Loading...
HomeMy WebLinkAbout09 - Balboa Islands Bulkhead and SeaWall RepairCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 9 October 14, 2008 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Peter Tauscher 949 - 644 -3316 or ptauscher @city.newport- beach.ca.us SUBJECT: BALBOA ISLANDS BULKHEAD AND SEAWALL REPAIR - AWARD OF CONTRACT NO. 3962 Recommendations: 1. Approve the project plans and specifications. 2. Declare the bid submitted by Kitson Specialty Contracting, Inc., of Santa Fe Springs non - responsive. 3. Award Contract No. 3962 to Surfside Restoration & Waterproofing, Inc., for the Total Bid Price of $196,385, and authorize the Mayor and the City Clerk to execute the contract. 4. Establish an amount of $45,615 (23 %) to cover the cost of unforeseen and anticipated work not covered in the original scope. Discussion: At 10:00 a.m, on September 18, 2008, the City Clerk opened and read the following bids for this project: BIDDER Low Surfside Restoration & Waterproofing, Inc. 2 Bielski Specialty Services 3 Superior Gunite 4 Zondiros Corporation 5 Kitson Specialty Contracting, Inc. 6 Ace Restoration & Waterproofing, Inc. 7 Slater Waterproofing, Inc. TOTAL BID AMOUNT *$196,385.00 **$339,301.00 *"$447,061.00 * ** *$538,300.00 * * ** *$575,910.00 $624,475.00 $629,900.00 As -bid amount is $196,400.00 ** As -bid amount is $343,285.00 * ** As -bid amount is $450,550.00 * * ** As -bid amount is $537,800.00 * * * ** Nonresponsive Balboa Islands BVttc read aru Seawall Repair— Award of Contract No. 3962 October 14. 2008 Page: 2 The low bid total amount is significantly lower than the Engineer's Estimate and could be due to the following reasons: (1) The Engineer's Estimate was prepared using bid prices received from previous identical projects. Surfside Restoration & Waterproofing, Inc. (Surfside) indicated to staff that his unit prices reflect the current construction environment for his company. The average of the other submitted bids was within the range of the Engineer's Estimate; (2) Surfside is relatively small staffed, which allowed for less administrative and overhead costs; and (3) Surfside specializes in concrete, bulkhead, and seawall repairs giving it a competitive advantage to provide lower costs than its competitors. A check of Surfside's references indicates they have satisfactorily completed similar repair projects for other public agencies. Surfside has satisfactory completed four projects involving identical work for the City within the past twelve years. Despite Surfside's low bid prices there was no compromise in the quality of work performed. Surfside possesses a California State Contractors License Classification "C -61" for concrete - related services as required by the project specifications. Due to the low unit prices bid by Surfside, staff recommends Council establish a contingency amount of $45,615, equaling approximately 23% of the contract amount. These additional funds will provide an opportunity for the City to take advantage of the low unit prices to negotiate additional bulkhead and seawall repairs at other locations. This project provides for repairing concrete cracks and spalls, sealing joints, and installing shotcrete to the bulkheads and seawalls along the perimeter of Balboa Island and Little Balboa Island. These repairs will mitigate some of the high tide seawater infiltration caused by non - structural deficiencies. The existing abandoned streetlight pull boxes within the bulkhead copings will be removed and backfilled. Pursuant to the contract specifications, Surfside will have 120 consecutive working days to complete the work with an estimated completion of no later than April 21, 2009. All work under contract shall be inspected for water- tightness during an extreme daytime high tide of at least 6.9 feet before the City will accept the work. The final release of retention will be made at the end of the one -year warranty period. Environmental Review: The project is Categorically Exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Implementing Guidelines. This Balboa Islands Bulkhead and Seawall Repair — Award of Contract No. 3962 October 14, 2008 Page: 3 exemption covers the repair, maintenance and minor alteration of existing public facilities with negligible expansion. Public Notice: The Notice Inviting Bids was advertised in the City's official publication. Prior to starting work, City - prepared notices will be distributed by the contractor to both residents and businesses in the area ten days and 48 -hours prior. Geotechnical, Material Testinq, and Surveying Services: Geotechnical, material testing, and surveying services are not anticipated for this project. Fundinq Availability: There are sufficient funds available in the following account for the project: Account Description Balboa Bulkhead Coping and Seawall Repairs Proposed uses are as follows: Vendor Surfside Restoration Surfside Restoration Various Prepared by: Account Number Amount 7231- C5100835 $ 242,500 Total: $ 242,500 Purpose Amount Construction Contract $ 196,385 Construction Contingency $ 45,615 Printing and Incidentals $ 500 Total: $ 242,500 ,roe ' Gibe Tgr/JCW erTauscher Junior Civil Engineer Attachment: Project Location Map Submitted by: Badum rks Director