HomeMy WebLinkAbout13 - City Council 2010 PrioritiesCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 13 February 9, 2010 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: City Manager's Office Dave Kiff, City Manager 949/644 -3000 or dkiff @newportbeachca.gov SUBJECT: Council Approval of Goals and Projects, along with Implementation Plan, for City Council's 2010 Priorities ISSUE: Do the wording, action steps and schedules proposed by the City Manager accurately reflect the City Council's intent regarding the 2010 calendar year priorities as determined by the Council during its January 9th Special Council meeting? RECOMMENDATION: Review the list of goals and projects, draft implementation plan, and Planning Department project hours allocation provided by the City Manager to determine if they accurately reflect the intent of the City Council for its 2010 City Council priorities. Make changes as needed to accurately reflect the City Council's priority intentions. DISCUSSION: Background: The City Council held a Special City Council meeting on Saturday, January 9, 2010, to discuss and establish its priorities for 2010. This was the fourth consecutive year the City Council has met early in the calendar year to set its priorities. Prior to the meeting, facilitator Jan Perkins asked each Council member to indicate the priorities for attention by the City in 2010. The potential priorities were organized into five goals, each of which had a list of projects. The projects that would constitute new priorities were so noted on the list. At the meeting, the list of goals and projects were discussed by the Council and management team. Members of the public provided their comments as well. Through a Council consensus, a final list of six broad goals was agreed upon, each of which contained a number of priority projects. Most of the projects were ones already on the City Council's and staff's work program. Proposed Implementation Plan: Following the special meeting, the staff created an Implementation Plan, which is attached for review by the Council. The Plan establishes, for each project, the key 2010 milestones with dates, lead staff, and a notation whether sufficient resources are available. The status of the projects will be posted online, updated regularly, and reported to the City Council each quarter using the Implementation Plan. This differs from last year when we provided monthly reports. We believe that quarterly reports will provide information that will enable the Council to see progress, and will be a more efficient use of staff time. The Implementation Plan is provided in Attachment A. 2010 Goals and Projects: The following are the six goals with their associated projects by the City Council at the January 9th meeting. GOAL 1 — PROTECT AND ENHANCE OUR QUALITY OF LIFE: The following issues are ongoing, top City priorities. • Airport: Minimize adverse impacts of JWA on the community by protecting the Settlement Agreement's caps on average daily departures and passengers as well as the curfew and current noise ordinances. • Group homes: Implement group home regulations to minimize adverse impacts on residential neighborhoods while preserving appropriate treatment options. • Fiscal health and sustainability: Make decisions today that will protect and enhance the City's fiscal health into the future. • Public safety: Provide services that enhance safety and protection in the community. GOAL 2 — FISCAL SUSTAINABILITY: Protect and enhance the City's economic and fiscal health so that the community continues to thrive. 2010 Projects: • Adopt and follow a Fiscal Sustainability Plan. • Adopt a balanced budget that adjusts to lower revenues; provide quarterly financial forecasts and budget implementation updates to the Council. • Achieve and maintain the highest possible bond rating. • Update the Facilities Financing Plan (FFP) to reflect priorities for capital projects funding. • Update the City's harbor fees in a manner that is fair; secure a funding mechanism for funding harbor projects, such as dredging and providing additional harbor amenities. • Initiate a results -based budgeting system. GOAL 3 — EFFECTIVE MANAGEMENT: Make strategic decisions that support efficient use of resources, intended outcomes of City programs and continuous improvement of the services delivered. 2010 Projects: • Restructure City government to become more efficient and effective in the delivery of valued services. • Provide quarterly reports to City Council on performance measurements (comparing ourselves to ourselves) and information on feasibility of benchmarking (comparing ourselves to other agencies). • Conduct the second Citizen Satisfaction Survey. • Update the City Charter. • Improve customer service by mirroring the "gold standard" of service in the public or private sector. • Improve City /resident communications. • Restructure development services function for improved coordination among disciplines; continued improvement in customer service. • Adopt an updated Zoning Code and Transportation Fair Share Fee and obtain certification of Housing element. • Address the economic impact of new regulations considered by the City Council. GOAL 4 — ECONOMIC SUSTAINABILITY: Facilitate a strong underlying economy in order to enhance the tax base and property values. 