HomeMy WebLinkAbout03 - Non-Exclusive Solid Waste Franchise - PowerPoint (Staff)Sewer System Master Plan Capital Improvements
June 9,
2009 Sewer Master Plan developed by AKM Engineers Item No ?315
197 Miles of Sewer Mains
• 251525 Sewer Laterals
21 Sewer Lift Stations
• 4.7 Miles of Sewer Force Main
Sewer Master Plan Capital Improvement Cost Summary
Project Cost
CIP Project Description
($)
Collection System Capacity
1,281,391
Improvement Projects
Collection System Condition
16,648,060
Improvement Projects
Pump Station Improvement
11,088,000
Projects
Tota 1
29,017,451
s
fe
0: WZA
4i
4 � `
1
1 7 / •_�
capm.rgor,�
s Y�.w M6M bsIYi .rM�
CAPITAL IMPROVEMENT PROGRAM
Table 10 -2
Collection System Capacity Improvement Program
Projec
Size
Lengt
Replacemen
Project
t No.
Pipe ID
Location
UrS MH ID
DIS MH ID
(in)
h (ft)
Slope
tSize (in)
Comments
Cost($)
At east of Balboa Blvd and west
C -1
R20_014
of G St.
MHR20_014
MHR20_010
8
117
0.0011
10
Replace
71,078
At west of Coast Hwy and east of
D34_092
62 nd St.
MHD34_017
MHD34_016
10
105
0.0005
12
_
76,523
At west of Coast Hwy and east of
D34_093
Prospect St.
MHD34_018
MHD34_017
10
105
0.00061
12
76,545
At west of Coast Hwy and west
D34_094
of Prospect St.
MHD34_022
MHD34_018
10
210
0.0012
12
153,090
At west of Coast Hwy. and west
D34_095
of Cedar St.
MHD34_084
MHD34_022
10
105
0.0019
12
Flow monitoring verified
76,545
At west of Coast Hwy. and east
deficiency at MHD34_017.
C -2
D34_096
of Wallnut St.
MHD34_026
MHD34_084
8
105
0.0018
12
Verify upstream deficiencies
76,545
At west of Coast Hwy and west
through flow monitoring prior
D34_097
of Lugonia St.
MHD34_030
MHD34_026
8
210
0.0019
12
to project implementation.
153,068
At west of Coast Hwy and Alley
between Culton St and Lugonia
D34_098
St.
MHD34_085
MHD34_030
8
105
0.0014
12
76,545
At west of Coast Hwy and west
D34_099
of Culton St.
MHD34_033
MHD34_085
8
105
0.0010
12
76,523
At west of Coast Hwy and west
D34_101
of Orange St.
MHD34_062
MHD34_088
8 1
115 1
0,00101
12 1
83,886
At San Joaquin Hills Rd. and
C -3
K02_098
west of Marguerite Ave.
MHK02 085
MHK02 084
8
226
0.0037
10
Replace - low priority
137,483
At San Joaquin Hills Rd and
right next to west of Marguerite
K02_097
Ave.
MHK02 084
MHK02 078
8
368
0.0063
10
1
223,560
Total 1,281,391
10 -5 City of Newport Beach
R:RsportsV ewport Beach \Sewer Master Plan Sewer Master Plan
CAPITAL IMPROVEMENT PROGRAM
Table 10 -3 (continued)
Gravity Sewer Replacement and Rehabilitation Program
10 -10
R'.RhInsuarrpan Busigh ,Mscar Ran
Cif, of Newpa" Beach
Sewer Moore, plan
z°
>
E
re
o
&
z°
t9
`
3
¢
0
10
C
Ry
3
o
GIS
CCTV
2•
Full
Z
o
g
p
i
D
Location
Manhole
o
Sit.
