What is Selenium?
*Selenium is a naturally occurring element.
•Selenium is an essential nutrient for animals
and some plants.
•Selenium salts are toxic in large amounts.
�.m.w.�
L,
Cs
Pr
Nd
Pm
Sm
Eu
d
T6
Oy
Ho
Er
Tm
`(b
�.��
Ae
r
Th
Pe
U
r
Np
pu
Am
Cm
Bk
Cf
Es
Fm
Md
No
Selenium Mobilization
40 POTENTIAL SOURCES OF GROUNDWATER DISCHARGE
111
RAINFALL
AGRICULTURE
UNLINED RESERVOIR �^ NON.
11
IMPORTED WATER
w' 111
1_ TRUNK MAIN
GOLF COURSE
IN
DISTRIBUTION
LINE
GROUNDWATER MOUND
POND `I
W 4 `I►'
OVER IRRIGATION
LEAKAGE INTO S.D.
Selenium Hot Spots
NEWPORT BAY WATERSHED
-E
N
0 1 /p A
0
Mmes
ae
i CP F5
PIYEAAOE
00.N16f
l
Newport Bay
Watershed Paco
Selenium TMDL Compliance
• Option One — Comprehensive Cooperative
Watershed Program
• 15 -year compliance with early action item requirement
• Develop BMP Strategic Plan
+:•San Diego Creek treatment = 5 -12 ppb
❖Big Canyon treatment = 1 ppb
❖Build Cienega Selenium Treatment Plant
❖Treat "Swamp of the Frogs" groundwater
• Total potential shared cost: $50 -150 million
Selenium TMDL Compliance
• Option Two— Compliance with Numeric Effluent
Li m its
• RWQCB assigns waste load allocation to each
responsible party
• RWQCB assigns compliance period
• Immediate compliance at tend of pipe
• Meet existing CTR limit = 5 ppb (all locations)
• Potential Newport Beach cost: $7 -10 million
Cienega Treatment Plant
Cienega Treatment Plant
Selenium inflow
Creek flow
Flow diverted to plant
Selenium concentration
at end of treatment
Treatment stream-
additional reductions
30 -120 ppb
12 cfs (average)
3 cfs (1,350 gal /min)
9 ppb (@ pipe end)
Arsenic (70 %)
Bacteria (50 %)
Copper (75 %)
Nitrates (100 %)
Zinc (100 %)
Cienega Treatment Plant
• Construction Cost Estimates - $22 -30 million
• IRWD contributes a $5.5 million Federal Grant
• IRWD operates and maintains plant
• Several scenarios being considered
❖Percent Land Area /Population Variations
•'• Proportional Distance
❖Generation and Benefiter
• Newport Beach cost $250,000 to $1.5 million
• Proposed start in Fall 2011
Big Canyon Creek
Big Canyon Strategy
• Divert Reservoir low flow under -drain and 2 HOA sub-
drains to sewer.
• Eliminate slow moving water areas
— Target Nature Park & Golf Course Lakes
— $1.5 million Irvine Company settlement
• Continue reduction in over - irrigation activities
— Audit & upgrade HOA and residential systems
— $667,000 USBR Grant
Big Canyon Strategy Continued
• Monitor effects
— Field measure total Selenium, Selenate & Selenite
— O &M Funds
• Potential Treatment Facility or Diversion at Jamboree
— Install biological reactor
— Underground wetland
— Diversion to sewer
— $1.5 million Irvine Company settlement
• Potential Overall Cost:
— $5 -7 million
Selenium Mitigation Program