2010 Projects: • Support the renovation of Fashion Island and the prompt opening of Nordstrom. • Abate nuisances and improve Mariners Mile between Dover and McDonalds. • Start implementation of The Irvine Company's North Newport Center project. • Dredge the Lower Bay and establish a long -term funding source for repeat dredging efforts. • Continue to support business development efforts consistent with the Strategic Plan for Economic & Fiscal Stability and with the Council's Fiscal Sustainability Plan. • Identify a process and the resources needed to support innovative planning of and improvement in Lido Marina Village, including Via Oporto and other nearby properties. • Complete update of vision for Balboa Village. GOAL 5 — ENVIRONMENTAL SUSTAINABILITY: Strengthen and improve the community's environmental quality of life. 2010 Projects: • Respond to the results of the JWA air quality study. • Reduce our use of potable water and our dependence on imported water sources. • Improve recreational water quality. • Assist the Corps and County in dredging the Upper Bay and establish a long- term funding source to repeat the UNB dredging. • Dredge the Rhine Channel. • Create a plan for responding to future sea level changes that may affect properties. GOAL 6 — COMMUNITY ENHANCEMENTS: Increase opportunities for recreational and arts enjoyment, provide essential facilities and facilitate sound land use decisions. 2010 Projects: • Incorporate a public art component into the new Civic Center. • Break ground on the Civic Center Project, including the park. • Complete the EIR and seek funding sources for the Banning Ranch property. • Start construction of Sunset Ridge Park. • Start construction of Marina Park (phase I or all phases). • Complete construction of and open the new OASIS Senior Center. • Reduce fire hazard in Buck Gully and Morning Canyon. • Implement traffic management plan (including traffic synchronization) to improve traffic flows. • Implement a comprehensive parking program for the Balboa Peninsula. • Widen Jamboree Road in the Airport Area (especially Jamboree and Bristol). • Initiate the acquisition of Coast Highway between Jamboree Road and the Santa Ana River & Newport Blvd. from Finley to West Channel Bridge; create a process for initiating a longer range planning process for Mariner's Mile Traffic, Pedestrian, and Parking Comprehensive Plan. • Facilitate Newport Beach arts opportunities through: • Opening of the remodeled Port Theater; • The Newport Beach Film Festival; • Encouraging fundraising to renovate the Balboa Theater and implement the Newport Nautical Museum's master plan; • Assisting VisitNB.com or the Chamber in publishing and promoting a Master Calendar of Events. • Plan the future of the current City Hall site at 3300 Newport Boulevard. • Work to change the dynamic in West Newport on July 4 to have a more family - friendly celebration and lower law enforcement costs. While staff attempted to capture the City Council's thinking on these issues, the priorities need to accurately reflect your intentions and expectations. Please feel free to reconstruct them any way you see fit, as the City Manager wants for these priorities to be valuable and meaningful to both you and the entire staff. Planning Staff Analysis: Because two of the new priority projects have the Planning Department as the lead department, and because some Council members questioned whether the department has sufficient staff resources to complete new assignments, we have analyzed the demand on staff resources within that department. The allocation of professional staff hours to Planning Department activities is provided in Attachment B, with separate sections for the Planning and Economic Development divisions. Hours have been assigned to all of the activities within the department, including ongoing development review and customer service work, mandates from other government agencies, data and systems management, implementation of the Strategic Plan for Fiscal and Economic sustainability, administration and existing and new projects on the Council's priority list. The purpose of the analysis is to ascertain whether sufficient staff time is available to carry out all of the ongoing activities, as well as the new priorities, and when they can be accomplished. In the Planning division, staff time throughout the year is expected to be spent on the following general categories of activities. Our estimates assume that development activity will remain close to the current level, that there will not be a significant number of new group homes cases, that outside consultants will be used to process Coastal Development Permits for major City projects, and that there will not be significant new mandates from other levels of government. Customer Service /Plan Check 40% Discretionary Review Cases 26% Major City Projects 3% Advanced Planning & Mandates 23% Administration 6% For the