Length
Length
o
Project
u
u
O
c
64
CCTV Data
Pisan)
Map
o
In
Mat
fl
fl
a
Comments
Minimum Recommendation
Cog S
Simot
UIS MH
us MH
L4]021
698
Line tvq son hillside to
p�DC
NB
NO VIDEO
Y
tIDt BAYSIDE OR
8
L -10
MHL4]_001
MML4]
8
VCP
tOJ
108
Tram planmtl on tap of shallow main
OCSO
50,000
147 022
NB
Y
PORTARGUELLO WAY
101154008
K02_205
L -14
MHKO2_182
MHKO2_183
WS
8
VCP
193
193
109
Fn1Clure Circumferential
Spot Repair ®48'LOS Of
N.000
MHK02_182
NB
V
1815 SABRINA TERR
5/12/2009
L35_03
K -10
MXL28 014
MH435 020
d5
B
VCP
308
300
110
Ln loci for 19018 1915 Sabdna Ten
Spot Repair Q 185' and 270'
1ta'�
is Broken Q connection
O'S of MHL20_014
NB
Y
119 COLLINS AVE
11/812005
131_052
K-09
MHL31_081
COL310D15
WS
6
VCP
31
30
111
Pipe turns mduC.S 10 O- then 4
-Replace
11,000
TBA oath heavi mots Q Busher
Spat Repair end of line imm 66'
NB
Y
200 VIA BARCELONA
O1t3l2007
FOt_146
M416
MHFOI_128
MHFO1_129
WS
8
VCP
73
70
112
anholo
to rasher& abandon flusher
35.000
NB
Y
228 PEARL AVE
111012006
L31_105
LO9
NIHL31_076
COL31 0019
WS
8
VCP
314
314
113
287 the pipe changes born S' VCP
Replace
153,000
—
to 6- VCP
F1i_002
NS
NO VIDEO
Y
14TH TO 20111 ST
&
L4M
MHF17003
MHF11001
8
VCP
440
440
114
Root Invasion in Laterals
Spot Repair
214.000
ML at 20'; Un.M. Ib roolcut past
NB
Y
IN OLIVE ST
1014/2006
P43
MHO34_083
LHD34_004
WS
6
VCP
80
80
115
joint due to lip, also restricts Raw
Spot Repair Q 20'
2%O(kO
DIS 6- VCP
EP
AKM
M31" Y2
12
M311012
13
Y
POLARIS OR
1WV07
MHG22_W)
MHG22 036
US
B
VCP
194
193
118
3.6' h50mlion Runner 193.4' OBZ
Spot Repair Q 3.6'. Clear
94.00D
(OBR) &NSA.
rocks Q 193.4'.
