Loading...
HomeMy WebLinkAbout12 - Peninsula Point Water and Sewer ImprovementsCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 12 May 11, 2010 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Alfred Castanon, Associate Civil Engineer 949 - 644 -3314 or acastanon@newportbeachca.gov SUBJECT: PENINSULA POINT WATER AND SEWER IMPROVEMENTS — COMPLETION AND ACCEPTANCE OF CONTRACT NO. 4066 Recommendations: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after Council acceptance. Construction Contract Summary: Construction Contract Final Cost at Benchmark Contract Time Award Amount Completion Target Actual Time (Under) (days) or Over $1,415,079.00 $1,468,063.22 Contract Contract Plus 120 3 Plus 10% 3.70% Discussion: On September 8, 2009, City Council authorized the award of the Peninsula Point Water and Sewer Improvement Project to Paulus Engineering, Inc. The contract provided for the replacement of damaged and deteriorated water and sewer mains at Peninsula Point. The work also included enlargement of mains and betterments to improve both operational efficiency and fire protection capabilities of the water system. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Peninsula Point Water and Sewer Improvements - Completion and Acceptance of Contract No. 4066 May 11, 2010 Page 2 Original bid amount: Actual cost of bid items constructed: Total change orders: Final contract cost: $1,415,079.00 $1,332,855.00 $135,208.22 $1,468,063.22 The disparity between the actual cost of bid items constructed and the original bid amount was due to a design change which reduced the amount of 8 -inch water pipe constructed. There were five change orders totaling $135,208.22. The change orders provided for valve cut -ins to control water in order to install new water mains, private property water meter adjustments to raise water services to standard specifications and delay costs due to interfering portions of existing utilities. A summary of the project schedule is as follows: Estimated completion date per July 2009 Schedule: March 26, 2010 Project Awarded for construction: September 8, 2009 Contract Completion Date per NTP & Approved Extensions: April 6, 2010 Actual Construction Completion Date: April 9, 2010 Environmental Review: This project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 Class 1 (c), of the CEQA Implementing Guidelines. This exemption covers the maintenance and alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. Public Notice: The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Prior to starting work, two City - prepared construction informational notices were distributed by the Contractor to Peninsula Point residents. The first notice was distributed ten days prior to the scheduled work. The second notice was distributed 48 hours before the work commenced. Funding Availability: In addition to the original construction contract, this project involved other project expenses, as summarized below: Construction Geotechnical Testing Consultant Design Construction Inspection Incidentals Total Project Cost $1,468,063.22 12,155.00 32,597.01 25,540.00 1,191.26 $1,539,546.49 Peninsula Point Water and Sewer Improvements - Completion and Acceptance of Contract No. 4066 May 11, 2010 Page 3 Funds for the construction contract were expended from the following account: Account Description Account Number Amount Water Enterprise 7511- C6002007 $1,379,293.22 Wastewater Enterprise 7531- C7001002 88,770.00 Total: $1,468,063.22 Prepared by: Submitted by Alfre Castanon e—aM,,8adurn Associate Civil Engineer ublic Works Director Attachments: Project Location Map 1 NST J a CHANNEL RD. s $ V C"„ x-u.. 0 c q«FY?j7 0 m KST v �O / Qs � T ti PENINSULA POINT WATER AND SEWER IMPROVEMENTS LOCATION MAP SCALE: NT� S PROJECT LOCATIONS CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT )ATE08 /06/09 SCALE N.T.S SIT 1 OE 1 )RAWN TM C -4066