Loading...
HomeMy WebLinkAbout09 - Big Canyon Creek Restoration ProjectCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 7 October 13, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Robert Stein 949 - 644 -3311 or rstein - newportbeachca.00v SUBJECT: BIG CANYON CREEK RESTORATION PROJECT - APPROVAL OF AMENDMENT NO. 2 TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. RECOMMENDATIONS: 1. Approve Amendment No. 2 to Professional Services Agreement with VA Consulting, Inc., of Irvine, California, for design and permit application services at a contract price of $85,790 and authorize the Mayor and City Clerk to execute the Agreement. 2. Approve a Budget Amendment transferring $85,790 from Account No. 7014 - 05002001 to Account No. 7014- C5100709. 3. Approve staffs recommendation to stop work on current project and work with the Regulatory Agencies and our consultant team to re -scope the project into a much more modest plan for restoring disturbed area in the canyon, removing invasive species, and pursuing various means to reduce selenium concentrations entering the canyon to below 13 ppb to meet RWQCB TMDL requirements. BACKGROUND: The restoration project as originally conceived in 2002 was very modest. It originally involved upgrading the existing parking area, removing some invasive plants, replanting lower quality habitat areas with native species, and improving the trail system. Over the past five years, the project design evolved to address a number of issues in the canyon. In 2004, a canyon restoration plan was developed that proposed dredging at the mouth of Big Canyon to re- establish the historical tidal influence into the canyon. This proposed change entailed changing the restoration design to relocate Back Bay Drive around the recreated mouth of the canyon and creating a new freshwater marsh further upstream in the canyon. Additional parking, restroom facilities, covered outdoor seating area, educational signage and habitat interpretive areas were added. Big Canyon Creek Restoration — Approval of Amendment 2 to Professional Services Agreement with VA Consulting, Inc. October 13, 2009 Page 2 In 2008, high concentrations of selenium were found within Big Canyon Creek. The high selenium concentrations were found in the water column, sediments, and animal tissue with especially high concentrations discovered in the existing freshwater marsh located just upstream of Back Bay Drive. The high concentrations in the freshwater marsh were suspected by the Regional Water Quality Control Board (RWQCB) to occur because of the stagnant conditions in the marsh. As the proposed upstream freshwater marsh would create similar conditions for creating and accumulating high selenium concentrations, the proposed project design was further reviewed. After consultation with the resource agencies, a solution was proposed to revise the plan to construct a new freshwater pond offline from the creek. This freshwater pond would need to be filled with a source of water not contaminated with selenium. Staff suggestion to use reclaimed water was rejected by the RWQCB. The idea of using groundwater was also eliminated based on testing which found selenium in the groundwater. With these options eliminated, only potable water was left as a candidate. This option is the most expensive and also requires the removal of chloramines from the potable water. The recent requirements for a new, off -line pond as well as the use of potable water prompted high level discussions among City staff on the overall viability of the project. The decision to continue to move ahead was in part based on the availability of outside funding for construction of a restoration project in the canyon with $1.5 million from The Irvine Company and a promise of $2.5 million from the Wildlife Conservation Board. With the preparation of the construction documents nearing completion, new issues and questions have now been raised by the regulatory agencies on the project's protection measures for a very rare plant that grows in the mudflats called the Salt Marsh Bird's Beak (Bird's Beak), the largest remaining colony being located near the mouth of Big Canyon. This very rare and endangered plant species requires a briny water mixture of bay water and freshwater marsh water to survive. While the restoration plan can be modified to leave the embankments of the existing Back Bay Road in place in order to protect the environment of the Bird's Beak, in the past two months, the resource agencies have also asked for more pre- construction surveys and monitoring of the mudflat areas around the Bird's Beak (as well as canyon habitat as a whole). The resource agencies have also proposed extensive monitoring conditions during construction activities that would be reviewed by the resource agencies for evidence of habitat impacts to the Bird's Beak. That review could conceivably require modification of the project design mid - construction with the potential for delay or increased construction costs. Additionally, the resource agencies have requested post - construction monitoring and documenting of the Bird's Beak and other habitat changes over the next five years where plant growth targets would have to be met. Costs for the monitoring and assessments alone will likely exceed $250,000. With the cost estimate to construct the project as requested approaching $8 million, and only $4 million of construction funding identified so far, staff is questioning the viability of the project. The project has evolved past the original vision and cost, as well as the expertise of City staff and would now require hiring biologists, groundwater hydrologists, and water quality specialists from the private sector to continue the effort. Big Canyon Creek Restoration — Approval of Amendment 2 to Professional Services Agreement with VA Consulting, Inc. October 13, 2009 Page 3 And while the City and its consultants have been in close contact with the resource agencies over the course of planning and designing of this restoration project since its inception, resource agencies have not committed to issuing all required permits until well into this rainy season. Taking a step back and re- looking at this project, most of the project concerns center on the existing freshwater marsh (shown in the attached figure). This marsh is almost entirely within California Department of Fish and Game (DFG) property. This marsh was a mitigation site so it cannot be removed without providing an alternate mitigation site. DFG has indicated that pond turtles exist in the marsh; however, the last time a turtle was sighted is unknown. The marsh is also the location of some of the highest selenium concentrations within the whole 154 square mile Newport Bay Watershed. The marsh also provides freshwater for the Salt Marsh Bird's Beak located on the mudflats west of Back Bay Road. DFG, U.S. Fish and Wildlife Service and the California Coastal Commission have now taken a very keen interest in ensuring that the freshwater /saltwater balance required by the Bird's Beak is not upset. The ramifications of relocating or modifying the freshwater marsh were not recognized five years ago. In light of all the developing information and corresponding mitigation, monitoring and cost, staff has determined that a fresh approach to restoration activities in the canyon is warranted. As a first step, the City has requested that its permit applications to the resource agencies be withdrawn. Staff has also directed our consultants to hold off on any remaining design work. At this juncture, the following tasks are suggested. 