HomeMy WebLinkAbout10 - OASIS Senior Center Construction ManagementCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 10 November 12, 2008 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department David Webb, Deputy Public Works Director /City Engineer 949 - 644 -3328 or dawebb @city.newport- beach.ca.us SUBJECT: OASIS SENIOR CENTER CONSTRUCTION MANAGEMENT — APPROVAL OF PROFESSIONAL SERVICE AGREEMENT AMENDMENT NO. 1 WITH GKK WORKS RECOMMENDATION: Approve Amendment No. 1 to the Professional Services Agreement with GKK Works, of Irvine, California, to provide project and construction management services at a not to exceed price of $662,000 and authorize the Mayor and City Clerk to execute the amendment. DISCUSSION: On February 26, 2008, City Council approved a Professional Service Agreement with GKK Works, of Irvine, California for $89,090 to provide project management services during the design phase of the Oasis Senior Center project. As required in the original RFP, GKK Work's proposal also included an option to utilize the firm for either program manager at risk for project delivery or to provide construction management support services during the construction of the new Oasis Senior Center project. GKK Works was selected from the four firms that turned in proposals as the most qualified firm to provide program management for the Oasis Senior Center project. This was due to GKK Works having extensive experience with similar municipal projects and that the City has also had a very positive experience with GKK Works with their recent construction management of the Newport Coast Community Center and the Santa Ana Heights Fire Station and Training Facility. During the current design phase, Kim Harvey has been the primary project manager for GKK Works that has provided the necessary staff support to assist with the design development, review and management. Staff and Kim, as well as other supplemental GKK staff have worked well together during this process and we are now preparing for the up- coming advertising, award and construction of the project. Given the large CIP workload and the need for building related construction management services, staff is Oasis Senior Center Program Management— Approval of Amendment No. 1 to Professional Services Agreement with GKK Works November 12, 2009 Page 2 now requesting to use GKK Works, with Kim Harvey as the primary contract staff person, for construction management during the construction phase of the project. Staff has negotiated a not to exceed fee of $662,000 for these proposed services (including allowance for reimbursable expenses). The scope of work proposed includes providing project management and construction management services, from the bidding and award of the project, through the entire construction phase, including completion of the building and site work, as well as project closeout. GKK Works will serve as an extension of city staff for the project including providing necessary project and construction management services per the attached proposal. The specific work tasks are as follows: Preconstruction Phase • Manage the general contractor pre - qualification process. • Coordinate the public bidding process including bid analysis. Construction Phase • Manage the general contractor's monthly updates for logic, work item timeframes, and contract compliance, and negotiate necessary changes in order to maintain schedule and