HomeMy WebLinkAbout19 - Dory Fleet Access Area Emergency Sand ReplenishmentCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 19 June 8, 2010 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Bob Stein, Assistant City Engineer 949 - 644 -3322 or rstein @newportbeachca.gov SUBJECT: DORY FLEET ACCESS AREA EMERGENCY SAND REPLENISHMENT PROJECT — RETROACTIVE APPROVAL OF WORK Recommendations: 1. Approve the necessary Emergency Sand Replenishment Work adjacent to the Newport Pier and the Dory Fleet Compound performed by Tight Quarters Inc. (Tight Quarters). 2. Approve a Budget Amendment No. appropriating $20,000.00 from un- appropriated General Fund reserves into General Services Account No., 3140 -8080 (Operations Support Division — Services Professiona [/Tech n ica 1) to cover the Emergency Sand Replenishment work cost performed by Tight Quarters. Discussion: On April 16, 2010, Public Works and General Services staff met near the Dory Fleet Compound to survey the beach shoreline which had eroded to its lowest level seen in the past 30 years. While the foundation of the lifeguard headquarters and Dory Fleet compound had not yet received damage, the Dory Fleet concrete access ramp was found to be slightly undermined and cracked. The access ramp was several feet above the beach preventing its use for access to the ocean. Many west - facing beaches in Southern California are experiencing similar dramatic losses of sand this year. The underlying cause appears to be the high- energy swells originating from the west, an unusual direction for ocean waves, that have been very efficient in stripping sand from the beach and moving it offshore. While it is expected that this sand will return to the beaches in the summer, there was an urgent need to re- establish ocean access for the Dory Fleet and to take actions to prevent damage to the Dory Fleet Compound and Lifeguard Headquarters. General. Services and Public Works staff worked with consultants to identify potential sources of replenishment sand that could readily be obtained and transported to the site. Regulatory issues eliminated consideration of potential sources at Talbert Marsh and the Santa Ana River. The City opted to use its own sand near the lifeguard towers between the Santa Ana River and Prospect Street under authority of the City's Beach Maintenance permit. The maintenance permit allows the City to perform beach Dory fleet Access Area Emergency Sand Replenishment Project June 8, 2010 Page 2 maintenance activities above the mean high tide line. Prior to any work, our consultant's biologist inspected the borrow and fill sites for environmental issues, including grunion eggs and provided appropriate restrictions on excavation and grading activities. On April 27 and 28, Tight Quarters, under an on -call contract, mobilized and transported sand to the site, filling the area between the pier and the Dory Fleet Compound. As west swells continued to remove beach sand, additional sand was transported to the site by Tight Quarters on May 6, May 13 and May 21. While these fill activities have resulted in a net gain in sand, west swells continue to erode material at the site. Due to the onset of the summer tourist season, there will be no further sand replenishment efforts at this time. If needed, these efforts could recommence after Labor Day. The cost for the five days of sand transport to the Dory Fleet site was $20,000.00. The emergency work is being funded from a General Services beach maintenance account. With City Council approval, these funds will be replaced back into the General Services beach maintenance account. Environmental Review: The project is Categorically Exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Implementing Guidelines. This exemption covers the repair, maintenance and minor alteration of topographic features with no expansion of existing use in areas not environmentally sensitive. Public Notice: As the work falls within the City's normal beach maintenance activities, public notice was not required. Funding Availability: With the approval of the recommended budget amendment, adequate funds are available in the project account: Account Description Operations Support Division — Services Professional/Tech nical Prepared by Robert S e n Assistant City Engineer Account Number Amount 3140 -8080 $20,000.00 Submitted by: teph adum P Ic W s Director Attachments: 1. Emergency On -Call Debris Hauling Services Agreement with Tight Quarters Inc. 2. Beach Erosion Photo —April 15, 2010 3. Beach Repair Photo --April 28, 2010 EMERGENCY ON -CALL DEBRIS HAULING SERVICES AGREEMENT WITH TIGHT QUARTERS INC. .J+ a rK THIS AGREEMENT is made and entered into as of this in day of_Januafy, 2010, by and between the CITY OF NEWPORT BEACH, a Municipal Corporation and Charter City ( "City "), and TIGHT QUARTERS INC, a California Corporation, whose principal place of business is 2031 S. Anne Street, Santa Ana, California 92704 ( "Contractor "), and is made with reference to the following: V = cyit r_1161 A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. Due to severe rainfall in January 2010, the City has a need for emergency on -call assistance for debris hauling. C. City desires to engage Contractor to haul storm debris from various locations in the City of Newport Beach during the rainy season of 2010 ( "Project'). D. Contractor has examined the location of all proposed work, carefully reviewed and evaluated the specifications set forth by the City for the Project, and is familiar with all conditions relevant to the performance of services and has committed to perform all work required for the price specified in this Agreement. