HomeMy WebLinkAbout12 - PSA with Doty Bros. and Valverde ConstructionCITY OF NEWPORT BEACH
CITY COUNCIL STAFF REPORT
Agenda Item No. 12
July 22, 2008
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Utilities Department
Steve Myrter, Utilities Director
949 - 718 -3400 or smvrterOcitv.newport- beach.ca.us
SUBJECT: APPROVAL OF AMENDMENT NO. 1 TO PROFESSIONAL SERVICES
AGREEMENTS WITH DOTY BROS. CONSTRUCTION COMPANY AND
VALVERDE CONSTRUCTION, INC.
RECOMMENDATIONS:
1. Approve Amendment No. 1 with Doty Bros. Construction Company, for on -call
underground utility repair services and authorize the Mayor and City Clerk to execute
the Amendment.
2. Approve Amendment No. 1 with Valverde Construction, Inc. for on -call underground
utility repair services and authorize the Mayor and City Clerk to execute the
Amendment.
DISCUSSION:
On September 11, 2007, the City Council approved a Professional Services Agreement
(PSA) with Doty Bros. Construction Company (Doty Bros.) and on November 13, 2007,
the City Council approved a PSA with Valverde Construction, Inc. to provide as needed
on -call underground utility repair services. The proposed revisions to each PSA, as
detailed in Amendment No. 1, are summarized below:
• Amendment No. 1 to the PSA with Doty Bros. incorporates a revised labor rate
billing sheet based on their current labor union contracts which are renewed
annually in June. This amendment also extends the term of the PSA until December
31, 2008. Doty Bros. has informed the Department that due to the volatility in fuel
and material prices they would be unable to guarantee prices beyond a 6 month
period.
• Amendment No. 1 to the PSA with Valverde Construction, Inc. incorporates a
revised labor rate billing sheet based on their current labor union contracts which are
renewed annually in June. This amendment also extends the term of the PSA until
June 30, 2009.
Underground Repair Services — Approval of Amendments No. 1
On -Call Professional Service Agreements
July 22, 2008
Page 2
The scope of work for the on -call professional service agreements being amended
include the following services: general underground utility installation and repair,
installing and repairing sewer laterals and mains; installing and repairing water services
including system appurtenances, street repairs, and grading improvements.
Environmental Review:
This action requires no environmental review, as it is not a project pursuant to CEQA.
Funding Availabilitv:
Funding is available in various maintenance and operations water and wastewater
accounts. Periodically, a capital improvement account will be utilized, as necessary, to
facilitate project expediency.
Expenditures exceeding $30,000 for an individual repair project will require a separate
City Council action in accordance with Policy F -14.
Prepared by:
Cindy Asher
Administrativ&Manager
Submitted by:
Steve Myrter
Utilities Director
Attachments: Amendment No. 1 with Doty Bros. Construction Company
Amendment No. 1 with Valverde Construction, Inc.
AMENDMENT NO. 1
TO
PROFESSIONAL SERVICES AGREEMENT
WITH DOTY BROS. CONSTRUCTION, COMPANY
FOR ON -CALL UNDERGROUND UTILITY REPAIR SERVICES
THIS AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, entered
into this 22nd day of July, 2008, by and between the CITY OF NEWPORT BEACH, a
municipal corporation, (hereinafter referred to as "City ") and DOTY BROS.
CONSTRUCTION COMPANY, a California corporation whose address is 11232 E.
Firestone Blvd., Norwalk, CA 90650 ( "Contractor"), and is made with reference to the
following:
RECITALS
A. On September 11th, 2007, CITY and CONTRACTOR entered into a On-
Call Professional Services Agreement, hereinafter referred to as
"Agreement", for Underground Utility Repair Services. This Agreement is
scheduled to expire on August 3152, 2008.
B. City desires to enter into this Amendment No. 1 to extend the term of the
Agreement to December 31, 2008.
C. City and Contractor mutually desire to amend Agreement, hereinafter
referred to as "Amendment No. 1 ", as provided here below.
NOW, THEREFORE, the parties hereto agree as follows:
1. Contractor shall perform various underground utility repair services
pursuant to this Amendment No. 1 and according to the Request to
Extend On -Call Services Agreement dated July 6, 2008, attached hereto
as Exhibit A.
2. Compenstaiton to the Contractor for services performed pursuant to this
Amendment No. 1 for all work performed from September 1, 2008, to
December 31, 2008, shall be based on the attached Schedule of Billing
Rates (Exhibit B).
3. The term of the Agreement shall be extended to December 31, 2008.
4. Except as expressly modified herein, all other provisions, terms, and
covenants set forth in Agreement shall remain unchanged and shall be in
full force and effect.
IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 1 on
the date first above written.
APPROVED AS TO FORM:
Y 1111
Aaron C. Harp,
Assistant City Attorney
for the City of Newport Beach
ATTEST:
M
LaVonne Harkless,
City Clerk
CITY OF NEWPORT BEACH
A Municipal Corporation
0
Edward Selich,
Mayor
for the City of Newport Beach
DOTY BROS. CONSTRUCTION CO.
