Loading...
HomeMy WebLinkAbout07 - Campus Drive, San Joaquin Hills Road and San Miguel Drive Street Pavement Overlay — NOC and Acceptance of Contract No. 5582 (CAP14-0009)CTY OF F NEWPORT BEACH City Council Staff Report July 14, 2015 Agenda Item No. 7 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director- (949) 644-3330, dawebb@newportbeachca.gov PREPARED BY: Frank Tran, Civil Engineer PHONE: (949) 644-3340 TITLE: Campus Drive, San Joaquin Hills Road and San Miguel Drive Street Pavement Overlay — Notice of Completion and Acceptance of Contract No. 5582 (CAP14-0009) ABSTRACT: On November 25, 2014, City Council awarded Contract No. 5582, Campus Drive, San Joaquin Hills Road and San Miguel Drive Street Pavement Overlay project to All American Asphalt, for a total contract cost of $1,177,177.00 plus a 10% allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description Account Number Amount County Contribution 7251-C2002070 $ 68,437.00 Measure M Fair Share WV Grade Adjustment SMH Grade Adjustment 7282-C2002070 7521-C2002049 7541-C2002049 $ 951,812.43 $ 10,000.00 $ 16,068.00 Total: $ 1,046,317.43 7-1 DISCUSSION: Overall Contract Cost/Time Summary Actual Awarded Final Cost at Contingency % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change $1,177,177.00 1 $1,046,317.43 1 10% or less 1 -11.1% 1 -12.0 0.9% Actual Time Allowed Contract Time (days) 87 0 Under (-) or Over (+) The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $1,177,177.00 Actual cost of bid items constructed: $1,035,381.04 Total change orders: $10,936.39 Final contract cost: $1,046,317.43 This asphalt pavement overlay project includes the pavement resurfacing of northbound Campus Drive from Bristol Street North to MacArthur Boulevard; San Joaquin Hills Road from Marguerite Avenue to Spyglass Hill Road; and San Miguel Drive from MacArthur Boulevard to San Joaquin Hills Road (Attachment A). The work necessary to complete this contract included grinding the existing pavement, reconstructing and/or overlaying the asphalt roadway, removing and reconstructing portions of deteriorated concrete curb and gutter, sidewalk, and adjusting utility and survey monument covers to grade. A portion of the northbound side of Campus Drive is within the County of Orange right-of-way. Staff processed a cooperative agreement with County staff in order to describe roles and responsibilities for each agency. The County will reimburse the City in the amount of $68,437.00 for actual construction costs within County right-of-way. The final construction contract cost was approximately 11 percent below the original bid amount. This was primarily attributed to the reduced amount of dig -out locations as determined by staff during the construction cold -milling operations. A summary of the project schedule is as follows: Estimated Completion Date per 2014 Baseline April 24, 2015 Schedule Project Awarded for Construction November 25, 2014 Contract Completion Date with Approved Extensions May 15, 2015 Actual Substantial Construction Completion Date May 15, 2015 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ("CEQA') pursuant to Section 15301(c). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). 7-2 ATTACHMENTS: Description Attachment A - Location Man 7-3 ATTACHMENT A /Y J Y 0 �W9Y _I - LL CAMPUS DRIVE N 11GL H59.ILL RO C`11 _— —_— SAN JOAQUIN HILLS ROAD W - e � nnaeoR aolR. SAN MIGUEL DRIVE LEGEND LOCATION MAP NTS. -1O FCT CAMPUS DRIVE, SAN JOAQUIN HILLS ROAD CITY OF NEWPORT BEACH AND SAN MIGUEL DRIVE STREET OVERLAY PUBLIC WORKS DEPARTMENT LOCATION MAP C-5582 7/14/2015 7-4