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Agreement shall be for a period of six (6) months, and shall commence on the above written date, and shall terminate on the 31 day of July 2010, unless terminated earlier as set forth herein. 2. SCOPE OF SERVICES Contractor shall provide "Emergency On -Call" debris hauling services at the hourly rates attached hereto as Exhibit A and as more fully described in the Scope of Services attached hereto as Exhibit B and incorporated herein by this reference. As a material inducement to the City entering into this Agreement, Contractor represents and warrants that Contractor is a provider of first class work and services and Contractor is L experienced in performing the work and services contemplated herein and, in light of such status and experience, Contractor covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be of good quality. For purposes of this Agreement, the phrase "highest professional standards" shall mean those standards of practice recognized by one or more first -class firms performing similar work under similar circumstances. Contractor shall perform everything required to be performed, and shall provide and furnish all the labor, materials, necessary tools, expendable equipment and all utility and transportation services necessary for the Project. Upon verbal or written request from the Project Administrator, Contractor shall provide a letter proposal for services requested by the City (hereinafter referred to as the "Letter Proposal "). The Letter Proposal shall include the following: A. A detailed description of the services to be provided; B. The position of each person to be assigned to perform the services, and the name of the individuals to be assigned, if available; C. The estimated number of hours and cost to complete the services; and D. The time needed to finish the specific project. No services shall be provided until the Project Administrator has provided written acceptance of the Letter Proposal. Once authorized to proceed, Contractor shall diligently perform the duties in the approved Letter Proposal. 3. TIME OF PERFORMANCE Time is of the essence in the performance of services under this Agreement and the services shall be performed to completion in a diligent and timely manner. The failure by Contractor to perform the services in a diligent and timely manner may result in termination of this Agreement by City. Notwithstanding the foregoing, Contractor shall not be responsible for delays due to causes beyond Contractor's reasonable control. However, in the case of any such delay in the services to be provided for the Project, each party hereby agrees to provide notice to the other party so that all delays can be addressed. 3.1 Contractor shall submit all requests for extensions of time for performance in writing to the Project Administrator not later than ten (10) calendar days after the start of the condition that purportedly causes a delay. The Project Administrator shall review all such requests and may grant reasonable time extensions for unforeseeable delays that are beyond Contractor's control. 3.2 For all time periods not specifically set forth herein, Contractor shall respond in the most expedient and appropriate manner under the circumstances, by telephone, fax, hand- delivery or mail. Emergency On -Call Services Agreement Page 2 4. COMPENSATION TO CONTRACTOR City shall pay Contractor for the services on a time and expense not -to- exceed basis, in accordance with the provisions of this Section and the Schedule of Billing Rates attached hereto as Exhibit A and incorporated herein by reference. No rate changes shall be made during the term of this Agreement without the prior written approval of the City. Contractor's compensation for services performed in accordance with this Agreement, including all reimbursable items, shall not exceed the fees identified in the Letter Proposal, as approved by the Project Administrator. Total compensation for the term of this Agreement shall not exceed Thirty Thousand Dollars and No Cents ($30,000.00) without a written Amendment to Agreement. Any Letter Proposal that sets forth fees in excess of Thirty Thousand Dollars and No Cents ($30,000.00) shall further require a separate Professional Service Agreement approved by per Council Policy F -14. 