1. As there is funding earmarked from The Irvine Company litigation settlement for constructing a restoration project, our consultants can work with the existing drawings and information to fashion a modest vegetation maintenance plan for restoring disturbed area in the canyon adjacent to Jamboree Road. The project would be structured so that only a permit clearance from the California Coastal Commission would be required. The project could potentially kick off this January. Construction cost for this project would be approximately $300,000. 2. The City will meet with the resource agencies next month to work out alternatives for restoring the canyon, especially for addressing the selenium issue. The City would propose addressing the upstream over - irrigation practices by possibly constructing an inline, below -grade filter to reduce selenium concentrations entering the canyon to below 13 ppb (currently at about 50 ppb) to meet RWQCB TMDL requirements. 3. As DFG owns the marsh, the City would look to DFG staff to take the lead on how to deal with all the issues related to its marsh especially with regard to the selenium contamination. DFG biological and ecological experts are in a better position than the City to assess how the marsh can be modified to reduce selenium problems without disturbing biological resources like the Bird's Beak. Additionally, DFG could work with the biologists from the other resource agency Big Canyon Creek Restoration — Approval of Amendment 2 to Professional Services Agreement with VA Consulting, Inc. October 13, 2009 Page 4 in fashioning a cost effective monitoring program using resource agency expertise. CONSULTANT COSTS VA Consulting (VA) submitted a change order request on July 16, 2009 to perform new tasks to address the flurry of regulatory and design issues that would need to be resolved before the targeted advertisement date of September 9, 2009. City staff requested the consultant to continue moving forward with key tasks in parallel with the processing of the change order request for Council consideration in order to meet our construction window. As the deadline for advertising the project approached, the change order request was modified twice in light of changing project requirements. These changes repeatedly delayed bringing the change order to Council. As a result of a lot of last minute maneuvering, staff now finds itself having to request funds to reimburse VA for extra tasks that have now been completed. These tasks include: • Conducting coordination meetings and conference calls with the resource agencies. • Preparing an operations and maintenance plan describing long term maintenance procedures to protect sensitive habitats as a permit condition by the Army Corps of Engineers. • Preparing additional figures to show more detail for all habitat creation resulting from this project as a permit condition by the Department of Fish and Game. • Revising the mitigated negative declaration per comments of the resource agencies. • Repackaging the project into Phase 1 and Phase 2 tasks as a permit condition by the California Coastal Commission such that Phase 1 tasks are focused on establishing the freshwater pond and constructing OCSD facilities. • Preparing a biological monitoring plan. • Assessing if groundwater could be used for filling the proposed freshwater pond. • Preparing a California Endangered Species Act Incidental Take Permit for the Salt Marsh Bird's Beak. • Installing groundwater monitoring wells (a condition for protecting the Salt Marsh Bird's Beak). • Modifying drawings and specifications to include a water supply line and temporary irrigation system (including power for the automatic fill device and irrigation controller) to the freshwater pond. • Modifying the freshwater pond configuration to accommodate new habitat mitigation requirements as a permit condition by the Department of Fish and Game. • Modifying the selenium treatment subterranean wetland as recommended by the Regional Water Resource Control Board. The fee for these and other additional tasks (see Attachment A) to be covered under the second amendment to the contract is $85,790. The original contract compensation was $435,159 (66% from non -City funds) and the fee for the 18t amendment was Big Canyon Creek Restoration — Approval of Amendment 2 to Professional Services Agreement with VA Consulting, Inc. October 13, 2009 Page 5 $289,925 (100% from non -City funds). This 2nd amendment will bring VA's contract and the Big Canyon Creek Restoration Project to closure. Funding Availability: With approval of the budget amendment, funding is available from the following account. Account Description Account Number Amount General Fund 7014- C5100709 $85,790.00 Prepared by: Robert Stein Assistant City Engineer Total: $85,790.00 Submitted bv: Attachments: PSA with VA Consulting, Inc. Amendment 2 Scope of Services prepared by VA Consulting, Inc. AMENDMENT NO. TWO TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. FOR BIG CANYON CREEK RESTORATION THIS AMENDMENT NO. TWO TO PROFESSIONAL SERVICES AGREEMENT, is entered into as of this day of ' 2009, by and between the CITY OF NEWPORT BEACH, a Municipal Corporation ( "CITY "), and VA CONSULTING; INC., a California Corporation whose address is 17801 Cartwright Road, Irvine, California, 92614 ( "CONSULTANT'), and is made with reference to the following: RECITALS: A. On December 11, 2007, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT," for engineering design services for the Big Canyon creek Restoration Project, hereinafter referred to as "PROJECT." B. CITY and CONSULTANT have entered into one separate AMENDMENT of the AGREEMENT, the latest dated January 27, 2009. C. CITY desires to enter into this AMENDMENT NO. TWO to reflect additional services not included in the AGREEMENT or prior AMENDMENT, to extend the term of the AGREEMENT to December 31, 2010 and to increase the total compensation D. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. E. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. TWO" as provided here below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM ��Wyj 1i 11 CC �F im In addition to the services to be provided pursuant to the AGREEMENT and AMENDMENT NO. ONE, CONSULTANT shall diligently perform all the services described in AMENDMENT NO. TWO, including but not limited to, all work set forth in the Scope of Services attached hereto as Exhibit 1 and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 3. COMPENSATION City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached to the AGREEMENT. Consultant's total amended compensation for all work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed Eight Hundred Ten Thousand, Eight Hundred Seventy -Four Dollars and no /100 ($810,874.00) without prior written authorization from City. 3.1 The amended compensation reflects Consultant's additional compensation for additional services to be performed in accordance with this AMENDMENT NO. TWO, including all reimbursable items and subconsultant foes, in a ;cu::, r c: to ==11 Eighty-Five Thousand, Seven Hundred Ninety Dollars and no /100 ($85,790.00), without prior written authorization from City. 4. INTEGRATED CONTRACT Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. K IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. TWO on the date first above written. APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY A By: D_ Oefucoamp, Assistant City Afttrney ATTEST: Leilani I. Brown, City Clerk CITY OF NEWPORT BEACH, A Municipal Corporation Z Edward D. Selich, Mayor CONSULTANT: VA CONSULTING, INC. M Max P. Vahid, President and C.E.O. Michael S. Carter, Secretary and C.F.O. Attachment: Exhibit 1 — Additional Services to be Performed 3 VAI CONSIJUI.NG September 10, 2009 Mr. Mark Reader, P.E. Project Manager Public Works Department City of Newport Beach 3300 Newpori Boulevard Newport Beach, CA 92663 -3884 Dear Mr. Reader: This letter is a change order request for additional engineering design services