HomeMy WebLinkAbout12 - City Hall & Park Master Plan ProjectCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 12 April 28, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen Badum sbadumPcity. newport- beach. ca. us 949 - 644 -3311 SUBJECT: CITY HALL AND PARK MASTER PLAN PROJECT - APPROVAL OF AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH BOHLIN CYWINSKI JACKSON FOR ARCHITECTURAL DESIGN SERVICES — SCHEMATIC DESIGN AND DESIGN DEVELOPMENT RECOMMENDATIONS: 1) Approve Amendment No. 1 to the Professional Services Agreement (PSA) with Bohlin Cywinski Jackson, of San Francisco, California, for Schematic Design and Design Development Phases of City Hall and Park architectural design services at a not to exceed price of $ 4,689,775 and authorize the Mayor and City Clerk to execute the Amended Agreement, 2) Approve a Budget Amendment authorizing $3,051,696 in additional funding for the Schematic Design and Design Development Phases of City Hall and Park architectural design services from unappropriated Major Facilities Master Plan Fund to the City Hall and Park Design Account No. 7410- C1002009 DISCUSSION: On November 25, 2008, City Council selected Bohlin Cywinski Jackson (BCJ) as the architect for the City Hall and Park Master Plan Project. On January 13, 2009, City Council approved a PSA with BCJ to revise and refine the conceptual plans per the recommendations of City Council and the City Hall Design Committee. That work was successfully concluded on April 14, 2009, with the Council's approval of the design concept for City Hall and the Park. The next step in the effort to build our City Hall and Park is to prepare Schematic Design and Design Development. The Schematic Design process will further refine the approved concept and will explore areas such as grading, drainage, floor plan layout, refinement of space allocations, building systems, landscape palettes, irrigation systems, park amenities, constructability reviews and alternatives, cost analysis, green (LEED) building systems, as well as structural, mechanical and electrical systems. The Schematic Design process will City Hall and Park Master Plan — Approval of Amendment #1 - Professional services Agreement with Bohlin Cywlnski Jackson. April 28, 2009 Page 2 conclude concurrently with the certification of the EIR document which is tentatively scheduled for November 24, 2009. In an effort to expedite the project, we recommend that the subsequent Design Development phase work scope be included in this amendment so that upon Council approval of the Schematic Design phase, BCJ will immediately proceed with the Design Development phase. The Design Development phase will provide more detailed designs, drawings, specifications, material selections, continued constructability reviews, and more detailed cost analysis and estimates based upon the approved Schematic Design plan. A separate mass grading plan bid package will also be produced to enable the City to take advantage of potential disposal sites that would reduce our overall grading costs. The tentative schedule to complete the design development phase and put the mass grading plans out to bid is March 2010. Upon the completion of the Design Development Phase, staff will negotiate a second amendment with BCJ to produce construction documents and bid packages for the various trades under the Construction Management at Risk alternative delivery method. Staff will also negotiate with CW Driver to establish a Guaranteed Maximum Price (GMP) for the project. The completion of the construction documents and bid packages is tentatively scheduled for November 2010. City Staff have met with BCJ and negotiated a work scope and fees for the Schematic Design and Design Development Phases of the project. In general, the work scope includes revising and refining the conceptual plans to enable the final design phase which is the preparation of final construction documents and bid packages. The Schematic Design work scope will include all work including design, meetings and one public workshop to establish: • The final project program. • The site location of all project components and the basic scope of site work to be included in the project. • The basic size, shape and massing, plan and sectional relationships of project components and layout of the spaces of the building. • Selection of the primary exterior and interior materials to be used in the new building. • Selection of the basic structural materials and systems. • Selection of the basic mechanical and electrical systems. The Design Development work scope will include all work including design and meetings to provide drawings, details, draft specifications in advance of the final preparation of construction documents and bid packages and includes the preparation of a separate mass grading bid package. The Schematic Design and Design Development phases will each include two formal review submittals at 50% and 100% completion along with continual periodic review by staff, City Hall Design Committee and the City Council Building Committee. City Hall and Park Master Plan — Approval of Amendment #1 - Professional Services Agreement with Bohlin Cywinski Jackson. April 28, 2009 Page 3 The project schedule anticipates weekly coordination meetings with staff and monthly meetings with the City Hall Design Committee and the City Council Building Committee. We also anticipate at least one public workshop during the Schematic Design process and opportunities for public input at the City Council hearings for Schematic Design and Design Development approvals tentatively scheduled for November 24, 2009 and March 9, 2010. A more detailed work scope and tentative schedule is included in Exhibit 1 within the attached Professional Services Agreement (PSA). The proposed fee for the Schematic Design and Design Development services including listed subconsultants is $4,272,503 plus anticipated reimbursable expenditures of $283,896 for a total 'not to exceed' cost of $4,556,399. The work scope is itemized and billing will be per the approved billing rates as shown in Exhibit 1 of the attached PSA, which are the same as the billing rates in the concept phase. During the conceptual design process, it was determined that additional work in the areas of hydrology and utilities planning is necessary to supplement the ongoing work to prepare the project's EIR documentation. As BCJ's civil engineering subconsultant, Arup, is best suited to perform this work in conjunction with ongoing design services, staff requested a supplemental proposal which is also included in Amendment No. 1 to the BCJ PSA. In general, this work includes all drainage analysis, water quality management planning and utilities planning necessary for the preparation of a technical report for inclusion in the EIR document. The proposed fee for the supplemental EIR work is $133,375 and includes all reimbursables. Environmental Review Architectural and Engineering services are not projects as defined in the California Environmental Quality Act (CEQA) Implementing Guidelines. City Council has retained LSA who will prepare environmental documentation for the project. Funding Availability: Currently, $1,638,078 is available in the CIP account for this project. The total for the Schematic Design, Design Development, and the supplemental environmental work is $4,689,774. Upon approval of the attached budget amendment, $3,051,696, there are sufficient funds available in the following account: Account Description Account Number Amount City Hall and Park Design 7410- C1002009 $ 4,689,774 $ 4,689,774 Submitted by: nen CU.�.aBartti- ic Works Director Attachment: PSA with BCJ, including work scope, schedule and fee exhibits AMENDMENT NO. ONE TO PROFESSIONAL SERVICES AGREEMENT WITH BOHLIN CYWINSKI JACKSON FOR CITY OF NEWPORT BEACH CITY HALL AND PARK PROJECT THIS AMENDMENT NO. ONE TO PROFESSIONAL SERVICES AGREEMENT, is entered into as of this day of , 200, by and between the CITY OF NEWPORT BEACH, a Municipal Corporation ( "CITY "), and BOHLIN CYWINSKI JACKSON, a Pennsylvania Corporation whose address is 49 Geary Street, Suite 300, San Francisco, California, 94108 ( "CONSULTANT "), and is made with reference to the following: RECITALS: A. On January 13, 2009, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for architectural and consultant services for the new City Hall and Park Project, hereinafter referred to as "PROJECT ". B. CITY desires to enter into this AMENDMENT NO. ONE to reflect additional services not included in the AGREEMENT and to extend the tern of the AGREEMENT to March 1. 2010. C. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT for schematic and design development. D. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. ONE ", as provided here below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. In addition to the services to be provided pursuant to the AGREEMENT, CONSULTANT shall diligently perform all the services described in AMENDMENT NO. ONE, including but not limited to, all work set forth in the Scope of Services attached hereto as Exhibit 1 and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 2. City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached to this AMENDMENT NO. ONE for all work performed pursuant to this AMENDMENT NO. ONE. Consultant's compensation for all work performed in accordance with this AMENDMENT NO. ONE, including all reimbursable items and subconsultant fees, shall not exceed Four Million, Five Hundred Fifty -Six Thousand, Four Hundred Dollars and no/100 ($4,556,400.00) without prior written authorization from City. 3. The term of the AGREEMENT shall be extended to March 1, 2010. 4. In the event there are any conflicts or inconsistencies between Exhibit 1 attached to this AMENDMENT NO. ONE and the AGREEMENT entered into on January 13, 2009, the terms of the Agreement shall govern. 5. Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. ONE on the date first above written. APPROVED AS TO FORM: D. By. Mynette - Beauchamp, Assistant City Attorney for the City of Newport Beach ATTEST: C Leilani Brown, City Clerk Attachments: Exhibit 1 — Scope of Services CITY OF NEWPORT BEACH, A Municipal Corporation C Edward D. Selich, Mayor for the City of Newport Beach BOHLIN CYWINSKI JACKSON: M Gregory R. Mottola, Vice President By: W. Dan Haden, III Vice President /Treasurer EXHIBIT 1 Bohlin Cywinski Jackson Peter 0. Bahtto, FAIA Bernard J. Cywinskt, FAIA Jon C.Jackson, AIA W. Dan Haden III, AIA Frank W. Graurnan, AIA William D. Loose, AIA Cornelius J. Reid III, AIA Karl A. Backus, AIA Gregory R. Morale, AIA C. Roxanne Sheroeck, AIA Robert E. Mlllec AIA April 7, 2009 Mr. Stephen G Badum Public Works Director City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 Subject: Newport Beach City Hall and Park (BCJ Project 4: 08519B) Prnposal for Scheratic Design / Design Development Phase Services (Exhibit A, B & C to PSA) Dear Mr. Badum. We are pleased to have the opportunity to continue our collaboration with you and the City of Newport Beach on the new City Hall and Park project. We look forward to building on the work completed with you during the Concept Refinement Phase. Based on our conversations with you we are submitting the following proposal for Architectural and Consultant Services for the Schematic Design and Design Development Phases only at this time. Per our discussions.. a contract amendments) to cover the subsequent Construction Document. Bidding and Construction Administration phases will be issued at a later date once the scope of the project is fully developed. This proposal contains the scope of tasks and deliverables (Exhibit A), a work plan and schedule (Exhibit B) and our Billing Rates and Reimbursable Expenses Budget (Exhibit C) for the SD and DD Design Phases. We are pleased to present this proposal to the City of Newport Beach and we appreciate the opportunity to be of service to you in your efforts to create a new civic center for the City. The pages that follow this letter describe our proposal, work plan and preliminary project schedule based on our discussions over recent weeks. Sincerely, Gregory R. Mottola, AIA Principal cc: Dave Kiff, Asst City Manager, Steve Chaitow, Peter Bohlin, Daniel Lee, file Architecture Planning Interior Design 49 Geary Street, Suite 300 Wilkes- Barre /Pittsburgh /Philadelphia /Seattle /San Francisco San. Francisco, California 94108-5729 415-989-2100/Fax: 415-989-2101 Bohlin Cywinski Jackson Peter 0. Bohlin, FAA Bernard J. Cywinski, FAIA Jon C. Jackson, AIA W. Dan Haden III, AIA Frank Grauman. AIA William D. Loose, AIA Cornelius J. Reid III, AIA Karl Backus, AIA Gregory R. Mottola. AIA C. Roxanne Sherbeck, AI.A Robert E. Miller. AIA 08519E — Newport Beach City Hall and Park - Schematic Design and Design Development Phase Services: EXHIBIT A — Scope of Services A. Project Scope and Budget Our proposal is based on the following project scope, budget, schedule and process assumptions: 1. The Project has recently concluded a Concept Refinement Phase. See BCJ's proposal dated the January, 5, 2009, included with the main Professional Services Agreement (PSA) as Exhibit A, for the scope of this first phase of work. 2. Design Scope: The new City Hall and Park for Newport Beach project will consist of four major components. This project shall take the design concepts developed during the Concept Refinement Phase and presented to City Council on April 14, 2009 and continue to develop them in the subsequent phases. The four major components are as follows: a. A new two-story City Hall Building that will consist of approximately 95,000 + /- square feet of building area. b. A three -story Parking Structure containing approximately 450 parking spaces. c. Site development of approximately 17 acres that will integrate the library immediately to the south of the site, the proposed city hall and garage with a new 12 acre park north of the City Hall and garage. d. A two -story addition to the existing Central Library located immediately to the south of the City Hall site. This addition will consist of approximately 17,000 square feet of building area. 3. Program: The Newport Beach Civic Center City Hall Facilities Needs Assessment Document dated August 9, 2002 prepared by Griffin Advisors, and as updated with revision date 2008 formed the basis of the City Hall program and was refined, adjusted and approved as part of the Concept Refinement Phase. The City provided some initial project information that forms the basis of this proposal. This list of documents was included in the Concept Refinement Phase Proposal Exhibit A, Paragraph A.2, and is included herewith by this reference. 4. Preliminary Project Budget: The Concept Refinement Phase Project Information provided by the City of Newport Beach's Program Manager indicates the project budget to be in the range of $100 + /- million construction costs for the project, Architecture Planning Interior Design 49 Geary Street, Suite 300 Wilkes - Barrel Pittsburgh /Philadelphia /Seattle /San Francisco San Francisco, California 94108 -5729 415-989-2100/Fax: 415-989-2101 Bohlin Cywinski Jackson Stephen G. Badum, P.E. April 7, 2009 Schematic Design / Design Development Phase Exhibits ! Page 3 excluding soft costs. This breaks down to approximately $50M +/- for the City Hall Building, $15.1M +/- for the Parking Structure, $24M+ /- for the Park, $7.2M +/- for the Central Library Addition, and $5.5M +/- for the significant mass excavation / site preparation. 5. This proposal anticipates that at the conclusion of the Concept Refinement Phase, the City of Newport Beach will provide BCJ with direction and approval to proceed with a project scope, budget and schedule that are clearly defined. BCJ will then proceed with the Schematic and Design Development Phase services. If the City of Newport Beach approves revisions to the project scope, budget, schedule or other factors upon which this proposal and the attached Agreement are based. the Basic Seivices compensation shall be adjusted subject to mutual agreernent by the City of Newport Beach and BCJ. B. Project Design Team 1. This proposal includes the following Basic Services team, including Architect and the following core Consultant Team: a. Architect Bohlin Cywinski Jackson (BCJ) b. Structural Engineering Arup North America LTD (Arup) c. Mechanical /Electrical /Fire Protection Engineers Arup North America LTD (Arup) d. Cost Estimating C.P. 0 "Halloran Associates, Inc. (O'Halloran) 2. Other specialty consultants, such as the following, although not normally included in Basic Services scope, are also included as part of this proposal: e. Civil Engineer Arup North America LTD (Arup) E Landscape Architect Peter Walker Partnership (PWP) g. Acoustical Design Charles M. Salter Associates (CSA) h. Audio Visual Systems Engineering Charles M. Salter Associates (CSA) i. Lighting and Daylighting Design Consultant Arup North America LTD (Arup) j. Telecom, Signal and Data Systems Consultant Arup North America LTD (Arup) k. Sustainability Arup North America (Arup) I. Security Systems Consultant TransTech Systems, Inc. (TransTech) m. Waterproofing Consultant Allana Buick & Bers, Inc. (ABB) n. Code Consultant The Fire Consultants (TFC) o. Renderer (optional services) Pixelcraft (PXC) p. Model Maker (optional services) zDp (ZDP) 3. The following consultants will be under direct contract with the city of Newport Beach. BCTs services included as part of this proposal related to these consultants are as follows: a. Program Manager CW Driver (CWD) b. LEED Document Coordinator CW Driver (CWD) c. Environmental Impact Report (EIR) Consultant LSA Associates (LSA) d. Geotechuical Engineer Leighton & Associates (Leighton) e. Surveyor Hall and Foreman (H &F) f. Traffic Consultant RBF Consulting (RBF) BCJ's scope of work shall be completed in unison with concurrent services being provided by the City of Newport Beach's own staff or separate consultants or contractors in accordance with the same phase -by- phase schedule as the Architect. BCJ services made necessary by delays or out -of- sequence actions, changes or requests made by the City of Newport Beach's staff or separate consultants or contractors shall be compensated as Additional Services, subject to the terms of the PSA. All meetings with the City of Newport Beach's separate consultants shall take place as part of the quantity of meetings included by the Architect as part of Basic Services. Additional meetings, if required, shall be compensated as Additional Services, subject to the terms of the PSA. Bohlin Cywinski Jackson Stephen G. Badum, P.E. April 7, 2009 Schematic Design I Design Development Phase Exhibits I Page 4 C. Project Delivery The basis of this proposal assumes that the eventual construction procurement shall be by competitive bidding to subcontractors under the management of a Construction Manager with two bid packages with scopes as outlined below. If an alternate delivery method or changes to the scopes, quantity or schedule for bid packages are requested by the City, the Architect shall be. entitled to additional compensation, the amount of which shall be subject to mutual agreement. Other than as outlined below, preparing construction documents as multiple bid packages for alternate, separate or sequential bids, or providing services in connection with bidding, negotiation or construction prior to the completion of the Construction Documents Phase is not included as part of Basic Services. and would be compensated as Additional Services if requested by the City. The budget for the Cost of the Work shall he for tile. project as a whole, not a series of individual fixed construction budgets for multiple separate parts of the project or for separate bid packages. Bid Pk No. Bid Pack ge S_rgpe ._Bid Package,Schedule 1. Mass Excavation Package At 1000% completion of Design Development Docs Final GMP Package including the At completion, of Construction Documents balance of the Construction Documents. D. Project Schedule 1, The Basic Services scope and lee is based on the schedule that includes milestone phase submittal dates, the City of Newport Beach review and approvral lime frames as detailed In Exhibit B. Changes to this schedule will require an adjustment in BCJ's fee, the amount of which shall be subject to mutual agreement. 2. Bohlin Cywinski Jackson and consultants attendance at meetings (not including internal BCJ and Consultant team meetings) included as part of Basic Services shall not exceed the quantity defined In the Exhibit B Work Plan. BCJ and Consultant attendance at additional rneelings beyond the total indicated, if required, shall be compensated as Additional Services including reimbursable expenses. Written authorization from the City of Newport Beach will be required prior to attendance at additional meetings, subject to the terms of the PSA. E. Schematic Design Scope of Basic Services 1. Based on the approved Concept Refinement Phase design which includes approved site selection, schedule, budget and program, we will develop schematic level design documentation consisting of drawings, outline specifications, systems narratives and other documents illustrating the scale and relationship of project components. 