City Council Staff Report
May 12, 2015
Agenda Item No. 20
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director- (949) 644 -3330,
dawebb @newportbeachca.gov
PREPARED BY: Andy Tran, Senior Civil Engineer
PHONE: (949) 644 -3315
TITLE: Newport Boulevard Water Main Replacement (Via Oporto to 28th Street and 26th
Street to 19th Street) — Award of Contract No. 5481 (CAP14 -0030)
ABSTRACT:
Staff has received construction bids for the Newport Boulevard Water Main Replacement project and is
requesting City Council's approval to award the construction contract to T.E. Roberts, Inc. of Orange,
California.
RECOMMENDATION:
a) Approve the project plans and specifications;
b) Award Contract No. 5481 to T.E. Roberts, Inc. for the total bid amount of $3,511,515.00, and authorize
the Mayor and City Clerk to execute the contract;
c) Establish a contingency of $350,000.00 (approximately 10% of Total Bid) to cover the cost of
unforeseen work not included in the original contract; and
d) Approve Budget Amendment No. 15BA -047 appropriating $260,000 from the Water Enterprise
unappropriated fund balance to Account No. 7511- C6002014 to augment funding budgeted for Fiscal Year
2015 -16.
FUNDING REQUIREMENTS:
Upon approval of the proposed budget amendment and the Proposed Capital Improvement Program
budget for Fiscal Year 2015 -16, sufficient funding will be available for the award of this contract. The
following fund will be expensed:
[Account Descri tion
Number
I Amount
ater Enterprise
—Account
17511 - C6002014
$ 3,964,515.00
Total:
$ 3,964,515.00
20 -1
Staff recommends establishing approximately ten (10) percent for contingency purposes for unforeseen
conditions associated with construction.
Proposed fund uses are as follows:
Vendor
T.E. Roberts, Inc.
T.E. Roberts, Inc.
Geotechnical & Testing Consultant
Various
DISCUSSION:
Purpose
Construction Contract
Construction Contingency
Material Testing and Inspection
Printing and Incidentals
Amount
$ 3,511,515.00
$ 350,000.00
$ 100,000.00
$ 3.000.00
Total:$ 3,964,515.00
The proposed water transmission main replacement project is located on the northbound side of Newport
Boulevard from Via Oporto to 28th Street and from 26th Street to 19th Street. The existing pipeline consists
of 16 -inch and 20 -inch cast iron pipes that were installed in the mid 1920s. This transmission main is vital
to the City's water distribution system as it provides water supply and fire flow protection to businesses and
residents on the Balboa Peninsula. In addition to replacing the aging transmission main on Newport
Boulevard, various smaller cast iron distribution mains on Finley Avenue, 32nd Street and various alleys
will also be replaced.
The City will soon be administering a separate street improvement project on Newport Boulevard within the
limits of this water transmission main project. Replacement of the water transmission main at this time will
eliminate the potential of damaging the old existing cast iron water main during construction of the street
improvements, as well as prevent cutting into the new improvements in the near future.
At 10:00 a.m. on April 28, 2015, the City Clerk opened and read the following bids for this project:
The low bid amount is 3.3% higher than the Engineer's Estimate of $3,400,000. The low bidder, T.E.
Roberts, Inc., possesses a California state contractor's license classification "A" as required by the project
specifications. The contractor is registered with the California Department of Industrial Relations as
required by California law to work and bid on public contracts. A check of the contractor's references
indicates satisfactory completion of similar projects for other public agencies. T.E. Roberts, Inc. also
recently and successfully completed the Corona del Mar Water Transmission Main (C -4603) project.
The work necessary for the completion of this contract consists of mobilization, traffic control, construction
notification, trenching, shoring, installing water pipelines and appurtenances, dewatering, repairing sewer
pipelines, establishing temporary water services and sewer bypassing, and pavement restoration. Pursuant
to the Contract Specifications, the contractor will have 220 consecutive working days to complete the work.
