HomeMy WebLinkAbout04 - 2010-11 Ocean Piers MaintenanceQ aEVVPpRr CITY OF NEWPORT BEACH, c'9G,F00.N\P City Council Staff Report Agenda Item No. 4 November 8, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Tom Sandefur, P.E. APPROVED: 0, Y TITLE: 2010 -2011 Ocean Piers Maintenance — Completion and Acceptance of Contract No. 4682 ABSTRACT: On April 26, 2011, City Council awarded Contract No. 4682 to Associated Pacific Constructors for a total contract cost of $316,700.00 plus a 15% allowance for contingencies. The required work in now complete and staff requests City Council accept and close out of the contract. RECOMMENDATIONS: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description Tide and Submerged Lands Account Number 7231 - 4801001 $ Total: $ Amount 332,416.47 332,416.47 1 2010 -2011 Ocean Piers Maintenance — Completion and Acceptance of Contract No. 3682 November 08, 2011 Page 2 DISCUSSION: Overall Contract Cost/Time Summary Construction Final Cost at Contingency Actual Contract Time Contract Award Comletion pget Tar Contract Time Under or Amount TOTAL $15,716.47 Change (days) Over $316,700 $332,416.47 10% or less 5% 60 2 The work necessary for the completion of this contract consisted of making repairs to the two existing City piers including grouting cracks in stringers, piles, and cross bracings, replacing deteriorated fasteners, and replacing missing or broken timber members. In addition, the project replaced corroded seismic girder straps under the Life Guard Headquarters. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: Actual cost of bid items constructed: Total change orders: Final construction contract cost: $316,700.00 316,700.00 15,716.47 $332,416.47 The three change orders associated with this contract are detailed below: CO # Description Cost 1 Change out bolts to SS all thread rods to sister beams $3,441.47 2 Emergency Newport Pier dolphin pile repair 17,000.00 3 Labor savings on excess stringers that were not installed - 4,725.00 TOTAL $15,716.47 The final construction contract cost is 5 percent above the original bid amount. A majority of that cost resulted from the emergency repair to the dolphin pile at the end of the Newport Pier that had broken loose and was colliding with the pier. A summary of the project schedule is as follows: Estimated completion date per July 2010 Schedule: Project Awarded for construction: Contract Completion Date Plus Approved Extensions: Actual Construction Completion Date: May 23, 2011 April 26, 2011 October 12, 2011 October 10, 2011 K 2010 -2011 Ocean Piers Maintenance — Completion and Acceptance of Contract No. 3682 November 08, 2011 Page 3 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). Attachments: A. Location Maps Kl LOCATION MAP 2010 -2011 OCEAN PIER MAINTENANCE CONTRACT NO. 4682 (PAGE 1 OF 2) i 2m� 0 5� Q h � � S ry� y QO �C T I 1 L_ J - PROJECT LOCATION (NEWPORT PIER) Cj Attachment A 1 of 2 LOCATION MAP 2010-2011 OCEAN PIER MAINTENANCE CONTRACT NO. 4682 (PAGE 2 OF W117K '7�z / >"Vl (BALBOA PIER) 2 of 2 Fl