Loading...
HomeMy WebLinkAboutSS3 - City Council Selenium Mitigation Program Presentation�I ►V F.�� Selenium Mitigation N Program City Council Study Session March 812011 Public Works Department What is Selenium? *Selenium is a naturally occurring element. •Selenium is an essential nutrient for animals and some plants. •Selenium salts are toxic in large amounts. �.m.w.� L, Cs Pr Nd Pm Sm Eu d T6 Oy Ho Er Tm `(b �.�� Ae r Th Pe U r Np pu Am Cm Bk Cf Es Fm Md No Selenium Mobilization 40 POTENTIAL SOURCES OF GROUNDWATER DISCHARGE 111 RAINFALL AGRICULTURE UNLINED RESERVOIR �^ NON. 11 IMPORTED WATER w' 111 1_ TRUNK MAIN GOLF COURSE IN DISTRIBUTION LINE GROUNDWATER MOUND POND `I W 4 `I►' OVER IRRIGATION LEAKAGE INTO S.D. Selenium Hot Spots NEWPORT BAY WATERSHED -E N 0 1 /p A 0 Mmes ae i CP F5 PIYEAAOE 00.N16f l Newport Bay Watershed Paco Selenium TMDL Compliance • Option One — Comprehensive Cooperative Watershed Program • 15 -year compliance with early action item requirement • Develop BMP Strategic Plan +:•San Diego Creek treatment = 5 -12 ppb ❖Big Canyon treatment = 1 ppb ❖Build Cienega Selenium Treatment Plant ❖Treat "Swamp of the Frogs" groundwater • Total potential shared cost: $50 -150 million Selenium TMDL Compliance • Option Two— Compliance with Numeric Effluent Li m its • RWQCB assigns waste load allocation to each responsible party • RWQCB assigns compliance period • Immediate compliance at tend of pipe • Meet existing CTR limit = 5 ppb (all locations) • Potential Newport Beach cost: $7 -10 million Cienega Treatment Plant Cienega Treatment Plant Selenium inflow Creek flow Flow diverted to plant Selenium concentration at end of treatment Treatment stream- additional reductions 30 -120 ppb 12 cfs (average) 3 cfs (1,350 gal /min) 9 ppb (@ pipe end) Arsenic (70 %) Bacteria (50 %) Copper (75 %) Nitrates (100 %) Zinc (100 %) Cienega Treatment Plant • Construction Cost Estimates - $22 -30 million • IRWD contributes a $5.5 million Federal Grant • IRWD operates and maintains plant • Several scenarios being considered ❖Percent Land Area /Population Variations •'• Proportional Distance ❖Generation and Benefiter • Newport Beach cost $250,000 to $1.5 million • Proposed start in Fall 2011 Big Canyon Creek Big Canyon Strategy • Divert Reservoir low flow under -drain and 2 HOA sub- drains to sewer. • Eliminate slow moving water areas — Target Nature Park & Golf Course Lakes — $1.5 million Irvine Company settlement • Continue reduction in over - irrigation activities — Audit & upgrade HOA and residential systems — $667,000 USBR Grant Big Canyon Strategy Continued • Monitor effects — Field measure total Selenium, Selenate & Selenite — O &M Funds • Potential Treatment Facility or Diversion at Jamboree — Install biological reactor — Underground wetland — Diversion to sewer — $1.5 million Irvine Company settlement • Potential Overall Cost: — $5 -7 million Selenium Mitigation Program Questions?