HomeMy WebLinkAbout10 - Balboa Pier Emergency RepairsCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 10 October 13, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen Luy, P.E. 949 -644 -3330 or sluy @newportbeachca.gov SUBJECT: BALBOA PIER EMERGENCY REPAIRS - AWARD OF CONTRACT NO. 4326 Recommendations: 1. Approve the project plans and specifications. 2. Award Contract No. 4326 to Associated Pacific Constructors, Inc. for Total Bid Price of $59,900, and authorize the Mayor and City Clerk to execute the contract. 3. Establish an amount of $10,000 to cover the cost of unforeseen work. 4. Approve Budget Amendment No. 10BA- transferring $69,900 from Account No. 7231- C4402002 (Balboa Island /Harbor Bulkhead and Seawall Repairs) to Account No. 7231- C4802002 (Balboa Pier Emergency Repairs). Discussion: During the early morning hours of July 25, 2009, high surf caused a piling and eight diagonal cross braces to be broken. A portion of the broken piling was lost in the high surf. Staff reacted quickly to inspect the pier. Staff discovered additional damage and determined the pier was safe for public use. The remaining portion of the broken piling was tied to an adjacent pile until a private marine contractor could be hired on an emergency basis to remove the remaining portion of the pile to minimize movement and damage to related structure. At 11:00 a.m. on September 29, 2009, the City Clerk opened and read the following bids for this project: Low Associated Pacific Constructors, Inc. 2 John S. Meek Co., Inc. 3 R.E. State Engineering Inc. 4 Tal Cal Engineering, Inc. TOTAL BID AMOUNT $59,900.00 $66,680.00 $92,625.00 $137,471.00 Balboa Pier Emergency Repairs — Award of Contract No. 4326 October 13, 2009 Page: 2 The low total bid amount is 14.4 percent below the Engineers Estimate of $70,000.00. The difference between the low total bid amount and the Engineer's Estimate is attributed to the favorable bidding climate. The low bidder Associated Pacific Constructors, Inc. possesses a California State Contractors License Classification "A" as required by the project specifications. A check of the Contractor's references indicates they have satisfactorily completed similar projects for other municipalities. This pier repair contract consists of mainly replacing the damaged pile and twelve cross bracings caused by the high surf and heavy waves over the weekend of July 25 and 26, 2009. Other items of work include replacing hardware and the installing trowelable epoxy to fill voids and fix cracks in an existing structural member of the pier; and performing all related work as required to complete the work in place. Pursuant to the Contract Specifications, the Contractor will have 20 consecutive working days to complete the work. Funding Impact: Staff recommends encumbering the necessary $69,900 in funding for this work from the Balboa Island /Harbor Bulkhead and Seawall Repairs CIP (Account No. 7231- C4402002. Over the summer of 2009, staff took advantage of the low bid unit prices received for the 2008 -09 Balboa Island Bulkhead - Seawall Repairs Project and addressed additional future planned work locations around Balboa and Little Balboa Islands. That effort, as well reduced cost estimates to address the Edgewater Lane bulkhead modification should provide enough available funding to cover this transfer and still address all the items planned under the Balboa Island /Harbor Bulkhead and Seawall Repairs project. Environmental Review: The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15269 (b) of the CEQA Implementing Guidelines. This exemption covers the emergency repair or existing facilities for the safety of pedestrians and visitors. Public Notice: The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Affected businesses will be notified by the Contractor prior to the start of the project. Geotechnical and Material Testing Services: Geotechnical, material testing, and survey services are not anticipated for this project. Balboa Pier Emergency Repairs — Award of Contract No. 4326 October 13, 2009 Page: 3 Funding Availability: Upon approval of the budget amendment, sufficient funds are available in the following account for the project: Account Description Balboa Pier Emergency Repairs Proposed uses are as follows: Vendor Associated Pacific Constructors, Inc. Associated Pacific Constructors, Inc. Prepared by: Stephe uy Associate Civil Engineer Attachment: Project Location Map Account Number Amount 7231- C4802002 $ 69,900.00 Total: $ 69,900.00 Purpose Amount Construction Contract $ 59,900.00 Contract Contingency $ 10,000.00 Total: $ 69,900.00 Submitted by ,2;,.Stephen G. Badum Public Works Director Ste_ P ti y� o �P o P4QqC n BALBOA PIER °Ct4v LOCATION MAP NOT TO SCALE C-4326 CITY OF + o�. KMIU c APPROVED BALBOA PIER _ EMERGENCY REPAIRS DRAWING No. EXHIBIT A City of Newport Beach BUDGET AMENDMENT 2009 -10 EFFECT ON BUDGETARY FUND BALANCE: Increase Revenue Estimates Increase Expenditure Appropriations AND X Transfer Budget Appropriations SOURCE: from existing budget appropriations from additional estimated revenues from unappropriated fund balance EXPLANATION: This budget amendment is requested to provide for the following: NO. BA- 10BA -016 AMOUNT: $69,900.00 Increase in Budgetary Fund Balance Decrease in Budgetary Fund Balance X No effect on Budgetary Fund Balance To transfer expenditure appropriations from the Balboa Island /Harbor Bulkhead and Seawall Repairs account to the Balboa Pier Emergency Repairs account to cover the cost of contract award # 4326 to Associated Pacific Constructors, Inc. and unforeseen work. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account REVENUE ESTIMATES (3601) Fund /Division Account EXPENDITURE APPROPRIATIONS (3603) Description Description Division Number 7231 Tidelands - Capital Account Number C4402002 Balboa Island Bulkhead Repair Division Number Account Number Division Number Account Number Division Number Account Number Signed: Signed: Signed: 7231 Tidelands - Capital C4802002 Balboa Pier Emergency Repairs Fin ncial Approval: AdCmi_nistrativ Adminis a e Approval: City IM City Council Approval: City Clerk Services Director Amount Debit Credit $69,900.00 $69,900.00 Date t0 &, Date Date