Cq<cOFNP City Council Staff Report Agenda Item No. 9
October 11. 2011
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
Stephen G. Badum, Public Works Director
949 - 644- 3311,sbadum @newportbeachca.gov
PREPARED BY: Andy Tran
APPROVED: A
TITLE: Approval of Amendment No. 4 with RBF Consulting for Jamboree
Road Bridge Widening Over State Route 73 (C -3724)
ABSTRACT:
The City entered into a Professional Services Agreement with RBF Consulting, (RBF) for
the design of the Jamboree Road Bridge Widening over State Route 73 project. Additional
funds are required in order to increase construction support services with RBF Consulting.
In accordance with Council Policy F -14, City Council approval is required in order to
process Amendment No. 4.
RECOMMENDATIONS:
Approve budget amendment No. 12BA - 011 appropriating $84,972.00 from the
unappropriated Transportation and Circulation fund balance to project account
number 7261- C5100784.
2. Approve Amendment No. 4 with RBF for additional construction support services for
the Jamboree Road Bridge Widening over State Route 73 project (C- 3724).
FUNDING REQUIREMENTS:
Upon approval of a budget amendment sufficient funds will be available for Amendment No.
4. Funds will be expended from the Transportation and Circulation account (7261 -
05100784).
DISCUSSION:
This project is located on Jamboree Road between Bayview Way and MacArthur Boulevard.
The project involves widening the west side of the Jamboree Road Bridge overcrossing at
State Route 73 to accommodate one additional thru lane in each travel direction.
Approval of Amendment No. 4 with RBF Consulting for Jamboree Road Bridge
Widening Over State Route 73 (C -3724)
October 11, 2011
Page 2
Construction is currently in progress and is approximately 30 percent complete. Due to the
complex nature of the bridge structure and unforeseen existing conditions, the design is
being modified to avoid conflict with existing improvements. In addition, the numerous
design material submittals and Requests for Information (RFIs) from the contractor require
additional efforts by RBF. Amendment No. 4 with RBF in the amount of $84,972.00 is
needed to increase construction support services. RBF is uniquely qualified to provide
these services since they are the engineer of record for the design of the bridge structure.
With the approval of Amendment No. 4, the total amended contract compensation to RBF
for Design and Construction services will be $1,126,959.00
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this action is not subject to the California
Environmental Quality Act ( "CEQA ") pursuant to Sections 15060(c)(2) (the activity will not
result in a direct or reasonably foreseeable indirect physical change in the environment) and
15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential
for resulting in physical change to the environment, directly or indirectly.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of the
meeting at which the City Council considers the item).
Submitted by:
Attachments: A. Budget Amendment
B. Amendment No. 4 with RBF Consulting
C. Project Location Map
2
Attachment A City of Newport Beach NO. BA- 12BA -011
BUDGET AMENDMENT
2011 -12 AMOUNT: $ea,97z.00
EFFECT ON BUDGETARY FUND BALANCE:
Increase Revenue Estimates Increase in Budgetary Fund Balance
�X Increase Expenditure Appropriations AND X Decrease in Budgetary Fund Balance
Transfer Budget Appropriations No effect on Budgetary Fund Balance
SOURCE:
from existing budget appropriations
from additional estimated revenues
qX from unappropriated fund balance
EXPLANATION:
This budget amendment is requested to provide for the following:
To increase expenditure appropriations from the Circulation and Transportation Fund Balance for the Jamboree Road
Bridge Widening over State Route 73. This is to cover increased construction suppport services.
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Account
260 3605
REVENUE ESTIMATES (3601)
Fund /Division Account
EXPENDITURE APPROPRIATIONS (3603)
Description
Circulation and Transportation - Fund Balance
Description
Amount
Debit Credit
$84,972.00
Signed:
Signed:
Approval: City
City Council Approval: City Clerk
101411
Date
Date
F
Description
Division
Number 7261 Transportation and Circulation
Account
Number C5100784 Jamboree Road Widening over SR73
$84,972.00
Division
Number
Account
Number
Division
Number
Account
Number
Division
Number
Account
Number
' Automatic System Entry.
Signed:
'w"r,
j, „,'
�i C
Financial Apbioval:
Administrative Services Director
Date
Signed:
Signed:
Approval: City
City Council Approval: City Clerk
101411
Date
Date
F
Attachment B
AMENDMENT NO. FOUR TO
PROFESSIONAL SERVICES AGREEMENT WITH
RBF CONSULTING FOR
JAMBOREE ROAD WIDENING OVER SR 73 PROJECT
THIS AMENDMENT NO. FOUR TO PROFESSIONAL SERVICES AGREEMENT
( "Amendment No. Four "), is entered into as of this day of 2011,
by and between the CITY OF NEWPORT BEACH, a California Municipal Corporation
( "City "), and RBF CONSULTING, a California Corporation whose address is 14725
Alton Parkway, Irvine, California 92618 ( "Consultant'), and is made with reference to
the following:
RECITALS:
A. On April 12, 2005, City and Consultant entered into a Professional Services
Agreement ( "Agreement') for engineering services for the Jamboree Road
Widening Over SR 73 Project ( "Project').
