HomeMy WebLinkAbout06B - CIP FY 2003-04(Item 6B)
January 7, 2003
• RECREATION Et SENIOR SERVICES DEPARTMENT
To: Parks, Beaches and Recreation Commission
From: Marie Knight, Recreation & Senior Services Director
Re: FY 2003/04 CIP Review
The following are requests for FY 2003/04 CIP funds and are not in order of priority:
Recreation Services
Project: Remove and replace the current The outdoor basketball court
at Grant Howald Park that is cracked with uneven surfaced, caused by
tree roots and presents a safety hazard for players.
Project: Annual Exterior painting of 3 of our 10 Community Centers . It
will cost approximately $6,000 to paint one large building. By making
this an ongoing program, it would allow for exterior painting of each
building every 5 -7 years and every 2 -4 years for the interior.
•
1) Project: Replace the carpet in meeting room that is unraveling and
has holes. It has become a trip hazard as well as aesthetically
unpleasant. This room is used seven days per week for programs and
meetings. Rental and program revenues for that room support the
replacement cost. $10,000
2. Project: Replacement of the front entry doors that are the original
doors from 1988 and are a security problem. Currently the doors
cannot be locked in an open position which presents a constant service
and supervision challenge for the staff at the center. Revenue funds for
the building support the replacement of the doors. 6,000
3. Project: Replacement of the dance floor is that is warped and
cannot be repaired. This center is used seven days per week and is
the busiest community center in the city. It is the only large dance
studio in the city and it critical to our popular program. 35,000
Project: Add a second rail on the stairs to the parking lot. The steps at
the Theater are curved and create an optical illusion that makes it easy
to misstep. In addition, in the evening hours there is minimal lighting in
this area. These conditions have resulted in complaints to the theater as
• well as there have been several reported falls.
Project: Repair and refurbishment of the bleachers in the gymnasium at
West Newport CC. The wooden sections that have been damaged and
currently present a safety hazard with regards to slivers.
FY 2003/04 CIP Review
Page 2
• Creation of Trailer storage area at the NAC
Project: Creating an asphalt pad for parking additional trailers behind
the facility, enclosing this area with fencing and landscape in order to
create an aesthetically pleasing view for the neighbors.
•
Project: Remove the current turf at Bonita Creek field 3, which is a
lighted football /soccer field and replace with a cushioned artificial
grass for year round play.
This field has constant turf problems even with 4 -6 months of down
time per year. The wear from constant use by football and soccer make
it costly to keep turf in good safe condition. By installing a synthetic
grass field, the city would be able to program the field year round and
experience payback for the upfront costs within 8 years.
FUNDING: The total project cost is $650,000, which will be offset with
$356,000 in Proposition 40 funds.
Submittal by Recreation Services
This project will provide for the repair of multiple leaks in the roof in
the Multipurpose Room and lobby area. The acoustic ceiling over the
stage will be replaced as well. It is severely stained from the leaks.
Completion of this project would result in the reduction in operating
costs associated with the constant repairs
This project will provide for the repair of multiple leaks in the roof in
the Multipurpose Room and lobby area. The acoustic ceiling over the
stage will be replaced as well. It is severely stained from the leaks.
Completion of this project would result in the reduction in operating
costs associated with the constant repairs
OASIS of Cabinet and Sink Refurbishment 5.000
This project provides for the refurbishment of the counter tops,
cabinets and sinks in 4 classrooms. The cabinets are used by classes and
they are falling apart and unsecured.
The OASIS is an old facility that is in constant need of refurbishment and
repair. The cabinets are not able to be locked anymore and doors need
• to be rehung. The sinks are beyond cleaning and need to be replaced.
The rooms are used by the public and this makes them not presentable
when being used. These rooms generate approximately $17,000 in
revenue and host 7500 users a year.
$472,000
FY 2003/04 CIP Review
Page 3
• OASIS Sound System and Cabinet $5,000_
This project provides for a new sound system for the Multi - purpose room
replacing the current antiquated system, and building of a cabinet /booth
to house the new sound system.
The current system is located in back of the stage and is not a good
location for regulating the sound quality in the room. From that location
it is difficult to know what the sound needs are in the room itself. In
addition, the system is antiquated and is in need of replacement. The
new system will be located in the back of the room facing the stage
making it easier to adjust the sound levels. The Friends of OASIS have
generously offered to pay for the new sound system. ($6,000) The new
sound system needs to be located in a secured area that can be locked
up. The room currently does not have such and location therefore one
will need to be built. This room is heavily used by the seniors, City
functions and rentals and this new system and location will greatly
increase the efficient use of the facility.
Submittal by Senior Services
• TOTAL DEPARTMENT SUBMITTAL
•
$20,000
$492,000