Economic Development division, several activities are shown with the objective number in the Strategic Plan for Fiscal and Economic Sustainability, and these activities are projected to use the majority of staff time (67 %). About 9% of staff hours are anticipated to be needed for administration of the Community Development Block Grant and general administration. City Council Priorities February 9, 2010 Page 6 In both divisions, only a few staff hours are unaccounted for and available for special projects that may arise during the year (e.g., water efficient landscape ordinance, smoking ordinance, Corona del Mar community events sign, and Seaview Lutheran Plaza assistance), Staff projects that Economic Development staff time will be available to participate in a revised vision for Balboa Village, assuming that the scope is limited to review and update of existing plans in light of changed circumstances and opportunities, and assuming that stakeholders in the area contribute to the cost for a consultant to lead the effort. Economic Development staff also can manage the market positioning portion of the Lido Marina Village /City Hall site study, but staff believes that consultant assistance is needed to ensure that we are planning for an economically successful project. Planning staff could then take the lead on the land planning portion of the project (without consultant assistance) in September, after adoption of the Zoning Code. It should be noted that many of the Planning Department's activities require assistance from other departments, including the Office of the City Attorney, Harbor Resources Division, and the Public Works, Utilities and General Services Departments. The same detailed analysis of their staff resources has not been done, and it is possible that other priorities in those departments could affect the time to complete projects on which Planning has the lead responsibility. Environmental Review: The City Council's approval of this Agenda Item does not require environmental review. Public Notice: This agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the Council considers the item). Submitted by: VA DAVE l IFF City Manager Attachments: A: 2010 Council Goals and Projects Implementation Plan B: Staff Hours by Planning Department Activity 2010 Council Goals and Projects — Implementation Plan PURPOSE: The purpose of this Implementation Plan template is to provide the Council and staff clarity about what will be accomplished on each of the projects included in the Council's priorities for 2010. It will also be used to provide a quarterly update on the status of each of the projects. This Implementation Plan contains each of the goals and their associated projects. For each project, the Plan states the desired outcome, milestones, assignment of responsibility, whether sufficient resources have been allocated or not, and comments. Quarterly Updates Q1 = January-March (update in April) Q2 = April -June (update in July) Q3 = July- September (update in October) Q4 = October - December (update in January) GOAL 1 - PROTECT AND ENHANCE OUR QUALITY OF LIFE: The following issues are ongoing, top City priorities. Project Desired Outcome for 2010 Milestones with Dates Lead Sufficient Project Comments Quarterly Update (2010 unless otherwise Responsibility Resources . On Target noted) Allocated . Revised Yes /No (Explain if No Airport Minimize adverse impacts of D. Kiff Yes JWA on the community by protecting the Settlement Agreement's caps on average daily departures and passengers as well as the curfew and current noise ordinances. 2010 Council Goals and Projects — Implementation Plan Group homes Implement group home Complete Administrative D. Hunt Yes regulations to minimize Proceedings — February J. Kappeler adverse impacts on residential neighborhoods Actively support Code while preserving appropriate Enforcement efforts and treatment options. assure compliance with approvals and ordinance — Narcanon abatement by February 28. Assist & coordinate discovery and motion work, trail preparation and trial in Pacific Shores /NCR/ Yellowstone Cases. Fiscal health Make decisions today that will Ongoing City Council Yes and protect and enhance the City's and Executive sustainability fiscal health into the future. Staff Public safety Provide services that enhance Ongoing City Council Yes safety and protection in the Executive Staff community. 2010 Council Goals and Projects — Implementation Plan GOAL 2 — FISCAL SUSTAINABILITY: Protect and enhance the City's economic and fiscal health so that the community continues to thrive. Project Desired Outcome in 2010 Milestones with Dates Lead Sufficient Project Comments Quarterly Update (2010 unless otherwise Responsibility Resources . On Target noted) Allocated . Revised Yes /No (Explain if No 1. Fiscal Adopt and follow a Fiscal Council adopted on D. Kiff Yes This is a comprehensive sustainability Sustainability Plan. January 12 T. McCraner plan that crosses plan All Dept Heads department lines; it Present report on existing involves numerous and planned finance strategies that will be policies /practices that implemented during the support the Plan — March year. Fully implement in 2010 2. Budget Adopt a balanced budget that Finance Committee Mtg. - T. McCraner Yes Study session will forecasting adjusts to lower revenues; February S. Badum include CIP and and adoption provide quarterly financial operating budgets. forecasts & budget Council study session for implementation updates to the policy direction - February Cost savings through Council. 