Loading...
HomeMy WebLinkAbout12 - MacArthur at Dolphin Striker (PA2010-135)�EWPOR CITY OF NEWPORT BEACH 09�oP City Council Staff Report Agenda Item No. 12 October 25, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Community Development Department Kimberly Brandt, AICP, Director 949 - 644 -3226, kbrandtCcDnewportbeachca.00v PREPARED BY: Rosalinh Ung, Associate Planner APPROVED: A �� TITLE: Appeal - MacArthur at Dolphin- Striker (PA2010 -135) L1:TM:LGi9 An appeal of the Planning Commission's decision to deny the entitlement request to allow a development of two, single -story commercial buildings of 13,525 square feet total. Subsequent to the Planning Commission's action on the project, the applicant has modified the project by reducing the gross floor area from 13,525 to 12,351 square feet and eliminating the additional off -site parking request. RECOMMENDATION: Uphold or reverse the Planning Commission's decision by either 1. Adopting the draft resolution for denial without prejudice (Attachment No. CC1); or 2. Adopting the draft resolution approving the revised project (Attachment No. CC2) by: a. Adopting the Mitigated Negative Declaration, including the Errata and Mitigation Monitoring and Report Program; and b. Finding that, based on the weigh of evidence in the administrative record, including Traffic Study No. TS2011 -002, that the project complies with the Traffic Phasing Ordinance; and c. Approving Transfer of Development Rights No. TD2010 -002, Conditional Use Permit No. UP2011 -026, Modification Permit No. Mn2011 -014; and Waiver of Development Agreement, subject to findings and conditions; and 1 2 Appeal - MacArthur at Dolphin- Striker (PA2010 -135) October 25, 2011 Page 2 d. Introduce Ordinance No. 2011- 25 (Attachment No. CC4) approving Planned Community Development Plan Amendment No. PD2010 -007, and pass to second reading on November 22, 2011 (contingent on the Airport Land Use Commission action which tentatively scheduled on November 17, 2011). 3 VICINITY MAP m - Dr Classic Q o Saagar India Restaurant m Subject Property 3 c Y N DOLPHINSTWKERWAV p GENERAL PLAN ZONING Pc 11 � 14 - LOCATION GENERAL PLAN ZONING CURRENT USE ON -SITE Mixed Use Horizontal 2 MU -H2 pC -11, Restaurant Site 1 Restaurant (vacant) NORTH MU -H2 PC -11, Pro. & Bus. Office Classic Q Sports Club & Site 6 Restaurant SOUTH MU -H2 PC -11, Pro. & Bus. Office Glidewell Laboratories Site 5 EAST MU -H2 PC -11, Pro. & Bus. Office MacArthur Blvd. & Koll Center Site 7 WEST MU -H2 MacArthur Blvd. & Koll Saagar India Restaurant & Center PC Dolphin- Striker Way 3 Appeal - MacArthur at Dolphin- Striker (PA2010 -135) October 25, 2011 Page 3 LAND USE ANOMALY & TRANSFER OF DEVELOPMENT RIGHTS EXHIBIT AO PF Receiver O -G 12 Site Donor Site " ; V �'PM MU -H2 Fletcher Jones z.1 z , i - e � R i i i Donor Site CG 0.5 FAR qp 17 Lexus D FAR' & r RS-D 8 C i T3 X ti FUNDING REQUIREMENTS: There is no fiscal impact related to this item DISCUSSION: Proiect Settin The subject property is approximately 48,221 square feet (1.11 acres) in size and located on the west side of MacArthur Boulevard, between Martingale Way and Newport Place Drive. The property is currently improved with a 7,996 square -foot commercial building and a 78 -space surface parking lot. In addition to the on -site parking, the subject property has 16 off -site parking spaces that are currently located at 4100 Newport Place (US Bank's parking structure). These off -site parking spaces are permanently available pursuant to a recorded off -site parking agreement and are part of the application. The property is Parcel 1 of three parcels designated as Restaurant Site 1 in the Newport Place Planned Community. Parcel 2 is currently improved with a 7,015 square -foot restaurant (Saagar Fine Cuisine of India Restaurant) and a 59 -space surface parking lot. Parcel 3 is currently improved with a 7,870 square -foot sports club and restaurant (Classic Q Sports Club and Restaurant) and has a 74 -space surface parking lot. The parking lots of these parcels are shared and the total combined parking spaces is 211 (78 +59 +74) parking spaces. Vehicular access to all three parcels is from Dolphin- Striker Way and Martingale Way. Parcels 2 and 3 are not a part of the proposed development. 21 Appeal - MacArthur at Dolphin- Striker (PA2010 -135) October 25, 2011 Page 4 Project Description — Original Request The project, as originally proposed and reviewed by the Planning Commission, included the demolition of the existing 7,996 square -foot, single -story commercial building and construction of two, single -story commercial buildings with a total of 13,525 square feet. The following applications were requested: 1. An amendment to the Newport Place (PC -11) Planned Community Development Plan to change the zoning designation of the subject property from "Restaurant Site 1" to "General Commercial Site 8 ", pursuant to Chapters 20.56 (Planned Community District Procedures) and 20.66 (Amendments) of the Municipal Code. 2. Transfer of Development Rights to allow the transfer of 48 unbuilt hotel units from Hotel Site 2 -B (Fletcher Jones Vehicle Storage Facility at 1301 Quail Street) and 1,620 square feet from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) for a total of 5,529 square feet to the subject site, pursuant to Chapter 20.46 (Transfer of Development Rights) of the Municipal Code. 3. Traffic Study approval pursuant to Chapter 15.40 (Traffic Phasing Ordinance) as the project will generate in excess 300 average daily trips (ADT). 4. Conditional Use Permit to modify the off - street parking requirements, allow for the use of off -site parking, and to establish a parking management plan for the site, pursuant to Chapter 20.40 (Off- Street Parking) of the Municipal Code. 5. Waiver of the requirement for a Development Agreement pursuant to the provisions of Chapter 15.45 (Development Agreements) of the Municipal Code. 6. Modification Permit to deviate from the landscaping requirements of the Newport Place (PC -11) Planned Community Development Plan, pursuant to Section 20.52.050 of the Municipal Code. Please refer to the attached September 22, 2011, Planning Commission Staff Report for a detailed discussion and analysis of the proposed project, related application requests, and Mitigated Negative Declaration (Attachment No. CC5). Planning Commission Action The Planning Commission reviewed the project application on September 22, 2011, and voted 4 -3 to deny the applicant's request without prejudice. The draft Planning Commission minutes are included as Attachment No. CC7. The Planning Commission was unable to make the required findings based upon the following: J Appeal - MacArthur at Dolphin- Striker (PA2010 -135) October 25, 2011 Page 5 1. The purpose and intent of parking standards is to provide adequate parking for development. The applicant requests a change in the allowable use and an increase in the intensity of use while inadequately addressing parking through a waiver and off -site parking. 2. The 1 -year term of the applicant's off -site parking lease does not satisfy the Zoning Code that requires off -site parking be permanently available. 3. The applicant's justification for the modification permit to allow relief from the landscaping standards is based upon the applicant's request for increased intensity of use and proposed design rather than a practical difficulty of the property and that the project can easily be redesigned to comply with the interior landscape requirement. 4. The proposed primary access to the subject property is inconsistent with the existing design of MacArthur Boulevard that does not provide direct access into commercial parking lots and may interrupt traffic flow along MacArthur Boulevard. me On October 1, 2011, City Councilmember Rush Hill appealed the Planning Commission's action (Attachment No. CC3). The appeal request states that the project should be reviewed by the City Council given the importance of addressing the economic need for the City to support the improvement of the City's underperforming commercial areas combined with the applicant's willingness to address issues raised by the Planning Commission. Pursuant to Section 20.64.030.0 of the Zoning Code, a public hearing on an appeal is conducted "de novo ", meaning that it is a new hearing and the prior decision to approve the application by the Planning Commission has no force or effect. The City Council is also not bound by the Planning Commission's prior decision and it is not limited to the issues raised on appeal. On review, the City Council may sustain, or reverse the decision of the Planning Commission. The City Council may also remand the matter to the Planning Commission for further consideration, which remand shall include either specific issues to be considered or a direction for a new hearing. Project Revisions Based on some of the concerns expressed by the Planning Commission, the applicant has presented revised plans (Attachment No. CC10). Project modifications include: a. Reducing the project gross floor area from 13,525 square feet to 12,351 square feet; NO Appeal - MacArthur at Dolphin- Striker (PA2010 -135) October 25, 2011 Page 6 b. Reducing the transfer request from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) from 1,620 square feet to 400 square feet. C. Changing the proposed land use mix by reducing general commercial area from 8,525 to 7,351 square feet and changing the operational characteristic of the proposed fast -food use to take -out limited use; d. Increasing the number of on -site parking from 59 to 65 spaces thereby reducing the parking waiver request from 13 to 3 parking spaces; and e. Reducing the off -site parking request from 32 to 16 spaces. A long term reciprocal parking agreement for these spaces has been in effect since 1972 and does not have a termination date. Kunzman Associates, Inc. has prepared a revised parking analysis and parking management plan the revised project. Since the on -site surface parking lot is, and would continue to be, shared by the proposed project, Classic Q Billiards and Sports Club and Saager Fine Cuisine of India the shared parking analysis is a projection of future parking demand of all three uses. The analysis concludes that based on the land uses and mix of tenants, a peak parking demand of 205 spaces is expected to occur, which is less than the 217 space zoning code requirement and less than the 214 spaces provided. Additionally, a revised parking management plan was prepared that recommends all employees use the 16 off -site spaces before parking on -site. The revised shared parking analysis and parking management plan have been reviewed and approved by the City's Traffic Engineer and are included as Attachment Nos. CC8 and CC9. In summary, the modified plans address some, but not all, of the Planning Commission's concerns. Although the intensity of the project (reduced gross floor area and changed land -use mix) reduces the parking waiver from 13 to 3 spaces and eliminates the need of 16 additional off -site parking spaces, the new drive access and modification permit for relief from some of the landscaping requirements remain. The draft planned community development plan has been revised to reflect the project's modifications (Attachment No. CC4). Altarnntivas- 1. If the City Council finds the facts do not support the findings required to grant approval of the application requests, the City Council should adopt the draft resolution (Attachment No. CC9) upholding the decision of the Planning Commission and denying the project. 2. If the City Council finds there are facts to support the findings required to grant approval of the modified application requests, the City Council should adopt the draft resolution (Attachment No. CC2) and draft ordinance (Attachment No. CC4) 7 Appeal - MacArthur at Dolphin- Striker (PA2010 -135) October 25, 2011 Page 7 reversing the decision of the Planning Commission and approving the modified project. 3. If the City Council finds that the applicant's revisions to the project request are substantial and warrant further consideration by the Planning Commission, the City Council should refer review of the modified project to the Planning Commission with direction to review specific issues and conduct a new hearing. 4. If the City Council finds that the revised project does not adequately address concerns regarding the intensity and overall design of the project, the City Council may direct the applicant to further reduce the intensity of the project in order to be in compliance with the development standards (i.e. parking, landscape setbacks). The City Council should direct the applicant to redesign the project accordingly and refer the project to the Planning Commission to conduct a new hearing. Conclusion The applicant has revised the project to address many of the Planning Commission's concerns by reducing the intensity of the project, increasing the on -site parking supply, and eliminating the request for additional off -site parking. However, a parking adjustment and modification to the landscape setback are still being requested. The City Council has the option of either: 1) denying the project; 2) approving the modified project; or 3) referring review of the modified project back to the Planning Commission for further consideration. ENVIRONMENTAL REVIEW: A Mitigated Negative Declaration (MIND) has been prepared by planning staff, in accordance with the implementing guidelines of the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and City Council Policy K -3. The MIND is provided as Attachment No. CC11. A copy of the MIND was also made available on the City's website, at each Newport Beach Public Library, and at the Community Development Department at City Hall. Please see the September 22, 2011, Planning Commission staff report for a detailed discussion pertaining to the preparation and conclusions of the MIND, the public review period and comments received, and an Errata to the MIND. The modifications proposed by the applicant do not constitute "substantial revisions" that would warrant recirculation of the MIND pursuant to CEQA Guidelines Section 15073.5. 0 Appeal - MacArthur at Dolphin- Striker (PA2010 -135) October 25, 2011 Page 8 NOTICING: Notice of this hearing was published in the Daily Pilot, mailed to property owners within 300 feet of the property (excluding roads and waterways) and posted at the site a minimum of 10 days in advance of this hearing consistent with the Municipal Code. The environmental assessment process has also been noticed consistent with the California Environmental Quality Act. The Notice of Intent (NOI) to adopt the MND was mailed to property owners within 300 feet of the property (excluding roads and waterways), and posted at the site and at City Hall. Finally, the item appeared upon the agenda for this meeting, which was posted at City Hall and on the city website. Submitted by: c Kimberly Brandt, Community Development Director Attachments: CC1 Draft Resolution for Denial CC2 Draft Resolution for Approval CC3 Appeal Letter CC4 Draft Ordinance (Amended PC Development Plan) CC5 September 22, 2011 Planning Commission Staff Report package (Pages 109 -580) is available at City Clerk's Office and at City's website at www.newportbeachca.gov CC6 Planning Commission Resolution for Denial CC7 Draft September 22, 2011 Planning Commission Minutes CC8 Revised Shared Parking Analysis CC9 Revised Parking Management Plan CC10 Revised Plans CC11 Mitigated Negative Declaration, Comment Letters, & Errata (Distributed Separately) 10 NOTME OF PUBLIC HEARING NOTICE IS HEREBY GIVEN that on Tuesday, October 25, 2011, at 7:00 p.m., a public hearing will be conducted in the City Council Chambers (Building A) at 3300 Newport Boulevard, Newport Beach. The City Council of the City of Newport Beach will consider the following application: MacArthur at Dolphin - Striker — An appeal of the Planning Commission's denial of an application to develop two, single -story commercial building of 13,525 square feet total. The project requires the approval of the following applications: A Planned Community Text Amendment to change the zoning designation of the subject property from "Restaurant Site V to "General Commercial Site 8 "; a Transfer of Development Rights to allow the transfer of 48 un -built hotel units from Hotel Site 2 -B (Fletcher Jones Vehicle Storage Facility at 1301 Quail Street) and 1,620 square feet from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) for a total of 5,529 square feet of specialty retail to the subject site; a Traffic Study approval pursuant to Chapter 15.40 (Traffic Phasing Ordinance) as the project will generate in excess 300 average daily trips (ADT); a Conditional Use Permit to modify the off - street parking requirements; allow for the use of off -site parking, and to establish a parking management plan for the site; a waiver of the requirement for a Development Agreement; and a Modification Permit to deviate from the landscaping requirements of the Newport Place (PC -11) Planned Community Development Plan. NOTICE IS HEREBY FURTHER GIVEN that a Mitigated Negative Declaration (MND) has been prepared by the City of Newport Beach in connection with the application noted above. The MND states that, the subject development will not result in a significant effect on the environment. It is the present intention of the City to accept the MND and supporting documents. This is not to be construed as either approval or denial by the City of the subject application. The MND was circulated for a 20 -day public review and comment period that began on July 15, 2011, and concluded on August 3, 2011. All interested parties may appear and present testimony in regard to this application. If you challenge this project in court, you may be limited to raising only those issues you or someone else raised at the public hearing (described in this notice) or in written correspondence delivered to the City, at, or prior to, the public hearing. The agenda, staff report, and documents may be reviewed at the Planning Division (Building C, 2nd Floor), 3300 Newport Boulevard, Newport Beach, California, 92663 or at the City of Newport Beach website at www.newportbeachca.gov on the Friday prior to the hearing. For questions regarding details of the project please contact Rosalinh Ung, Associate Planner, at (949) 644 -3208, rung @newportbeachca.gov. Project File No.: PA2010 -135 Zone: Restaurant Site 1 of PC -11 (Newport Place) Location: 4221 Dolphin- Striker Way, West side of MacArthur Blvd at Dolphin Striker -Way Activity No.: PD2010 -007, TD2010 -002; TS2011- 002, UP2011- 026,ND2011 -001, & MN2011 -014 General Plan: MU -H2 (Mixed Use Horizontal 2) Applicant: Ridgeway /Whitney, Partnership 4�0eil 1 I. Brown, City Clerk City of Newport Beach Harris, Lillian From: McDonald, Cristal Sent: Monday, October 03, 2011 10:31 AM To: Harris, Lillian; Brown; Leilani Subject: FW: Call Up of Planning Application PA2010 -135 In the Clerk's inbox for your handling. Thanks. From: City Clerk's Office Sent: Saturday, October 01, 20119:31 AM To: McDonald, Cristal Subject: FW: Call Up of Planning Application PA2010 -135 From: Hill, Rush Sent: Saturday, October 01, 2011 9:28:23 AM To: City Clerk's Office Cc: Kiff, Dave Subject: FW: Call Up of Planning Application PA2010 -135 Auto forwarded by a Rule With Leilani being out of the office until October 3, 1 am forwarding this to the City Clerk's office for processing to insure the proper time for filling a PC call up is met. Thanks. rush Councilman Rush Hill City of Newport Beach District Three Office: 115 Twenty Second Street Newport Beach, CA 92663 Phone: 949.723.7202 ext 321 For scheduling, please contact Alan Limon at: Alan(aDNRMservice.com 949.723.7202 ext 327 From: Hill, Rush Sent: Sat 10/1/20119:26 AM To: Brown, Leilani Cc: Henn, Michael; Kiff, Dave; Brandt, Kim; Campbell, James Subject: Call Up of Planning Application PA2010 -135 Office of City Clerk City Of Newport Be October 1, 2011 On September 22, 2011 the Dolphin- Striker Way Commercial Project (the "Project ") came before and was denied by our Planning Commission (the "PC "). The Project presented an opportunity to revitalize an underperforming area within our city. In order to address a higher market driven tenant mix for the site, the applicant requested approval of several items including improved site access, an increase in development density, changed layout allowing for two single story buildings and related parking reconfiguration. These requests are identified as: Planned Community Development Plan Amendment No. PD2010 -007 Transfer Development Rights No. TD2010 -002 Traffic Study No. TS2011 -002 Conditional Use Permit No. UP2011 -026 Mitigated Negative Declaration No. ND2011 -001 Modification Permit No. MN2011 -014 Waiver of Development Agreement City staff evaluated all aspects of the project and recommended approval. The PC took issue however with some elements and denied the Project. Topics discussed during the PC meeting included site access, building square footage and parking. Subsequent to the rejection by the PC, the applicant has made changes to the proposed Project including reducing the square footage and increasing on site parking. Given the importance of addressing the economic need for our city to support the improvement of our underperforming commercial areas, combined with the applicant's willingness to address issues raised by the PC, I request the September 22, 2011 decision of the Planning Commission related to Planning Application PA2010 -135 be called -up before the City Council for further discussion and consideration at the first available Council meeting. Rush Hill Councilman Rush Hill City of Newport Beach District Three Office: 115 Twenty Second Street Newport Beach, CA 92663 Phone: 949.723.7202 ext 321 For scheduling, please contact Alan Limon at: AI an (a) N RM se rvice. co m 949.723.7202 ext 327 NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN that on Tuesday, October 25, 2011, at 7:00 p.m., a public hearing will be conducted in the City Council Chambers (Building A) at 3300 Newport Boulevard, Newport Beach. The City Council of the City of Newport Beach will consider the following application: MacArthur at Dolphin- Striker — An appeal of the Planning Commission's denial of an application to develop two, single -story commercial building of 13,525 square feet total. The project requires the approval of the following applications: A Planned Community Text Amendment to change the zoning designation of the subject property from "Restaurant Site 1" to "General Commercial Site 8 "; a Transfer of Development Rights to allow the transfer of 48 un -built hotel units from Hotel Site 2 -B (Fletcher Jones Vehicle Storage Facility at 1301 Quail Street) and 1,620 square feet from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) for a total of 5,529 square feet of specialty retail to the subject site; a Traffic Study approval pursuant to Chapter 15.40 (Traffic Phasing Ordinance) as the project will generate in excess 300 average daily trips (ADT); a Conditional Use Permit to modify the off - street parking requirements, allow for the use of off -site parking, and to establish a parking management plan for the site; a waiver of the requirement fora Development Agreement; and a Modification Permit to deviate from the landscaping requirements of the Newport Place (PC -11) Planned Community Development Plan. NOTICE IS HEREBY FURTHER GIVEN that a Mitigated Negative Declaration (MND) has been prepared by the City of Newport Beach in connection with the application noted above. The MND states that, the subject development will not result in a significant effect on the environment. It is the present intention of the City to accept the MND and supporting documents. This is not to be construed as either approval or denial by the City of the subject application. The MND was circulated for a 20 -day public review and comment period that began on July 15, 2011, and concluded on August 3, 2011. All interested . parties may appear and present testimony in regard to this application. If you challenge this project in court, you may be limited to raising only those issues you or someone else raised at the public hearing (described in this notice) or in written correspondence delivered to the City, at, or prior to, the public hearing. The agenda, staff report, and documents may be reviewed at the Planning Division (Building C, 2ntl Floor), 3300 Newport Boulevard, Newport Beach, California, 92663 or at the City of Newport Beach website at www.newoortbeachca gov on the Friday prior to the hearing. For questions regarding details of the project please contact Rosalinh Ung, Associate Planner, at (949) 644 -3208, rung @newportbeachca.gov Project File No.: PA2010 -135 Zone: Restaurant Site 1 of PC -11 (Newport Place) Location: 4221 Dolphin- Striker Way, West side of MacArthur Blvd at Dolphin Striker -Way Activity No.: PD2010 -007, TD2010 -002, TS2011 -002, UP2011- 026,ND2011 -001, & MN2011 -014 General Plan: MU -H2 (Mixed Use Horizontal 2) Applicant: Ridgeway/Whitney, Partnership ;2 LeLe ani�Clerk City of Newport Beach NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN that on Tuesday, October 25, 2011, at 7:00 p.m., a public hearing will be conducted in the City Council Chambers (Building A) at 3300 Newport Boulevard, Newport Beach. The City Council of the City of Newport Beach will consider the following application: MacArthur at Dolphin- Striker — An appeal of the Planning Commission's denial of an application to develop two, single -story commercial building of 13,525 square feet total. The project requires the approval of the following applications: A Planned Community Text Amendment to change the zoning designation of the subject property from "Restaurant Site V to "General Commercial Site 8 "; a Transfer of Development Rights to allow the transfer of 48 un -built hotel units from Hotel Site 2 -B (Fletcher Jones Vehicle Storage Facility at 1301 Quail Street) and 1,620 square feet from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) for a total of 5,529 square feet of specialty retail to the subject site; a Traffic Study approval pursuant to Chapter 15.40 (Traffic Phasing Ordinance) as the project will generate in excess 300 average daily trips (ADT); a Conditional Use Permit to modify the off - street parking requirements, allow for the use of off -site parking, and to establish a parking management plan for the site; a waiver of the requirement for a Development Agreement; and a Modification Permit to deviate from the landscaping requirements of the Newport Place (PC -11) Planned Community Development Plan. NOTICE IS HEREBY FURTHER GIVEN that a Mitigated Negative Declaration (MND) has been prepared by the City of Newport Beach in connection with the application noted above. The MIND states that, the subject development will not result in a significant effect on the environment. It is the present intention of the City to accept the MND and supporting documents. This is not to be construed as either approval or denial by the City of the subject application. The MND was circulated for a 20 -day public review and comment period that began on July 15, 2011, and concluded on August 3, 2011. All interested parties may appear and present testimony in regard to this application. If you challenge this project in court, you may be limited to raising only those issues you or someone else raised at the public hearing (described in this notice) or in written correspondence delivered to the City, at, or prior to, the public hearing. The agenda, staff report, and documents may be reviewed at the Planning Division (Building C, 2 I Floor), 3300 Newport .Boulevard, Newport Beach, California, 92663 or at the City of Newport Beach website at www.newportbeachea.gov on the Friday prior to the hearing. For questions regarding details of the project please contact Rosalinh Ung, Associate Planner, at (949) 644 -3208, rung @newportbeachca.gov Project File No.: PA2010 -135 Activity No.: PD2010 -007, TD2010 -002, TS2011 -002, UP2011- 026,ND2011 -001, & MN2011 -014 Zone: Restaurant Site 1 of PC -11 (Newport Place) General Plan: MU -H2 (Mixed Use Horizontal 2) Location: 4221 Dolphin- Striker Way, West side of MacArthur Blvd at Dolphin Striker -Way applicant: Ridgeway/Whitney, Partnership i�� ila i Brown, City Clerk Citv of Newport Beach 3 Easy 14elw Labels 0918 /� :;Sj Nanyiaane o wuePq(t U n 8i ao ap ::;nbl.3 Use Avery Template 5160 d � 3n gi1>R "5e, lagpd 16 labels printed. 16 Labels Bold FontforAction Letters Only ®� _ �� Owner /Applicant Ridgeway Development Ridgew�a Dev Iti'pment PA2010 -135 forGP2010 -010, 2804 Lafayette Raod 2804 Lafa a Raod 282010 -007 Newport Beach, CA 92663 Newpor ea , CA 92663 Ridgeway Lafayette Avenue Ridgeway Development ti s i peler ; lab l the 1" x 2 5 /8"fr�q p0ble ieWt bAwigW&6a 316'; www.avery.com Uti t AVERT® 5160® °iguett��W5 mm xOM4tanI�avAAr� - =5; i0/8160 1- 800 -GO -AVERY 6 ' b, 938 941 14 938 941 15 938 941 16 Journey Inside Out LLC Rita Carp Michael Stoll 28611 Rancho Maralena 1101 Dove St #h170 5 Madison Laguna Niguel Ca 92677 Newport Beach Ca 92660 Newport Beach Ca 92660 938 941 17 938 941 18 938 941 19 Gregory Montagna e S 1101 Dove St 9 Bayview 1101 D e 1101 Dove St #100 Irvine Ca 92614 Newp rt Beach Ca 92660 Newport Beach Ca 92660 938 941 20 938 941 21 938 941 22 Dove Street Condos Inc Do Street ondos Inc ove Stre ndos Inc 4300 Von Karman Ave 4300 Vo an Ave 4 arman Ave Newport Beach Ca 92660 Newpo Beach Ca 92660 New ort Beach Ca 92660 938 941 23 93 941 24 938 941 25 Do Stree os Inc Dove e C ndos Inc Scott Daniels 4300 Vo Karman Ave 4300 V Karman Ave 1101 Dove St #225 Newpo Beach Ca 92660 Newpo Beach Ca 92660 Newport Beach Ca 92660 938 941 26 938 941 27 8 941 28 D e Str ondos Inc D tr ndos Inc e S dos Inc 4300 V n Karman Ave 4300 V n Karman Ave 4300 on Karman Ave New rt Beach Ca 92660 Newp rt Beach Ca 92660 Ne port Beach Ca 92660 938 941 29 938 941 30 938 941 31 Lee Professional Yongjin Vada Lee Jones Do Str C 'os Inc 1101 Dove St #v 9550 SW Inverness Way 4300 on Karman Ave Newport Beach Ca 92660 Beaverton Or 97007 New ort Beach Ca 92660 938 941 32 938 941 3 D ve S Condos Inc ondos Inc 4300 V n Karman Ave 430 on Karman Ave Newpo Beach Ca 92660 Newport Beach Ca 92660 MacArthur at Dolphir- Striker �qo! PA2010 -135 427 221 09 427 221 10 427 221 11 Feb Dove Street Partners Sbs Dove Street Partners 1000 Quail LLC 1001 Dove St #106 901 Dove St #270 2235 Faraday Ave #o Newport Beach Ca 92660 Newport Beach Ca 92660 Carlsbad Ca 92008 427 222 05 Malaguena Trust 1000 Dove St #100 Newport Beach Ca 92660 427 241 04 LSWLtd 1603 Emerald Bay Laguna Beach Ca 92651 427 241 10 State Of California 3337 Michelson Dr #380 Irvine Ca 92612 42724203 S f Itfornia iv 3337 'che #380 Irvine a 92612 427 242 08 C "Y Of N p Beach 3300 ewport Blvd Newp rt Beach Ca 92663 445 131 26 Kcn an e nt LLC 4343 V Kerman Ave Newpo Beach Ca 92660 445 132 16 Cip Centerpoint LLC 19762 Macarthur Blvd #300 Irvine Ca 92612 938 941 08 Shirt Dinning 24945 Huron St Loma Linda Ca 92354 938 941 11 Edward Moss 1101 Dove St #140 Newport Beach Ca 92660 42722206 Pmc General Partnership 4001 Macarthur Blvd #300 Newport Beach Ca 92660 427 241 05 Elevation Equities LLC 1 Mauchly Irvine Ca 92618 427 241 13 Newport Plaza Glenborough 400 S El Camino Real #1100 San Mateo Ca 94402 427 242 04 S to Of iro nia Po 30 OY Los A geles Ca 90051 427 223 01 Mac Arthur Building LLC 2700 N Main St #780 Santa Ana Ca 92705 427 241 09 Back Bay Court Property 515 Loring Ave ' Los Angeles Ca 90024 ® 427 241 14 3901 Mac Arthur.Blvd LLC 1400 N Tustin St Orange Ca 92867 427 242 05 State Of California Po Box 2304 Los Angeles Ca 90051 427 242 09 445 131 04 Irvine Co Kcn Management LLC 550 Newport Center Dr 4343 Von Karmen Ave Newport Beach Ca 92660 Newport Beach Ca 92660 445 132 09 445 13211 South Coast Thrift & Loan Bates Johnson Building 1100 Paseo Camarillo 19742 Macarthur Blvd #240 Camarillo Ca 93010 Irvine Ca 92612 445 132 18 5 132 19 Cip Centerpointe 123 LLC Ci ent ointe 1 .3 LLC 19762 Macarthur Blvd #350 1976 aca ur Blvd #350 Irvine Ca 92612 Irvin Ca 92612 938 941 09 938 941 10 Esther Park Do LLC Watson Tung Po Box 70180 2865 E Coast Hwy #206 Los Angeles Ca 90070 Corona Del Mar Ca 92625 938 941 12 938 941 13 Barriet Investments LLC Robert & Marsha Hewlett 4 Park Piz #640 1101 Dove St #160 Irvine Ca 92614 Newport Beach Ca 92660 Compatible with Avery ®5160 0 Template woo 'g/9 3 X'j a4is pqlT Ffrst States Investors 5000A Lic PO . BoX 167120 Wing; TX 75016-7129 Pacifi;,- Plaza Associates Blvd ;1' ?2d NewPQrt Beach; CA 926.66-0023 .427481-12 James CUdewell 4141 NMacarthUr Blvd Nlavypq rt,Pea I ch, CA 92600 20`5 445-12243 -The Found Viii 1:301 Ddv'e*st860 Newport Beach, CA 92266&2412. Whitney Ridgeway , 8N"taf a y ette Rd N.pw.pp!t Reach, CA 026�3782 427:181-Gs- tillill thy,& PhOfWy Flathers 20292 Acee. Orange �A•92..869 -1700 427A81-1.3 Newport Plabe Corp 18818 Tell& Ave 277 INIffe, CA.926,1271678 427-1:81 -03 16011 Dove . �p 1'600 Dove St480 Niewpor . t:Beach, Q&92860-24k 445-122-06 Craig. Realty Group Mdcarthur LJQ. . 4 1610 Mace . rthur'S(Vd 4200 Newport ' -8' " il - . e.aa, CA 92860 -2064 A45-122-17 2N[blfid'club Affo Mada �� rthur Blvd Beach, 92660 -2001' ach CA pprt Be .. 427 221 -04 "Palm, Springs Village: -'809'Llar 2922 Daimler St 5anta,AnP,: CA:92705 51853, 427-1,7243 Vab ArthUr Square 17631 Fitch CA 9261'4 =6021 427 - 221 =01 .Nf Qc"ve LIc 4.425 dambdree Rd NI-VOOrt Beath, CA 92e60-3024 4.45712246 Mizan tic 4343 Von Karmen Ave :Newport Beach, CA 92660- 2099 445-122-1:8 Kcti A MsnagernentLte "3 Von Karman Ave. ft Beep hj,.12A 92660-2099. 421- 1�81-08 Q9rcharan,& 8aIjeet $a hdher 17130 Apricot Gir Fountain Valley; CA 92760= 3.'567 Old Fo.n t.fo.r Action L ett&s On8i KOA - NA EE��T-966-00B-T . — -k]6AV OP o09T9 1!1*15 al oaAe 91gpedwoo -iesej sellarib'13 *e,r L e S ;r MTempl�{p;I . �. • e ve T 7:. P. t £ep�atfi} M* "g �i`�I € 9t:o > O a E .riej j 939- 94-054 e( 935-94 -055 L U ' .G . ULLAS A CALIPOR WARREN L FULMER LaaS QU . ST 16 VLA DLAMAN1: G Nlrv'PO3t. EACH CA NIMPO ZT COAST CA g206o -27 92657 -1624 :.s, 935 -94 -056 LUCAS -GIANT ILMS 1165 QUAIL ST NEWPORT BEACH CA 9266o-2705 lid 5ak a Compatl 2 -9q-056 rtiq 9�,a IF OR 9�8 1,11CM-GIANTULIAS iZT�7 Applicant/Owner Fle tcher Jones Motors am 330DJarnbome Newport Beach, CA 92660 Y lz� -;; Contact HOA .NIA VA Government solutions Atth., C, McDermottff,.Fetterman I San Joaquin Plaza Suite 210. NtWPWI,Seach, CA, 92660. 0-ooT6aieldwaiNE jaded pead aleldwal @OgIS vWAV pmalyledwoo slacie-1 jese-1 Coiatible with AveAtjAq0tTgnbV�, L 427221.-o6 WESTERN NATL LIFE INS Co i SUN AMERICA CTR 38TH LOS ANGELES 'CA 90o6,7 -.610o Fe/,� rk6fPd0d PJOqOA 01 JOJxAgV fl oAH3AVlj,ALqt?5 wi 13P O�u aAfl4nq q q 2611dob op suas 4�27-2.21-08 451 DOVE LLC GM . GORY M MONTAGNA 2235 FARADAYAVE 0 1888i VON KARMAN AVE 155o CARLSBAD CA IRVINE. CA 92008-7215 926.12-1557 427722109 427-221-10 FEB DbVE STREET PARTNERS LLC SBSTO 1 VE STREET PARTNERS lool DOVE ST 106 goi D . OVE ST 270 NEWPORT BEACH CA NEWPORT BEACH CA 9266a-2845, 92660-3039 427=221-13: 1.200 QUAIL.ST LLC 7778 ITIGUEROA-ST 4850 M9 ANGE LES CA g6017-584 ,427-221-16 MIREF 1500,QUAIL LLC iFRONTS75co :SAN FRANCISCO CA 04lil-53'27 427-221-12 nooQUAILST NEWPORT BEACH CA. 9266o-,270.5, 427-33Z-GI REALTYASSOCIATES FUND - 1301 DOVL_ST 86o . NEWPORT BEACH CA gz46(j4!244u 427-332 -04 NEWPORT PLACE iNVESTMENT CO 1401 QUAIL ST 120 NEWPORT BEACH CA 0266o-2744 4277342-02 JONES FLETCHER 7300 W SAHARA A AVE LAS VEGAS YV 80n7-2756 938-94-051 LUCAS bIANULIAS 1105.QUAILST NEWPORT BEACH CA 926.60-2705 427-22'1-14 MAA014EY & GRAU LLC 3822 CAMPUS DR 105 NEWPORT BEACH CA 427- 221-17 METROPOLITAN LIFE alo, S HOPE ST 3650 LOSANGELES CA 9007i`V20 42.7-241-03 LSWLTD 1603 EMERALD BAY LAGUNA.BEACH CA 9265171236 427-2 GLENBQROU.GH NEWPQRTP.LAZA LLC, 40,q S EL CAMINO Rr.AL.1-ioa SAN MATE , O CA 44442.1706 427-22.1-11 l000 QUAIL LLC 2235 FARADAYAVE. 0 CARLSBAD CA 92008-7215 4197- 221-15 DAVENPORT QUAIL PARTNERS.LLC 1400 QUAIL ST 165 NEWPORT BEACH CA 9266o.-2769 4.27-2.21-18 fiei DOVE-ST 165 NEWPORT. BEACH CA 926-262 60, & 4v7-241-04 W.1 W LTD L 1603 -14 D BAY D BAY � �A CH�CA 9 92 _ 1_123 2 1.-1986 427- 331 -01 Ol,C<AL 1A DIVISION OF CA '.1 Ch 9578-144 427-332-02 427-332-03 1400 BUILDING PARTNERSHIP CROWN . BUILDING 142o BRISTOL , ST ioo PO BOX NEWPORT BE ' ACH ' CA NEWPORT . BEACH CA 926,60-2914 - 926,58 =9oi8 427-341-01 STATE-OF CALIFORNTADIVISIOYPIF SACRAMENTO CA 95814 439-024-24 BACK BAY 2675 IRVINF.AVE 2A1 COSTA MESA CA 99627.46513 427-349>01 HILBERT PROPERTIES 11 13oo BRISTOL ST igo NEWPORT BEACH CA 92660. 291,! ,442-283-05 K.ODAkA ING 500 E 71'P ST LOS ANGELES CA 900.14-94TO 938-94-052 938-94-053 PRISTINE PROPERTIES CORP LUCAS-GIANULIAS 1103 QUAIL ST 2 PO BOX 2990 NEWPORT BEACH CA NEWP . ORT BEACH GA 92660, 2705 9265f . 3=9018 .,e;5P3dn-d0dasocjAc2T- 'r 01'e'v,poulmooft m#*pan of edl, BUOIL puoW8qol -ON ; 1 � &-mm 1: 1 W�a Compmi6 v�0 ®Tem I �' ' i F e a er 41ersd along ttne So Use Avery Tettipiate51 00 A �eeBPa�ar�_ exposo Pop-up Edge= AVEWOM � 938 -94 -136 938 - 94-,.37 _.. 938- 94-138 PRES -QUAIL STREET LLC ADAM M ROTUNDA BARBARA S`TRAUB 4300 VON KARMANAVE 1401 AVOCADO AVE 1100 QUAIL ST1o3 NEWPORT BEACH CA NEWPORT BEACH CA NEWPORT BEACH CA. 9266o -2004 9266o -7720 9266o -2702 938-94-1139. 933 -94 -140 938 - 94-141... 4�A71L..ST T LZC ARNAD ANCENlY CHIH{A UP . 030AVE 11VENEZIAAISLE 13791 :MAR LGIEU N ECIR NEWVO CA. IRVINE CA 92660 -2004 92606 =8296 9262'0 -3222 938-94 -142;. 938-94-143 938-9044 CHTHKAI 'LIU AUD ANCE & ES =QUAIL ST 1 ET LLC 13791 MARGENE'CIR 4300 AVE IRVINE CA IR NE 1" CH CA 9262o -3222 92606 -8296 926_,_ -2004 938 94.145 938-94 -146 938 94147 . CONTEXT PROPERTIES LLC STEVEAXENOS R 8- 944'PIZAAN 1100 QUAIL ST u 1 1106 QUAIL ST 114: 33 TUSCANY NEWPORT 13L':ACII CA NEWPORT BEACH CA LAI3iRA RANCH CA 9266o.2779 9266o -2703; 92694 -1457 938-94 -148 938 -94 7149 P12 -QUAIL REET T.LC 938 -94 -150 NEWPORT INTL MGMT GROUP LLC P -QUAIL ET LLC 430o AVE 24 BLUR SMT 4306 AVE NEWP EACH CA IRVINE CA IE PO CH CA 92660 -2004 92603 0155 %Mb.-2004. 938794-151 938-94 -152 938-94 -153. SAN REMb LLC: P QUAIL IIT LLC REM C YO BOX 17923 4300 AN AVE P 17923 IRVINE CA NEWPO B + CIi CA IR 92623- 7923:; 82660= 004' 92623 -703 938-94-154 938 4 -55 938 94.156 PRES- UAT ET LLC PRE)- AI BEET LI.0 PRES -QUAIL STREET LLC 4300 VO AVE 4300 VO AVE NEWP0 B + Cii CA 9 SPOdNBILL DR NEWPO B + CH CA ALISO:VIEJO CA 9266.0- 004 92660 =2oo4 92656 -8877 938-94 -157. 938-94-15$ VADA JONES PRES- U A EET LLC 438 94-159 . 