HomeMy WebLinkAbout17 - Pelican Hill Road North and Newport Coast DriveCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 17 January 13, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Iris Lee, Senior Civil Engineer 949 -644 -3323 or ilee @city.newport- beach.ca.us SUBJECT: PELICAN HILL ROAD NORTH & NEWPORT COAST DRIVE SOUTHBOUND RIGHT -TURN IMPROVEMENTS — COMPLETION AND ACCEPTANCE OF CONTRACT NO. 3945 Recommendations: Accept the completed work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond 1 year after Council acceptance. Discussion: On September 9, 2009, the City Council authorized the award of Pelican Hill Road North & Newport Coast Drive Southbound Right -Turn Improvements to GMC Engineering, Inc. The contract provided for a right -turn lane reconstruction, which also included curb & gutter, storm drain, sidewalk, curb access ramps, traffic signal system modification, median construction, retaining wall, landscaping and irrigation. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $318,293.00 Actual cost of bid items constructed: $330,948.99 Total change orders: $13,356.98 Final contract cost: $344,305.97 Pelican Hill Rd. N & Newport Coast Dr. SB Rrr Improvements NOC — Contract No. 3945 January 13, 2009 Page 2 With regard to the contract bid items, the project entailed more over - excavation and concrete work for the roadway, and extending the retaining wall beyond the originally designed limits at an additional cost of $12,656. There were eight change orders for this project (see table below). Change orders were approved to have the contractor provide additional traffic control, modify the storm drain system, provide additional tree uplighting accessories, and replace damaged signal loop detectors. Staff also reviewed and approved a request made by the Pelican Heights Association to extend the project's sidewalk into the association's property. The cost for all change orders was approximately $13,357. The final overall construction cost including change orders was $26,013 or 8.2 percent over the original bid amount. CO# Description Cost 1 Additional Traffic Control $ 1,150.00 2 Storm Drain Modifications $ 2,242.58 3 Tree Uplighting Accessories $ 359.95 4 Six Signal Detector Loops $ 3,303.95 5 Sidewalk Extension: Landscape & Irrigation $ 2,388.00 6 Sidewalk Extension: Clear & Grub $ 1,000.00 7 Sidewalk Extension: Grading $ 1,000.00 8 Sidewalk Extension: Integral - Colored PCC Sidewalk $ 1,912.50 Change Order Total: $13,356.98 The following is a summary of the project schedule per the Fiscal Year 2008 -2009 Master Project Schedule. Schedule Summary Estimated Completion date per FY 08 -09 Schedule: April 17, 2009 Project award for construction: September 9, 2008 Estimated completion date at award: January 2, 2009 Actual substantial construction completion date: December 11, 2008 Environmental Review: This project was exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Guidelines. This exemption covers the minor alteration of existing public facilities with negligible expansion of. the facilities in areas that are not environmentally sensitive. Pelican Hill Rd. N & Newport Coast Dr. SB Rrr Improvements NOC — Contract No. 3945 January 13, 2009 Page 3 Public Notice: The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Prior to starting work, City - prepared notices were distributed by the Contractor to residents within the project vicinity. Funding Availability: In addition to the primary construction contract, this project involved other project expenses for material testing and incidentals. Total project expenses are summarized as follows: Construction $344,305.97 Materials Testing $3,286.00 Incidentals $314.02 Total Project Cost $347,905.99 Funds for the project were expended from the following account(s): Account Description Newport Coast Drive at Pelican Hill Road North Prepared by: e Senior Civil Engineer Account Number Amount 7181- C5200974 $ 347,905.99 Total: $ 347,905.99 Submitted ,n (rBadum Works Director