HomeMy WebLinkAboutPPT - 2011 Goal Setting Meeting Presentation2011 GOAL SETTING
Newport Beach City Council
Saturday, February 5, 2011
OASIS Senior Center, Room 2
WELCOME AND INTRODUCTIONS
2011 Council
Goal Setting
REVIEW OF THE MORNING
2011 Council
Goal Setting
THE MORNING'S AGENDA
8:30 a.m. — Welcome and Introductions (Mayor
Henn)
Public Comment — Non - Agenda Items
8:40 a.m. — Review the morning (Jan Perkins)
8:45 a.m. — Review status of 2010 Priorities (Dave
Kiff)
9:00 a.m. — Fiscal Outlook & More(Dave K)
Good to Great
THE MORNING'S AGENDA
(CONT' D)
9:30 a.m. — Budgeting Principles (Dave K)
Public Comment
10:00 a.m. — Break
10:15 a.m. — Goal Setting for 2011 (Jan + All)
Public Comment
11:45 a.m. — Wrap -Up (Mike Henn)
12:00 Noon —Adjournment
REVIEW STATUS OF 2010
PRIORITIES
2011 Council
Goal Setting
2010 PRIORITY RECAP
Protect and Enhance Quality of Life Goal
Status
Next steps
• Airport minimize adverse impacts of IWA
Corridor cities added in 2010:
2011 will see a majorityof
on the community by protecting the
- Irvine
the Settlement Extension
Settlement Agreement's caps on average
- Laguna Beach
discussions /negotiations,
daily departures and passengers as well as
-Villa Park
led by Council, City
the curfew and current noise ordinances.
Met several times with
Man age r, City Attorney
SupervisorMoorlach
• Group homes: implement group home
- Remain in court on major
- Federal court date in
regulations to minimize adverse impacts on
group uses ordinance, but
2011
residential neighborhoods while preserving
successfulthus far
- Continue to implement
appropriate treatment options.
S
- CompletedDAreviewsfor
Ord. 2008 -05 with existing
SLBTS, new DA for
and new uses
Morningside
• Fiscal health and sustainability: make
- Adopted Fiscal Sustainability
Implement Muni Cast
decisions today that will protect and
Policy
Analysis Tool
enhance the City's fiscal health into the
- Provided Finance Committee
- MultiYear Budget
future.
regular updates on current
Forecast
and short and long -term
- Control Costs
budget issues
-Full Cost Recovery &
Revenue Enhancement
• Public safety: provide services that
Ongoing. Performance
Hire new fire chief; protect
enhance safety and protection in the
measurement goals generally
community safety despite
community.
metfor 2010
continuing budget
reductions
9
2010 PRIORITY RECAP
Fiscal Sustainabilitv Goal I Status I Next steps
Adopt and tollow a
Plan.
Adopt a balanced budget that adjusts to
lower revenues provide quarterly financial
forecasts and budget implementation
updates to the Council.
bond rating.
maintain the highest
Imp
-Final Budget adopted with
$2.5M in unidentified
adjustments. Should balance
by yearend by monitoring
revenue increase and
implanting expenditure
reductions
- Succeeded. 1S °Orange
Countycityand oneof only
five cities in California to
receive AAA underlying
agency ratingfrom all three
rating agencies
Ito ri ng
- Identify and implement
cost control measures
including department
reductions and employee
benefit plan concessions
- Implementfull cost
recovery and fee schedule
updates regularly
- Protect ratings bytaking
budget actions to respond
to revenue conditions and
cost control rising cost
threats
- Expand and improve upon
financial policies where
2010 PRIORITY RECAP
Fiscal Sustainability Goal Can't
Status
Next steps
Update the Facilities Financing Plan(FFP)
-FFP was updated several
-U pdate FFP quarterly or
to reflect priorities for capital projects
times duringthe course of the
when new information
funding.
yearas new construction
concerning construction
estimates became available
costs orfunding changes
significantly
Update the City's harbor fees in a manner
- Council approved mooring
- Currently evaluating
that is fair; secure a funding mechanism for
and BYB rate increases in
commercial pierfeeswith
funding harbor projects, such as dredging
November /December 2010
goal of converting all
and providing additional harbor amenities.
permits to leases
- These increases will assist
in long term fundingfor
harbor related projects
- Harbor Commission
evaluatinga "Mooring
support Service Center'
conceptatthe BYB and
future Marina Park.
Council conceptual review
in February 2011
Initiate a results -based budgeting system.