4300VONYARMATq;gVL P QU STREET LLC 4300 V AVE 4300.... MAN AVE NEWPORT _BEACH CA NEWPO I3 CA NEWP EACH CA 9266o -2oo4 92660= 004 92666 2004 938-94-160 938- 4 -16 938 -�Y4 a62 P "S QUAIL REST LLC PRE U STREET LLC MCA CONSULTANTS INC 4300 RMAN AVE 4$00 V AVE 18010 SKY PARK CIR 245 NEWP r H CA NE VP BEACH CA IRVINE CA 9266o, 004 92660 -2004 92614 -6441 938-94 -163. MCA CONSULTANTS INC 18o10 SKY PARK CIR IRVINE CA 92614-6441 Ia A peter / shSaergeA os ndlent R1l i .py,� I ealgnbdiw11=211 s 0gabad 4AJ[iYo51G41 43 C CITY CLik `16 ICE AFFIDj gV11TC1* RP4.TIING OFFICE OF ��� ,i 1 THE GTYCLERK On � "� , 20'WYICp6sf6ijfi8EA4blice of Public Hearing regarding: MacArthur at Dolphin Striker PA2010 -135 Date of City Council Public Hearing: October 25, 2011 � "t Dolphin Striker MacArthur Blvd at Dolphin Striker Way, Newport Beach, California S T 0 U T E N B 0 R 0 U G N A r c h i t e c t s a n d P l a n n e r s 420 Alin Vista Way, Sui I 100, Laguna B ach, Ca 92651 F 949 715 3257 1 F 949 715 3256 1 www.sloulenboroug h i ns.com S T 0 U T E N B 0 R 0 U G H Site Plan Architects and Planners 420 A I V i s I a Way, S u i I a 100, Laguna Banc h, (e 92651 i 949 715 3257 1 F 949 715 3256 1 www.s l o u l e n h o r o u g h i nc.com =AA Striping Plan S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 A I I a Vis I Way, Suile IOU, Caguna B ar h, Ca 92651 F 949 715 3257 1 F 949 715 3256 1 www. s I o u I e n bo r o u g h in s. c om 1 DIY y - �1 .'��. > man J• ac N t/ :o R 0 pl vim rw J ?Y•i IOW' � 1J]�f I I :�u " "' Striping Plan S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 A I I a Vis I Way, Suile IOU, Caguna B ar h, Ca 92651 F 949 715 3257 1 F 949 715 3256 1 www. s I o u I e n bo r o u g h in s. c om n. ; S T 0 U T E N B 0 R 0 U G H Conceptual Rendering Architects and Planners 420 A to Vis to Way, S u i I a 100, loguno Banc h, (o 92651 i 949 715 3257 1 F 949 715 3256 1 ww w. s to u l e n h or o u g h inc. c ono EXISTING PARKING 57RUCTUURE (lb Cast ) Mflwy vldlwve In rcewN — Nciwts OBYfJe � a ❑ I , L LL-L I{L- B•0i 'o sc ru�cnsn� - -I- E ----------- � �� o. ------------ Fropeary u� i� 1 SP Ground Level Plan on Site i l IN Pnalrem' Lhia EXISTING BuIDING MI S SGi Fl r I-I 1 1 1 1 1 1 1 11111 I I "I I I I I I I I 111RU #a A R E L 31 FARCEEI -- „+�rre:%',$p�- - -- n.M son §+P..lu 9Z Ff — hWalsrl Ia i G gi b R r A I•tNrr V Ix azc' bg e F. =. A-Q3 '; • s n ry _ a EXISTING SUILOING sLGSgF- �rt:, ammFr t, IyJi• "• Fl .5 "J t k 10 Q 4 ei � O _ _ alb P b PKCd'tV IIM _ __ Lv 5 -- 4•! S r, m E40M L•rDilnp 3pri e l p K 1W4 I _ = r:mc =rbn lYp pl S= Adlcpr{�Iy wtT =taMntl Sf61 LL — 6 vu awmme DomErm Nob: FNtCELIPgeyplargnfMltdwPH w41h aosterd laoNVtl ruenn SbMarB 5rpdaf.IM'. mtl 516aaSld S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 A I V I s I Way, Sui I IOU, Laguna B ac h, Ca 92651 T 949 715 3257 1 F 949 715 3256 1 w w w. s I o u I en b o r o u g h i n s. c o Conceptual Landscape Plan S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 A I I a V i s I a Way, S u i I a 100, Laguna Banc h, (e 92651 T 949 715 3257 1 F 949 715 3256 1 www.s t o u I e n h o r o u g h i nc.com Wv 12TH a aT� 217-0- or•rr i sign Locini n l Pad £ - Il l €lev4 on I Alesbr �I well � I I 11 well ss•eler sl:,n Lecadanl --I—I . MY Ianl I r 'I "Ie M1 Laivkn $ye 1 l ,., MM Mde _Igit 65'fi' d EXIEIIW 6I9n LOwtlrtn [ Pies 2617}' ROW H q _ sL. ia' FIE Alrs!r Pads A& E -East Elevation North and East Elevations a RAOi —_ 10'd' 7l'd' ^s%W 4Td' Palkh9 OtHa+eal' PerBh9 _I.._ - I., L SOe+newl Glass r5UE' &ti-0 Meual sereees r 'I3srer r Plla M ■�■ ■� :: MEN 1=1__- _U__NIN ■ ■ ■ ■ in S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 A la Vis la Way, Sui I IOU, Laguna B ar h, Ca 92651 F 949 715 3257 1 F 949 715 3256 1 www. s l o u l e n bo r o u g h in s. c o een Yq Sun Sdeen � Y Pad A -South Flewarlon I `h PPomoel 1'e1, Ronl a FL +51'x° Pad A & B - West Elevation era• clv ' W ee•a- r- Pad A- North Eleeatlwl 55A' 7a'a^ YI�q CAvmmY o:c4�@ Piste � %wsln Clear GIM � � SP M-IQee L Oe Vdthsldwlbja South, North and West Elevations B5'+B' Ea rlar Ple Wdl 5ysasn Clear Glee � � spr lGleww L sonsrnen e'er^ I ,c � g S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 A la Vista Way, Sui I IOU, Laguna B ac h, Ca 92651 F 949 715 3257 1 F 949 715 3256 1 w w w. s l o u l e n b o r o u g h i n r. c ora 4T 41' 26' -0' 1T-0' '' u' 12T -0' P.At., Orl+nrv/ pm , n. -C. 20'1Y 202' 900 I I I FMo. Ls 11m I F phB y I M I Poep�gt Roof h q K �5t4T _ Pad 0 -South -I"atlon Pad A & A' -Ronf Plan South Elevation & Roof Plan 51'2' I I r Sin LecatlSn � Flamer 1 &.5 em S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P I a n n a r a 420 A I Vista Way, Su i Jo IOU, Logo no Booth, Co 92651 F 949 715 3257 1 F 949 715 3256 1 www.sloulenboroughinl.com TABULATION SUMMARY Parcel Name PARCEL 1 48,221 sf Parking Building Area Provided (sf) (cars) Existing Building to be removed 8,000 at Proposed Buildings Pad A 4,000 sf (Retail Use) 4,000 sf Pad B 8,351 sf (Retail Use) 3,351 sf (Food Use) 5,000 sf Total Area 12,351 at Existing Parking to be modified 78 cars and /or removed Proposed Parking (On-Site) 65 cars Existina Off-Site Parkins 16 cars Total Parking (including Off-Site) 81 cars PARCEL 2 (not part) 31,364 sf Existing Building 7,015 sf Existing Parking (On-Site) 59 cars PARCEL 3 (not part) 47,205 sf Existing Building 8,000 sf Existing Parking (On-Site) 74 cars Total Building Area 27,366 sf Total On-Site Parking 198 cars (Total On -Site & Off -Site Parking For Parcel 1 214 cars) S T 0 U T E N B 0 R 0 U G N Tabulation Architects and Planners 420 A I I a Vista Way, Sui I 100, L a g u no Boach, Ca 92651 T 949 715 3257 1 F 949 715 3256 1 www.sloulenboroug h i nc.com =AA Striping Plan S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 A I I a Vis I Way, Suile IOU, Caguna B ar h, Ca 92651 F 949 715 3257 1 F 949 715 3256 1 www. s I o u I e n bo r o u g h in s. c om 1 DIY y - �1 .'��. > man J• ac N t/ :o R 0 pl vim rw J ?Y•i IOW' � 1J]�f I I :�u " "' Striping Plan S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 A I I a Vis I Way, Suile IOU, Caguna B ar h, Ca 92651 F 949 715 3257 1 F 949 715 3256 1 www. s I o u I e n bo r o u g h in s. c om n. ; S T 0 U T E N B 0 R 0 U G H Conceptual Rendering Architects and Planners 420 A to Vis to Way, S u i I a 100, loguno Banc h, (o 92651 i 949 715 3257 1 F 949 715 3256 1 ww w. s to u l e n h or o u g h inc. c ono Agenda Item #12 — Appeal of MacArthur at Dolphin- Striker Ridgeway /Whitney, Partnership (PA2010 -135) City Council Public Public Hearing Oc:ber, 25, 2011 Restaurant Site 1 of Newport Place Planned Community 2 Planning Commission considered the entitlement application: • Construction: — 2, single -story buildings with a total of 13,525 square feet — A 59 -space parking lot — New landscaping — 8,850 sf. 3 Planning Commission Denial • Increase in the intensity of use while inadequately addressing parking through a waiver and off -site parking • One -year term of new off -site parking lease does not satisfy the Zoning Code that requires off -site parking be permanently available • Justification for the modification permit to allow relief from the landscaping standards is not practical difficulty • New access from MacArthur Boulevard is not consistent with the existing design (does not provide direct access into commercial parking lots) and may interrupt traffic flow along MacArthur Boulevard 51 Appeal • Appealed by Councilmember Hill • Given the importance of addressing the economic need for the City to support the improvement of the City's underperforming commercial areas and the applicant's willingness to address issues raised by the Planning Commission • The applicant has modified the project as follows: 5 r I exlsrlraG wak" 1 / PARKING 5TRUCTURE j b "nw _ I 145 C�5 f Fros.c•r . L boCl'1ow . _.r la roman EXIS111 Meten e. eacldlav P -tp� n ]evbe AP Lry ie ACCOS MI •i �,r -.F -_, —Pmt ti; .f ,� — )=SOFT 6}♦ +r-r 6-05 b lro;�esa 8.05 f i . _ ; 1 — �. -r a PARCEL 1 -- • ? ►ARCH 1 Lows 1S1pO3 IT -03 . 13103O Fr- .- g2 r 4d• NY Y w ------- -_ 7fi865 DMT 6.C1 FL. -,.. a - - - - -- – s. —I A -01 I 65 r _f �2y26yI)SOn .'t _1L•!Q�'� •L •s "4' — sin I -- �.ns n r1'y, $F V Wore fl N 12 - +•]' 4 "' F° � - � 12]'x' TLN {Y X21 6 Transfer of Development Rights Request Use Permit Request: parking waiver, off -site parking & parking management plan • Project provides: -94 81 spaces — On -site: -59 65 spaces — Off -site: -32- 16 spaces • Parking Waiver: 44 3 spaces • Surplus of 9 spaces under shared parking arrangement with Saagar & Classic Q Resta u ra nt Off -Site Parking Location Modified Project Summary: • Reducing the size of project by 1,174 sf., from 13,525 A to 12,351 A • Reducing the transfer request from Lexus Dealership site from 1,620 A to 400 A • Changing the proposed land use mix by reducing general commercial area from 8,525 to 7,351 sf., and changing the proposed fast -food use to take- out limited use • Increasing the number of on -site parking from 59 to 65 spaces, thereby reducing the parking waiver request from 13 to 3 parking spaces; and • Reducing the off -site parking request from 32 to 16 spaces. Project Applications • Planned Community Development Plan Amendment— change zoning designation from "Restaurant Site 1" to "General Commercial Site 8" • Transfer of Development Rights- 48 unbuilt hotel units from Fletcher Jones site and 400 sf. From Lexus Site • Conditional Use Permit — 3 -space parking waiver, 16 existing off -site parking and parking management plan • Waiver of Development Agreement • Modification Permit — Deviate from interior landscaping setback requirement (1 tree for 25 linear feet) 11 Project Studies • Traffic Study — 942 ADT ( 67 A.M. /55 P.M. peak hour trips) — Acceptable Level of Service — No improvements or mitigation required • Mitigated Negative Decla ratio n /CEQA — Project would not result in potentially significant impacts — 12 Mitigation measures — 20 -day Public Review (July 15 to August 3, 2011) — 3 Comment Letters — Errata to the MND has prepared to address minor changes and does not warrant recirculation 12 City Council Options • Deny the project • Approve the project • Refer modifications to Planning Commission • Direct applicant to modify project 13 ewfl p 1211.0' 127• — — .' —[I .. }I C{ New Loll tun tm N M: r'ARCEL I ?5 jIg Wypyl ll.al c rnplo Aln SMrtlo� 5fobOSLa# aM $IUbLISLB III i / EXISI G PARKING SlRUCiU'RE � } 5� f r I l d �Cvs f I pvlll%Yj wplkwjy IO1°TO~ EXISTING BUlDING _ so 20d r emcrma -e•1 8 m a _ _ pu4 rrc.ry .rfl }, Fmprry ,rte — 9 Fr_ez t q w I I I I� �I u 1 1 19 ❑ I I I I I� ISC+6 c-- Fr a n 19 -- }yeti - ARCEL a R -D4 r x v PARCEL 1 m a;?cssorl IT 1�apmfl `06LC VCLh HLD ®.0 Is r—� _'f3 S• ®Z l Qr I N Y Ap {• az.n, § s ! 6 a L I A -01 P h' EXI571NG BUILDING it ^r - -- s — - at 'n 1.ti3 n _ I.cw iwP egarg _ L.YM1nG Sg� ewfl p 1211.0' 127• — — .' —[I .. }I C{ New Loll tun tm N M: r'ARCEL I ?5 jIg Wypyl ll.al c rnplo Aln SMrtlo� 5fobOSLa# aM $IUbLISLB Harris, Lillian From: Sudo, Jenny Sent: Tuesday, October 25, 2011 4:12 PM To: Brown, Leilani; Harris, Lillian; McDonald, Cristal; Rieff; Kim Subject: FW: City Council Agenda Item 12. APPEAL - MACARTHUR BOULEVARD AT 4221 DOLPHIN STRIKER WAY (PA2010 -135). Attachments: Nephew Jay Johnson.jpg This link and photo were also uploaded onto our laptop. The speakers are also attached and it is working. Thank you- Jenny S. Sudo I Administrative Assistant to the Assistant City Manager City of Newport Beach I City Manager's Office (949) 644 -3003 1 (949) 644 -3020 (FAX) I jsudo@newportbeachca.gov From: Dan Purcell [mailto:dan5indexstreet.com1 Sent: Monday, October 24, 2011 1:47 PM To: Sudo, Jenny Subject: City Council Agenda Item 12. APPEAL - MACARTHUR BOULEVARD AT 4221 DOLPHIN STRIKER WAY (PA2010- 135). Hi Jenny: I appreciate your help on this. I need to make certain the laptop used for presentations during City Council meetings is properly configured to present, with sound, the KABC 7 video available at the following link: http : / /abclocal.go.com /kabc /story ?section= news /local /orange countv &id = 7144631 The video is 2 minutes and 31 seconds long with a 15 second advertisement preceding the video. CJ Hubbard was living in Corona del Mar at the time of his death. The picture shows CJ holding is nephew Jay Johnson. Thanks, Dan PROOF OF PUBLICATION STATE OF CALIFORNIA) ) SS. COUNTY OF ORANGE ) I am a citizen of the United States and a resident of the County of Los Angeles; I am over the age of eighteen years, and not a party to or interested in the notice published. I am a principal clerk of the NEWPORT BEACH /COSTA MESA DAILY PILOT, which was adjudged a newspaper of general circulation on September 29, 1961, case A6214, and June 11, 1963, case A24831, for the City of Costa Mesa, County of Orange, and the State of California. Attached to this Affidavit is a true and complete copy as was printed and published on the following date(s): Saturday, October 15, 2011 I certify (or declare) under penalty of perjury that the foregoing is true and correct. Executed on October 18, 2011 at Los Angeles, California rl YI/frlMl� W Signature NOTICE Of Pu6uC18111li NOTICE IS HEREBY GIVEN that on Tues- day, October 25, 2011, at 7:00 p.m., e public hearing will be conducted in the City Council Chambers (Building A) at 3300 Newport Boulevard,.i Newport Beach. The City Council of the City. of Newport Beach will consider the following application: MacArthur at Dolphin - Striker - An appeal of the Planning Commis- sion's denial of an ap- plication to develop two, single -story com- mercial building of 13,525 square feet to- tal. The project requires the approval of the fol- lowing applications: A Planned Community Text Amendment to change the zoning des- ignation of the subject property from "Restau- rant Site 1" to "General Commercial Site 8 "; a Transfer of Develop- ment Rights to allow the transfer of 48 un- built hotel units from Hotel Site 2 -B (Fletcher Jones Vehicle Storage Facility at 1301 Quail Street) and 1,620 square feet from Gen- eral Commercial Site 7 (Lexus Dealership at 3901 MacArthur Bou- levard) for a total of 5,529 square feet of specialty retail to the subject site; a Traffic Study approval pursu- ant to Chapter 15.40 (Traffic Phasing Ordi- nance) as the project will generate in excess 300 average daily trips (ADT); a Conditional Use Permit to modify the off - street parking requirements, allow for the use of off site park- ing, and to establish a parking management plan for the site; a waiver of the re- quirement for a Devel- opment Agreement; and a Modification Permit to deviate from the land- scaping requirements of the Newport Place (PC- 11) Planned Community Development Plan. NOTICE IS HEREBY FURTHER GIVEN that a Mitigated Negative Dec- laration (MND) has been prepared by the City of Newport Beach in connection with the application noted above. The MND states that, the subject devel- opment will not result in a significant effect on the environment. It is the present intention of the City to accept the MIND and supporting documents. This is not I to be construed as ei- I ther approval or denial by the City of the sub- ject ND was application. iculated for a 20 -day public review and comment period that began on July 15, 2011, and concluded on August 3, 2011. All interested parties may appear and present testimony in regard to this application.. If you challenge this project in court, you may be limited to raising only those issues you or someone else raised at the public hearing (de- scribed in this notice) Or in written corre- spondence delivered to the City, at, or prior lo, the public hearing. The agenda, staff report, and documents may be reviewed at the Plan- ning Division (Building C, 2nd Floor), 3300 Newport Boulevard, Newport Beach, Califor- nia, 92663 or at the City of Newport Beach web - site at www.newport beachca.gov on the Fri- day prior to the hear- ing. For questions regarding details of the project please contact Rosalinh Ung, Associate Planner, at (949) 644 -3208 rung(. newportbeachca.gov. Project File No. PA2010 -135 Activity No.: PD2010 007, TD2010 -002 TS2011 -002. UP2011 026TND2011 001, ! MN2011 -014 Zen.: Restaurant Site of PC -11 (Newpor Place) General Plan: MU -H'. RECEIVED 2011 OCT 24 PM 2: 03 OFFRCE OF TI IE OT( CLERK CITY 0:= ?OW BEACH the City, a or prior o, the City, at, ea prior he the public hearing. The agenda, staff report, and wed at may be Plan- ning at the Plan- ning Division (Building C, 2nd Floor), 3300 Newport Boulevard, Newport Beach, he Cir- of ewpororatthe City si Newport Beach web - site h a.gov on the day prior to on the Fri- day prior [o the hear- ing. For questions regarding details of the project please contact Planner, Ung, Associate Planner, r, at (9a9) 644 -3208, rung@ newportbeachca.gov. ProjIect File No.: PA2610 -135 Activity No.: PD2010- 007, TD2010 -002, TS2011 -002, UP2011- 026,ND2011.001, & MN2011 -014 Zone: Restaurant Site I of PC -11 (Newport Place) General Plan: MU -142 (Mixed Use Horizontal 2) Location: 4221 Dolphin - Striker Way, West side of MacArthur Blvd at Dolphin Striker -Way AAp fi,ant: Ridgeway/ Wh t.ey, Partnership Leilani I. Brown, City Clerk City of Newport Beach Published Newport Beach/ Costa Mesa Daily Pilot October 15, 2011 �OOO PL = A1C�, fOO P� STATE OF CALIFORNIA) )SS. COUNTY OF ORANGE ) I am a citizen of the United States and a resident of the County of Los Angeles; I am over the age of eighteen years, and not a party to or interested in the notice published. I am a principal clerk of the NEWPORT BEACH /COSTA MESA DAILY PILOT,. which was adjudged a newspaper of general circulation on September 29, 1961, case A6214, and June 11, 1963, case A24831, for the City of Costa Mesa, County of Orange, and the State of California. Attached to this Affidavit is a true and complete copy as was printed and published on the following date(s): Saturday, October 29, 2011 I certify (or declare) under penalty of perjury that the foregoing is true and correct. Executed on November 3, 2011 at Los Angeles, California Signature RECEIVED ?Oil NOV -7 AM 10: 29 CITY GrFir G= Or Attachment No. CC 1 Draft Resolution for Denial 11 12 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH DENYING WITHOUT PREJUDICE PLANNED COMMUNITY DEVELOPMENT PLAN AMENDMENT NO. PD2010 -007, TRANSFER OF DEVELOPMENT RIGHTS NO. TD2010 -002; CONDITIONAL USE PERMIT NO. 2011 -026, MODIFICATION PERMIT NO. 2011 -014, AND TRAFFIC STUDY NO. TS2011 -002 FOR A NEW COMMERCIAL DEVELOPMENT LOCATED AT 4221 DOLPHIN - STRIKER WAY (PA2010 -135) THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Ridgeway/Whitney, Partnership, with respect to property located at 4221 Dolphin- Striker Way, and legally described as Parcel 1 of Portion of Lot 4 of Tract No. 7770, requesting approval of an amendment to the Newport Place (PC -11) Planned Community Development Plan to accommodate the development of two new commercial buildings of 13,525 square feet total. The following applications were requested or required in order to implement the project as proposed: a) An amendment to Newport Place (PC -11) Planned Community Development Plan to change the zoning designation of the subject property from "Restaurant Site 1" to "General Commercial Site 8 ", pursuant to Chapters 20.56 (Planned Community District Procedures) and 20.66 (Amendments) of the Municipal Code. b) A transfer of development rights to allow the transfer of 48 unbuilt hotel units, which equates to Storage Facility at 1301 Quail Street) and 400 square feet from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) for a total of 5,529 square feet to the subject site, pursuant to Chapter 20.46 (Transfer of Development Rights) of the Minicipal Code. c) A traffic study approval pursuant to Chapter 15.40 (Traffic Phasing Ordinance) as the project will generate in excess 300 average daily trips (ADT). d) A conditional use permit to modify the off - street parking requirements, allow for the use of off -site parking, and to establish a parking management plan for the site, pursuant to Chapter 20.40 (Off- Street Parking) of the Municipal Code. e) A modification permit to deviate from the landscaping requirements of the Newport Place (PC -11) Planned Community Development Plan, pursuant to Section 20.52.050 of the Municipal Code. f) A waiver of the requirement for a development agreement pursuant to the provisions of Chapter 15.45 (Development Agreements) of the Municipal Code. 13 City Council Resolution No. _ Paqe 2 of 3 2. The subject property has zoning designation of Restaurant Site 1 of the Newport Place (PC -11) Planned Community Zoning District and the General Plan Land Use Element category is Mixed -Use Horizontal 2 ( "MU -H2 "). 3. The subject property is not located within the coastal zone. 4. A public hearing was held by the Planning Commission on September 22, 2011, in the City Hall Council Chambers, 3300 Newport Boulevard, Newport Beach, California. A notice of time, place and purpose of the meeting was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this meeting. 5. At the September 22, 2011, Planning Commission hearing, the Planning Commission voted 4 -3 to deny the project without prejudice. 6. On October 1, 2011, the Planning Commission's decision to deny the applicant's request was appealed by City Councilmember Rush Hill. The appeal was filed to allow the City Council an opportunity to review the project given the importance of addressing the economic need for the City to support the improvement of the City's underperforming commercial areas combined with the applicant's willingness to address issues raised by the Planning Commission. 7. Due to the concerns expressed by the Planning Commission at the September 22, 2011, Planning Commission hearing, the applicant modified the application request by: a. Reducing the project gross floor area from 13,525 square feet to 12,351 square feet; b. Reducing the transfer request from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) from 1,620 square feet to 400 square feet; C. Changing the proposed land use mix by reducing general commercial area from 8,525 to 7,351 square feet and changing the operational characteristic of the proposed fast -food use to take -out limited use; d. Increasing the number of on -site parking from 59 to 65 spaces thereby reducing the parking waiver request from 13 to 3 parking spaces; and e. Reducing the off -site parking request from 32 to 16 spaces. A long term reciprocal parking agreement for these spaces has been in effect since 1972 and does not have a termination date. 8. A public hearing was held by the City Council on October 25, 2011, in the City Hall Council Chambers, 3300 Newport Boulevard, Newport Beach, California. A notice of time, place and purpose of the meeting was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the City Council at this meeting. Tmplt: 03/08/11 14 City Council Resolution No. _ Paqe 3 of 3 9. Pursuant to Section 20.64.030.C, the public hearing was conducted "de novo," meaning that it was a new hearing and the decision being appealed has no force or effect as of the date the call for review was filed. SECTION 2. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The City Council of the City of Newport Beach does hereby deny without prejudice Planned Community Text Amendment No. PD2010 -007, Transfer of Development Rights No. TD2010 -002, Conditional Use Permit No. UP2011 -026, and Modification Permit No. MN2011 -014, and Traffic Study No. TS2011 -002. 2. This resolution shall take effect immediately upon adoption. 3. This resolution was approved, passed and adopted at a regular meeting of the City Council of the City of Newport Beach, held on the 25th day of October, 2011, by the following vote, to wit: AYES, COUNCIL MEMBERS NOES, COUNCIL MEMBERS /_ :1091rK011J►[a]I0uI :INI:]: ICZ1 MAYOR CITY CLERK Tmplt: 03/08/11 ZJ� 10 Attachment No. CC 2 Draft Resolution for Approval 17 12 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH ADOPTING A MITIGATED NEGATIVE DECLARATION NO. MN2011 -001, APPROVING TRANSFER OF DEVELOPMENT RIGHTS NO. TD2010 -002; CONDITIONAL USE PERMIT NO. 2011 -026, MODIFICATION PERMIT NO. 2011 -014, AND WAIVER OF DEVELOPMENT AGREEMENT, AND FINDING TRAFFIC STUDY NO. TS2011 -002 IN COMPLIANCE WITH THE TRAFFIC PHASING ORDINANCE, FOR A NEW COMMERCIAL DEVELOPMENT LOCATED AT 4221 DOLPHIN - STRIKER WAY (PA2010 -135) THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. An application was filed by Ridgeway/Whitney, Partnership, with respect to property located at 4221 Dolphin- Striker Way, and legally described as Parcel 1 of Portion of Lot 4 of Tract No. 7770, requesting approval of an amendment to the Newport Place (PC -11) Planned Community Development Plan to accommodate the development of two new commercial buildings of 13,525 square feet total. The following applications were requested or required in order to implement the project as proposed: a) An amendment to Newport Place (PC -11) Planned Community Development Plan to change the zoning designation of the subject property from "Restaurant Site 1" to "General Commercial Site 8 ", pursuant to Chapters 20.56 (Planned Community District Procedures) and 20.66 (Amendments) of the Municipal Code. b) A transfer of development rights to allow the transfer of 48 unbuilt hotel units, from Hotel Site 2 -B (Fetcher Jones Vehicle Storage Facility at 1301 Quail Street) and 1,620 square feet from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) for a total of 5,529 square feet to the subject site, pursuant to Chapter 20.46 (Transfer of Development Rights) of the Minicipal Code. c) A traffic study approval pursuant to Chapter 15.40 (Traffic Phasing Ordinance) as the project will generate in excess 300 average daily trips (ADT). d) A conditional use permit to modify the off- street parking requirements, allow for the use of off -site parking, and to establish a parking management plan for the site, pursuant to Chapter 20.40 (Off- Street Parking) of the Municipal Code. e) A modification permit to deviate from the landscaping requirements of the Newport Place (PC -11) Planned Community Development Plan, pursuant to Section 20.52.050 of the Municipal Code. 29 City Council Resolution No. _ Paqe 2 of 26 f) A waiver of the requirement for a development agreement pursuant to the provisions of Chapter 15.45 (Development Agreements) of the Municipal Code. 2. The subject property has zoning designation of Restaurant Site 1 of the Newport Place (PC -11) Planned Community Zoning District and the General Plan Land Use Element category is Mixed -Use Horizontal 2 ( "MU -H2 "). 3. The subject property is not located within the coastal zone. 4. A public hearing was held by the Planning Commission on September 22, 2011, in the City Hall Council Chambers, 3300 Newport Boulevard, Newport Beach, California. A notice of time, place and purpose of the meeting was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this meeting. 5. At the September 22, 2011, Planning Commission hearing, the Planning Commission voted 4 -3 to deny the project without prejudice. 6. On October 1, 2011, the Planning Commission's decision to deny the applicant's request was appealed by City Councilmember Rush Hill. The appeal was filed to allow the City Council an opportunity to review the project given the importance of addressing the economic need for the City to support the improvement of the City's underperforming commercial areas combined with the applicant's willingness to address issues raised by the Planning Commission. 7. Due to the concerns expressed by the Planning Commission at the September 22, 2011, Planning Commission hearing, the applicant modified the application request by: a. Reducing the project gross floor area from 13,525 square feet to 12,351 square feet; b. Reducing the transfer request from from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) from 1,620 square feet to 400 square feet. c. Changing the proposed land use mix by reducing general commercial area from 8,525 to 7,351 square feet and changing the operational characteristic of the proposed fast -food use to take -out limited use; d. Increasing the number of on -site parking from 59 to 65 spaces thereby reducing the parking waiver request from 13 to 3 parking spaces; and e. Reducing the off -site parking request from 32 to 16 spaces. 8. A public hearing was held by the City Council on October 25, 2011, in the City Hall Council Chambers, 3300 Newport Boulevard, Newport Beach, California. A notice of time, place and purpose of the meeting was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the City Council at this meeting. Tmplt: 03/08/11 20 City Council Resolution No. _ Paqe 3 of 26 9. Pursuant to Section 20.64.030.C, the public hearing was conducted "de novo," meaning that it was a new hearing and the decision being appealed has no force or effect as of the date the call for review was filed. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. An Initial Study and Mitigated Negative Declaration have been prepared in compliance with the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and City Council Policy K -3. 2. The draft Mitigated Negative Declaration (MND) was circulated for a 20 -day public comment period beginning on July 15, 2011, and ending on August 3, 2011. The contents of the environmental document and comments on the document were considered by the Planning Commission in its review of the proposed project. 3. An Errata has been prepared which clarifies and augments data in the document in responses to comments including the added location of transfer of development rights to the subject property, and supports the conclusions reached in the draft MND. Consistent with CEQA Guidelines section 15073.5(c), recirculation of the MND is not required when new information is added to the MND which merely clarifies, amplifies, or makes insignificant modifications to the MND. 4. On the basis of the entire environmental review record, the proposed project, with mitigation measures, will have a less than significant impact upon the environment and there are no known substantial adverse affects on human beings that would be caused. Additionally, there are no long -term environmental goals that would be compromised by the project, nor cumulative impacts anticipated in connection with the project. The mitigation measures identified and incorporated in the Mitigation Monitoring and Reporting Program (MMRP) are feasible and will reduce the potential environmental impacts to a less than significant level. 5. The MND and MMRP are hereby adopted by the City Council. The document and all material, which constitute the record upon which this decision for recommendation was based, are on file with the Planning Department, City Hall, 3300 Newport Boulevard, Newport Beach, California. 6. The City Council finds that judicial challenges to the City's CEQA determinations and approvals of land use projects are costly and time consuming. In addition, project opponents often seek an award of attorneys' fees in such challenges. As project applicants are the primary beneficiaries of such approvals, it is appropriate that such applicants should bear the expense of defending against any such judicial challenge, and bear the responsibility for any costs, attorneys' fees, and damages which may be awarded to a successful challenger. Tmplt: 03/08/11 21- City Council Resolution No. _ Paqe 4 of 26 SECTION 3. REQUIRED FINDINGS. The subject property is located in Statistical Area L4 (Airport Area) and has a General Plan designation of Mixed -Use Horizontal 2 ( "MU -H2 "). The MU -H2 designation provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed -use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses. The proposed commercial development would be allowed as the proposed uses are ancillary and supportive to the existing nearby office and light industrial developments. 2. Chapter 20.46 (Transfer of Development Rights) of the Municipal Code requires the City Council must also make the following findings for the approval of transfer of development rights: Finding: A. The reduced density /intensity on the donor site provides benefits to the City. Facts in Support of Finding: A -1. The transfer of 48 hotel rooms from Hotel Site 2 -B and 400 square feet from General Commercial Site 7 would result in a reduced intensity on the donor sites which also would result in a reduction of local vehicle trips and traffic congestion traffic, especially along North Bristol Street and MacArthur Boulevard. B -1. The proposed transfer allows the subject property to redevelop and improve with a mixture of food uses and general commercial uses. B. The transfer of development rights will not result in any adverse traffic impacts and would not result in greater intensity than development allowed without the transfer and the proposed uses and physical improvements would not lend themselves to conversion to higher traffic generating uses. C -1. The transfer of development rights onto the receiver site (the subject property) will not result in adverse traffic impacts as demonstrated in the Traffic Study prepared by Kunzman Associates, Inc. The transfer and the proposed uses of the receiver site would not lend themselves to conversion to higher traffic generating uses since the subject property is currently approved for 7,996 square feet of food service use which is being reduced to a maximum of 5,000 square feet (4,000 square feet of high turnover restaurant use and 1,000 of take -out service, limited food use). The remainder of the development will be allocated for general commercial uses. Furthermore, the donor sites and the receiver site are located within the same Land Use Statistical Area L4. The proposed transfer would be trip neutral as any increase in the peak hour Tmplt: 03/08/11 22 City Council Resolution No. _ Paqe 5 of 26 generated by the receiver site would be deduced proportionally from the donor sites. C. The increased development potential transferred to the receiver site will be compatible and in scale with surrounding development and will not create abrupt changes in scale or character. D -1. The increase development potential transferred to the subject property will be compatible and in scale with the surrounding development as the proposed development will be single story, at 29 feet in height. The subject property is physically suitable for the new development and provides improved vehicular access to and from the site off of MacArthur Boulevard. D. The receiver site is physically suitable for the development proposed taking into consideration adjacent circulation patterns, protection of significant public views and open space, and site characteristics, including any slopes, submerged areas, and sensitive resources. D -1. The subject property will have a direct access to and from MacArthur Boulevard instead of the existing circuitous route from Dove Street or Corinthian Way. The site characteristics lend themselves to the development since all building setbacks are being respected and the overall development scale is in proportion to the immediate area. 3. Chapter 15.40 (Traffic Phasing Ordinance, or TPO) of the Municipal Code requires that a traffic study be prepared and findings be made prior to issuance of building permits if a proposed project will generate in excess of 300 average daily trips (ADT). For the purposes of preparing the traffic analysis for this project, the 13,525- square- foot commercial development was assumed to include 1,000 square feet of fast -food uses, 4,000 square feet of high turn -over food uses, and 8,525 square feet of general commercial uses. Combined, this land use mix is forecast to generate a net increase of 942 trips per day, including 67 a.m. peak hour trips and 55 p.m. peak hour trips. Pursuant to Section 15.04.030.A, the Project shall not be approved unless certain findings can be made. The following findings and facts in support of such findings are set forth: Finding: A. That a traffic study for the project has been prepared in compliance with this chapter and Appendix A. Facts in Support of Finding: A -1. A traffic study, entitled "4221 Dolphin Striker Project Traffic Impact Analysis (Revised)" dated May 31, 2011, was prepared by Kunzman Associated, Inc. under the supervision of the City Traffic Engineer. Tmplt: 03/08/11 23 City Council Resolution No. _ Paqe 6 of 26 Finding: B. That based on the weight of the evidence in the administrative record, including the traffic study, one of the findings for approval in subsection (8) can be made: 15.40.030.8.1 Construction of the project will be completed within 60 months of project approval; and 15.40.030.B.1(a) The project will neither cause nor make worse an unsatisfactory level of traffic service at any impacted primary intersection. Facts in Support of Finding: B -1. Construction of the Project is anticipated to be completed in 2012. If the Project is not completed within sixty (60) months of this approval, preparation of a new traffic study will be required. B -2. The traffic study indicates that the Project will increase traffic on 4 of the 12 study intersections in the City of Newport Beach by one percent (1 %) or more during peak hour periods one year after the completion of the Project. B -3. Utilizing the Intersection Capacity Utilization (ICU) analysis specified by the Traffic Phasing Ordinance, the traffic study determined that the four primary intersections identified will operate at LOS "C" or better during the AM and PM peak hours, and no mitigation is required. B -4. Based on the weight of the evidence in the administrative record, including the traffic study, the implementation of the Project will neither cause nor make worse an unsatisfactory level of traffic service at any impacted primary intersection within the City of Newport Beach. Finding: C. That the project proponent has agreed to make or fund the improvements, or make the contributions, that are necessary to make the findings for approval and to comply with all conditions of approval. Facts in Support of Finding: C -1. Since implementation of the Project will neither cause nor make worse an unsatisfactory level of traffic service at any impacted primary intersection within the City of Newport Beach, no improvements or mitigations are necessary. 