related to the Big Canyon Creek Restoration Project (Project) (Professional Services Agreement dated December 11, 2007). This change order supersedes our previous letter dated August 31, 2009. These additional services include on -call services that were not included in the original scope of work or Addendum 1 for the final design of the project. The services provided include excavation of a boring hole to provide access to groundwater for sampling and analysis, revisions to the Operations and Maintenance Plan to include procedures required to avoid impacts to biologically sensitive habitats, additional services required for permit and environmental document processing, and dividing the project plans into two phases to meet Coastal Commission requirements. A detailed scope of services is provided in Section I and fees in Section II of this letter. Also a breakdown of VA's hours and tasks is included as Attachment A. We will provide our services on a time - and - materials, not -to- exceed basis in accordance with the attached fee schedule (Exhibit A). SCOPE OF SERVICES Boring Holes Excavation Geosoils, Inc. drilled a hand auger boring hole adjacent to the access road along the northerly slopes of Big Canyon, in the vicinity of the existing spillway to provide Cl access to groundwater. Because this operation was successful, the Geosoils fee is $500 and further drilling with a drill rig for groundwater sampling is not required. The proposal from Geosoils is included with this letter as Attachment B. VA Consulting, Inc. Corporate Office Orange County Division 6400 Oak Canyon, Suite 150 Irvine. CA 92619 Phone 949.474.1400 Fax 949.261.9482 x.' 1Pio19[ tCY l3JN0.YM,ixCOaS_ngLevyq�Geet,klf GO@.doc Mr. Mark Reader, P.E. Big. Canyon Creek Restoration September 10, 2009 Page 2 of 7 2. Update Environmental Documents and Permits Applications Resource agencies requested additional information. and revisions to the environmental documents and permits beyond the original project scope and Addendum 1. In response to these requests, WRA provided additional figures showing greater detail regarding habitat impacts and creation. WRA provided an Alternatives Analysis, project impact analysis, Biological Monitoring Plan, and additional Salt Marsh Bird's Beak information to the resource agencies. WRA reviewed the project Operations and Maintenance Plan and provided text which dv.SCr4t the f�iig -t6n�: n�a to i�.. prou,dl:res CegilI I t0 a'JGId IRipaia5 t0 sensitive habitats, including wildlife and vegetation. Per the request of CDFG and the Coastal Commission, WRA installed 5 groundwater monitoring wells with piezometers and data loggers at each well location to measure water level; conductivity and temperature at 30- minute intervals. The total WRA fee for this task is $4,273. The proposal from WRA is included with this letter as Attachment C. VA incorporated the language provided by WRA to address biologically sensitive resources in Big Canyon into the Operations and Maintenance Plan for use in obtaining regulatory permits. VA provided peer review of the additional language: for project compatibility and incorporated the language into the Operations and Maintenance Plan text. The total VA fee for this task is $3,092. VA purchased the data loggers and provided them to. WRA for installation at each groundwater monitoring well location. The total. VA cost. for this item is .$8,475. 3. Project Coordination and Meetings.(WRA) Additional. project coordination and stakeholder meetings for design review and permit approval was conducted after permit application materials were. formally submitted. This scope of work provides for the additional conference calls, meeting preparations, and project management time. The total' WRA fee for this task is $2,500. The proposal from WRA is included with this letter as Attachment C.. 4. Electrical Systems Design The temporary irrigation systems needed for the establishment of proposed tidal and restoration planting will require a power source in lieu of solar power, as originally proposed to the City. W.A. Dotty Engineering, Inc. has provided a station plan, station single. line diagram, Service Pedestal elevations and installation details, SGE equipment connection detail's, construction details, and electrical. construction specifications. The total W.A. Doby fee—for this task is $3,750. The proposal. from W.A. Doby is included as Attachment Q. %'.Ni01u11'3]] OdLUNlInM1I1JfF $:BIgLa- „1'4MJ88N_0$tOp9dv” dill cx. -_., d�GL Qe.g3`.E ° cta,:p r m t'.i kw.' Id I$ 1 1 q Rn Mr, Mark Reader, P.E. Big Canyon Creek Restoration September 10, 2009 Page 3 of 7 5. Temporary Irrigation Water Line The temporary irrigation of restoration planting will require a potable water source. IMA prepared the design and layout of a pressure mainline and backtlow preventer from the hot tap point of connection at an existing potable water source, along the proposed sewer maintenance road to the proposed freshwater pond. The IMA cost for this task is $4,500. The proposal from IMA is included as Appendix E. G. Project Coordination and Meetings (Ron Yeo) Additional project coordination and meetings were required to address City comments on the Project plans. This task provides for coordination and meeting time required for Ron Yee (architect) to complete the architectural aspects of the Project. The total Ron Yee fee for this task is $1,200. Construction Phasing The City requested that the Project Plans be divided into two separate plan sets, one for each Phase of construction, in order to satisfy the California Coastal Commission request that the proposed freshwater pond be established before construction in the existing freshwater marsh takes place. At the time Addendum 1 was written, the proposed freshwater pond was at a conceptual level, with no elevation studies or grading design completed. The additional cost of providing two separate plans sets was not included in the original contract, nor was it includedfn.Addendum 1. In order to create two complete but separate construction phases, two unique grading plans were developed,, each providing flood control protection of the proposed freshwater pond. The Phase 1 grading base was developed with the original base file and modified to include a staging area in the vicinity of the proposed interpretive area, the proposed freshwater pond, and the proposed sewer maintenance road. Grading for the staging area was developed using: the proposed interpretive area roadway and modified to balance the Phase 1 site with regards to out and fill quantities. An iterative approach was required to arrive at a final Phase '1 project that was balanced. As such, the grading for the staging area was refined three times in order to balance the site, The proposed flood control conveyance grading will impact the. existing freshwater marsh, therefore the flood control conveyance could not be part of the Phase 1 plans. The flood control. conveyance contours were deleted from the Phase t basefile and the contours along the berm between the. proposed flood control conveyance and proposed freshwater pond were revised to allow Big Canyon Creek to continue to flow to the existing freshwater marsh after Phase 1 construction is completed. In order to ensure that storm water would not damage the new freshwater pond during a major storm event, a Phase 1 hydraulic analysis was conducted. Grading along the northerly trail of the proposed freshwater pond was adjusted to ensure that 100 -year storm flows would not z�n,gPmoq_gqoP.aammhao� afdraoyanere�mxoos:ar d 2 M- ........ ks _. may, pR— to ee MR- 'M � x-r.'. 3. xi1 1, fitU1, fn, .'yc _ _ ...,s.. a.r. 3. 5......... 