By:
Title: President
Print Name:
By:
(Financial Officer)
Title:
Print Name:
Attachment: Exhibit A — Request to Extend On -Call Services Agreement
Exhibit B — Shedule of Billing Rates
f: \users \pbw \shared \agreements \fy 07 -08\on -call serviceslAdvanced Survey Amendment.doc
'DOTY BROS,
Construction Company
July 6, 2008
City of Newport Beach
949 West 16�' Street
Newport Beach, CA 92658
Attention: Cindy Asher, Utilities Administration Manager
Reference: Professional Services Agreement
On -Call Emergency Underground Utility Repairs
Term: 09/11/07-08131/08
Subject: Labor Rates and Equipment Rates
Term: 09/01/08-08/31/09
Dear Cindy:
EXHIBIT "A"
Please find enclosed, Doty Bros. Equipment Co.'s Labor Rates and Equipment Rates per our
previous email communications (May 28, 2008 and May 29, 2008). You had requested our current
applicable rates in order to submit to the City Council with the amendment to the above referenced
Agreement, requesting an extension to the current effective term.
Thank you for your patience and understanding as we completed integration of the labor
agreement rate modifications into the current rate schedules. As you are aware, Doty Bros. Equipment
Co. is a union signatory contractor therefore in compliance with its current labor agreements, these rates
are now effective and applicable to us. Therefore, we respectfully request your prompt acceptance by
issuance of a revised Exhibit "A ".
We would like to bring your attention to the fact that this year our Equipment Rates are effective
only through December 31, 2008. In the event that such increases are necessary we will be submitting to
you a revised Equipment Rate sheet at that time. We respectfully request that in such event you amend
the Agreement again at that time. Please know that it remains our goal to bring our customers
professional and quality services for a competitive price.
Thank you in advance for your time and consideration. If you should have any questions please
do not hesitate to call our office.
Very truly yours,
Sandy Dennis J l
Contracts Manager
cc: Phil Dennis
Binny Patel
contract file
Enclosures
11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864 -6566 Fax: (562) 564 -6052 www.dotybrasxom CA Lic. 273024
DOTY B EXHIBIT "B"
Construction Company
COST PLUS RATES
SOUTHERN CALIFORNIA
COST PLUS RATES EFFECTIVE JULY 1 2008 TO JUNE 30, 2009
Apprentice Rates: Apprentice rates as listed above are the highest classBcatiw prior to journeyman full scale rates. Billing rate for Apprentice will be based on
actual classification.
Subsistence: $85.00/day
Travel Time: Customer wig be advised If travel time Is applicable
Overtime Rates: All hours outside regularly constituted shift shall be time and one half. Sundays and holidays shall be paid at double time. For operating
Engineers - first four (4) hours outside regular shift. and first twelve (12) hours on Saturday is time and one half: all additional hours at double time except hc#days
which are at triple time. Emergency "calf out work" - Four (4) hour minimum for labor and equipment.
Markup: Material. subcontractors, subsistence. and outside rentals (including fuel costs), will be billed cost plus safes tax where applicable. plus mark -up of 15%
Boundaries of Southern California Cost Plus Rates: consists of the eleven (11) counties of Los Angeles, Inyo, Mono. Orange. Riverside, San Bernardino,
Imperial. Verdure. Santa Barbara. San Luis Obispo, Kem and in addition: Richardson Rock, Santa Cruz Island, Arch Rock, San Nicholas Island. Catalina Island. San
Clemente Island, San Miguel Island, Santa Barbara Island, Santa Rosa [stand. Amcapa Island, including the Channel Islands Monument. Rate Scale does not
include San Diego County.
OT to chance without not This
rate sheet is not all Inclusive; additional classifications available if required. (v2.0) CA C.L. 273024
11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864 -6566 Fax: (562) 864 -6052 www.dotybros.com CA Lic. 273024
PAY
STRAIGHT
OVER
DOUBLE
PAY
STRAIGHT
OVER
DOUBLE
CRAFTSMAN/CLASS
CODE
TIME
TIME
TIME
CRAFTSMAN/CLASS
CODE
TONE
TI%fE
TIME
CARPENTERS
OPERATING ENGINEERS
General Foreman
CGF
85.62
121.78
157.93
General Foreman, Appdx. A
OGF
91.63
126.80
161.97
Operating Foreman
COF
80.32
113.82
147.32
Foreman. Appdx. A
OFM
88.29
121.79
155.29
Foreman
CFM
80.62
114.27.