4. Based on the revised application, a total of 84 parking spaces are required for the proposed development per the Municipal Code. The applicant proposes a total of 81 spaces (16 off -site and 65 on- site), which results in a parking shortage of 3 spaces. Section 20.40.110.B.2 of the Municipal Code allows required off - street parking to be Tmplt: 03/08111 24 City Council Resolution No. _ Paqe 7 of 26 reduced with the approval of a conditional use permit for joint use of parking facilities. Additionally, Pursuant to Section 20.40.100 of the Municipal Code, approval of a conditional use permit is required for a portion of required parking that is not located on the same site it is intended to serve. In accordance with Section 20.40.100.6 (Off -Site Parking) of the Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. The parking facility is located within a convenient distance to the use it is intended to serve. Facts in Support of Finding: A -1. The subject property currently has a 16 -space off -site recorded parking agreement with the adjacent property located at 4100 Newport Place. These off - site spaces are located on the 5th floor of the US Bank's parking structure. These spaces will be used solely by the employees of the project and not by customers. The US Bank's parking structure is located approximately 120 feet southwest of the property. It would take an employee approximately less than a minute to walk from the off -site parking structure according to The Manual on Uniform Traffic Control Devices (MUTCD) which suggests four feet per second as a normal walking speed. Given the location of the parking spaces on the fifth floor of the parking structure, it would take an additional 3 to 4 minutes of elevator time, for a total of less than 5 minutes. This is considered a convenient distance for employee parking. Finding: B. On- street parking is not being counted towards meeting parking requirements. Facts in Support of Finding: B -1. On- street parking spaces do not exist within close proximity of the project site and are not being used towards meeting the parking requirements of the project. Finding: C. Use of the parking facility will not create undue traffic hazards or impacts in the surrounding area. Facts in Support of Finding: C -1. The use of the parking lot will not create an undue traffic hazard as the proposed project and subject off -site parking lot are located next to one another. This allows employees to walk across the subject property's parking Tmplt: 03/08/11 25 City Council Resolution No. _ Paqe 8 of 26 lot, through a pedestrian walkway to the elevator of the parking structure, without crossing any street intersection. The parking structure is accessed through a keycard system and the applicant has agreed to provide their employees with the necessary keycards. Since the off -site parking will be used by employees only, typical noise disturbances associated with restaurant patrons loitering in parking lots is not expected. Finding: D. The parking facility will be permanently available, marked, and maintained for the use it is intended to serve. Facts in Support of Finding: D -1. The off -site parking spaces will be made available for the use of employees of the project on a daily basis, with no restriction on the hours of use. In the event that the applicant loses the ability to provide parking at the off -site location, the applicant will be required to notify the Community Development Director who will establish a reasonable time for substitute parking to be provided or reduce the size of the tenant spaces or change the tenant mix (i.e. less restaurant) in proportion to the parking spaces lost pursuant to Section 20.40.100.D (Loss of Off -Site Parking) of the Municipal Code. 5. Pursuant to Sections 20.40.100 (Off -Site Parking) and 20.40.110.6.2 (Reduction of Required Off - Street Parking) of the Municipal Code, a conditional use permit is required to allow a portion of required parking that is not located on the same site it is intended to serve and to modify the off - street parking requirements and to establish a parking management plan. In accordance with Section 20.52.020.E of the Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. The use is consistent with the General Plan and any applicable specific plan. Facts in Support of Finding: A -1. The proposed commercial development and uses are consistent with MU -H2 General Plan land use designation. An amendment to the Newport Place (PC- 11) Planned Community Development Plan to change the zoning designation of the subject property from Restaurant Site 1 to General Commercial Site 8 would allow general commercial uses in addition to food service uses. Finding: B. The use is allowed within the applicable zoning district and complies with all other applicable provisions of this Zoning Code and the Municipal Code. Tmplt: 03/08/11 20 City Council Resolution No. _ Paqe 9 of 26 Facts in Support of Finding: B -1. With the approval an amendment to the Newport Place (PC -11) Planned Community Development Plan to change the zoning designation of the subject property from Restaurant Site 1 to General Commercial Site 8, the proposed general commercial and food service uses would be consistent with the zoning designation and development standards of General Commercial. Finding: C. The design, location, size, and operating characteristics of the use are compatible with the allowed uses in the vicinity. Facts in Support of Finding: C -1. The project includes conditions of approval to address potential incompatibles. As conditions of approval, the proposed development would be restricted to a total of 5,000 square feet of food service uses. Of that, 1,000 square feet would be allocated for a take -out service, limited food use. The remaining 7,351 square feet would be allocated for general commercial uses as allowed for General Commercial Sites per the Newport Place Planned Community Development Plan. Furthermore, the hours of general commercial uses would not be allowed during the 7:00 to 9:00 morning (AM) peak hour, daily. C -2. The proposed project has a parking shortage of 3 spaces per the Municipal Code. However, under a shared parking scenario within the project site, there would be a surplus of 2 spaces during peak demand and a surplus of 9 spaces during peak demand under a shared parking scenario with the adjoining restaurant sites. A parking management plan has been prepared to mitigate impacts associated with the reduction in the number of required parking spaces per the Municipal Code. This plan has been reviewed and approved by the City's Traffic Engineer. The off -site parking spaces will be made available for the use of employees of the project on a daily basis, with no restriction on the hours of use. C -3. The project's location, surrounded by existing retail commercial, office and light industrial developments, is appropriate given the proposed uses are to be compatible and supportive to the surrounding uses. The proposed development would not result in negative impacts to adjacent properties as a result of traffic, parking or noise. Finding: D. The site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle (e.g., fire and medical) access and public services and utilities. Tmplt: 03/08/11 27 City Council Resolution No. _ Paqe 10 of 26 Facts in Support of Finding: D -1. Adequate public and emergency vehicle access, public services, and utilities are provided to the subject property. The proposed development will comply with all Building, Public Works, and Fire Codes. All ordinances of the City and all conditions of approval will be complied with. Findinq: E. Operation of the use at the location proposed would not be detrimental to the harmonious and orderly growth of the City, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in the neighborhood of the proposed use. Facts in Support of Finding: E -1. The project complies with the development standards prescribed for General Commercial developments, with the exceptions of parking and landscaping requirements. E -2. The proposed development has been reviewed and includes conditions of approval to ensure that potential conflicts with the surrounding land uses are minimized to the greatest extent possible. 6. In accordance with Section 20.52.050 (Modification Permits), the Planning Commission must make the following findings for approval of a modification permit: Finding: A. The requested modification will be compatible with existing development in the neighborhood. Facts in Support of Finding: A -1. The proposed landscaping to be provided at the project site will be compatible with the adjacent properties and surrounding office and light industrial developments. The proposed ground cover, shrubs, and trees will be provided to enhance the aesthetics of the newly proposed development and seamlessly connect the property boundaries with adjoining sites. Finding: B. The granting of the modification is necessary due to the unique physical characteristic(s) of the property and /or structure, and /or characteristics of the use. Tmplt: 03/08/11 22 City Council Resolution No. _ Paqe 11 of 26 Facts in Support of Finding: B -1. One tree per 25 lineal feet of the interior south property line is not provided due to the existing lot configuration. It is logical for the proposed development to be designed and located along the south property line and the needs of providing secondary exits along the back side of this building prevent the provisions of required landscaping. Finding: C. The granting of the modification is necessary due to practical difficulties associated with the property and that the strict application of the Zoning Code results in physical hardships that are inconsistent with the purpose and intent of the Zoning Code. Facts in Support of Finding: C -1. Sufficient landscaping consisting of ground cover, shrubs, and trees are being proposed in conjunction with the new development that meets the intent of the Planned Community Development Standards. The strict application of the Planning Community Development Standards would require reconfiguration of the project and result in physical hardships to the proposed development in terms of site design and building placement. Finding: D. There are no alternatives to the Modification Permit that could provide similar benefits to the applicant with less potential detriment to surrounding owners and occupants, the neighborhood, or to the general public. Facts in Support of Finding: D -1. The provision of the required trees per the landscape development standards of PC -11 (Newport Place Planned Community) would result in a much narrower and less desirable building size and shape and would also reduce the length of the parking stalls and prevent the drive aisle to align with the driveway approaches. E. The granting of the modification would not be detrimental to public health, safety, or welfare to the occupants of the property, nearby properties, the neighborhood, or the City, or result in a change in density or intensity that would be inconsistent with the provisions of this Zoning Code. Tmplt: 03/08/11 29 City Council Resolution No. _ Paqe 12 of 26 Facts in Support of Finding: E -1. The deviation from the landscape development standards will not result in any detriment to public health, safety, or welfare. The landscaping deviation will not change the density or intensity of the proposed development. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The City Council of the City of Newport Beach does hereby find, on the basis of the whole record, that there is no substantial evidence that the project will have a significant effect on the environment and that the Mitigated Negative Declaration reflects the City Council's independent judgment and analysis. The City Council does hereby adopts Mitigated Negative Declaration and Errata, including the Mitigation Monitoring and Reporting Program attached as Exhibit "A ". The document and all material, which constitute the record upon which this decision was based, are on file with the Planning Department, City Hall, 3300 Newport Boulevard, Newport Beach, California. 2. The proposed development complies with the Traffic Phasing Ordinance, based on the weight of the evidence in the administrative record, including Traffic Study No. TS2011 -002. 3. The City Council of the City of Newport Beach does hereby approve Planned Community Text Amendment No. PD2010 -007, Transfer of Development Rights No. TD2010 -002, Conditional Use Permit No. UP2011 -026, and Modification Permit No. MN2011 -014, and waive the requirement for a Development Agreement, subject to the conditions set forth in Exhibit B. 4. This resolution shall take effect immediately upon adoption. 5. This approval was based on the particulars of the individual case and does not in and of itself or in combination with other approvals in the vicinity or Citywide constitute a precedent for future approvals or decisions. 6. This resolution was approved, passed and adopted at a regular meeting of the City Council of the City of Newport Beach, held on the 25th day of October, 2011, by the following vote, to wit: Tmplt: 03/08/11 30 City Council Resolution No. _ Paqe 13 of 26 AYES, COUNCIL MEMBERS NOES, COUNCIL MEMBERS ABSENT COUNCIL MEMBERS MAYOR ATTEST: CITY CLERK Tmplt: 03/08/11 31 City Council Resolution No. _ Page 14 of 26 EXHIBIT "A" MACARTHUR AT DOLPHIN - STRIKER PROJECT MITIGATION MONITORING PROGRAM CITY OF NEWPORT BEACH Mitigation Measure Phase of Responsible Completion Implementation Monitoring Date /Initials Party Cultural Resources 5.1. The project applicant shall have a qualified During City of Newport professional archaeologist on site to monitor for any construction Beach potential impacts to archaeological or historic Community resources throughout the duration of any demolition Development and ground disturbing activities. The professional Department archeologist shall have the authority to halt any activities adversely impacting potentially significant cultural resources until the resources can be formally evaluated. The archaeologist must have knowledge of both prehistoric and historical archaeology. Additionally, the archaeological monitoring program shall include the presence of a local Native American representative (Gabrielino and /or Juaneno). Resources must be recovered, analyzed in accordance with CEQA guidelines, and curated. Suspension of ground disturbance in the vicinity of the discoveries shall not be lifted until the archaeologist has evaluated discoveries to assess whether they are classified as historical resources or unique archaeological sites, pursuant to CEQA. 5.2. The project applicant shall retain a qualified During City of Newport professional paleontologist for periodic monitoring construction Beach for any potential impacts to paleontological Community resources throughout the duration of ground Development disturbing activities. In the event paleontological Department resources are uncovered, the professional paleontologist shall have the authority to halt any activities adversely impacting potentially significant fossil resources until the resources can be formally evaluated. If potentially significant fossils are uncovered they must be recovered, analyzed in accordance with CEQA guidelines, and curated at facilities at the Natural History Museum of Los Angeles County, or other scientific institution accredited for curation and collection of fossil specimens. Suspension of ground disturbances in the vicinity of the discoveries shall not be lifted until the paleontologist has evaluated the significance of the resources pursuant to CEQA. Geology And Soils 6.1. Prior to issuance of grading permits, a detailed Prior to issuance City of Newport design- engineering -level geotechnical investigation of grading permits Beach report shall be prepared and submitted with Community engineered grading plans to further evaluate Development Tmplt: 03/08/11 32 City Council Resolution No. _ Paqe 15 of 26 expansive soils, soil corrosivity, settlement, Department foundations, grading constraints, and other soil engineering design conditions, and to provide site - specific recommendations to address these conditions, if determined necessary. The engineering -level report shall include and address each of the recommendations included in the geotechnical reports prepared by Strata -Tech, Inc. (Appendix B). The geotechnical reports shall be prepared and signed /stamped by a Registered Civil Engineer specializing in geotechnical engineering and a Certified Engineering Geologist. Geotechnical rough grading plan review reports shall be prepared in accordance with the City of Newport Beach Grading Ordinance. Noise 12.1. All noise - producing project equipment and During City of Newport vehicles using internal combustion engines shall be Construction Beach equipped with mufflers, air -inlet silencers where Community appropriate, and any other shrouds, shields, or other Development noise - reducing features in good operating condition Department that meet or exceed original factory specification. Mobile or fixed "package" equipment (e.g., arc welders, air compressors) shall be equipped with shrouds and noise control features that are readily available for that type of equipment. 12.2. All mobile and fixed noise - producing During City of Newport equipment used on the proposed project that is Construction Beach regulated for noise output by a local, state, or Community federal agency shall comply with such regulation Development while in the course of project activity. Department 12.3. Electrically powered equipment shall be used During City of Newport instead of pneumatic or internal combustion- Construction Beach powered equipment, where feasible. Community Development Department 12.4. Mobile noise - generating equipment and During City of Newport machinery shall be shut off when not in use. Construction Beach Community Development Department 12.5. Material stockpiles and mobile equipment During City of Newport staging, parking, and maintenance areas shall be Construction Beach located as far as practical from noise - sensitive Community receptors. Development Department 12.6. Construction site and access road speed limits During City of Newport shall be established and enforced during the Construction Beach construction period. Community Development Department 12.7. The use of noise - producing signals, including During City of Newport horns, whistles, alarms, and bells, shall be for safety Construction Beach warning purposes only. Community Development Department Tmplt: 03/08/11 33 City Council Resolution No. _ Paqe 16 of 26 12.8. No project - related public address or music During City of Newport system shall be audible at any adjacent receptor. Construction Beach Community Development Department 12.9. The on -site construction supervisor shall have During City of Newport the responsibility and authority to receive and Construction Beach resolve noise complaints. A clear appeal process to Community the project proponent shall be established prior to Development construction commencement that shall allow for Department resolution of noise problems that cannot be immediately solved by the site supervisor. Tmplt: 03/08/11 /' ST City Council Resolution No. _ Paqe 17 of 26 EXHIBIT "B" CONDITIONS OF APPROVAL (Project- specific conditions are in italics) PLANNING The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval. (Except as modified by applicable conditions of approval.) 2. A covenant or other legally binding agreement approved by the City Attorney shall be recorded against the donor sites located at 1301 Quail Street and 3901 MacArthur Boulevard assuring that all of the requirements of the transfer of development rights shall be met by the current and future property owners. 3. Conditional Use Permit No. UP2011 -026 and Modification Permit No. MN2011 -014 shall expire unless exercised within 24 months from the date of approval as specified in Section 20.91.050 of the Newport Beach Municipal Code, unless an extension is otherwise granted. 4. Uses shall be permitted, or conditionally permitted, within the project consistent with the provisions of the Zoning Code, so long as they do not increase the approved traffic generation for the project (TS2011 -002). 5. Required parking for this project has been determined based on documentation and a number of assumptions, including: a. The shared parking analysis as a part of the Traffic Impact Analysis, prepared by Kunzman Associates, Inc., dated October 4, 2011 and the Addendum dated October 7, 2011; b. A limitation that the maximum Net Public Area (NPA) of the 4,000 square feet high tum -over eating and drinking uses shall be limited to 2,000 square feet with a parking demand of 1 space per 40 square feet of NPA; c. The take -out service, limited food use shall be limited to 1,000 gross square feet with a parking demand of 1 space per 250 gross square feet and a maximum of 6 seats; d. The general commercial uses shall be limited to 7,351 net square feet proposed floor area with a parking demand of 1 space per 250 net square feet; and e. The allowed hours of operation for general commercial uses are from 9:00 a.m. to 7:00 p.m., daily. Tmplt: 03/08/11 35 City Council Resolution No. _ Paqe 18 of 26 Any changes to the assumed tenant mix or changes in the type of food use that would increase parking demands may require the preparation of a new shared parking analysis to ensure that adequate parking can be provided on -site and at the approved off -site parking location, and shall be subject to the review and approval of the Community Development Department. 6. A total of 65 parking spaces shall be provided on -site and 16 parking spaces shall be provided off -site at 4100 Newport Place, for a total of 81 parking spaces, as illustrated on the approved plans and parking management plan for the project. 7. In the event of loss of off -site parking, the applicant shall be required to notify the Community Development Director who will establish a reasonable time for substitute parking to be provided or reduce the size of the tenant spaces or change the tenant mix (i.e. less restaurant) in proportion to the parking spaces lost, in accordance to Section 20.40.100.D (Loss of Off -Site Parking) of the Municipal Code. 8. Any minor changes to the parking management plan shall be reviewed and approved by the Community Development Director and City Traffic Engineer prior to implementation. Significant changes may require an amendment to this Conditional Use Permit. 9. All employees are required to park off -site at a parking structure located at 4100 Newport Place at all times, until all 16 spaces are occupied, unless otherwise approved by the Community Development Director and may require an amendment to this Conditional Use Permit. 10. The hours of operation for the general commercial uses shall not commence before 9:00 a.m., daily. 11. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 12. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of Conditional Use Permit No. UP2011 -026 and Modification Permit No. MN2011 -014. 13. Any change in operational characteristics, hours of operation, expansion in area, or other modification to the approved plans, shall require an amendment to Conditional Use Permit No. UP2011 -026, and /or Modification Permit No. MN2011 -014 or the processing of new permits. 14. All landscape materials and landscaped areas shall be installed and maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. Tmplt: 03/08111 so City Council Resolution No. _ Paqe 19 of 26 15. Should this business be sold or otherwise come under different ownership, any future owners or assignees shall be notified in writing of the conditions of this approval by the current owner or leasing company. 16. This Conditional Use Permit and Modification Permit may be modified or revoked by the City Council or Planning Commission should they determine that the proposed development, uses, and/ or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 17. Prior to the issuance of a building permit the applicant shall submit a landscape and irrigation plan prepared by a licensed landscape architect. These plans shall incorporate drought tolerant plantings and water efficient irrigation practices, and the plans shall be approved by the Planning Division and the Municipal Operations Department. All planting areas shall be provided with a permanent underground automatic sprinkler irrigation system of a design suitable for the type and arrangement of the plant materials selected. The irrigation system shall be adjustable based upon either a signal from a satellite or an on -site moisture - sensor. Planting areas adjacent to vehicular activity shall be protected by a continuous concrete curb or similar permanent barrier. Landscaping shall be located so as not to impede vehicular sight distance to the satisfaction of the Traffic Engineer. 18. Prior to the final inspection of building permits the applicant shall schedule an inspection by the Planning Division to confirm that all landscaping was installed in accordance with the approved plan. 19. Reclaimed water shall be used whenever available, assuming it is economically feasible. 20. Water leaving the project site due to over - irrigation of landscape shall be minimized. If an incident such as this is reported, a representative from the Code Enforcement Division shall visit the location, investigate, inform and notice the responsible party, and, as appropriate, cite the responsible party and /or shut off the irrigation water. 21. Watering shall be done during the early morning or evening hours (between 4:00 p.m. and 9:00 a.m.) to minimize evaporation the following morning. 22. All leaks shall be investigated by a representative from the Code Enforcement Division and the property owner or operator shall complete all required repairs. 23. Water shall not be used to clean paved surfaces such as sidewalks, driveways, parking areas, etc. except to alleviate immediate safety or sanitation hazards. 24. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26 and other applicable noise control requirements of the Newport Beach Municipal Tmplt: 03/08/11 37 City Council Resolution No. _ Paqe 20 of 26 Code. The maximum noise shall be limited to no more than depicted below for the specified time periods unless the ambient noise level is higher: 25. Prior to the issuance of a building permit the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 26. Construction activities shall comply with Section 10.28.040 of the Newport Beach Municipal Code, which restricts hours of noise - generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday and 8:00 a.m. and 6:00 p.m. on Saturday. Noise - generating construction activities are not allowed on Sundays or Holidays. 27. No outside paging system shall be utilized in conjunction with this project. 28. All trash shall be stored within the building or within dumpsters stored in the trash enclosure (three walls and a self - latching gate) or otherwise screened from view of neighboring properties, except when placed for pick -up by refuse collection agencies. The trash enclosure shall have a decorative solid roof for aesthetic and screening purposes. 29. Trash receptacles for patrons shall be conveniently located both inside and outside of the establishment, however, not located on or within any public property or right -of- way. 30. The exterior of the business shall be maintained free of litter and graffiti at all times. The owner or operator shall provide for daily removal of trash, litter debris and graffiti from the premises and on all abutting sidewalks within 20 feet of the premises. 31. The applicant shall ensure that the trash dumpsters and /or receptacles are maintained to control odors. This may include the provision of either fully self- contained dumpsters or periodic steam cleaning of the dumpsters, if deemed necessary by the Planning Division. Cleaning and maintenance of trash dumpsters shall be done in compliance with the provisions of Title 14, including all future amendments (including Water Quality related requirements). Tmplt: 03/08111 3g Between the hours of 7:00AM and 10:00PM Between the hours of 10:00PM and 7:OOAM Location Interior Exterior Interior Exterior Residential Property 45dBA 55dBA 40dBA 5OdBA Residential Property located within 100 feet of a commercial property 45dBA 60dBA 45dBA 50dBA Mixed Use Property 45dBA 60dBA 45dBA 50dBA Commercial Property N/A 65dBA N/A 60dBA 25. Prior to the issuance of a building permit the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 26. Construction activities shall comply with Section 10.28.040 of the Newport Beach Municipal Code, which restricts hours of noise - generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday and 8:00 a.m. and 6:00 p.m. on Saturday. Noise - generating construction activities are not allowed on Sundays or Holidays. 27. No outside paging system shall be utilized in conjunction with this project. 28. All trash shall be stored within the building or within dumpsters stored in the trash enclosure (three walls and a self - latching gate) or otherwise screened from view of neighboring properties, except when placed for pick -up by refuse collection agencies. The trash enclosure shall have a decorative solid roof for aesthetic and screening purposes. 29. Trash receptacles for patrons shall be conveniently located both inside and outside of the establishment, however, not located on or within any public property or right -of- way. 30. The exterior of the business shall be maintained free of litter and graffiti at all times. The owner or operator shall provide for daily removal of trash, litter debris and graffiti from the premises and on all abutting sidewalks within 20 feet of the premises. 31. The applicant shall ensure that the trash dumpsters and /or receptacles are maintained to control odors. This may include the provision of either fully self- contained dumpsters or periodic steam cleaning of the dumpsters, if deemed necessary by the Planning Division. Cleaning and maintenance of trash dumpsters shall be done in compliance with the provisions of Title 14, including all future amendments (including Water Quality related requirements). Tmplt: 03/08111 3g City Council Resolution No. _ Paqe 21 of 26 32. Deliveries and refuse collection for the facility shall be prohibited between the hours of 10:00 p.m. and 8:00 a.m., daily, unless otherwise approved by the community Development Director, and may require an amendment to this Conditional Use Permit. 33. Storage outside of the building or within the parking lot of the property shall be prohibited, with the exception of the required trash container enclosure. 34. A Special Events Permit is required for any event or promotional activity outside the normal operational characteristics of the approved use, as conditioned, or that would attract large crowds, involve the sale of alcoholic beverages, include any form of on- site media broadcast, or any other activities as specified in the Newport Beach Municipal Code to require such permits. 35. All proposed signs shall be in conformance with the provision of Chapter 20.42 of the Newport Beach Municipal Code and shall be approved by the City Traffic Engineer if located adjacent to the vehicular ingress and egress. 36. The final location of the signs shall be reviewed by the City Traffic Engineer and shall conform to City Standard 110 -L to ensure that adequate sight distance is provided. 37. Lighting shall be in compliance with applicable standards of the Zoning Code. Exterior on -site lighting shall be shielded and confined within site boundaries. No direct rays or glare are permitted to shine onto public streets or adjacent sites or create a public nuisance. "Walpak" type fixtures are not permitted. Parking area lighting shall have zero cut -off fixtures. 38. The site shall not be excessively illuminated based on the outdoor lighting standards contained within Section 20.30.070 of the Zoning Code, or, if in the opinion of the Community Development Director, the illumination creates an unacceptable negative impact on surrounding land uses or environmental resources. The Community Development Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. 39. Prior to the issuance of a building permit the applicant shall prepare photometric study in conjunction with a final lighting plan for approval by the Planning Division. The survey shall show that lighting values are "1" or less at all property lines. 40. Prior to issuance of the certificate of occupancy or final of building permits the applicant shall schedule an evening inspection by the Code Enforcement Division to confirm control of all lighting sources. 41. A covered wash -out area for refuse containers and kitchen equipment, with minimum useable area dimensions of 36- inches wide, 36- inches deep and 72- inches high, shall be provided for all food uses, and the area shall drain directly into the sewer system, unless otherwise approved by the Building Official and Public Works Director in conjunction with the approval of an alternate drainage plan. Tmplt: 03/08/11 39 City Council Resolution No. _ Paqe 22 of 26 42. Kitchen exhaust fans for all food uses shall be installed /maintained in accordance with the Uniform Mechanical Code. The issues with regard to the control of smoke and odor shall be directed to the South Coast Air Quality Management District. 43. The exhaust systems for any food uses shall be installed with pollution control units to filter and control odors. 44. The construction and equipment staging area shall be located in the least visually prominent area on the site and shall be properly maintained and /or screened to minimize potential unsightly conditions. 45. A six- foot -high screen and security fence shall be placed around the construction site during construction. 46. Construction equipment and materials shall be properly stored on the site when not in use. 47. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City's approval of the MacArthur at Dolphin- Striker project including, but not limited to, Planned Community Text Amendment No. PD2010 -007, Transfer of Development Rights No. TD2010 -002, Conditional Use Permit No. UP2011 -026, Modification Permit No. MN2011 -014, Traffic Study No. TS2011 -002 and /or the City's related California Environmental Quality Act determinations, the certification of the Mitigated Negative Declaration and /or the adoption of a Mitigation Monitoring Program for the project. This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and /or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. Fire Department Conditions 48. Automatic fire sprinklers shall be required for any structure that exceeds 5,000 square feet regardless of occupancy. Additionally, food service uses shall require fire sprinklers when fire area has an occupant load of 100 or more. The sprinkler system shall be monitored by a UL certified alarm service company. Tmplt: 03/08/11 40 City Council Resolution No. _ Paqe 23 of 26 Building Division Conditions 49. The applicant is required to obtain all applicable permits from the City's Building Division and Fire Department. The construction plans must comply with the most recent, City - adopted version of the California Building Code. The construction plans must meet all applicable State Disabilities Access requirements. Approval from the Orange County Health Department is required prior to the issuance of a building permit. 50. Prior to the issuance of grading permits a Storm Water Pollution Prevention Plan (SWPPP) and Notice of Intent (NOI) to comply with the General Permit for Construction Activities shall be prepared, submitted to the State Water Quality Control Board for approval and made part of the construction program. The project applicant will provide the City with a copy of the NOI and their application check as proof of filing with the State Water Quality Control Board. This plan will detail measures and practices that will be in effect during construction to minimize the project's impact on water quality. 51. Prior to issuance of grading permits the applicant shall prepare and submit a Water Quality Management Plan (WQMP) for the proposed project, subject to the approval of the Building Division and Code and Water Quality Enforcement Division. The WQMP shall provide appropriate Best Management Practices (BMPs) to ensure that no violations of water quality standards or waste discharge requirements occur. 52. A list of "good house - keeping" practices will be incorporated into the long -term post - construction operation of the site to minimize the likelihood that pollutants will be used, stored or spilled on the site that could impair water quality. These may include frequent parking area vacuum truck sweeping, removal of wastes or spills, limited use of harmful fertilizers or pesticides, and the diversion of storm water away from potential sources of pollution (e.g., trash receptacles and parking structures). The Stage 2 WQMP shall list and describe all structural and non - structural BMPs. In addition, the WQMP must also identify the entity responsible for the long -term inspection, maintenance, and funding for all structural (and if applicable Treatment Control) BMPs. 53. The applicant shall comply with SCAQMD Rule 403 requirements as follows: Land Clearing /Earth - Moving a. Exposed pits (i.e., gravel, soil, dirt) with five percent or greater silt content shall be watered twice daily, enclosed, covered, or treated with non -toxic soil stabilizers according to manufacturers' specifications. b. All other active sites shall be watered twice daily. C. All grading activities shall cease during second stage smog alerts and periods of high winds (i.e., greater than 25 mph) if soil is being transported to off -site locations and cannot be controlled by watering. Tmplt: 03/08/11 41- Z City Council Resolution No. _ Paqe 24 of 26 d. All trucks hauling dirt, sand, soil, or other loose materials off -site shall be covered or wetted or shall maintain at least two feet of freeboard (i.e., minimum vertical distance between the top of the load and the top of the trailer). e. Portions of the construction site to remain inactive longer than a period of three months shall be seeded and watered until grass cover is grown or otherwise stabilized in a manner acceptable to the City. f. All vehicles on the construction site shall travel at speeds less than 15 mph. g. All diesel - powered vehicles and equipment shall be properly operated and maintained. h. All diesel - powered vehicles and gasoline - powered equipment shall be turned off when not in use for more than five minutes. j. The construction contractor shall utilize electric or natural gas - powered equipment instead of gasoline or diesel - powered engines, where feasible. Paved Roads k. All construction roads internal to the construction site that have a traffic volume of more than 50 daily trips by construction equipment, or 150 total daily trips for all vehicles, shall be surfaced with base material or decomposed granite, or shall be paved. I. Streets shall be swept hourly if visible soil material has been carried onto adjacent public paved roads. M. Construction equipment shall be visually inspected prior to leaving the site and loose dirt shall be washed off with wheel washers as necessary. Unpaved Staging Areas or Roads n. Water or non -toxic soil stabilizers shall be applied, according to manufacturers' specifications, as needed to reduce off -site transport of fugitive dust from all unpaved staging areas and unpaved road surfaces. Public Works Conditions 54. The existing OCSD easement along MacArthur Boulevard frontage shall be shown on plans. Any encroachment (wall, stairs and ADA ramps) within the existing OCSD easement requires approval from OCSD. The applicant shall provide said approval as part of the plan check process. 55. The parking lot layout plan shall be fully dimensioned. All parking spaces within the project site shall have a minimum of 26 feet of back up area /drive aisle. The parking Tmplt: 03/08/11 42 City Council Resolution No. _ Page 25 of 26 layout shall comply with City Standard STD - 805 -L -A and STD - 805 -L -B. The centerlines of the drive aisles that straddle the adjacent properties shall match. If the entire site (all 3 properties) is planned to be restriped, the entire site shall comply with City Standard STD - 805 -L -A and STD - 805 -L -B. 56. Prior to issuance of building permits, a signage and striping parking lot plan shall be submitted for review and approval. 