Loading...
HomeMy WebLinkAbout11 - Bayside Drive Storm Drain Litter Removal - NOC and Acceptance of Contract No. 5954 (CAP15-0025)CTY OF F NEWPORT BEACH City Council Staff Report June 23, 2015 Agenda Item No. 11 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director- (949) 644 -3330, dawebb @newportbeachca.gov PREPARED BY: Ben Davis, Associate Civil Engineer PHONE: (949) 644 -3317 TITLE: Bayside Drive Storm Drain Litter Removal — Notice of Completion and Acceptance of Contract No. 5954 (CAP15 -0025) ABSTRACT: On January 27, 2015, City Council awarded Contract No. 5954 for the construction of the Bayside Drive Storm Drain Litter Removal project, to Clarke Contracting Corporation for a total contract cost of $328,100.00 plus a contingency allowance of approximately 10 percent. The required work is now complete and staff requests City Council acceptance and close out of the construction contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after City Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following account: Account Description Account Number Amount Measure M2 Competitive 7284- C2502015 $ 332,910.61 Total Construction Cost: $ 332,910.61 11 -1 DISCUSSION: Overall Contract Cost/Time Summary This contract involved the construction of a hydrodynamic separation unit that will remove trash and debris originated in the Corona del Mar area before storm water flows can carry it into the ocean. Original bid amount: $ 328,100.00 Actual $ 329,350.00 Awarded Contract Final Cost at Contingency Final contract cost: % Due to % Due to Amount Completion Allowance Contract Directed Unforeseen Change Change Change $328,100.00 $332,910.61 A rox.10% +1.5% 0.0% 1.5% Allowed Contract Time (days) 60 Actual Time (days) Under ( -) or Over ( +) -10 This contract involved the construction of a hydrodynamic separation unit that will remove trash and debris originated in the Corona del Mar area before storm water flows can carry it into the ocean. Original bid amount: $ 328,100.00 Actual cost of bid items constructed: $ 329,350.00 Contract change order: $ 3,560.61 Final contract cost: $ 332,910.61 The final overall construction cost was approximately 1.5% over the original bid amount. This difference was attributed to an unforeseen change in the existing soil conditions discovered during the excavation process. During excavation of the pit for the structure, our Contractor encountered a large amount of buried concrete rubble which required additional time and resources to remove and dispose of. The original contract allowed for 60 consecutive working days to complete the scope of work. The project was substantially completed on May 11, 2015. A summary of the project schedule is as follows: Project Awarded for Construction: January 27, 2015 Completion Date per Contract and Approved Time Extensions: May 26, 2015 Actual Substantial Construction Completion Date: May 11, 2015 ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15302 (replacement of existing facilities involving negligible expansion of capacity) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Description Attachment A - Location Map Attachment B - Project Photos 11 -2 /N 0 PROJECT LOCATION BAYSIDE DRIVE STORM DRAIN LITTER REMOVAL LOCATION MAP ATTACHMENT A n 03 U) CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C -5954 I 6/23/2015 11 -3 ATTACHMENT B Project Progress Photos - C -5954 Bayside Drive Litter Removal Project Dropping the lower half of the huge trash collection system. Note the storm drain and the trash collection screening device. 11 -4 _ I2_ The box has been backfilled and the 3 manholes used for cleaning are visible (above). Bayside Drive Park; grass and driveway are restored. Some of our best work is buried underground! O 11 -5