HomeMy WebLinkAbout15 - Corporation Yard Fleet Shop CNG Modification Project-NOC (C-4315)aEWPORr CITY OF NEWPORT BEACH FOAN City Council Staff Report Agenda Item No. 15 June 14, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Frank T. Tran, Associate Civil Engineer APPROVED: n1 V V TITLE: Corporation Yard Fleet Shop CNG Modification Project - Completion and Acceptance of Contract No. 4315 UUMMr7_rii M On September 14, 2010, City Council awarded the Corporation Yard Fleet Shop CNG Modification Project, Contract No. 4315 to Anderson Air Conditioning, LP for a total contract cost of $195,434.00 plus a 10% allowance for contingencies. The purpose of this contract was to modify two existing service bays in Building "D" of the Corporation Yard for servicing compressed natural gas (CNG) vehicles. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATIONS: Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after this Council acceptance. FUNDING REQUIREMENTS: In addition to the primary construction contract, this project involved other project expenses. Total project expenses are summarized as follows: Design and Construction Support $57,634.00 Construction $208,584.22 Incidentals $1,038.07 Total Project Cost $267,256.29 1 Corporation Yard Fleet Shop CNG Modification Project - Completion and Acceptance of Contract No. 4315 June 14, 2011 Page 2 Funds for the construction contract were expended from the following accounts: Account Description Account Number AQMD Fund 7290- C8002014 Equipment Maintenance 7611- C8002014 Total Construction Cost DISCUSSION: Amount $ 156,000.00 $ 52,584.22 $ 208,584.22 Summary of Completed Construction Contract Total Contract Final Cost at Benchmark Actual Contract Time Amount Completion Target Contract Time Under ( -) (days) or Over ( +) $195,434.00 $208,584.22 Contract +6.7% 105 0 Plus 10% The work necessary to complete this contract consisted of modifying two existing service bays in Building "D" with steel framing and three full- height drywall partitions; doors, windows and HVAC including makeup -air ducts, roof - mounted duct inlets, and roof - mounted exhaust fans; a methane -leak detection system including roof - mounted detectors, control panels, and annunciators required for servicing CNG vehicles. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $195,434.00 Actual cost of bid items constructed: $195,434.00 Change Orders $13,150.22 Final contract cost: $208,584.22 The two change orders in the amount of $13,150.22 were approved for adding a new door, relocating a door framing, modifying an overhead lighting, re- working the electrical connection per field condition, upgrading 2 oil -hose reels, and sealing the top of interior walls at roof. The contractor was allowed an additional 45 working days to complete the additional work described above. A summary of the project schedule is as follows: Estimated Completion Date per 2010 Baseline Schedule: November 12, 2010 Project Awarded for Construction: September 14, 2010 Completion Date per the Contract & Approved Extensions: March 22, 2011 Actual Substantial Construction Completion Date: March 22, 2011 2 Corporation Yard Fleet Shop CNG Modification Project - Completion and Acceptance of Contract No. 4315 June 14, 2011 Page 3 ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301 Class 1(a), of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). In addition, the Notice Inviting Bids was advertised in the city's official publication and in construction industry publications. Submitted by: adum Director Attachments: Project Location Map 3 CORPORATION YARD FLEET SHOP CNG MODIFICATION PROJECT CONTRACT NO. 4315 PROJECT LOCATION MAP (592 Superior Avenue, Newport Beach, CA) ® Y ,c The $ W +7111 St W 171n 51 1r' +71n S+ c Mare Inn 3 � Ramada Y 0 g Irm A Sirrtes o4F a Pot o PROJECT < r Mobile sl 2 LOCATION P'• ° re e' eer F/ Mesa Center �`r/ 2 Shopping Cenw 15th St 161n St 1&h St P,o �c/ ,$P4e O e0° nProduction PI 0+, HeOer Park r •c` o p-� 6/ or eS/ Too F O S /oS � S °' +-, O / 151h sl + p e y ° Bots• i " +poi r +�(.y e0 g^ & c° ay �• O� 5 Pe 1 HaeP o% 19N 6 VA ter) y`A � royaF a /O+ t'e �•r +y P'e 0 o C�` �• /S,6 F" y g� �eP po 2 29 `•`Nor C`P ye° pga baP S/ e` Y A � Q• °• Q �'e +a y CMtt Drr�e p e Sunsel Park Ln •�° Park C /+y r� VC CIM or a k4l '• S/ o OHoag Dr Oda dope Senfa PCa P..e a?�54ve ope °P Pe �o P� r S5 s New C d O. kt pb`Oy y\ channel nel Balboa ��Y O1 Wes ?Co R fp Pye QS b5�c 6sy C/, • gL ,P 1110 yne0 oOA.9° �.��, '� x,91 Newport Holiday Inn 'b BCBCh Express Th4iErphtld Newport Ft.,, I Chf e�5 :street Part _ � 1QcgIe - MaP tl g10 91 N.T.S r