57. The proposed project is required to stripe a 120 -foot minimum dedicated right -turn lane into the project site along southbound MacArthur Boulevard. The travel lane adjacent to the new right -turn lane shall be 12 -foot wide minimum. The applicant shall provide plans showing the proposed striping on MacArthur Boulevard. 58. New sidewalk, curb, gutter and driveway approach shall be installed along the MacArthur Boulevard and Dolphin Striker Way project frontage per the applicable City standards. The applicant may be required to provide a sidewalk easement along the driveway approach along MacArthur Boulevard if an ADA compliant path of travel can not be accommodate across the driveway approach. 59. The proposed project shall modify the southbound MacArthur Boulevard left turn pocket at the MacArthur Boulevard /Von Karman Avenue - Newport Place Drive intersection and restriping MacArthur Boulevard to accommodate the left turn access into the site. The design shall maintain a minimum left turn pocket length of 270 feet at the southbound MacArthur Boulevard/Von Karman Avenue - Newport Place Drive intersection with a transition length of 140 feet minimum. The transition length at the proposed left turn into the driveway shall be 120 feet minimum. The buffer between the two left turn pockets shall be a minimum of 50 feet. The applicant shall provide plans showing the proposed striping on MacArthur Boulevard. 60. All improvements shall be constructed as required by Ordinance and the Public Works Department. 61. An encroachment permit is required for all work activities within the public right -of -way. 62. In case of damage done to public improvements within the public right -of -way surrounding the development site by the private construction, additional reconstruction within the public right -of -way may be required at the discretion of the Public Works Inspector. 63. All on -site drainage shall comply with the latest City Water Quality requirements. 64. All improvements shall comply with the City's sight distance requirement. See City Standard 110 -L. 65. Traffic circulation and signage is subject to further review by the City Traffic Engineer. Tmplt: 03/08111 -43 City Council Resolution No. _ Paqe 26 of 26 66. County Sanitation District fees shall be paid prior to the issuance of any building permits. Mitigation Measures 67. The applicant shall comply with all mitigation measures and standard conditions contained within the approved Mitigation Monitoring and Reporting Program of the adopted Mitigated Negative Declaration (Exhibit A) for the project. Tmplt: 03/08/11 44 Attachment No. CC 3 Appeal Letter G= :'lw From: Hill_ Rush To: Brown, Leilani Cc: Henn. Michael; Kiff. Dave; Brandt. Kim; Campbell. James Subject: Call Up of Planning Application PA2010 -135 Date: Saturday, October 01, 20119:26:48 AM Office of City Clerk City Of Newport Be October 1. 2011 On September 22, 2011 the Dolphin- Striker Way Commercial Project (the "Project ") came before and was denied by our Planning Commission (the "PC "). The Project presented an opportunity to revitalize an underperforming area within our city. In order to address a higher market driven tenant mix for the site, the applicant requested approval of several items including improved site access, an increase in development density, changed layout allowing for two single story buildings and related parking reconfiguration. These requests are identified as: • Planned Community Development Plan Amendment No. PD2010 -007 • Transfer Development Rights No. TD2010 -002 • Traffic Study No. TS2011 -002 • Conditional Use Permit No. UP2011 -026 • Mitigated Negative Declaration No. ND2011 -001 • Modification Permit No. MN2011 -014 • Waiver of Development Agreement City staff evaluated all aspects of the project and recommended approval. The PC took issue however with some elements and denied the Project. Topics discussed during the PC meeting included site access, building square footage and parking. Subsequent to the rejection by the PC, the applicant has made changes to the proposed Project including reducing the square footage and increasing on site parking. Given the importance of addressing the economic need for our city to support the improvement of our underperforming commercial areas, combined with the applicant's willingness to address issues raised by the PC, I request the September 22, 2011 decision of the Planning Commission related to Planning Application PA2010 -135 be called -up before the City Council for further discussion and consideration at the first available Council meeting. Rush Hill Councilman Rush Hill City of Newport Beach District Three Office: 115 Twenty Second Street Newport Beach, CA 92663 Phone: 949.723.7202 ext 321 For scheduling, please contact Alan Limon at: Alanno NRMservice.com 47 42 Attachment No. CC 4 Draft Ordinance (Amended PC Development Plan) 49 50 ORDINANCE NO. _ AN ORDINANCE OF THE CITY OF NEWPORT BEACH APPROVING PLANNED COMMUNITY DEVELOPMENT PLAN AMENDMENT NO. PD2010 -007 TO CHANGE THE ZONING DESIGNATION FROM RESTAURANT SITE "1" TO GENERAL COMMERCIAL SITE "8" FOR PROPERTY LOCATED AT 4221 DOLPHIN- STRIKER (PA2010 -135) THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Ridgeway/Whitney, Partnership, with respect to property located at 4221 Dolphin- Striker Way, and legally described as Parcel 1 of Portion of Lot 4 of Tract No. 7770, requesting approval of an amendment to the Newport Place (PC -11) Planned Community Development Plan to accommodate the development of two new commercial buildings of 13,525 square feet total. The following applications were requested or required in order to implement the project as proposed: a) An amendment to Newport Place (PC -11) Planned Community Development Plan to change the zoning designation of the subject property from "Restaurant Site 1" to "General Commercial Site 8 ", pursuant to Chapters 20.56 (Planned Community District Procedures) and 20.66 (Amendments) of the Municipal Code. b) A transfer of development rights to allow the transfer of 48 unbuilt hotel units, which equates to Storage Facility at 1301 Quail Street) and 1,620 square feet from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) for a total of 5,529 square feet to the subject site, pursuant to Chapter 20.46 (Transfer of Development Rights) of the Minicipal Code. c) A traffic study approval pursuant to Chapter 15.40 (Traffic Phasing Ordinance) as the project will generate in excess 300 average daily trips (ADT). d) A conditional use permit to modify the off - street parking requirements, allow for the use of off -site parking, and to establish a parking management plan for the site, pursuant to Chapter 20.40 (Off- Street Parking) of the Municipal Code. e) A modification permit to deviate from the landscaping requirements of the Newport Place (PC -11) Planned Community Development Plan, pursuant to Section 20.52.050 of the Municipal Code. f) A waiver of the requirement for a development agreement pursuant to the provisions of Chapter 15.45 (Development Agreements) of the Municipal Code. City Council Ordinance No. _ Paoe 2 of 2. The subject property has zoning designation of Restaurant Site 1 of the Newport Place (PC -11) Planned Community Zoning District and the General Plan Land Use Element category is Mixed -Use Horizontal 2 ( "MU -1­12 "). 3. The subject property is not located within the coastal zone. 4. A public hearing was held on September 22, 2011, in the City Hall Council Chambers, 3300 Newport Boulevard, Newport Beach, California. A notice of time, place and purpose of the meeting was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this meeting. 5. At the September 22, 2011, Planning Commission hearing, the Planning Commission voted 4 -3 to deny the project without prejudice. 6. On October 1, 2011, the Planning Commission's decision to deny the applicant's request was appealed by City Councilmember Rush Hill. The appeal was filed to allow the City Council an opportunity to review the project given the importance of addressing the economic need for the City to support the improvement of the City's underperforming commercial areas combined with the applicant's willingness to address issues raised by the Planning Commission. 7. Due to the concerns expressed by the Planning Commission at the September 22, 2011, Planning Commission hearing, the applicant modified the application request by reducing the project gross floor area from 13,525 square feet to 12,351square feet, increased on -site parking supplies, and eliminating the off -site parking request. 8. A public hearing was held by the City Council on October 25, 2011, in the City Hall Council Chambers, 3300 Newport Boulevard, Newport Beach, California. A notice of time, place and purpose of the meeting was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the City Council at this meeting. 9. Pursuant to Section 20.64.030.C, the public hearing was conducted "de novo," meaning that it was a new hearing and the decision being appealed has no force or effect as of the date the call for review was filed. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. An Initial Study and Mitigated Negative Declaration have been prepared in compliance with the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and City Council Policy K -3. 2. The draft Mitigated Negative Declaration was circulated for a 20 -day comment period beginning on July 15, 2011, and ending on August 3, 2011. The contents of the environmental document and comments on the document were considered by the City Council in its review of the proposed project. TmpIC 11/23/09 -,� City Council Ordinance No. Paae 3 3. An Errata has been prepared which clarifies and augments data in the document in responses to comments including the added location of transfer of development rights to the subject property, and supports the conclusions reached in the draft MND. Consistent with CEQA Guidelines section 15073.5(c), recirculation of the MND is not required when new information is added to the MND which merely clarifies, amplifies, or makes insignificant modifications to the MND. 4. On the basis of the entire environmental review record, the proposed project, with mitigation measures, will have a less than significant impact upon the environment and there are no known substantial adverse affects on human beings that would be caused. Additionally, there are no long -term environmental goals that would be compromised by the project, nor cumulative impacts anticipated in connection with the project. The mitigation measures identified and incorporated in the Mitigation Monitoring and Reporting Program are feasible and will reduce the potential environmental impacts to a less than significant level. 5. The Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program were adopted by City Council Resolution No.2011 -_. The modifications proposed by the applicant subsequent to the circulation of the Mitigated Negative Declaration do not constitute "substantial revisions" that would warrant recirculation of the MND pursuant to CEQA Guidelines Section 15073.5. The document and all material, which constitute the record upon which this decision was based, are on file with the Planning Department, City Hall, 3300 Newport Boulevard, Newport Beach, California. 6. The City Council finds that judicial challenges to the City's CEQA determinations and approvals of land use projects are costly and time consuming. In addition, project opponents often seek an award of attorneys' fees in such challenges. As project applicants are the primary beneficiaries of such approvals, it is appropriate that such applicants should bear the expense of defending against any such judicial challenge, and bear the responsibility for any costs, attorneys' fees, and damages which may be awarded to a successful challenger. SECTION 3. FINDINGS 1. The subject property is located in Statistical Area L4 (Airport Area) and has a General Plan designation of Mixed -Use Horizontal 2 ( "MU -1­12 "). The MU -H2 designation provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed -use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses. The proposed commercial development would be allowed as the proposed uses are ancillary and supportive to the existing nearby office and light industrial developments. 2. The subject property has a zoning designation of Restaurant Site 1 of the Newport Place (PC -11) Planned Community which allows only eating and drinking establishments. The proposed amendment would change the zoning designation to Tmplt: 11/23/09 C3 City Council Ordinance No. General Commercial Site 8, to allow general commercial uses and eating and drinking establishments, which thereby is consistent with the MU -1-12 General Plan designation. SECTION 4. DECISION. THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH DOES HEREBY ORDAIN AS FOLLOWS: 1. The Newport Place Planned Community Development Plan (PC -11) shall be revised as provided in Exhibit "A ", with all other provisions of the existing Planned Community District Regulations remaining unchanged and in full force and effect. 2. If any section, subsection, sentence, clause or phrase of this ordinance is, for any reason, held to be invalid or unconstitutional, such decision shall not affect the validity or constitutionality of the remaining portions of this ordinance. The City Council hereby declares that it would have passed this ordinance, and each section, subsection, clause or phrase hereof, irrespective of the fact that anyone or more sections, subsections, sentences, clauses and phrases be declared unconstitutional. 3. This action shall become final and effective thirty days after the adoption of this Ordinance. 4. The Mayor shall sign and the City Clerk shall attest to the passage of this Ordinance. This Ordinance shall be published once in the official newspaper of the City, and the same shall become effective thirty (30) days after the date of its adoption. Tmplt: 11 /23/09 `f City Council Ordinance No. This Ordinance was introduced at a regular meeting of the City Council of the City of Newport Beach held on the 25th of October, 2011, and adopted on the 22nd day of November, 2011, by the following vote, to wit: AYES, COUNCIL MEMBERS NOES, COUNCIL MEMB ABSENT, COUNCIL MEMB MAYOR Michael F. Henn ATTEST: Leilani Brown, City Clerk APPROVED AS TO FORM, OFFICE OF CITY ATTORNEY: Aaron Harp, City Attot ney ° �3 for the City of Newport Beach Tmplt 11/23/09 City Council Ordinance No. _ Paqe 6 J 6 EXHIBIT "A" Newport Place Planned Community Development Plan (PC -11) Tmpit: 11/23/09 7 (- PLANNED COMMUNITY DEVELOPMENT STANDARDS NEWPORT PLACE Emkay Development Company, Inc. Newport Beach, California 57 CONTENTS General Notes +6 Definitions 27 Statistical Analysis 4- 469 -21 PART I - INDUSTRIAL Section I Minimum Site Area 4422 Section H Permitted Uses 4-722 Group I. Light Industrial 4-722 A X22 B 1-923 C 4-823 Group H. Medium hndustrial and Industrial Service and Support Facilities 41324 A 1-924 B 2825 C 2425 D 2226 Section III General Development Standards for Industry 2327 A. Building Height 2327 B. Setbacks 2427 C. Site Coverage 2428 D. Sign Area 2 -528 E. Sign Standards 2629 F. Parking 2730 G. Landscaping 2830 H. Loading Areas 2432 I. Storage Areas 2432 J. Refuse Collection Areas 2932 K. Telephone and Electrical Services 3832 L. Sidewalks 3832 M. Nuisances 3832 E M PART II - COMMERCIAL Section I Minimum Site Area 34-33 Section II Permitted Uses 433 Group I. Professional and Business Offices B. A. Professional Offices 3433 B. Business Offices 3233 C. Support Commercial 3234 Group H. Commercial Uses 3540 A. Automobile Center 3335 B. Hotels and Motels 3335 C. City, County, and State Facilities 3335 D. Service Stations, Car Wash 3335 E. Retail Commercial Uses 3335 F. General Commercial 3436 Section III General Development Standards for Telephone & Electrical Services Commerce 3638 A. Setbacks 3638 B. Signs 3239 C. Sign Standards 3540 D. Parking 3540 E. Landscaping 4042 F. Loading Areas 4243 G. Storage Areas 4243 H. Refuse Collection Areas 4244 I. Telephone & Electrical Services 4244 J. Pedestrian Access 4344 FOOTNOTES 44 5045 -51 ATTACHED EXHIBITS Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F Land Use [1,5,8, 36] Grading & Roads [1_ Storm Drain [ 1 ] Sewer & Water [1] Topography [I] Traffic Analysis [1] 3 159 Planned Community Development Standards for Newport Place Ordinance No. 1369 adopted by the City of Newport Beach December 21, 1970 Amendment No. 1 Approved on December 13, 1971 by Resolution No. 7572 (A -305) Amendment No. 2 Approved on June 12, 1972 by Resolution No. 7706 (A -325) Amendment No. 3 Approved on October 24, 1972 by Resolution No. 7846 (A -341) Amendment No. 4 Approved on January 8, 1983 by Resolution No. 7901 (A -349) Amendment No. 5 Approved on July 23, 1973 by Resolution No. 8054 (A -369) Amendment No. 6 Approved on June 10, 1974 by Resolution No. 8262 (A -429) Amendment No. 7 Approved on September 8, 1975 by Resolution No. 8588 (A -450) Amendment No. 8 Approved on February 9, 1976 by Resolution No. 8693 (A -462) Amendment No. 9 Approved on April 11, 1977 by Resolution No. 9050 (A -488) Amendment No. 10 Approved on May 23, 1977 by Resolution No. 9091 (A -490) Amendment No. 11 Approved on April 10, 1978 by Resolution No. 1003 (A -504) Amendment No. 12 Approved on July 11, 1978 by Resolution No. 9393 (A -510) Amendment No. 13 Approved on November 27, 1978 by Resolution No. 9472 (A -514) Amendment No. 14 Approved on June 11, 1979 by Resolution No. 9563 (A -530) Amendment No. 15 Approved on March 23, 1982 by Resolution No. 10003 (A -560) Amendment No. 16 Approved on March 26, 1984 by Resolution No. 84 -22 (A -604) Amendment No. 17 Approved on April 23, 1984 by Resolution No. 84 -30 (A -597) Amendment No. 18 Approved on June 25, 1984 by Resolution No. 84 -58 (A -607) Amendment No. 19 Approved on July 23, 1984 by Resolution No. 84 -79 (A -608) Amendment No. 20 Approved on January 12, 1987 by Resolution No. 87 -1 (A -637) E MO Amendment No. 21 Approved on March 9, 1987 by Resolution No. 87 -30 (A -638) Amendment No. 22 Approved on March 14, 1988 by Resolution No. 88 -17 (A -658) Amendment No. 23 Approved on August 14, 1989 by Resolution No. 89 -94 (A -684) Amendment No. 24 Approved on July 22, 1991 by Resolution No. 91 -83 (A -740) Amendment No. 25 Approved on March 9, 1992 by Resolution No. 92 -20 (A -749) Amendment No. 26 Approved on June 8, 1992 by Resolution No. 92 -58 (A -745) Amendment No. 27 Approved on September 13, 1993 by Resolution No. 93 -69 (A -783) Amendment No. 28 Approved on January 22, 1996 by Resolution No. 96 -10 (A -833) Amendment No. 28.1 Approved on September 9, 1996 by Resolution No. 96 -78 (A849) Amendment No. 28.2 Approved on March 24, 1997 by Resolution 97 -25 (A858) Amendment No. 28.3 Approved on July 28, 1997 by Ordinance No. 97 -29 (A861) Amendment No. 29 Approved on June 18, 1998 by Ordinance No. 98 -16 (A 875) Amendment No. 30 Approved on January 11, 1999 by Ordinance No. 98 -28 (A -877) Amendment No. 31 Approved on February 8, 1999 by Ordinance No. 99 -4 (A -880) Amendment No. 32 Approved on April 12, 1999 by Ordinance No. 99 -11 (A -883) Amendment No. 33 Approved on March 26, 2002 by Ordinance No. 2002 -6 (PD2001 -002) Amendment No. 34 Approved on June 14, 2005 by Ordinance No. 2005 -8 (PD2004 -003) Amendment No. 35 Approved on September 14, 2010 by Ordinance No.2010 -16 (PD2010 -002) 5 01 GENERAL NOTES 1. The Newport Project, a planned community development is a project of Emkay Development Company, Inc., a subsidiary of Morrison - Knudsen Company, Inc. The area is most appropriate for commercial and light industrial use because of its central location, ideal topography, availability to four freeways, accessibility to two railroads and its relation to the Orange County Airport. Attached drawings indicate land use, grading and roads, storm drains, water and sewer, topography and traffic analysis. 2. Water within the Planned Community area will be furnished by the City of Newport Beach. 3. Sewerage Disposal facilities within the Planned Community area are by the City of Newport Beach. 4. Prior to or coincidental with the filing of any tentative map or use permit, the developer shall submit a master plan of drainage to the Director of Public Works. 5. The height of all buildings and structures shall comply with FAA criteria. 6. Except as otherwise stated in this ordinance, the requirements of the Zoning Code, City of Newport Beach, shall apply. The contents of this supplemental text notwithstanding, no construction shall be proposed within the boundaries of this Planned Community District except that which shall comply with all provisions of the Building Code and the various mechanical and electrical codes related thereto. Phasing of Development. 1,799,941 sq. ft. of development was existing or under construction as of October 1, 1978. The additional allowable development in the total approved development plan is 566,423 square feet. Any further development subsequent to October 1, 1978, in excess of 30% of the additional allowable development, being 169,927 sq. ft. shall be approved only after it can be demonstrated that adequate traffic facilities will be available to handle that traffic generated by the project at the time of occupancy of the buildings involved. Such demonstration may be made by the presentation of a phasing plan consistent with the Circulation Element of the Newport Beach General Plan. (Phasing Plan approved by City Council March 12, 1979 for all development subject to this regulation.)[ 13] 02 DEFINITIONS Advertising Surface: The total area of the face of the structure, excluding supports. Area of Elevation: Total height and length of a building as projected to a vertical plane. Building Line: An imaginary line parallel to the street right -of -way line specifying the closest point from this street right -of -way line that a building structure may be located (except for overhangs, stairs and sunscreens). Public Safety Area: A strip of land twenty (20) feet in width and running parallel with street rights -of -way. Rip-ht-of-Way When reference is made to right -of -way line it shall mean the line which is then established on either the adopted Master Plan of Streets and Highways or the filed Tract Map for Minor Roads as the ultimate right -of -way line for roads or streets. Side and Front of Comer Lots: For the purpose of this ordinance, the narrowest frontage of a lot facing the street is the front, and the longest frontage facing the intersecting street is the side, irrespective of the direction in which structures face. Sign: Any structure, device or contrivance, electric or non - electric and all parts thereof which are erected or used for advertising purposes upon or within which any poster, bill, bulletin, printing, lettering, painting, device or other advertising of any kind whatsoever is used, placed, posted, tacked, nailed, pasted or otherwise fastened or affixed. Site Area: The total land area of the land described in the use or other permit. Special Landscaped Street: Special landscaped streets are designated as MacArthur Boulevard, Jamboree Road, Bristol Street North and Birch Street. The landscaping requirements for special landscaped streets and for the remaining streets are described in the following text. 03 Streets - Dedicated and Private: Reference to all streets or rights -of -way within this ordinance shall mean dedicated vehicular rights -of -way. In the case of private or non - dedicated streets, a minimum setback from the right -of -way line of said streets of ten (10) feet shall be required for all structures. Except for sidewalks or access drives, this area shall be landscaped according to the setback area standards from dedicated streets herein. =1 STATISTICAL ANALYSIS PART L INDUSTRIAL* A. Building Sites Site 1 2.0 acres [3, 9] Site 3A 21.3 acres [2.4] ...............23.3 acres [9, 35] B. Building Area Site lA 34,130 sq. ft .................0.8 ac. [3,9] * *Site 3A 297,798 sq. ft ...............6.8 ac. [2, 4, 14, 33] 331,928 sq. ft ............ 7.6 ac. [9, 14, 31, 33, 35] The following statistics are for information only. Development may include but shall not be limited to the following. C. Parking (Criteria: 3 spaces/ 1000 sq. ft. (d), 363 sq. ft/space) Site IA 102 cars.......... 0.9 acres [3, 9] Site 3A 894 cars......... 7.5 ac. [2, 4, 14, 33] 996 cars......... 8.4 ac. [9, 14, 31, 33, 35] D. Landscaped - Open Space Site IA ..................0.30 acres [3, 9] Site 3A ..................6.5 acres [2,4,14,33] 6.8 acres [9,14,31, 33, 35] Net Open -3.8 acres ..............Space.....3.0 ac. *[14,31, 33, 35] * 3.8 acres have been allotted for service stations exclusive of permitted building acres and subject to use permit. ** Industrial Site 3A has been reduced by 20,000 sq. ft. with the reduction allocated to the allowable building area for Parcel No. 3 of Resubdivision 529. The allowable building area for Parcel No. 3 of Resubdivision 529 is now 61,162 sq. ft. [ 14]. Industrial Site 3A was then increased by 1,590 square feet in 2002 [33]. 7 05 STATISTICAL ANALYSIS PART II. COMMERCIAL/PROFESSIONAL & BUSINESS OFFICES A. Building Sites Site 1 & 2........38.5 acres' Site 2A............3.9 acres [3 1] Site 4 ..................9.0 acres Site 5 ..................7.4 acres Site 6 ..................1.9 acres Site 7 ..................2.5 acres Site 8 ..................1.64 acres Site 9 .............16.9 acres [35] 81.74 acres [20, 35] B. Building Area Site 1 &2 ......... 860,884 square feet [5, 14, 17, 30] Site 2A ............ 109,200 square feet [31] Site 4 .................228,214 square feet [32] Site 5 .................268,743 square feet [ 16, 19, 21, 24, 25] Site 6 ....................42,420 square feet Site 7 .................. 55,860 square feet Site 8 ..................54,000 square feet [20] Site 9............ 288,264 square feet [35] 1,907,585 square feet [21, 30, 31, 32, 33, 35] The following statistics are for information only. Development may include, but shall not be limited to the following. C. Typical Building Mix/Site Utilization Typical site areas for buildings of varying heights are provided for purposes of illustration. Development of any of the Sites indicated may include any number of combinations of building types, characterized by number of stories, within the range of building types indicated for that site. 'Commercial/Professional and Business Office Site 1 and 2 have been reduced by 36,119 feet with the reduction allocated to the allowed building area for Parcels 1 & 2 of Resubdivision 585. The allowable building area for Parcel 1 & 2 of Resubdivision 585 is now 272,711 square feet. [ 14] 2 I commercial uses are constructed on Commercial/Professional and Business Office Site 5 which are ancillary to and in the same building as office uses, additional development up to a maximum of 294,600 sq. ft. may be developed, so long as office use does not exceed 268,743 sq. ft. [21, 24, 25] 10 Site 1 &2 ................860,884 square feet [5, 14, 17, 30] a. Two Story ................ 8.42 acres b. Three Story ............ 5.61 acres C. Four Story ............... 4.21 acres d. Five Story .............. 3.37 acres e. Six Story ................. 2.81 acres Site 2A ............ 109,200 square feet [31] a. Two Story ......................1.25 acres b. Three Story ...................0.84 acres c. Four Story .................... 0.63 acres d. Five Story .................... 0.51 acres Site 4 .................. 228,214 square feet [32] a. Two Story . ...........................2.31 acres b. Three Story ......................... 1.54 acres c. Four Story ........................... 1.15 acres d. Five Story . ...........................0.92 acres e. Six Story ... ...........................0.77 acres Site 5 ..................268,743 square feet [16, 19, 21, 25] a. Two Story ..........................1.90 acres b. Three Story ........................1.27 acres c. Four Story ..........................0.95 acres d. Five Story ..........................0 76 acres e. Six Story . ...........................0.63 acres f. Nine Story ..........................0.50 acres Site 6 .............. 42,420 square feet a. Two Story ..........................0.49 acres b. Three Story ....................... 0.32 acres c. Four Story ......................... 0.24 acres d. Five Story ..........................0.19 acres e. Six Story .......................... 0.16 acres Site 7 .....................55,860 square feet a. Two Story ........................... 0.64 acres b. Three Story ...................... 0.43 acres c. Four Story . ...........................0.32 acres d. Five Story ...........................0.26 acres e. Six Story ... ...........................0.21 acres 11 07 Site 8 ..................54,000 square feet [20] a. Four Story . ...........................0.30 acres Site 9 .............288,264 square feet [35] a. Two Story ......................3.31 acres b. Three Story ....................2.21 acres c. Four Story ..................... 1.65 acres d. Five Story ......................1.32 acres e. Six Story ........................1.10 acres D. Parking (Criteria: 1 space /225 sq. ft. (& 363 sq. ft/space) Site 1 &2 ..... 3,827 cars......... 31.89 acres [5, 14, 30] Site 2A ......... 474 cars *....... 1.26 acres' [3 1] Site 4 .............. 905 cars.......... 7.54 acres [32] Site 5 ............ 1,234 cars......... 6.13 acres [211 Site 6 .............. 188 cars........ 1.57 acres Site 7 .............. 248 cars.......... 2.07 acres Site 8 .............. 231 cars.......... 1.34 acres [20] Site 9 ........... 1,281 cars......... 10.68 acres [35] 8,388 cars 62.48 acres [21,31, 32, 33, 35] E. Landscaped - Open Space Site 1 & 2 [5,14] Gross Site........ 38.5 acres Parking ........... 27.17 acres Net .................11.33 acres Two Story ......... 8.42 acres....... 2.91 acres Three Story ....... 5.61 acres....... 5.72 acres Four Story ......... 4.21 acres....... 7.12 acres Five Story ......... 3.37 acres........ 7.96 acres Six Story ........... 2.81 acres........ 8.52 acres Site 2A [311 Gross Site ....... 3.9 acres Parking .......... 1.26 acres Net ............... 2.68 acres Two Story ....... 1.25 acres ... 1.43 acres. Three Story ...... .84 acres ... 1.84 acres Four Story ........ .63 acres ... 2.05 acres Five Story ......... .51 acres ... 2.17 acres 3 Includes surface parking and fast floor of existing parking structure only, does not include upper levels of parking structure. [31]. 12 M Site 4 [32] Gross Site....... 9.00 acres Parking......... .7.54 acres Net ...................1.46 acres Two Story .......... 2.31 acres...... N/A Three Story ........ 1.54 acres....... 0.01 acres Four Story .......... 1.15 acres...... 0.40 acres Five Story ............ 0.92 acres...... 0.63 acres Six Story ............. 0.77 acres...... 0.78 acres Site 5 Gross Site........ 7.4 acres Parking ............ 6.13 acres Net ..................1.27 acres Two Story .......... 1.90 acres...... N/A Three Story ........ 1.27 acres ...... . 00 acres Four Story .......... 0.95 acres...... 0.32 acres Five Story ......... 0.76 acres...... 0.51 acres Six Story .......... 0 .63 acres...... 0.64 acres Nine Story ......... 0.50 acres...... 0.77 acres [21] Site 6 Gross Site......... 1.90 acres Parking .............1.57 acres Net ...................0.33 acres Two Story .......... . 49 acres...... N/A Three Story ........ .32 acres...... 0.01 acres Four Story ............ 24 acres...... 0.09 acres Five Story .......... .19 acres...... 0.14 acres Six Story .............16 acres....... 0.17 acres Site 7 Gross Site......... 2.50 acres Parking .............2.07 acres Net .................... 0.43 acres Two Story ........... 0.64 acres...... N/A Three Story ......... 0.43 acres...... 00 acres Four Story ........... 0.32 acres...... 0.11 acres Five Story ............ 0.26 acres....... 0.17 acres Six Story ............. 0.21 acres...... 0.22 acres Site 8 Gross Site......... 1.64 acres Parking .............1.34 acres Net .....................30 acres Four Story ......................30 acres...... N/A [20] Site 9 [35] Gross Site...... 16.90 acres Parking ......... 10.68 acres 13 i • Net .............. 6.22 acres Two Story ......... 3.31 acres...... 2.91 acres Three Story ........ 2.21 acres....... 4.01 acres Four Story ......... 1.65 acres....... 4.57 acres Five Story ......... 1.32 acres....... 4.90 acres Six Story ........... 1.10 acres....... 5.12 acres F. Building Height [5, 12, 15, 21, 31] Maximum building height shall not exceed six (6) stories above ground level except for Parcel No. 1 of Resubdivision No. 585 which shall have a maximum building height of ten (10) stories above ground level, for Parcel No. 2 of Resubdivision No. 585 which shall have a maximum building height of seven (7) stories above ground level, and for Site 5 which shall have a maximum of nine (9) stories /167 feet above ground level. Maximum building height for Professional & Business Office Site 2A shall not exceed 95 feet above ground level. 14 70 THIS PAGE IS INTENTIONALLY BLANK 15 71- STATISTICAL ANALYSIS PART II RETAIL COMMERCIAL /PERMITTED USES - Part II, Section II, Group ILE A. Building Sites Site 1 1.4 acres The following statistics are for information only. Development may include but shall not be limited to the following. B. Building Area Site 1 ...... 10,000 sq. ft. .22 acres C. Parking (Criteria: 5 /spaces /1000 sq. 11.0, 363 sq. ft./ space) Site 1.......50 cars .41 acres D. Landscaped - Open Space Site 1 .77 acres E. Buildin Hg eight Building height of structures shall be limited to a height of thirty -five (35) feet. 16 72 STATISTICAL ANALYSIS PART II COMMERCIAL/RESTAURANTS A. Building Sites Site 1 2:9 1.80 acres 2631.80 acres .............. ........2:91.80 acres [5, 20, 36] The following statistics are for information only. Development may include but shall not be limited to the following. B. Building Area Site 1 .... 15,000 square feet ......34 acres 15,000 square feet ....... 34 acres [5, 20] C. Parking (Criteria: 300 occupants/ 10,000 sq. ft.) 1 space /3 occupants 363 sq. ft. /space Site 1 439133 cars .....................431.11 acres 439133 cars .................... 4- 451.11 acres [5, 20, 36] Restaurant Site 1 and General Commercial Site 8 have shared parking arrangements per the 1972 Reciprocal Parking & Management Agreement [36] D. Landscaped - Open Space Site 1 ... 4-4 0.46 acres 4-4� 0.46 acres ...................... 4-.4 0.46 acres [5, 20, 36] E. Building Height Building height of structures shall be limited to a height of thirty -five (35) feet. 17 73 STATISTICAL ANALYSIS PART 11 COMMERCIAL/HOTEL & MOTEL A. Building Site [26,31] Site 1 - 6.35 acres Site 2B - 3_7 acres [3 1] 10.05 acres [3 1] B. Hotel Room Limit [18,25,31] Site 1 - 349 rooms' Site 2B- 384 256 rooms [31, 36] The following statistics are for information only. Development may include but shall not be limited to the following. C. Building Area (Site 1 - 349 units (a) 400 sq.ft. /unit) (Site 2B — 384 256 units 517 net sq. ft. /unit).[18, 25, 31,361 Site 1 - 3.2 acres 3.2 acres Site 2B - 3-6 3.0 acres (total enclosed area is 4.5 acres) D. Parking (Criteria: 1 space /unit A, 363 sq. ft. /space)[18, 26, 31, 361 Site 1 - 349 parking spaces - 2.9 acres Site 2B - 43-2 128 parking spaceS2 2.5 acres (total) E. Landscaping -Open Space [ 18] 'Use permits approved as of November 14, 1983, allow 468 hotel rooms with related restaurant, conference area, and other support facilities. Hotel suites included as part of the hotel room count may be converted to standard hotel rooms consistent with the specified hotel room limit, so long as the approved site plan is maintained. Location and size of restaurant, conference area, and other support facilities may also be revised if the plans meet the intent of the approved site plan and other conditions of approval. [ 1, 18] ` Based on one space /2 guest rooms per Page 20.66 -8, Off - Street Parking and Loading Requirements, of the City of Newport Beach Planning and Zoning Code. [31 ] T 74 The following is intended to show some of the variations possible. Site 1 One Story Development 0.92 acres Two Story Development - 2.98 acres Three Story Development - 3.67 acres Four Story Development - 4.02 acres Five Story Development - 4.22 acres Six Story Development 4.36 acres Seven Story Development - 4.46 acres Eight Story Development - 4.53 acres Nine Story Development - 4.59 acres Ten Story Development - 4.64 acres Eleven Story Development - 4.67 acres Twelve Story Development - 4.71 acres Thirteen Story Development - 4.73 acres The above analysis does not include support facilities utilized in many hotel operations. These facilities would also require parking not reflected in the parking requirement criteria. F. Buildine Heieht f 3l l Building height on Site 2B shall not exceed 60 feet. [31] 19 75 STATISTICAL ANALYSIS PART II GENERAL COMMERCIAL PERMITTED USES [8,91 Part II, Section II, Group II A & F A. General Commercial Building Sites [8, 26, 28.3, 31, 361 Site 1 - 3.0 acres Site 2 - 1.0 acres [9] Site 3 - 3.9 acres [9] Site 4 - 2.0 acres [9] Site 5 - 2.45 acres' [26] Site 6 5.8 acres [25, 28.3] Site 7 8.2 acres Site 8 1.11 acres 1361 26.M 27.46 acres [36] B. Building Area [26, 27, 28.3, 361 Site 1 - 35,000 sq. ft. - 0.80 acres Site 2' - 11,700 sq. ft. - 0.27 acres [9] Site 3z - 49,380 sq. ft. - 1.13 acres [27] Site 43 - 20,870 sq. ft.[19]- 0.57 acres [9] Site 5' - 31,362 sq. ft. - 0.72 acres [26] Site 6 50,000 sq. ft 1.14 acres [28.3] Site 7 141,120139,500sq. ft. 840 3.20 acres 1361 Site 8 12,351 sq. ft.'s [361 0.28 acres [361 339;432 350,163 sq. ft. [36] 12-83 8.11 acres [26, 27, 28.3, 36] s A recorded reciprocal easement shall be provided for ingress, egress and parking for mutual benefit between Hotel Site I and General Commercial Site 5 6 Restaurants are permitted uses in Sites 1, 2, 3, 5 and 6, subject to a use permit. [9, 23, 26, 27, 28.3] Ibid 8 If the development of General Commercial Site 4 is limited solely to Professional and Business Office use, then the allowable Building Area shall not exceed 30,000 sq. ft. (19) 9 Restaurants are permitted uses in Sites 1,2,3,5 10 257 surface parking spaces; minimum 100 parking spaces in parking structure 11 Of 12,351 square feet, 5,000 square feet shall be allocated for food service uses and 7,351 square feet shall be allocated for general commercial uses. [361 20 70 The following statistics are for information only. Development may include, but shall not be limited to the following. [8] D. Parking (Criteria 4 spaces/1,000 sq.ft. @ 363 sq.ft. /space [9, 26, 28.3] Site 1 - 140 cars Site 2 - 47 cars Site 3 - 193 cars Site 4 - 100 cars Site 5 - 167 cars Site 6 - 250 cars Site 7 357 353 cars Site 8 81 cars12 - 1.17 acres - 0.39 acres - 1.61 acres - 0.83 acres - 1.39 acres - 2.08 acres - 298 2.94 acres10 [36] 0.54 acres [36] 4-0.45 10.95 acres E. Landscaping_ - Oven Space [9, 26, 28.3] Site 1 - 1.03 acres Site 2 - 0.34 acres Site 3 - 1.18 acres Site 4 - 0.60 acres Site 5 (1 & 2 story) - 0.24 acres Site 6 - 2.58 acres Site 7 - 214 acres Site 8 0.24 acres [36] Sub Total 8,418.35 acres [36] Site 5 (3 story) 0.49 acres Sub Total 8-60 8.84 acres [36] Site 5 (4 story) 0.75 acres Grand Total 9-.3-5 9.59 acres [36] F. Building Height [8, 9, 26, 31, 28.3, 36] Building height of structures on General Commercial Site 1, 2, 3, 4 and 6, and 8 shall be limited to a height of thirty-five (35 ft.) and on General Commercial Site 5 shall be limited to a height of fifty feet (50 ft.). Height of buildings on Site 7 shall be limited to fifty -five (55) feet except that the vertical projection of a building element intended to provide architectural interest and/or integrate the project identification sign and not for occupancy may be up to seventy -five (75) feet in height. 