-Met with Department
- Convert all other
Directors and Consultants
departmentRAPto
- Developed concept plan
Performance Plan template
-Admin Services and Public
Workswill serve as first test
budgets for 2011 -12
2010 PRIORITY RECAP
fective Management Goal
Status
Next steps
Restructure City government to become
Several changes in 2009 -10
More to come in 2010 -11
more efficient and effective in the delivery
(MOO, Code Enff, Harbor
and2011 -12
of valued services.
Resources, contracting out,
mare)
Provide quarterly reports to City Council on
- PerformanceMeasurement
Awaiting implementation of
performance measurements (comparing
Program undertransition.
results based budgeting
ourselves to ourselves) and information on
-Will be integrated tvithnew
system
feasibility ofbenchmarking (comparing
results based budgeting
ourselves to other agencies).
system once implemented
Conduct the second Citizen Satisfaction
- SurveyconductedinAugust
Completed. Next Survey
Survey.
2010.
likelyto be In 2012 or 2013.
-Final survey report
presented to Council on
October25, 2010
Update the City Charter.
Measure V passed byvoters
Amending Polices to match
November2010
new Charter language
Improve customer service by mirroring the
Generally met goal of 24 -hour
Provide more services
"gold standard" of service in the public or
response time forcalls, e-
online,24 /7.Reducetrips
private sector.
mails
to City Hall
2010 PRIORITY RECAP
Effective Management Goal Con't
Status
Next steps
• Improve City / resident communications.
- Citizen survey indicated
PlOSfromvarious
increased citizen satisfaction
departments will meet
with overall communication
early in new yearto align
efforts and several
communication goals and
communication tools
objectives for 2011
- Staff continues to
incorporate new technologies
& update processes for
community outreach and
communication efforts
• Restructure development services function
-Hired interim Community
- Conductrecruitmentfor
for improved coordination among
Development Director;
Community Development
disciplines; continued improvement in
- MergedPlanningand
Director,
customer service.
Building in Jan 2011;
- Continue implementation
- Implementation underway of
ofcustomerservice
revised proceduresto
enhancements
streamline operations and
improve customerservice
• Adopt an updated Zoning Code and
ZoningCode adopted in
- Implementandtrainstaff
Transportation Fair Share Fee and obtain
October
on updated Zoning Code,
certification of Housing element.
- FairSharefeereviewedby
Adoptanynecessary
GP /LCPcommittee andfinal
revisions to the Zoning
draft isbeingprepared
Code
- Staffhasreceivedcomments
- Finalizeandadoptthe
f rom HCD and is working
revised FairShare fee,
closely with HCD staff on
obtain certification of
minorchanges to the Housing
Housing Element
Element
• Address the economic impact of new
None passed in 2010
regulations considered by the City Council.
2010 PRIORITY RECAP
Economic Sustainability Goal
Status
Next steps
. Support the renovation of Fashion Island
Staff has worked closelywith
Continuation of key staff
and the prompt opening of Nordstrom.
the Irvine Companyto support
assignmentto support
renovation of Fashion island
renovation of Fashion island
including renovation of the
movietheaters
- Nordstrom opened in April of
2010
Abate nuisances and improve Mariners Mile
Staff supportedthenew
Completethe review of the
between Dover and M #WgqAd�,.
owner'seffortsto
new development proposal
aesthetically enhance and re-
and ensure atimely hearing
use several buildings that are
and if approved, coordinate
now occupied, Staff is
the timely issuance ofa
presently reviewing a new
building permit for new
commercial development
construction
proposalforthe corner parcel
2010 PRIORITY RECAP
comic
Company's North Newport Center project.
ureage cne cower nay am esmousn a in
term funding source for repeat dredging
efforts.
effortsconsistent with the Strategic Plan
for Economic & Fiscal Stability and with the
Council's Fiscal Sustainability Plan.
Status
Staff facilitated the timely
review and approval of an
amendmenttothe North
Newport Planned Community
- Reviewedand approvedon
schedulethe Irvine Company's
requestforsetsmic retrofit of
the Block 600 oarkine earaee
with the Corps
- Federal funding is still
unknown
has supported the Chamber of
Commerce, BIDS, Restaurant
Week, Film Festival and has
coordinated development
processing for seve ral
prospective businesses, OPTS
Network program support
Next steps
Continue to coordinate
future project specific
requests as they arise
Lower Bay contaminated
material as a source of fill
forthe POLE
- Be prepared for last
minute POLB request
- Longterm fundingfor
Lower Bay possibly
provided by current harbor
fee increases (moorings,
BYB, pier permit fees etc...)