23 Restructuring (phases 1 and 2) and other means Budget adoption in currently underway will May /June be incorporated. 3. Bond rating Achieve and maintain the Present report on existing T. McCraner Yes This is linked to fiscal highest possible bond rating. and planned finance sustainability and will be policies /practices that incorporated as part of support Plan - March that detailed plan. 2010 Council Goals and Projects — Implementation Plan 4. Facilities Financing Plan Update the Facilities Financing Plan (FFP) to reflect priorities for capital projects funding. February July October T. McCraner S. Badum Yes 5. Harbor fees Update the City's harbor fees in Task Force w/ community T. McCraner Yes Two simultaneous a manner that is fair; secure a scheduled for February 25 C. Miller processes — the annual funding mechanism for funding CPI adjustment and a harbor projects, such as Scope of Services to complete fee review. dredging and providing Finance Committee — additional harbor amenities. Spring Fee update will include CPI adjustments to Council a survey of fees charged other by cities. - July Should also coincide with budget presenta- tion and will need to be expedited for Spring. 6. Results- Initiate a results -based Work plan prepared - T. McCraner Pending Plan Once a plan is based budgeting system. February All Dept Heads Development developed, resources budgeting needed to implement system First phase implemented will be identified. with FY 10/11 Second phase implemented FY 11/12 0 2010 Council Goals and Projects — Implementation Plan GOAL 3— EFFECTIVE MANAGEMENT: Make strategic decisions that support efficient use of resources, intended outcomes of City programs and continuous improvement of the services delivered. Project Desired Outcome in 2010 Milestones with Dates Lead Sufficient Project Comments Quarterly Update (2010 unless otherwise Responsibility Resources . On Target noted) Allocated . Revised Yes /No Explain if No 1. Restructuring Restructure City government Incorporate restructuring D. Kiff Yes to become more efficient and ideas into budget — April All Dept Heads effective in the delivery of valued services. 2. Performance Provide quarterly reports to Quarterly reports to City S. Wood Performance Benchmarking to be measurement City Council on performance Council — February 23, T. McCraner measurement: implemented in 2011 measurements (comparing April 27, and July 27 All Dept Heads Yes if appropriate ourselves to ourselves) and comparison cities are information on feasibility of Incorporate limited Benchmarking: found and data is benchmarking (comparing performance measurement Unsure until compatible with ourselves to other agencies). into FY 2010 -11 budget restructuring Newport Beach. document. plans complete Explore benchmarking opportunities this fiscal year. 3. Citizen Conduct the second Citizen Retain research consultant D. Kiff TBD satisfaction Satisfaction Survey. - April T. Finnigan survey Conduct Survey — June Report Findings - August 2010 Council Goals and Projects — Implementation Plan 4. City Charter Update Update the City Charter. Commission concludes analysis by May Council places issues on ballot by July Election held — November 2 D. Hunt L. Brown Yes 5. Customer Improve customer service by Research Customer D. Kiff TBD service mirroring the "gold standard" Response Management T. Finnigan of service in the public or Software - June All Dept Heads private sector. Establish a strategic plan for customer service - June Staff Training - September 6. City /resident Improve City /resident Regular mailing of City T. Finnigan Yes communications communications. Manager's Newsletter All Dept Heads Complete NBTV survey and analysis — April Update City communication plan - June 2010 Council Goals and Projects — Implementation Plan 7. Development services Restructure development services function for improved coordination among disciplines; continued improvement in customer service. Complete development services restructuring study — April. Implement restructuring — June. D. Kiff J. Elbettar S. Badum D. Lepo Yes Staff cross - training and reassignment as needed; Building inspectors may need to be added back if activity increases. 8. General Plan Adopt an updated Zoning Code Consider a Fair Share Fee D. Lepo Yes Housing element and Transportation Fair Share — May S. Wood schedule depends on Fee and obtain certification of HCD response time Housing element. Submit revised draft and acceptance of Housing Element to HCD — City submittal. May Adopt new Zoning Code — TBD 9. Analyze the Address the economic impact of Ongoing and as needed. D. Kiff Unknown Determinations of Economic new regulations considered by New ACM need for economic impact of the City Council. All Dept. Heads impact study should proposals be made when new regulations are first proposed, before ordinances are drafted. 