performance. • Review the contractor's requests for information (RFI's), shop drawings, samples, and submittals prior to submitting to the Architect. • Review change order requests for completeness and accuracy, negotiate final cost, and process any change orders. • Develop and update a change order report for the use of the City and the Architect. • Review and manage the LEED documentation process during construction. • Manage the contractor and other consultants and take the lead role in-.solving field problems. • Monitor the quality of construction and maintain jobsite photographs to document the contractor's progress, quality, and conformance with the contract documents. • Review, verify, and approve the contractor's monthly application for payment. • Review as -built drawings on a monthly basis, insuring the contractor inserts necessary updated information. • Monitor the contractor's jobsite safety program. • Review the work in place for conformance with the contract documents. • Manage the testing and inspection company as they test construction materials to verify compliance with the contract documents. This includes required soils testing and all required special inspections and testing. Close -Out Phase • Obtain final as -built drawings, review and cause any corrections to be made prior to submittal to the City. • Prepare a final project report, which will include a financial report, summary of change orders, and final schedule analysis. • Manage the assembly of the contractor's close -out documents including the Operation and Maintenance manuals, warranties, etc. Review the close -out documents for completeness, cause any necessary corrections, approve, and submit to the City. Oasis Senior Center Program Management — Approval of Amendment No. 1 to Professional Services Agreement with GKK Works November 12, 2008 Page 3 The scope of work anticipates approximately 23 months until completion of construction around October 2010. Environmental Review: Project Management /Construction Management services are not a project as defined in the California Environmental Quality Act (CEQA) Implementing Guidelines. Funding Availability: There are sufficient funds available in the following account for the project: Account Description OASIS Senior Center Prepared by: Account Number Amount 7453- C1002007 $ 662,000 Total: $ 662,000 Submitted by: David We b (�Zb adum Deputy Public Works Director /City Engineer or Director Attachment: Amendment No. 1 to Professional Services Agreement Project Location Map x XAX , OASIS SENIOR CENTER LOCATION MAP �lyx CITY OF NEWPORT BEACH. PUBLIC WORKS DEPARTMENT 2 31 AMENDMENT NO. ONE TO PROFESSIONAL SERVICES AGREEMENT WITH GKK WORKS FOR PROGRAM MANAGEMENT SERVICES FOR THE OASIS SENIOR CENTER THIS AMENDMENT NO. ONE TO PROFESSIONAL SERVICES AGREEMENT, is entered into as of this _ day of , 2008, by and between the CITY OF NEWPORT BEACH, a Municipal Corporation ( "CITY "), and GKK WORKS, a California Corporation whose address is 2355 Main Street Ste. 220, Irvine, California, 92614 ( "CONSULTANT "), and is made with reference to the following: RECITALS: A. On February 27, 2008, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for program management services for the new Oasis Senior Center, hereinafter referred to as "PROJECT B. CITY desires to enter into this AMENDMENT NO: ONE to reflect additional services not included in the AGREEMENT. C. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. D. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. ONE ", as provided here below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. In addition to the services to be provided pursuant to the AGREEMENT, CONSULTANT shall diligently perform all the services described in AMENDMENT NO. ONE including, but not limited to, all work set forth in the Scope of Services attached hereto as Exhibit A and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 2. City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached to the AGREEMENT. Consultant's compensation for all work performed in accordance with this AMENDMENT NO. ONE, including all reimbursable items and subconsultant fees, shall not exceed Six Hundred Sixty - One Thousand and Sixty Dollars and no /100 ($662,000) without prior written authorization from City. 3. The term of the Agreement shall be extended to March 31, 2011 . 4. Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. ONE on the date first above written. APPROVED AS TO FORM: City Attorney for the City of Newport Beach ATTEST: 0 LaVonne Harkless, City Clerk CITY OF NEWPORT BEACH, A Municipal Corporation in Mayor for the City of Newport Beach CONSULTANT: MR (Corporate Officer) Title: Print Name: - 23 (Financial Officer) Print Name: Attachments: Exhibit A — Scope of Services and Schedule of Billing Rates EXHIBIT A gkk�wqr_ks 2355 Main Street I Suite 220 1 IRVINE I CA 92614 949 25O 1500 1949 955 2708 FAX I wwiV9kkworks.com. October 22, 2008 Mr. Steve Badum Public Works Director 3300 Newport Blvd, Newport Beach, CA 92663 Ref: Oasis Senior Center Phase II Construction Management Fee Proposal Dear Steve, gkkworks is pleased to submit our fee proposal to provide Phase II construction management services to the City of Newport Beach for the Oasis Senior Center. This is an exciting opportunity for the City as well as our firm, and we are looking forward to continuing to work with the City's team & Robert R. Coffee Architect and Associates to deliver a successful project. Our not -to- exceed fee is as follows: $662,000 including $15,000 for additional constructability review services for the architectural, mechanical, electrical, and plumbing drawings and $27,590 for general conditions /reimbursables. Please see the attached Schedule of Estimated Fees for a breakdown of the proposed onsite staff and support staff hours as well as the general conditions included in the proposal. This fee proposal is based on the general contractor providing a trailer and furniture for our use at the site. gkkworks proposes to provide full service construction management services Including: Preconstruction Phase • Manage the general contractor pre - qualification process. • Coordinate the public bidding process including bid analysis. Construction Phase • Manage the general contractor's monthly updates for logic, work item timeframes, and contract compliance, and negotiate necessary changes in order to maintain schedule and performance. • Review the contractor's requests for information (RFI's), shop drawings, samples, and submittals prior to submitting to the Architect. • Review change order requests for completeness and accuracy, negotiate final cost, and process any change orders. • Develop and update a change order report for the use of the City and the Architect. gkkwork.s • Review and manage the LEED documentation process during construction. • Manage the contractor and other consultants