Focus on providing business
attraction and business
retention services and
project implementation
coordination where
necessary
2010 PRIORITY RECAP
identify a process and the resources needed
Public /Private partnership
Approve the final
to support innovative planning of and
with Duda and Vornado
conceptual plan on
improvement in Lido Marina Village,
identified and implemented in
1/25/2011, identifyand
including Via Oporto and other nearby
July of this year, Tim Collins
implementfutureprogram
properties.
retained in August, WHA
retained in September, two
presentationsto the City
Council completed, and the
conceptual planning effort
nearly 90% complete
• Complete update of vision for Balboa
Previous studies identified and
-Re -affirm Council priority
Village.
reviewed, Process to identify a
and identify a budget
'Vision" using a public /private
allocation,
partnership and planning
- Perform economic
effort is recommended,
analysis, identify partners
Economic analysis needed,
implement visioning
Project not budgeted
2010 PRIORITY RECAP
Environmental Sustainability Goal
Status
Next steps
• Respond to the results of the JWAair
Study completed August "10
Decide if Phase llstudy
quality study.
(water quality) warranted
• Reduce our use of potable water and our
- Reduced residential potable
- Supportconstruction of
dependence on imported water sources.
water consumption by 15%
the Poseidondesaliniiation
from Syr average to130
plant
gallons per day per capita
- Increase use of recycled
(GPCD)
waterfrcm432 acre -feet
- Updated N8MC14.16 Water
(aff)to 500 aaf
Conservation and Supply
- Increaseourbasin
Level Regulations
pumping percentage from
- Adopted NBMC14.17
62% to 65% to eliminate
Water -Effic -rent Landscaping
theneedfor500 of of
and landscape & Irrigation
importedwaterfrorn
Design Standards
Metropolitan Water District
- Implement a progressive
tiered water rate
- Implement City rebate
programs to incentivize
efficient water use
0
2010 PRIORITY RECAP
Assist the Corps and County in dredging
the Upper Bay and establish a long -term
funding source to repeat the UNB dredging.
1293
volunteers
- UpperBuckGully Wetlands
Restoration
- Newport Beach Receives
Five Star Rating - NRDC's
report provides a 5 -star
ratingguide for 200 of the
nation's most popular
beaches
Upper Bay project complete
in November 2010
- Project planningand
construction documents
complete
- Coastal Permit issued
lanuary12, 2011
- Work .;,:n our ups-.-e am
cities and regional agencies
to reduce nutrient, selenium
and debris loading into the
UpperBay and Harbor
- Water quality projects in
Lower Buck Gully and Big
Canyon Creek
- Maintain our enhanced
cleaningand maintenance
of storm drains
- Deploy trash booms in
Longterm funding for Upper
Bay possibly provided by
current harborfee increases
(moorings, BYB, pier permit
-Bid package release
February 2011
- Construction start
August 2011 (subject to
POLBschedule)
- Project complete by
December2011
2010 PRIORITY RECAP
Environmental Sustain abiIity Goal ton`t
Status
Next steps
+ Create a plan for responding to future sea
- Building code slab
- Consultant reporton Sea
level changes that may affect properties.
construction height adjusted
Level rise impactto Balboa
tomeetlatestFEMA
Islandtobe completed In
guidelines
Spring 2011
- FutureBulkheadheightsto
- FuturereviewofSeaLevel
• Break ground on the Civic Center Project,
be increased as replaced
rise impacts to rest of
including the park.
Studyunderwayto
Coastal area to be
understand Sea Level impacts
undertaken
to Balboa Island
is in process
Community Enhancements Goal
Status
Next steps
• Incorporate a public art component into
MOU completed veithOrange
Art to be acquired and then
the new Civic Center.
County Museum of the Arts
installed when Park
forthe acquisition and
construction complete
Installation of Art workfor the
Civic Center Park
• Break ground on the Civic Center Project,
Under Construction
Sail Export completed.
including the park.
Building Permitissued.The
biddingof Final GMP phase
is in process
2010 PRIORITY RECAP
• Complete the FIR and seek funding sources
Continuedto explore
Circulation of Draft EIR
forthe Banning Ranch property.
acquisition funding and no
following its completion
sources have been identified,
Draft EIR nearly complete with
publication anticipated in the
Spring of 2011
• Start construction of Sunset Ridge Park.