2010 Council Goals and Projects - Implementation Plan GOAL 4- ECONOMIC SUSTAINABILITY: Facilitate a strong underlying economy in order to enhance the tax base and property values. Project Desired Outcome in 2010 Milestones with Dates Lead Sufficient Project Comments Quarterly Update (2010 unless otherwise Responsibility Resources • On Target noted) Allocated . Revised Yes /No Explain if No 1. Fashion Support the renovation of Nordstrom parking D. Lepo Yes, unless Island Fashion Island and the prompt structure signs installed - J. Elbettar citywide opening of Nordstrom. March commercial building activity Nordstrom opening — April increases. Mall improvements completed - November 2. Mariners Mile Abate nuisances and improve Commence Civil Nuisance D. Hunt No, not at this Deadlines subject to Mariners Mile properties Proceedings in Superior S. Wood time. Court's timing and between Dover and McDonalds. Court in February process. Process Summary Physical abatement Abatement procedures subject to construction through final decision by scheduling and cost Council by March allocation. Complete abatement by July 3. Newport Start implementation of The Depends on submittal of D. Lepo Yes Construction likely to Center North Irvine Company's North Newport permit applications from J. Elbettar begin in future years. Center project. The Irvine Company S. Wood 2010 Council Goals and Projects — Implementation Plan 4. Lower Bay dredging Dredge the Lower Bay and establish a long -term funding source for repeat dredging efforts. Sediment testing fully approved — March Status of Port of Long Beach disposal option — April C. Miller L. Paul T. McCraner Yes Currently soliciting funding support from Federal government. President's FY 11 Budget contained only $1.6 million. 5. Business Continue to support business Annual review and update S. Wood Yes Annual review of development development efforts consistent of Strategic Plan — May Strategic Plan to with the Strategic Plan for provide more detailed Economic & Fiscal Stability and Update BID administration report. with the Council's Fiscal —April Sustainability Plan. Implement Balboa Village and Corona del Mar parking management recommendations — Fall 6. Planning of Identify a process and the Conceptual infrastructure D. Lepo No, not at this Lido Marina resources needed to support Realignment Plan - June time. Village, Via innovative planning of and Consultant Oporto and improvement in Lido Marina Market Positioning needed for nearby Village, including Via Oporto and Program — July market properties other nearby properties. positioning. Conceptual Site Plan — October 0 2010 Council Goals and Projects — Implementation Plan 7. Balboa Complete update of vision for Gather and summarize D. Lepo Yes, if Project scope is limited Village vision Balboa Village. past work — February stakeholders to review of existing contribute to plans and update to Secure contributions for cost of reflect changed stakeholder support of consultant to conditions and consultant assistance - manage and opportunities. March facilitate process. Approve PSA with consultant — April Council approval of vision - December 10 2010 Council Goals and Projects — Implementation Plan GOAL 5— ENVIRONMENTAL SUSTAINABILITY: Strengthen and improve the community's environmental quality of life. Project Desired Outcome in 2010 Milestones with Dates Lead Sufficient Project Comments Quarterly Update (2010 unless otherwise Responsibility Resources . On Target noted) Allocated . Revised Yes /No (Explain if No 1. JWA air Respond to the results of the D. Kiff Yes quality JWA air quality study. T. Edwards 2. Water Reduce our use of potable water Water Supply and Level G. Murdoch Yes Presentation to Council conservation and our dependence on Regulations Ordinance of current water imported water sources. 14.16 - January 7 allocations and supplies to be included in Study Conversion of two parks to Session. recycled water supply — Spring Multi- agency study underway regarding Tiered rate feasibility / parcel data. implementation discussion with Finance Committee — Billing system June 2010 capabilities pending software upgrade May 2010. 11 2010 Council Goals and Projects — Implementation Plan 3. Recreational Improve recreational water Successful report cards J. Kappeler Maintain compliance water quality quality. from NRDC and Heal the C. Miller with the City's NPDES Bay — August permit, General Construction Permit, TMDLs, and implement water quality improvement projects as outlined in the City of Newport Beach's Water Quality Master Plan. Track Progress via the Performance Measurement Project. 4. Upper Bay Assist the Corps and County in Project complete — C. Miller Yes Phase II is underway dredging dredging the Upper Bay and December 2010 L. Paul establish a long -term funding T. McCraner source to repeat the UNB dredging. 