Loading...
HomeMy WebLinkAbout09 - 2010-2011 Sidewalk, Curb & Gutter ReconstructionCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 9 November 23, 2010 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Peter Tauscher, Junior Engineer 949 -644 -3316 or pauscher@newportbeachca.gov SUBJECT: 2010 -2011 SIDEWALK, CURB & GUTTER RECONSTRUCTION PROJECT — REJECT ALL BIDS FOR CONTRACT NO. 4561 ISSUE Staff requests City Council to reject all bids received for the 2010 -2011 Sidewalk, Curb & Gutter Reconstruction Project and allow staff to re- advertise for new bids. RECOMMENDATIONS 1. Reject all received bids for Contract No. 4561. 2. Direct staff to clarify the contract documents and re- advertise the project for bids. DISCUSSION At 9:00 a.m. on November 2, 2010, the City Clerk opened and read the bids for the 2010- 2011 Sidewalk, Curb & Gutter Reconstruction project that would include reconstructing existing sidewalk, medians, driveways, curb & gutter, installing access ramps & truncated domes, removing & pruning tree roots; and installing new tree root barriers within the Eastbluff Community and Balboa Island areas. A total of twelve bids were received, ranging from $399,999.90 to $930,460.00. In reviewing the bids, it was apparent that none of the bidders fully understood the required tree preservation requirement and bid forms pertaining to using an ISA Certified Arborist. Additionally, most of the bids received contained mathematical and clerical errors within the proposal. As a result, staff recommends rejecting all of the bids, clarify the arborist requirement and bid forms, and re- advertise the project for responsive and conformant bids. PUBLIC NOTICE The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Prepared by: Peter Tauscher Junior Engineer Attachment: Location Map 5 a e e nK J E' P ® J 4� M ✓fST Sai 4 a� f z W a � p � o rvar 4+ 9 ,r� M i m y } yK S AB � yQVpy y m i U N � HMV 4 m g 6` q 'y U FY 10 -11 SIDEWALK, CURB & CITY OF NEWPORT BEACH GUTTER RECONSTRUCTION PROJECT PUBLIC WORKS DEPARTMENT LOCATION MAP NOT TO SCALE C -4561