1Fr a._ _ _ _ Mr. Mark Reader, P.E. Big, Canyon Creek Restoration septemper 10, 2009 Page 4 of 7 overtop the berm and damage the pond based on the results of the Phase f hydraulic analysis. The Phase 2 grading base was developed with the original base fife and modified to include the proposed tidal marsh, proposed Back Bay Drive realignment, proposed interpretive area, proposed freshwater marsh, and proposed flood control conveyance. Contours in the vicinity of the Phase t staging area and along the berm between the proposed freshwater marsh and proposed flood control conveyance were revised for continuity between the two phases. A Phase 2 hydraulic: analysis was conducted to ensure that 100 -year storm water ;lows would not emel the freshv�atoi pond during a 100 -rear stone cvcnt and that storm water flows would be non - erosive in the proposed flood control conveyance. In order to provide plans that could be used separately for each phase of construction, two additional rough grading plan sheets were created and each of the remaining six rough grading plan sheets were significantly revised. Two additional cross- sections and detail sheets were created to clarify each phase of the grading plan. Creating a new rough grading sheet required setting up vfewports in paperspare that were consistent with the index map, updating title block information, adding the appropriate constructions notes to the construction motes list, labeling construction items with the appropriate construction note numbers, adding a curve and line data table, labeling curves and lines the with appropriate label;. addition of annotations, adding typical section notation, and formatting line weights, line types, and line type scales. Revisions to. the rough gradirig.sheets included changesto the construction notes and labels, revisions to the annotations; revisions to typical section notation, and revisions to yfewports:to be consistent with the index 'map. Creating a new cross- section and detail sheet requires drafting the sections and details, annotating the sections and details; referencing in the appropriate files into the sheet, creating viewports to show the sections and details and the appropriate. scale, and formatting line weights, line types, and line type scales; Each phase of construction requires a separate erosion control plan; therefore three additional erosion: control'p.lan sheets .were developed. Creating 'a new erosion control sheet required setting up viewports in paperspace, updating title block information, adding erosion control features, adding erosion control notes, construction notes, and details as required, and formatting line weights, line types, and line type scales. The invasive species removal plan had to be divided into two separate plans corresponding to each construction Phase; therefore two additional invasive species removal plan sheets were created. Creating the additional invasive . species removal sheets required updating'titie block information, updating legend information, 'and updating invasive species removal phase hatching to be, consistent with project phasing. The. restoration planting plan :had to be divided into two separate plans corresponding to each phase of construction; therefore two restoration plans had KeY,oiecLwr.�o+oti�nema (ins- e�pcen�e:+c�cek?s +[iw9dx t- INr. Mark Reader, P.E. Big Canyon Creek Restoration September 1.0, 2009 Page ri of 7 to be developed and six additional planting plan sheets were created. The Phase 1 Restoration Plan was developed to Include planting in areas that would experience invasive species removals prior to the construction of Phase 1 and areas that would be graded as part of Phase 1 construction. The Phase 2 Restoration Plan was developed to include planting in areas that would experience invasive species removals prior fio the construction of Phase 2 and areas that would be graded as, part of Phase .2 construction. Development of the Phase 1 and Phase 2 Restoration Plans required changes to the planting plan base file, specifically revising the polygons for the different habitat types. Revisions to the planting plant sheets included revising viewports to be ( Conslsfrenr with the index mop and undatii- reference flies- Additionpi mOsion� include plan check comments from the City that require duplicating planting information from the project specifications on each of the planting plan sheets. Dividing the project plans into two separate plan sets required revisions to three AUfoCAD base files and the addition of 15 sheets to the Project Plans. This task also includes revisions to the freshwater pond configuration after the revised grading design was completed to accommodate requests for mitigation site avoidance made by California Department of Fish and Game. The original pond size/acreage was established to provide a 1:1 freshwater habitat replacement. This task also provides for the time spent by VA staff to divide the project specifications into two phases; per the request of the City. The total VA fee for this task is $34,000. 8. Structural Submittal The City requested that the structural sheets from the Project. Plans be submitted to the Building and Safety Department as a separate submittal from the entire Project Plan set. One title sheet and one index. map was created for each Phase of .construction for a, total of 4 additional plan sheets., In addition, the Phase 2 plan submittal was divided into two plans sets: one for Public Works Department Components and one for Building and 'Safety Department Components. Top Public Works Department Components Plans include Rough Grading Plans, Street Improvement Plans, Quad Box Structural Plans, Erosion Control Plans, Invasive Species Removal Plans, Restoration Planting Plans, Wetland Planting Plans, and Interpretive Signage. Plans. The Building and Safety Department Components Plans include the .Precise Grading Plans„ Architectural Plans, and Miscellaneous Structures Plans. Revisionsi were required on a total of 20 sheets in order to create the separate plan set for Building Department; Review. The Hydraulic and Structural Calculation Package (Phase 1 and 2) was also revised in order to create a. separate structural calculations package for Building arid Safety Department Review. Revisions to 10 pages of the calculations and the creation of one new title sheet were required. The VA fee. for this task is $9,000. 9. Subterranean Wetland Deletion As part of Addendum subterranean wetland selenium. During a XINMBC155]i] OapP.Mrt1KA0i9WGnpt{',re5k , p910pJRiF 1,. VA provided engineering design activities to include a in the .construction plans as a treatment facility for telephone conference call., the Regional Water Quality -'.l F„". .7 A "V, Mr. -Mark Reader, P.E. Big Canyon Greek Restoration September t0; 2008 Wage 6 of 7 Control Board expressed concerns that subterranean wetlands have not been tested for treatment of selenium, and may worsen the condition in Big Canyon, The Citv decided that the subterranean wetland would be deleted from the project plans to be included as a later Phase or a future pilot project. Additional engineering design and grading was required to ensure that low flows from the Jamboree culvert would drain to the existing Big Canyon Creek without the subterranean wetland. Revisions to the restoration planting plan were required to provide planting in the location of the deleted subterranean wetland. The rough grading plan sheet depicting the subterranean wetland was revised to properly annotate the revised project configuration. An additional cross - section was added to the ,erti2: s ar.ri detaDs h ^et fn clarity the revised grading at the location of the deleted subterranean wetland Revisions to two base files and two plan sheets were required to eliminate the subterranean wetland. The total VA fee for this task is $2,000. 