12 65 on -site spaces and 16 off -site spaces [36] 21 77 STATISTICAL ANALYSIS PART II COMMERCIAL /SERVICE STATION" A. Building Site Site 1 1.2 acres 1.2 acres PART I. INDUSTRIAL Section I. Minimum Site Area A. Thirty Thousand (30,000) square feet. B. Exception: f 111 The Planning Commission may authorize an exception to the minimum site area. Application for any such exception shall be made at the time of the filing of a tentative map by the applicant. In order for an exception to be granted, the Planning Commission shall find the following facts with respect thereto: 1. That the granting of the exception will not be detrimental to the public welfare or injurious to other property in the vicinity. 2. That the development considerations and intent of this Planned Community Development Standards are substantially met. Section H. Permitted Uses Group I. Light Industrial A. To allow uses primarily engaged in research activities, provided that such activities are confined within a building or buildings that do not contribute excess noise, dust, smoke, vibration, odor, toxic, or noxious matter to the surrounding environment nor contain a high hazard potential, due to the matter of the product material or processes involved. Such activities may include but shall not be limited to research laboratories and facilities, developmental laboratories and facilities and compatible light manufacturing related to the following list of examples: 1. Bio- Chemical Chemical Film and Photography Medical and Dental Metallurgy Pharmaceutical X -Ray "Reference Page 4, Part I, Item D. 22 M 2. Manufacture, research assembly, testing and repair of components, devices, equipment and systems and parts and components such as but not limited to the following list of examples: Coils, Tubes, Semi - Conductors Communication, Navigation Control, Transmission and Reception Equipment, Control Equipment and Systems, Guidance Equipment and Systems Data Processing Equipment and Systems Glass Edging, Beveling, and Silvering Graphics, Art Equipment Metering Instruments Optical Devices, Equipment and Systems Phonographs, Audio Units, Radio Equipment and Television Equipment Photographic Equipment Radar, infra -red and Ultra- Violet Equipment and Systems Scientific and Mechanical Instruments Testing Equipment B. To allow the location of offices and areas associated with and accessory to the permitted uses listed under A. Administrative, professional and business offices. 2. Regional or home offices of industries which are limited to a single use. Blueprinting, Photostatting, photo engraving, printing, publishing and bookbinding, provided that no on -site commercial services is associated with said uses. 4. Cafeteria, cafe, restaurant or auditorium. Service stations will be permitted, subject to a use permit provided that no on -site commercial service is associated with said uses. * & * *6. (Transferred to Part H — Commercial, Section II, Group I) [28.2, 35] C. Service stations subject to a use permit. 23 �9 Group II. Medium Industrial and Industrial Service and Support Facilities. A. To allow the location of general manufacturing activities, provided that such activities are confined within a building or buildings and do not contribute excessive noise, dust, smoke, vibration, odor, toxic or noxious matter to the surrounding environment nor contain a high hazard potential due to the nature of the products, material or processes involved. 1. Manufacture and/or assembly of the following or similar products: Aircraft and Related Components Clocks and Watches Coffins Ceramic Products Concrete Products Electrical Appliances Farm Equipment Heating & Ventilating Equipment Linoleum Machinery & Machine Tools Musical Instruments Neon Signs Novelties Oil Well Valves & Repairs Optical Goods Refrigeration Screw Machine Products Sheet Metal Products Shoes Silk Screens Sporting Goods Springs Stencils Toys Trailers Trucks 2. The manufacture of products or products made from the following or similar materials: Aluminum Iron Bags, except Burlap Bags or Linoleum Sacks Matches Batteries Mattresses Boxes, Paper Paper Brass Steel Cans Tin Copper Tools Glass Wool 24 la Grinding Wheels Yarn The manufacturing, compounding, processing or treatment of the following or similar items: Acids, Non - Corrosive Candles Cigarettes & Cigars Detergents Disinfectants Dye Food Products Lubricating Oil Pharmaceutical Products Plastics Toiletries Vitamin Products Waxes and Polishes 4. Woodworking Shops, such as: (Provided that, if a planer, router, sticker or moulder is maintained, all doors and windows in the outside walls of the room in which said machinery is located shall be kept closed while said machinery is in use.) Box Furniture Wood Products Distribution and Warehousing Plants B. To allow the location of general manufacturing activities, service industry and activities related to contractor and construction industry, provided that such activities are confined within a building or buildings and do not contribute excessive noise, dust, smoke, vibration, odor, toxic or noxious matter to the surrounding environment nor contain a high hazard potential due to the nature of the products, materials or processes involved. Service industries or those industries providing a service as opposed to the man- ufacture of a specific product, such as the repair and maintenance of appliances or component parts, tooling, printers, testing shops, small machine shops, shops engaged in the repair, maintenance and servicing of items excluding automobile repair, providing that such industries are not the point of customer delivery or collection. 2. Contractor and construction industries relating to building industry, such as general contractors, electrical contractors, plumbing contractors. C. To allow a combination of general industry, business and professional offices, and industrial support activities, provided that such activities are confined within a building or buildings, and do not contribute excessive noise, dust, smoke, vibration, odor, toxic or noxious matter to the surrounding environment nor contain a high hazard potential due to the nature of the products, materials or processes involved. The industrial support activities shall be defined as and limited to the sale of products or services relating only to the immediate industrial complex. Any activity, which could 25 M be classified as retail commercial, shall be restricted to activities strictly accessory and/or supplementary to the industrial community. 1. All uses permitted under A, B, and D. a. Business and Professional Offices. b. Industrial Support Facilities, to include activities limited to the sale of products or services related to only the industrial complex. Activities of a commercial nature shall be restricted in scope so as to service and to be accessory and/or supplementary to the industrial complex. C. Service stations subject to a use permit. 2. Except as herein indicated, the General Development Standards for Industry shall apply. a. Sign Area Industry Support Facilities and Business and Professional Offices. Only one (1) facia mounted identification sign shall be permitted per street frontage for each individual business or office. No sign shall exceed an area equal to one and one -half (1 -1/2) square feet of sign for each one (1) foot of lineal frontage of the building or store. However, no sign shall exceed two hundred (200) square feet in area per face. b. Site Identification Ground Sign One (1) site identification sign listing only the name of the site or major tenant on the site shall be allowed. Said sign shall be limited to a maximum height of four (4) feet and a width of eight (8) feet and may be double faced. C. Pedestrian Access It is required of all developments in the industrial support facility area to submit a plan of pedestrian access to the Planning Department prior to the issuance of building permits. Said plan will detail consideration for pedestrian access to the subject property and to adjacent properties, and shall be binding on subsequent development of the property. The plan shall show all interior walkways and all walkways in the public right of way, if such walkways are proposed or necessary. D. To allow for the location of a storage facility for new car inventory. Located within Industrial Site IA between Quail Street on the east, adjacent to Auto Center Sites 2A and 2B on the south, and Bristol Street on the west This use shall be subject to a use permit. [3] E. (Deleted)[2,4] 26 :. Section III. General Development Standards for Industry Maximum building areas shall be as noted in the Statistical Analysis, Part LA and Part I.B. A. Building g eight [22] Building heights of structures shall be limited to a height of thirty-five (35) feet; provided, however, that on Parcel 1 and Parcel 2 of Parcel Map 86 -33 -34 (Resubdivision No. 529) in Industrial Site 3A, the Planning Commission or the City Council on review or appeal may approve a structure up to a maximum height of 50 feet after the approval of a use permit. The Planning Commission or City Council in granting any use permit for structures in excess of thirty-five (35) feet shall find that each of the following four points have been complied with: (a) The increased building height would result in more public visual open space and views than is required by the basic height limit. Particular attention shall be given to the location of the structure on the lot, the percentage of ground cover, and the treatment of all setback and open areas. (b) The increased building height would result in a more desirable architectural treatment of the building and a stronger and more appealing visual character of the area than is required by the basic height limit. (c) The increased building height would not result in undesirable or abrupt scale relationships being created between the structure and existing developments or public spaces. Particular attention shall be given to the total bulk of the structure including both horizontal and vertical dimensions. (d) The structure shall have no more floor area than could have been achieved without the use permit. [22] B. Setbacks All setbacks shall be measured from the property line. For the purpose of this ordinance, a street side property line is that line created by the ultimate right -of -way line of the frontage street. Front Yard Setback Thirty (30) feet minimum, except that unsupported roofs or sunscreens may project six (6) feet into the setback area. 2. Side Yard Setback Ten (10) feet, except that unsupported roofs and sunscreens may project three (3) feet into the setback area. 27 M In the case of a comer lot, the street side setback shall be thirty (30) feet, except that unsupported roofs and sunscreens may project six (6) feet into the setback area. Interior lot lines for a comer lot shall be considered side lot lines. 3. Rear Yard Setback No rear yard setback is required except on a through -lot in which case the required front yard setback shall be observed. C. Site Coverage D. Signs Maximum building coverage of fifty (50) percent is allowed. Parking structures shall not be calculated as building area, however, said structures shall be used only for the parking of company vehicles, employee's vehicles, or vehicles belonging to persons visiting the subject firm. Sign Area Only one (1) single faced or double -faced signs shall be permitted per street frontage. No sign or combination of signs shall exceed one (1) square foot in area for each six - hundred (600) square feet of total site area. However, no sign shall exceed two hundred (200) square feet in area per face. An additional twenty (20) square feet shall be allowed for each additional business conducted on the site, 2. Sale or Lease Sign A sign, advertising the sale, lease, or hire of the site shall be permitted in addition to the other signs listed in this section. Said sign shall not exceed a maximum area of thirty -two (32) square feet. 3. Ground Sign All ground signs shall not exceed four (4) feet above grade in vertical height. Also, ground signs in excess of one - hundred fifty (150) square feet in area (single face) shall not be erected in the fast twenty (20) feet, as measured from the property line, of any street side setback area. However, the above standards shall not apply to the Community Directional Sign and Special Purpose Sign. 4. Special Purpose Sign Signs used to give directions to traffic or pedestrians or give instructions as to special conditions shall not exceed a total of six (6) square feet (single face) in area and shall be permitted in addition to the other signs listed in this section. W:1 r 5. Wall Signs Wall signs shall not comprise more than ten (10) percent of the area of the elevation upon which the sign is located. Said signs shall be fixture signs; signs painted directly on the surface of the wall shall not be permitted. In the instance of a multiple tenancy building, each individual industry may have a wall sign over the entrance to identify the industry. Said sign shall give only the name of the company and shall be limited to four (4) inch high letters. Said sign must be oriented toward the parking area for that building. 6. Construction Sign One (1) construction sign denoting the architects, engineers, contractor, and other related subjects, shall be permitted upon the commencement of construction. Said sign shall conform with the requirements of Item 3 above, Ground Sign, and will be permitted until such time as a final inspection of the building(s) designates said structure(s) fit for occupancy, or the tenant is occupying said building(s), whichever occurs first. Future Tenant Identification Sign A sign listing the name of the future tenant, responsible agent or realtor, and identification of the industrial complex shall be permitted. Said sign shall conform with the requirements of Item 3 above, Ground Sign, and will be permitted until such time as a final inspection of the building(s) designates said structure(s) fit for occupancy or tenant is occupying said building(s), whichever occurs first. 8. Community Directional and/or Identification Sign Permanent directional and identification signs, not exceeding two- hundred fifty (250) square feet (single face), shall be permitted but subject to use permit. E. Sign Standards Signs visible from the exterior of any building may be lighted, but no signs or any other contrivance shall be devised or constructed so as to rotate, gyrate, blink or move in any animated fashion. 2. Signs shall be restricted to advertising only the person, firm, company or corporation operating the use conducted on the site or the products or sold thereon. 3. A wall sign with the individual letters applied directly shalt be measured by a rectangle around the outside of the lettering and/or the pictorial symbol and calculating the area enclosed by such line. 4. All signs attached to the building shall be flush mounted. 29 M F. Parkin¢ Adequate off - street parking shall be provided to accommodate all parking needs for the site. The intent is to eliminate the need for any on- street parking. Required off - street parking shall be provided on the site of the use served, or on a contiguous site or within three hundred (300) feet of the subject site. Where parking is provided on other than the site concerned, a recorded document shall be approved by the City Attorney and filed with the Building and Planning Departments and signed by the owners of the alternate site stipulating to the permanent reservation of use of the site for said parking. The following guide shall be used to determine parking requirements: Office One (1) space for each 225 square feet of net floor area. The parking requirement may be lowered to one (1) space for each 250 square feet of net floor area upon review and approval of the modification committee. Manufacture, Research and Assembly Two (2) parking spaces for each three (3) employees, but in no event less than three (3) spaces for each one thousand (1000) square feet of gross floor area. Warehouse Two (2) parking spaces for each three (3) employees, but in no event less than one (1) space for each one thousand (1000) square feet of gross floor area for the first twenty thousand (20,000) square feet; one (1) space for each two thousand (2,000) square feet of gross floor area for the second twenty thousand (20,000) square feet; one (1) space for each four thousand (4,000) square feet of gross floor area for areas in excess of the initial forty thousand (40,000) square feet of floor area of the building. If there is more than one shift, the number of employees on the largest shift shall be used in determining parking requirements. G. Landscanine Detailed landscaping and irrigation plans, prepared by a landscaping architect, licensed contractor of architect shall be submitted to and approved by the Planning Director prior to issuing of building permit and installed prior to issue of Certificate of Use and Occupancy. All landscaping referred to in this section shall be maintained in a neat and orderly fashion. 30 IM Front Yard Setback Area a. General Statement Landscaping in these areas shall consist of an effective combination of street trees, trees, ground cover and shrubbery. All unpaved areas not utilized for parking shall be landscaped in a similar manner. b. Special Landscaped Street The entire area between the curb and the building setback line shall be landscaped, except for any access driveway in said area. C. Other Streets The entire area between the curb and a point ten (10) feet in back of the front property line shall be landscaped, except for any access driveway in said area. 2. Side and Rear Yard Setback Area a. General Statement All unpaved areas not utilized for parking and storage, shall be landscaped utilizing ground cover and/or shrub and tree materials. b. Undeveloped Areas Undeveloped areas proposed for future expansion shall be maintained in a weed free condition but need not be landscaped. C. Screening Areas used for parking shall be landscaped and/or fenced in such a manner as to interrupt or screen said areas from view from access streets, freeways, and adjacent properties. Plant materials used for this purpose shall consist of lineal or grouped masses of shrubs and/or trees. 3. Parking Areas Trees, equal in number to one (1) per each five (5) parking stalls shall be provided in the parking area. 4. Sloped Banks All sloped banks greater than 5 -1 or 6 feet in vertical height and adjacent to public right -of -way shall be stabilized, planted and irrigated in accordance with plans submitted and approved by Planning Director. 31 M H. Loading Areas 1. On other than special landscaped streets street side loading shall be allowed provided the loading dock is set back a minimum of seventy (70) feet from the street right -ofway line or one hundred ten (I 10) from the street centerline, whichever is greater. Said loading area must be screened from view from adjacent streets. I. Storage Areas 1. All outdoor storage shall be visually screened from access streets, freeways, and adjacent property. Said screening shall form a complete opaque screen up to a point eight (8) feet in vertical height but need not be opaque above that point. 2. Outdoor storage shall be meant to include all company owned and operated motor vehicles, with the exception of passenger vehicles. 3. No storage shall be permitted between a frontage street and the building line. I Refuse Collection Areas 1. All outdoor refuse collection areas shall be visually screened from access streets, freeways, and adjacent property by a complete opaque screen. 1. No refuse collection areas shall be permitted between a frontage street and the building line. K. Telephone and Electrical Service All "on- site" electrical lines (excluding lines in excess of 12 KV) and telephone lines shall be placed underground. Transformers or terminal equipment shall be visually screened from view from streets and adjacent properties. L. Sidewalks The requirement for sidewalks in the Planned Community District may be waived by the Planning Director if it is demonstrated that such facilities are not needed. However, the City retains the right to require installations of sidewalks if, in the future, a need is established by the City. M. Nuisances No portion of the property shall be used is such a manner as to create a nuisance to adjacent sites, such as but not limited to vibration, sound, electro - mechanical disturbance and radiation, electro- magnetic disturbance, radiation, air or water pollution, dust, emission of odorous, toxic or noxious matter. 32 :: PART 11. COMMERCIAL Section I. Minimum Site Area A. Thirty Thousand (30,000) square feet B. Exception: [111 The Planning Commission may authorize an exception to the minimum site area. Application for any such exception shall be made at the time of the filing of a tentative map by the applicant. In order for an exception to be granted, the Planning Commission shall find the following facts with respect thereto: 1. That the granting of the exception will not be detrimental to the public welfare or injurious to other property in the vicinity. 2. That the development considerations and intent of this Planned Community Development Standards are substantially met. Section H. Permitted Uses Group I. Professional and Business Offices. To allow the location of commercial activities engaged in the sale of products or services relating to and supporting the Development Plan, provided that such activities are confined within a building or buildings. A. Professional Offices 1. Accountants 2. Attorneys 3. Doctors, dentists, optometrists, oculists, chiropractors and others licensed by the State of California to practice the healing arts. 4. Engineers, architects, surveyors and planners. 5. Any other general professional offices. [30] B. Business Offices 1. Advertising agencies 2. Banks 3. Economic consultants 4. Employment agencies 5. Escrow offices 6. Insurance agencies 7. Laboratories: a. Dental b. Medical c. X -Ray d. Biochemical 33 NO e. Film, wholesale only f. Optometrical 8. Stock Brokers 9. Studios for interior decorators, photographers, artists and draftsmen. 10. Telephone answering services 11. Tourist information and travel agencies and ticket reservation services but not to include any airline terminal services or facilities for the transport of passengers, baggage or freight. [2] 12. Business and trade schools subject to the approval of a Director's Use Permit [29] 13. Any other general business offices. [3 1] * & ** 14. Remedial driving instruction and counseling facility, subject to a use permit in each case. [28.2, 35] *This use shall be limited to Professional and Business Offices Site 9 only. [28.2, 35] * *That all uses, including remedial driving instruction /counseling facilities, located within Professional and Business Offices Site 9 shall be limited to providing services to adult clientele only, any use dedicated to serving school aged and minor children shall be prohibited.[28.2,35] C. SUnnOrt Commercial [2 11 1. Retail sales and services, so long as said retail sales are of a convenience nature ancillary to the operation and use of office facilities including tobacco stores, card shops, confectionery and newspaper stands, and other uses which, in the opinion of the Planning Commission are of a similar nature. Retail uses shall be located in the basement or on the first floor of a building. Storage for such uses shall be within a building. 2. Service uses which are for building tenants and patrons, such as a car wash and gyrnnasium/health club facilities. Car washes shall drain into the sanitary sewer system. 3. Restaurants - outdoor restaurants and take -out restaurants - subject to securing a use permit in each case. 34 Group H. Commercial Uses A. Automobile Center, subject to a use permit. [28] 1. Automobile dealership selling only new cars. The sale of used cars, automobile repair, and automobile detailing may be permitted in conjunction with the sales of new vehicles but only accessory uses. 2. Service stations subject to the issuance of the use permit and a finding that the use is supportive of the principal uses permitted in the Newport Place Planned Community text. B. Hotels and Motels, subject to a use permit. C. State. County and Municipal Facilities [2] D. Service Stations & Mechanical Car Wash within Service Station Site #11 subject to a use permit. [4] E. Retail Commercial uses such as: Restaurants, including outdoor, drive -in or take -out restaurants shall be permitted subject to the securing of a use permit. except as noted under "a" and "b" below: [7] a. Restaurants, other than outdoor, drive -in or take -out restaurants, shall be permitted in Retail - Commercial Site 1 without a use permit provided that the net floor area of all restaurant uses does not exceed 20% of the net floor area of the retail - commercial center. b. Outdoor, drive -in or take -out restaurants shall be designed and located so as to be an integral element of the retail - commercial center and shall not be permitted as a free - standing independent use in any case. 2. Barber shop and beauty parlor 3. Book and stationery store 4. Blueprinting and photostatics 5. Camera shop 6. Delicatessen store 7. Florist 8. Shoe store or repair shop 9. Tailor 10. Tobacco store 11. Office equipment retail and repair 12. Pharmacies 35 91 13. Tourist information and travel agencies and ticket reservation services, but not to include any airline terminal services or facilities for the transport of passengers, baggage or freight 14. Instructional dance facility for adults and related retail sales, subject to a use permit (28.1) 15. Other uses similar to the above list F. General Commercial [8, 9, 23, 26, 28.3, 36] 1. New car dealership, subject to a use permit, including ancillary uses listed under Part II, Section 11, Group 11, A. 2. Service stations subject to a use permit. 3. Restaurants, including outdoor, drive -in or take -out restaurants, shall be subject to a use permit. Restaurant uses are permitted within General Commercial Sites 1, 2, 3, 5 and 6 not permitted within General Commercial Site 4. a. Restaurants, consisting 1,000 square feet of take -out service - limited use, and 4,000 square feet of food service use shall be permitted in General Commercial Site 8 in accordance to the Municipal Code, for General Commercial District Site 8. [361. 4. Hobby, Arts and Crafts, including: a. Sporting goods store b. Camera store C. Art gallery d. Craft store e. Pet store f. Bicycle store g. Other uses of similar nature 5. Book and Office Support Stores, including: a. Book store b. Office supplies C. Other uses of similar nature 6. Retail stores and professional service establishments, including: a. Pharmacies b. Specialty food C. Fabric shops d. Jewelry shops e. Furrier f. Formal Wear g. Barber and hair styling h. Clothing store i. Liquor store j. Tourist information and travel agencies and ticket reservation services, but not to include any airline terminal services or facilities for the transport of passengers, baggage or freight. k. Other uses of similar nature 36 92 7. Home and Office Furnishings, including: a. Home furniture store b. Office furniture store C. Interior decorators d. Home appliances e. Antique store f. Other uses of similar nature 8. Athletic Clubs, including: a. Spa b. Health club C. Recreation facility d. Other uses of similar nature 9. Home improvement stores, including: a. Hardware store b. Paint store C. Wallcovering store d. Other uses of similar nature 10. Retail nursery subject to a use permit 11. Institutional, instructional and educational uses, subject to a use permit in each case. (28.3) *12. Professional and Business Offices - see Part II, Section II, Group I for permitted uses. *Office uses are permitted within General Commercial Sites 3, 4, 5, and 6, and 8 and not permitted within General Commercial Sites I and 2. [9, 26, 28.3, 31, 36] 37 93 Section III. General Development Standards for Commerce Maximum building areas and building heights shall be noted in the Statistical Analysis, Part H.A and Part II.B. A. Setbacks All setbacks shall be measured from the property line. For the purpose of this ordinance, a street side property line is that line created by the ultimate right -of -way line of the frontage street. 1. Front Yard Setback Thirty (30) feet minimum; except that unsupported roofs or sunscreens may project six (6) feet into the setback area. Hotel/Motel uses: Seventeen (17) feet and six (6) inches minimum, provided that the average setback for all buildings along the linear street frontage is thirty (30) feet. [31] 2. Side Yard Side yard setbacks will be required only when any one of the following conditions exist: a. Corner lot: Thirty (30) feet (street side setback only), except that unsupported roofs and sunscreens may project three (3) feet into setback area. Hotel/Motel uses: Fourteen (14) feet and six (6) inches minimum, provided that the average setback for all buildings along the linear street frontage is twenty-seven (27) feet. [31 ] b. Where property abuts other than commercially zoned property, a ten (10) foot setback is required. Unsupported roofs and sunscreens may project three (3) feet into the setback area. Hotel/Motel uses: Ten (10) feet minimum setback for all buildings along the property line. [31] 3. Rear Yard None required except on a through -lot in which case the required front yard setback shall be observed. KI 94 B. Sins 1. Sign Area: General Standard Building identification shall be limited to a single (1) entity. Building identification signs shall have an area not to exceed 1 1/2 square feet of surface for each one (1) foot of lineal frontage of building. However, no sign shall exceed two hundred (200) square feet per face. Building identi- fication signs shall be limited to two (2) facades. 2. Pole Sign: One (1) identification pole sign site will be allowed for the following commercial businesses: a. Restaurant b. Cocktail lounge and/or bar C. Motel and hotel If a pole sign is utilized, it shall be in lieu of other identifications signs allowed by ordinance. Pole signs shall be limited to maximum height of twenty (20) feet and a maximum area of fifty (50) square feet per face, double faced. 3. Wall Sign: In no event shall an identification sign placed on a wall comprise more than ten (10) percent of the area of the elevation upon which the sign is located. Said signs shall be fixture signs. Signs painted directly on the surface of the wall shall not be permitted. 4. Ground Sign: An identification ground sign shall not exceed four (4) feet above grade in vertical height. Also, ground signs in excess on one - hundred and fifty (150) square feet in area (single face) shall not be erected in the first twenty (20) feet, as measured from the property line, of any street side setback. However, the above standards shall not apply to the Community Directional Sign and Special Purpose Sign. 5. Multi -Tenant Directory Sign: One (1) directory sign listing only the name of the firms or businesses on a site shall be allowed. Said sign shall be limited to a maximum height of twenty (20) feet. Panels identifying each individual story shall be no longer than one (1) foot in width and five (5) feet in length. 39 95 6. Special Purpose Sign: Subject to the standards established in Part I, Section III, Item DA 7. Construction Sign: Subject to the standards established in Part I, Section III, Item D.6. 8. Future Tenant Identification: Subject to the standards established in Part I, Section III, Item D.7. 9. Community Direction and/or Identification Sign: Subject to the standards established in Part I, Section III, Item C.B. C. Sign Standards Except as noted above, the same sign standards as outlined in Sub - Section D, Section III, Part I of this ordinance, shall prevail for developments in this area. D. Parkins 1. Medical and Dental Five (5) spaces for each doctor or one (1) space for each 200 square feet of gross floor area whichever is greater. 2. Professional Offices One (1) space for each 225 square feet of net floor area. The parking requirement may be lowered to one (1) space for each 250 square feet of net floor area upon review and approval of the modification committee. Exceptions: [35] The following parking requirements are applicable to Professional and Business Office Site No. 9. • One (1) space for each 281 square feet of net floor area. • Changes to the on -site parking plans shall be reviewed by the Planning Director. 3. Lodge, Halls, Private Clubs, Union Headquarters One (1) space for each 75 square feet of gross floor area plus one (1) space for each 250 square feet of gross office floor area. ,e M 4. Restaurants, Outdoor, Drive -In and Take -Out Restaurants. [7] Restaurant parking shall be in accordance with Section 20.'� �(d) 20.40.040 of the Newport Beach Municipal Code, except as noted under "b" and "a" below. [361 b. Restaurants other than outdoor, drive -in or take -out restaurants within Retail - Commercial Sites 1 and 2 shall provide one (1) space for each 200 square feet of net floor area and one (1) loading space for each 10,000 square feet of gross floor area; to the extent that the net floor area of all restaurants does not exceed 20% of the net floor area of the retail - commercial center. In the event that any restaurant causes the total of all restaurant uses in the retail - commercial center to exceed 20% limitation noted above, that entire restaurant and any subsequent restaurants shall provide parking as noted under "a" above. C. Parking for ,,..t,,,.,._ driA...:.. and take ,...t _ ,...t.. . ha4l be Provided in with sp'otiR4; ?0 �I 060 of the NeMTOFt restaurants (take -out service - limited use, food service with/without alcohol, with /without late hour) within General Commercial Site 8 shall be in accordance with the Newport Beach Municipal Code [361. 5. Retail Commercial One (1) space for each 200 square feet of net floor area. One (1) loading space for each 10,000 square feet of gross floor area. 6. Hotels and Motels [6] Parking for Hotel and Motel guestrooms; all related restaurants, cocktail lounges, banquet and meeting rooms, retail shops; and all employees shall be based on a demonstrated formula to be reviewed and approved by the Planning Commission. The parking formula shall contain the minimum parking which would be required for each of the separate uses evaluated independently. Any reductions from this minimum parking requirement must be based on the joint usage of the facilities by hotel and motel patrons. [10] 7. General Commercial [8, 9] a. One (1) space for each 250 sq.ft. of net floor area. One (1) loading space for each 10,000 sq.ft. of gross floor area. b. If the development of General Commercial Site 3 or 4 is limited solely to Professional and Business Office use, the parking shall be: One (1) space for each 225 sq.ft. of net floor area. 41 97 The parking requirements may be lowered to one (1) space for each 250 sq.ft. of net floor area upon review and approval of the modifications committee. C. Specific parking requirements shall be developed for uses such as fumiture stores, athletic clubs, theaters, bowling alleys, home improvement stores, retail nurseries or tire stores based upon functions and occupancies within these uses. Parking shall be in conformance to existing City of Newport Beach requirements for said occupancies, or at a demonstrated formula agreeable to the Director of Community Development. In the event that any use described above is converted to another use parking requirements for the new use shall be subject to review by the Director of Community Development. d. For restaurant parking see Part II, Section III, DA E. Landscapin¢ Detailed landscaping and irrigation plans, prepared by a landscaping architect, licensed landscaping contractor or architect shall be submitted to and approved by the Planning Director prior to issuing of Building Permits and installed prior to issue of Certificate of Use and Occupancy. All landscaping referred to in this section shall be maintained in a neat and orderly fashion. 1. Front Yard Setback Area a. General Statement Landscaping in these areas shall consist of an effective combination of street trees, trees, ground cover and shrubbery. C. Special Landscaped Street The entire area between the curb and the building setback line shall be landscaped, except for any driveway in said area. C. Other Streets The entire area between the curb and a point ten (10) feet in back of the front property line shall be landscaped except for any driveway in said area. 2. Side Yard and Rear Yard a. General Statement WA All unpaved areas not utilized for parking and storage, shall be landscaped utilizing ground cover and/or shrub and tree materials. b. Undeveloped Areas Undeveloped areas proposed for future expansion shall be maintained in a weed free condition, but need not be landscaped. C. Screening Areas used for parking shall be screened from view or have the view interrupted by landscaping and/or fencing from access streets, freeways, and adjacent properties. Plant materials used for screening purposes shall consist of lineal or grouped masses of shrubs and/or trees. d. Boundary Areas Boundary landscaping is required on all interior property lines. Said areas shall be placed along the entire length of these property lines or be of sufficient length to accommodate the number of required trees. Trees, equal in number to one (1) tree per twenty -five (25) lineal feet of each property line, shall be planted in the above defined areas in addition to required ground cover and shrub material. e. All landscaped areas shall be separated from adjacent vehicular areas by a wall or curb, at least (6) inches higher that the adjacent vehicular area. 3. Parking Areas Trees, equal in number to one (1) per each five (5) parking stalls shall be provided in the surface parking area (31). F. Loading Areas Street side loading on other than special landscaped streets, shall be allowed providing the loading dock is set back a minimum of seventy (70) feet from the street right -of -way line, or one hundred ten (110) feet from the street center line, whichever is greater. Said loading area must be screened from view from adjacent streets. G. Storage Areas 1. All outdoor storage shall be visually screened from access streets, freeways and adjacent property. Said screening shall form a complete opaque screen up to a point eight (8) feet in vertical height but need not be opaque above that point. 