147.92
Group 1. APPdx. A - Oiler
OGt
80.13
109.56
13698
Journeyman
CJM
75.62
106.77
137.92
Group 2, APPdx. A - Oiler
OG2
61.44
111.51
141.58
Shingler
CSJ
75.83
107.09
138.35
Group S. Appdx. A - Universal
OG8
84.96
116.79
148.62
Apprentice - 8th Period (90 %)
CA8
69.39
97.42
125.46
Group 10, Appdx. A - Mechanic
OGA
65.16
117.09
149.02
Group 8, ApPdx. B - Cram < 25 Tons
OB6
85.44
117.51
149.59
MILLWRIGHTS
Group 9, Appdx. B - Crane > 25 Tons
OB9
85.72
117.94
150.16
General Foreman
CMG
86.46
123.03
159.60
Apprentice. Grp 8. Appdx A - Step 6(90%)
OA6
78.59
107.24
135.89
Foreman
CMF
81.45
115.52
149.59
Journeyman
CMJ
76.45
108.02
139.58
Apprentice -8th Period (96 %)
CM8
66.98
93.81
120.64
U.A. P/PEFITTERSNVELDERS
INDUSTRIAL
General Foreman
IGF
94.98
129.68
164.38
CEMENTMASONS
Foreman
(FM
89.09
121.02
152.94
Foreman
MFM
75.86
102.13
128.41
Journeyman - Weld4il'itter
IJM
80.25
108.01
135.76
Journeyman
WM
72.53
97.13
121.73
Apprentice - Fifth Year
IA5
67.68
92.67
117.65
F &T Machine Operator
MTO
72.94
97.76
122.57
Apprentice- 8th 6 Mm. (90%)
MA8
67.61
89.75
111.69
SHORTLINE (LOCAL 250)
Foreman
SFM
93.31
129.90
163.68
LABORERS
Journeyman(WeldedFitter)
SJM
90.31
125.40
157.75
Operator General Foreman
LOG
88.76
123.93
159.10
Welder Helper
SW H
50.30
68.50
86.66
Operator Foreman
LOF
85.43
118.93
152.43
Pre-Helper
SPH
29.96
41.02
52.08
General Foreman
LGF
71.35
97.81
124.28
.
Foreman
LFM
69.68
95.31
120.94
Group 1 - General
LGt
.62.34
84.30
106.26
Group 2 - Wrapper To 6"
LG2
63.26
85.68
108.10
U77UTY
Group 3 - PTONyreppor> 6"
LG3
64.18
67.05
109.93
Foreman
UFM
63.47
69.04
11329
Group 4 -Pipe layer. C&$
LG4
66.76
90.93
115.10
Welder
UIND
61.21
82.85
104.48
Group 5 - Blaster
LGS
67.35
91.81
116.27
JoumeymanlFuser
UJM
52.57
70.31
88.04
Apprentice -6th Period (85 %)
LA6
51.63
72.42
93.22
Pipe Tradesman II
UP2
40.22
51.89
63.57
TEAMSTERS
ELECTRICHI NS /INSIDE W/REMEN
Operator General Foreman
TOG
93.86
129.03
164.20
(Rates sublect to project location a employee base location)
Operator Foreman
TOF
90.53
124.03
157.53
General Foreman
EGF
97.65
136.91
176.17
General Foreman
TGF
72.63
97.18
121.74
Foreman
EFM
90.42
126.06
161.70
Foreman
TFM
70.96
94.68
11640
Icumeyman
EJM
83.18
115.20
147.22
Group 2 - 2 Axle
TG2
67.88
90.05
112.23
Apprentice -10th Period (85 %)
EAO
72.07
99.29
126.51
Group 3 - 3 Axle
TG3
68.09
90.38
112.66
Group 5 - Working Truck Driver
TG5
68.46
90.93
113.40
PROJECT MANAGEMENT
Group 6 - 4 or More Axle
TG6
68.51
91.00
113.50
Project Manager
MPM
106.33
145.45
187.85
Group 9- Lo-Bed
TG9
69.68
92.76
115.83
Superintendent
MSP
95.40
130.02
167.93
Group 12 - WTD BoomTrk Cent
TBT
71.73 .
95.83
119.94
Project Engineer
MPE
74.04
108.37
14270
Apprentice Rates: Apprentice rates as listed above are the highest classBcatiw prior to journeyman full scale rates. Billing rate for Apprentice will be based on
actual classification.
Subsistence: $85.00/day
Travel Time: Customer wig be advised If travel time Is applicable
Overtime Rates: All hours outside regularly constituted shift shall be time and one half. Sundays and holidays shall be paid at double time. For operating
Engineers - first four (4) hours outside regular shift. and first twelve (12) hours on Saturday is time and one half: all additional hours at double time except hc#days
which are at triple time. Emergency "calf out work" - Four (4) hour minimum for labor and equipment.
Markup: Material. subcontractors, subsistence. and outside rentals (including fuel costs), will be billed cost plus safes tax where applicable. plus mark -up of 15%
Boundaries of Southern California Cost Plus Rates: consists of the eleven (11) counties of Los Angeles, Inyo, Mono. Orange. Riverside, San Bernardino,
Imperial. Verdure. Santa Barbara. San Luis Obispo, Kem and in addition: Richardson Rock, Santa Cruz Island, Arch Rock, San Nicholas Island. Catalina Island. San
Clemente Island, San Miguel Island, Santa Barbara Island, Santa Rosa [stand. Amcapa Island, including the Channel Islands Monument. Rate Scale does not
include San Diego County.