2. We propose two submissions of documents during this phase as follows: a. 5010 SD Set — Includes A &E drawings and select draft outline specifications b. 100% DD Set — Includes A &E drawings and outline specifications 3. BCJ will provide support to the City's EIR consultant by providing select graphics, and other required data to enable the EIP consultant to prepare the necessary reports. BCJ's services do not include the preparation of any alternative designs on other project sites, nor on alternate designs on the current Avocado Avenue site. If such alternate design documents are requested, if required, this work shall be compensated as Additional Services including reimbursable expenses, subject to mutual agreement by the City and BCJ. Written authorization from the City of Newport Beach will be required prior to commencing such additional work, subject to the terms of the PSA. 4. The City's Program Manager will provide cost estimating services after the Schematic Design Phase documents are issued. BCJ's cost estimator will prepare a parallel estimate, and an estimate reconciliation meeting will be conducted after both estimates are completed. 5. BCJ will attend design review and other coordination meetings with the City in accordance with the draft work plan in Exhibit B. Bohlin Cywinski Jackson Stephen G. Badum, P.E. April 7, 21309 Schematic Design / Design Development Phase Exhibits / Page 5 6. Study models, perspective sketches, or digital modeling may be prepared in -house by 13CJ during the Schematic Design Phase to assist in communicating the design concepts to the City's Building Committee. If provided, such models and sketches would he working tools and would not be intended to be suitable for presentation for fundraising or other similar presentation purposes. Finished models, special drawings, renderings, brochures or digital animations for presentation purposes, if requested by the City, are provided as an optional service in Ihis proposal. 7. Schematic Design Phase written approval by the City will include the following basic decisions subject to the City's agreement that sufficient information has been provided by the Architect for these decisions to be made and subject to corpliance with the Cost of the Work as approved by the City a. The final project program. I-,. The site location of all project components and the basic scopo of cite work to be included in the project. c. The basic size, shape and massing, plan and sectional relationships of project components and layout of the spaces of the building. cl. Selection of the primary exterior and interior materials to be used in the new building. e. Selection of the basic structural materials and systems. f. Selection of the basic mechanical and electrical systems_ F. Design Development Scope of Basic Services 8. Upon written receipt of the City's approval of the Schematic Design submission, comprised of the schematic budget and approved schematic design drawings. we still develop Design Development documents consisting of drawings, draft project specifications, and other information sufficient enough for suitable cost estimating to be completed. 9. We propose two submissions of documents during this phase as follows. a. 50% DD Set - Includes A &E drawings and select draft specifications b. 100% DD Set - Includes A &E drawings and draft specifications 10. Concurrent with the preparation of the 100% DO package, we will also be submitting a set of bid documents for permit and bidding for the mass excavation work. This package will allow the City and Program Manager to bid the major site excavation work in advance of the balance of the Construction Documents for the rest of the project components. 11. The City's Program Manager will provide cost estimating services during the Design Development Phase. BCJ's cost estimator will prepare a parallel estimate, and an estivate reconciliation meeting will be conducted after both estimates are completed. 12. BCJ will attend design review and other coordination meetings with the City in accordance with the draft work plan in Exhibit B. G. Basic Services Summary - CD, Bidding, CA Professional Services for the Construction Documents Phase, Bidding Phase, and Construction Administration Phase shall be determined at a later date by contract amendments. H. Environmentally Responsible Design Scope of Basic Services One of the goals of the Architect and its consultants is to design and document this project to be environmentally responsible. The City approves this goal subject to City approval of the measures proposed by the Architect to achieve this goal and subject to compliance with the City's budget for the Cost of the Work. In addition, the City requires the Architect and its consultants to design and document the project with the goal of achieving US Green Building Council ( USGBC) LEED certification. Formal application to and certification by the USGBC for LEED certification is a discrete activity that requires the involvement of the City, the Program Manager, contractors and others outside the Design Team to be successful. In response, the City has agreed that the following consultants will be selected and retained to perform the tasks indicated, under contracts directly with either the City or the Program Manager: Bohlin Cywinski Jackson Stephen G. Badum, P.E. April 7, 2009 Schematic Design I Design Development Phase Exhibits! Page 6 a. LEED is a measurement system designed by the US Green Building Council to define "green buildings ". The process requires that the Architect and the Contractor each provide, for the LEED work that is their responsibility, an individual who Is responsible for tracking, compiling and organizing the information and letter template files that the USGBC uses to validate compliance with their rating system. In the outline below these individuals are called the Architect's LEED Manager and the Contractor's LEED Manager. b. In addition,.lhe City or Program Manager should directly retain a consultant to serve as the LEED Documentation Coordinator for the project, or the Program Manager may art as the LEED Document Coordinator. The LEED Documentation Coordinator is responsible for maintaining and updating the LEED checklist, for overvie'J+ing the progress by the City, the Architect's LEED Manager and the Program Manager's LEED Manatler in assembling the electronic documentation required for submittal to USGBC for LEED certification. for creating the files for submittal to USGBC, and for monitoring and assisling the Architect's and Program Manager's compliance with LEED totaled requirements and procedures. c. A major component of LEED compliance is the proper operation of building systems and assemblies, so the process also involves an individual employed to develop a plan for managing the installation, operation, and maintenance of those systems. For compliance with LEED EA Prerequisite 1, this individual is required to be engaged early in the project so as to be involved in during both design and construction. In the Outline below that individual is called the Commissioning Agent. The City or Program Manager should directly retain a separate consultant as the Commissioning Agent for the project. The Commissioning Agent is responsible for: 1) Developing and managing the detailed Commissioning Plan in accordance with the general performance defined in a performance specification prepared by the Architect's MEP Consultant 2) Ensuring that the systems and assemblies installed are operable and maintainable. 3) Ensuring that the design intent, installation and O &M requirements are thoroughly documented. 4) Coordinating training of operators and facility staff to ensure they are able to operate and maintain the facility per the design intent and facility requirements. LEED related services performed by the Architect and Its Consultants, led by the Architect's LEED Manager, as part of Basic Services shall be as follows: a. Pre - Design and Schematic Design Phases: 1) Organize and lead a LEED meeting /charrette with the City, Design Team, Contractor and other Project stakeholders to review the USGBC LEED checklist at project start -up to determine target goals, opportunities and potential means of achieving points toward certification. 2) Evaluate and track progress toward conformance with goals. 3) Project has previously been registered with the USGBC by the City's Program Manager ! LEED Document Coordinator in the Concept Refinement Phase. 4) Coordinate project requirements with the City, the LEED Documentation Coordinator, the Contractor's LEED Manager and the Commissioning Agent. 5) Coordination of the LEED- related construction costs with the City's budget for the Cost of the Work. b. Design Development Phase: 1) Develop solutions that address LEED issues and points (See notes below). 2) Evaluate and track progress toward conformance with goals. 3) Assist City to make final decisions on LEED point strategies. 4) Coordinate project requirements with the City, the LEED Documentation Coordinator, the Program Manager's LEED Manager and the Commissioning Agent. 5) Coordination of the LEED- related construction costs with the City's budget for the Cost of the Work. Bohlin Cywinski Jackson 3. LEED - Related Notes and Clarifications Stephen G. Badum, P.E. April 7, 2009 Schematic Design / Design Development Phase Exhibits / Page 7 a. The initial review of mechanical and electrical system alternatives includes opinions on the relative rnerits of various alternatives. This information will be of a general nature and will not he based on detailed calculations and analyses. Such detailed calculations and analyses, if requested by the City, shall be, compensated as Additional Services. 1) The Architect's MEP Consultant will investigate mechanical and electrical system options for the project. Order of magnitude life cycle cost analysis calculations to confirm relative comparisons of systems options will be provided as described in Anip's S stainal:illily Proposal, but formal analysis is not included as part of Basic Services. 