2. Outdoor storage shall be meant to include all company owned and operated motor vehicles, with the exception of passenger vehicles. 3. No storage shall be permitted between a frontage street and the building line. 43 H. Refuse Collection Areas 1. All outdoor refuse collection areas shall be visually screened from access streets, freeways and adjacent property. Said screening shall form a complete opaque screen. 2. No refuse collection area shall be permitted between a frontage street and the building line. I. Telephone and Electrical Service All "on- site" electrical lines (excluding lines in excess of 12KV) and telephone lines shall be placed underground. Transformer or terminal equipment shall be visually screened from view from streets and adjacent properties. I Pedestrian Access It is required of all developments in the commercial areas to submit a plan of pedestrian access to the Planning Department prior to the issuance of building permits. Said plans will detail consideration for pedestrian access to the subject property and to adjacent properties, and shall be binding on subsequent development of the property. The plan shall show all interior walkways and all walkways in the public right -of -way, if such walkways are proposed or necessary. SE. 100 FOOTNOTES [1] Planned Community Text Amendment No. 1, dated December 13, 1971, incorporating a revised land use plan. [2] Planned Community Text Amendment No. 2, dated June 12, 1972, incorporating the following changes: a. Relocation of Fire Station site. b. Limitation of tourist information, travel agencies and ticket reservations within Retail Commercial sites. C. Addition of specific restaurant density within Retail Commercial sites. [3] Planned Community Text Amendment No. 3, dated October 24, 1972, permitting Auto Centers as an additional use within Industrial Site 2B. [4] Planned Community Text Amendment No. 4, dated January 8, 1973, incorporating the following changes: a. Provision for a Mechanical Car Wash within Service Station Site No. 1. b. Eliminate provision for a Fire Station within Industrial Site 3A. [5] Planned Community Text Amendment No. 5, dated July 23, 1973, incorporating the following changes: a. Rearrangement of Office Site 3 and Restaurant Site 2 and reapportionment of land allotted to each. b. Reduce allowable building area in Office Sites 1 and 2 and increase allowable building area in Office Site 3A. C. Increase allowable building height in Office Site 3A to 8 stories. [6] Planned Community Text Amendment No. 6, dated June 10, 1974, establishing parking requirements for Hotels and Motels based on a demonstrated formula. [7] Planned Community Text Amendment No. 7, dated September 8, 1975, revising off - street parking requirements for restaurants to conform with existing City Standards. [8] Planned Community Text Amendment No. 8, dated February 9, 1976, permitting General Commercial uses on Auto Center Site 1 a and 2b. 45 101 FOOTNOTES (Cont.) [9] Planned Community Text Amendment No. 9, dated April 11, 1977, incorporating the following changes: a. Expand the permitted uses for General Commercial. b. Re- designate General Commercial Site 1 -A and 2 -B to General Commercial Sites 1, 2 and 3. C. Expand General Commercial Site 3 to include one half of Industrial Site IA. d. Convert Industrial Site 2A to General Commercial Site 4. e. Restrict the allowable building area and the permitted uses for General Commercial Sites 1, 2, 3 and 4. [10] Planned Community Text Amendment No. 10, dated May 23, 1977, incorporating the following change: a. Delete the provision added by Resolution No. 8261 adopted by the City Council on June 10, 1974 from Section III, D, 6. [11] Planned Community Text Amendment No. 11, dated April 10, 1978, incorporating the following change: a. Establish guidelines for an exception to the minimum site area. [12] Planned Community Text Amendment No. 12, dated July 11, 1978, incorporating the following change: a. Revised the allowable building height for Parcel No. 1 of Resubdivision No. 585. [13] Planned Community Text Amendment No. 13, dated November 27, 1978, incorporating the following change: a. Requirement that a Phasing Plan be approved by the Planning Commission for seventy (70) percent of the undeveloped allowable building area existing as of October 1, 1978. [14] Planned Community Text Amendment No. 14, dated June 11, 1979, incorporating the following changes: a. Reduce the allowable building area of Industrial Site 3A. b. Reduce the allowable building area of Commercial/Professional and Business Office Site 1 and 2. 102 FOOTNOTES (Cont.) [15] Planned Community Text Amendment No. 15, dated March 23, 1981, incorporating the following changes: a. Specification of a maximum building height of seven (7) stories on Parcel No. 2 of Resubdivision No. 585. [16] Planned Community Text Amendment No. 16, dated March 8, 1984 incorporating the following change: a. Increase of 16,154 square feet of office space in Professional and Business Offices Site 5. [17] Planned Community Text Amendment No. 17, dated April 23, 1984, incorporating the following change: a. Increase of 1,091 square feet of office space in Professional and Business Offices Sites 1 and 2. [18] Planned Community Text Amendment No. 18, dated June 25, 1984, incorporating the following changes: a. Establish a specific limit on hotel rooms in Hotel Sites IA and 1B. [19] Planned Community Text Amendment No. 19, dated July 23, 1984, incorporating the following changes: a. Transfer of 4,130 square feet of allowable building area from General Commercial Site 4 to Professional and Business Offices Site 5. [20] Planned Community Text Amendment No. 20, dated January 12, 1987, incorporating the following changes: a. Add Professional and Business Offices Site 8, with 54,000 square feet allowed. b. Delete Restaurant Site 2A, with 8,400 square feet deleted. [21] Planned Community Text Amendment No. 21, dated March 9, 1987, incorporating the following change: a. Increase allowed development in Professional and Business Offices Site 5 to 241,570 square feet; allow additional support retail uses up to 294,600 square feet total; add support commercial as permitted land use. (2 1) NJ 103 FOOTNOTES (Cont.) [22] Planned Community Text Amendment No. 22, dated February 4, 1988, incorporating the following change: a. Allow structures located within a portion of Industrial Site 3A to be constructed in excess of the 35 -foot height limit up to a maximum of 50 feet, subject to the approval of a use permit. [23] Planned Community Text Amendment No. 23, dated July 6, 1989 incorporating the following change: a. Allow restaurant uses on General Commercial Site 1, subject to the approval of a use permit in each case. [24] Planned Community Text Amendment No. 24, dated June 6, 1991, incorporating the following change: a. Increase the allowable office development in Professional Business Offices, Site No. 5 to 257,287 square feet, and reduce the allowable retail development to 37,315 square feet. [25] Planned Community Text Amendment No. 25, approved by the City Council on March 9, 1992, incorporating the following change: a. Increase the allowable office development in Professional Business Offices, Site No. 5 to 268,743 square feet, and reduce the allowable retail development to 25,857 square feet. [26] Planned Community Text Amendment No. 26, approved by the City Council on June 8, 1992, incorporating the following changes: a. Redesignate the Sheraton Hotel Site from Hotel Site lA and 1B to Hotel Site 1 and General Commercial Site 5. b. Reduce the hotel room entitlement on Hotel Site 1 by 119 rooms and establish a development entitlement of 31,362 square feet for General Commercial Site 5. C. Establish a height limit of 50 feet within General Commercial Site 5. d. The Requirement for a reciprocal easement to provide ingress, egress, and parking for mutual benefit between Hotel Site 1 and General Commercial Site 5. WOM 1i FOOTNOTES (Cont.) [27] Planned Community Text Amendment No. 27, approved by the City Council on September 13, 1993, incorporating the following changes: a. Increase the allowable commercial development in General Commercial Site 3 from 48,300 square feet to 49,380 square feet. b. Delete the provision which counts one square foot of floor area devoted to restaurants as two square feet of permitted commercial floor area in General Commercial Sites 2, 3, and 5. C. Delete the provision which restricts the maximum amount of gross floor area devoted to restaurants to 8,000 square feet each in General Commercial Sites 3 and 5. [28] Planned Community Text Amendment No. 28, approved by the City Council on January 22, 1996, incorporating the following changes. a. Restricting automobile repair and detailing as an accessory use only in conjunction with sales of new vehicles. C. Eliminate other permitted uses. [28.1] Planned Community Text Amendment No. 28.1, approved by the City Council on September 9, 1996. a. To add 'Instructional Dance Facility for Adults and Related Retail Uses' to the list of 'Retail Commercial' uses for Newport Place. [28.2] Planned Community Text Amendment No. 28.2, approved by the City Council on March 24, 1997, incorporating the following changes: a. Change the list of permitted uses of "Industrial Site No. 4" to allow establishment of remedial driving instruction and counseling facility. [28.3] Planned Community Text Amendment No. 28.3, approved by the City Council on August 11, 1997, incorporating the following changes: a. Redesignate "Retail Commercial Site 1" (MacArthur Square) to "General Commercial Site No. 6." b. Redesignate "Retail Commercial Site 2" to "Retail Commercial Site 1" [29] Planned Community Text Amendment No. 29, approved by the City Council on July 27, 1998, incorporating the following change: a. Permit Business and Trade Schools within Profession and Business Office Site 3A, subject to the approval of a Planning Director's Use Permit. .. 105 FOOTNOTES (Cont.) [30] Planned Community Text Amendment No. 30, approved by the City Council on January 11, 1999, incorporated the following changes: a. Establish the permitted Gross Floor area for Professional and Business Offices Sites 1 and 2 at 860,884 square feet. [31] Planned Community Text Amendment No. 31, approved by the City Council on February 8, 1999, incorporating the following changes: a. Redesignating Auto Center Site 2A to Commercial/Professional & Business Offices Site 2A. b. Redesignating Industrial Site 2B to Commercial/Hotel & Motel Site 2B. C. Expand the permitted uses for Professional & Business Offices to include general professional and general business offices. d. Establish a height limit of 95 feet within Professional & Business Office Site 2A. e. Establish a height limit of 60 feet within Hotel & Motel Site 2B. f Establish a front yard setback for Hotel/Motel "uses a 17 '/z foot minimum, provided that the average setback for all buildings along the linear street frontage is 30 feet. g. Establish a side yard, corner lot setback for Hotel/Motel uses of a 14 1/2 foot minimum, provided that the average setback for all buildings along the linear street frontage is 27 feet. It. Establish a side yard setback for Hotel/Motel uses of a ten (10) foot minimum. Provide that landscaping in parking areas be provided in surface parking areas. [32] Planned Community Text Amendment No. 32, approved by the City Council on April 12, 1999, incorporated the following changes: a. Establish the permitted gross floor area for Professional and Business Offices Site 4 at 228,214 square feet. [33] Planned Community Text Amendment No. 33, introduced at the City Council meeting on March 26, 2002 and adopted on the 9th of April 2002: a. Update The Industrial Statistical Analysis by allowing a 1,590 square foot building addition at the subject property identified as 1811 Quail Street. 50 100 FOOTNOTES (Cont.) [34] Planned Community Text Amendment No. 34,adopted on the 14th of June 2005: a. Revising the Land Use Plan, permitted uses, and development standards of the Newport Place Planned Community as they relate to the Newport Lexus Dealership. [35] Planned Community Text Amendment No. 35, adopted on September 14, 2010: a. Re- designate Industrial Site 4 to Professional and Business Offices Site 9. b. Change the parking requirement for office uses within Professional and Business Offices Site No. 9 to one space per 281 square feet, which allows all of the buildings to be occupied with office uses. C. Add a provision that requires Planning Director review of the parking configuration in Professional and Business Offices Site No. 9. d. Revising the Land Use Plan, permitted uses and development standards of the Newport Place Planned Community as they relate to the Newport Commerce 16.9 acre site bounded by Birch Street, Dove Street, Westerly Place and Quail Street. 51 107 Area Summary Industrial 23.3 ac. Office 81.7 ac. Retail /General Commercial 16.5 ac. Commercial /Restaurant 1.8 ac. Commercial /Hotel Motel 10.1 ac. Service Station 1.2 ac. Total 134.6 ac. J� Service Station J� Site 1 Industrial Site 3A General Commercial Site 4 Industrial Site 1A Retail Hotel General Commercial Commercial Site 1 Site 5 Site 1 General Commercial W „ „ Site 6 Pro. & Bus. Office Site 6 Restaurant Site 1 Pro. &Bus. Office Site 9 Pro. & Bus. Office Site 7 Pro. & Bus. Office Sites 1 & 2 DRAFT General Land Use Plan CoSitee3ial Newport Place Planned Community PC Text Amendment No. PD2010 -007 (PA2010 -135) 4221 Dolphin- Striker Way & o,Q� \2e A 0 ?,9 General Commercial Site 2 Pro. &Bus. I \ Office ,l General Commercial Site 5 Site 8 Pro. & Bus. Office Site 4 Pro. & Bus. Office Site 8 General Commercial Site 7 General Commercial Site 1 \ -y ^^ �� 9 LU Exhibit 2&1q-hf>Td N Attachment No. CC 5 September 22, 2011 Planning Commission Report Package (Pages 109 -580) is available at the City Clerk's Office and City's website at www.newportbeachca.gov D `' 110 CITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT September 22, 2011 Agenda Item 5 SUBJECT: MacArthur at Dolphin- Striker (PA2010 -135) 4221 Dolphin- Striker Way • Planned Community Development Plan Amendment No. PD2010- 007 • Transfer Development Rights No. TD2010 -002 • Traffic Study No. TS2011 -002 • Conditional Use Permit No. UP2011 -026 • Mitigated Negative Declaration No. ND2011 -001 • Modification Permit No. MN2011 -014 • Waiver of Development Agreement APPLICANT: Ridgeway/Whitney, Partnership PLANNER: Rosalinh Ung, Associate Planner (949) 644 -3208, rung @newportbeachca.gov PROJECT SUMMARY The applicant proposes a planned community development plan amendment to allow the construction of two, single -story commercial buildings of 13,525 square feet total. The following approvals are requested or required in order to implement the project as proposed: 1. An amendment to the Newport Place (PC -11) Planned Community Development Plan to change the zoning designation of the subject property from 'Restaurant Site 1" to "General Commercial Site 8 ", pursuant to Chapters 20.56 (Planned Community District Procedures) and 20.66 (Amendments) of the Municipal Code. 2. Transfer of Development Rights to allow the transfer of 48 unbuilt hotel units, which equate to 3,909 square feet of specialty retail, from Hotel Site 2 -B (Fletcher Jones Vehicle Storage Facility at 1301 Quail Street) and 1,620 square feet from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) for a total of 5,529 square feet to the subject site, pursuant to Chapter 20.46 (Transfer of Development Rights) of the Municipal Code. 3. Traffic Study approval pursuant to Chapter 15.40 (Traffic Phasing Ordinance) as the project will generate in excess 300 average daily trips (ADT). 111 MacArthur at Dolphin- Striker September 22, 2011 Page 2 VICINITY MAP Q o JClassic Saagar India Restaurant m J Subject e Property DOIPHINSTWKER S GENERAL PLAN Z ONING G n J � 12 MU -112 srwxLn wnr PC 11 I pp�FWNarwxfx Wxr 1111\ 10 LAND USE ANOMALY & TRANSFER OF DEVELOPMENT RIGHTS EXHIBIT AO fir PF i U Receiver cO -G Site Donor Site a — .. MU -M2 Fletcher Jones - z.1 2 3 i 14 R i 15 � i Donor Site CG 0.5 FAR aqs" 17 L2XUS C 0 5FAR RS -D eye o�s'a 8 r C I/ CG 112 MacArthur at Dolphin- Striker September 22, 2011 Page 3 LOCATION GENERAL PLAN J ZONING CURRENT USE ON -SITE Mixed Use Horizontal 2 pC -11, Restaurant Site 1 Restaurant (vacant) MU -H2 PC -11, Pro. & Bus. Office Classic Q Sports Club & NORTH MU -H2 Site 6 Restaurant SOUTH MU -H2 PC -11, Pro. & Bus. Office Glidewell Laboratories Site 5 PC -11, Pro. & Bus. Office EAST MU H2 MacArthur Blvd. & Koll Center Site 7 WEST MU -H2 MacArthur Blvd. & Koll Saagar India Restaurant & Center PC Dolphin- Striker Way 4. Conditional Use Permit to modify the off - street parking requirements, allow for the use of off -site parking, and to establish a parking management plan for the site, pursuant to Chapter 20.40 (Off- Street Parking) of the Municipal Code. 5. Waiver of the requirement for a Development Agreement pursuant to the provisions of Chapter 15.45 (Development Agreements) of the Municipal Code. 6. Modification Permit to deviate from the landscaping requirements of the Newport Place (PC -11) Planned Community Development Plan, pursuant to Section 20.52.050 of the Municipal Code. RECOMMENDATION 1) Conduct a public hearing; and 2) Adopt Resolution No. _ (Attachment No. PC1) recommending that the City Council: a. Adopt Mitigated Negative Declaration No. ND2011 -001 and Errata, including the Mitigation Monitoring and Reporting Program; b. Find that, based on the weight of the evidence in the administrative record, including Traffic Study No. TS2011 -002, that the project complies with the Traffic Phasing Ordinance; and c. Approve Planned Community Text Amendment No. PD2010 -007, Transfer of Development Rights No. TD2010 -002, Conditional Use Permit No. UP2011- 026, and Modification Permit No. MN2011 -014; and d. Waiver of the requirement for a Development Agreement 113 MacArthur at Dolphin- Striker September 22, 2011 Page 4 INTRODUCTION Project Setting & Background The subject property is approximately 48,221 square feet (1.11 acres) in size and located on the west side of MacArthur Boulevard, between Martingale Way and Newport Place Drive. The subject property currently improved with a 7,996 square -foot commercial building and a 78 -space surface parking lot. Additionally at 4100 Newport Place, 16 off -site parking spaces are located on the 5th floor of the US Bank's parking structure pursuant to a recorded off -site parking agreement. The subject property is Parcel 1 of three parcels designated as Restaurant Site 1 in the Newport Place Planned Community. Parcel 2 is currently improved with a 7,015 square - foot restaurant (Saagar Fine Cuisine of India Restaurant) and a 59 -space surface parking lot. Parcel 3 is currently improved with a 7,870 square -foot sports club and restaurant (Classic Q Sports Club and Restaurant) and has a 74 -space surface parking lot. The parking lots of these parcels are shared and the total combined parking spaces is 211 (78 +59 +74) parking spaces. Vehicular access to all three parcels is from Dolphin - Striker Way and Martingale Way. Parcels 2 and 3 are not a part of the proposed development. Protect Description The applicant proposes to demolish the existing 7,996 square -foot, single -story commercial building and to construct two, single -story commercial buildings with a total of 13,525 square feet. Details of the project components are as follows: Commercial Buildings The proposed development consists of two, free - standing buildings. Building A is approximately 4,000 square feet and would be located on the northern side of the property. Building B is approximately 9,525 square feet and would be located along the southernly portion of the property. Each building is single -story and has a maximum building height of 29 feet. The buildings are a contemporary design. Building materials are smooth troweled integral tan color plaster, simulated wood composite sidings, glass and metal. Approximately 5,000 square feet of Building B is allocated for food service uses. Of that, 1,000 square feet will be allocated for a fast -food service use (i.e. Subway Restaurant). Anticipated hours of operation for the fast -food service use would be from 7:00 a.m. to 11:00 p.m., daily; and from 11:00 a.m. to 10:00 p.m. for the high turn -over dining establishments. 1-14 MacArthur at Dolphin- Striker September 22, 2011 Page 5 The remaining 8,525 square feet (4,525 square feet in Building B and the entire Building A) will be allocated for general commercial uses such as office /delivery, computer electronic service and cellular service stores. The hours of operation would be from 9:00 a.m. to 7:00 p.m., daily. The applicant estimates approximately 20 -30 employees to be working at the development during any of the given shifts. Site Improvements A portion of the existing 78 -space parking lot will be demolished to accommodate the proposed commercial buildings. The remaining surface parking lot will be reconfigured to provide 59 parking spaces and new landscaping. The applicant is requesting minimal changes to their parking layout in order to maintain existing on -site circulation with the adjacent two restaurant parking lots. The proposed development also includes the creation of a new vehicular access onto MacArthur Boulevard. Analysis General Plan The subject property is located in Statistical Area L4 (Airport Area) and has a General Plan designation of Mixed -Use Horizontal 2 ( "MU -H2 "). The MU -H2 designation provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed -use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses. The applicant seeks no changes to the General Plan designation or development limits. The proposed commercial development would be allowed as the proposed uses are ancillary and supportive to the existing nearby office and light industrial developments. The subject property has a maximum development limit of 7,996 square feet and has no remaining buildable square footage per Anomaly No. 12 of the General Plan Land Use Element. Anomaly No. 12 covers the entire block, and is bounded by Corinthian Way to the north, Newport Place Drive to the south, Scott Drive and Dove Street to the east, and MacArthur Boulevard to the west. In order to accommodate the proposed 13,525 square -foot development (7,996 square feet of existing entitlement plus 5,529 square feet of new development), the applicant is requesting a transfer of development rights of 48 un -built hotel rooms from Hotel Site 2- B, which equates to 3,909 square feet of specialty retail, and 1,620 square feet from 215 MacArthur at Dolphin- Striker September 22, 2011 Page 6 General Commercial Site 7 to the subject site. Please refer to the Transfer of Development Rights Section of this report. A complete consistency analysis of each of the applicable General Plan policies is attached to the Mitigated Negative Declaration as Appendix #1 (Attachment No. PC10). The environmental analysis concludes that the project is consistent with each of the adopted goals and policies. Planned Community2oning The subject property has a zoning designation of Restaurant Site 1 of the Newport Place (PC -11) Planned Community which allows only eating and drinking establishments. The proposed amendment would change the zoning designation to General Commercial Site 8, to allow general commercial uses and eating and drinking establishments. The redlined draft planned community development plan (Attachment No. PC3) illustrates the proposed changes. Transfer of Development Rights The applicant has proposed a transfer of development rights of 5,529 square feet from two different locations in order to accommodate the proposed development. The request includes a transfer of 48 un -built hotel units which equates to 3,909 square feet of specialty retail presently allocated to Hotel Site 2 -B site (Fletcher Jones Vehicle Storage Facility at 1301 Quail Street) by the Land Use Element. Hotel Site 2 -B has a development limit of 33,292 square feet and 304 hotel rooms, per Anomaly No. 17 and is currently improved with a 200 square -foot office /security building for the Fletcher Jones vehicle storage facility. The applicant also requested a transfer of 1,620 square feet presently allocated to General Commercial Site 7 ( Lexus Auto Dealership at 3901 MacArthur Boulevard) by the Land Use Element. General Commercial Site 7 is a part of Anomaly No. 19 that has an overall development limit of 228,530 square feet for three separate properties. The Lexus site is allocated with 141,120 square feet and has 23,384 square feet of unbuilt floor area. In accordance with Chapter 20.46 (Transfer of Development Rights), the Planning Commission must make the following findings for the approval of transfer of development rights: 1. The reduced density /intensity on the donor site provides benefits to the City, for example: a. The provision of extraordinary open space, public view corridor(s), increased parking, or other amenities, b. Preservation of an historic building or property, or natural resources; 110 MacArthur at Dolphin- Striker September 22, 2011 Page 7 c. Improvement of the area's scale and development character, - d. Reduction of local vehicle trips and traffic congestion; and e. More efficient use of land. 2. The transfer of development rights will not result in any adverse traffic impacts and would not result in greater intensity than development allowed without the transfer and the proposed uses and physical improvements would not lend themselves to conversion to higher traffic generating uses, 3. The increased development potential transferred to the receiver site will be compatible and in scale with surrounding development and will not create abrupt changes in scale or character; and 4. The receiver site is physically suitable for the development proposed taking into consideration adjacent circulation patterns, protection of significant public views and open space, and site characteristics, including any slopes, submerged areas, and sensitive resources. The transfer of 48 hotel rooms from Hotel Site 2 -B and 1,620 square feet from General Commercial Site 7 would result in a reduced intensity on the donor sites, which also would result in a reduction of local vehicle trips and traffic congestion, especially along North Bristol Street and MacArthur Boulevard. The transfer of development rights onto the subject property will not result in adverse traffic impacts as demonstrated in the Traffic Study prepared by Kunzman Associates, Inc. The transfer and the proposed uses of the receiver site would not lend themselves to a conversion to higher traffic generating uses, since the subject property is currently approved for 7,996 square feet of food service use which is being reduced to a maximum of 5,000 square feet (4,000 square feet of high turnover restaurant use and 1,000 square feet of fast food use). The remainder of the development will be allocated for general commercial uses. The proposed transfer would be trip neutral as any increase in the peak hour generated by the receiver site would be deduced proportionally to the donor sites. Furthermore, the hours of general commercial uses would be restricted not to open during the 7:00 to 9:00 morning (AM) peak hour, daily. This restriction is as a result of using the 4:00 to 6:00 afternoon (PM) peak hour trip which has a lower trip generation rate, in computing square footage for the transfer of development rights. This rate was also used in the traffic study and environmental analysis. The potential increase in development transferred to the subject property will be compatible and in scale with the surrounding development as the proposed development will be a single story, at 29 feet in height. The subject property is physically suitable for the new development and provides improved vehicular access off of MacArthur Boulevard. Direct access will be available to and from MacArthur 117 MacArthur at Dolphin- Striker September 22, 2011 Page 8 Boulevard instead of the existing circuitous route from Dove Street or Corinthian Way. Additionally, all building setbacks are being complied with and the overall development scale is in proportion to the immediate area. Staff, therefore, believes that the findings for the proposed transfer could be made. As a condition of approval, a covenant or other legally binding agreement approved by the City Attorney shall be recorded against the donor sites assuring that all of the requirements of the transfer of development rights shall be met by the current and future property owners. The property owners of the donor sites are in agreement with the proposed transfer (Attachment No. PC4). Parking Analysis According to the Newport Place (PC -11) Planned Community Development Plan, the parking requirement for eating and drinking establishments is in accordance to Title 20 of the Municipal Code. The parking requirement for general commercial uses would be one space for each 250 square feet of net floor area, according to Part II, Section III, Subsection D of the Newport Place Planned Community Development Standards. Using the above criteria, approximately 104 parking spaces would be required based on the following calculations: Land Use Gross Square Net Public Parking Ratio Parking Feet Area (NPA)' Required for Restaurant Use Fast -Food 1,000 N/A 1 per 50 gross 20 Service square feet (Subway) Food Service 4,000 2,000 1 per 40 of NPA 50 General 8,325(8,525- 1 per 250 net 34 Commercial 200 of utility square feet room Total 13,525 104 'The total area used to serve customers, including customer sales and display areas, customer seating areas, service counters, and service queue and waiting areas; but, excluding restrooms and offices, kitchens, storage and utility areas, and similar areas used by the employees of the establishment. 2Estimated as 50 percent of the gross square feet allocated for food service uses. The proposed fast -food service use of 1,000 square feet would yield a parking demand of 20 spaces, with a parking ratio of one space per 50 square feet of gross square feet. An assumption was made with regard to parking requirements for the remaining 4,000 square feet of food service use (restaurant), given that the specific design (i.e., seating 118 MacArthur at Dolphin- Striker September 22, 2011 Page 9 type, arrangement, bar area) and operational characteristics are not known at this time. Additionally, since parking requirements for most restaurants (except fast -food) are based on NPA and not gross floor area, a conservative assumption of 50 percent of gross floor area was used to determine expected NPA. Pursuant to Section 20.40.060 of the Zoning Code, Food Service uses are required to provide off - street parking within a range of one space for each 30 to 50 square feet of NPA, depending on the physical design, operational characteristics, and location of the establishment. It is the applicant's intent for these restaurants to be occupied by small sit -down boutique dining establishments, with high turnover. A parking ratio of one space per 40 square feet of NPA, therefore would be adequate. The physical design and operational characteristics that would lead to higher parking ratios include uses with higher occupant loads, such as bars or restaurants with large bar areas, or the operation of live entertainment and /or dancing. It should be noted that each of the proposed restaurants will be required to apply for a minor or conditional use permit, at which time the final parking requirements can be calculated based on the specific design and operational characteristics. Parking Strategy The parking strategy for the proposed project is complex and includes a request to adjust the parking requirements based on a shared parking analysis, use of a parking management plan, and use of off -site parking for the employees. Pursuant to Sections 20.40.100.A and 20.40.110.B of the Municipal Code, a conditional use permit is required for each of these requests. The following sections describe each of the parking related requests. The Conditional Use Permit Findings Section summarizes whether the findings can be supported for each of these requests. Shared Parking Analysis Based on the parking requirements per the Municipal Code, a total of 104 parking spaces is required. The project includes 91 spaces (32 off -site and 59' on- site), which results in a parking shortage of 13 spaces per the Municipal Code. Section 20.40.110.B.2 (Joint Use of Parking Facilities) of the Municipal Code allows required off- street parking to be reduced with the approval of a conditional use permit where two or more distinct uses on the same site have distinct and differing peaking parking demands. A shared parking analysis has been prepared by Kunzman Associates, Inc., as a part of the Traffic Impact Analysis (Attachment No. PC5). The shared parking analysis takes into account the parking demand at peak hour generated by the proposed project, and the cumulative parking demand for the proposed project combined with the ' According to the latest site plan proposed by the applicant. The latest site plan has been revised to provide a total of 59 parking spaces, an addition of two spaces after the Shared Parking analysis and Parking Management Plan were completed. 119 MacArthur at Dolphin- Striker September 22, 2011 Page 10 existing parking demand for all three properties, under the existing shared parking arrangement. The analysis concludes on a peak hour demand, from 12:00 p.m. to 1:00 p.m. on Friday afternoon, a total of 99 spaces are required for the proposed project, which results in a parking shortage of 8 spaces. Under the cumulative parking demand analysis for the existing parking demand for the existing restaurants Classic Q Sports Club and Restaurant), a total of 22: the peak hour demand, from 12:30 p.m. to 1:00 p.m. o pool with the proposed project is 224 parking spaces for Saagar, and 74 spaces for Classic Q) which result: by peak demand. proposed project combined with the ( Saagar Fine Cuisine of India and parking spaces are needed during i Friday afternoon. The total parking (91 spaces for Parcel 1, 59 spaces in a parking shortage of one space A parking management plan has been prepared in compliance with Section 20.40.110.C, in order to mitigate impacts associated with a reduction in the number of required parking spaces. As a condition of approval, the proposed development would be restricted 5,000 square feet of food service uses. Of that, 1,000 square feet would be allocated for a fast - food service use. The remaining 8,525 square feet would be allocated for general commercial uses as allowed for General Commercial Sites per the Newport Place Planned Community Development Plan. Please see Conditional Use Permit Findings Section below for a discussion of the required findings for approval. Parking Management Plan A parking management plan has been prepared by Kunzman Associates, Inc. to illustrate and explain in detail how the on -site and off -site parking spaces will be managed (Attachment No. PC6). In general, the plan indicates the following: • The subject property has a high pedestrian potential as it is within a convenient pedestrian walking distance to and from the nearby businesses (1,000 feet is considered to be a convenient pedestrian walking distance). Because of the high pedestrian accessibility, the parking demand is expected to be less than required by the Municipal Code. Parking spillover from the adjacent businesses is a significant factor in the existing parking conditions of the subject property and because of the high parking spillover that exists during the time of the parking survey; the parking demand is believed to be overstated by approximately 15 -20 vehicles during the projected peak period. • The 32 off -site parking spaces should be used for employee parking. 