OT to chance without not This
rate sheet is not all Inclusive; additional classifications available if required. (v2.0) CA C.L. 273024
11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864 -6566 Fax: (562) 864 -6052 www.dotybros.com CA Lic. 273024
DOT BROS.
Construction Company
MASTER EQUIPMENT LIST AND RATES
SOUTHERN CALIFORNIA
COST PLUS RATES EFFECTIVE JULY 1, 2008 TO DECEMBER 31, 2008
BACK HOES
AUGER
Accessory - COMPACTION WHEEL EXECAVATOR
Accessory - COMPACT WHEEL F/CASEJD
Accessory - HYDRAULIC BREAKER / CASE & JD
Accessory- VIBRATORY PLATE
POWER BROOM - TRACTOR MOUNTED
CC -135A ROCK WHEEL
CASE 580 /JD 310
CASE 590
CAT 300 -TRACK MOUNTED
CAT 345 -TRACK MOUNTED
CAT 416
JD 710
COMPACTION EQUIPMENT
ARROW (HYDRO HAMMER)/ STOMPER
SHEEPS FOOT - Tow Behind (Vibrating)
WACKERTAMPER
ID 4
Hourly
ROAD EQUIPMENT
1P..iE
$
Hourly
COMPRESSOR • AIR PORTABLE WER DAY RATE)
Rate
CRANES
SIDEBOOM CAT 561
#5045
Rate
#1189
$ 20.00
CABLE DOLLY- ONE REEL (Traitor Mounted)
$
$
12.00
#1181
$ 40.00
CABLE DOLLY -THREE REEL (Trailor Mounted)
#3308 $
$
25.00
#1179
$ 20.00
FLASHING ARROWBOARD - (4 HR. MIN.)
30.50
$
17.00
#1183
$ 50.00
GRADER -CAT 140
#R7791
$
B5.50
#1535
$ 40.00
GRINDER/ COLD PLANER (BITELLB - (4 HR MIN.)
#1187
$
235.00
#1085
$ 20.00
ROLLER - (RIDE ON)
S
30.00
#1313
$ 75.00
ROLLER (WALK BEHIND) -1 TON VIBRATOR
$
24.00
$ 41.75
ROLLER TRAILER
$
12.00
$ 43.75
TILT TRAILER
#6366
$
12.00
#4055
S 117.50
TRENCHER TRAILER
#6481
$
12.00
#4072
$ 147.50
UTILITY TRAILER
#6452
$
12.00
#4147
$ 39.75
ZIPPER PAVEMENT GRINDER (PER DAY RATE)
#1800
$
375.00
$ 47.75
ASPHALT PAVER - LEE BOY 1 GOOD
#1196
$
117.00
CEMENT SAW - WALK BEHIND
#1938
$
34.00
$ 46.00
#1169 $ 16.00
#1860 $ 23.50
COMPR SSORS W790 LS. BIREAgER, CLAY SPADE & T MP
R
$ 4625
COMPRESSOR 125. 185 CFM
$
21.50
COMPRESSOR • AIR PORTABLE WER DAY RATE)
#1808 $ 107.00
CRANES
SIDEBOOM CAT 561
#5045
BOOM TRUCK - 8 TON
#3647 $
37.50
BOOM TRUCK 10 -11 TON
$
52.50
BOOM TRUCK 14 TON
$
56.50
BOOM TRUCK 23.25 TON
#3308 $
61.50
CRANE • RT / 15-18 TON (or eoulvalenq
$
63.50
DOZERS I SIDEBOOMS
DOZER JD 450
#5078
$ 4625
SIDEBOOM CAT D-6
41184, $
$ 60.25
SIDEBOOM CAT D-7
#5063
$ 69.25
SIDEBOOM CAT 561
#5045
$ 66.25
SIDEBOOM CAT 572
#5067
$ 81.25
SIDEBOOM JD 450
#5087 $
$ 4425
FORKLIFTS
FORKLIFT - HYSTER 20,000 LB
#1203
$ 36.75
FORKLIFT -LION 6,000 LB
#1204
$ 24.75
LOADERS
LOADER - BOBCAT W1 BUCKET
#1184! $
28.75
LOADER - BOBCAT W1 SWEEPER
41184, $
38.75
LOADER - BOBCAT W/ GRINDER
#1184f $
58.75
RUBBER TIRE LOADER - 544 JD
#5086 $
49.50
RUBBER TIRE LOADER - 930 CAT
#5089 $
51.50
RUBBER TIRE LOADER - 950 CAT
#5087 $
62.50
RUBBER TIRE LOADER - 960E/F CAT
#5099 $
73.50
RUBBER TIRE LOADER - 966 CAT
#5070 $
68.50
SKIPLOADER - CASE 580 / MF 40E / F 445
$
33.75
TRUCKS
2-3 TON TRUCK
5 Yard (Flat bed or Bobtail) Dump / 2-3 Ton Utility Truck
BACK HOE MOVER TRUCK
CEMENT TRUCK w/ mixer and compressor
DUMP TRUCK 10 WHEELER
EQUIPMENT TRAILER - 20,000 LB
EQUIPMENT TRAILER - 40,000 LB
FLAT BED with LIFT
FLAT BED with MD(ER / DUMP
LOWBED TRAILER w/ tractor & move permit fees
LOWSIDE END DUMP TRAILER W/ TRACTOR
PICKUP TRUCKS • MISC. TOOLS NOT INCLUDED
PICK -UP - RENTAL NUMBER
SERVICE TRUCK - MISC TOOLS NOT INCLUDED
SERVICE VAN - MISC TOOLS NOT INCLUDED
TEST PUMP TRUCK
TEST TRAILER (Hypmstatic) (#6549 & 6674)
UTILITY VEHICLE (NON -HWY)
WATER TRUCK - (1,500 - 2,000 GALS.)