10. Past Resource Agency Meetings and Coordination The original contact and Addendum 1 funds for meetings and coordination were depleted in May of 2009. This task provides for VA participation in 8 resource agency meetings and 20 hrs of coordination time required for the approval of the environmental documents and permits that have occurred between May of 2009 and the present. This task also includes meeting and coordination time required to initiate the electrical and water supply line design tasks. Meetings and coordination relating to project design are not a part of this task. The total VA cost for this task is $8,583. 11. Future Meetings and Coordination This task provides for future meetings, coordination;. and information requests by the City for the Phase '1"B and Phase 2 portions of the Project. This task provides for 24 additional hours of meeting and coordination time. The total VA cost for this .task is $3,912, II. FEES 1. Boring Holes Excavation.........,....... ............. ........... ... a................. .,.,..._....,.$ 500 2. Update Environmental Documents and Permit Applications ......................$ 151840 3. Project Coordination and Meetings ( WRA) ........ ........ ...........:.................$ 2,500 4. Electrical System Design. .... t_ .... _ ........ ....... ............. .............. ...... ........ $ 3,750 5, Temporary Irrigation Water Line,...... ......................... ..........._..................$ 4,500 6. Project Coordination and Meetings (Roil Yeo) ............. ........................i....:$ 1,200 7, Construction Phasing ........... .........................::..:...... ..............................$ 34;000 XiPrgrzinsi3; wndeaMMrnvs e+n= e�reev cseaoaax r �>t '-'i ,t qtr *,( f'��ep� r <ir :;-¢',•�..� -.., ,J� .. }�U. !`^ I .: { - ,�„'` -j�l; if.!;. =;tip r._._.. ... Mr. Mark neader. E Big Canyon Greek Restoration September 10, 2009 Page 7 of 7 8. Structural Suhrnit\8. ........... ...... —.................. ....... —...... ..... ...... 91000 9. Subterranean Wetland Deletion ........................ . 2`00$ 70� Past Resource Agency Coordination ......... ....................... .--- .... ..—.—$ 0,588 11, Future Meetings and Coordination ......... .......... ... ^^ ................. —.... ... $ 3.912 TOTALFEES ......... ....... . ................... ....... ~ ............ ................ ................. ... * 85,730 If yo" have any questions or require uddki^ou| iA|Unnahoo, please feel free to 000kani Uuo Vi|hoesormoa/(949)474'14O8or John Wolter at(8S\)34O-0O80` Sincerely. Max P.Vuhid,P£ President and CEO MPV/1(am Enclosure— Exhibit A—\/A Fee Schedule/ Attachments & through E; cc: Dan Villines, John Wolter, Contracts EXHIBIT A VA CONSULTING, INC. FEE SCHEDULE staft Classification 1. Wil EtIgineering and Planning Services President...... ..................................... ....... ...... ~............... Division President/Division Manager ......... ........ --..... -'- Sr. Vice President/Vice President/ Exec. Director . ..... .-..� Director.......................... ....... -....... ,^-.-'''--^ ... -',~ Senior Project ^ ...... ........ . ................ ....................... Project Mannger,..-.-...--,----`'--^`^~~---� Assistant Project Manager ............. ^ ........ ....... .............. ........ Senior Project Eng-trieer/Senlor Design Supervisor/Senior Planne Project Senior Design Engineer/Senior Designer ........... .......... , ...... ..... Design Engineer/Planner ................... ...................... ................... wcs. ... . ................... .................. .... . ...... .~~^'^'-'^.... Assistant. Engineer/Assistant Planner ............. ......... ................... .`e,nn.ww.".�v~vo""/ov°''."n""�"^`'`~~~~-^^-`-`^~ Senior CA0DTkhnitiao ............. ............................ ............. .~� Junior ~~--.r~.^^....~`-~,^^-'~-^'^ CAW Technician ........ '............................................................... � E.`.^~.~. ..................................... off",==pp".�qe^"^x^+!;�!... ^~.°^-.~^~~^^—`'^� Field Survev and Mapping Services 1-&08nGPS.Chew.^ ...... .... ...... ......... ,..,,,^'.,. ......... ­` ........ .'~-~~.~°°.—~~........ Special Services Litigation `~^^`~^''^~`^^"^"^`^^`''`.°'�^^~—^'--^'—~~~-,~...-~........ $450 Notes: 1- ,rv�a/m*°a|bupri3geV lot all umnicw^ through the end of each calendar Month. |nmolm are ghd . 2. Overtime, e U�!4u�hu9�d p^a��o�13��«dme��d�dh6harT�tm�oyou�wa�mu�u*s wWbeoonba0*$'a| nnuo n,17A of. oestmndao/ hourly rates. o. ||b ���Ou, 4. In-house repruttraphim rhavnes.:4W.00nu"upIv�$1.mvsq-fL8n0/oWm $80N0t, 4. mildsoa Will be Wed at slandaid Milear felzE; W.by IRS. ZWO fates curWRIV listed el $0 65 per Milb- -- - -' - ' ATiAENMEtR.A Cky gMewP?��Seseh Ei0 Cepen Leek ReetaeXOePre{ed' E9TICiFTEO FEES4PJ PEMES. %rT- f4eIiM -6-r -8 3812 E. La Palma Avenue - Anaheim, CA 92807 • (714) 632 -0151 ^ FAX (714) 632 -0745 May 15, 2009 VA Consulting, Inc. 17801 Cartwright Road Irvine. Califomin 92814 Attention: Mr. Dan Viilines W.0,5595 -A1 -OC Subject: Change Order Request No. 2, Big. Canyon Creek Restoration, Upper Newport Bay, Newport Beach, Orange County, California Dear Mr. Villines: GSI respectfully requests a change order to the contract for geotechnical services addressing the Big Canyon Creek Restoration, Upper Newport Bay, Newport Beach, Orange County, California. This change order was created in response to your recent request by for groundwater sampling at the site. It should be noted however, that the actual sampling will be performed by others. GSI'will be responsible for excavating the boring holes only. Two methods of drilling are provided as options in this change order.. The first option includes four (4) hours for a geologist with a 'hand' auger and is estimated to be approximately $500. This option would 'provide one (1) hand auger.boring, up to 15 feet in depth, or until groundwater is encountered. The: second option includes four (4) hours with a hollow stem drill rig as well as a- supportl:ng geologistand:is estimated at $1,400.00. This, option is provided in case the first option is not successful, due to refusal or excessive depth to groundwater. The:opportunity to. be of:service is sincerely appreoiated. If you should have any questions, please do not hesitate to contact our office. Respectfully submitted, GeoSoils, Inc. Shaun Wi kins Project Geologist SHW /BBS /jh Distribution: (2) Addressee inn Shahrvini f Vice President, GE 2296 €nth @UN M'E.N iti. CON&(MAIM Big Canyon Creek Restoration Project Phase II Permitting and Design Services & California Environmental Quality Act Documentation VA Consulting Project No. 373.0400 SCOPE OF WORK AND ESTIMATED BUDGET CHANGE ORDER Prepared for. John Wolters VA Consulting, Inc. 17801 Cartwright Road Irvine, California 92614 September 9, 2009 PURPOSE The purpose of this Scope of Work is to describe tasks required to complete for work described in the December 17, 2008 change orders submitted to VA by WRA ('Permitting and Design Services" and "California Environmental .Quality Act Documentation").. Due to project changes, phasing, and agency requests, the scope of work described in the December 2008 change orders expanded and additional funds are required to compensate for additional work already conducted. by WRA.. This out -of -scope work focused on providing resource agency personnel with additional project documentation, project impact analyses. and installation of hydrology. monitoring wells. This Scope of Work also describes Work to be conducted by WRA, Inc. to assist the City of Newport Beach in completing Phase IA of the Big Canyon Creek Restoration Project. WRA`s work will focus on landscaping drawings, specifications and cost estimates; preparation and receipt. of agency, permits; construction management services to implementthe<Plan; and coordination and meetings with ageney.and City staff. Finally, this