4.1 Contractor shall submit bi- weekly invoices to City describing the work performed the preceding month. Contractor's bills shall include the name of the person and /or classification of employee who performed the work, a brief description of the services performed and /or the specific task in the letter proposal to which it relates, the date the services were performed, the number of hours spent on all work billed on an hourly basis, and a description of any reimbursable expenditures. City shall pay Contractor no later than thirty (30) days after approval of the bi- weekly invoice by City staff. 4.2 City shall reimburse Contractor only for those costs or expenses specifically approved in the Letter Proposal. Unless otherwise approved, such costs shall be limited and include nothing more than the following costs incurred by Contractor: A. Actual costs and /or other costs and/or payments specifically authorized in advance in writing and incurred by Contractor in the performance of this Agreement. 4.3 Contractor shall not receive any compensation for Extra Work without the prior written authorization of City. As used herein, "Extra Work" means any work that is determined by City to be necessary for the proper 'completion of the Project, but which is not included within the Letter Proposal and which the parties did not reasonably anticipate would be necessary. Compensation for any authorized Extra Work shall be paid in accordance with the Schedule of Billing Rates set forth in Exhibit A. 5. WORK DEFICIENCIES AND CORRECTIONS 5.1 The Contractor's performance will be evaluated on a regular basis. When problems are identified, the City will notify Contractor. If issues are serious or go unresolved, a Notice of Deficiency will be issued to Emergency On -Call Services Agreement Page 3 Contractor in writing. This notice will detail the issues and give a cure period to resolve them. 5.2 Failure to correct the deficiencies listed in the Notice of Deficiency within the timeframe specified by the City may, in the City's sole discretion, result in action being taken by the City, including, but not limited to, (a) withholding payment for the subject deficiency until the work is completed; (b) correcting the deficiency (using the City's own work force and /or by contracting out) and deducting any associated costs plus overhead incurred thereby from the total monthly compensation due the Contractor; (c) contracting with another Vendor to perform the maintenance and other services required for the remainder of the term of the Contract; (e) terminating the agreement; and /or (f) taking any other action and exercising any other legal remedy available to the City under law. 6. ADMINISTRATION This Agreement will be administered by the General Services Department. Jim Auger shall be the Project Administrator and shall have the authority to act for City under this Agreement. The Project Administrator or his /her authorized representative shall represent City in all matters pertaining to the services to be rendered pursuant to this Agreement. 7. STANDARD OF CARE 7.1 All of the services shall be performed by Contractor or under Contractor's supervision. Contractor represents that it possesses the personnel required to perform the services required by this Agreement, and that it will perform all services in a manner commensurate with community professional standards. All services shall be performed by qualified and experienced personnel who are not employed by City, nor have any contractual relationship with City. 8. RESPONSIBILITY FOR DAMAGES OR INJURY 8.1 City and all officers, employees and representatives thereof shall not be responsible in any manner for any loss or damage to any of the materials or other things used or employed in performing the Project or for injury to or death of any person as a result of Contractor's performance of the services required hereunder; or for damage to property from any cause arising from the performance of the Project by Contractor, or its workers. 8.2 Contractor shall be responsible for any liability imposed by law and for injuries to or death of any person or damage to property resulting from defects, obstructions or from any cause arising from Contractor's work on the Project, or the work of any supplier selected by the Contractor. Emergency On -Call Services Agreement Page 4 8.3 Contractor shall indemnify, hold harmless, and defend City, its officers and employees from and against: (1) any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damage, or any other claims arising from any and all acts or omissions of Contractor, its employees, agents or subcontractors in the performance of services or work conducted or performed pursuant to this Agreement; (2) use of improper materials in performing this Project including, without limitation, defects in workmanship or materials and /or design defects; and /or (3) any and all claims asserted by Contractor's subcontractors or suppliers on the Project, and shall include reasonable attorneys' fees and all other costs incurred in defending any such claim. However, nothing herein shall require Contractor to indemnify City from the sole negligence or willful misconduct of City, ifs officers or employees. 