and take the lead role in solving field problems. • Monitor the quality of construction and maintain jobsite photographs to document the contractor's progress, quality, and conformance with the contract documents. • Review, verify, and approve the contractor's monthly application for payment. • Review as -built drawings on a monthly basis, insuring the contractor inserts necessary updated information. • Monitor the contractor's jobsite safety program. • Review the work in place for conformance with the contract documents. • Manage the testing and inspection company as they test construction materials to verify compliance with the contract documents. This includes required soils testing and all required special inspections and testing. • Coordinate work with third party contractors, consultants, and City staff to complete the installation of FF &E. (Move management and FF &E procurement, including purchase of furniture, equipment, and the communication and data systems, are outside of our scope of work.) Close -Out Phase • Obtain final as -built drawings, review and cause any corrections to be made prior to submittal to the City. • Prepare a final project report, which will include a financial report, summary of change orders, and final schedule analysis. • Manage the assembly of the contractor's close -out documents including the Operation and Maintenance manuals, warranties, etc. Review the close -out documents for completeness, cause any necessary corrections, approve, and submit to the City. We look forward to this unique opportunity. Should you have any questions or require additional information, please don't hesitate to call me at (714) 883-1502. Very truly yours, gkkworks Charlie Merrick Vice President gkkworks HOURLY RATE SCHEDULE: Principal in Charge .................................................................. ............................... $195.00 /hour RegionalManager ........................................... ............................... ........................$185.00 /hour OperationsManager ................................................................ ............................... $185.00 /hour Project Director ..................................................................... ............................... $170.00 /hour Sr. Project Manager..... ............. $150.00 /hour ProjectManager.......... ........................................................... ............................... $130.00 /hour Sr. Construction Manager ........................................................ ............................... $150.00 /hour ConstructionManager ............................................................. ............................... $130.00 /hour Senior Estimator .................................................................... ............................... $160.00 /hour Estimator.............................................................................. ............................... $145.00 /hour Senior Program Manager.......... $185.00 /hour Program Manager.....-............ ... $150.00 /hour ProjectEngineer ..................................................................... ............................... $115.00 /hour ProjectScheduler ................................................................... ............................... $120.00 /hour Construction Administrator ...................................................... ............................... $125.00 /hour General Superintendent .......................................................... ............................... $185.00 /hour Superintendent ...................................................................... ............................... $145.00 /hour Document Control .................................................................. ............................... $115.00 1hour Administrative .......................................................................... ............................... $80.00 /hour Hourly Rate Inclusions • Wages • Fringe benefits and payroll taxes • Workers compensation insurance • Cell phone costs • Computers and computer software • Main office overhead costs • Profit • Business license • Incidental office supplies & expenses Reimbursables • Mileage and travel expenses • Room and board costs for overnight stays • Printing and postage • Permits and fees • Plan check fees • Office or trailer lease costs • Architecture or engineering costs • Testing and inspection • Hazardous materials inspection, testing or abatement Payment and performance bonds *Hourly rates are effective through June 30, 2009 and may be subject to an increase following this date for cost of living and other market conditions. gkkworks Chy of Newport Benah. Omis Seal-e Center Phase 2 Catntrslcdon Men aRement SerWees Schednle of Esllmmed Fees ,.. F^�.+';i.Fx „'G'u'?_:",2'F':° r 5...,::t3.. mr ...'P.ew:: tc'sa55.9s'v �,..,. ,:ia'�i�..aiTr' °.r,. ,...w ....T,...ir. -: .."'�.1a2v.:n .�„aYwn?^Trr�. Rol $a°w4i`:9R:5 °•5t"�.'P:"#Xi�,m . ..... Emma ms i� ,(yi �1.'t✓f PY 1]A\ S}�@iYTiS�i :ga..y ` y�y�� &'L�:N.4Bie'ER?iC*a�Y:"_°t :'P�'u4;u"°'2�.ri'�.ri .sVRk"+�i".31'�..'xw' "�' S+Y$� .S ASru.dFNi6S u\vii r 5 �• � :"'$"i .j ®�daaaaa �® oar. 4GPOR 7 r,.a w�i le +e.,�,��m elr.em \4uva for raa u \rca� o,la fm neBlry Pe. 311 qX1 n.�4 T..IL1Mr. Ullke.Rerirv. L['a 1M31W J.fP oar. 4GPOR gkkworks City of Newport Beach - Oasis Senior Center Phase 2 General Conditions - Summary Schedule Duration: Approximate Direct Coar. Bid Dam: 19.0 months .$18,700,000 January 20, 2009 General Conditions - Detail 0110 Temporary Facilities 0120 Hoist Facilities 940 0130 Temporary Utilities a� 0 0140 Cleaning ,� < +stdk'4' 0 0150 Protection and Safety T-Otb' 0 0160 General Expense Tom titeraclllifes,r eS k «, , „, r _00.4) a^('wn%t` M 6,650 0170 Taxes, Insurance, and Bonds OI{,{ aa".kr> 4r ._ro baxivF 20,000 pd' h....'. d ._.:_p_ 0 SUBTOTAL - GENERAL CONDITIONS $ 272590 0180 Project Staffand Fringes 0 0 619,410 SUBTOTAL - GENERAL CONDITIONS W/ STAFF $ 0 $ 647,000 0190 Overhead and Profit (Fee) gF In / out / hold downs / fall .stop TOTAL - GENERAL CONDITIONS W/ STAFF AND FEE le $ 647,000 General Conditions - Detail Page I of 3 -3003 a� MM ama Maugg ,� < +stdk'4' :. r 3t9lfi Umt"RrlEea T-Otb' �'TOTAI: " -' 0140 Tom titeraclllifes,r eS k «, , „, r _00.4) a^('wn%t` M m.5.',...;s ..p„pfli S3NfKti['3 "t4._: -se.4 OI{,{ aa".kr> 4r ._ro baxivF r ��.aCXLXL.v.i+i -Xt pd' h....'. d ._.:_p_ ,v�t4lV t .avii l m ,.., .✓_zk 1r}ttl Job name touter rental 0 mos 0 0 $ 45.00 $ 0 - 0 §... _n 0 _ -�p gF In / out / hold downs / fall .stop 0 le 0 0 $ 45.00 0 $ 0 0 $ 0 0 $ 0 Joboffice security 0 mos 0 0 $ 45.00 0$ 0 0 S 0 0$ 0 Jobsite move-in / move-ow 0 Is 40 0 $ 45.00 0 $ 0 0 $ 0 0 $ 0 Owner / Inspector tWler rental 0 mus 0 0 $ 45.00 0 $ 0 0 $ 0 0 .