Scope of Work describes hydrology well monitoring tasks to be conducted by WRA for a 2 -year monitoring period. WORK PRODUCTS Additional funds are required to compensate for unanticipated work- associated with the following Work products described in the December 17, 2008 change orders: Permitting and Design Services Change Order Task 3., Update Environmenfal,Documents and Perm, it Applications Task 5.: Project Coordination Medtings WRA will add additional tasks to the December IT,`2008 Permitting and Design Services Change Order'and will .provide thefollowing work product: 21 59mG Frat Fiandsco @lyd., San Rgloe, CA 94901 (41'5) 454 -88US lei (4 15, 454 -0129 tax irkftm- ca.com WwW:W(fl-" :Ce1i1 Task 6: Phase lA Construction Documents Task 7: Phase 1A Permit Applications Task 8: Phase )A Construction Observation Task 9: Well Monitoring & Reporting SCOPE OF WORK Permitting and Design Services Change Order Task 3: Update Environmental Documents and Permit Applications Edits and additions to permit documents beyond the scope of the December 2008 change order were required before final submittal to resource agencies. WRA incorporated agency and stakeholder comments into permit application materials ana generated additional figures to show more details of all habitat impacts and creation as a result of Project. Additional Project documentation was required to satisfy resource agency information requests after permit submittal, including an Alternatives Analysis, project impacts analyses, sections of the Project's Operations and Management and Biological Monitoring Plans, and coordination of salt marsh bird's beak information with the agencies. WRA prepared all requested documentation and provided it to the resource agency personnel for review. WRA coordinated with agency personnel via phone calls and email with the objective of formal permit approval. WRA performed background research, obtained an access permit to California Department of Fish and Game (DFG) lands adjacent to the project boundary, and installed 5 monitoring wells as requested by the California Coastal Commission and DFG. Task 5: Project Coordination and Meetings Additional project coordination and stakeholder meetings:fordesign review and.permit approval was conducted after permit application .materials were formally submitted. WRA will provide a project summary and,as.semble. Phase IS and Phase I] materials for the City's records. This scope of work provides for additional meetings attended by W RA staff via conference call,; and provides for preparation and, follow -up time for each meeting for work related to.Phase IA implementation. Task 6: Phase IA Permit Applications WRA will work with the City to develop a vegetation management plan to implement Phase. IA of the Big Canyon Creek Restoration Project and that optimizes weed removal and native• plant restoration while avoiding major resource.ageney permits. WRA will prepare materials to apply for and gain receipt of resource agency permits for Phase IA. We will coordinate with resource agency personnel via phone calls and emails to secure receipt of permits. Task 7 : Phase IA Construction. Documents & Cost Estimates Construction Documents We will review existing.plans and documents thatclescribe the habitat enhancementand restoration components that will be: - -pert. ormed:as part of Phase IA,: We will perform onesite visit to document site conditions. As part. of this site visit, .We .will estimate the, quahtlry; we (if applicable) And locations of invasive plants to beremoved and use this information to define the scope of work for the.contractor. We may change the recommended habitat enhancement and restoration actions based on our understanding' of the biological conditions on= site'and the potential for successful restoration. We will only make changes that are permitted within the current project.definftion. We will prepare construction drawings and supplemental technical specifications for the habitat enhancement and restoration components of Phase IA. Construction drawings and specifications will be prepared for the following project components: Demolition, Invasive Plant Removal and Site Preparation Erosion Control Planting Irrigation We will prepare the construction documents for the following submissions. You will have the opportunity to review each submission and provide us with written comments. We will review your comments and incorporate them into the subsequent revision. At your request, we will prepare additional submissions. Additional submissions are considered extra work and will be billed on a time and material basis. 100% Draft Completion Set - Drawings and Specifications 100% Final Completion set - Drawings and Specifications Cost Estimates We will prepare a detailed estimate of the cost of construction and update in correspondence with the following submittal. This will allow you to make decisions during the design phase that effect the cost of your project. The cost estimate that corresponds the final 100% will be intended for use in comparing and evaluating the bids for construction. Construction Cost Estimate - 100% Draft Completion Set Construction Cost Estimate - 100% Final Completion Set Task 8: Phase lA Construction Observation Assistance with Acquisition and Negotiation of Bids for Construction We will assist you in obtaining, evaluating, and negotiating bids for construction. We will perform the following services Prepare the.final opinion of construction cost Provide a list of qualified contractors • Prepare the invitation letter for the bidders Prepare a unified, bid form for. distribution and use by bidders • Compilation, comparison, and evaluation of the bids Assistance in negotiations with a. candidate contractor Construction Observation Services WRA will provide construction observation services for during the construction phase of the project, We will perform site visits in order to provide information to the contractor regarding the interpretation of the contract drawings and specifications. We Will: also review the contractors worts to see if it is being performed in accordance with the contract drawings: and specifications. During this phase of the project we will prepare field reports, evaluate and'respond to submissions and requests for information that we receive from the contractor', and assist in evaluating change orders, This proposal includes time for field visits and office support. The list below summarized the scheduled site visits that are included. in this scope of work. At your request WRA will extend the amount of time allocated for office support and perform additional :site visits on a time and material basis. We have experienced thatthe quality of the constructed project increases significantly when WRA provides construction observation services and our clients have told us that this service provides significant value to their overall project. Schedule Meeting and Site Visits during Construction Observation (1) Pre -bid Meeting (1) Preconstruction Meeting (2) Site Visits:- Preparation & Demolition (1) Site Visits - Seeding & Erosion Control (2) Site Visits - irrigation (4) Site Visits - Planting (2) Site Visits - Punch List and Final Walk -thru 40 hours of office support (approxirnate)y 3 -hours per field visit) As -built Documentation We will prepare an as -built report for distribution to the necessary regulatory agencies. We will quantify the restoration efforts by making field measurements of the area or length ofthe restoration elements. The report will include a description of the construction restoration elements, photographs of the constructed restoration elements,. and as -built grading, planting, or irrigation plans if required. We will also perform baseline inventory of the restoration elements for