HomeMy WebLinkAbout08 - Ocean Boulevard and Marguerite Avenue Pavement Reconstruction - NOC and Acceptance of Contract No. 5581 (CAP15-0045)CTY OF F NEWPORT BEACH City Council Staff Report TO: FROM: PREPARED BY: PHONE: TITLE: ABSTRACT: July 14, 2015 Agenda Item No. 8 HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL David A. Webb, Public Works Director- (949) 644-3330, dawebb@newportbeachca.gov Frank Tran, Civil Engineer (949)644-3340 Ocean Boulevard and Marguerite Avenue Pavement Reconstruction — Notice of Completion and Acceptance of Contract No. 5581 (CAP15-0045) On January 13, 2015, City Council awarded Contract No. 5581, Ocean Boulevard and Marguerite Avenue Pavement Reconstruction project, to All American Asphalt, for a total contract cost of $1,098,098.00 plus a 10% allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description Account Number Amount General Fund 7013-C2002074 $ 648,558.08 Measure M Fair Share WV Grade Adjustment SMH Grade Adjustment 7282-C2002074 7521-C2002049 7541-C2002049 $ 376,618.00 $ 7,700.00 $ 2.100.00 Total: $ 1,034,976.08 8-1 DISCUSSION: Awarded Contract Amount Overall Contract Cost/Time Summary Actual Final Cost at Contingency % Due to % Due to Completion Allowance Contract Directed Unforeseen Change Change 1 $1,098,098.00 1 $1,034,976.08 10% or less -5.8% 1 -8.2 Actual Time Allowed Contract Time (days) 1 70 Under H or Over (+ The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $1,098,098.00 Actual cost of bid items constructed: $1,008,267.60 Total change orders: $26,708.48 Final contract cost: $1,034,976.08 This pavement reconstruction project is located on Ocean Boulevard from Goldenrod Avenue to Marguerite Avenue, and Marguerite Avenue from Bayside Drive to Ocean Boulevard (Attachment A). The work necessary for the completion of this contract consisted of removing and reconstructing the existing concrete pavement, upgrading all curb access ramps, installing bike racks and a water bottle filling station at the Lookout Point, adjusting street utility covers to the new surface grade, and performing other appurtenant and incidental items of work as required. The final construction contract cost was approximately 6 percent below the original bid amount due to the deletion of some pavement work on Marguerite Avenue from East Coast Highway to Bayside Drive. This portion of Marguerite Avenue pavement replacement was deleted from the original scope of this contract, and will be added into the work scope for the up -coming water main replacement work associated with Contract 4920 that is tentatively scheduled to start construction after Labor Day 2015. Additionally, a change order was issued to provide for 24-hour flagman traffic control and for additional concrete work at the entrance to the beach parking lot, additional saw -cutting during the pavement removal to reduce vibration, additional over -excavation of subgrade at certain locations and additional cement to the concrete to allow the earlier opening of certain roadway segments. A summary of the project schedule is as follows: Estimated Completion Date per 2014 Baseline Schedule May 22, 2015 Project Awarded for Construction January 13, 2015 Contract Completion Date with Approved Extensions May 11, 2015 Actual Substantial Construction Completion Date May 11, 2015 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ("CEQA") pursuant to Section 15301(c). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. LIM NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Description Attachment A - Location Mao M ATTACHMENT A a� LULUMH a 2ND AVE 2ND AVE IST AVE � D D EOAST H� ❑ TM BAYSIOE pR W � w tt w O j � o a SEAVIEW AVE > SEAVIENA-VE w ��❑a❑❑w 0 w w a �oa a ����wa�W��p��> 2 N O ��K OCEAN BLVD O OCEAN LN O ¢ g D O ZO a LL- a OCEAN BLVD OCEAN BLVD OKOUT POINT CDM STATE EACH PROJECT LOCATION NTS OCEAN BLVD & MARGUERITE AVE CITY OF NEWPORT BEACH PAVEMENT RECONSTRUCTION PUBLIC WORKS DEPARTMENT LOCATION MAP C-5581 07/14/2015 a