HomeMy WebLinkAboutSS3 - Mooring Support Service CenterMooring Support Service Center
at the
Balboa Yacht Basin
Harbor Commission Conceptual Plan
Council Study Session
February 22, 2011
Why We're Here
November Zoio - Council Member Selich requested
the Harbor Commission return to Council with a
conceptual plan for a Mooring Support Service Center
at the City owned Balboa Yacht Basin Marina
• Better serve the needs of mooring permittees
• Balboa Yacht Basin could serve eastern end of harbor
• Future Marina Park could serve western end of harbor
•BBB9IN
9 _ l
• ��yy \�y •,ISl
r•
Oki-,
r • °••
'PEy1ASULA _ _
°R. LIDO
- JSL - €.
NEWPORT j/ BAY,•
PIER ISLA.
West Harbor Mooring Support Services Censer
Dinghy Racks
Rest Rooms
Pump Dut
Dedicated Minor Mainternnce /Washing Slip
Parking
Newport Harbor
City of Newport Beach
/�/ eulkha80
Pbmead
_Moor, Snes
NaNOaaon CEenOel
�) L
♦ �Y
0 025 OS
I51km
,l
BALBOA
PIER
BAUWA ------
NEWPORT
B
•`
DUNES
Harbor Mooring Support Services Center
'� a 1' a,
ow �av o
Dirghy Racks
-
Rest Roams
Pump Out
•I
dicated Mirror Maintenance /Washing Slip
Parkng
i�l
l
BALBOA
PIER
BAUWA ------
LSLANQ___.
B
•`
�, `. 4.9NN \L - -.�
'� a 1' a,
ow �av o
-
\
THE
WEDGE
e \,
a
`y' 1
m
YJ 11
Rv -i41 •�N6�1,
charge batteries,
EE-Dock
wash down, vessel pump -
outs etc... -
Proposal
• Designate 2 side -ties
(preferably same fairway).
Alternate side -tie locations are
available.
• Side ties yield more space
without removing a slip renter.
• Water / Power available —
new pedestals needed.
• Access to Galley, Basin
Marine and other stores.
• Time limit.
enforcement.
Need plan for
z
Existing Pump -Out
D -Dock
w
C -Dock
D -Dock
C -Dock
FFMXWM�ort term public
access to Galley Cafe, Basin
Marine and Pavilions etc...
Proposal
• Establish short term side ties
• Easy access to Galley and
Basin Marine
• Time limits: 1 -3 hours ?
Need plan for enforcement.
• Relocation of 2 slip
occupants. Possible when
slips become available.
• Other side ties may be used
when available, but not as
convenient. Could implement
before summer season.
'ZiWprofit (no charge) in
disabled. Could
7r n available, but
this location is preferred for this program.
F �
I L
Slip currently rented, but
could pos ' ocated
to an i r A" slip
when available.
I
Improve access for
mooring permittees to reach
vessels in mooring fields.
Proposal:
• Floating dock with rack storage for
dinghies
• Open water behind E-
Dock I
• 15 -20 capacity
• Permit system
• Small, narrow channel
exists next to groin
(Beacon Bay). Sailboat
relocated.
• Also access via pump -
out dock
• Agency permits
required
• Outreach to BYB
tenants
Example: American Legion
rack system
• Racks for lightweight
dinghies /kayaks inside existing
storage space in back corner
• Longer walk to water
• NMFS vessel (no charge) would
vacate
• Very close to apartment tenant
and Beacon Bay
• Limited hours for access (noise)
• Good use of space yet challenging
• Outreach to BYB tenants
Idea #1
• Racks for lightweight
dinghies /kayaks near enclosure at
end of lot
• Occupy 3 -4 parking spaces
• Install slats in fence for visual
barrier for Beacon Bay
• Possible security camera added
here
• Outreach to BYB tenants
racks
E -Dock
I
Proposal
• Install new float for visitor access
• Add to existing pier platform at E-
Dock.
• New gangway needed
• Lots of unused water space
• Could impact side -tie D -1
• Agency permits required
E -Dock � D -Dock
.;.A
M M
Next Steps
Guidance from Council to:
• Study further and return with detailed plan / costs
or
• Postpone project
Staff has inserted a placeholder in 2011 /2012 CIP
proposed budget for $25k
r
Questions
Chris Miller
Harbor Resources Manager
(949) 644 -3043