B. On August 8, 2006, City and Consultant entered into Amendment No. One to the
Agreement to increase the scope of work and increase the total compensation
( "Amendment No. One ").
C. On April 7, 2009, City and Consultant entered into Amendment No. Two to the
Agreement to extend the term of the Agreement to December 31, 2011
( "Amendment No. Two').
D. On July 8, 2010, City and Consultant entered into Amendment No. Three to the
Agreement to reflect additional services not included in the Agreement or prior
Amendments, to extend the term of the Agreement to December 31, 2012,
increase the total compensation and update various standard terms to the
Agreement ( "Amendment No. Three ").
E. City desires to enter into this Amendment No. Four to reflect additional services
not included in the Agreement or prior Amendments, to increase the scope of
work and increase the total compensation.
F. City and Consultant mutually desire to amend the agreement, as provided below.
NOW, THEREFORE, it is mutually agreed by and between the undersigned
parties as follows:
4
1Z
1. SERVICES TO BE PERFORMED
Section 2 of the Agreement, as amended shall be supplemented to include the Scope of
Services dated June 30, 2011, which is attached hereto as Exhibit 'A' and incorporated
herein by reference. The City may elect to delete certain tasks of the Scope of Services
at its sole discretion.
2. COMPENSATION
The introductory paragraph to Section 4 of the Agreement as amended shall be
amended in its entirety and replaced with the following: City shall pay Consultant for the
services on a time and expense not -to- exceed basis in accordance with the provisions
of this Section and the Schedule of Billing Rates attached to the Agreement.
Consultant's total amended compensation for all work performed in accordance with this
Agreement and all prior amendments, including all reimbursable items and
subconsultant fees, shall not exceed One Million, One Hundred Twenty -Six
Thousand, Nine Hundred Fifty -Nine Dollars and no /100 ($1,126,959.00) without
prior written authorization from City ( "Total Amended Compensation "). No billing rate
changes shall be made during the term of this Agreement without the prior written
approval of the City.
3.1 The Total Amended Compensation reflects Consultant's additional
compensation for additional services to be performed in accordance with
this Amendment No. Four, including all reimbursable items and
subconsultant fees, in an amount not to exceed Eighty -Four Thousand,
Nine Hundred Seventy -Two Dollars and no /100 ($84,972.00), without prior
written authorization from City.
3. INTEGRATED CONTRACT
Except as expressly modified herein, all other provisions, terms, and covenants set forth
in the Agreement as amended shall remain unchanged and shall be in full force and
effect.
5
IN WITNESS WHEREOF, the parties hereto have executed this Amendment No.
Four on the dates written below.
APPROVED AS TO FORM: CITY OF NEWPORT BEACH,
OFFICE O T�'H'�'C/ITY ATTORNEY A California municipal corporation
Dater Date:
B}
Leonie Mulvihill
Assistant City Attorney ct1
ATTEST:
Date:
By:
Leilani L Brown
City Clerk
Bv:
Michael F. Henn
Mayor
CONSULTANT: RBF CONSULTING, a
California Corporation
By:
Gary L. Warkentin,
Vice President
Date:
By:
Douglas J. Frost.
Executive Vice President and
Chief Financial Officer
Attachment: Exhibit A — Additional Services to be Performed
M
2610 1
r
June 30, 2011
Andy Tran, P.E.
Senior Civil Engineer
City of Newport Beach
3030 Newport Boulevard
Newport Beach, CA 92663
Subject: Jamboree Road / SR -73 Bridge Widening Project —
Addendum for Construction Support Services
Dear Andy:
JN 10- 104114.002
RBF Consulting (RBF) is submitting this addendum request for continued construction support
services for the Jamboree Road /SR -73 Bridge Widening project in the City of Newport Beach. Our
proposal includes the following Scope of Work and attached Task/Hour Breakdown and Fee
Proposal.
SCOPE OF WORK
During the construction phase, RBF will continue to work closely with the City and its representative
to assist and advise the City in order to minimize construction conflicts and to expedite project
completion.
Task 1 Shop Drawing and Submittal Review
RBF will review submittals and shop drawings requested by the City or its representative. The review
of shop drawings is assumed to include bridge working drawing submittals, construction contractor's
submittals for substitutions, construction contractor's alternative construction approval, structural steel
layout for structures, storm drain pipe, concrete mix design, traffic signal equipment, and others as
required by the City or its representatives. The shop drawing scope assumes one review of each
submittal and one back check of re- submittals. Incomplete submittals will not be accepted for initial
review. Multiple reviews of re- submittals that do not adequately address the initial review comments
are not included. The total fee paid for this task shall include full payment for shop drawing reviews as
required forthe project, excluding any Cost Reduction Incentive Proposal (CRIP) change orderwork.