120 MacArthur at Dolphin- Striker September 22, 2011 Page 11 • The installation and enforcement of parking regulation signs, such as "Customer Only ", to prevent spillover from adjacent properties. Parking regulation such as tow -away should be enforced to be effective. In the event that the parking supply is deficient, the parking management plan also provides alternatives that could be implemented such as encouraging employees of Saagar Fine Cuisine of India and Classic Q Restaurants to park at the off -site parking location; roping off an area of the shared parking lot for tandem parking during the peak parking periods; and providing a complimentary valet parking during peak parking periods. The latter two would require consideration and approval from the Traffic Engineer. The parking management plan has been reviewed and approved by the City's Traffic Engineer. Please see Conditional Use Permit Findings Section below for a discussion of the required findings for approval. Off -Site Parking for Employees As mentioned above, the subject property currently has a 16 -space off -site recorded parking agreement with the adjacent property located at 4100 Newport Place. These off - site spaces are located on the 5th floor of the US Bank's parking structure (Attachment No. PC7). The applicant has entered into a separate parking agreement for an additional 16 spaces at the same property, for a total of 32 spaces (Attachment No. PC8). These spaces will be used solely by the employees of the project and not by customers. The bank parking structure currently has approximately 99 surplus parking spaces that are available for lease. Pursuant to Section 20.40.100 of the Municipal Code, approval of a conditional use permit is required for a parking facility that is not located on the same site it is intended to serve. In addition to the standard conditional use permit findings discussed Conditional Use Permit Findings section of this report, the Planning Commission must also make each of the following findings: 1. The parking facility is located within a convenient distance to the use it is intended to serve; 2. On- street parking is not being counted towards meeting parking requirements; 3. Use of the parking facility will not create undue traffic hazards or impacts in the surrounding area; and 4. The parking facility will be permanently available, marked, and maintained for the use it is intended to serve. The US Bank's parking structure is located approximately 120 feet southwest of the property. It would take an employee approximately less than a minute to walk from the off -site parking structure according to The Manual on Uniform Traffic Control Devices 121 MacArthur at Dolphin- Striker September 22, 2011 Page 12 (MUTCD) which suggests four feet per second as a normal walking speed. Given the location of the parking spaces on the fifth floor of the parking structure, it would take an additional 3 to 4 minutes of elevator time, for a total of less than 5 minutes. This is considered a convenient distance for employee parking. The use of the parking lot is not expected to create undue traffic hazards since the proposed project and off -site parking lot are located next to one another. This allows employees to walk across the subject property's parking lot, through a pedestrian walkway to the elevator of the parking structure, without crossing any street intersections. The parking structure is accessed through a keycard system and the applicant has agreed to provide their employees with the necessary keycards. The off- site parking spaces will be made available for the use by employees of the project on a daily basis, with no restriction on the hours of use. According to the executed parking authorization and license agreement for the additional 16 spaces, the agreement will expire one year subsequent to the commencement date (the date in which the applicant receives a certificate of occupancy for the proposed development) and is subject to a month -to -month basis after the initial one -year period. It also states that the agreement will be void if the applicant does not secure the certificate of occupancy by June 1, 2012. If the agreement is not renewed, the applicant will be required to notify the Community Development Director who will establish a reasonable time for substitute parking to be provided or reduce the size of the tenant spaces or change the tenant mix (i.e., less restaurant) in proportion to the parking spaces lost, in accordance to Section 20.40.100.D (Loss of Off -Site Parking) of the Municipal Code. Conditional Use Permit Findings — Parking Structure, Parking Adjustments, Parking Management Plan, and Off -Site Parking Pursuant to Sections 20.40.070.6.3, 20.40.110.6.2, and 20.40.100 of the Zoning Code, a conditional use permit is required to modify the off - street parking requirements and to establish a parking management plan, and to allow for the use of off -site parking. Pursuant to Section 20.52.020.E of the Zoning Code, the Planning Commission must make the following findings in order to approve a conditional use permit: 1. The use is consistent with the General Plan and any applicable specific plan; 2. The use is allowed within the applicable zoning district and complies with all other applicable provisions of this Zoning Code and the Municipal Code; 3. The design, location, size, and operating characteristics of the use are compatible with the allowed uses in the vicinity; 4. The site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle (e.g., fire and medical) access and public services and utilities; and 122 MacArthur at Dolphin- Striker September 22, 2011 Page 13 5. Operation of the use at the location proposed would not be detrimental to the harmonious and orderly growth of the City, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in the neighborhood of the proposed use. The proposed project has a parking shortage of 13 spaces per the Municipal Code; 8 spaces by peak demand under a shared parking scenario within the project site or one space by peak demand under a shared parking scenario with the adjoining restaurant sites. The proposed parking waiver is for the 13 -space parking shortage. A parking management plan has been prepared to mitigate impacts associated with the reduction of required parking spaces. This plan has been reviewed and approved by the City's Traffic Engineer. The adjustment in parking requirements is justified as the shared parking analysis indicated that not all uses within the project will require the full allotment of parking spaces at the same time. Furthermore, when peak demand for parking within the shared lot exists, the parking management plan requires all employees to park off -site so use of the parking lot for patrons is maximized. The Traffic Engineer and Fire Department have reviewed the parking lot design including the proposed vehicle access onto MacArthur Boulevard and have determined that the parking lot design and new drive approach will function safely and will not prevent emergency vehicle access. With regard to the off -site parking, the location of the off -site parking is convenient for the use of employee parking. It is not anticipated that the use of the off -site parking lot would create an undue traffic hazard. Since the off -site parking will be used by employees only, typical noise disturbances associated with restaurant patrons loitering in parking lots is not expected. Traffic Study - Traffic Phasing Ordinance Chapter 15.40 (Traffic Phasing Ordinance, or TPO) of the Municipal Code requires that a traffic study be prepared and findings be made prior to issuance of building permits if a proposed project will generate in excess of 300 average daily trips (ADT). For the purposes of preparing the traffic analysis for this project, the 13,525- square -foot commercial development was assumed to include 1,000 square feet of fast -food use, 4,000 square feet of high turn -over food uses, and 8,525 square feet of general commercial uses. Combined, this land use mix is forecast to generate a net increase of 942 trips per day, including 67 A.M. peak hour trips and 55 P.M. peak hour trips. Pursuant to Section 15.04.030.A, the Planning Commission must make the following findings in order to approve the project: 12S MacArthur at Dolphin- Striker September 22, 2011 Page 14 1. That a traffic study for the project has been prepared in compliance with this chapter and Appendix A. 2. That, based on the weight of the evidence in the administrative record, including the traffic study, one of the findings for approval in subsection (8) can be made: 15.40.030.8.1 Construction of the project will be completed within 60 months of project approval; and 15.40.030.8.1(a) The project will neither cause nor make an unsatisfactory level of traffic service at any impacted intersection. 3. That the project proponent has agreed to make or fund the improvements, or make the contributions, that are necessary to make the findings for approval and to comply with all conditions of approval. A traffic study has been prepared by Kunzman Associates, Inc. under the supervision of the City Traffic Engineer pursuant to the TPO and its implementing guidelines (Attachment No. PC5). A total of 12 primary intersections in the City were evaluated. The traffic study indicates that the project will increase traffic on 4 of the 12 study intersections by one percent (1 %) or more during peak hour periods one year after the completion of the project and, therefore, these four intersections required further Intersection Capacity Utilization (ICU) analysis. Utilizing the ICU analysis specified by the TPO, the traffic study determined that the four primary intersections identified will continue to operate at satisfactory levels of service as defined by the Traffic Phasing Ordinance, and no mitigation is required. Since implementation of the proposed project will neither cause nor make worse an unsatisfactory level of traffic service at any impacted primary intersection within the City, no improvements or mitigation are necessary. Therefore, staff recommends that the Planning Commission find that the traffic study has been prepared in compliance with the TPO. Development Agreement Chapter 15.45 provides that development agreements shall be required in conjunction with City approval of a project that requires a Zoning Code amendment or other legislative act, and includes new non - residential development in Statistical Area L4 (Airport Area). The proposed project meets these parameters. The development agreement provides a developer a vested right to proceed and complete a project without the uncertainty of future changes in policies or regulations. This factor is important with larger or long -term projects. A development agreement also allows the City greater latitude to advance local planning policies and it provides ��i4r MacArthur at Dolphin- Striker September 22, 2011 Page 15 flexibility in addressing project - related impacts that may occur in the future or those that might occur across jurisdiction boundaries. The applicant requests a waiver of the requirement for a development agreement pursuant to the provisions of Section 15.45.020.0 of the Municipal Code (Attachment No. PC9). This section provides that the City Council may waive the requirement for a development agreement, except for one required by General Plan Policy, if it finds one of the following: • The legislative act is of a minor nature; or • The project provides significant public benefits to the City; or • The nature of the project is such that neither the City nor the developer would benefit from a development agreement. The applicant has provided factors in support of each of the above findings that could justify a waiver of the requirement for a development agreement. Is the project a "minor legislative act ?" The project is minor in nature because it consists of a transfer of 48 un -built hotel units from Hotel Site 2 -B and 1,620 square feet from General Commercial Site 7 in the Newport Place Planned Community to be used as an increase of 5,525 in the square footage to newly created Commercial Site 8. The transfer of development rights onto the receiver site (the subject property) will not result in adverse traffic impacts. The donor sites and the receiver site are located within the same Land Use Statistical Area L4. The proposed transfer would be trip neutral as any increase in the peak hour generated by the receiver site would be deduced proportionally from the donor sites. Does the project `provide significant public benefits to the City ?" The project would provide short-term employment opportunities in construction and long -term employment opportunities for approximately 20 -30 employees on site. Further, vendors will be hired to maintain the property and landscaping. Approval of the project would help to maintain the City's jobs -to- housing balance. The project would generate additional sales and property tax for the City. The project would accommodate the patrons that work in close proximity to the site who can walk to eat and shop and thereby not burden the road system. Further, the ingress and egress is vastly superior to the original project and will decrease vehicle miles traveled by lost patrons and vehicular confusion in the area. 125 MacArthur at Dolphin- Striker September 22, 2011 Page 16 The project would be adequately served by existing public facilities, infrastructure and services. Under what circumstances would neither the City nor the developer benefit from a development agreement due to the `nature of the project ?" This finding can be made given the nature of the project in that it is small, no significant environmental impacts would be created, and adequate infrastructure presently exists. Based on the preceding, staff believes neither the City nor the development would benefit from a development agreement due the nature of the project. Modification Permit In accordance with Section 20.52.050 (Modification Permits), the Planning Commission must also make the following findings for approval of a modification permit for deviations to the landscape development standards: 1. The requested modification will be compatible with existing development in the neighborhood; 2. The granting of the modification is necessary due to the unique physical characteristic(s) of the property and /or structure, and /or characteristics of the use; 3. The granting of the modification is necessary due to practical difficulties associated with the property and that the strict application of the Zoning Code results in physical hardships that are inconsistent with the purpose and intent of the Zoning Code; 4. There are no alternatives to the Modification Permit that could provide similar benefits to the applicant with less potential detriment to surrounding owners and occupants, the neighborhood, or to the general public; and 5. The granting of the modification would not be detrimental to public health, safety, or welfare to the occupants of the property, nearby properties, the neighborhood, or the City, or result in a change in density or intensity that would be inconsistent with the provisions of this Zoning Code. A modification permit is requested to deviate from the provision of one tree per each 25 linear feet along the south property line. Due to the lot configuration, Building B is located along the southern property line. The required secondary exits along the back side of this building prevent the placement of required landscaping. The proposed landscaping to be provided at the project site will be compatible with the adjacent properties and surrounding office and light industrial developments. Ground cover, 120 MacArthur at Dolphin- Striker September 22, 2011 Page 17 shrubs, and trees will be provided to enhance the aesthetics of the proposed development and seamlessly connect the property boundaries with adjoining sites. Sufficient landscaping consisting of ground cover, shrubs, and trees are being proposed and the strict application of the Planning Community Development Standards results in physical hardships to the proposed development in terms of site design and building placement. The provision of the required trees per the landscape development standards of PC -11 (Newport Place Planned Community) would result in a much narrower and less desirable building size and shape and would also reduce the length of the parking stalls and prevent the drive aisle to align with the driveway approaches. Staff, therefore, believes the findings for approval of the requested modification permit can be made. Airport Land Use Commission The project site is within the Airport Environs Land Use Plan ( AELUP) Airport Planning Area. Projects that are located within the AELUP Airport Planning Area and that require a Zoning Code amendment are referred to the Orange County Airport Land Use Commission (ALUC) for a determination of consistency with AELUP prior to the adoption by the City. This process will be done in between the Planning Commission and City Council hearings. Environmental Review A Mitigated Negative Declaration (MND) has been prepared by planning staff, in accordance with the implementing guidelines of the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and City Council Policy K -3. The MND is attached as Attachment PC10. A copy of the MND was also made available on the City's website, at each Newport Beach Public Library, and at the Community Development Department at City Hall. The MND does not identify any component of the project that would result in a "potentially significant impact" on the environment per CEQA guidelines. However, the document does identify components of the project that would result in effects that are "less than significant with mitigation incorporated" with regard to the following three environmental categories: Cultural Resources, Geology and Soils, and Noise. Twelve (12) mitigation measures are identified in the Mitigation Monitoring and Reporting Program, which is attached as Exhibit A of Attachment No. PC1. The MND was made available for public review for a 20 -day comment period from July 15 to August 3, 2011. Staff has received comment letters from the California Cultural Resource Preservation Alliance, Airport Land Use Commission (Attachment No. PC11), and City of Irvine. 127 MacArthur at Dolphin- Striker September 22, 2011 Page 18 The California Cultural Resource Preservation Alliance has the following comments: 1) whether the donor site (Fletcher Jones Vehicle Storage Facility) is a part of the environmental analysis; 2) if a literature search of any recorded archaeological sites located at or near subject site has been conducted; and 3) whether adequate monitoring and provisions for cessation of work have been included should cultural remains be encountered. There would be no construction on the donor site as the transfer of development rights involves in the transfer of un -built hotel units and Section V.b of Cultural Resources (page 41) discussed the subject property's existing lack of any unknown archeological resources present and Mitigation Measure 5.1 has been included to ensure compliance with state historical guidelines. The Airport Land Use Commission commented on the proposed building height as compared with the Notification Surface Height, whether the project is within the Obstruction Imaginary Surfaces for John Wayne Airport, whether the project would include heliports, and the need for a determination of consistency with AELUP prior to the adoption by the City. A clarification to the MND is necessary in order to address whether the proposed project penetrates the Notification Surface Height and /or the Obstruction Imaginary Surface. The corrected Notification Surface Height at the subject property is 86 feet above mean sea level, not 206 feet above mean sea level as stated in the MND. The proposed building height is an approximately 79 feet above mean sea level (50 feet at the subject property + 29 feet of building height) and is therefore, below the Notification Surface Height by 7 feet. The Obstruction Imaginary Surface height at the subject property is at 116 feet above mean sea level. The proposed development is at 79 feet at the top of the proposed building and is therefore, below the Obstruction Imaginary Surface height. In both cases, the proposed project does not penetrate the Notification Surface Height and /or the Obstruction Imaginary Surface criteria. The clarification does not alter nor change the outcome of the environmental analysis as the project does not penetrate the Notification Surface Height of 86 feet above mean sea level and the Obstruction Imaginary Surface for JWA of 116 feet above mean sea level. City of Irvine recommended a built -out traffic analysis be prepared for 4 intersections that lie partially within the City of Irvine limits to determine if impacts /mitigations result from the project. The City Traffic Engineer considered the recommendation and determined such analysis is not required as the project does not include a general plan amendment request (i.e., to increase development intensity beyond what is being allowed within the Airport Area Statistical Area); and the Transfer of Development Right request would be a trip neutral as any increase in the peak hour traffic generated by the receiver site would be reduced proportionally by the donor sites. 122 MacArthur at Dolphin- Striker September 22, 2011 Page 19 Subsequent to the circulation of the MND, the applicant informed staff that Fletcher Jones Vehicle Storage Facility property could only honor the transfer of 48 un -built hotel units and the remaining needed square footage of 1,620 will be transferred from the Lexus Dealership property. The added donor property for the transfer of development rights will not result either in the creation of any new impacts or more severe impacts than those identified and described in the MND as the Lexus Dealership is located within the same Land Use Statistical Area L4, and there would be no increase in peak hour trips. Therefore, the analysis presented in the MND remains adequate and recirculation of the document is not required. An Errata to the MND (Attachment No. PC12) has been prepared to address the above - mentioned changes. The Errata also includes changes to the Appendix I as to the references made regarding a general plan amendment request for the increase of the development limits for the subject property. A general plan amendment is not required as the application includes a transfer of development rights to allow for the increase of the development limits for the subject site. Summary The proposed project implements the City's goal of redeveloping underperforming properties, and will redevelop and improve the property with a mixture of food uses and general commercial uses. The subject property would be limited to a total of 13,525 square feet of development, under a new zoning designation of General Commercial Site 8. The project complies with the development standards prescribed for General Commercial developments, with the exceptions of parking and landscaping requirements. The proposed transfer of development rights is in accordance to the Municipal Code. The parking strategy for the project which requires an adjustment to the parking standards based on a shared parking arrangement with the adjacent properties and off - site parking arrangement to function is less than ideal, but within a reasonable solution. The traffic study prepared in compliance with the Traffic Phasing Ordinance concluded that the implementation of the proposed project will not require any improvements or mitigation as it will neither cause nor make worse an unsatisfactory level of traffic service at any impacted primary intersection within the City. Staff believes the modification permit request can be supported due to the existing lot configuration and lay out of the proposed buildings and findings for approval can be made. Alternatives Staff believes the findings for approval can be made and the facts in support of the required findings are presented in the draft resolution (Attachment No. PC1). The following 129 MacArthur at Dolphin- Striker September 22, 2011 Page 20 alternatives are available to the Planning Commission should they feel the facts are not in evidence of support for the project application: 1. The Planning Commission may suggest specific operational changes and /or reduction of square footage of the proposed development that are necessary to alleviate any concerns. If any additional requested changes are substantial, the item could be continued to a future meeting. Should the Planning Commission choose to do so, staff will return with a revised resolution incorporating new findings and /or conditions. 2. If the Planning Commission believes that there are insufficient facts to support the findings for approval, the Planning Commission should deny the application and provide facts in support of denial to be included in the attached draft resolution for denial (Attachment No. PC 2). Public Notice Notice of this hearing was published in the Daily Pilot, mailed to property owners within 300 feet of the property (excluding roads and waterways) and posted at the site a minimum of 10 days in advance of this hearing consistent with the Municipal Code. The environmental assessment process has also been noticed consistent with the California Environmental Quality Act. The Notice of Intent (NOI) to adopt the MND was mailed to property owners within 300 feet of the property (excluding roads and waterways), and posted at the site and at City Hall. Finally, the item appeared upon the agenda for this meeting, which was posted at City Hall and on the city website. Prepared by: Submitted by: bA alinh Ung, Associa a fanner Gregg Rami ez, Acting Planner I Planner anager ATTACHMENTS �� PC 4 Letters of Transfer of Development Rights PC 5 Traffic Impact Analysis (& Shared Parking Analysis) by Kunzman Associates, Inc.' 1-1 1 g 11-49mageR48M Pie by e., PC 7 Reciprocal Parking and Maintenance Agreement for Existing Off -Site Parking PC 9 Waiver of Development Agreement P65 414 GOM11448PA ISO MacArthur at Dolphin- Striker September 22, 2011 Page 21 PG 42 EFF@19 to the Wil; PC 13 Project plans Note: 'These attachments are not included in the staff report package due to their size and bulk. They are available at the City Hall in the offices of the Planning Division and online at: http:// www .newportbeachea.gov /index.aspx ?pane =1325. Tmpll: 11/23109 F: \USERS \PLN \Shared \PA's \PAs - 2010 \PA2010 - 135 \PC \Staff_Report.docx 131 1S2 Attachment No. PC 13 Project Plans 571- 572 View Along MacArthur Boulevard Key Plan AM 7;m Location Map r msok MacArthur at Dolphin Striker 4221 Dolphin Striker Way Newport Beach, CA RIDGEWAY DEVELOPMENT 5 T 0 U T E _4._OWi 7'1RRQl I I III ► I 3 x PARKING STRUCTURE $ 116 Cars I for e- —J E ISTINGButmiNG rulonaeock9w. \ 30'YC - ro15508 8-06 § 7 s 171°508 T$ j tl 131DMR § ww 360 '0 9E °EMO�ED 1965508 �$ 605. -- -- - - - - -- B.a, 1160508 `�1 ~50'e&Aer lminl New lCPiur \V'IJ.,vIJ Ground Level on Site sqn ftrrzlolt T I 0' ]0' AO' SC' W 106 IIN faewg 0e�be�g:o ee rtme.ee 6Dlp tl Farsurq BU�H�ng PrPOerlt•Lrb 'rg ,e 31.36.SO� 5 Ir10fOp01I �ra� I I I I I10F�3s1��91r Fa." B.'" <,INN 1are- - v Pro?crt/ ' x u.e PbIPI W) 1515 ly Cm: ^� Fem UUI 6gPP L21 I.°t!fr110Q o� Topl MCa l]RS p Sitb g WCrW°YZ iAY- 1965508 �$ 605. -- -- - - - - -- B.a, 1160508 `�1 ~50'e&Aer lminl New lCPiur \V'IJ.,vIJ Ground Level on Site sqn ftrrzlolt T I 0' ]0' AO' SC' W 106 IIN PARCH 7 I is �6$ IT�I ' J�13 I ft .�M T §� �. .__ lila�lllj TA&1LATgN SUh1AARY Pskip vrM vre 9Jbq ARe PryNe.6 ml tv.f faewg 0e�be�g:o ee rtme.ee 6Dlp tl Farsurq BU�H�ng PrPOerlt•Lrb 'rg ,e 31.36.SO� Faaluig P+ry^910rvS1e1 Ir10fOp01I �ra� I I I I I10F�3s1��91r Fa." B.'" <,INN PARCH 7 I is �6$ IT�I ' J�13 I ft .�M T §� �. .__ lila�lllj TA&1LATgN SUh1AARY Pskip vrM vre 9Jbq ARe PryNe.6 ml tv.f Jill I III PIOPe.N ur — 9�l to I PARCELS a 10550 R Irora PPr11 10__ I a 3j1J I E%17TING BUILDING Ir Ir eooawR I„ f I SI V nNnaegon urea sn.MlcarvM..nvslmeFo-110a_ _ _ _ _ _ _ _ _ 8a PwlC31P.MpIPI'e.AYd MPKt/'�6w II .. - PPIAMGPwIbn s1PPeorta sloaasaa Pne smmsaa P 2(bi�3t.16.1 faewg 0e�be�g:o ee rtme.ee 6Dlp tl Farsurq BU�H�ng 1P16 Pmo ePm.y. Faaluig P+ry^910rvS1e1 M .vz PW Pm A mo Fa." B.'" <,INN L � pw" IOi+Ste) PmB 9527 MSIe .l3[S.e el PbIPI W) 1515 ly Cm: .M Ong a0n.:bP agca P✓.Nt Fem UUI 6gPP 1N ra.I Topl MCa l]RS p WCrW°YZ iAY- _ i 1' I I I I I _ I fiNYg P.M1agbYmglf4U � Il� aWor r.mor.0 ]! cr IPA M rk Faalmg ONSge Perkog U* Mg 16 He�OrtSUe 16 TO y" (Nk, g Oe3ke1 91 cvc Jill I III PIOPe.N ur — 9�l to I PARCELS a 10550 R Irora PPr11 10__ I a 3j1J I E%17TING BUILDING Ir Ir eooawR I„ f I SI V nNnaegon urea sn.MlcarvM..nvslmeFo-110a_ _ _ _ _ _ _ _ _ 8a PwlC31P.MpIPI'e.AYd MPKt/'�6w II .. - PPIAMGPwIbn s1PPeorta sloaasaa Pne smmsaa P 2(bi�3t.16.1 Farsurq BU�H�ng 1P16 Faaluig P+ry^910rvS1e1 M .vz PA fwP 47.205 c� Fa." B.'" 60P0 a L � pw" IOi+Ste) 7..m TetalTetL eu�M. MSIe .l3[S.e el leulprvSUO PVYng ly Cm: .M Ong a0n.:bP agca P✓.Nt 1N ra.I Location Map NutzosOle MacArthur at Dolphin Striker 4221 Dolphin Sinker way Newport Sear11. CA RIDGEWAY DEVELOPMENT " �:;, =. . r... 1.a 1. ..c II.... r. I 5 "'ng Plan �Ia' Im iw iml SeaaMer ;301t i MRCH3 minn o�a een t.+r.d..rwvur.w S MacArthur at Dolphin Striker 4221 Dolphin Striker Way Newport Beach, CA RIDGEWAY DEVELOPMENT I 3 Y K \ r ,z O DUSTING RURDING O MacARTXUR RIVD. (�S �` �^ abm^vY OlwW aurgMM. CwmpSMmrom ••_._-•_•`• —• WaM'QWnYBeN WNM�mP9Ga�(B.M,P) � OAOO- WWl 5We. m�ar...ra..+. ti_.aYG RdpaMaY Ids. ►r LCONCE➢ UNlDSCAPE PIhN LS 1 -4 — Q m�oQ N Q ry' O 36'-0' 673' 4 i9 Puogcr 4 -- Root FL •51'-0- Pad A - North Elevation 1T4- TO iP-U* (—! symm P _i --- . Pam ng Ell 11, � I Sun Sorcnn W4r 61-V 1 6 Clear Goss SPOn Glass '- Dmr ,Rh Side L'gM Chwebss - Spandrel GUIs - Sun Scam Pad A& B - West Elevation if11Y Pad A September2.2011 vf'It 0 tc' 20 ' I30' c0' 50' Id a MacArthur at Dolphin Striker 4221 Dolphin Striker Way Nevpon Beach, CA RIDGEWAY DEVELOPMENT 673' w4- PeAag D Erterior n a - P14star - WaII SY'�am PiasWr Qi'4• I 11 Root —_ i q! Suns mn l - CbrGlass I- Spats [Glm Iyi Pad A - South Elevation 3'3 ' 65' A• 4w 1T4' r _ _ _ - - . — PatAYg -� � I 1 -4 — Q m�oQ N Q ry' O 36'-0' 673' 4 i9 Puogcr 4 -- Root FL •51'-0- Pad A - North Elevation 1T4- TO iP-U* (—! symm P _i --- . Pam ng Ell 11, � I Sun Sorcnn W4r 61-V 1 6 Clear Goss SPOn Glass '- Dmr ,Rh Side L'gM Chwebss - Spandrel GUIs - Sun Scam Pad A& B - West Elevation if11Y Pad A September2.2011 vf'It 0 tc' 20 ' I30' c0' 50' Id a MacArthur at Dolphin Striker 4221 Dolphin Striker Way Nevpon Beach, CA RIDGEWAY DEVELOPMENT 30'-0' tub' T-67, 2S-0' tr-0- 11-0' W-6* eP$ 27-V 20'-0' 2W4r 20 -0' ��h+ Y PaM1ing a Sign l nim - - W San ystom Plasty -, Sign lnmtion , W System I r Pinter - Wan System I I c Pad B- North Elevation _ Rog S-0- s Location liS$ r4'$ 65d' Pakeg um'e.®v 1 Pmeep EtRartor I Plasw - Pamir 4 —Eet O ti � 4 - - -` 4 — b 4. P r Pads A & B - East Elevation N PadsA &B of ,a 129 as septemEerzmlt 4V Isw r Key Plan -- -T ' 4 Roofoee, Roof � N 4 H ,J,$ '. MacArthur at Dolphin Striker 4221 Dolphin Striker Way Newport Beach. CA RIDGEWAY DEVELOPMENT 4 pia Pon o m FL 1' -0' 1T -01 26-01 3'$ W4r l — 1 30%0' 30 -0' Pad B - South Elevation in� i�'I l!I!Illlllil ^� �� B =.L Pad A & B - Roof Plan Pad B Secle be 2.2011 D 10 2D' I:D <o Sc MacArthur at Dolphin Striker r r— ,rrmr.-.i 4221 Dolphin Striker Way Newport Beath. CA RIDGEWAY DEVELOPMENT U G H- Key Plan c¢rmu� nom DOLPMN SnOMP. WAY vV I --------- - - - - -- ------------------- ---------- - ----- ----- FARCft 7- .. ..... .... -------- - --- - ------ MAL D.ON p AR C EL :2 ------------- 7 IT c¢rmu� nom DOLPMN SnOMP. WAY vV I --------- - - - - -- ------------------- ---------- - ----- ----- FARCft 7- .. ..... .... -------- - --- - ------ MAL D.ON p AR C EL :2 ------------- , F.r - --- - ------- ------- Attachment No. PC 4 Letters of Transfer Development Rights 13.3 i34 September 6, 2011 Rosalinh Ung, Associate Planner City of Newport Beach 3300 Newport Blvd, Newport Beach, CA 92663 Re: General Commercial Site 7 3901 MacArthur Blvd Newport Place Planned Community Dear Ms. Ung DECEIVED &I, COMMUNITY SEP 0 8 2011 O DEVELOPMENT Z' G P OP NEWPORT As owner of the above referenced site that is entitled for 141,120 square feet of general commercial usage and the site is currently built out to 117,736 square feet, I hereby consent to transfer 1,620 square feet of commercial development rights to property located at 4221 Dolphin Striker Way, Block C of the Newport Place Planned Community. This transfer is contingent upon approval of the Specialty Retail project proposed by Tod W. Ridgeway. If you should have any questions regarding this consent, please do not hesitate to call. 3901 MacArthur LLC Dave Wilson, Managing Member 135 October 29, 2010 Rosalinh Unp, Associate Planner City'of Newport Beach 3300 Newport Blvd, Newport Beach, CA 92663 Re: Hotel Site 2 -B 1301 Quail Newport Place Planned Community .Dear Ms. Ung: Csp IV 0.1 00 0 As owner of the above referenced site that is entitled for 304 un -built hotel rooms,l hereby consent to transfer the Development Rights of 48 rooms to property located at 4221 Dolphin Striker Way, Block C of the Newport Place Planned Community, This transfer is contingent upon approval of the Specialty Retail project proposed by Tod W. Ridgeway. If you should have any questions regarding this consent, please do not hesitate to call at the address shown on the letterhead, 777 West 190th Sheet LLC, ISO Attachment No. PC 5 Traffic Impact Analysis (& Shared Parking Analysis) by Kunzman Associates, Inc. I-S7 ISO CITY OF NEWPORT BEACH 4221 DOLPHIN STRIKER PROJECT TRAFFIC IMPACT ANALYSIS (REVISED) Prepared by: Giarcarlo Ganddini, EIT, Carl Ballard, and William Kunzman, P.E. QPpF ESS /o& A K(�ti �FZ No. TF0056 Z o d * * ?, AFF CFCAI May 31, 2011 KUNZMAN ASSOCIATES, INC. 1111 Tovv-N 9- Cou\Tw ROAD. SUITE 34 ORANGE, CA 928(58 -4667 PHONE: (714) 973 -8383 FAx: (714) 973 -8821 EmAIL: \1A[L@FRAFF10-ENG1NEER.CO.vI \,�IEB: AA'VA'VA.TP,AFFIC-ENOINEER.CO�I 4839c 139 Table of Contents 1. Findings ................................................................................................... ..............................3 Existing Traffic Conditions ..................................................................... ..............................3 TrafficSummary ................................................................................... ............................... 4 Recommended Improvements ............................................................. ..............................5 Required Improvements ....................................................................... ..............................6 2. Project Description .................................................................................. ..............................7 Location................................................................................................ ............................... 7 Proposed Development ........................................................................ ..............................7 Parking................................................................................................. ............................... 7 3. Existing Traffic Conditions .................................................................... ............................... 10 Study Area Intersections ...................................................................... .............................10 Existing Travel Lanes and Intersection Controls .................................. .............................10 Existing Master Plan of Arterial Highways ........................................... .............................10 ExistingTraffic Volumes ....................................................................... .............................11 Existing Intersection Capacity Utilization ............................................ .............................11 4. Project Traffic ......................................................................................... .............................19 TrafficGeneration ................................................................................ .............................19 Traffic Distribution and Assignment .................................................... .............................20 Project - Related Traffic ......................................................................... .............................20 5. Existing (Year 2011) + Project Analysis .................................................... .............................29 Intersection Capacity Utilization .......................................................... .............................29 SignificanceCriteria ............................................................................. .............................29 6. TPO Analysis ......................................................................................... ............................... 33 ApprovedProjects .............................................................................. ............................... 33 RegionalGrowth ................................................................................ ............................... 34 One - Percent Methodology .................................................................. .............................34 Intersection Capacity Utilization .......................................................... .............................34 SignificanceCriteria ............................................................................. .............................35 240 7. CEQA Analysis ...................................................................................... ............................... 45 CumulativeProjects ............................................................................. .............................45 Intersection Capacity Utilization .......................................................... .............................45 SignificanceCriteria ............................................................................. .............................46 8. Orange County Congestion Management Program ............................... ............................... 55 County Congestion Management Program (CMP) .............................. .............................55 SignificanceCriteria ........................................................................... ............................... 55 9. Other Traffic Considerations ................................................................. ............................... 57 Parking............................................................................................... ............................... 57 Access................................................................................................. ............................... 59 SightDistance .................................................................................... ............................... 59 Appendices Appendix A Glossary of Transportation Terms Appendix B Year 2008 /2009 Worksheets Appendix C Regional Traffic Annual Growth Rate Appendix D Explanation and Calculation of Intersection Capacity Utilization Appendix E Approved Project Data Appendix F TPO One - Percent Analysis Calculation Worksheets Appendix G Cumulative Project Data Appendix H City of Newport Beach Parking Code Requirements Appendix I Parking Covenant and Agreement 2'4 1- List of Tables Table 1. Existing (Year 2011) Intersection Capacity Utilization and Levels of Service ..................12 Table 2. Traffic Generation Rates .................................................................... .............................21 Table 3. Project Traffic Generation .................................................................. .............................22 Table 4. Existing (Year 2011) + Project Analysis Intersection Capacity Utilization and Levels of Service............................................................................................. ............................... 30 Table 5. Approved Project List ......................................................................... .............................36 Table 6. TPO Analysis One - Percent Threshold ................................................. .............................37 Table 7. TPO Analysis Intersection Capacity Utilization and Levels of Service .............................38 Table 8. Cumulative Project List ....................................................................... .............................47 Table 9. CECA Analysis Intersection Capacity Utilization and Levels of Service ...........................48 Table 10. Existing Project Land Uses ................................................................. .............................60 Table 11. Friday (February 11, 2011) Parking Count ......................................... .............................61 Table 12. Saturday (February 12, 2011) Parking Count ..................................... .............................62 Table 13. Parking Spaces Required by City of Newport Beach Parking Code .... .............................63 Table 14. Parking Code Requirements ............................................................... .............................64 Table 15. Parking Code Requirements for a Friday With Time -of -Day (TOD) Factors ....................65 Table 16. Projected Peak Day (Friday) Number of Parked Vehicles .................. .............................66 Table 17. Parking Demand Summary ................................................................. .............................67 142 List of Figures Figure 1. Project Location Map ........................................................................... ..............................8 Figure2. Site Plan ............................................................................................... ..............................9 Figure 3. Existing Intersection Controls ............................................................. .............................13 Figure 4. Existing Through Travel Lanes ............................................................. .............................14 Figure 5. City of Newport Beach General Plan Circulation Element .................. .............................15 Figure 6. City of Newport Beach General Plan Roadway Cross - Sections .......... .............................16 Figure 7. Existing (Year 2011) Morning Peak Hour Intersection Turning Movement Volumes...... 