HomeMy WebLinkAbout05 - Irvine Avenue Sidewalk WideningCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 5 March 9, 2010 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Tom Sandefur, P.E., Associate Civil Engineer 949 - 644 -3312 or tandefur@newportbeachca.gov SUBJECT: IRVINE AVENUE SIDEWALK WIDENING - AWARD OF CONTRACT NO. 4432 Recommendations: 1. Approve the project plans and specifications. 2. Declare the apparent low Bid by Pivot Group, Inc. to be non - responsive. 3. Award Contract No. 4432 to S.J. Grigolla Construction Company, Inc. for the Total Bid Price of $86,920.00, and authorize the Mayor and the City Clerk to execute the contract. 4. Establish an amount of $8,700.00 (10 %) to cover the cost of unforeseen work. Discussion: The existing sidewalk on Irvine Avenue between Coral Place and Haven Place is only three feet wide and contains numerous obstructions. A wheelchair would be unable to safely traverse the length of the sidewalk without going into the street or bike lane. The City received questions from residents concerned about the ability of a child using a wheelchair to navigate the sidewalk. The City put together a project late last year to address these concerns. The work necessary for the completion of this contract consists of removing the existing sidewalk, pouring new sidewalk, replacing existing curb and gutter, installing curb ramps, removing interfering trees, root pruning, moving and restoring irrigation systems, and removing and reinstalling street signs. At 10:00 a.m. on February 18, 2010, the City Clerk opened and read the following bids for this project: BIDDER TOTAL BID AMOUNT Low Pivot Group, Inc. $77,800.00 2 SJ Grigolla Construction $86,920.00 3 Grigolla and Sons $90,178.00 4 HYM Engineering $91,870.00 Irvine Avenue Sidewalk Widening —Award of Contract No. 4432 March 9, 2010 Page: 2 5 Southland Construction $92,650.00 6 Nobest, Inc. $95,000.00 7 Belaire -West Landscape $98,475.00 8 KM Consulting $98,528.05 9 Black Rock Construction $98,607.50 10 Tal -Cal Engineering $98,741.00 11 Peterson -Chase General $99,799.00 Engineering 12 E.C. Construction, Inc. $102,192.75 13 CJ Construction, Inc. $104,477.50 14 B &T Works, Inc. $108,612.50 15 Kalban, Inc. $119,700.00 16 S. Parker Engineering, Inc. $130,535.00 The apparent low bidder, Pivot Group, Inc., failed to submit the necessary Federal Contract Documents at the time of bid opening and therefore must be deemed a nonresponsive bidder. This project is partly funded by Community Development Block Grant (CDBG) Funds and must follow federal procedures. Additionally, a reference check conducted by staff revealed a questionable performance history on work done by Pivot Group, Inc. for another local public agency. The second low bidder, SJ Grigolla Construction, provided all necessary forms. A check of the contractor's references indicated that they have satisfactorily completed similar projects for other municipalities. The low total bid amount is 47 percent below the Engineer's Estimate of $128,000.00. The competitive nature of the current bidding environment, and the large number of bidders, most likely led to the large difference between the Low Bidder and the Engineer's Estimate. The low bidder, SJ Grigolla Construction, possesses a California State Contractors License Classification "A" as required by the project specifications. Pursuant to the Contract Specifications, the Contractor will have 15 consecutive working days to complete the work. Environmental Review: The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Implementing Guidelines. This exemption covers the repair, maintenance and minor alteration of existing public facilities with negligible expansion. Public Notice: The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Prior to starting work, two City prepared notices are Irvine Avenue Sidewalk Widening — Award of Contract No. 4432 March 9, 2010 Page: 3 distributed by the contractor to both residents and businesses. The first notice will be distributed ten days before work in the area and the second notice 48 hours prior to starting work in the area. Geotechnical, Material Testing, and Survey Services: In addition to the contract costs, approximately $2,500.00 in geotechnical and material testing services are projected to be needed for this project and will be performed under the respective on -call professional services agreements. $1,000.00 is included for printing and other incidentals. Funding Availability: There are sufficient funds available in the following account(s) for the project: Account Description CDBG General Fund Proposed uses are as follows: Vendor SJ Grigolla Construction SJ Grigolla Construction GMU Geotechnical, Inc. Various Prepared by: Tom Sandefur, P.E Associate Civil Engineer Attachments: Project Location Map Account Number Amount 7161- C2001009 $ 53,600.00 7013- C2001009 $ 45,520.00 Total: $ 99,120.00 Purpose Amount Construction Contract $ $86,920.00 Construction Contingency $ 8,700.00 Materials Testing $ 2,500.00 Printing and Incidentals $ 1,000.00 Total: $ 99,120.00 Submitted by: :n,rai-tsacum Works Director LOCATION MAP IRVINE AVENUE SIDEWALK REPLACEMENT CONTRACT NO. 4432 z w w A GARET DRIVE Z NEWPORT HARBOR HIGH SCHOOL PROJECT LOCATION 15TH STREET - HAVEN PLACE CLAY STREET CORAL PLACE ENSIGN INTERMEDIATE 1 z O D D G� \FF �\NGSa0Po N�GN G0