Currently workingto obtain all
Anticipate construction
necessary permits including
could begin in Fall of 2011
CCC
• Start construction of Marina Park (phase I
Currently workingto obtain all
Anticipate construction
orall phases).
necessary permits including
could begin in Pall of 2011
CCC
• Complete construction of and open the new
Openedperplanon
Project is Complete.
OASIS Senior Center.
September20,2010.
Project is Complete
2010 PRIORITY RECAP
Reduce fire hazard in Buck Gully and
- OrangeCountyFireAuthority
Expectedfinal approved Fire
Morning Canyon.
has compiled all Fire Hazard
Hazard Safety Zone mapto
Safety Zone details andis
be completed early in 2011.
finalizingtheirreport.
The map willidentifyhigh
- City staff have reviewed a
riskzones and guide staff to
draftversion and submitted
develop plans to reduce fire
comments
riskin these areas.
+ Implement traffic management plan
Currently working onthe
Construction slatedfo
(including traffic synchronization) to
design of Phase 5ofCitywide
Spring 2011
improve traffic flows.
FrafficSignal Modernization
project iNewport CenterAreaj
2010 PRIORITY RECAP
Community Enhancements Goal Con't
Status
Next steps
• Implement a comprehensive parking
Walker Consultants reports
Upon availability of funds,
program for the Balboa Peninsula.
completed, Council directed
complete the Balboa Vision
parking management program
and implement its findings,
for Balboa Village, Study
Prioritize parking program
Session in September, on -hold
implementation bydistrict
as parking managementisa
likely component ofthe
Balboa Vision effort
• Widen Jamboree Road in the Airport Area
Advertising the bridge
Planningto award the
(especially Jamboree and Bristol).
widening project in January
ConstructionContractin
2011
March 2011
• Initiate the acquisition of Coast Highway
Caltrans has produced, and is
-The nextstep will befor
between Jamboree and the Santa Ana
rev ewingthe Project Study
Caltransto provide repertto
River and Newport Boulevard from Finley
Reportforthe condition
Citystaff for review and
to West Channel Bridge; create a process
assessment of the two
discussion
for initiating a longer range planning
highway facilities
- Staffhopestohavethe
process for Mariner's Mile Traffic
Pedestrian, and Parking Comprehensive
reportfrom the state by Feb
Plan.
2011
L
2010 PRIORITY RECAP
Newport Beach arts
through:
• opening of the remodeled Port
Theater;
• The Newport Beach Film Festival;
• Encouraging fundraising to renovate
the Balboa Theater and implement
the Newport Nautical Museum's
master plan-
• Assisting VisitNB.com or the Chamber
in publishing and promoting a Master
Calendar of Events.
Plan the future of the current
at 3300 Newport Boulevard.
• Work to change the dynamics in West
Newport on July 4 to have a more family -
friendly celebration and lower law
enforcement costs.
- $100,000 Council grant in
support of the Film Festival
given in 2010
- Arts Commission is giving
the Festival aS5,000 arts
grant
- Master events calendartha-,
is enclosed in the City's
Navigator newsletter
Study Session 1/11/2011
completed with direction
given to staff as a component
of the Lido Village Conceptual
planningeffort
West Newport Safety
Committee reps, community
members and staff to meeting
inJanuary
- Continued efforts to
support the Arts in Newport
Beach
- The City continues to have
a staff representative to
work with the Film Festival
Board
- Approvethefinal
conceptual plan on
1/25/2011,
- Implement final Council
direction on re -use, prepare
environmental review and
adopt necessary
amendments to regulatory
documents
Committee will meet
regularly through the late
winter& spring
FISCAL OUTLOOK
2011 Council
Goal Setting
SIDEBAR: GOOD TO GREAT
2011 Council
Goal Setting
GOOD TO GREAT
It's about being faster, smarter, leaner,
better.
Identify:
What we are passionate about;
What we want to be best in the world at;
and
What drives our economic engine.
GOOD TO GREAT
Today's times are hard, but a better organization
is ahead.
Right people on the bus, the wrong ones off the
bus.
A "stop doing" list is more important than a "to
do" list.
Disciplined action based on disciplined thought.
GOOD TO GREAT
IN NEWPORT BEACH
Shining city by the Bay
We value:
A high quality physical environment;
The sense of community enjoyment and safety;
Engagement within the community and with city government.
What services, investment, and actions are critical to achieving
those values?
Of those, what does the City need to do — i.e., what can we be
best in the world at?
Disciplined Thought -> Disciplined Action
QUARTERLY FINANCIA
REVIEW
City of Newport Beech, Adelieistrotive Sei`Me3 Deper!men!