use in subsequent restoration performance monitoring. Task 9: Well Monitoring & Reporting To fulfill hydrology monitoring requests by resource agencies, WRA will perform, periodic site visits to check on monitoring well function and to retrieve data collected on installed data loggers. Site visits will occur every two months for an initial six months, and will occur approximately every six months thereafter for a total of 2 years of monitoring. Travel and car rental expenses are included in the cost of this task. Each year we will prepare a short annual report to summarize data collected between October 16 of the,previous year through October 15 of the current year. Annual reports will be submitted, to the City no later than December 1 of each year. SCHEDULE Work will begin upon receipt of approval of this proposal. Permits will be submitted to resource agencies by October 1., 2009. Final project planning will proceed with the goal to begin vegetation management activities in mid - December, 2009. Well monitoring will occur within the first week of the following months: November 2009, January 2010, March 2010, November 2010, March 2011, November 2011. ASSUMPTIONS The following assumptions were used in the development of this Scope of'Work: All assumptions in the Big Canyon Creek Restoration Project Phase It: Permitting and Final Design Services Scope of Work and Estimated. Budget (Revised)(October 27, '2007.), Permittingand Design Services (December 2008) and California Environmental Quality Act Documentation (December 2008) apply to this change order. ESTIMATED COST Estimated costs are subject to. change based on specific conditions that arise during the conduct of this work. The client will be.informed if additional fees will be incurred and the reasons for any such increase. The client will. be billed monthly on a time and materials basis for work completed to date in accordance with the attached Rate Schedule. The proposed budget is $113,600 and is detailed in the attached cost estimate. TERMS AND CONDITIONS All terms and conditions in the approved contract dated December 10, 2007 will apply to this Change Order. JOB xa;. 1# " PROJEC.CBY/'OCnyepjk W..S 1RUNcs BYtljvl Rep�6J' SBp1MIM 9. MJ9 1851 EstlNarm casT TSEM FM00- M x USdete: c*v.pw.m +nuim:PamnMNa'wns S: hlo)e.Y.C.bNiwlM Ld NeN4g9 a 6. TInxNPnrMMeNMlerm i 1. Rueaw CplNrucJeY.IJUMPmM1 C54 S — t1 S3 , � Sii916 16 r6 S2E 66,dtC S25 iI WJ 1 TS 0 34 e w 15u 9 B 9 E 9 IS 40 A9 18 1. 72 5112 F tes 5'. bn5 rt iM5 K 612] 1170 S 5216 FY182G SIN $1W 170]E Sl. Man 2a SmaP 'Sa ll 1"a 588 ST526 Sao sal so 16 i1 nC t6 ]2 GIB �xger'.vrt ill al S at 11 9: VtvXMWbr'vq blk Vmt lB) 65 RMYPkP.ohm •S EeYPw NIb) SB eemaaa>rc�R! w ToW HeJrs B 0 0 B p 0 p 196 Q 56 f54 :19 )O1 163 6 Y $6 -'r Topp Exparme ®Ymale6 T%M Cas EkPEµSE9 Tme 6Ne L&il BiH ad.CTV SMet [ %marylwr;Imtisax'id , My EBB G to PYNfiig Plans. YHgY'ron Pklre 5W4kmeM66W�cedauo 6YCCrYIan- 100NPm PYSPIIW9 WN:f1nN %91eCm1 E#'quk B. FNet I0. fXiNti W t!i 4,YR K�9ar�. s:wM Mwvl?_p3 S4 WU'[(6i Rapw..Inwrdsaw.ttP IS! Aav %RaSbl R1 real PerpnE C., Ma- (MOg Nl.a Tel. F1'. ,C, S12FG 51414 52$ S20 Ssb 1'B 62S :2d szs ue 536 e 2 :2a 6156 toy S2 S 55 ax se z v± ensn S SPS b8.:::0 SI,'36 6'.S i2 b Eaa S'e ST3.Y20 S13,Y41 590 5'2.Px S S3 , 628. Sii916 62e $J 0tl! S2E 66,dtC S25 iI WJ 1 TS O s2 26,; s2 IC9. OM 15u 534 a �JS 53,p36 ias lil BYMaiel $61389 n 5�s 450 _ t53 ' E £ i3 0 550 150 I5. 6 am .150 n Is 36 5 40 _ in Tel. F1'. ,C, S12FG 51414 52$ S20 Ssb 1'B 62S :2d szs ue 536 e 2 :2a 6156 toy S2 S 55 ax se z v± ensn S SPS b8.:::0 SI,'36 6'.S i2 b Eaa S'e ST3.Y20 S13,Y41 590 5'2.Px S S3 , 628. Sii916 62e $J 0tl! S2E 66,dtC S25 iI WJ Y'N C zX s2 26,; s2 t)6: S3 ,!c $ta5 534 a $29 53,p36 ias lil BYMaiel $61389 ,11: S3 , Sa fig4 B11.2�4 5461f ?(! JR iC9 iJSSA S+1% >4u S2£ °'a 51,91$ Ba_t62 Y'N $4 pis n, sa.zaz r�ss.uuw sxvz�e 5139 ^t S1 R666 Uc g1%.DOR@@Mg Y @Q b� W.11,01Afirig ek�ctriclol engineers VA CONSULTING, INC. 17801 Cartwright Rd. Irvine, CA 92614 REFERENCE: Big Canyon Restoration Project Electrical Systems Design W.A.D.E, JOB # 09-026 VA JOB # ATTENTION: Mr. Roger Chung, P.E. Dear Roger: FEE PROPOSAL August 10, 2009 The following is a, FIXED FEE, Electrical Engineering Fee Proposal for the above referenced project. See attached "Scope of Work'' and "Fee Outline" for services to be rendered. 1. CONSTRUCTION DOCUMENTS: 4. Electrical Construction Documents b. Electrical Construction Specifications c. Printing, Plotting, Shipping, Handling SUB—TOTAL 2. CONSTRUCTION ADMINISTRATION:. Not Included in scope of service GRIMD TOTAL Sincerely, Michael L. Warn President, W.A. DobyRogincering, Inc. $ 3,150.01D $ 600,00 T&M $ 3,750.00 $ 3,750.00 Page I of 3 327Z ff. "V St., Suffe E, Sin Gernardino,.Calffornfa 92485 TWphone (909) 881-4200 Faxs1mile (969) 681-4223 Attachment #09 -026 (8/10109) Construction Document Engineering fees indicated on page 1 are based-on the following scope criteria: Scope of Work: A) Site will require a new SCE service and Metered Service Pedestal for site power. B) Site will be equipped with future irrigation pumps C) Site will not be equipped with a -PI.0 / RTU at this time. I3) Site will be equipped with cabinet for future installation of irrigation equipment electrical power anti controls. E) Site will not require design of area tighring. I-) No clused circuit surveiilancc system equipm(AuL included in design. G) No access control and intrusion alarm system equipment included in design. 11) No stand -by generator or manual transfer switch and generator receptacle included in design. 1) No chemical analyzers included in design. J) No solar powered charging system included in design_ K) Autocadd compatible backgrounds will be provided to W.A.D.E. for adding electrical design. (background showing existing architectural /mechanical equipment). Construction Document Engineering fees outline: A) :Station plan to include ($"1550): a) Locate, size, show installation requirements, and coordinate new S.C.E. utility service. b) Design new SCE service transformer provisions and primary and secondary ducts including pull boxes for utility service, c) Locate service pedestal and design service grounding:. .d) Show all power conduit feeder routing, sizing, and connections for future irrigation equipment: e) Show all control signal circuit feeder design for future irrigation equipmerrtconnections, B) Station Single :Line Diagram ($500) a) Provide Single line diagram and electrical load calculation. b) Provide SCE service connection, and station grounding. e) Identify all conduit and wiring for site. d) Provide complete conduit and conductor schedule. e) Provide voltage drop and short circuit calculations as required. C) Notes, Symbol List, Details, and Elevations. ($700) a) Provide Service Pedestal arid elevations and. installation details. b) Provide SCE equipment connection details as required. c) Provide constriction details as required. d) Provide construction notes, symbol list, abbre'viat'ions, etc. D) Electrical Constriction Specifications - CS1 book form ($600). E) Attend Pre Construction design mceting(s). (Not Included). F) District plan. check corrections (as required for completion, Page 2 of 3 Attachment (continued) #M0'26 Construction Administration Engineering fees. outline: Not included in this proposal Scope of Service — General Conditions: A) Electrical Specifications to be issued in CSI format "Book Form" - printing and binding by others -- an MIS Word fie will be provided by WADE. B) Construction documents to include all required responses to City plan check comments and questions, including City recommended revisions as pertaining to current identified scope of project. ('8l1 OIOQ) C) Construction Document Fees includes a Registered CA State Electrical Engineer stamp and signature of.approval D) Completed Autocadd Version 14 to 2006 electronic drawing files will be furnished by WADE to VA Consulting for plotting, printing, and distribution. E) Autocadd Version. 