garage Conversion p /sqJ $48.00 Solid Roof (per sq.ft.) $11.75 Example: 100' long x 6' high ' Patio Enclosures (p sq.ft) $48.00 X $9.50 = $5,700.00 32. Portable Spa (typical) $4,105.50 Res Remodel (per sq.ft.) $48.00 21. ROOFING: Valuation per roofing square With tear-off Without tear -off Built -up /rock roofs $234.50 /sq $176.00 Isq Composition Shingle $234.50 /sq $176.00 /sq Wood Shake /Shingle $381.75 /sq $340.50 /sq Tile, or special product $440.50 /sq Sheathing $82.25 /sq Metal Roofing $323.25 /sq ADD EQUIPMENT COST: AIR CONDITIONING: Commercial $4.75 Residential $4.00 SPRINKLER SYSTEMS: $3.00 °Add shoring cost where applicable * Add 0.5 percent to total cost for each story over three. ** Deduct 20 percent for shell -only buildings. * ** Deduct 11 percent for mini-warehouses. * ** Deduct 11 percent for mini-warehouses. Page 93