$ 0 In / out / hold downs / fall stop 0 Is 0 0 S 45.00 0 $ 0 0 $ 0 0 S 0 Joboffice security 0 mus 0 0 S 45.00 0$ 0 O S U U$ U Joboffice - Hard-build 0 Is 0 0 $ 45.00 0$ 0 0$ 0 0$ 0 Special scaffolding / sharing 0 Is 0 0 $ 45.00 0$ 0 0$ 0 0 S 0 Temp buildings, compounds, sheds 0 mos 0 0 $ 45.00 0$ 0 0$ 0 0 S 0 Equipment rentalals 0 Is 0 0 S 45.00 0$ 0 0$ 0 0 S 0 Temp trailer wet stamp dwgs for OASIS staff offices & Site layout assist. I Is 0 0 $ 45.00 0 $ 0 0 S 940 940 S 940 SWPPP design 0 Is 0 0 $ 45.00 0 $ 0 0 $ 0 0 S 0 Sandbags, maintenance. remove 0 mos 0 0 S 45.00 0$ 0 0$ 0 0 5 0 Vehicle maintenance 0 mos 0 0 $ 45.00 0$ 0 0$ 0 0 S 0 Trucking, uaspunaticn 0 Is 0 0 $ 45.00 0$ 0 0 .$ 0 0 S 0 Temporary stair / ladders 0 ea B 0 $ 45.00 0. $ 0 0$ 0 0 5 0 Temporary ramps / roads 0 Is 0 0 $ 45.00 0$ 0 0 S 0 0$ 0 Winter weather 0 Is 24 0 $ 45.00 0$ 0 0$ 0 0 S 0 Job sign. 0 Is 15 0 $ 45.00 0 $ 0 0 $ 0 1) $ U Dust control 0 mos 0 0 S 45.00 0$ 0 0 .S 0 U S 0 Electrical cords 0 mos 0 0 $ 45.00 0$ 0 0$ 0 0$ 0 Small loads 0 mus 0 0 $ 45.00 U$ 0 0$ 0 0$ 0 otal - emporary aci [ties ntyRRti[u<trr,ENr $ Page I of 3 -3003 gkkworkE City of Newport Beach • Oasis Senior Center Phase 2 General Conditions • Summary Schedule Durouttim. 19.0 months Approximate Direct Cosa $18,700,000 Bid Date: January 20, 2009 AIRC e'1 tt_ S fib d " -''' Ua`ry, tt e' .. tz " k., sr4h: i0' & '{: rftk$bSLI'sa'k .' k0'. „h,'; ''F'”- ,#i3;i6. Fe T'u['ul• Unit.Ptie4- $6 . -ea bR"so ` tr Ut fir n adHifuf9 p m t Rat ri iaT n Un f r 0Ioal U[N..t , PrfGe Total :i= TOTAY° i'`, . Progress Cleaning lnt'� 0 wks 0 0 - 4 fti.':r .v t., "' Temp. water meter fnstall temporary water ::An < « 'F.tii=t 0 0 vrt�d +..a.'1i"},' 1 Is 0 Is 0 777777 0 0 . Y( -� „t $ 45.00 $ 45.00 ..,:.. t I.n,! 0 0 c a.'2N �Inttalt& dismantle man h(t � h U - - 0 0 .$ 0 .S 0 0 0$ Temp water consumption Temp. power, meter 0 0 mos 0 Is 0 0 0 $ 45.00 $ 45.00 0$ 0 0 $ 0 0 0 S - $ - 0$ 0 0 S 0 0 0 tau' -. Install cemp power, lights 0 Is 0 0 Install, dismantle gates 0 Is 0 0 S 45.00 0$ 0 0$ 0 0$ 0 mos 0 Man lift - rental 0 mow 0 U $ 45.00 0$ 0 0$ 0 0 5 0 0 Man lift - operator 0 teas 0 0 $ 45.00 0$ 0 0 S 0 0$ 0 Dial • Temporery Uti Ines Misc, hoisting, cranes, fork lift 0 Is 0 0 $ 45.00 0$ 0 0 $ 0 0 S 0 ota - Dist Facilities Eat ,a,t,. �:..;x - AIRC e'1 tt_ S fib d " -''' Ua`ry, tt e' .. tz " k., sr4h: i0' & '{: rftk$bSLI'sa'k .' k0'. „h,'; ''F'”- ,#i3;i6. Fe T'u['ul• Unit.Ptie4- Total $. TOTAI;te� `.01305 TeiftpoHiyUI illtle9 "i't L...t it 1?ttm"; n i ,,..., .,, r. ;" .,, -. Pn:.: a a{"?•;., v<! i'`, . Progress Cleaning lnt'� 0 wks 0 0 - 4 fti.':r .v t., "' Temp. water meter fnstall temporary water ::An < « 'F.tii=t 0 0 vrt�d +..a.'1i"},' 1 Is 0 Is 0 777777 0 0 . Y( -� „t $ 45.00 $ 45.00 ..,:.. t I.n,! 0 0 4H, »' .r $ 0 $ 0 •- .. - - 0 0 S .$ - - - 0 0 .$ 0 .S 0 0 0$ Temp water consumption Temp. power, meter 0 0 mos 0 Is 0 0 0 $ 45.00 $ 45.00 0$ 0 0 $ 0 0 0 S - $ - 0$ 0 0 S 0 0 0 tau' -. Install cemp power, lights 0 Is 0 0 $ 45.00 0 E 0 0 $ - 0 9 0 Temp power consumption 0 mos 0 0 $ 45.00 0$ 0 0$ 0$ 0 If Temporary Toilers 0 wks 0 0 $ 45.00 0 E 0 0$ - 0$ .$ 45.00 0$ 0 0 .S U Dial • Temporery Uti Ines 0 Flagman 0 mos 0 D $ 45.00 0$ 0 D S 0 oneaevar s 0 ota - rotec on an a ety AIRC e'1 t iDB$rrl Ii'nVa e',}, ' •. 4�:e, a ,. <, :� rif tE .P`.' .4 ours!: hie '; N otal .: nit' aceTOtalr )e �dtt4a'�sr.< ice ,'fir' 'fntai TOTAL 0,141, Q'leanin ;:;i +. . ', -j Rt++1. n#;7tn ii. Progress Cleaning lnt'� 0 wks 0 0 - $ 45.0 0 8 - 0 $ 0 0 $ - ,0 .