WATER TRUCK - (3.500 GALS.)
WINCH TRUCK
#3450 $ 16.50
$ 26.00
$ 23.50
#3338 $ 52.50
$ 31.50
S 14.00
$ 16.00
#3693 $ 25.50
#3392 $ 52.50
#3456 $ 48.50
#3418 $ 45.50
$ 17.50
R7700 $ 17.50
$ 19.50
$ 17.50
#3401 $ 82.50
$ 32.00
$ 24.50
$ 32.50
#3464 $ 42.50
#3395 $ 32.50
MISCELLANEOUS
SOARING MACHINE HYDRAULIC
#1521
$
25.00
BORE MACHINE TRAILER
#6447
$
10.00
TAP MACHINE (Water lines 3" to 12ry (Per inch / per day)
#828
$
30.00
TAP MACHINE (Water lines up to 2") (Per Inch / Per day)
#820
$
20.00
WELDERS
200 AMF • TRUCK MOUNTED
$
30.50
200 AMF. SKID MOUNTED or TRAILER
$
17.50
WELDER - RIG RENTAL NUMBER
R7704
$
30.50
FABRICATION SHOP & EQUIPMENT
#101 $ 91.00
Pe 1.12
11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864 -6566 Fax: (562) 864 -6052 www.dorybros.com CA Lic. 273024
DOTY BROS,
Construction Company
MASTER EQUIPMENT LIST AND RATES
SOUTHERN CALIFORNIA
COST PLUS RATES EFFECTIVE JULY 1, 2008 TO DECEMBER 31, 2008
MISCELLANEOUS
Iu
DAILY
MISCELLANEOUS
ID#
DULY
Rate
ADDITIONAL (1) TORQUE HEAD FOR HYDRAULIC TORQUE WRENCH
#9091
$ 50.00
PIPE LOCATOR
#843
$
25.00
AIR HOSE 3/4"X 50'
#870
$ 8.00
PIPE LOCATOR - METROTECH
#1935.
$
40.00
AIR SAW
#857
$ 50.00
PIPE PUSHER I GRUNDOR4M - HERCULE
91939
$
600.00
AIR TAMPER
#859
$ 35.00
PLYWOOD 113 REPLACEMENT COST
#897
$
3.00
ASPHALT SPREADER BAR
#1193
$ 125.00
PNEUMATICIHYDRAU TORQUE WRENCH
93090
$
150.00
BARRICADES
#880
$ 250
PORTABLE BAND SAW
#860
$
35.00
BEVELING BAND 14"-20"
#833
$ 75.00
POWER THREADER
#853
$
85.00
BEVELING BAND 24 "-42"
#834
$ 100.00
PRESSURE WASHER TRAILER MOUNT.
#6941
$
160.00
BEVELING BAND 4 " -12"
#832
$ 50.00
PUMP -SKID MOUNT BENTONITE
91166
$
107.00
BEVELING MACHINE 14 " -20"
#830
$ 75.00
PUMP - SUBMERSIBLE
#861
$
27.00
BEVELING MACHINE 24 "-42"
#831
$ 100.00
RIGID ROLL GROOVER
( #873 & #8561
$
30.00
BEVELING MACHINE 4 " -12"
#829
$ 42.50
RIVET BUSTER I RIPPING GUN
#869
$
50.00
BORING MACHINE - CASE HYDRA
#1092
$ 160.00
ROCK DRILL (Plus Steel)
#865
$
35.00
BORE MOTOR
#854
$ 10.00
ROCK SEPARATOR - GRIZZLY
91811
$
85.00
BORING MACHINE 1 -112" & 1 314" (Acm- punch)
91178
$ 15.00
ROTARY HAMMER (Plus Steel)
#852
$
50.00
BORING MACHINE 4 " -8" (Acc"unch)
#1520
$ 25.00
SANDBLASTER - UNIT (VAth accessories)
#1175
$
125.00
BORING MACHINE 3.112" (Accu- punch)
#1177
$ 20.00
SAWZALL
#874
$
15.00
BUFFER & GRINDER
#836
$ 25.00
SHORING LUMBER 3"X 12"X14' nn REPLACEMFNTCOSTI #895
$
3.00
BUILDER LEVEL - AC-2X NIKON
#845
$ 25.00
SHORING LUMBER 8"X 8" X 8' (113 REPLACENENrcosn #896
$
3.00.
