Loading...
HomeMy WebLinkAbout20 - Newport Blvd Water Main Replacement - PowerPoint (Staff)May 12, 2015 Item No. 20 Newport Boulevard Water Main Replacement Award of Contract No. 5481 Newport Beach City Council Meeting May 12, 2015 Agenda Item No. 20 Background Water Master Plan identified the need to replace existing cast iron water mains. The existing 20 -inch cast iron transmission water main in Newport Boulevard was installed in the 1920's New 24 -inch steel transmission water main will: Z. Improve operation and service reliability 2. Increase fire flow 3. Reduce potential of major water pipeline breaks associated with old cast iron mains. Proposed 24 -inch Pipeline Alignment Via Oporto to 28th Street 1_ '':& a a W; W'19=1 . -P Nli , Proposed 16 -inch Pipeline Alignment A 4 a r� 26th Street to 19th Street 4 4 + 4 _ ! V f f • Ak Project Schedule Award Contract Contractor Preparation/ Pipe Order Construction Start Construction Complete May 12, 2015 May - Sept. Sept. 2015 May 2016 2015 Recommendations Approve the project plans and specifications Award contract No. 5481 to low bidder T.E. Roberts, Inc. for total bid price of $3,511,515 Establish contingency amount of $350,000 (10 %) Approve Budget Amendment appropriating $260,000 from Water Enterprise Fund 0� V L1 FO • Your Public Works Department A Well- Engineered Machine Protecting and Providing Quality Public Improvements and Services