The contractor will be performing field exploratory work (potholing) in late May 2015 in order to start the
fabrication of the steel pipes which takes approximately four months. Trenching and installation of pipes will
20 -2
BIDDER
TOTAL BID AMOUNT
Low
T.E. Roberts, Inc.
$ 3,511,515.00
2
GRFCO, Inc.
$ 3,949,575.00
3
Paulus Engineering, Inc.
$ 4,198,773.00'
4
Trautwein Construction, Inc.
$ 4,665,365.00
5
Vido Artukovich & Sons, Inc.
$ 4,713,190.00
6
J.A. Salazar Construction & Supply Corp.
$ 4,722,674.00
7
Lonerock, Inc.
$ 4,888,761.00
8
CCL Contracting, Inc.
$ 5,226,779.00
9
Mike Bubalo Construction Co.
$ 6,739,800.00
The low bid amount is 3.3% higher than the Engineer's Estimate of $3,400,000. The low bidder, T.E.
Roberts, Inc., possesses a California state contractor's license classification "A" as required by the project
specifications. The contractor is registered with the California Department of Industrial Relations as
required by California law to work and bid on public contracts. A check of the contractor's references
indicates satisfactory completion of similar projects for other public agencies. T.E. Roberts, Inc. also
recently and successfully completed the Corona del Mar Water Transmission Main (C -4603) project.
The work necessary for the completion of this contract consists of mobilization, traffic control, construction
notification, trenching, shoring, installing water pipelines and appurtenances, dewatering, repairing sewer
pipelines, establishing temporary water services and sewer bypassing, and pavement restoration. Pursuant
to the Contract Specifications, the contractor will have 220 consecutive working days to complete the work.
The contractor will be performing field exploratory work (potholing) in late May 2015 in order to start the
fabrication of the steel pipes which takes approximately four months. Trenching and installation of pipes will
20 -2
begin in September and will be completed before the start of Summer 2016.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California Environmental Quality Act
( "CEQA ") pursuant to Section 15302 Class 2C (replacement or reconstruction of existing utility systems
involving negligible or no expansion of capacity) of the CEQA Guidelines, California Code of Regulations,
Title 14, Chapter 3, because it has no potential to have a significant effect on the environment.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at
which the City Council considers the item).
ATTACHMENTS:
Description
Attachment A - Location Mao
Attachment B - Budget Amendment
20 -3
m J
PROJECT LOCATION
AVE
G
D
sl
OO
a �
00
NEWPORT BOULEVARD
WATER MAIN REPLACEMENT
VIA OPORTO TO 19TH ST
LOCATION MAP
ATTACHMENT A
�00
0
,o
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C -5481 1 5/12/2015
20 -4
ATTACHMENT B
City of Newport Beach NO. BA- 15BA -047
BUDGET AMENDMENT
2014 -15 AMOUNT: $2so,000.00
EFFECT ON BUDGETARY FUND BALANCE:
Increase Revenue Estimates Increase in Budgetary Fund Balance
X Increase Expenditure Appropriations AND Decrease in Budgetary Fund Balance
Transfer Budget Appropriations P1 No effect on Budgetary Fund Balance
SOURCE:
from existing budget appropriations
from additional estimated revenues
PX from unappropriated fund balance
EXPLANATION:
This budget amendment is requested to provide for the following:
To increase expenditure appropriations from the Water Capital Fund fund balance for the Newport Blvd. Water Main
Replacement Project.
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Account Description
510 3605 Water Capital - Fund Balance
REVENUE ESTIMATES (3601)
Fund /Division Account Description
EXPENDITURE APPROPRIATIONS (3603)
Description
Division Number 7511 Distribution & Piping
Account Number C6002014 Newport Blvd. Transmission Main
Division Number
Account Number
Division Number
Account Number
Signed:
Signed:
Signed:
Finance
Approval: City
City Council Approval: City Clerk
Amount
Debit Credit
$260,000.00
Automatic
$260,000.00
Date
S1611.5
Date
Date
20 -5