14 or 2004 site piping layouts and background drawing files will be furnished to WADE by VA Consulting. F), Important Note: At the time of issuing this F"ee Proposal - W.A. Doby Engineering carries the following insurance coverages: $1,000,000/2,000;000 Ptofessional Liability Insurance coverage. $1;000;000 Automotive insuance coverage. $1,000,000 Workmen's Compensation coverage. All work asked to be performed by W.A. Doby Engineering that is not included or outlined in this fee proposal will be charged at out standard hourly rate based on a, time and material. Standard Hourly Rates for W.A. Doby Engineering Inc.: Site Visit Principal Engineer Design Engineer Engineering Inspector Draftsman Secretarial Office $500,00 per trip (not to exceed 5 hours). - $165.00 per hour. - $135:00 per hour. - $135,00 per hour. - $85.00 perhour. - $48:00 per hour. - $42:00 per hour: Page 3 of 3 la 0 MASTER PLANNING I- DEVELOPMENT SERVICES LANDSCAPE ARCHITECTURE PROPOSAL BIG CANYON WATER LINE AND TEMPORARY IRRIGATION SYSTEM NEWPORT BEACH, CALIFORNIA LANDSCAPE ARCMTECTURAL SERVICES August 11, 2009 Owner CiLY of Newport 11(�Ick Address! 3300 Newporr Blvd. Newport Bencli, (,q 92603 Phone: 949 -6443109 Client: VA Consulting Contact: Robin Flayes Address: 6400 Oak Canyon, Suite ISO Irvine,.CA 926I8 Phone: 949-474-1401, extension 2.53 Fax: 949-261-8482 Ernail• rhattes a—iconsultinginc.com PROTECT SCOPE OF SERVICE The project is a mitigation project in the vicinity of Upper Newport Bay at the inland side of Jamboree Road. The Owner and maintenance group, for the project is die City of NdwpoftiBeach. The overall site area of the work, is about twenty acres. A part of the total area will be included in ima work. The specific areas included at this time are as indicated on the Plan provided by VA.Eugincers on FridavAugot 7, 2009. Generally the areas include two to three, areas of native Plan, ol for plant material establishment. Additionally there is a fresh water .. ungs requiring irrigation pond for, bird use, the layout of the areas has been designed and engineered by others. The plant material palette and layout has been design A �, ed byLSA. AN of this information will be pr06d by VA Engineers furima use prior to the commencement of snuff work; AU back ground and base sheet development will be provided by VA Engineers for inla use as CADD fifes. VA Engineers- will provide the coordination and interaction with the Public Agencies.as required except that ima will attend meetings that directly' ffect Ona, work, i7no will prepare.design and layout of an irrigation water source pressure mainline -from.the hot tap point of cormettion to an existing potable water line in Jamboree Road, along L46 adigriment of the new access road, to the pond and landscape areas. inin will calculate therequirements of the makeup line to be a fill sourcefor the.pand. iow design to include the backflow prtwenter and water Reverse Osmosis (RO) systernfor the fresh water pond. 2500 Michelson dr 949:254:0023 wwwjmadesiqnxom S.k t2s 949.250.0043 f Irvine cx 93612 hua will provide specification of a prefabricated structure for the electronic etluipmeu.t . ivig will provide Irrigation. Design and - system calculations for the installation of temporary use irrigation system {s) to establish approximately 5 acres of planting areas. The areas may be of three separate uses and may be installed in a phased construcdon. All work shall be accomplished simultaneously with indication of constiarction phase lines. Pond W:ater quality equipment and controls are not included. Duration of the work as a continuous effort is anticipated ro be three months or less between September and December of 2009. SCHFDULE 1 SCOPE OF WORK TASK 1 Meet with the Civil Engineer to receive the information prepared to date for the development of the facilities, Discuss with VA Staff to gain understanding of the specific program, schedule and deliverables to be provided by ima. TASK Prepare 'prelim nar}' calculations and pond seepage & evaporation requirements review with VA. Engineers. Prepare Level Control operational functioning system "TASK 3 Design the egiiipmeritand layout for. the water line, anti code required equipment for review, with VA Engineers TASK 4 DesignAie system, equipment and layout of the water RO equipment, layout and enclosure for review with VA Engineers. TASI{ 5 Design the automatic: water make up system for. the fresh water pond. TASK G Design power requirements & RO water discharge requirements. TASK Automatic irrigation controls shall be arranged for use with electrical source provided by \7A Engineers: TASKS Overhead sprinkler units -rill be arranged with on- grade piping and fixed riser units xiith a sprinkler spacing appropriate for establishing the seeded areas: TASK 9 Su.btetranedn'.sgsteirts will be designee) as appropriate in lieu of overhead systems. TASK 1'0 Tree bubbler systems shall .be docuruented as required for. planting establishment. TASK -I 1. Inigation.and water equipment schedules, details and written specificationsshall be included with design doccinmitation. 1AR. K 12 Irrigation controllerscheduling u'tfrarmation shall be provided on plans as required to configure irrigation scheduling program(s). TASK 13 Meet with VA Engineers up to three times to review the design and layout infornmcirnt. TASK 14 Meet with the City of Newport Reach up to two times to discuss the design and lavutoof the work. TASK 15 Revisethel apoata lid LEI uipment design upto two tirnestoaecotmmod ate mnments for the Public AgencF. k t SCHEDUU 2 FEES BIG CANYON RATER LINE AND TEMPORARY IRRIGATION SYSTEM NEWPORT BEACH, CALIFORNIA LANDSCAPE ARCHITECTURAL SERVICES August 11, 2009 Pecs are lump sum Ivor s:hc sewices described above. Pcianiniruble expenses are in addition to die tee amp'unt. STAGE t. IRRIGATION DESIGN SERVICES FEE; Water source line design and layout/Egttipment Schedule. and Details Irrigation design and layout /Equipment Schedule and Details $3,000.00 Fresh water Frond automatic makeup /RO /Equipment Schedule /Details $6,000.00 TOTAL LUMP SUM FEE $13,500.00 RUMBUIiSABLE E:XPENSES:. Reproductions; C;ADD Blots, mileage, travel. costs, slipping expenses are in addition to the fee amount at cost. City of Newport Beach BUDGET AMENDMENT 2009 -10 EFFECT ON BUDGETARY FUND BALANCE: Increase Revenue Estimates Increase Expenditure Appropriations AND qX Transfer Budget Appropriations SOURCE: from existing budget appropriations from additional estimated revenues from unappropriated fund balance EXPLANATION: This budget amendment is requested to provide for the following: NO. BA- 10BA -017 AMOUNT: $e5,79o.ao Increase in Budgetary Fund Balance Decrease in Budgetary Fund Balance fX1 No effect on Budgetary Fund Balance To transfer expenditure appropriations from the Proposition 50 Areas of Biological Significance account to the Big Canyon Creek Restoration account to cover the cost of amendment no. 2 to the professional services agreement with VA Consulting Inc. for design and permit application services. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account REVENUE ESTIMATES (3601) Fund /Division Accou nt EXPENDITURE APPROPRIATIONS (3603) Description Description Description Division Number 7014 Misc & Studies Account Number C5002001 Prop 50 ASBS Protection Division Account Division Account Division Account Signed Signed Signed Number 7014 Misc & Studies Number C5100709 Big Canyon Creek Restoration Number Number Number Number Amount Debit Credit $85,790.00 $85,790.00 Approval: Administrative Services Director Date 61 ptikle Approval: City Man ger Date City Council Approval: City Clerk Date