W1r1r.0e1wpprtbe0NC0.pOS• 949.6+1.3127
PROJECT: Civic Center Project
Department(s): PutN&Wa is
Project Lead: Steve Ha&m
Project Start Date: Apri12010
Target Completion Date: December 2012
For
ABOUT THE QBR
NEWPORT BEACH QUARTERLY
BUSINESS REPORT
Quarterly Financial Review
2010-11 Budget Update
FY 2010-11
G.iginal
12131 /18 VD
eidy.
A—.. Butlgel
breves
Rer W.
Clwsge
.4apery'a.es
S - ::4`840
S 33.591.170
3 71000.000
S 39.160
S.—T.
"4 734
3895079
18150000
875366
9ropeeYT= -m lmuafsoleslm
0.392273
-
6]08,305
(s3.9a0)
- rsen -Q cupancy'as
11355.034
6.002.'73
12,500000
5 946,966
Rulness bcemes
4006.000
1,183339
3,520,000
tseacc)
Fana�Kes
4.145.000
0661'6
3,955C
l'6C DX
Ostlldir 9eyen.e
3,552749
1573.002
4119381
466632
011
27154260
16,2295y
27.15626n
Tmmfen4n
3679,034
8-
-
Tel9[ aeremies a T.anCers
l
3 149,505,504
5 61 966.612
3 151 016.)60
3 2.211156
Page 5
Summary Property Tans - The California residential housin5
r. our economic outlook is stable with market appears to have bottomed out for now and is now
BACK TO FISCAL OUTLOOK
2011 Council
Goal Setting
FISCAL OUTLOOK
We survived the recession
Hard choices, significant reductions
Sustained reserves per Fiscal Sustainability Plan
We are not out of the woods yet...
Pension costs (market, actuarial assumptions, return
rate)
Conservative approach — slow recovery
Protect reserves for emergencies, key initiatives
Uncertainty as to State of California actions
$30,000,000
$25,000,000
$20,000,000
$15,000,000
$10,000,000
$5,000,000
PENSION COSTS GOING UP
Total Payments to PERS (ER & EE)
11,979,481
14,420,311
15,477,087
16,331,846
18,917,869
18,480,
20,221,097
3,241,524
24,774, 7
27,958,951
• Employer
$7,687,339
$9,832,895
$10,720,16
$10,722,16
$12,312,38
$11,766,74
$16,432,23
$17,528,41
• Employee Misc (Contribution)
0
0
0
$604,666
$1,284,197
$1,314,795
$1,555,808
$2,562,529
$2,841,675
$2,870,092
• Employee Safety (Contribution)
0
0
0
0
0
$173,224
$971,004
$971,004
$1,000,134
$1,030,138
• EPMC
$4,292,142
$4,587,416
$4,756,921
$5,005,016
$5;321,284
$5,225,891
$4,450,610
$3,275,754
$3,404,458
$3,479,828
KEEPING UP OUR FACILITIES
Facilities Replacement Plan includes Civic Center,
Fire stations, Police HQ, Sunset Ridge, Marina Park,
Lifeguard HQ, more.
GF Contribution to Facilities Replacement Plan
FY
2010
-11
- $3.8
million
FY
2011
-12
- $4.6
million
FY
2012
-13
- $5.0
million
FY
2013
-14
- $6.0
million
INVESTING IN BASIC INFRASTRUCTURE
8,000,000
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
1,000,000
General Fund Annual CIP Budget
FY 2007- FY 2008- FY 2009- FY 2010- FY 2011- FY 2012- FY 2013-
08 09 10 11 12 13 14
Proposed Proposed Proposed
WHAT'S THE BOTTOM LINE?
Change the way we do business to:
Improve services & programs
Invest more in critical IT
O CAD /RMS
O Electronic Plan Check
O Advanced budgeting
Right people on the bus
Entrepreneurial, innovative, communicative
Bring General Fund CIP back to +$5 million
Protect our reserves
WHAT'S THE BOTTOM LINE?
Means that we need to:
Reduce expenditures by 5% in 2010 -11
Reduce another 5% in 2011 -12
Must be:
Structural
Thoughtful, creative, efficient
A transition to a better government
WHAT'S THE BOTTOM LINE?
Means that we need to:
Reduce expenditures by 5% in 2010 -11
Reduce another 5% i
Must be:
Structural
Thoughtful, creative, efficien
A transition to a better go
PiL4
Faster,
Smarter,
Leaner,
Better
BUDGET PRINCIPLES
2011 Council
Goal Setting
PROPOSED BUDGET
PRINCIPLES
Adhere to & build on 2010's Fiscal Sustainability
Plan.
