HomeMy WebLinkAbout05 - Lower Buck Gully Restoration - Award of ContractAgenda Item No. 5 August 9, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum(cDnewportbeachca.gov PREPARED BY: Bob Stein, Assistant City Engineer Iris Lee, Senior Civil Engineer APPROVED: J� D. �✓� TITLE: LOWER BUCK GULLY RESTORATION PROJECT - AWARD OF CONTRACT NO. 3780 /±\.IAdNFAT a As part of an effort to restore the Lower Buck Gully natural stream and stabilize the streambed, staff requests City Council approval to award the Lower Buck Gully Restoration Project to Environmental Construction, Inc. RECOMMENDATIONS: 1. Approve the project drawings and specifications, 2. Award Contract No. 3780 to Environmental Construction, Inc. for the total bid price of $1,188,558.36 and authorize the Mayor and the City Clerk to execute the contract, and 3. Establish a contingency of $181,441.64 (approximately 15 percent) to cover the cost of unforeseen work. FUNDING REQUIREMENTS: The adopted budget includes sufficient funds for this contract. Account Description Account Number Amount Environmental Contributions 7255- C5002002 $ 705,000.00 General Fund 7014- C5002002 672,000.00 Total $ 1,377,000.00 LOWER BUCK GULLY RESTORATION PROJECT- AWARD OF CONTRACT NO. 3780 August 09, 2011 Page 2 Proposed uses are as follows: Vendor Purpose Amount Environmental Construction, Inc. Construction Contract $ 1,188,558.36 Environmental Construction, Inc. Construction Contingency 181,441.64 GMU Geotechnical, Inc. Geotechnical Services 7,000.00 Total $ 1,377,000.00 DISCUSSION: At 10:00 a.m. on July 14, 2011, the City Clerk opened and read the following bids for the Lower Buck Gully Channel Restoration Project: BIDDER Low Environmental Construction, Inc. 2 Los Angeles Engineering, Inc. 3 Bert W. Salas, Inc. 4 Excavating Engineers, Inc. 5 Rock Structures Construction Co. 6 Griffith Company 7 Clarke Contracting Corporation TOTAL BID AMOUNT $1,188,558.36 $1,200,619.00 $1,277,080.00 $1,323,835.00 $1,349,275.00 $1,781,300.00 $1,796,795.00 `As -bid amount is $1,179,565.55 The total bid amount is approximately 18 percent below the Engineer's Estimate of $1,450,000. The disparity between the estimate and the actual bid perhaps reflects a continuing competitive construction market. A portion of the costs, $705,000.00, will be funded through a grant from the State Water Resource Control Board as this project will improve water quality entering the sensitive marine life area at Little Corona Beach. The work for this contract includes the grading of a construction road into the canyon, grading to restore the steambed near the center of the canyon, installing rock - filled gabion grade control structures and bendway weirs to guide flows within the center of the canyon, subsurface wetland filters for water quality improvement, and revegetating the canyon with California native plant materials. The low bidder, Environmental Construction, Inc., possesses a California State Contractors License Classification "A" and "C -27" as required by the project specifications. A check of Environmental Construction, Inc. references indicates satisfactory completion of projects with similar components in other municipalities. LOWER BUCK GULLY RESTORATION PROJECT - AWARD OF CONTRACT NO. 3780 August 09, 2011 Page 3 Pursuant to the contract specifications, Environmental Construction, Inc. will have 80 consecutive working days to complete the work followed by 120 consecutive calendar days for plant maintenance and establishment. A 15 percent contingency is recommended for this project. The allowable construction window for work the canyon does not open until mid - September. As we have experienced large October storms in 2004 and 2010, construction in and around the canyon streambed will be complicated and delayed if the inclement weather occurs. This in turn could increase costs. Construction services, including biological survey and water quality testing, will be performed by the RBF Consultants, the design consultants. The cost is expected to be approximately $60,000 and will be paid under a separate professional services agreement. ENVIRONMENTAL REVIEW: The City - prepared Mitigated Negative Declaration for the Lower Buck Gully Restoration Project was adopted by City Council on January 25, 2011. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. In addition to the number of informal discussions with individual community members, staff also conducted two public information sessions (March 24, 2010 and April 7, 2010), one door -to -door property owner visit (October 19, 2010), and prepared a project status update mailer (February 17, 2011). Submitted by: Location Map Project Site PROJECT LOCATION MAP LOWER BUCK GULLY RESTORATION PROJECT AWARD OF CONTRACT NO. C3780 CM OF NEW PORT BEACH