5. Rhine Dredge the Rhine Channel. Outreach to property C. Miller Yes Target project start — Channel owners — March / April Spring 2011 dredging 6. Sea level Create a plan for responding to Draft amendment to Flood J. Elbettar Propose CIP project to changes future sea level changes that prevention ordinance. S. Badum raise Balboa Island Sea may affect properties. Expect adoption by C. Miller wall consistent with the Council - March new FEMA guidelines — Fall 2011 Sea level rise plan - October 12 2010 Council Goals and Projects - Implementation Plan GOAL 6 -COMMUNITY ENHANCEMENTS: Increase opportunities for recreational and arts enjoyment, provide essential facilities and facilitate sound land use decisions. Project Desired Outcome in 2010 Milestones with Dates Lead Sufficient Project Comments Quarterly Update (2010 unless otherwise Responsibility Resources . On Target noted) Allocated . Revised Yes /No (Explain if needed) 1. Civic Center Incorporate a public art Meet with various arts C. Cowell No, resources The Arts Commission public art component into the new Civic groups (i.e., OCMA) to S. Badum have not been has been working on Center. explore options for joint D. Hunt allocated. these items and dates curatorial projects to shown are highly secure art for opening day tentative. All are — April subject to review by the Arts Commission. Determine fundraising strategy, including possible need for a foundation or other vessel for receiving donations - September Appoint citizen's advisory group to determine scope of opening day collection / rotating art collection by July 30, 2011 2. Civic Center Break ground on the Civic Start rough grading & S. Badum Grading and parking ground Center Project, including the export - April structure schedule breaking park. dependent on securing Start parking structure - a favorable export site. September 13 2010 Council Goals and Projects — Implementation Plan 3. Banning Complete the EIR and continue Circulate Draft EIR for S. Wood Yes Ranch to seek funding sources for the public review —June Banning Ranch property. City Council certification of EIR and action on project — September Exploration of funding sources — ongoing 4. Sunset Ridge Start construction of Sunset Certification of EIR — S. Badum Construction - May Park Ridge Park. March L. Detweiler 2011 through June 2012 Submit application to Coastal Commission - April Secure Coastal Permit by December 5. Marina Park Start construction of Marina Certification of EIR - May S. Badum Park (phase I or all phases). L. Detweiler Submit application to S. Wood Coastal Commission - June Secure Coastal Permit by December 14 2010 Council Goals and Projects — Implementation Plan 6. OASIS Senior Center Complete construction and open the new OASIS Senior Center. Complete construction — September Relocate Staff /Facility Training - September Dedication Ceremony & Program Initiation - October S. Badum L. Detweiler Yes, for construction. No, for operations. New funds needed in FY 2010-11 for staffing and some FF &E. Funding for maintenance and operations to be requested for FY11 7. Buck Gully / Reduce fire hazard in Buck Biannual inspections S. Bunting Yes Fuel reduction work Morning Gully and Morning Canyon. completed - August must be completed prior Canyon • Bi- annual property (Additional to nesting season inspections Complete fuel reduction funding may be (begins July 1). • Reduce fuels on City- work below the terraces - needed to owned parcels below De June complete fuel CalFire hazard mapping Sola and Isabella reduction work.) program is one year Terraces. Hazard mapping tentative behind schedule. • Implementation of new date is July 1 regulations subsequent A Very High to the completion of the classification will enable CalFire hazard mapping. the City to enforce Government Code regulations without the need for an EIR. 8. Traffic Implement traffic management Award Phase 4 &7 S. Badum management plan (including traffic construction contract - synchronization) to improve April traffic flows. Complete Phases 4 &7 by December 15 2010 Council Goals and Projects — Implementation Plan 9. Balboa Peninsula parking Implement a comprehensive parking program for the Balboa Peninsula. S. Badum D. Lepo Complements projects in 4.5 and 4.7 10. Jamboree Widen Jamboree Road in the Right of Way certification - S. Badum Road Airport Area (especially June widening Jamboree and Bristol). Construction - September 2010 through October 2011 11. Coast Initiate the acquisition of Coast To be determined. Actual S. Badum TBD Caltrans is currently Highway Highway between Jamboree schedule is dependent on preparing a study for the acquisition Road and Santa Ana River & Caltrans processing and relinquishment. The City Newport Blvd. from Finley to the City's success in may want to separate West Channel Bridge; create a negotiating a satisfactory the two segments. process for initiating a longer agreement. range planning process for Mariner's Mile Traffic, Pedestrian, and Parking Comprehensive Plan. 16 2010 Council Goals and Projects — Implementation Plan 12. Local arts Facilitate Newport Beach arts Publish events calendar - S. Wood Yes, but budget opportunities through: February J. Barbier constraints in FY 2010 -11 • Opening of the remodeled Special Events Advisory may require Port Theater; Committee more scrutiny of • The Newport Beach Film recommendations to any direct Festival; Council - May financial • Encouraging fundraising to assistance. renovate the Balboa Theater and implement the Newport Nautical Museum's master plan; • Assisting VisitNB.com or the Chamber in publishing and promoting a Master Calendar of Events. 