CEMENT MIXER
$ 43.00
SKILL SAW (INCLUDES BLADES)
#835
$
20.00
CHAIN LINK FENCE PANELS
#846
$ 3.00
TAP MACHINE -T.D. WILLIAMSON (UP TO 3 ").
#827
$
100.00
CHAIN SAW 16" (INCLUDES BLADES)
#850
$ 50.00
TAR POT
#862
$
50.00
CHIPPING GUN (Plus Steel)
#868
$ 35.00
TEST PLUG
#892
$
10DO
CLAY SPADE (Plus Steel)
#866
$ 35.00
TEST PUMP 200 LB. -400 LB. SPRAGUE
#1815
$
125.00
CLEANING BALL
#890
$ 10.00
TEST PUMP 5,000 LB. TRAILER MOUNTED
#6818
$
187.00
COM- A-LONG I CHAIN
#886
$ 15.00
TEST PUMP High Pressure
#1940
$
125.00
CONCRETE FINISHER
#1823
$ 125.00
TEST PUMP Portable 2001b
f#816Ύ
$
80.00
CONCRETE VIBRATOR
#891
$ 40.00
TESTING TABLE
#1834
$
60.00
CONSTRUCTION SIGNS
#882
$ 4.00
TRAFFIC CONES
#881
$
2.50
CROSSING PLATES
#878
$ 6.25
TRANSIT - THEOLITE
#8450
$
35.00
CUT OFF l CHOP SAW (INCLUDES BLADES)
#810
$ 53.00
TRENCH BOX - 6'X 10'
#1910
$
200.00
DEAD WEIGHT TESTER
$ 60.00
TRENCH BOX -4' X 10'
91909
$
130.00
DELINEATORS
#879
$ 2.50
TRENCH JACK (SCREW)
#877
$
4.00
DRILL MOTOR 112' _
#811
$ 20.00
TRENCH JACK (HYDRAULIC)
#876
$
20.00
DRILL MOTOR 314"
#812
$ 25.00
TRENCHER
91160
$
125.00
DRY ROD OVEN - PORTABLE
#813
$ 25.00
TRI -VISE
#884
$
25.00
DUCT ROD
#865
$ 30.00
VIBRATOR PLATE
$
91.00
EMULSION POT SPRAYER
$ 60.00
WALKIE TALKIES (SET OF 2)
#893
. $
25.00
FLOODLIGHT TRIALER (MERCURY VAPOR LIGHTS)
$ 125.00
WATER HOSE 1 112" X 50'
#871
$
6.00
FLOW LINER
#841
$ 25.00.
WATER HOSE 2 112" X 50'
#872
$
7.50
FUSION MACHINE 4-12" Macelrey
#3095
$200.00
WATER PUMP 2" Portable
#1831
$
53.00
GENERATOR (3.5 -5 KW)
#1807
$ 53.00
WATER PUMP 3" Portable
#1832
$
80.00
HEAT TRACER
#814
$ 25.00
WEEDEATER
9116
$
50.00
HEATER
#815
$ 25.00
WHALERS HYDRAULIC
#1894
$
300.00
HOLIDAY DETECTOR
#838
$ 25.00
WINCH 10 TON (GRUNDO)
#6042
$
300.00
HYDRAULIC STAR CUTTER
#889
$ 100.00
IMPACT GUN 1"
4819
$ 25.00
IMPACT GUN la"
#821
$ 15.00
DAILY
IMPACT GUN 314"
#822
$ 20.00
SAFETY AND HAZMAT EQUIPMENT
Rate
IMPACT WRENCH 1"
#864
$ 35.00
EXPLOSIMETER
#844
$
50.00
LADDER
#875
$ 10.00
4 WAY GAS MONITOR
#921
$
100.00
LASER LEVEL
#8456
$ 75.00
MULTI -GAS DETECTOR I PID
#914
$
100.00
LEAF BLOWER
#824
$ 25.00
AIR SUPPLY UNIT
#922
$
50.00
LIGHT STAND
#849
$ 15.00
ESCAPE AIR PACK
#918
$
25.00
MANHOLE BLOWER
#840
$ 43.00
1-12S MONITOR
#920
$
15.00
PAVEMENT BREAKER I JACKHAMMER
#867
$ 35.00
HAZMAT SUIT - TYVEK
#912
$
8.00
PIPE BENDER 5" GREENLEE
#1885
$ 100.00
HAZMAT TRAILER
#6648
$
20.00
PIPE BENDER MACHINE 6 -20" (Plus shoes#reight per day)
#1082
$ 400.00
RESPERATOR - HALFIFULL MASK
#911
$
5.00
PIPE BENDER SHOES 11082 BENDER
#1190
$1165.00 WEEKLY
SCBA - self contained
#916
$
40.00
PIPE CUTTER - RIDGID SOIL
#885
$ 15.00
SCBA cylinder - extra
#917
$
25.00
PIPE CUTTER LINEUP CLAMP 16 " -36"
#839
$ 50.00
TRIPOD WITH WINCH
#913
$
100:00
PIPE CUTTER LINEUP CLAMP 8 " -14"
#851
$ 25.00
Page 2 of 2
11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864 -6566 Fax: (562) 864 -6052 www.dotybros.com CA Lic. 273024
AMENDMENT NO. 1
TO
PROFESSIONAL SERVICES AGREEMENT
WITH VALVERDE CONSTRUCTION, INC.