One hundred twenty four (124) hours is budgeted for this task.
Task 2 4 -Scale Drawings
RBF shall prepare a drafted Deck Contour Plot (otherwise known as 4- scale Plan) in accordance
with Caltrans Memo To Designers 2 -2 and Bridge Design Details, Section 4 -10. The large scale plots
will be prepared and delivered to the City for use by the Contractor during construction.
Sixteen (16) hours is budgeted for this task.
PLANNING ■ DESIGN ■ CONSTRUCTION
14725 Afton Parkway, Irvine, CA 92618 -2027 N P.O. Box 57057, Irvine, CA 92619 -7057 - 949.472.3505 • FAX 949.472.8373
Offrzs located throughout Cafifomia, Arizona & Nevada • www.R8F.com
Mr. Andy Tran
June 30, 2011
Page 2
Task 3 Additional Drawings
If requested by the City, RBF will prepare additional drawings and change -order supporting
documents.
Forty (40) hours is budgeted for this task.
Task 4 Site Visits /Field Meetings
RBF will visit the job site as requested by the City or its representative. Regularly scheduled
construction observation or attendance at weekly meetings is specifically excluded from this
scope of work.
Forty five (45) hours is budgeted for this task.
Task 5 Respond to Inquiries /Requests for Information (RFI's)
RBF will provide response to contractor's requests for information (RFI's) about the plans and
specifications forwarded by the City or its representative. This task includes conferring with the
City's Resident Engineer /Construction Manager regarding the RFI as appropriate.
One hundred thirty five (135) hours is budgeted for this task.
Task 6 Change Order Preparation and Review
Upon written authorization from the City, RBF will provide engineering design services for
revisions to construction documents resulting from changed field conditions, construction
methods, or other change order work. Change Order documentation and processing will be
prepared by the City or its representative and is specifically excluded from this scope of work.
Specific fee authorization is required from the City prior to commencement of work on each
revision.
Eighty (80) hours is budgeted for this task.
Task 7 Record Drawings
Following the completion and acceptance of the project, RBF will furnish the City with a complete set
of revised full size reproducible as -built plans. Revisions will be based solely on as -built information
provided by the City or its representative. RBF assumes no responsibility for the accuracy of the
information provided by the City or its representative.
One hundred (100) hours is budgeted for this task.
Task 8 Electronic Submittal to Caltrans
Following the completion and acceptance of record drawings, RBF will furnish Caltrans with a
complete set of record drawings (hard copy and electronic format) in accordance with the
Cooperative Agreement between Caltrans and the City. The scope does not include conversion of
files from Microstation v7 format to Microstation v8 format. Electronic submittal to the Office Engineer
(OE) is explicitly excluded from this task. A separate scope and fee will be provided if any of the
above exclusions become a requirement by Caltrans
One hundred (100) hours is budgeted for this task
8
R
Mr. Andy Tran
June 30, 2011
Page 3
Reproduction Services and Other Expenses
RBF will provide all reproduction services and other related expenses for RBF's work elements
during construction. This includes all reprographics and photocopying for RFI's, revised plans, and
shop drawings, and other in -house reproductions.
$1,000 is budgeted for this task.
The estimated budget for continued support services is $84,972. Professional services during this
phase will be on a time and material basis. RBF looks forward to continuing to work with the City of
Newport Beach on this important project. Please contact me at (949) 855 -3625 if you have any
questions.
Sincerely,
Gary L. Warkentin
Senior Vice President
Transportation Planning
cc: Came Davis, MS 415
Stefan Hoffineister, MS 420
Janie Janks, MS 130
H: 1pdata \101041l4Wdmin\contmct\4114 Scope of Work.d=
M
JAMBOREE ROAD / SR -73 BRIDGE WIDENING PROJECT
CONSTRUCTION SUPPORT TASK/HOUR BREAKDOWN
a3F
M ONSUL-TING
6/30/2011
TASK
TOTAL
Hours
$
1
Shop Drawing and Submittal Review
124
18,152
2
4 -Scale Drawings
16
1,960
3
Additional Drawings
40
5,280
4
Site Visits /Field Meetings
45
6,400
5
Respond to Inquiries/Requests for Information (RFI's)
135
19,100
6
Change Order Preparation and Review
80
11,640
7
Record Drawings
100
10,720
8
Electronic Submittal to Caltrans
100
10,720
Reproduction Services and Other Expenses
1,000
TOTAL FEE
624
$84,972
H : \pdata \10104114\Admin\contract \4114 Task Hour Breakdown.xlsx
10
PROJECT LOCATION
JAMBOREE RD. BRIDGE WIDENING
LOCATION MAP
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
XX I N.T.S. I X OF XX
TJM C -3724 R- XXXX -S 4
Attachment C "