HomeMy WebLinkAbout05 - Police Department Generator ReplacementCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 5 June 23, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Tom Sandefur, Associate Civil Engineer 949 -644 -3312 or tsandefur @city.newport- beach.ca.us SUBJECT: POLICE DEPARTMENT GENERATOR REPLACEMENT — AWARD OF CONTRACT NO. 4056 Recommendations: 1. Approve the project plans and specifications. 2. Award Contract No. 4056 to Gammill Electric, Inc., for the Total Bid Price of $245,958.00 and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $36,800 (15% of Total Bid) to cover the cost of unforeseen work. Discussion: At 10:00 a.m. on June 10, 2009 the City Clerk opened and read the following bids for this project: BIDDER Low Gammill Electric, Inc. 2 American Electric, Co. 3 Mel Smith Electric, Inc. 4 Best Electric 5 Fore Engineering Construction, Inc. 6 Brewster Electric, Inc. 7 Minako America Corp. AS -READ BID CORRECTED BID $245,958.00 - -- $252,400.00 $252,406.22 $253,317.25 - - - -- $281,809.00 - - - -- $239,490.00 $284,604.17 $294,231.76 $294,232.37 $377,000.00 $377,014.05 During the bid reading at the City Clerk's office, the apparent low bidder was Fore Engineering Construction, Inc. However, after double checking the unit prices Fore submitted, it became apparent that Fore (as well as several other bidders) had made several multiplication mistakes. The Corrected Bid Amounts for all bidders were calculated with the submitted Unit Prices, per the Instructions to Bidders: 6. Bids are to be computed upon the estimated quantities indicated in the PROPOSAL multiplied by unit price submitted by the bidder. In the event of discrepancy between wording and figures, bid wording shall prevail over bid figures. Police Department Generator Replacement —Award of Contract No. 4056 June 23, 2009 Page: 2 In the event of error in the multiplication of estimated quantity by unit price, the correct multiplication will be computed and the bids will be compared with correctly multiplied totals. The City shall not be held responsible for bidder errors and omissions in the PROPOSAL. As a result, the actual low bidder is Gammill Electric, Inc. Fore has submitted a letter protesting the bid results. However, staff is confident that, based on the Instructions to Bidders, Gammill Electric is the low bidder. The low total bid amount is 55 percent below the Engineer's Estimate of $446,635. The difference between the engineer's estimate and the low bid amount may be related to the current down turn in the economy and the number of contractors looking for work. The low bidder, Gammill Electric, possesses a California State Contractors License Classification "C -10" as required by the project specifications. The existing emergency backup generator at the Police Facility is 75 kW and only backs - up a limited number of key Police Department operations. A large number of items are not currently tied to the existing generator, including some lighting, air conditioning and computer terminals. The proposed 300 kW generator is sized to allow the Department to be fully operational during a power outage. There is sufficient excess capacity in the proposed generator to allow some additional connections to be made, should the Department require them. The work necessary for the completion of this contract consists of procuring and installing a new diesel powered emergency backup generator including removing existing generator, clearing, grubbing and pouring for a concrete foundation slab, running electrical conduit, procuring and installing new automatic transfer switch, providing temporary power to police facility, and all testing and certification to make the generator operable. Pursuant to the Contract Specifications, the Contractor will have 120 consecutive working days to complete the work. Up to 60 consecutive working days shall be granted for shop drawing preparation, review and approval, generator manufacturing and delivery. After the manufacture and delivery of the generator, the Contractor shall install and complete all construction activities under the contract within 60 working days. Environmental Review: The operation of a diesel backup generator requires a South Coast Air Quality Management District Permit to Construct and Operate. The permit will be applied for during the construction process. A Certified Equipment Permit, supplied by the manufacturer of the generator, must be submitted to SCAQMD for the Permit to Construct and Operate. Public Notice: The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Police Department Generator Replacement— Award of Contract No. 4056 June 23, 2009 Page: 3 Geotechnical and Other Costs: No geotechnical or other costs are anticipated on this project. $1,000 is included for printing and other incidentals. Funding Availability: Upon approval of the budget amendment, sufficient funds are available in the following accounts for the project: Account Description General Fund Proposed uses are as follows: Vendor Gammill Electric, Inc. Gammill Electric, Inc. Various Prepared by: e�y Tom Sandefur Associate Civil Engineer Account Number Amount 7019- C1820918 $283,758.00 Total: $ 283,758.00 Purpose Amount Construction Contract $245,958.00 Construction Contingency $36,800.00 Printing and Incidentals $1,000.00 Total: $ 283,758.00