Loading...
HomeMy WebLinkAbout07 - Carroll Beek Community Center Improvements?�WP�RT = CITY OF NEWPORT BEACH 9<,FOa� City Council Staff Report Agenda Item No. 7 May 10, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Tom Sandefur, P.E. APPROVED: C'-4- l CAF�ROLL BEEK COMMUNITY CENTER IMPROVEMENTS - TITLE: COMPLETION AND ACCEPTANCE OF CONTRACT NO. 4507 ABSTRACT: On October 26, 2010, City Council awarded Contract No. 4507 to Pointer Enterprises for a total contract cost of $84,635 plus a 10% allowance for contingencies. The required work in now complete and staff requests City Council accept and close out of the contract. RECOMMENDATIONS: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description Carroll Beek Improvements Carroll Beek Improvements Facilities Maintenance and Repair Account Number Amount 7011- C1002023 $ 19,394.18 7251- C1002023 $ 67,975.12 4390 -8040 $ 8,700.00 Total: $ 96,06930 1 Carroll Beek Community Center Improvements - Completion and Acceptance of Contract No. 4507 May 10, 2011 Page 2 DISCUSSION: Overall Contract Cost/Time Summary Construction Final Cost at Contingency Actual Contract Time Contract Award Change vinyl flooring to carpet in multipurpose room $1,579.63 Contract Time Under or Amount Com pletion Target Change days Over $84,635.00 $96,069.30 10% or less 13% 25 +44 The work necessary to complete this contract consisted of replacing doors and windows, skylights, cabinets, countertops, sinks, exterior and interior lighting fixtures and the associated wiring, rain gutters, and flooring, installing acoustical panels, and painting various surfaces. Two additive bid items were included in the bid. The first item would add up- lighting to the community room to brighten the room and give a softer, more indirect light. The second item would tint the tall, south -east facing windows in the center to ameliorate the harsh afternoon glare and diminish the heat gain in the room on the sunniest days. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: Actual cost of bid items constructed: Total change orders: Final construction contract cost: $84,635.00 11,434.30 $96,069.30 The final construction contract cost was approximately 13 percent above the original bid amount. There were sixteen change orders broken down as below: CO # Description Cost 1 French style sliding door for kitchen area $662.75 2 Change vinyl flooring to carpet in multipurpose room $1,579.63 3 Credit to not replace existing metal bathroom doors and frames - $1,115.39 4 Add'I coping required to support gutter and credit for roof flashing - $103.70 5 Extra wood replaced due to rot and termites. $2,379.64 6 Enlarge door frames that needed replacement due to termites $1,972.15 7 Block sealer to seal exterior walls and prevent water intrusion $905.67 8 Aluminum skylight frame to seal new skylight lenses $1,450.32 9 Substitute stainless oven for white oven finish $337.66 10 Replace basketball hoop and pole $1,476.82 2 Carroll Beek Community Center Improvements - Completion and Acceptance of Contract No. 4507 May 10, 2011 Page 3 11 Add lighting under kitchen cabinets $241.87 12 Replace storage closet sliding door $796.97 13 Garbage Disposal $255.48 14 GFCI correction from the building permit $156.92 15 ADA Handrail on outside ram $437.51 TOTAL $11,434.30 The change orders fall into two categories. Some of the change orders were due to the unexpected rot and termite damage in the structure that necessitated the removal of additional wood. A number of other change orders were requested after getting additional input from the community and users of the facility. Additional time was needed in the construction phase to accommodate the extra work and the procurement of some of the specialty fixtures. A summary of the project schedule is as follows: Estimated completion date per July 2010 Schedule: December 10, 2010 Project Award for construction: October 26, 2010 Contract Completion Date Plus Approved Extensions: December 20, 2010 Actual Construction Completion Date: March 7, 2011 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQX) pursuant to Section 15301(a). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: This agenda item has been noticed according to the Brown Act. In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Submitted by: -z�repnen u.,.baoum Public Works Director Attachment: Location Map 3 LOCATION MAP CARROLL BEEK COMMUNITY CENTER IMPROVEMENTS CONTRACT NO. 4507 PROJECT LOCATION C' ti