Developing a Bay-wide Management Strategy for
Maintenance Dredging
Presented by
Chris Miller, City of Newport Beach, and Adam Gale, Anchor QEA
March 24, 2014
Project Goals
Develop a more effective and useful maintenance
dredging permit approach
.,,
W 47Z
e
Park �V
`ANTn Ari,
a d Victoria St Hc.c i i--
Talbert
a 114D, Upper
Ad Regional = Newport CALIFORNIA
ParkF` Bay
`, F. 9��s Regional - San Francisco
a Park '
Project Location
7
� Los Angeles
Newpo t l` Y Project Location
E Co Not to Scale
�dSt611
c'
L
ona del Mar c
0
a
Crystal Cove St
Park
Crystal Cove
3
The Need for Maintenance Dredging
I
_'
1 1
r _
- - - _ --
,meati �•"_� Y�"��.� - .�-.e_
Purpose of RGP
• Regional General Permits ( RGPs ) "are
developed to avoid unnecessary regulatory
control over activities that do not justify
individual control or which are adequately
regulated by another agency" ( 33 CFR
320 . 1 (a ) ( 3 ) )
mammon
�5
4
---?�.! • ` t=}-:.-.+r y,..et.--; ^ � i . . � .s t.ter_ X
History of RGP 54
• Permit originated in 1974
• Known as the Blanket Dredging Permit
• Evolved into RGP- 18 in 1989 and RGP - 54 in 2000
• Renewed every 5 years
c
4
---?�.! • ` t=}-:.-.+r y,..et.--; ^ � i . . � .s t.ter_ X
Harbor Commission Dredging
Subcommittee
• Key members
- The public , including private residents and
business owners
- Consultants
- Harbor Commission staff
• Forming approach for new and better RGP 54
4
Existing RGP 54 2014 Proposed RGP 54
Annual
Maximum Volume 20,000 cubic yards (cy) 75,000 cy
Individual Project
1 ,000 cy 8,000 cy
Volume Limit
Maximum Maximum of -7 feet MLLW Maximum of -10 feet MLLW plus 2 feet of overdredge
Dredge Depth plus 1 foot of overdredge (1 paid and 1 unpaid)
(based on authorized depth of harbor)
Sediment Testing Periodic 5 e years)
characterization Periodic baywide characterization (5 years)
on ((5
Eelgrass No impacts allowed Impacts permitted and will be mitigated pursuant to
SCEMP or future applicable policy
Repair or replace docks, bulkheads, and piles with similar
Structures No maintenance allowed structures; reconfiguration of existing docks to meet
modern standards and boater needs will be allowed (still
being considered)
4 -t'
Baywide Sediment Sampling
• Sampling conducted in July 2013
• Sediment cores collected at 58 stations within
Newport Bay via electrically powered vibracore
• Sampling and analysis results discussed at DMMT
.o
WF Al
malt '
PON'ON
- s
Baywide Sediment • • Results
LEGEND:
EXTE
Suitable to-10 feet MLLW plus 2
• —feetdoverdepth for unrestricted
disposal at the lA3 DDMD$.
Grain size required pnor to beach
DOVER
replenishment to demonstrate
SHORES
suitability.
�s �':r - -Suitahleto-10 feetMLLW plus? II
"CC
•, feet of overdepth for unrestricted
!>' disposal at the lAd ODMOS.
_IA
. .# _ Material proposed for beach
' -' - placement must have grain size
veriflmtion and chemical terting
" , , with agenry concurrence[o verify
. sultabiliry prior to placement.
® Suitable to-7 feet MLLW plus 1
�w� foot of overdepth for unrestricted
O ��� _ disposal at the lA3 ODMDS.
Z-layer testing to confirm
It postdredge surface contains
(y.� mercuryless thanlppm prior to
'•:v , Q �� - dredging to demonstrate newly
e><posed surface Is clean.Grain
size required prior to heath
� replenishment to demonrtrate
sultabiliry.
®Area not included under
proposed RGP 54.
t
Eelgrass
• Nursery for juvenile fish species
• Support both commercial and recreational
fisheries
• Habitat for fish and bird foraging ground
• Minimizes and slows coastal erosion
Source: EcoMarine 2012
Eelgrass Regulatory Requirements
• Eelgrass is considered a sensitive resource by
state and federal agencies
• Federal agencies are required to consult with
NMFS on all actions or proposed actions
authorized , funded , or undertaken by agencies
that could adversely affect eelgrass
• Mitigation requirements per the Southern
California Eelgrass Mitigation Policy, or "SCEMP "
4
Biannual Eelgrass Surveys
., � '����y�j -� � �tt►tF+ -rte � ..•r s r � �3
- LINDA ISLE BAYSIDE VILLAGE _
MARINA
COAST HIGHWAY j
,,RIDGE ? i
BALBOA YACHT •
{r BASIN
w �0
BALBOA NLAN4' F
BRIDGE
J
BALBOA ISLAND
15TDOCK
BA(6pA pFV/MSU :
PACIFIC OCEAN
.. ...
«-�.A
Summary
• Once implemented and approved , new RGP 54
will allow the following key activities
- Maintenance dredging to - 10 feet MLLW ( plus
2 feet of overdepth )
- Cumulative annual dredging limit up to
80, 000 cy
- Maximum 8 , 000 cy per project limit
- Impacts to eelgrass permitted with appropriate
mitigation
4
Questions
4504
i rr r rrr�•� —=e1 ` did
-
t .
r.-7T''�---•-�.=A� ...::��.�. �.�- .--- ate.-,-n - _. - —__ - _ ` �---+A,-,i
t re7
e �� - -•r a ""�C— �ix �
o
LFK
Source: WRA October 2013
For More Information
Chris Miller
cmillerC newportbeachca . o,ov