8.4 Contractor shall perform all Project work in a manner to minimize public inconvenience and possible hazard, to restore other work areas to their original condition and former usefulness as soon as possible, and to protect public and private property. Contractor shall be liable for any private or public property damaged during the performance of the Project work. 8.5 To the extent authorized by law, as much of the money due Contractor under and by virtue of the Agreement as shall be considered necessary by City may be retained by it until disposition has been made of such suits or claims for damages as aforesaid. 8.6 Nothing in this section shall be construed as authorizing any award of attorney's fees in any action to enforce the terms of this Agreement, except to the extent provided in Section 8.3 above. 8.7 The rights and obligations set forth in this Section shall survive the termination of this Contract. 9. INDEPENDENT CONTRACTOR City has retained Contractor as an independent contractor and neither Contractor nor its employees are to be considered employees of the City. The manner and means of conducting the work are under the control of Contractor, except to the extent they are limited by statute, rule or regulation and the express terms of this Agreement. No civil service status or other right of employment shall accrue to Contractor or its employees. 10. COOPERATION Contractor agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or interest in the work to be performed. City agrees to cooperate with the Contractor on the Project. Emergency On -Call Services Agreement Page 5 Without limiting Contractors indemnification of City, and prior to commencement of work, Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement, a policy or policies of liability insurance of the type and amounts described below and in a form satisfactory to City. A. Certificates of Insurance. Contractor shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Insurance certificates must be approved by City's Risk Manager prior to commencement of performance or issuance of any permit or performance of any work. Current certification of insurance shall be kept on file with City at all times during the term of this Agreement. B. Signature. A person authorized by the insurer to bind coverage on its behalf shall sign certification of all required policies. C. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. D. Coverage Requirements. L Workers' Compensation Coverage. Contractor shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his or her employees in accordance with the laws of the State of California. In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California for all of the subcontractor's employees. Any notice of cancellation or non - renewal of all Workers' Compensation policies must be received by City at least thirty (30) calendar days (10 calendar days written notice of non- payment of premium) prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Contractor for City. ii. General Liability Coverage. Contractor shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury, and property damage, including without limitation, contractual liability. If commercial general liability insurance or other form with a general aggregate limit is used, either the general Emergency On -Call Services Agreement Page 6 aggregate limit shall apply separately to the work to be performed under this Agreement, or the general aggregate limit shall be at least twice the required occurrence limit. iii. Automobile Liability Coverage. Contractor shall maintain automobile insurance covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with work to be performed under this Agreement, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit for each occurrence. E. Endorsements. Each general liability and automobile liability insurance policy shall be endorsed with the following specific language: L The City, its elected or appointed officers, officials, employees, agents and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Contractor. if. This policy shall be considered primary insurance as respects to City, its elected or appointed officers, officials, employees, agents and volunteers as respects to all claims, losses, or liability arising directly or indirectly from the Contractor's operations or services provided to City. Any insurance maintained by City, including any self- insured retention City may have, shall be considered excess insurance only and not contributory with the insurance provided hereunder. iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company. iv. The insurer waives all rights of subrogation against City, its elected or appointed officers, officials, employees, agents and volunteers. V. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to City, its elected or appointed officers, officials, employees, agents or volunteers. vi. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits, by either party except after thirty (30) calendar days (10 calendar days written notice of non - payment of premium) written notice has been received by City. Emergency On -Call Services Agreement Page 7 F. Timely Notice of Claims. Contractor shall give City prompt and timely notice of claim made or suit instituted arising out of or resulting from Contractor's performance under this Contract. G. Additional Insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work. 12. SUBCONTRACTING The parties recognize that a substantial inducement to City for entering into this Agreement is the professional reputation, experience and competence of Contractor. Assignments of any or all rights, duties or obligations of the Contractor under this Agreement shall be permitted only with the express written consent of City. Contractor shall not subcontract any portion of the work to be performed under this Agreement without the written authorization of City. 13. WITHHOLDINGS City may withhold payment to Contractor of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Contract. Contractor shall not discontinue work as a result of such withholding. Contractor shall have an immediate right to appeal to the City Manager or his /her designee with respect to such disputed sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of return that City earned on its investments during the time period, from the date of withholding of any amounts found to have been improperly withheld. 14. CONFLICTS OF INTEREST The Contractor or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act "), which (1) requires such persons to disclose any financial interest that may foreseeably be materially affected by the work performed under this Contract, and (2) prohibits such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. If subject to the Act, Contractor shall conform to all requirements of the Act. Failure to do so constitutes a material breach and is grounds for immediate termination of this Contract by City. Contractor shall indemnify and hold harmless City for any and all claims for damages resulting from Contractor's violation of this Section. 15. NOTICES All notices, demands, requests or approvals to be given under the terms of this Agreement shall be given in writing, to City by Contractor and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first -class mail, addressed as Emergency On -Call Services Agreement Page 8 hereinafter provided. All notices, demands, requests or approvals from Contractor to City shall be addressed to City at: Attn: Jim Auger General Services Department City of Newport Beach 3300 Newport Blvd. PO Box 1768 Newport Beach, CA 92658 Phone: 949 - 718 -3477 Fax: 949-650 -0747 All notices, demands, requests or approvals from City to Contractor shall be addressed to Contractor at: Attention: Telford Coftam Tight Quarters Inc. 2031 S. Anne Street Santa Ana, CA 92704 Phone: 714 -557 -7901 Fax: 714- 241 -3820 16. TERMINATION In the event that either party fails or refuses to perform any of the provisions of this Agreement at the time and in the manner required, that party shall be deemed in default in the performance of this Agreement. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, the non- defaulting party may terminate the Agreement forthwith by giving to the defaulting party written notice thereof. Notwithstanding the above provisions, City shall have the right; at its sole discretion and without cause, of terminating this Agreement at any time by giving seven (7) calendar days prior written notice to Contractor. In the event of termination under this Section, City shall pay Contractor for services satisfactorily performed and costs incurred up to the effective date of termination for which Contractor has not been previously paid. On the effective date of termination, Contractor shall deliver to City all materials purchased in performance of this Agreement. 17. COMPLIANCE WITH ALL LAWS Contractor shall at its own cost and expense comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. Emergency On -Call Services Agreement Page 9 18. WAIVER A waiver by City of any term, covenant, or condition in the Agreement shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition. 19. INTEGRATED AGREEMENT This Agreement represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal Agreement or implied covenant shall be held to vary the provisions herein. 20. CONFLICTS OR INCONSISTENCIES In the event there are any conflicts or inconsistencies between this Agreement and the Scope of Services, the terms of this Agreement shall govern. 21. AMENDMENTS This Agreement may be modified or amended only by a written document executed by both Contractor and City and approved as to form by the City Attorney. 22. EFFECT OF CONTRACTOR'S EXECUTION Execution of this Agreement by Contractor is a representation that Contractor has visited the Project Site, has become familiar with the local conditions under which the work is to be performed, and has taken into consideration these factors in submitting its Project Proposal and Scope of Work. 23. CONTROLLING LAW AND VENUE The laws of the State of California shall govern this Agreement and all matters relating to it and any action brought relating to this Agreement shall be adjudicated in a court of competent jurisdiction in the County of Orange. 