Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2011-08-02 PB&R AGENDA_Page_15
General Services Department Activities Report -June 2011 This Month This Month Last Year Total To Date TTD Last Year Asphalt/Concrete Street Patching (Tons of Blacktop) 258 347 2,580 3,467 Sidewalk Repaired (sq. ft.) 3,225 3,750 39,972 49,540 Curb 8 Gutter Replacement (lin. fl) 101 230 2,708 2,879 Sweeping, Beach Cleaning, Demo Materials (tons) 259 334 3,431 4,678 Asphalt(Concrete Recycled (tons) 292 386 3,140 4,110 Signs & Traffic Markings Signs Made 55 37 1,403 5,534 Signs Installed 278 237 2,246 2,330 Decals 6 359 512 2,885 Special Purpose Signs/Banners Made 18 102 486 712 Street Striping (tin. ft.) Added /Replaced 276 11,000 453,166 32,979 Pavement Markings (Including reflective) 3 438 697 936 Parking Stalls 3 0 66 274 Curb Painting (lin. ft.) 77 151 14,547 73,569 Thermoplastic (lin. ft.) 0 0 32,001 14 Sign Posts Installed 23 19 225 263 GrdRti Graffiti Incidents Removed by Staff 15 72 241 238 Graffiti Incidents Removed by Contractor 92 250 816 2,531 Refuse Collection Residential (tons) 3,060 3,106 33,800 33,851 Liquid HazMat Incidents 19 21 296 227 E -Waste Incidents 3 17 162 220 U -Waste Incidents 9 10 155 128 Recyclables(tons) 1,274 1,315 14,133 14,330 Tress Trimmed by Staff 13 13 271 840 Trimmed by Contractor 683 1,428 11,608 11,814 Removed 9 0 144 125 Planted 17 0 95 114 Roots Pruned by Contractor 0 0 29 40 Roots Pruned by Staff 1 19 33 147 Automotive Repairs 222 299 2,903 1 3,366 Preventive Maintenance Completed 77 75 873 876 PM Labor Hours 177 201 2,110 1,990 Beach Maintenance Beach Area Refuse (tons) 132 118 1,245 1,228 Beach Debris (tons) 71 83 1,075 1,853 Sweeping /Storm Drain Gutter Miles Swept 3,428 4,739 42,944 52,270 Sweeping Debris (cubic yards) 668 572 6,001 6,255 Storm Drain Debris (cubic yards) 13 20 569 800