2) t he Archilecl's MEP Consultant will verify the energy performance" LIED points via calculation based on final systems selections will) corputer modeling of the energy use of the proposed building including comparison runs of building envelope, fenestration, shading, HVAC system type, and other variables. This scope includes a maximum of 6 independent computer runs once the basic geometry of the building has been entered. Final simulation will include a comparison of a budget (ASHRAE 90.1 compliant) building to the proposed building. Final sinxlalion report to be provided at Schematic Design and end of Construction Documents phases (total of 2). 3) Life Cycle .Analysis: Computer generated present value comparison of system alternatives incorporating cost of funds, inflation, first cost. energy cost, maintenance cost and repair /replacement costs. over a fixed term determined by the City. One iteration of the life, cycle analysis is included in INS scope. The Life cycle analysis will be based on the Schematic Dosign energy model. 4) Daylighting and Lighting Control Modeling. Computer modeling of natural fighting schemes including orientation, shading, glass type, reflectance geometry, and artificial lighting controls. Incorporation of these results into the energy model. All other services related to calculations, special analyses, constructebility analyses, life cycle costing, energy analysis studies, environmental impact reports, analysis of owning, operating and maintenance costs, special research, cost estimates or reports related to validating green building design alternatives are not included as part of Basic Services. b. LEED credits review by the USGBC may involve the services of the Architect and its consultants in order to satisfy USGBC requirements for additional information such as calculations or modeling. All services related to responding to any comments or requests by the USGBC for additional information on individual LEED credits beyond what is defined as required in the LEED manual are not included as part of Basic Services. c. All services required if the City elects to appeal any credit denied in the Final LEED Review are not included as part of Basic Services. d. All services indicated above as the responsibility of the LEED Documentation Coordinator, the Contractor's LEED Manager or the Commissioning Agent are not included as part of Basic Services. e. All LEED related meetings are assumed to be part of the typical project meetings. If the City requests separate LEED meetings that result in exceeding the quantity of meetings included as part of Basic Services, such meetings are to be compensated as Additional Services f. All LEED related registration, application, appeal and other fees are not included as part of Basic Services and would be addressed as reimbursable expenses. 5. The Architect's scope of services related to commissioning that shall be provided as part of Basic Services shall be subject to the following limitations: 1. The Architect shall develop and include in the Contract Documents a general performance specification defining a scope of commissioning services to be provided by a Commissioning Agent to be retained by the City or Program Manager. If the Project is required to comply with USGBC LEED certification or similar City requirements related to commissioning the performance specification shall include compliance with such requirements to the level requested by the City (i.e. LEED 2.2 EA Prerequisite 1 with or without Bohlin Cywinski Jackson Stephens Badum,P.E. April 7, 2009 Schematic Design 1 Design Development Phase Exhibits / Page 8 Credit EA3 additional commissioning). The specification defining the Commissioning Agents scope of services shall be subject to the review and approval of the City, The duration of the Commissioning Agent's specified scope of services shall include the entire construction period and a period of one year following Substantial Completion of the Project. For the duration of their services Through Final Completion, the Commissioning Agent shall be. the Program Manager's and City's point of contact for providing consultation and assistance as to any Work not performing as expected or that is discovered to be defective, and particularly in connection with the utitizahon of any equipment or system such as initial startup and testing, adjusting and balancing, and maintenance- t)uring :lie one year following Suhstantial Completion, The Commissioning Agent shall meet with the City and Program Manager at the 3- month, / -month and 11 -month intervals and follow up in writing with the City and Program Manager in providing consultation and assistance as to any Work not performing as expected or that is discovered to be defective- The Commissioning Agent shall coordinate the repair of the issue with the Program Manager to the City s satisfaction. Qualifications and Exclusions 1 . The scope of work outlined in this proposal shall be. incorporated as a Contract Amendment I I Exhibit A into the City of Newport Beach "s Professional Services Agreement, as modified to suit this specific project Per the PSA, BCJ is proposing our fee as a time and expense not -to- exceed fee, to be invoiced monthly based on hours spent completing the above described scope of work completed. Invoices for this work shall be in the Same format as those used in the Concept Refinement Phase. 2. Substantial revisions to the budding program and/or documents after completion of the phase and the City of Newport Beach's approval of the Concept Plan Refinement Phase documents, will be considered as an additional service. 3. If the City of Newport Beach causes the duration of this phase of work to substantially exceed what is specified in this proposal, the work performed in excess of the specified duration would be in addition to this proposal and would be considered as an additional service. BCJ shall provide prompt written notice to the City if BCJ becomes aware of any delay to the schedule. 4. In order to achieve project schedule goals, the Design Development Phase will commence prior to the final Certification of the Environmental Impact Report. The schedule indicates that the project will be at roughly 50% DD when the EIR is certified. The City acknowledges that any revisions to the Design Development documents which are made necessary from the findings and mitigation measures indicated in the EIR would be considered as an additional service. 5. A fixed number of meetings are identified for this phase of the work. This proposal assumes that the attendees at these meetings are limited to the Project Administrator and designated City Staff representatives and /or members of the Building Committee who can act on behalf of the various departments within the City Government, and the City's Program Manager. It does not include extensive meetings with City Staff and others beyond those outlined in Exhibit B. If the number of meetings for the phase is exceeded, these meetings would be in addition to this proposal and considered an additional service. 6. Special presentation -style booklets, models, perspectives or renderings beyond those described above are not included as part of these services beyond BCJ's in -house design materials normally produced to convey design intent. Special Professional Renderings and /or Presentation Models, Animations, etc., beyond those described above can be provided as an additional service. 7. Specialty Consultants, not specifically identified and included in the proposal are excluded. Should the City require the addition of any other specialty consultants, they can be provided as an additional service. 8. Furniture Design is not included in this proposal, however conceptual furniture plan layouts will be developed in the Schematic Design Phase as part of the design of the building to verify functionality of spaces. Bohlin Cywinski Jackson Stephen G. Barium, P.E. April 7, 2009 Schernalic Design ,' Design Development Phase Exhibits 1 Page 9 9. The survey or relocation of existing office equipment or furniture is not included as part of these services. 10. Services relative to future facilities, systems and equipment are not included as pad of Basic Services. 11. Furniture plans that indicate office equipment such as computer CPU's, monitors, keyboards, fax machines and copy machines are for location planning purposes only. Information regarding equipment sizes and utility requirements are to be provided to BCJ by the City. No new office equipment is being selected, specified or purchased as part of this contract. 1l. Architectural survey of the existing buildings: Vde assume that the existing information on adjacent buildings is complete, available and deemed reliable for our use. 13. Land or property boundary survey is provided by the City is deemed reliable and accurate for our use. 14. BCJ has the right to rely on the accuracy and completeness of services and information banished by the City and the City's Consultants. BCJ shall provide prompt written notice to the City it BCJ becomes aware of any error, omission or inconsistency in such services or information. 15. Services related to value engineering includes reviews with the City and Program Manager of relative cost information on scope. design and constructabilily alternatives on a continuous or "rolling" basis, proceeding from general to more detailed issues, as alternatives are evaluated and decisions are made during the Schematic Design and Design Development Phases are not included in this proposal. All cost estimating services required related to the value engineering process will be provided by the Program Manager. All value engineering services after City approval of the Design Development Phase and all other services related to value engineering are not included as pad of Basic Services other than the Architect's and the Architect's consultants services required to comply with the City's budget for the Cost of the Work. 16. Documents shall be prepared according to BCJ office standards for construction documentation, which are in compliance with the industry standard of care, and where applicable, the City of Newport Beach Public Works Department's City Standards 'Design Criteria'. 17. Provision of electronic file formals for use by the estimator, contractors or bidders shall be available upon receipt of a signed original of the Electronic File Transfer Agreement to be provided by BCJ, previously included in the Concept Refinement Phase proposal. 