24. INTERPRETATION The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Agreement or any other rule of construction which might otherwise. apply. .Emergency On -Call Services Agreement Page 10. IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the day and year first written above. APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY B;)� Leonie Mulvihill Assistant City Attorney ATTEST: By: �r'lV' {N1Nri Leilani I. Brown City Clerk CITY OF NEWPORT BEACH, A Municipal Corporation By. r 0- L D A. Kiff City Manager CONTRACTOR: TIGHT QUARTERS INC. By: arye:`T iArot''/" Co 114 Title: Pafr. Attachments: Exhibit A — Billing Rates Exhibit B — Scope of Services f:\ apps\ cat\ cycom \wpdocs \d003 \p003 \00002072.doe Emergency On -Call Services Agreement Page 11 =�Z Proposal 2031 S. Anne Street. Santa Ana. Ca 92704 (714) 557 -7901 Fax (7141241 -1 820 SUBMITTEDTO PHONE DATE City of Newport Beach 949 718 -3477 January 14, 2010 STREET e-mail 3300 Newport Blvd. P.O. box 1768 jauger@newportbeachca.gov CITY, STATE, ZIP JOB LOCATION Project Manager Newport Beach CA. 92658 -8915 Beach clean up Jim Auger Mobile # Telford Cottam I Newport Beach We hereby submit specifications and estimated for Trucking Rates as follows: Roll off with 40 yards containers $ 90.00 per hour Semi End Dump / Lowside $ 95.00 per hour Semi End Dump/ Highside $100.00 per hour 953 Track Loader $140.00 per hour 210 Linkbelt excavator with Hydraulic Thumb $140.00 per hour EXCLUSIONS: Please see Exhibit "A" Excludes dump fees Excludes Solid Waste Hauling Tax Excluded permits of any kind VARIATIONS TO THE ABOVE CREATING ADDITIONAL COSTS WILL BE CHARGED ACCORDINGLY WE PROPOSE hereby to furnish material and labor-complete in accordance with above specifications, for the sum of: $ See hourly rates above 131-Weekly PROGRESS PAYMENT DUE UPON RECEIPT PROPOSED PRICES GOOD Thru January 31, 2012 My signature shall serve as Authorization to Proceed with SIGNATURE T:M- the above work as Proposed, I have also read and agree to the terms in Exhibit' ZIO -tr,. Date j EXHIBIT THE FOLLOWING MAYOR MAY NOT BE APPLICABLE TO YOUR PROJECT -READ YOUR PROPOSAL FOR ALL INCLUSIONS AND ACKNOWLEDGE BY SIGNING BELOW EXCLUSIONS: Permits of any Kind, Septic Tank Removal, Footing Dirt Removal, Hazardous Unsuitable Material Removal, Off -Site Work, Meters /Permits, Shoring /Barricades, De- Watering. Any City Solid Waste Hauling Taxes. THE EXCAVATION PRICE IS BASED ON THE USE OF CONVENTIONAL EQUIPMENT. IF ROCK OR UNSTABLE MATERIAL IS ENCOUNTERED WHICH APPRECIABLY LIMITS PRODUCTION, THEN THAT PORTION OF THE EXCAVATION SHALL BE DONE AT A NEGOTIATED PRICE. ANY AND ALL ROCK BREAKING SHALL BE DONE ON A TIME- AND - MATERIAL BASIS. BEFORE COMMENCEMENT OF WORK, IT SHALL BE THE OWNER'S /CONTRACTOR'S RESPONSIBILITY TO CUT /CAP AND ISOLATE ALL UTILITIES (I.E., ELECTRICITY, GAS, WATER, TELEPHONE) SO THAT REMOVAL WORK WILL NOT CONFLICT WITH UTILITIES THAT WILL BE RE- ACTIVATED. TIGHT QUARTERS, INC. IS NOT RESPONSIBLE TO REPAIR UNDERGROUND UTILITIES IN GRADED AREAS. Prior to the commencement of any dirt export. It is the responsibility of the contractor /owner to attain the necessary testing and clearance far dirt export from the Country of Orange. (See following County of Orange Soil Acceptance Fact Sheet.) Contact the County with any questions or concerns. UPON OWNER'S /CONTRACTOR'S APPROVAL TO COMMENCE WORK, THE OWNER/CONTRACTOR CERTIFIES THAT THE PROJECT IS FREE FROM ASBESTOS AND ANY AND ALL OTHER HAZARDOUS MATERIAL. ALL SALVAGEABLE MATERIAL AT TIME OF JOB WALK SHALL BECOME THE PROPERTY OF 'LIGHT QUARTERS, INC. UNLESS OTHERWISE NOTED PRIOR TO SCHEDULEDSTART DATE. • PROPOSED PRICE GOOD FOR THIRTY (30) DAYS. ACCEPTED BY: � DATE: 2-1a to- PLEASE PROVID HE FOLLOWI G Soils Engineer Name Phone Demo Permit # Grading Permit # City of Newport Beach BUDGET AMENDMENT 2009 -10 EFFECT ON BUDGETARY FUND BALANCE: Increase Revenue Estimates X Increase Expenditure Appropriations AND Transfer Budget Appropriations SOURCE: from existing budget appropriations from additional estimated revenues X from unappropriated fund balance EXPLANATION: This budget amendment is requested to provide for the following: NO. BA- 10BA -050 AMOUNT: $20,000.00 Increase in Budgetary Fund Balance X Decrease in Budgetary Fund Balance No effect on Budgetary Fund Balance To increase expenditure appropriations from General Fund fund balance to reimburse the General Services beach maintenance account for the Dory Fleet Access Area Emergency Sand Replenishment Project performed by Tight Quarters Inc. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account 010 3605 REVENUE ESTIMATES (360 1) Fund /Division Account EXPENDITURE APPROPRIATIONS (3603) Division Number Account Number Division Number Account Number Division Number Account Number Division Number Account Number Signed: -Z� Financial Signed: Administi Signed: Description General Fund - Fund Balance Description Description 3140 General Services - Operation Support 8080 Services - Professional & Technical NOC Administrative Services Director Approval: City City Council Approval: City Clerk Amount Debit Credit $20,000.00 ` ' Automatic $20,000.00 ,) 2 Go Date 6/ );v Date Date