FOR ON -CALL UNDERGROUND UTILITY REPAIR SERVICES
THIS AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, entered
into this 22nd day of July, 2008, by and between the CITY OF NEWPORT BEACH, a
municipal corporation, (hereinafter referred to as "City ") and VALVERDE
CONSTRUCTION, INC., a California corporation whose address is 10918 Shoemaker
Avenue, Santa Fe Springs, California 90670 ( "Contractor'), and is made with reference
to the following:
RECITALS
A. On November 13th, 2007, CITY and CONTRACTOR entered into a On-
Call Professional Services Agreement, hereinafter referred to as
"Agreement", for Underground Utility Repair Services. This Agreement is
scheduled to expire on June 30, 2008.
B. City desires to enter into this Amendment No. 1 to extend the term of the
. Agreement to June 30, 2009.
C. City and Contractor mutually desire to amend Agreement, hereinafter
referred to as "Amendment No. V, as provided here below.
NOW, THEREFORE, the parties hereto agree as follows:
1. Contractor shall perform various underground utility repair services
pursuant to this Amendment No. 1 and according to the Request to
Extend On -Call Services Agreement dated May 29, 2008, attached hereto
as Exhibit A.
2. Compenstaiton to the Contractor for services performed pursuant to this
Amendment No. 1 for all work performed from July 1, 2008, to June 30,
2009, shall be based on the attached Schedule of Billing Rates (Exhibit
B).
3. The term of the Agreement shall be extended to June 30, 2009.
4. Except, as expressly modified herein, all other provisions, terms, and
covenants set forth in Agreement shall remain unchanged and shall be in
full force and effect.
IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 1 on
the date first above written.
APPROVED AS TO FORM:
By: C
Aaron C. Harp,
Assistant City Attorney
for the City of Newport Beach
ATTEST:
M
LaVonne Harkless,
City Clerk
CITY OF NEWPORT BEACH
A Municipal Corporation
By:
Edward Selich,
Mayor
for the City of Newport Beach
VALVERDE CONSTRUCTION, INC.
By:
Title: President
Print Name:
By:
(Financial Officer)
Title:
Print Name:
Attachment: Exhibit A — Request to Extend On -Call Services Agreement
Exhibit B — Shedule of Billing Rates
f: \users\pbw\shered\agreements \fy 07-Mon-call servicaMAdvanced Survey Amendment.doc
05/29/2008 12:24 URLUERDE CONSTRUCTION 4 19496465204 NO.804 P02
VALVERI3E CONSTRUCTION, INC. EXHIEW
Genera! Enginening Contractors
UWAGO No. Mme
10918 SHOEMAKER AVE.
SANTA FE SPRINGS, CA 90670
(562) 906 -1626 • FAX' (562) 906.1918
May 29, 2008
Mr. Steve Myrter
Utilities Director
City of Newport Beach
3300 Newport Blvd.
P.Q. Box 1768
Newport Beach, CA 92658
Re. Professional Service Agreement — Utility Repair Services
Dear Mr. Myrter.
Valverde Construction, Inc. is requesting to extend the Professional Service Agreement for
another year to commence on July 1, 2006. New rate sheets are attached.
Yours Truly,
VALVERDE CONSTRUCTION, INC
�T.�2 -
Edward Valverde
President
Enclosure
Im
D
Obi
01
Z
N
d
.y
u
VALVERDE CONSTRUCTION INC.
LABOR RATES
771!0 8- 6130109
Y L sTIT
W
Rates Gaud Through Jur[e 30 2008
EMPE£
EMPER
GENT
WKRS
NLT
REG
DAILY
017
0
BASE
VAC
PAY
TAXES
LIAR
MP. INS.
AND
OTHER
TOTAL
COST
COST
COST
COST
Rate
Cede
PAY
PAY
RATE
13.85%
INS
7.61%
ENSI
WEL
FRINGE
FRINGE
RATE
RATE
RATE
RATE.