$ �. ,.e.:0 Dumpsters /Trash Bins 0 ea 0 0 S 45.00 0$ 0 0$ - 0 0$ 0 0$ Street, parking tut sweeping Final Clean Up ote - Cleaning 0 - Is 0 sf 0 0 0 $ 45.00 0 $ 45.00 0 S 0 0 $ 0 D meat. .$ 0 S rcataa -..,~ 0 0 tau' -. .$ u $ e.+•„rr.^msas; S 0 Barricades, temp railings 0 .� {'IiQSCr 6R..,.;.ie >ti .M -, "rI !Vw, Y, tc -1 ., Itt $�9V ,_ ° "8ti,{i;,, "OSed, ., i$ ff"S.,`�,1.��ii$1 AliltO IC „ TOSaPfiF0150E Rt++1. n#;7tn ii. r,,'.+ Fire Extingui +hers 0 O "'C$ 4500t D SOitt ,0 .$ �. ,.e.:0 OS 0First Aid 0 mos M 0 $ 45.00 0$ 0 0$ 0 0$ 0 Temporary Site Fencing, including gates 0 R' 0 S 45.D0 0$ 0 0$ 0 O S 0 Barricades, temp railings 0 Is 0 $ 45.00 0 S 0 0$ 0 0$ Safety consultant 19 mos 0 S 45.00 0 $ 0 0 $ 350 6,650 S 6.650 Sidewalk canopy 0 If 0 $ 45.OU 0$ 0 0$ 0 0 5 0 Guards /Watchmen 0 his 0 .$ 45.00 0$ 0 0 .S U 0$ 0 Flagman 0 mos 0 D $ 45.00 0$ 0 D S 0 01 s 0 ota - rotec on an a ety Eat Daw 9.30.09 page 2 .13 gkkwork=_ City of Newport Beach • Oasis Senior Center Phase 2 General Conditions • Summary Schedule Duration: 19.0 months Approximate Direct Cost: $18,700,000 Bid Date: January 20, 2009 Die: 9.10.08 Page 3 of 3 01 51.. -; fit.. _ ' r c :.:�+; ,.,,. � .. e, ,Qe With , ,iU�°.Ym, 'a' RUx'3'.- lists : offal IYY P.rde r'ni otal Unit Price Total TOTAL ' 016011 �,eneral K 'use '• .. ::_mow ,. t�3. .C`„ .`.ru, ,, .._ .. Yh 4„ 01^Ifii '.f'axC6.�nSGrOnCe`,afld:g''nds r jlfr..l "' 'a" :1 a iN ..:k:= G ..•bl . a .FV g, "'; d - k .:: -- -,.,".._ ,ilavi .n. .. .. '- ...5 '. ,u.+•a n :a- .,.t_. 'y.= nne:,. m. �" e.::' '.: ,. Liability Insurance Is Building Permit u Is U O $ 45.00 0$ 0 0 E U l) E 0 9.87% Business License 0 Is 0 0 $ 45.00 0 $ 0 0 S 0 0 $ 0 S pecial Taxes Office Equipment - copier, fax, etc. 0 mos 0 0 $ 45.00 0 $ 250 0 $ (I 0 $ - $'a Office Equipment - copier, fax, etc. for lnspec 0 most 0 0 $ 45.00 0 $ - 0 $ 0 0 $ 0 Office Supplies 20 mos 0 0 $ 45.00 0 $ 100 2.000 $ 0 0 $ 2,000 fMMITotat Office Furniture 0 mos 0 0 " $ 45.00 0 $ - 0 $ 0 0 $ - Jobsite Telephone • Install, Set -up 0 Is 0 0 S 45.00 0 S 0 0$ - 0$ 0 Jobsue Telephone - Charges 20 mos 0 0 $ 45.00 0 $ 0 0 $ 500 10,000 $ 10,000 Computer / Software l Intranet 20 mos 0 0 $ 45.00 0 $ 0 0 $ 100 2,000 $ 2,000 Bidding Blueprints 0 Is 0 0,$ 45.00 0 S 2.000 0 S 0 0$ 0 Construction Blueptina 1 Is 0 0 $ 45.00 0 $ - 0 $ 1.000 3,000 $ 3,000 Survey l Layout 0 Is 0 0 $ 45.00 0$ 0 0$ 0 0$ 0 Drinking Water - Office 20 mos 0 0 $ 45.00 0 $ 0 0 $ 75 1,500 $ 1,500 Postage 20 mos 0 0 $ 45.00 0 $ 50 1,000 $ 0 0 $ 1,000 Progress Photos 20 mos 0 0 $ 45A0 0 $ 0 0 $ 25 500 $ 500 Job related travel 0 mos 0 0 $ 45.00 0 $ 0 0 $ 500 0 $ ota General Expense Die: 9.10.08 Page 3 of 3 01 51.. -; b s u d c ' TOTAL, sofa dn�_'s •r., f ;� ,r ,., ir, v_ t., , ,nom . ;,,0 ._ .� a. a e.'.t _ �Ij .y 01^Ifii '.f'axC6.�nSGrOnCe`,afld:g''nds r jlfr..l "' 'a" :1 a iN ..:k:= G ..•bl . a .FV g, "'; d - k .:: -- -,.,".._ ,ilavi .n. .. .. '- ...5 '. ,u.+•a n :a- .,.t_. 'y.= nne:,. m. �" e.::' '.: ,. Liability Insurance Is 7 500 w1 Summary Bud Worker's Compensation Insurance $ - $'s Staff Payorll(unburdened) $9.871$100 9.87% wl Summary Bid Builder's All Risk lnsutance $ 18,700,000 $'s Project Cost 0100% wl Su mmary Bid S pecial Taxes $ 18,700,000 $'.s Project Cost 0.00% w1 Summary Bid Sewer Assessments $ 18,700,000 $'a Project Cost 0.00%n excluded Miscellaneous Assessments $ 18,700,000 $'s Project Cost 0.00% excluded axes, Insurance, and Bonds MMMMMMMM WNW m . fMMITotat Die: 9.10.08 Page 3 of 3