18. BCJ will assist the City with Permit Applications through the City's EIR Consultant. BCJ's assistance does not include payment of fees, tracking and reporting of permit status, preparation of special research studies, alternate designs, variances, special tests or documentation, surveys, or environmental studies and submissions, beyond those described herein, which services, if required by BCJ, will be considered as an additional service. 19. All services related to special studies, including constructabilily analyses, life cycle costing, energy analysis studies, environmental hnpact reports and analysis of owning, operating and maintenance costs are not included as part of Basic Services except as required by standard requirements to obtain approvals/ permits from regulatory agencies and as required by services related to green building design as defined herein. Services related to performance -based criteria studies and analyses to obtain approvals/ permits from regulatory agencies or establish energy equivalence for non - conforming buildings are not included as part of Basic Services and would be addressed as Additional Services if required 2.0. All services related to submitting to Grant, Energy or other similar Programs, other than Southern California Edison's'Savings by Design' program, are not included as part of Basic Service. This proposal assumes that the City's Program Manager will submit required information for any Grant, Energy or other similar Programs. 21. Generally, BCJ will not provide drawings to a Contractor in electronic form. Contract provisions on this subject will be included in City's agreement with the Contractor stating that if the Architect is required to provide drawings to a Contractor in electronic form, the Contractor shall be required to execute a CADD Electronic File Bohlin Cywinski Jackson Stephen G. Badum, P.E. April 7, 2009 Schematic Design I Design Development Phase Exhibits I Page 10 Transfer Agreement, and the Architect will be reimbursed by the Contractor for the time and expenses associated with providing the electronic files at the rate of $100 per sheet. 22. The Architect and some consultants will, at their sole discretion, elect to produce some or all of the construction documents drawings utilizing Building Information Modeling (BIM) software. The BIM software shall be utilized solely as an internal architect - consultant team tool. The model may be provided to the Program Manager solely as a convenience, after a CARD transfer agreement has been signed. The Program Manager mny not distribute the BIM model to other subcontractors. The City and Program Manager acknowledge that any Third party use of the BIM rnodel is done so at the users' own risk. The construction docuni�tnts shall be naditignal twa- dimensioned drawings and shall be the official. binding doculnenis for M pre;eci. I he issues il-dated !o the !ise of Blp;l will he reviewed with 1ho City upon request. 23. The scope of the Consultants' and Engineers' Basic Services shall be as indicated as included in the attached Consultant Proposal:; dalod April 7 2009 and attached to this proposal as Exhibit A Appendix. END OF EXHIBIT A Bohlin Cywinski Jackson EXHIBIT B — Project Schedule I Work Plan: Stephen G. Badum, RE: April 7, 2009 Schematic Design / Design Development Phase Exhibits I Page 11 A. Project Schedule and Concept Refinement Phase Work Plan: Our proposal is based upon the following general overall project schedule as discussed with the City of Newport and CW Driver, the City's Program Manager. This schedule has the following milestone phases. Concept Refinement Phase: 1/15/09 — 4114!09 City Phase Approval: 4114/09 Schematic Design Phase: 4/15!09 — 8/14/09 City Phase Approval: 8,14109- 9/14109 Design Development Phase: 9/15/09 — 2/04/10 City Phase Approval: 2/04110 — 311/10 Bidding Package 1 — Mass Excavation 3/1/10 Construction Documents Phase' 3/01110 8130110 Final City Review Comments: 9101110 -- 9/30110 Bidding Package 2 — Balance of Docs 11/30/10 Construction 11[15/10 — 5/30/12 Based on the our current understanding of the scope of work described herein and assuming timely approvals and authorizations to proceed at each Phase by the City of Newport Beach, this schedule will allow for construction to cornmence in November of 2010. A detailed draft work plan for the Schematic Design Phase and the Design Development Phase is included below and defines the quantity and frequency of project meetings for each phase. Bohlin Cywinski Jackson Stephen G. Badum April 7, 2009 2009 SID/DID Phase Exhibit B / Page 12 Newport Beach City Hall Exhibit B - Schematic Phase Draft Work Plan 06 April 09 edll. Week Week of Date Mlg a Events 1 13- Apr -09 15 Apr D9 1 Schematic Phase Kick -off Follow -cp session with Budding Coumnitee and City Slalf Kick oil of Schematic Phase Ton, ei raised floor precedents - Santa Monica Pnblrc Library and Santa Moraca Puhlie Safely Pactl•; 2 20- Apr -09 '23- Apr -09 §V ?ably prolem emryress conference coli vailh Cf1y representalives (2:00 1, in.) J 27-Apr-09 30-Apr -09 n hroleC (arc gres. �onirence co'l v.ill, City -f r enla; 's (2 00 p in l 4 4 May -09 5r6 May 09 2 Design Session 1 - Technical Review Arc:!t -y Inert Update Doporlrneal Head Follow - ,p questions Mernnicel mfg 1 -III Discussion of Owne:'s Project Requ,rements Sunniraibihly Iueeung 1 . review kFRD'e l -get KB input LIP meeting review prcgress. c000Malion for upcomarg deadlines C.:,.. meeting 1 update e,g hydrology study Landscape Ieelfnq - update $volaa,ay review with seleci Design Committee representatives (12 00 noon - 1:00 pmt at.uvhh3ry review with Bvildfng Co:unv0ee (1.011 pm - 2 00 pm) : -.�. i:�%V r2 f49 nm 2.:::1 p:.h 5 11 -May 09 14- May -09 Weel +1, project progress conference call "Al, sty representatives (2:00 p m ) 13- May-09 Lilt technmal studies Aral! 6 18- May -09 21- May -09 Wrckly pro,acl proyress conference call w4h city rrt ?pre5enlat ves (2 00 p m -) 7 25- May -09 28- May -09 Weekly prgecl prngress conference call with city representatives (2 00 o m -) 8 1- Jun -09 3 +4 Jun 09 3 Design Session 2 - Building and Site Refinement Architeco,al Update Teleeomm Meeting 1 - kick -off Acoustic rneehng 1 - Kiok -off Audiovisual meeting 1- Kick -off Code update - review of preliminary assumptions and any specific issues Security meeting 1 - Kick -off Landscape meeting - update User meetings (e.g. Library) Summary review with select Oesign Committee representatives (12:00 noon - 1'.00 pm) Summary review with Budding Committee (1:00 pm - 2:00 pm) Next steps (2:00 pm- 3:00 pm) 9 8- Jun -09 1I- Jun -09 Weekly project progress conference call with city representatives (2'00 p na 9- Jun -09 EIR final techcical studies 10 15- Jun -09 18- Jun -09 Weekly project progress conference call with city representatives (2:00 pain Issue 50% SD progress set 11 22- Jun -09 24 +25 Jun 09 4 Design Session 3 - User Review Architectural Update /Review of 50% estimate Structural meeting 1 - summary of approach and review w city reps e.g. code Mechanical meeting 2 Bohlin Cywinski Jackson Newport Beach City Hall Exhibit B - Schematic Phase Draft Work Plan Stephen G. Badum , P.E. April 7, 2009 SO /DD Phase Exhibit B / Page 13 00" April 09 edit Week Week of Date Meg # Events Suslainabdity meeting 2 Electrical meeting 1 Security meeting 1 Lighting Neer,% 1 Civil meeting 1 Landscape Update unreeling Summary re,fevr wi.h SraeCt Design (; ,tnnwtP.2'epresentaliv25 (12'.0 noun 1.00 pm) Summary review '.eith Euikung Cnu,nnn ac I I'G'J per 2:00 ornj Next Steps (2(10 Pm - 3 R pop tnnl plea for 1':uul..: r..yi .�•v I> 79.3bam0 +. 2- Jul -09 'ol .ly(c ?cl pn ")'rss r('n &n '. ".:It"it)r:l 'r.,4.rf.;t a ,2:('In o,..1 13 G- Ju: -09 9- Jul -09 W lk /iarelcetV �_'e _ueier C rtJl with. .; n1.91'e-;(2. 3.0 p in 19 13 -Jul 09 15 +16 Jul 09 5 Oosign Session 4 - Public review Architecture update nteebng .Audiovisual meeting 2 Telecomm meeting 2 Landscape Update meeting Public Review meeting in evening Discussion regarding PUTAC ntecl:ng rnpu; _C,tmmary ": s ow rvch H.:1111 1.; t�Un!I:ntng, i 'JU put ok: yul! Next steps (2:00 pm - 3 00 pmt ind, review of dray DI7 meeting sahedufe 15 20- Jul -09 23-Jul-09 Weekly project Progress conlcm"C'e Call will, City representst:ves (2 00 p in ) IG 27 Jul 09 28 +29 Jul 09 6 Design Session 5 - Schematic final - proparation for DO phase Architecture update meeting Lighting meeting 2 Mechanical en ehng 3 Meeting with users re: departments Landscape Update meeting Summary review with select Design Commiltae representatives (12'00 noon - 1:00 pm) Summary review with Building Committee (1:00 per - 2:00 pre) Next steps (2:00 pm - 3:00 pm) Incl. confirmation of DD meeting schedule 17 3- Aug -09 6- Aug -09 Weekly project progress conference call with city representatives (2:00 p.m.) 18 10-Aug -09 13- Aug -09 Issue 100% SO phase documents 1 17 Au9-09 20- Aug -09 Weekly project progress conference call with city rePtesematives (2:00 orn 2 24 Aug -09 27- Aug -09 Weekly project progress conference call with city representatives (2:00 P.m.) 3 31 -Aug-09 3- Sep -09 Weekly project progress conference can with coy representatives (2:00 p. m.) 4 7 -Sep 09 8- Sep -09 100% SO estimate due Note: rroh [wo say :e,,,. Gssumes: • NighPUefore an:vai • 9:00 am - 5:00 pm meetings Ilrat nay 9 :00 an - 3 00 Om meetings >eeond day Bohlin Cywinski Jackson Stephen Badurn,009 April 7, 2009 SO /DD Phase Exhibit Q i Page 14 Newport Beach City Hall Exhibit D - Design Development Phase Draft Work Plan Ol Apol 09 edit Week Week of Date MIg. a Events 1 14-Sep 09 15 Sep 09 Start of Design Developmenl Phase Weekly :lrolecl progress conference call with city representatives (2:00 pan 1 2 2' Seo 09 24- Sep 49 V me / project progress conference call with oily representatives 12.00 p.m 4 3 28 Set: 30 Sep r 1 1 Oesign Session I Oct 09 'J irk; schedule T90 5"CIN -05 FI- Oct -09 5 12 00 -09 15 -0et -09 5 19- Oct -09 22- 0ct -09 1 20 Oct 09 28,20 Oct 09 8 2- Nov 5- Nov -09 9 9 "Nry rlv 12- Nov -09 10 104NOV Og 19- Nov -09 1. 23 N0o-0923«24 Nov 09 3 12 30- Nov -09 3- Dec -09 13 7- Dec "09 10- Dec-D9 14 14- Dec -09 17-Dec-09 15 21 -0sc -09 18 28-Dec 09 17 4Jan -10 E +7 Jan 10 18 11 Jan -10 14- Jan-10 19 10- Jan -10 21- Jan -10 20 25- Jan -10 28- Jan -10 21 1 -Feb 10 4- Feb -10 +r —gIdy !reject Prpyre55 conference call well Ci:Y eiveseoleaives {2.00 pro I %ienkly po"Ic., progress conference call •. 