Loading...
HomeMy WebLinkAbout16 - 38th Street Tidal Structure-Tide ValveCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 16 June 10, 2008 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Tom Sandefur 949 - 644 -3312 or tandefur @city.newport- beach.ca.us SUBJECT: 38th Street Tidal Structure /Tide Valve -Award of Contract No. 3954 Recommendations: 1. Approve the project plans and specifications. 2. Award Contract No. 3954 to GCI Construction, Inc., for the Total Bid Price of $92,800, and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $9,200 to cover the cost of unforeseen work. Discussion: At 10:00 a.m. on May 27, 2008 the City Clerk opened and read the following bids for this project: BIDDER Low GCI Construction, Inc. 2 Atlas Allied, Inc. 3 Humphrey Constructors 4 Zondiros Corp. TOTAL BID AMOUNT $92,800.00 $112,380.00 $110,800.00 $196,700.00 * Corrected Bid Amount The low total bid amount is 28 percent below the Engineer's Estimate of $119,000. Slowing of the construction industry contributed to favorable bids. The low bidder, GCI Construction, Inc. possesses a California State Contractors License Classification "A" as required by the project specifications. A check of the Contractors references indicates they have satisfactorily completed similar projects for other municipalities. The work necessary for the completion of this contract consists of removing interfering portions of existing valve vault, removing and replacing sluice gate, installing electric actuator, constructing valve vault modifications, installing new valve vault hatch, installing conduits, pulling conductors through existing streetlight conduits, connecting electrical facilities, miscellaneous concrete improvements, installing new vault ladder, and repairing surface improvements. 38'" Street Tidal Structure / Tide Valve — Award of Contract No. 3954 June 10, 2008 Page: 2 Pursuant to the Contract Specifications, the Contractor will have 125 consecutive working days to complete the work. Up to 100 consecutive working days shall be granted for shop drawing preparation, review and approval, tide valve manufacturing and delivery. Environmental Review: The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Implementing Guidelines at the time the project was authorized by the City Council. This exemption covers the repair, maintenance and minor alteration of existing public facilities with negligible expansion. Public Notice: The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Prior to starting work two City prepared notices are distributed by the contractor to both residents and businesses. The first notice will be distributed ten days before work in the area and the second notice 48 hours prior to starting work in the area. Geotechnical, Material Testing, and Survey Services: Geotechnical, material testing, and survey services are not anticipated for this project. Funding Availability: There are sufficient funds available in the following account for the project: Account Description Account Number Amount Tide and Submerged Lands 7231- C2502001 $ 102,000 Total: $ 102,000 Proposed uses are as follows: Vendor Purpose Amount GCI Construction, Inc. Construction Contract $ $92,800 GCI Construction, Inc. Construction Contingency $ 9,200 Total: $ 102,000 Prepared by: Tom Sandefur Associate Civil Engineer Attachments: Project Location Map Submitted by: Daum Director f LOCATION MAP 38TH STREET TIDE VALVE REPLACEMENT CONTRACT NO. 3954 y9 P� S 9y �2 f� O 9� �O 'S 9� GF, P OJ T LOCATION O (�Yf