SUBJECT: AMETHYST AVENUE -SOUTH BAYFRONT MOTORIZED TIDE VALVE
REPLACEMENT- COMPLETION AND ACCEPTANCE OF CONTRACT
NO. 4063
Recommendations:
1. Accept the completed work and authorize the City Clerk to file a Notice of
Completion.
2. Authorize the City Clerk to release the Labor and Materials bond 35 days after
the Notice of Completion has been recorded in accordance with applicable
portions of the Civil Code,
3. Release the Faithful Performance Bond 1 year after Council acceptance.
Construction Contract Summary:
Construction Contract
Final Cost at
Benchmark
Contract
Time (days)
Award Amount
Completion
Target
Actual
Time (days)
Under ( -) or
Over +
$76,972.90
$77,349.40
Contract
Contract
127
-83
+10%
+0.5%
Discussion:
On February 10, 2009, the City Council authorized the award of this contract to John S.
Meek Co. Inc. (Meek). Under this contract, Meek removed interfering portions of
existing valve vault, removed and replaced the existing slide gate, removed and
installed an electric actuator, constructed valve vault modifications, installed new valve
vault hatch, installed conduits, connected electrical facilities, miscellaneous concrete
improvements, installed a new vault ladder, repaired surface improvements, and other
miscellaneous tasks associated with the project construction.
Amethyst Avenue — South Bay Front Motorized Tide Valve Replacement
Completion and Acceptance of Contract No. 4063
January 26, 2010
Page 2
The contract has now been completed to the satisfaction of the Public Works
Department. The contract construction costs were:
Original bid amount:
Actual amount of bid items constructed:
Total amount of one change order:
$76,972.90
$76,972.90
Final contract cost: $77,349.40
One change order in the amount of $376.50 was approved for the installation of a
galvanized catch basin protection bar. The final contract cost, including one change
order, was essentially the same as the original bid amount.
A summary of the project schedule is as follows:
Estimated completion date per Master Schedule:
Project award for construction:
Date of Notice To Proceed:
First day of work:
Estimated completion date on Notice To Proceed
Actual substantial construction completion date:
October 9, 2009
February 10, 2009
October 9, 2009
October 19, 2009
April 10, 2010
December 1 T200
While the project was awarded to Meek in February 2009, the start of construction did
not occur until mid- October due to the tide valve manufacturer's inability to produce a
valve unit.that complies with the design specifications. There were also concerns over
the gate unseating head pressures. Meek performed well in constructing the
improvements as originally designed. Additional time was granted for the change order
work.
Environmental Review:
The project was determined to be exempt from the California Environmental Quality Act
(CEQA) pursuant to Section 15301 (Restoration or Rehabilitation) of the CEQA
Implementation Guidelines. This Exemption covers the restoration or rehabilitation of
deteriorated or damaged structures, facilities or mechanical equipment to meet current
standards of public health and safety.
Public Notice:
The Notice Inviting Bids was advertised in the City's official publication and in
construction industry publications. Prior to starting work, two City prepared construction
notices were distributed by the contractor to the nearby residents advising them of the
work.
Amethyst Avenue — South Bay Front Motorized Tide Valve Replacement
Completion and Acceptance of Contract No. 4063
January 26, 2010
Page 3
Total Proiect Cost
In addition to the primary construction contract, this project involved other project
expenses. Total project expenses are summarized as follows:
Construction $77,349.40
Incidentals 153.84
Total Project Cost $77,503.24
Funding Availability:
Funds for the construction contract were expended from the following account:
Account Description Account Number Amount
General Fund 7012- C2502005 $ 77,349.40