Loading...
HomeMy WebLinkAbout06 - Ocean Piers Maintenance� SEW FART = CITY OF NEWPORT BEACH U\� City Council Staff Report Agenda Item No. 6 April 26, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Tom Sandefur, P.E. APPROVED: TITLE: 2010 -2011 OCEAN PIERS MAINTENANCE — AWARD OF CONTRACT NO. 4682 ABSTRACT: As part of the on -going maintenance required on the Newport and Balboa Piers, the City generated plans, advertised and received bids for various repairs. RECOMMENDATION: 1. Approve the project drawings and specifications. 2. Award Contract No. 4682 to Associated Pacific Constructors, Inc. for the total bid price of $316,700.00, and authorize the Mayor and City Clerk to execute the Contract. 3. Establish an amount of $47,500.00 (15 %) to cover the cost of unforeseen work not included in the original contract. FUNDING REQUIREMENTS: The current adopted budget includes sufficient funding for this contract. Account Description Account Number Amount Tide and Submerged Lands 7231- C4801001 $ 365,200.00 Total: $ 365,200.00 1 2010 -2011 OCEAN PIERS MAINTENANCE —AWARD OF CONTRACT NO. 4682 April 26, 2011 Page 2 Proposed uses are as follows: Vendor Purpose Amount Associated Pacific Construction $ 316,700.00 Associated Pacific Construction Contingency 47,500.00 Various Printing and Incidentals 1,000.00 Total: $ 365,200.00 DISCUSSION: At 10:00 a.m. on April 7, 2011, the City Clerk opened and read the following bids for this project: BIDDER TOTAL BID AMOUNT Low Associated Pacific Constructors $291,700.00 * 2nd John S. Meek $334,160.00 * 3`d R.E. Staite Engineering, Inc. $471,427.50 *Corrected Bid The low total bid amount is 59% lower than the Engineer's Estimate of $490,750.00. The disparity between the estimate and the actual bid prices reflect a continued favorable construction market. An additive bid item was included for the bidders consideration that would change all the galvanized hardware to stainless steel hardware. Associated Pacific Constructors bid $25,000 on this additive item. Based on the favorability of the bid and the longer lasting, higher quality product that would be produced, Staff recommends awarding the contract with the additive bid item included. The low bidder possesses a California State Contractors License Classification "A" as required by the project specifications. A check of Associated Pacific Constructors' references indicates satisfactory completion of similar projects for other public agencies, including several projects for the City of Newport Beach. Given the favorable project bid, staff recommends Council approve a 15% contract contingency limit with this contract. The contingency will be used to address any damage that has occurred subsequent to the Ocean Piers Inspection Report completed in November 2010. The work necessary for the completion of this contract consists of making repairs to the two existing City piers including grouting cracks in stringers, piles, and cross bracings, replacing deteriorated fasteners, and replacing missing or broken timber members. In addition, the project will also replace corroded girder straps under the Life Guard Headquarters. 2 2010 -2011 OCEAN PIERS MAINTENANCE —AWARD OF CONTRACT NO. 4682 April 26, 2011 Page 3 Pursuant to the Contract Specifications, Associated Pacific Constructors will have 60 consecutive working days to complete the work. Any work not completed by July 1, 2011, shall be completed after September 5, 2011. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301 (minor alteration of existing public facilities with negligible expansion) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Ten days prior to starting work, a City prepared notice will be distributed by the Contractor to residents and businesses within the project limits advising them of the pending work. Additionally, a second notice will be distributed by the contractor to residents and businesses two days before work will start adjacent to their property. Ci ihmittc`i h%r Attachment: Location Map 3 LOCATION MAP 2010 -2011 OCEAN PIER MAINTENANCE CONTRACT NO. 4682 (PAGE 1 OF 2) PK Zm� 5� A t y I r :%NX 1 - PROJECT LOCATION (NEWPORT PIER) LOCATION MAP 2010 -2011 OCEAN PIER MAINTENANCE CONTRACT NO. 4682 (PAGE 2 OF 2) PROJECT LOCATION (BALBOA PIER)