13. Current City Plan the future of the current TBD D. Kiff TBD Call site City Hall site at 3300 Newport D. Lepo Boulevard. S. Badum 14. Create a new Work to change the dynamic in Public meeting — February R. Luman Yes. Plan is substantially strategy for West Newport on July 4 to have D. Hunt developed and will be Fourth of a more family - friendly Letters to property owners D. Kiff discussed with West July in West celebration and lower law — March J. Kappeler Newport stakeholders. Newport enforcement costs. Beach Mobilize for 2010 event — Implement annual goals June and early July within the 3 to 4 year plan. 17 PLANNING DEPARTMENT ACTIVITIES DEFINITIONS Staff Approvals: Action on applications for development projects that require public notice, but not public hearing, and including outdoor dining permits, take -out and small scale restaurants, and commercial signs. Plancheck/Plan Review Includes review and comment on plans as part of the process culminating with issuance of a building permit. This activity also includes informal review of preliminary plans to assist applicants in determining the extent of permissible development as well as staff participation in the Development Review Committee process. Review of plan revisions required to reflect changes made on the job site after issuance of a building permit are part of this process. Over the Counter Plancheck: Review and comment on minor development project plans while the customer waits. Records /Property Research: Staff review of files and related documents in response to inquiries about real property and land uses such as zoning designation, special use restrictions, applicable development standards, previously - approved entitlements, non - conforming status, and the potential for future development or entitlements. Telecom Permits: Review of proposals to install wireless communication components for consistency with Municipal Code standards. Group Homes Direction to applicants regarding discretionary approvals required for residential care facilities for 6 or more persons, review of applications for such approvals, and preparation of reports and findings required at public hearing for action by the appropriate review authority. Code Compliance: Review of property records and property improvements and land uses to determine compliance with local ordinances in support of code enforcement actions, compliance with terms of the Alcoholic Beverage Outlet ordinance, and compliance with use permit conditions of approval. Zoning Administrator Support: Provide assistance to applicants for discretionary approvals subject to Zoning Administrator approvals including Modifications, Parcel Maps, and Comprehensive Sign Programs.. This activity includes review of development proposed for conformity with application local regulations, review of existing improvements, preparation of staff reports, recommendations and findings required at public hearing for action by the Zoning Administrator. Planning Commission Support: Professional planning staff activities required for providing required public notice, preparation of agendas, processing of discretionary project applications, and preparation of staff reports, resolutions and ordinances as required for Planning Commission action on matters within their purview. City Council Support: Professional planning staff activities required for providing responses to routine inquiries related to land use and planning, for preparing special studies and reports on topics related to land use and planning, for preparation and adoption of local policies, resolutions, and ordinances, and for review and action by City Council at public hearing on discretionary projects within their purview. Sunset Ridge Park: Management of preparation and circulation of Draft Environmental Impact Report, preparation of response to comments, and preparation of Final Environmental Report including facts and findings required for certification by City Council for development of active park at Coast Highway and Superior Avenue. Marina Park: Management of preparation and circulation of Draft Environmental Impact Report, preparation of response to comments, and preparation of Final Environmental Report including facts and findings required for certification by City Council for development of park, community facility, marine service facility, and marina on the Balboa Peninsula. Lower Bay Dredge Management of preparation of a Mitigated Negative Declaration in conjunction with proposed dredging of the Rhine Channel and Lower Newport Bay and transport of export to a Confined Aquatic Disposal site at the Port of Long Beach, and management of preparation of a Draft