11, oily represenlati \•es l2 CO p ur, VVCeHv prn;eCl orogress conference colt wan oily re,1mse1tpriv,S 42:00. p.nl.l Design Team ro ofo de responses to select EIR comments 2230 Oct Design Session 2 fvleelina schedule TOO vveek ;; proje_I progresS conference Call will, Of, r1,oescolahves f2:011 p "n 1 •?;ez'..Iy prolocl progress i:unfer=oce cpff "th city rpresemaliaes (2 0(I p.m r Weekly prolrcl Irt)S,ess Conlerence ca=l wah cry representatives 12 JO p in .I Issue 50% DO progress set Design Session 3 Submittal of final EIR and City formal approval of SO package Presentalion to city council Weekly projecf progress conference tail with city representatives (2:00 p.m.) Weekly project progress conference call with city representatives (290 P.m.) Weekly project progress conference call with oily representatives (2:00 p.m.) Holiday Week Holiday Week 4 Design Session 4 Meeting schedule TOO Weekly project progress conference call with city reoresenlalives (2.00 p.n1 ) Weekly project progress conference call with city representatives (2:00 p. m.) Weekly project progress conference call with city representatives (2:00 p.m.) Weekly project progress conlerence call with city representatives (2:00 p.m.) Issue 100% DD phase documents Bohlin Cywinski Jackson Newport Beach City Hall Exhibit B - Design Development Phase Draft Work Plan Stephen G. Badurn, P.E. April 7, 2009 SDIDE) Phase Exhbit B I Page 15 01 April 09 edit Week Week of Date Mtg. # Events 1 3 :ut, - 10 11 Fci,.10 project p-nees- c, rfpr,,Owe call %,00 zty (2:01) p.m.) 2 15 Feb 10 16,17 Feb 10 5 Design Session 5 flurtmg schedule TBID 3 22-Feb 10 25-Feb-10 Woelklylpiojert progress cooler oc� coil n th city representatives (2:00 4 1 h, 100% DD estimate doe 9:00.1.. . 1; ;)o r., Bohlin Cywinski Jackson EXHIBIT C - Schedule of Hourly Rates /Fees: A. Schedule of Effective Hourly Rates Stephen G. Badum. P.E. April 7, 2009 Schematic Design I Design Development Phase Exhibits I Page 16 The following Ilsl indicates 2009 hourly rates for the staff of the firms that n'iake up Bohlin Cywinski Jackson's team. T - �^� arrinr fr r „1b .,... -.,r, h,,r� L""'� —lily 1 Discipline — Architecture Bohlin Cywinski Jackson Prineiiial J8` -. Senior Associate, `5160 Associate $125 Staff 1 $105 Staff II S 85 Staff 111 $ 65 Office $ 75 Disciplines - Struchrraf Engineering, M /E /P /FP, Civil, Sustainability, Telecomm, Lighting Arup North America LTD Principal S30D Associate Pwicipel $2.15 Associate $190 Senior Engineer $160 Engineer $130 Graduate Engineer 5110 Senior Drafter $120 Drafter $110 Clerical $ 85 3 Discipline - Landscape Architecture Peter Walker and Partners Landscape Architects P. Walker, Director $410 D. Findlay, Director $305 Partner $190 Associate $125 Landscape Architect $100 Staff $ 65 Archivist /Librarian $150 4 Discipline - Cost Estimating C.P. O'Halloran Associates, Inc. Principal $185 Associate $125 Senior Estimator $115 Assistant Estimator $ 95 Bohlin Cywinski Jackson 5 Discipline — Building Code Consulting The Fire Consultants Principal $190 6 Discipline - Waterproofing Consulting Alana Buick & Bers, Inc. Senior Principal $350 Associate/Principal $225 Consultant HI $160 Consultant Ilk $145 Administrative $ 70 7 Disciplines - Audiovisual and Acoustical Charles M Salter Associates, Inc. President $250 Sr. Vice- President $250 Vice - President $230 Director $230 Principal Consultant $190 Senior Consultant $145 Consultant $125 Technical Assistant $ 90 8 Discipline — Security Systems Consulting TransTech Systems, Inc. Principal $175 Engineer $145 CADD $ 95 Administration $ 75 Stephen G. f32dum, P.E. April 7, 2009 Schematic Design I Design Development Phase Exhibits 1 Page 17 Based on the above- described scope of work, budget and schedule and the Agreement terms and conditions, we request a professional services Hourly - not -to- exceed fee as detailed on the following sheets Bohlin Cywinski Jackson SeIhen G, t3adam , PE APIN!L2009 50.90 Me- Edlihi: C! Pagc t8 B. Hours and Fee for Newport City Hall Project - SD and DD Phase =--B) 61 2 23 � 32 "5 A sot al Sit 9 t 126 Ufl 6] ]5 =;2 n 8 9 a111 ctG A9 i1f0 189 at ^. - tOf s2• Al a aH "t DY t9 G8F 252 483 nn 2iei 85 01 V 32 I,tu .. 011ice a] L .0 GL s2 z .,n _ .�Iz 7 �i ] —� 1 � l3 e _ A¢hireclural FCes ;505652 5660.84$ S07,049 S138.g03 050,235 92710 534,7B7 551.325 $7019 19.646 516`•2.260 St,. tUII t. All, Pr , opal I: LU 'r< 2Uf _ 9 ll� J ].l C lc let tf I- City Hall Old s__ —_ Parkmy Structure Librarvnddition Sle Yedeslrian OridOe lola's sate __ cp OD SD OD SO DD SO DD SO DD t2c t 1)1 FrIs Hr5 IitS Hr5 _. 116 4r5 14i Yr5 ,_ J Cleical tJrJ Ar�hilee:lural 3nblin eMi .. Graduate En ,ee 1 0 y 16 =--B) 61 2 23 � 32 "5 A sot al Sit 9 t 126 Ufl 6] ]5 =;2 n 8 9 a111 ctG A9 i1f0 189 at ^. - tOf s2• Al a aH "t DY t9 G8F 252 483 nn 2iei 85 01 V 32 I,tu .. 011ice a] L .0 GL s2 z .,n _ .�Iz 7 �i ] —� 1 � l3 e _ A¢hireclural FCes ;505652 5660.84$ S07,049 S138.g03 050,235 92710 534,7B7 551.325 $7019 19.646 516`•2.260 St,. tUII t. All, Pr , opal I: LU 'r< 2Uf _ 9 ll� J ].l C lc let tf I- 521 _ SI lU - otfF--2-t� . t U 300 II 2. : I 32 J2 qn 4 !C atlr I f u0 2 ,.n Ual tTl.. t)� nU —" z.. 32 1 0 f ll J' filil 2C _ 44 10 IF! U i St IF 5 58]210 5116.600 S26,6J0 53.5,520 516040 522,040 59,100 511,]90 529.910 539.960 i 49 -_55 1]0' iC Me h—w,l APh— hinn -A.... n oc ate c o 1 n 0cae Sean F tr 521 _ SI lU - otfF--2-t� ..... 12 ICI- t U 300 II 2. : I 32 J2 24 2a 4 2 2 ,_ d t)� G aUU 1 En] C IIP 2� s i90 ne t2c t 1)1 IE I 8 32 i6 _ ,,. .. tJ( - 20 16 , gtGO Cleical tJrJ .. Graduate En ,ee 1 0 y 16 t0 MBP Fees 591,570 5:21.800 Stt960 516,200 $11,960 516.200 50 so 51A50 $2.090 G2i9.120] Eleluicel Aru 1 Assoc ale P' I 32t ..... 12 ICI- It 20r ...e N 4 24 "5 4 2 2 Seno E e t G 2� _ 1 E, 'risers $136 60 ,,. .. tJ( - 20 16 Senior En ineer gtGO _ -720 tUU .. Graduate En ,ee 1 0 y 16 t0 5.60 Ila ` n'or .•e OraOer <t20 -- 6U - -tlU 22 20 2a _ _.. ... 4110 Grauer, $v0 _ _ ". - gl'tn _ ILlerical $851 - 221 321 L.. ? 211 EleclriCal Fees $41,650 $63,800 S],2]0 $9,590 S],2]0 $9890 s'.50 $2.090 $0 30 f7si a8950 sustainable Arup I — �T"lf-- T1r-T -1 Associale Princi al 1 4215 40 32 4 4 2 2 ASS0631e 1 $190 _ _ _ 1 _ Senior En ineer gtGO _ -720 tUU 20 10 y 16 t0 Senior E n im:er 5.60 Ila u0 _ 16 22 10 a 5 Graduate EEn lileer 4110 ___ _ _- Senior Grauer gl'tn _ Oraller _ _ St2U __ -£110 Clerical $85 J2 _ JL ]2 2 _. 2 -- Sustainable Fees 850,020 $39,900 so $0 $7,090 53,9J0 42,990 52,03U so $0 r 5105960 Princi al 831)0 !associate Princi at ' 32l5 _ _ _ 1 Associale _ _ Senior E n im:er 5.60 SU 52 8 16 8 10 a 5 F.npineers $139 ___ _ erile ra Seri rOuer_ St2U _ Drafter 5110 1t. ]2 Clerical $85 v 1¢I¢¢Om lees ]I1,YOV J1] EYU ]11hbV $2,5F. DI,LtlV al UVV >Oeu s.uV so 50 [ 36,140 Bohlin Cywinski Jackson H. Hours and fee for Newport City Hall Project - SD and DD Phase SlepnenG Hadum. RE. Apni 7 2009 SDIED Phase Exhlo0 c r page 19 Totals . -. ._. —._ - .___ -... . _ - .— ._.......-. ._ --- GghlingFees 512,060 $19,400 53,810 55,025 55.025 SS.0'25 52,560 53040 52.560 53.560 860 ]d5 40 $0 5119110 52.4 %0 i0 SO 50 so „ _539580 Civil -A _ $300 I �- T l - R — --- s o: t _ bt99 t 1l 119 _._ F1 r bl 0 dL _ U ,e FJalIRIdGSD 0 SVUCIlU PH 0 Site N oeslrian, RriDtlOc L 511e Lighting Arno rG oCJcto,al r ia a1l l e E V _[ Sal, U Ile 20; OE'." S1C C nee S 3o I- H911Y SO 50 Sin 5130.180 ib5ra2'Ad!fiOD —__ .......... — 0 H`s His- _ I r SS4 )20I C120_550 L 8]3,920 i_ $46,610 0 1 38 32 —_ _ tl ... 14 . —. --- ....5 _6 . 0 ,.lfi . -- 16 Totals . -. ._. —._ - .___ -... . _ - .— ._.......-. ._ --- GghlingFees 512,060 $19,400 53,810 55,025 55.025 SS.0'25 52,560 53040 52.560 53.560 860 ]d5 40 $0 5119110 52.4 %0 i0 SO 50 so „ _539580 Civil -A _ $300 I �- T l - R — --- s o: t _ bt99 t 1l 119 _._ F1 r bl 0 dL _ U ,e P walks 0 euo 1 8410 ._ ... .. .......... .. 0 0 0 0 r L 0 Gml Ppes 40 50 50 $0 SO 50 530.100 SWO,O9O SU 40 5130.180 $130 — 0 530) 840 551.330.L_560.)� L 553,605 FSfi, 1, d9G�L r SS4 )20I C120_550 L 8]3,920 i_ $46,610 41 tY5�U 15 II A:up Totals__. 53]8 T5o_i 0 U _._ P walks 0 euo 1 8410 ._ ... .. .......... .. 0 0 0 0 r L 0 _ 0 IdQ 120 _ -„ .. 230 10 -- ...---- 5 _ 30 t5 D. F. Panne $130 — 0 9 0 0 rss ease St25 0 0 U 0 0 0 1120 1190 1145 162 t0 10 tlscapa 8110 23 38 F8 Staff 15 La odscape Architecture Fees $0 $0 $0 $0 50 $0 $569,550 $648,1)5 $8,850 $6,000 $1232,575 Landscape Architecture Consultant's Fees $10,000 $16,500 $26,500 $1 259 Oi5 Code Consuiti., -The Flre Consullanls _ T Code Cade Consulting Fees $4,100 89,500 $800 $800 $1]00 81,500 SO $0 o 50 80 $16000 Principal__ nseciate _. $190. $125 ...__ 14 22 24 3'0 5 6 4 6 N _ Senior Esfimamr $115 29 4> t0 16 8 Ar 0 23 38 F8 15 Cos, Estimating Fees $11,000 518000 $4,000 $6,000 53.000 55.000 54,000 $7,000 $0 50 _ 000 558 P cma $V5 8.p 125 LS 4.3 0 45 -i 14.0 12.0 115 �cnoo s�s� -- o.ol zs of o.0 16s oU - oa ss $2z ?�. 4.0 1.0+ 2.0 10 zo 9s o.e Security Fees $4,160 $10,663 $1280 $4,491 $2.690 $4568 $560 51,561 $0 $0 529,9]3 Bohlin Cywinski Jackson Stephen G. 8adum , P E. Apdi). 2009 SOIDO I'll EAel: C r Page 20 �I t B. Hours and Fee for Newport City Hall Project -SD and DD Phase d s Pa'kinq S.n ,lure L b ry AtlU ion Site -_ Petles' ian 8ldge. To1315 RaveD OD SD DD SD DU SD UD SO DD }hr HCIY11Hrs 1.5 Hrs li' Hr; Mrs Ilrs Itrs Ilrs 1 Acoi.ISOCS C A �P sl I If V1, � bl 1 P D cl P I(, t 1 J14J — -S I fnn.. Ilra t V'. ll ten cal t' tl ij Anp I J ACoulicS Fees 54200 SI t,950 Au[Iia Vi. 11 _G_SA V _s -- OL 9 1=771- I :- GI p 0 _. 1 .. 0. 0 L- - - 0 0 +0 J It — 28 0 q �- __I SU SO 51300 $3,1110 . 510,000 50 50 SO L__ 5191A11l it So 5o 52,505 51000 50 so $0 so 5154.3518 5218.x69 5116,610 5156,101 5481.81) 5841,712 Sx9J39 560.254 ( _5 ?._]1 gfl Audio Nsudl rtes Tola15 Sis'sto 5101000 5855.362 SI,35,588 2. ings Fr Pi.elrral: GCJ Co dinalion act Inc :J Imes � 5[.325 Renderings Total _tl0.69 r t3, X]25 520 O 8160 0 $0 E125 25 U $105 fi 5940 85 5 $125 5 0 $0 $75 2 5150 :J Imes � 5[.325 Renderings Total _tl0.69 r t3, X]25 520 Bohlin Cywinski Jackson Stephen G. Barium, P.E. April 7, 2009 Schematic Design l Design Development Phase E.chibils / Page 21 EXHIBIT C Pro ect Name: Project No. Date: NEWPORT BEACH CITY HALL AND PARK - SO /DD Phases 108519B 4/7/09 INITIAL REIMBURSABLE EXPENSES ESTIMATE (SEE NOTE 1) ATTACHMENT (to proposal) Item No. Description Amount I No. of Days / Total Remarks Person Miles BCJ Travel Expenses per 2 -Day Trip Transportation toilrom airport iii SF $45.00 2 590.00 1 Parking at airport S2; *,00 3 $66.00 2 Cab fare i car rental 575.00 2 S15000 3 Food $75.00 215000 4 Hotel per nn;hl 224') 00 _ $480.00 5 Plane Fan: isce No;_ 1) iiz5(li', 00 I 5500.00 Total per person per two day trip 51,436.00 BCJ Travel Expenses per 1 -Day Trip _ Traosponalon to /horn airport in SP $45.00 2 '00.00 1 Parking at airport $22.00 2 $44.00 2 Cab fare I car rental 475.00 1 $75.00 3 Food $7500 1 $75.00 4 Hotel per night 5240.00 1 $240.00 5 Plane Fare (see Note 1) $50000 $50O_00 Total per person per one day trip 51,024.00 BCJ TRAVEL REIMBURSABLE EXPENSES PER PHASE P SDIDD PHASE People X No. of Trips SO 4 2-day trips :4 people /trip $1.4 36 i10 1G $22,976.00 SO 1 1 -clay trips, 3 peopleltrip $1,024.00 3 $3,072.00 DO 3 2 -day trips; 4 people /trip $1,436.00 12 $17,232.00 00 2 2 -day trips; 3 people/trip $1.436.00 6 $8,616,00 Additional Trips (If Required) People X No. of Trips All Expenses are Additional Services NIC NIC NIC BCJ ESTIMATED TOTAL FOR TRAVELILODGINGIMEALS $51,896.00 (SEE NOTE 2) BCJ TOTAL INITIAL REIMBURSABLE EXPENSES $75,000.00 ESTIMATE FOR REPRODUCTION, PRINTING, TELEPHONEIPAX, MAIL (REGULAR AND EXPRESS), PHOTOSIPRINTS PER BCJ PROPOSAL PWP Landscape Architects TOTAL INITIAL $104,500.00 REIMBURSABLE EXPENSES ESTIMATE Arup MEP /Structural /CivillLighting TOTAL INITIAL 540,000.00 REIMBURSABLE EXPENSES ESTIMATE C.P. O'Halloran Assoc. TOTAL INITIAL REIMBURSABLE $1,000.00 EXPENSES ESTIMATE The Fire Consultants TOTAL INITIAL REIMBURSABLE $1,000.00 EXPENSES ESTIMATE Charles Salter & Associates • Acoustical Consulting $3,500.00 Bohlin Cywinski Jackson Stephen G. prig 7. 