NS
Y
8 DRAKES BAY
91343008
FK021
K -14
MHK02 162
MHK02 161
d5
B
VCP
16).52
168
117
Fracture Orcumfrenlial
Spot Repir@ 146' US
81,000
Pipe reduces to V min 0'. 60
NS
Y
2]51 COAST HIGHWAY
91241008
N-W
MHD05145
MHODS
WS
8
PVC
80
SO
118
upstream of MHDOS: Heow grease
Replace
39,000
accumulalion
Pip. m luxes horn 12- to 8-
NB
NO VIDEO
Y
2500 BEACON
014E
MHDOSm2
MHC05 009
12
VCP
398
398
119
MH005072: Bottleneck for debits
Replace
290,000
to get lodged
Pipe entering MHL68_003 45's into
NB
Y
153 HARBOR ISLAND DR.
112=008
L60_013
L48
MHL68_003
MHUHI 017
US
8
VCP
441
440
120
manna.. catches debris: Install
Replace
214,000
manhole or realign pipe
Lt5_029
Una laid in planter with trees planted
Une pipe from street to Sian o1
NB
NO VIDEO
Y
2W EVENING CANYON
&WO TO
1212
MHL15023
MHLIS_116
8
PVC
141
140
121
siphon line going antler buck
69,000
L15 174
on oP
galley
NB
NO VIDEO
Y
15 RUE VERTE
115 026
Niv
0112/
MHIIS 022
MM115 026
8
VCP
175.5
170
122
Pipe runs umenm.'tl area mmugM1
Una
85.000
—
—
wash
ND
Y
FINLEY AVE
44912009
F04_009
MANS
MHFO4 001
MHF04_002
WS
8
VCP
243
239
123
Multiple cracks in old pipe
Una
I18O0O
OCEAN FRDNTALLEV FROM 30TH
FOS 003
Pi la aid and mas
Pe g y.nth sereml
NB
NO VIDEO
Y
TO NEWPORT PIER
Tp
M5'L5
MHFOS OO7
MHFOS 002
8
VCP
I
1395
1500
124
infirs. Needs to be lined
Line
678,000
F05007
Belly stars at 1101 don't knew
Na
Y
2705 VISTA UMBROSA
21114009
Noll 430
R -01
MHHOS 438
MHH40_439
O'S
8
VCP
124
124
125
Replace
60,000
where It trds
Uning Failure. Chimney dropped and
NB
V
522 W OCEAN FRONT
41274009
R11_001
K-8
MHR11_00l
MHRII
WS
8
PVC
125
103
126
is crashing mein due I. vs ter main
Replace
61,000
aid an top
ADJACENT KINGS ROAD AND ST
Cartesian in pipe. Replace as
Steel ReDlacemeet Fragment
JAMES PLACE
I
I
6 &
Steel
Ide,elopmarl occurs
Replace
1,254.060
Total
31,390
31,174
T.Iat
18,645,060
10 -10
R'.RhInsuarrpan Busigh ,Mscar Ran
Cif, of Newpa" Beach
Sewer Moore, plan
Table 10-4 (continued)
Pump Station Improvement Program
PS ID
Station Name
Improvement Description
Project Cost
1. Upgrade electrical and controls to current City standard - Currently being implemented
11
Harbor Ridge
2. Replace pumps with 120 gpm capacity units
$54,000
3. Line existing wet well
$54,000
4. Install standby generator with automatic transfer switch-Currently being implemented
Carnation
1. Install standby generator with automatic transfer switch
$108,000
12
Avenue
2. Line wet well to extend its useful life
$68,000
3. Construct 1,600 gallon emergency storage when pump station is replaced
13
China Cove
1. Install standby generator with automatic transfer switch when pump station is replaced
2. Construct 1,600 gallon emergency storage when pump station is replaced
1. Install standby generator with automatic transfer switch
$108,000
14
Main Beach
2. Line wet well
$68,000
3. Construct 1,600 gallon emergency storage
$203,000
15
Buck Gully
1. Install standby generator with automatic transfer switch
$162,000
1. Install standby generator with automatic transfer switch
$203,000
16
Cameo Shores
2. Increase stripper pump capacity to handle dry weather urban runoff
$54,000
3. Replace 30 HP main pump motors with 40 HP motors
$54,000
1. Upgrade electrical and controls to current City standards- Currently being implemented
2. Install standby generator with automatic transfer switch - Currently being implemented
17
Polaris Drive
3. Replace forcemain
$207,000
4. Line existing wet well
$68,000
5. Construct 3,600 gallon emergency storage when pump station is replaced
18
Mariners Drive
1 Construct 1,100 gallon emergency storage when pump station is replaced
$203,000
20
Brien Tract
1. Replace existing pump station with a new facility - Currently being implemented
2. Construct new forcemain
$400,000
1. Upgrade electrical and controls to current City standards - Currently being implemented
21
Back Bay Drive
2. Install standby generator with automatic transfer switch - Currently being implemented
3. Construct operational storage
$135,000
4. Line existing wet well
$68,000
1. Construct new wet well and 1,100 gallon emergency storage when pump station is replaced
22
Ford Road
2. Install standby generator with automatic transfer switch
$108,000
3. Replace forcemain with 4 inch pipe
$410,000
23
Shellmaker
1. Upgrade the facility to current City Standards utilizing the existing wet well structure
$450,000
Island
2. Replace forcemain with 4 -inch pipe
$82,000
Total
$11,088,000
10 -12 City of Newport Beach