Environmental Impact Report in conjunction with proposed dredging of Lower Newport Bay with placement of contaminated export within a Confined Aquatic Disposal site in the Lower Bay. Housing Element: Complete responses to requests from California Department of Housing and Community Development and supply additional data and documentation including analysis of impact of local inclusionary housing efforts on the provision of affordable housing as part of preparation of second draft Housing Element submittal. Local Coastal Program: Proceed with development of strategy, schedule, and required document preparation for submittal of Implementation Plan for Coastal Commission review. Zoning Ordinance: Completion of Final Public Draft Zoning Ordinance for review by public, Planning Commission, and City Council prior to adoption. Design Guidelines /PC Clean -up: Fine tune interim Design Guidelines adopted subsequent to General Plan adoption and adopt as City policy. Prepare simplified, revised regulatory documents to replace obsolete Planning Community texts. Mandates: Includes all State and federally- required data collection and maintenance activities including census block data, reports on population to the California Department of Finance, updates on population and land use to Orange County Transportation Authority, Santa Ana Regional Water Quality Control Board, and the Orange County Council of Governments. This function includes monitoring of proposed legislation and programs that have an impact on local land use regulation including current efforts to require additional Green House Gas Emissions analysis in EIR's and the periodic assignment of target housing production numbers by the Southern California Association of Governments pursuant to the Regional Housing Needs Assessment. LMV and CH Reuse Strategic real estate economics and land use approach to facilitating adaptive reuse of functionally and economically obsolete improvements in Lido Marina Village and at the current City Hall site. Advanced Planning: Preparation of local ordinances, policies, analyses, and recommendations that will prospectively shape the land use and development fabric of Newport Beach. Staff Hours by Planning Department Activity 2010 PLANNING ACTIVITY FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Staff Approvals 45 45 45 45 45 45 45 45 45 45 45 Over the Counter Plancheck 15 15 15 15 15 15 15 15 15 15 15 Plancheck /Plan Review 414 414 414 414 414 414 414 414 414 414 414 Records / Property Research 375 375 375 375 375 375 375 375 375 375 375 Telecom Permits 20 20 20 20 20 20 20 20 20 20 20 Group Homes 30 30 30 30 30 30 30 30 30 30 30 Code Compliance 100 120 120 120 120 120 120 120 100 100 100 subtotal 999 1019 1019 1019 1019 1019 1019 1019 999 999 999 Zoning Administrator support 185 185 185 185 185 185 185 185 185 185 185 Planning Commission support 445 445 445 445 445 445 445 445 445 445 445 City Council support 35 35 35 35 35 35 35 35 35 35 35 subtotal 665 665 665 665 665 665 665 665 665 665 665 Sunset Ridge Park 40 100 40 10 10 5 5 5 20 20 10 Marina Park 40 60 100 20 50 10 10 5 10 10 15 Lower Bay Dredge 20 40 20 40 10 80 80 101 10 10 30 subtotal 100 200 160 70 70 95 95 20 40 40 55 Housing Element 120 1201 20 20 1001 100 50 20 601 80 80 Local Coastal Program 10 10 30 100 100 100 50 130 200 200 150 Zoning Ordinance 320 320 300 300 320 300 300 300 80 60 40 Design Guidelines / PC Cleanup 0 0 01 0 0 0 0 20 120 1201 120 Mandates 25 10 15 15 10 5 20 25 15 15 25 LMV & CH Reuse 110 15 100 125 60 50 100 100 120 140 140 Advanced Planning 5 5 20 40 101 5 40 40 40 40 40 subtotal 590 480 485 600 600 560 560 635 635 655 595 Mapping / Data Mgmt./ System Maintenance 40 45 45 45 45 60 60 60 60 45 80 Administration 125 125 125 125 125 125 125 125 125 125 125 subtotal 165 170 170 170 170 185 185 185 185 170 205 Total Hours 25191 2534 2499 2524 2524 2524 2524 2524 2524 2529 2519 Available Staff Hours 2535 2535 2535 2535 2535 2535 2535 2535 2535 2535 2535 Staff Hours by Planning Department Activity 2010 Surplus /Deficit FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Staff Hours 16 1 1 36 11 11 11 11 11 11 6 16 ECONOMIC DEVELOPMENT ACTIVITY FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 1.1 Balboa Village Vision 10 10 40 50 50 80 80 80 80 80 80 1.3 Parking 80 80 60 40 40 30 30 30 30 30 30 1.4 BIDS 50 50 40 50 50 40 40 40 40 40 40 3.3 Business Assistance 151 15 151 15 15 151 15 151 15 151 15 4.5 Water Transport 30 30 30 30 20 0 0 0 0 0 0 6.1 Small Scale Lodging 0 0 0 0 0 0 0 0 0 0 0 6.2 Vacation Rentals 0 0 0 0 0 0 0 0 30 30 30 6.3 Marketing /Promo 20 20 20 20 10 10 10 10 10 10 10 SP Annual Review 20 20 20 20 0 0 0 0 0 0 0 subtotal 225 225 225 225 185 175 175 175 205 205 205 LMV Planning 10 10 20 30 801 80 80 80 40 40 40 EDC Support 10 10 10 10 10 10 10 10 10 10 10 Special Projects 10 10 10 10 10 10 10 10 10 10 10 CDBG 30 30 30 15 15 15 15 15 15 15 15 Administration 10 10 10 10 10 10 10 10 10 10 10 Total Hours 295 295 305 300 310 300 300 300 290 290 290 Available Staff Hours 300 300 300 300 300 300 300 300 300 300 300 Surplus/Deficit Staff Hours 5 5 -5 0 -10 0 0 0 10 10 10