009 April 7, 2009 Schematic Design / Design Development Phase Exhibils I Page 22 EXHIBIT C Project Name: Project No. Date: NEWPORT BEACH CITY HALL AND PARK - SD /DD Phases 085198 4/71119 INITIAL REIMBURSABLE EXPENSES ESTIMATE (SEE NOTE 1) ATTACHMENT (to proposal) Item No. Description Amount l No, of Days I Total Remarks Person Miles Charles Salter & Associates -Audio Visual Systems $3,500,00 Adana Buick Berrs - Waterproofing COOSUIta Ot $2.500.00 Transtech Systems - Security ConsSdtant s1,000.00 7 6W6FLSSIUNAL I AM fat I IAC-- REIMBURSABLE EXPENSES ESTIMATE (see Note 3) TnTnrn Nalz 1 Reunhursable expenses ,ndudc She follpwmg' - BCJ and Consultants Iransponation, lodging and expenses for all travel between their olfices and the joh sile. - BCJ and coneullan!S expenses for all reproduction and printing. - All expenses for tefephonclfax, video conf_rencing, postage, handling, delivery (regular and express) betvmen BCJ. BCJ s Consultants, the Owner, on Confiac!ors and others fnvolved in file project. - BCJ and Con9ulta o s expenses for photos /prints. Nate 2: flans fare cosl5 are estfmreled basil on mid"mum two week advanced notice to 8CJ of all meeting dates and on lick 1 I 51 t i non -rnb.i IaL n n*1.hr r. as Bhas no ccmlrol of a am faro m ,l i cw':w_i the lion' of Ihrs Sgreentelt EC) will regwie min5bursenlNnl far any adchhonaf costs that may Occur due to lu Woe late InCreaSeS in excess Of the estimatod Cost indicated herein NpICa 3: II Ilus mha! projected amount for BCJ andlor Consultants reimbursable expenses IS exceeded ii . due to remsons to Inc quantity of or schedule for 3CJ and /or Consultants meetings /presentations, changes to costs upon. which the fnilial projections were. based, Scope of sorvices changes. etc.) this Inrlial not-to- exceed dollar amount will be increased based on an updated prcjecklOo of reunbursable oxpenses. All reimbursable expenses will be billed at a multiple Of 1.10 onles the expenses Incurred. Upon Receipt of the City Of Newport Beach's written approval and authorization to proceed, BCJ will commence this work. END OF EXHIBIT C Bohlin Cywinski Jackson Peter 0. Bohlin, FAIA Bernard J. Cywinski, FAIA Jon C. Jackson, FAIA W. Dan Haden III, AIA Frank W. Grauman, AIA Wilharn D. Loose, AIA Cornelius A Reid, III AIA Karl A. Backus, AIA Gregory R. Mollola, AIA C Roxanne Sherbeck, AIA Robert E. Miller, AIA 19 March 2009 Mr. Steve Badum, Public Works Director City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 Project: Newport Beach City Hall Newport Beach Project Number xxx BCJ Project 08519A Subject: Hydrology and Utilities Planning Additional Services Proposal (BCJ Project 08519A x1) Dear Mr. Badum: Per previous discussions, we are submitting this proposal for the provision of a)Hydrology and Water Quality Planning and Reporting and b)Utilities Planning. Per the email message I forwarded from Arup on the tenth of March;-a portion of this fee is directly related to EIR- related tasks that are separate from basic services; the remainder is schematic design phase work that is being moved forward in order to meet the proposed EIR schedule. Project Scope The scope of services included in this proposal is indicated in the attached proposal dated 19 March 2009 from Arup, with related services provided by BCJ. BCXs services will include management of and coordination with Arup in the process, as well as the attendance of the meetings listed in the Arup proposal. Schedule No changes to the established schedule are proposed based on the execution of this additional service. Architecture Planning Interior Design 49 Geary Street — Suite 300 Wilkes - Barre / Pittsburgh /Philadelphia /Seattle /Berkeley San Francisco, California 94108 415.989.2100/F ax: 415.9 89.2101 Bohlin Cywinski Jackson 08519A x1 10 March 09 Page 2 of 3 Project Fee This proposal is for a lime - and - material fee, with a not -to- exceed amount of $133,375 based on the assumptions below: Services BCJ 10 hours Principal $285.00 per hour $2,850 20 hours Senior Associate $160.00 per hour $3.200 20 hours Associate $125.00 per hour 52,500 15 hours Staff 1 $105.00 per hour $1.575 10 hours Office $75.00 per hour $750 Arup 19 Mar 09 proposal Hydrology $90,000 Utilities Planning $30,000 Reimbursables BCJ To be billed under base project NA Arup Costs of travel, printing, etc. $2,500 Total $133,375 BCJ reimbursable expenses will be billed to the main project (BCJ 08519A). Arup reimbursable expenses will be billed separately from services as part of this additional service. The BCJ team appreciates the continued opportunity to work with the Newport Beach community towards the realization of this exciting project. Please contact us if you have any questions or need additional information. Sincerely yours, Greg Moltola, AIA Principal Cc: BCJ Team OWNER: City of Newport Beach Signed: Printed Name: Title: Date: f� V Steven Chaitow, AIA Project Manager ARCHITECT: Bohlin Cywinski Jackson Signed: Printed Name: Gregory R. Mottola, AIA Title: Vice President Date: ARU P To Bohlin Cywinski Jackson (130) cc John Eddy, Principal, At John Worley, Principal Arup From Roman Roderick -Jones x 27222 (Sun I rfwii col Subject Newport Reach Cih, Wall Add Service i. l Hvdioloev and Utilities Phinine Memorandum Page 1 of 6 Reference number 208597 /RR.I File reference J :\2118597 +3 Project Adininistiawmi\3 -03 Project Financial Files \3- 03 -01 Contracts, Costs, Fees \f'ivil Scope 0i 4 \'ork _.-.....-- Dab Minch 19. 2009 I he following document provides the proposed scope 01 work Fee and schedule for preparation 01'01C 10110 +61u technical studies including a Site Drainage Report, a AWater Quality Management Plan. and a Utilities Memorandum. These documents ale intended to provide pertinent information for inclusion in the project EIR document. This scope excludes detailed engineering design which we would be happy to provide at a later date as req u 1 re cl . s�� - of Worm Task i : Hydrology and Water Quality Planning and Reporting Task 1.1 : Site Drainage Report Preparation of the site drainage report will incorporate the fuhawing subtasks: • Dcfine treanment and hydromodificalion criteria from NPDES and the Orange County Drainage Area Management Plan (DAMP) • Field reconnaissance to observe downsteam conditions and collect stream moss sections to populate the pre and post construction hydraulic model. • Establishment of site design, source control and treatment control measures to be incorporated and maintained to meet water quality and hydrologic design criteria and to address downstream conditions of concern. Prepare concept plan depicting location and sizing of BMPs for the post construction condition. • Hydrodynamic modeling of rainfall and runoff characteristics for pre and post development conditions including peak now rate, flow velocity, rumtll volume, time of concentration and retention volume. Amp proposes to use InlbWoiks as the primary routing model but may utilize other models as required by the Orange County Hydrology Manual. The model shall be built and run based on the fixed site plan evaluated in the EIR. • Estimate pre and post construction water quality using a regression model based on predicted runoff concentrations and treatment performance of BMP's. • Prepare typical sections and plans of each proposed BMP type including rainwater harvesting facilities. • Work with project biology consultant to understand permitting requirements with Army Corps of Engineers and US Fish and Game based on rite projects impacts to environmentally sensitive areas or zones ofjurisdiction. ,. @085973 PROJECT AOMINISTRATIOW -03 PROJECT FINANCIAL PILE 5 \303 -01 CONTRACTS. COSTS. FEESICIVIL auv norm Amedwva Fa.� SCOPE OF WORVNKH AOLOGY ANO UTILITIES SCOPE. WC R-9.0, 1 Nma W M 208597/RRJ March 19, 2009 Memorandum Page 2 of 6 • Work with the landscape architects and architects to integrate the concept drainage deli, -n elements into the grading plan, landscape and irritation plan, and architectural drawings. • If raimvater harvesting is utilized at the site, the .slgrmwater drainage report shall account for the effects oI raimeaterhiovesting in its findings on site drainage. Task 1.2: Draft and Final Water Quality Management Plan (WQMP) A bV0AlP is required for projects within the City of Newport Beach. Amp shall utilize the Inodeli ic, and design results oldie Sitc Drainage Repoli lo conipleto the WQN'IP, which includes applicable site desi m. ;ounce control. and ;rcsir,idnl li \IP'>. I1),: WOMP-'ct Ford) a broad range ofexittili_contlllions. permit requlrcuicnts. re_ul illxc controls. i diolo,% and orteI inlimnalion relevant to the control oFtnban runol l,. Task 2: Utilities Planning Task 2.1: Water efficiency and alternative supply strategies Prepare, in collaborulien with Cite staff and the design team, water efficiency and alternative supple balchnwrkc for incurpiami'm into the building and landscape design at FIR level, These shall be above and beyond those tarocts required by Building codes and shall sa the tiametvoik fix preparing the utilities peak and avemec daty demand projections. 