CARP
CARPENTER
37.35
3.30
40.65
5.63
3.52
3.09
1.91
3.95
0.74
22.14
59.49
475.95
78.17
98.84
CMF leemeni
Masons
29.0
5.73
3523
4.88
3.52
2.6
4.50
5.22
1.69
28.42
57.92
483.36
72.67
87.42
LAPi
LABO RAPPRENTICE 1ST PERIOD
2.52
17.19
2.38
3.52
1.31
t.05
298
0.91
14.67
29.34
234.71
36,67
44.01
tAP2
BORER APPRENTICE 2ND PER 0-
.14.67
1 .13
2.52
18.85
2.58
3.52
1.42
1.65
2.98
0.81
14.98
31.71
24896
39.18
47.24
LAP3
BORER APPRENTICE 3RD PERIOD
17.60
Z.52
20.12
219
352
1.53
1.05
2.88
0.91
15.30
329p
263.18
41.7
5pSD
LAP4
LABORER APP TICE 4TH PERIOD
20.53
2.52
23.05
3.19
3.52
1.75
1.05
2.98
0.91
15.93
36.46
291.65
46.72
56.99
LAPS
LABORER APPRENTICE 5TH PERIOD
23.46
252
25.98
3.60
3.52
1.96
1.05
206
0.91
16.56
40.02
320.12
51.75
63.48
LAP6
LABORER APPRENTICE 6TH PERIOD
24.93
2.52
27.45
3.80
3.5
2.09
1.0.''.
298
0.91
16.87
41MI
334.41
54.27
66.73
LCF2
Laborer foreman C2 a la
28.72
3.60
32.32
4.48
3.52
2.46
5.25
4.26
0.98
24.66
53:27
478.13
67.63
81.99
LF1A
borer FOREMAN 1A ORT {Z GARREO
34.48
3.60
30.08
5.27
3.52
2.90
5.25
4.26
0.98
25.78
fi0.Z6
4$210
77.50
94.74
LGFt
rer FOREMAN 1 ( VINA
27.29
3.60
30.89
426
3.52
2.35
525
4.28
0.98
24.24
5t.53
412.23
65.17
7882
-
LGF3
FOREMAN 3 J.R. MUNO
36.73
3.60
40.33
5.59
3.52
3.07
525
4.28
0.98
26.26
62.99
503.96
81.38
LG7
GEN. LABORER GROUP 1
26.33
26.88
3.60
3.60
29.93
30.48
4.15
4.22
3.52
3.52
2.28
232
5.25
5.25
4.26
4.26
0.96
Q.98
24.03
24.15
50.39
51.03
402.90
408.25
63.53
64.47
76.69
77.91
LG2
GE N. LABORER GROUP 2
LG2A
GROUP 2A J. Min rez
2&33
3.60
31.93
4.42
3.52
2.43
5.25
4.26
0.98
24.46
52.79
42234
66.9681.12
LG4
PIPELAYER GROUP 4
28.98
3.60
32.56
4.51
3.52
2.48
5.25
4.28
0.98
24.60
53.58
428.65:
68.07.
8256
LG5
P PELAYER GROUP 5
29.33
3.60
3293
4.56
3.52
2.51
8.25
4.28
p.9
24.68
54:01
432Q5
6 &67
63.34
O10C
GROUP IOC Mke Vahrerde
38.88
2.82
41.70
5.78
3.52
3.17
5.05
7.95
0.62
29.11
67.99
543.91
_07.43:
-
10 &87
-FOR
GROUP 1OR Apron VaIZ
38.88
282
41.70
5.78
3.52
3.17
5.05
7.95
0.82
29.11
57.99
543.91
67.43-
106.87
OG6
GROUP6
38.06
2.82
40.88
5.68
3.52
3.11
5.05
7.95
0.82
26.93
'68:99
535.94
66.02.
TOS.05
8621
105.30
OG8
GROUPS
38.17 282 40.99 5.68 3.52 3.12
5.05 7.95
0.82 2 &96
67.13 537.01
OG9
GROUP 91Ja Lewis
39.81
2.82
42.83
5.90
3.51
3.24
p. H2
2A31
69.12
552.&5
89A2:
10 &93
8&65
64.07
SOFM
GEM. FORE San Dis o -R.Ra i
30.84 3.31 34.15 4.73 3.52 260
0.62 2239
53.23 425-63
.
TFC
FOREMAN e5 id
30.40
2.60
33.00
4.57
3.52
251
1.54
29.31
59.71
477.69
74:91
.90 -11
TF1
FOREMAN (B.DOSEK)
25-4
2.80
31.p0
4.29
3.52
236
=14541
1.54
28.88
57.26
45 &2OS
Teamster TRUCK DRIV SPECIAL
2 &94
2.60
31.54
4.37
3.52
2.46
1.
29.00
57:94
4&9.51
72.44
86.88
Teamste[TRUGK DRIVER
26.94
2.60
29.54
4.09
3.52
225
1.54
2&57
5551
444.07
68.98
8245
Y L sTIT
W
Rates Gaud Through Jur[e 30 2008