Next 18 months = not a crisis, but an
opportunity to change government.
"Shining City's" success as a community includes
our investment in our infrastructure.
PROPOSED BUDGET
PRINCIPLES
10 great programs today should not become 10
mediocre programs tomorrow.
Address pension costs comprehensively and
aggressively.
Public safety is paramount
But there are still smarter, better ways of
delivering public safety services without
compromising safety.
2011 Council
Goal Setting
2011 PRIORITY SETTING
2011 Council
Goal Setting
TODAY'S GOALS BUILD ON A
STRONG BASE
Emerging /Generational
Issues for 2011
2010's Efforts:
In Execution Mode
City Operations
Core City Functions
BASE -CORE CITY SERVICES
Emerging /Generational
Issues for 2011
2010's Efforts:
In Execution Mode
Primarily
Staff City operations
Driven Core City Functions
Council
review, but
staff execution
MIDDLE - "IN EXECUTION
Emerging /Generational
Issues for 2011
2010's Efforts:
"In Execution Mode"
City Operations
Core City Functions
MODE"
Active Council
& Community
Input Critical
Top: TODAY'S Focus
Emergi ng /Gene ration a
Issues for 2011
2010's Efforts:
n Execution Mode
11f7 City Operations
Core City Functions
THE BASE: CORE CITY
Emergi ng /Gene ration a
Issues for 2011
2010's Efforts:
In Execution Mode
City Operations
Core City Functions
FUNCTIONS
ak
THE MIDDLE: IN EXECUTION
Emergi ng /Generational
Issues for 2011
2010's Efforts:
In Execution ModE
City Operations
Core City Functions
Rhine Channel,
Sunset Ridge Park
arina Park, Civic Center
Newport Bay, July 4,
AAmunications,
i6p Homes,
�Aturing, more
THE TOP: GENERATIONAL
CHANGE
Emerging /Generation Proposed:
Issues for 2011 JWA Settlement Extension
2010's Efforts:
In Execution Mode
City Operations
Core City Functions
Revitalization
Tidelands Management
Pension Reform
2011 City Restructuring
2011 PROPOSED PRIORITIES/ GOALS
"GENERATIONAL CHANGE"
2011 Council
Goal Setting
#1: .1 WA SETTLEMENT
EXTENSION
Goal: Secure long -term extension of protections at JWA
(curfew, noise ordinance, ADD caps, more)
Leadership by Supervisor Moorlach and:
Aviation Committee
Community advocates
Air Fair
AWG
Corridor Cities
Additional Data
Phase 11 of Air /Water Quality Study?
#2: REVITALIZATION
Goal: A comprehensive, prioritized multi -year approach to City
investment in areas of town that need attention to shine.
Areas might include:
Current city hall site, Lido Marina Village
West Newport Beach /Coast Highway (Newport Blvd to HB)
Mariner's Mile
Bristol Street /Santa Ana Heights
CDM -- outdoor dining request
#2: REVITALIZATION
Goal: A comprehensive, prioritized multi -year
approach to City investment in areas of town
that need attention to shine.
Areas looked at through multiple lenses:
Infrastructure (medians, parkways, parking
strategies)
Economic development needs
Code Enforcement strategy
Community benefits, community wishes
#3: TIDELANDS
MANAGEMENT
Goal: A comprehensive management, governance,
and investment strategy for all tidelands — address:
E - .. .
Beach replenishment
Long -term capital plan like Facilities Replacement
Plan
Sea Level Rise
Oil and Gas
Water Quality Master Plan
#4*. PENSION REFORM
Goal: Enact public pension reform that maintains
City's competitiveness but protects City's long-
term sustainability
Strategy:
Appropriate negotiations at home
Regional, statewide involvement /advocacy
#5*. RESTRUCTURING
Goal: Guide /advise city manager in moving city
government forward, becoming a Great organization.
Strategy:
Regular communications /updates /guidance on
restructuring (QBR)
Extensive community involvement to ensure
community needs are met
Learn from others
Avoid distractions
Disciplined thought -> disciplined action
WRAP -UP
2011 Council
Goal Setting
WHAT'S NEXT
If consensus on priorities:
Staff will develop workplans, estimated budgets
Council agenda for February 22, 2011
Implementation begins
Tracking via Project Tracking Sheets
Careful, disciplined approach to actions proposed
outside of priorities.