'I strategics shall include interior and exterior design efficiencies. A variety of reuse or alternative suplrh snarl: es such as reclaimed "Icywater, or rainwater. shall be i, Vie%red for their abilid� o� mecl non- Iwu:hlc ��alcr demands. co >i cffcclircue<s. nulintenanre orals_ :ald rryuirentcln <.:A non- potable Jvadcr sul'>ply snategy shall be selected based on this hioad -level evaluation. Task 2.2: Energy efficiency and alternative supply strategies Prepare, in collaboration %Lich City staff and design leant, energy (gas and electric) efficiency imil alternative supply bendunarhs for incorporation in the building and parking gnrage design ai EIR level. These shall he above and heynnd latoOts required h% buildim! codes and shall set the trantework Ior preparing the utilities peak and average daily demand projections. Interior and exterior building efficiencies and alternative benchmarks will be reviewed to evaluate site energy needs, cost effectiveness, and maintenance. Preferred strategies will be selected based oil this broad -level evaluation. Energy modeling will occur during scheme and detail design phases under separate scope. Task 2.3 Utility Demand Projections Prepare project water, sewage, energy (gas and electric), and telecom demand estimates. Water demands to be estimated based on approximate fixture model in order to calculate sewage flows, reclaimed and potable water demands. Gas. electric, and telecom peak and average daily use demands will be developed front demand inputs required by the building piograin as broad estimates. Energy modeling will occur during scheme and detail design phases under separate scope. Deanands shall be projected for two scenarios, a to -code scenario and a sustainable -case scenario to which all of the efficiency and alternative supply strategies are applied. Arup shall also provide estimate of irrigation demands based on the landscape architect's inaiA designs. This task will enable a final determination of which strategies to incorporate into the design in order to achieve water, sewer, energy, and telecom demand targets. Task 2.4 Draft and Final Utilities Memorandum Prepare a Draft Utilities MCI110randllln for comment by the City. The mentoiandunt shall include wrilieri descriptions of water, sewer, energy, and telecom demand targets, recommended efficiency and alternative supply strategies, and estimated demand reductions. Based on comments from the City following initial submission of the technical document Arup shall prepare a Final Utilities Memorandum. J'.A 29959119 PROJECT ADMINISTRATIONI PROJECT FINANCIAL FILESi -03-01 CONTRACTS, COST`:. FEESCFAL AmpmoonA— kauaF. SCOPE OF WORIAHYDROLOGY AND UTILITIES SCOPE. DOC Reg e 0 I rvrvi.men 200'. 20859WRRJ March 19, 2009 Task 3: Meetings , Site Visits, Working Sessions Memorandum Page 3 of 6 One site visit, two meetings with the relevant (Ty departments and unhy providery and three working sessions with the duln team are included in this scope of work. Uuny the I day site visit, Aru) shall collect data in support of Be site fhamage Report and WQMP. This shall include stream sections and rapid surveys of stream channel, erosion, and vegetation conditions at points downstream from the project area. Amp shall meet with relevant City departments Cady in the design procoss to discuss modeling and reporting, standards and procedures, hydrologic design CI'Itel'I::, and data colkawn. Arup will use These meetings to hetter h.mderstaml Be opportunities and constraints of the site The sawind meeting shall lollowing submittal of the owlamical documents and would include a review or the hudhmgi with the City and a discussion or design implications and impacts related to the EIR. This scope also includes attendance of 2 Amp sod at up to three working meetings in On Francisco with the landscape architect and/or architects to brainstorm strategies and discuss opportunities and constraints relating to drainage and utilities planning. Task I : IIcdrology and WAter Quahly Planning and Ifcporting 3910010 Task 2 : Utilities Planning 331000 Expenses: Tnuvcl E.xpense.t: 2 trips from SFO to LAX_ inducing airfare, ground transportation, lodging, per diem, parking etc, for two staff. Printing onef Office Expenses: 3 bound, color hard copies of all key deliverables. I otal Estimated Expenses: 5 2,500 Total Fee: 5122,500 The schedule to complete work outlined in this scope is based on the need to submit materials in support of the EIR. The draft technical reports including the Drainage Report, WQMP, and the utilities strategies and projections shall be submitted by May 15 and the final reports shall be issued by June 12 pending timely receipt of comments from the City by May 24 and with the assumption that major changes to the reports are not required. The schedule is based on an assumed start date of March 11. Task L Hydrology and 'Nat" Quality Planning and Reporting Draft Drainage Report May 15 Draft WQMP May 15 Final Drainage Report June 12 Final WQMP June 12 Task 2: Utilities Planning and Memorandum Draft Utilities Memorandum May 15 Final Utilities Memorandum June 12 -:Q 095970 PROJECT 4DIAINISTRATIONa3- 03 PROJECT FINANCIAL F9.ESU -D3 -01 CONTRACTS, COSTS. FEESCIVIL Amp M" "VW FO.] SCOPE OF WORK\MYDROLOGY AND UTILITIES SCOPE. DOC ago 8 a, I N. —M, tam 20859WRRJ March 19. 2009 Memorandum Page 4 of 6 Total Duration: Id weeks phis proposal is n;sluucd to be an additional meI'vice ILI which the ienns and conditions of the existing contract balwecn BC-1 and Arup shtdl apply. The terms and conditions in the e.eistini", contract aereemeut shall constiunr the entire a,reenieut unless they a2 expressly I ciccled prior to the authorization of Arup's services and another contract is a_reed by all parties Concerned, We propose that we perform the above work on a Time and Materials basis, with a total fec not to exceed $122,500. The estimated fee for each scope item is provided above, which reflects the anticipated level of effort equired assuming the hourly rates noted below. Should it become apparent that the scope of work is significantly changed from what is described above, we will notify BC1 immediately, and submit a request for authorization of additional fees prior to proceeding. Our current time and materials rates per hour are as follows: TITLE RATE Principal 1 $325.00 Principal 2 $300.00 A.ssodate Principal $215.00 Associate $190.00 Sr. Consultant I Engineer $160A0 Consultant 1 Engineer $130.00 Graduate Consultant I Engineer $110,00 Sr. Drafter $120.00 Drafter! Graphic designer $110.00 Clerical $85.00 3120959]%3 PROJECT AOMINISTRATIOW3- 03 PROJECT FINANCIAL FILESO -03-01 CONTRACTS, COSTS. FEESICI\9L . ,N.mh A—d, UJFa SCOPE OF WORKWYDROLOGY AND UTILITIES SCOPE.DOC Fe' 8A f 11—[,n tom 208597/RRJ March 19, 2009 Memorandum We will apply a I_I multiplier to reimbursable expenses, which covers. • I ravel expenses, including airfare, I,round transportation, lodging, per diem, parkineetc. We anticipate that expenses will not exceed 52,500. Page 5 of 6 We plvpose that Lve submit monthly invoices, with payment requested within 30 clays ti ona the date of the invoice. We will summarize howdy rates, time and tie spew t2x each of the scope items noted 'above on each invoice_ Assump#iorss/ C1arificatioras I_ Please note that the above scope consists ol - lcchnical studies under taken to a level of detail appropriate to support the preparation o the GILL This proposal assuanes Ilse iOJIOwing SCI VICCS are not included: a. Cost estimating b- Detailed gcotechnical :md envn'onnlental inveAloa(wns C' Topographic and utiliny survn Ing d. Mapping services 2. The proposal assumes that a fixed site plan will be available by March 24'' fix use in the hydroloe.y report and WQN1P. If, fbllocving aareCulcot on the lined site- architectural plans are adjusted siQuilicaulk' such that the results of the model arc no Iwlster �ulid, oI the site drainage report and the WQNIP rec'luire significant revision. additiomll wort: required shall he billet) on a time and materials basis. 3. Arup Shall update the Dnft Dninage Report, WQMP, and Utilities Memorandum, based on comments fIO1TI the City Ibllowine initial submission of the technical documents. This scope assumes that a single luund of comments shall be addressed and that any additional New comments following submission of the final draft of the technical documents shall be addressed on a time and materials basis. 4. The estimated fee is based on an assumed pl'oject duration of 14 weeks. Should Arup incur additional costs due to the schedule being extended for reasons heyond Arup's control, we will seek fair and appropriate compensation. J.Q08597U PROJECT ADMINISTRATION\ 3 -03 PROJECT FINANCIAL FILES\ }03 -01 CONTRACTS, COSTS. FEES \CIVIL A,O '.,em uc GO.] SCOPE OF WORMHYDROLOGY ANO UTILITIES SCOPE,DOC R- a a. I rv—"" 10.1 208597/RRJ March 19, 2009 Y'our� sincerely kow:ln Rodcricl(- .Iuncs .scowl R, 5,wurct )j&Illlsl cc John I'Lld : \rup Jl'hn 1VOrlcc. Arup A(�RD*[) AND ACKNO\Vl EDCIP:D: The brloev siL!ned <uknnwletieus and aarecs to the. above tenn> and is an DITICer Of fSCI Will) the auihbrltV fo enter 13C.1 into lllli> �IlCi a reznlent kith - \rup Noi lh Anle.rica Ltd. Si�enauve. Name: Date: Memorandum Page 6 of 6 J'120859]19 PROJECT ADMINISTRATIOW -03 PROJECT FINANCIAL FILESI3 -03.01 CONTRACTS, COSTS, FEE SICIVII A1.1 rvonn a--Lb 10 SCOPE OF WORN HYDROLOGY AND UTILITIES SLOP[ OOC A- B 11, ; N—.1 am, City of Newport Beach NO. BA- 09BA -050 BUDGET AMENDMENT 2008 -09 AMOUNT: $3,osl,sss.00 EFFECT ON BUDGETARY FUND BALANCE: Increase Revenue Estimates Increase in Budgetary Fund Balance X Increase Expenditure Appropriations AND �X Decrease in Budgetary Fund Balance Transfer Budget Appropriations No effect on Budgetary Fund Balance SOURCE: from existing budget appropriations from additional estimated revenues PX from unappropriated fund balance EXPLANATION: This budget amendment is requested to provide for the following: To increase expenditure appropriations from City Hall & Park Fund unappropriated fund balance for amendment no. 1 to the professional services agreement (psa) with Bohlin Cywinski Jackson for the Schematic Design and Design Development Phases of City Hall and Park architectural design services. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account 410 3605 REVENUE ESTIMATES (3601) Fund /Division Account EXPENDITURE APPROPRIATIONS (3603) Description City Hall & Park Fund - Fund Balance Description Description Division Number 7410 City Hall Construction Account Number C1002009 City Hall: New Division Number Account Number Division Number Account Number Amount Debit Credit $3,051,696.00 $3,051,696.00 ' Automatic System Entry. ySigned: Signed: Signed Financial Approval: Administrator Services Director City Manager Date D e � City Council Approval: City Clerk Date