17 Figure 8. Existing (Year 2011) Evening Peak Hour Intersection Turning Movement Volumes....... 18 Figure 9. Project Outbound Traffic Distribution ................................................ .............................23 Figure 10. Project Inbound Traffic Distribution ................................................... .............................24 Figure 11. Project Morning Peak Hour Intersection Turning Movement Volumes ..........................25 Figure 12. Project Evening Peak Hour Intersection Turning Movement Volumes ...........................26 Figure 13. Project (Net Increase) Morning Peak Hour Intersection Turning Movement Volumes..27 Figure 14. Project (Net Increase) Morning Peak Hour Intersection Turning Movement Volumes..28 Figure 15. Existing (Year 2011) + Project Morning Peak Hour Intersection Turning Movement Volumes.............................................................................................. .............................31 Figure 16. Existing (Year 2011) + Project Evening Peak Hour Intersection Turning Movement Volumes............................................................................................ ............................... 32 Figure 17. Approved Projects Morning Peak Hour Intersection Turning Movement Volumes .......39 Figure 18. Approved Projects Evening Peak Hour Intersection Turning Movement Volumes ......... 40 Figure 19. Existing+ Growth (Year 2013) +Approved Projects Morning Peak Hour Intersection Turning Movement Volumes .............................................................. .............................41 Figure 20. Existing+ Growth (Year 2013) + Approved Projects Evening Peak Hour Intersection TurningMovement Volumes .............................................................. .............................42 Figure 21. Existing+ Growth (Year 2013) + Approved Projects + Project Morning Peak Hour Intersection Turning Movement Volumes ......................................... .............................43 Figure 22. Existing+ Growth (Year 2013) +Approved Projects + Project Evening Peak Hour Intersection Turning Movement Volumes ......................................... .............................44 Figure 23. Cumulative Projects Morning Peak Hour Intersection Turning Movement Volumes ..... 49 Figure 24. Cumulative Projects Evening Peak Hour Intersection Turning Movement Volumes...... 50 Figure 25. Existing + Growth (Year 2013) + Approved Projects+ Cumulative Projects Morning Peak Hour Intersection Turning Movement Volumes ........................ .............................51 Figure 26. Existing + Growth (Year 2013) + Approved Projects+ Cumulative Projects Evening Peak Hour Intersection Turning Movement Volumes ........................ .............................52 Figure 27. Existing + Growth (Year 2013) + Approved Projects+ Cumulative Projects + Project Morning Peak Hour Intersection Turning Movement Volumes ......... .............................53 Figure 28. Existing + Growth (Year 2013) + Approved Projects+ Cumulative Projects + Project Evening Peak Hour Intersection Turning Movement Volumes .......... .............................54 Figure 29. Circulation Recommendations ........................................................... .............................68 Figure 30. Parking Zone Boundary Map .............................................................. .............................69 Figure 31. Parking Survey Summary Graph (Existing Conditions) ....................... .............................70 143 City of Newport Beach 4221 Dolphin Striker Project Traffic Impact Analysis (Revised) This report contains the traffic impact analysis for the 4221 Dolphin Striker project in the City of Newport Beach. The traffic report contains documentation of existing traffic conditions, traffic generated by the project, distribution of the project generated traffic to the surrounding roadway network, and an analysis of future traffic conditions. Each of these topics are contained in separate sections of the report. The first section is "Findings ", and subsequent sections expand upon the findings. In this way, information on any particular aspect of the study can be easily located by the reader. The project site is designed as specialty retail in the heart of the professional office environment of the John Wayne Airport area. The design includes a new driveway that will allow ingress and egress from MacArthur Boulevard thereby eliminating the confusion of access to Restaurant Site 1 as provided in the Newport Place Community Text. The proposed project is a redevelopment of an approximately 48,221 square -foot (1.11 acres) site. Approximately 13,525 gross square feet of new commercial retail and food uses are proposed to replace the existing single -story 7,996 square -foot vacant quality restaurant. The new development will consist of two, free - standing, single -story buildings. Each has a maximum building height of 29 feet. 19=1 Approximately 5,000 gross square feet of the proposed new development will be allocated for food service use. Of that, 4,000 square feet will be allocated for high turn -over dining establishments (i.e. small sit -down boutique restaurants). Anticipated hours of operation will be daily from 11:00 AM to 10:00 PM for the high turn -over dining establishments. The remaining 1,000 square feet will be allocated for a fast food use (sandwich shop) with the hours of operation from 7:00 AM until 11:00 PM. The remaining 8,525 gross square feet of new development will be allocated for general commercial uses (i.e. financial institutions of 4,000 square feet, computer electronic service, and cellular service /retail stores). It is anticipated the retail commercial uses would have hours of operation from 9:00 AM to 7:00 PM, daily. Although this is a technical report, every effort has been made to write the report clearly and concisely. To assist the reader with those terms unique to transportation engineering, a glossary of terms is provided in Appendix A. r] -1 4'J5 1. Findings This section summarizes the existing traffic conditions, project traffic impacts, and the proposed mitigation measures. Existing Traffic Conditions The existing site is currently vacant, but was a quality restaurant. The existing building is approximately 7,996 square feet. b. The project site currently has access to Dolphin Striker Way and Martingale Way. C. The study area includes the following study area intersections: MacArthur Boulevard (NS) at: Campus Drive (EW) Birch Street (EW) Von Karman Avenue (EW) Jamboree Road (EW) Campus Drive /Irvine Avenue (NS) at: Bristol Street North (EW) Bristol Street South (EW) Birch Street (NS) at: Bristol Street North (EW) Bristol Street South (EW) Von Karman Avenue (NS) at: Campus Drive (EW) Birch Street (EW) Bayview Place (NS) at: Bristol Street South (EW) Jamboree Road (NS) at: Campus Drive (EW) Birch Street (EW) Bristol Street North (EW) Bristol Street South (EW) d. For existing (Year 2011) traffic conditions, the study area intersections currently operate at Level of Service C or better during the morning /evening peak hours. //10 Traffic Summary a. Approximately 5,000 gross square feet of the proposed new development will be allocated for food service use. Of that, 4,000 square feet will be allocated for high turn- over dining establishments (i.e. small sit -down boutique restaurants). Anticipated hours of operation will be daily from 11:00 AM to 10:00 PM for the high turn -over dining establishments. The remaining 1,000 square feet will be allocated for a fast food use (sandwich shop) with the hours of operation from 7:00 AM until 11:00 PM. The remaining 8,525 gross square feet of new development will be allocated for general commercial uses (i.e. financial institutions of 4,000 square feet, computer electronic service, and cellular service /retail stores). It is anticipated the retail commercial uses would have hours of operation from 9:00 AM to 7:00 PM, daily. b. The existing site development generated a total of approximately 719 daily vehicle trips, 6 of which occur during the morning peak hour and 60 of which occur during the evening peak hour. The proposed project is projected to generate a total of approximately 2,017 daily vehicle trips, 114 of which would occur during the morning peak hour and 130 of which would occur during the evening peak hour. It should be noted that for fast - food /high turn -over sit down restaurants and bank land uses, a portion of the traffic would come from pass -by trips. Pass -by trips are trips that are currently on the roadway system. The traffic volumes from the fast -food and high turn -over sit down restaurants have been reduced by 43% as a result of pass -by trips obtained from the Institute of Transportation Engineers and the bank has been reduced by 23% as a result of pass -by trips obtained from the San Diego Association of Governments. Based upon the difference in trips generated (less pass -by trips) between the current approval and proposed project, the proposed project is projected to generate a total of approximately 942 more daily vehicle trips, 67 more of which would occur during the morning peak hour and 55 more of which would occur during the evening peak hour. C. For existing (Year 2011) + project traffic conditions, the study area intersections are projected to operate at Level of Service C or better during the morning /evening peak hours. d. As shown in Table 4 for the existing (Year 2011) + project analysis, the project - generated traffic did not result in a significant impact at the study area intersections (increase of one - percent or more at a study area intersection operating at worse than Level of Service D during the morning /evening peak hours); therefore, no improvements are recommended at the study area intersections. e. The City of Newport Beach staff provided the approved and cumulative projects in the study area. The approved projects consist of development that has been approved but are not fully completed. Cumulative projects are known, but not approved project developments that are reasonably expected to be completed or nearly completed at the same time as the proposed project. 4 :L47 f. The Traffic Phasing Ordinance (TPO) analysis resulted in the following study area intersections exceeding the one - percent threshold and requiring additional analysis: MacArthur Boulevard (NS) at: Campus Drive (EW) — Morning Peak Hour Von Karman Avenue (EW) — Morning Peak Hour & Evening Peak Hour Jamboree Road (EW) — Morning Peak Hour & Evening Peak Hour Jamboree Road (NS) at: Campus Drive (EW) — Morning Peak Hour g. For existing + growth (Year 2013) + approved projects traffic conditions, the study area intersections are projected to operate at Level of Service C or better during the morning /evening peak hours. h. For existing + growth (Year 2013) + approved projects + project traffic conditions, the study area intersections are projected to operate at Level of Service C or better during the morning /evening peak hours. i. As shown in Table 7 for the TPO analysis, the project - generated traffic did not result in a significant impact at the study area intersections (increase of one - percent or more at a study area intersection operating at worse than Level of Service D during the morning /evening peak hours); therefore, no improvements are recommended at the study area intersections. j. For existing + growth (Year 2013) + approved projects + cumulative projects traffic conditions, the study area intersections are projected to operate at Level of Service C or better during the morning /evening peak hours. k. For existing + growth (Year 2013) + approved projects + cumulative projects + project traffic conditions, the study area intersections are projected to operate at Level of Service C or better during the morning /evening peak hours. I. As shown in Table 9 for the CECA analysis, the project - generated traffic did not result in a significant impact at the study area intersections (increase of one - percent or more at a study area intersection operating at worse than Level of Service D during the morning /evening peak hours); therefore, no improvements are recommended at the study area intersections. Recommended Improvements a. Site - specific circulation and access recommendations are depicted on Figure 29. b. The proposed project site plan will reconfigure the surface parking lot layout on Parcel 1 and provide a total of 222 parking spaces for the entire site, including the 32 off -site parking spaces located in the nearby parking structure. The total maximum parking demand for the entire site is 225 parking spaces. The site does not provide sufficient 5 142 parking spaces to meet the City of Newport Beach Parking Code requirements and is deficient by three (3) parking spaces. It is recommended that the project obtain a waiver to allow for the reduction of the parking spaces required by three (3) parking spaces pursuant to the supplemental parking management plan prepared by Kunzman Associates, Inc. C. To assure smooth traffic operations for vehicles entering and exiting the site, a northbound left turn pocket on MacArthur Boulevard is recommended to accommodate a minimum pocket length of 120 feet. d. Sight distance at the project accesses shall be reviewed with respect to City of Newport Beach standards in conjunction with the preparation of final grading, landscaping, and street improvement plans. e. On -site traffic signing and striping shall be implemented in conjunction with detailed construction plans for the project and as approved by the City of Newport Beach. Required Improvements a. As shown in Table 4 for the existing (Year 2011) + project analysis, the project - generated traffic did not result in a significant impact at the study area intersections (increase of one - percent or more at a study area intersection operating at worse than Level of Service D during the morning /evening peak hours); therefore, no improvements are recommended at the study area intersections. b. As shown in Table 7 for the TPO analysis, the project - generated traffic did not result in a significant impact at the study area intersections (increase of one - percent or more at a study area intersection operating at worse than Level of Service D during the morning /evening peak hours); therefore, no improvements are recommended at the study area intersections. C. As shown in Table 9 for the CEQA analysis, the project - generated traffic did not result in a significant impact at the study area intersections (increase of one - percent or more at a study area intersection operating at worse than Level of Service D during the morning /evening peak hours); therefore, no improvements are recommended at the study area intersections. 6 Z'4'9 2. Project Description This section discusses the project's location, proposed development, and traffic characteristics of such a development. Figure 1 shows the project location map. Figure 2 illustrates the site plan. Location The project site is located at 4221 Dolphin Striker project in the City of Newport Beach. The project site currently has access to Dolphin Striker Way and Martingale Way. Proposed Development Approximately 5,000 gross square feet of the proposed new development will be allocated for food service use. Of that, 4,000 square feet will be allocated for high turn -over dining establishments (i.e. small sit -down boutique restaurants). Anticipated hours of operation will be daily from 11:00 AM to 10:00 PM for the high turn -over dining establishments. The remaining 1,000 square feet will be allocated for a fast food use (sandwich shop) with the hours of operation from 7:00 AM until 11:00 PM. The remaining 8,525 gross square feet of new development will be allocated for general commercial uses (i.e. financial institutions of 4,000 square feet, computer electronic service, and cellular service /retail stores). It is anticipated the retail commercial uses would have hours of operation from 9:00 AM to 7:00 PM, daily. Parking The proposed project is Parcel 1 of three parcels in Resubdivision 347. The three parcels share a common surface parking lot. The two other parcels are currently operating as Classic Q Billiards & Sports Club and Saagar Fine Cuisine of India. In addition, the proposed project has exclusive use to 32 parking spaces at a nearby parking structure through a Parking Agreement. 7 1150 Figure 1 Project Location Map rmia mP �m 0 a� J °c sec P °aa ea Je Dolphin. ,aF QC` Striker Way 5 Y r Site ° 0 ,�cJe 9��sro �S Irvine �rs°jSrP 0 PS 04 th �a m a 3 v m � Legend ® = Study Area Intersection NTS 4839c/1 KuNZnnnN AssounTes, Inc. OVER 30 YEARS or Gxca i ENT SERVICE, 1151- tl W 52 8i 9� sm" rlltRr I s ESTING K1GSTRU N S \ PAR(16 Cos RE y q wy Uro wue«ar t °-emom - EEISIING BLAWING § aau )otss9n is PARCEL�2 § F Pmeenyum T nxm so (t o Irole P"e1 � c I rum -poum ' m lu § Iv I B-05 It Iv6sort " °° 's I PARCEL PARCELS m " �_ §R 47MiMff MTNG eundvc i talasa�*___ I §e616sso �r - - 9'a, sa: •_•yp b° Iwtewn 10 I sa' __ - ___ IXISn s B�NIDING f i R -01 $$$ mzsort - rt -sro §" el y a to l 9 rrooatn 4 alr - Sx10�If hqh IeaQ �„r' _.:_` 4so t'A'tl Rayne Nrot 6ee"R 34e . __� nHVat�{Yip •_� 1 —m4 eeawcnon ue asrxlol cmprwnmmesm =wa _ _ _ _ — �r6uaieoa eotnare>meovuve>m talY ' sOBM4t+N , New laN Mnlare N 1�J � — e�VPWINnem, 3. Existing Traffic Conditions The traffic conditions as they exist today are discussed below and illustrated on Figures 3 to 8. Study Area Intersections The study area includes the following study area intersections: MacArthur Boulevard (NS) at: Campus Drive (EW) Birch Street (EW) Von Karman Avenue (EW) Jamboree Road (EW) Campus Drive /Irvine Avenue (NS) at: Bristol Street North (EW) Bristol Street South (EW) Birch Street (NS) at: Bristol Street North (EW) Bristol Street South (EW) Von Karman Avenue (NS) at: Campus Drive (EW) Birch Street (EW) Bayview Place (NS) at: Bristol Street South (EW) Jamboree Road (NS) at: Campus Drive (EW) Birch Street (EW) Bristol Street North (EW) Bristol Street South (EW) Existing Travel Lanes and Intersection Controls Figure 3 identifies the existing intersection controls and Figure 4 illustrates the existing number of through lanes for the study area intersections. Existing Master Plan of Arterial Highways Figure 5 exhibits the current City of Newport Beach General Plan Circulation Element. Both existing and future roadways are included in the Circulation Element of the General Plan and are 10 1153 graphically depicted on Figure 5. This figure shows the nature and extent of arterial highways that are needed to serve adequately the ultimate development depicted by the Land Use Element of the General Plan. Figure 6 shows the City of Newport Beach General Plan roadway cross - sections. Existing Traffic Volumes The City of Newport Beach provided the Year 2008/2009 morning and evening peak hour approach volumes at each study area intersection (see Appendix B). To account for regional growth on roadways, existing (Year 2011) traffic volumes have been calculated based on a 1 percent annual growth rate (see Appendix Q. The 1 percent growth rate factor is for designated roadways within the City of Newport Beach. Existing (Year 2011) morning and evening peak hour intersection turning movement volumes are shown on Figures 7 and 8, respectively. Existing Intersection Capacity Utilization The City of Newport Beach methodology used to assess the operation of a signalized intersection is known as Intersection Capacity Utilization. To calculate an Intersection Capacity Utilization value, the volume of traffic using the intersection is compared with the capacity of the intersection. An Intersection Capacity Utilization value is usually expressed as a decimal. The decimal represents that portion of the hour required to provide sufficient capacity to accommodate all intersection traffic if all approaches operate at capacity. The Levels of Service for existing (Year 2011) traffic conditions have been calculated and are shown in Table 1. Existing (Year 2011) Intersection Capacity Utilization worksheets and the Level of Service description are provided in Appendix D. For existing (Year 2011) traffic conditions, the study area intersections currently operate at Level of Service C or better during the morning /evening peak hours. 11 -154 Table 1 Existing (Year 2011) Intersection Capacity Utilization and Levels of Service ICU -LOS= Intersection Capacity Utilization -Level of Service Isee Appendix O). L =Left; T= Through; R = Right;» =Tree Right Turn;>= Right Turn Overlap ITS = Traffic Signal 12 155 Intersection Approach Lanes' Peak Hour Northbound Southbound Eastbound Westbound Traffic ICU -LOS' Intersection Contr013 L T R L T R L T R L T R Morning Evening MacArthur Boulevard (NS) at: Campus Drive (EW) TS 1 4 1 1 4 1 2 2.5 0.5 2 3 1>> 0.44 -A 0.64 -B Birch Street (EW) TS 1 3 1 1 3.5 0.5 1.5 1 0.5 1 2 1>> 0.38 -A 0.46 -A Von Karman Avenue (EW) TS 1 3 1 1 3 1 1 2 1 2 1 1 0.55 -A 0.56 -A Jamboree Road (EW) TS 1 2 3 1> 2 3 1>> 2 3 1 1 2 3 1 0.60 -13 0.68 -B Campus Drive /Irvine Avenue (NS) at: Bristol Street North (EW) TS 2 3 0 0 4 2 0 0 0 1 3.5 0.5 0.49 -A 0.74 -C Bristol Street South (EW) TS 0 4.5 0.5 1 3 0 1.5 2.5 2 0 0 0 0.63 -13 0.47 -A Birch Street (NS) at: Bristol Street North (EW) TS 2 2 0 0 1.5 2.5 0 0 0 1.5 3 0.5 0.53 -A 0.53 -A Bristol Street South (EW) TS 0 2.5 1.5 2 2 0 1.5 3 0.5 0 0 0 0.39 -A 0.44 -A Von Karman Avenue INS) at: Campus Drive (EW) TS 1 2 1>> 1 1.5 0.5 1 2 1 1 1.5 0.5 0.46 -A 0.56 -A Birch Street (EW) TS 1 2 1 1 2 1 1 2 1 1 2 1 0.29 -A 0.3S -A Bayview Place (NS) at: Bristol Street South (EW) TS 0 0 2 0 0 0 0 4 1 0 0 0 0.42 -A 0.54 -A Jamboree Road (NS) at: Campus Drive (EW) TS 2 3.5 0.5 2 2.5 0.5 2 2 1>> 2 2 1 0.62 -B 0.58 -A Birch Street (EW) TS 1 2.5 0.5 1 3 1>> 1.5 0.5 1>> 0 1 0 0.51 -A 0.42 -A Bristol Street North (EW) TS 2 1.5 1.5> 0 2.5 1.5 0 0 0 0 0 0 0.43 -A 0.49 -A Bristol Street South (EW) I TS 1 0 4.5 0.5 0 3 0 1 1.5 1.5 2 1 0 0 0 0.61 -B 0.66 -13 ICU -LOS= Intersection Capacity Utilization -Level of Service Isee Appendix O). L =Left; T= Through; R = Right;» =Tree Right Turn;>= Right Turn Overlap ITS = Traffic Signal 12 155 OVER 30 YEARS Or Gxca i ENT SERVICE 13 150 Figure 3 Existing Through Travel Lanes and Intersection Controls c a�a 8D Q0 a° 6D 8D 4D Jo�P�a4D 6D a O as 0 4D 4D 4D Q ' 4D ��o° 70 JQ' 2D Dolphin la J5 Striker Way 6D 4D I] ti accQ 6D i¢a �0�� \ 4D 4U a 6D 4D v 4D n Site 4 5 7D 4D� Ja 4 B s P�ac rO Sh4 6D Irvine 6D B��s PP1 l.0/ 'VO ?h 4D 4 Po�S 6D o4t� 3 0 6D Qaa 4 6D v 4D m `rP Legend 7D M = Traffic Signal OS = AIIWay Stop 5* °1 = Stop Sign 4 = Through Travel Lanes D = Divided U = Undivided NTS KUNZMAN ASSOUATES, INC. 4839c/3 OVER 30 YEARS Or Gxca i ENT SERVICE 13 150 Figure 4 Existing Through Travel Lanes MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch street/ Campus Drive Birch street Von Kaman Avenue Jamboree Road Brirtol street North Brirtol street south Bristol street North B ^gyp 9 ^�] 1p ^r-1 11 ^gyp ]t 4—Z 13 2p 14 2p �bb.0.�coA .dr lc �bb.�ocsN .dr1 �bb0.�a3A .drat dbb.0.�aoA .�a2 �bb.�lA sl �bbasao,p �a0 �bb0sco,p �c1,5 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch street/ Campus Drive Birch street Von Kaman Avenue Jamboree Road Brirtol street North Brirtol street south Bristol street North Birch street/ Von Karman Avenue/ Von Karman Avenue/ Bayview place/ Jamboree Road/ Bristol street south Campus Drive Birch street Bristol street south Campus Drive 15 �p lamboree Road/ B istol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner d turn Overlap ight Turn 4839c/4 movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 14 157 B ^gyp 9 ^�] 1p ^r-1 11 ^gyp ]t 4—Z 13 2p 14 2p �bb.0.�coA �bb.�ocsN �bb0.�a3A dbb.0.�aoA �bb.�lA �bbasao,p �bb0sco,p Birch street/ Von Karman Avenue/ Von Karman Avenue/ Bayview place/ Jamboree Road/ Bristol street south Campus Drive Birch street Bristol street south Campus Drive 15 �p lamboree Road/ B istol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner d turn Overlap ight Turn 4839c/4 movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 14 157 ADOPTED INTERCHANGE PRIMARY ROAD •• •••• (NOT BUILT) PROPOSED INTERCHANGE 3.05Mi1e8 ROUT ESREQUIRING MAJORROAD = = == FURTHER COORDINATION (SIX LANE DIVIDED) O.T5 Miles 30.64 Miles COMMUTER ROADWAY EIGHT LANE ROAD (TWO LANE UNDIVIDED) (DIVIDED) 324 Miles 7.91 Miles SECONDARY ROAD SAN JOAQUIN HILLS (FOUR LANE UNDIVIDED) TRANSPORTATION CORRIDOR 16.10 Miles 5.32 Miles SECONDARY (NOT BUILT) 029 Miles PRIMARY ROAD (FOUR LANE DIVIDED) 79.62 Miles ADOPTED FREEWAY ROUTES 4A9 Miles FUTURE FREEWAY EXTENSION 0.75 Miles 152 PRINCIPAL - 144' (8 LANES DIVIDED) ti i MAJOR • 128' (8 LANES DIVIDED) -'r � 1 PRIMARY - 104' (4 LANES DIVIDED) hJ WEI SECONDARY -W (4 LANES UNDIVIDED) N tea' L COMMUTER - SG (2 LANES UNDIVIDED) _i �`' Figure 7 Existing (Year 2011) Morning Peak Hour Intersection Turning Movement Volumes 1295 918 669 0 489 432 385 v 255 0 1 >. dbiS�c90A4 260 0 2° �ig �bb.�c31 253 4-154 29 `V a 3 `°° ° °' abbs78 X12 4 -136 a 4 ` °' r �bb.a371 `z185 X687 4 5 m �bbsa120A ` 138 X902 4 6 abbs0 �0 d- 0 4 7 �bbs403 2237 09 4 D 316 I I D 158 [b D 19 �" dl q D 4183' I T r D Os' `h D 11863' d p D 0� d p ,^., 572 —D ,m„ -. 310 ,^�„ 96 —D Mo m 868-0 w,°�' Sg dl `t ID 0� -v o 0 1623 —D o D 0—D o 49 � °' 73 � '� — — 28, 194 —D 48� = 180 � 0 0 01 "' =' _ 8 —D 42� 299 — 0 —D 0� 01 562 m 603 1780 547 0 101 1073 0 1477 1060 836 2005 1920 994 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch street/ Campus Drive Birch street Von Kaman Avenue Jamboree Road Brirtol street North Brirtol street south Bristol street North 577 0 445 0 459 0 0 0 2256 0 2083 0 1001 0 B 20 0 9 -' 2112 W 10 222 H 11 20 0 12 2157 e IS m 26 xv 14 ° 20 ° °�' o-bb�0 C-0 4 abb�7s 4_293 4 �1b 4 -159 43 4 �bb�0 4-0 a °�' abbs267 4 -436 m 4 �bb�3 4-6 4 ` o-bb'0 �0 4 > 6763' p D 2333' al p D 793' q D 03 dl `t ID D 783 d `� ID D 1233' a Y D 03' alp .°.� 867 —D 291 o ""' 309 —D 43� e "' 194 —D 48� o $ 2464 -0 420 0 0 115 —D 10� g _ 8 —D 42� o_ _ `V 0 —D 0� m 562 m 603 547 0 101 0 1257 0 1477 3078 Birch street/ Von Karman Avenue/ Von Karman Avenue/ Ba,lew place/ Jamboree Road/ Bristol street south Campus Drive Birch street Brirtol street south Campus Drive FV-� lamboree Road/ B .are Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North 4839c/7 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 17 100 Figure 8 Existing (Year 2011) Evening Peak Hour Intersection Turning Movement Volumes 1350 1077 1070 0 1462 1784 1081 v 1227 1 ° X201 4 2 X170 4 3 ' X38 `° 4 `z 158 ° 4 5 X74 r 4 6 I ° �0 4-1 4 7 X124 D 1883' 4-689 D 1483' 4-433 "' ° 4 -127 D 03 °' X939 2263 X1867 a Y D 03 1p ° °° 4-1187 N . o, 4 b b su4 a � b It 6665 4 a b b x623 4 a b b x200 4 a b x392 4 334 p D 274 p D 1383' q (° D 218 �' % Y (° D Os' ry Y D 417 J�o- D 0- 282 —D 0 182 m " 195 —D a e 986 -0,°„ ° 0� ,° 1004 099��^ 53� ° 783 �, °� 38�"'"'� 0�"eo 429 01333 814 772 1227 1061 0 542 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch street/ Campus Drive Birch street Von Kaman Avenue Jamboree Road Brirtol street North Brirtol street south Bristol street North 919 0 932 0 716 0 0 0 1560 0 1528 0 1725 0 e o-bb° �p C-0 �0 4 9 a abb�52 X65 4-511 4 10 X41 4-235 `V 4 11 S—p 4-0 '0 ° 4 12 _ "' ab�157 v-341 4-233 r 4 IS ° ° b�o �0 4-1 4 14 a b'0 �0 4-0 ° 4 D 1883' p D 1483' al p D 03 `t ID D 2263 d `� D 2973 a Y D 03 1p zS 999 —D 2 174 o " 12 N 454 —D 50� H ' M26 2591-0 142 o e 271 —D 164 e 4 —D 0 100 e 0 0�'�672 552 � 533 � 433 � 1522 � 1269 � 2829 Birch street/ Von Karman Avenue/ Von Karman Avenue/ Ba,lew place/ Jamboree Road/ Bristol street south Campus Drive Birch street Brirtol street south Campus Drive F937�p 4-0 0 1945 lamboree Road/ B .are Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North 4839c/8 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 18 101 4. Project Traffic The proposed project is a redevelopment of an approximately 48,221 square -foot (1.11 acres) site. Approximately 13,525 gross square feet of new commercial retail and food uses are proposed to replace the existing single -story 7,996 square -foot vacant quality restaurant. The new development will consist of two, free - standing, single -story buildings. Each has a maximum building height of 29 feet. Approximately 5,000 gross square feet of the proposed new development will be allocated for food service use. Of that, 4,000 square feet will be allocated for high turn -over dining establishments (i.e. small sit -down boutique restaurants). Anticipated hours of operation will be daily from 11:00 AM to 10:00 PM for the high turn -over dining establishments. The remaining 1,000 square feet will be allocated for a fast food use (sandwich shop) with the hours of operation from 7:00 AM until 11:00 PM. The remaining 8,525 gross square feet of new development will be allocated for general commercial uses (i.e. financial institutions of 4,000 square feet, computer electronic service, and cellular service /retail stores). It is anticipated the retail commercial uses would have hours of operation from 9:00 AM to 7:00 PM, daily. Traffic Generation The traffic generated by the project is determined by multiplying an appropriate trip generation rate by the quantity of land use. Trip generation rates were determined for daily traffic, morning peak hour inbound and outbound traffic, and evening peak hour inbound and outbound traffic for the proposed land uses. By multiplying the traffic generation rates by the land use quantities, the project - generated traffic volumes are determined. Table 2 exhibits the traffic generation rates. The trip generation rates are derived from the Institute of Transportation Engineers, Trip Generation, 8th Edition, 2008. Table 3 shows the project peak hour volumes and project daily traffic volumes. The existing site development generated a total of approximately 719 daily vehicle trips, 6 of which occur during the morning peak hour and 60 of which occur during the evening peak hour. The proposed project is projected to generate a total of approximately 2,017 daily vehicle trips, 114 of which would occur during the morning peak hour and 130 of which would occur during the evening peak hour. It should be noted that for fast - food /high turn -over sit down restaurants and bank land uses, a portion of the traffic would come from pass -by trips. Pass -by trips are trips that are currently on the roadway system. The traffic volumes from the fast -food and high turn -over sit down restaurants have been reduced by 43% as a result of pass -by trips obtained from the Institute of Transportation Engineers and the bank has been reduced by 23% as a result of pass -by trips obtained from the San Diego Association of Governments. Based upon the difference in trips generated (less pass -by trips) between the current approval and proposed project, the proposed 19 102 project is projected to generate a total of approximately 942 more daily vehicle trips, 67 more of which would occur during the morning peak hour and 55 more of which would occur during the evening peak hour. Traffic Distribution and Assignment Traffic distribution is the determination of the directional orientation of traffic. It is based on the geographical location of employment centers, commercial centers, recreational areas, or residential area concentrations. The TPO requires the trip distribution percentages to be in increments of 5 %. Traffic assignment is the determination of which specific route development traffic will use, once the generalized traffic distribution is determined. The basic factors affecting route selection are minimum time path and minimum distance path. Figures 9 and 10 contain the directional distribution and assignment of the project traffic for the proposed land uses. Project- Related Traffic Based on the identified traffic generation and distributions, project morning and evening peak hour intersection turning movement volumes are shown on Figures 11 and 12, respectively. Project (net increase) morning and evening peak hour intersection turning movement volumes are shown on Figures 13 and 14, respectively 20 1('03 Table 2 Traffic Generation Rates' Land Use Units Peak Hour Daily Morning Evening Inbound Outbound I Total Inbound I Outbound Total Retail TSF NOM NOM NOM 1.19 1.52 2.71 44.32 Quality Restaurant TSF 0.66 0.15 0.81 5.02 2.47 7.49 89.95 High Turnover (Sit -Down) Restaurant TSF 5.99 5.53 11.52 6.58 4.57 11.15 127.15 Fast -Food Restaurant TSF 26.32 17.55 43.87 13.34 12.81 26.15 716.00 Bank TSF 1 4.20 1.80 6.001 4.80 7.20 12.00 150.00 i Source: Institute of Transportation Engineers,Trip Generation, 8th Edition, 2008, Land Use Categories 814, 931, 932, and 933. San Diego Association of Governments, (Not So) Brief Guide of Vehicular Traffic Generation Rates April, 2002. TSF= Thousand Square Feet 3 NOM =No mina I. It is anticipated the retail commercial uses would have hours of operations from 9:00 AM to 7:00 PM, daily. 21 104 Table 3 Project Traffic Generation Traffic Phasing Ordinance (TPO) Peak Hour Morning E Evening Land Use Q Quantity U Units I Inbound O Outbound T Total I Inbound O Outbound T Total D Daily Existing Use Quality Restaurant 7 7.996 T TSF 5 5 1 1 6 6 4 40 2 20 6 60 7 719 Pass -By (43 %) - -2 - -1 - -3 - -17 - -9 - -26 - -309 Total 3 3 0 0 3 3 2 23 1 11 3 34 4 410 Proposed Uses Retail 4 4.325 T TSF N NOM NOM N NOM 5 5 7 7 1 12 1 192 Fast Food Restaurant 1 1.000 T TSF 2 26 1 18 4 44 1 13 1 13 2 26 7 716 High Turnover (Sit -Down) Restaurant 4 4.000 T TSF 2 24 2 22 4 46 2 26 1 18 4 44 5 509 Bank 4 4.000 T TSF 1 17 7 7 2 24 1 19 2 29 4 48 6 600 Subtotal 1 13.325 T TSF 6 67 4 47 1 114 6 63 6 67 1 130 2 2,017 Pass -Bya - -25 - -19 - -44 - -21 - -20 - -41 - -665 Total 4 42 2 28 7 70 4 421 4 471 8 89 1 1,352 Difference 3 39 2 28 6 67 1 191 3 361 5 55 9 942 California Environmental Quality Act (CEQA) Peak Hour Morning E Evening Land Use Q Quantity U Units Inbound O Outbound T Total I Inbound I I Outbound I I Total D Daily Proposed Uses Retail 4 4.325 T TSF N NOW N NOM N NOM 5 5 7 7 1 12 1 192 Fast Food Restaurant 1 1.000 T TSF 2 26 1 18 4 44 1 13 1 13 2 26 7 716 High Turnover (Sit -Down) Restaurant 4 4.000 T TSF 2 24 2 22 4 46 2 26 1 18 4 44 5 509 Bank 4 4.000 T TSF 1 17 7 7 2 24 1 19 2 29 4 48 6 600 Subtotal 1 13.325 T TSF 6 67 4 47 1 114 6 63 6 67 1 130 2 2,017 Pass -By a - -25 - -19 - -44 - -21 - -20 - -41 - -665 Total 1 1 421 2 281 7 701 4 421 4 47 8 89 1 1,352 TSF =Thousand Square Feet t NOM = Nominal. It is anticipated the retail commercial uses would have hours of operations from 9:00 AM to 7:00 PM, daily. The traffic volumes from the fast -food and high turn -over sit down restaurants have been reduced by 43% as a result of pass -by trips obtained from the Institute of Transportation Engineers and the bank has been reduced by 23S as a result of pass -by trips obtained from the San Diego Association of Governments. 22 105 Figure 9 Project Outbound Traffic Distribution 10%° r �P �m 5% ao �F �a o� J as 15% �o em o� F� Dolphin. la 10% ��o triker Way 1 20% 15% Y v Sit 6;; 80% 10% i 0 0 5% e., 0j P2ti0 $$% stP nth PtS 0 5% 4th �a a 3 v m � m NP \ 25% (10% To SR -73) 15% Legend 25 %= Percent From Project NTS 4839c/9 KuNZnnnN AssounTes, Inc. OVER 30 YEARS Or GxcEt i ENT SERVICE 23 100 Figure 10 Project Inbound Traffic Distribution 10 °% m�a p 5% J� e� P� 15% 20% Je Dolphin. QL� Striker Wa J5 I ti 10% FQ iee v e 20% 6;; 10% v ° 55% 0 ro �S Irvine $% P Bjl2 2~PN PS 04 th 5% a 3 v 25% (10% From SR -73) 15% Legend 2$ %= Percent To Project NTS 4839c/10 KuNZnnnN AssounTes, Inc. OVER 30 YEARS or Gxca i ENT SERVICE 24 107 Figure 11 Project Morning Peak Hour Intersection Turning Movement Volumes 4 0 8 2 �p 22 0 1 10 2 12 �T15 b 0 13 �0 �0 14 o-�Tb 4 o a D 0 a O a 6 ' a F-000 �o D 4 o o a D 0 F-U24 03 0 O0� . D 0 D 0 -0 D 0 0— 0 0 0—D 0 0—D- 0 o�`�? n o 0 0� 0 0 0 4 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North I o 0 2 0 0 4 0 B 9 10 II 12 �0 13 �0 0 14 p 0 o-�Tb �2 aTb 4 o a �bb4--0 � o a �Tb ' o a l ab bo ' a T �o a J] b o o a D 0 03 0 03 D 0 D 0 D 0 0— 10 0 0—D 0 0 0—D- 0 —� 0 D o�`�? n o 0 0 0� 0 0 0 0 4 0 4 0 0 0 4 0 4 0 6 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive 4 0 15 �p 4-0 a�bb.�o a > 0 D��= 0� 6 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/11 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 25 102 Figure 12 Project Evening Peak Hour Intersection Turning Movement Volumes MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North 0 8 2 �p 38 26 6 0 6 0 p o p 10 II 12 b4 13 �p a p o fl-�000 abb4--0 0 a O ' o a 6� ' a F-000 �o D 4 4--0 o �o a E2�- F-U24 0s O � D 0 D 0 -0 D 0 0� 0 os2� 0—Do 0 0 23 0 0 7 I MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive 70 15 �p 4-0 albb.�o a > 0 D��= 0� 6 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/12 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 26 ��n 2 0 0 6 0 6 0 7 p 10 II 12 �0 13 �p 0 14 abb4--0 o a abb ' o a l ab bo ' a b �o a J] 4--0 o �o a E2�- 0s D 0 D 0 D 0 0� 0 0—Do 0 02 0 0 0 0 0 7 7 0 7 7 0 6 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive 70 15 �p 4-0 albb.�o a > 0 D��= 0� 6 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/12 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 26 ��n Figure 13 Project (Net Increase) Morning Peak Hour Intersection Turning Movement Volumes 4� 8� 220 15 4� iv 4 0 I �0 > 2 �p o 3 2p o 4 26 `° 12 2p o 6 ap o 14 2p 0 �bb.�4 �0 a a�bb.�o d-0 a "' a�bb 2 a �bb.�o �0 a al b b �0 so a a�bbso 4-0 a ql b b �0 so D 0� p D 0� p D Os 0s D 6�' % Y (° D 0 Y D 4� p 0� F-U24 0-D o�-,o 0— 0�0. -,0 0-p oho 0 p—D� 0 -000o ., 3—D O�o�o 0 0—D ono 0-D ono ono 0� o0� 0� 0� 0� 0�, 0� 0� 0� 0� 0� 0 4 21 o 0 o q 2 3 0 3 70 6 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North I o 2 0 2 0 0 0 6 0 6 0 4 0 B 10 2p o II 2p o 12 �0 a 13 �0 0 14 `? p abbo 4 4 a �bbo �0 a ebb 'o a al b b ,o a al b b �o a ql b b �o a 03' I D 0s 10 D 0s 01 T 10 D 0� 11T ID D 0� I D 0� D 0� 0—D 0 0— �, 0 0—D ono 0 p—D� ., 3—D ono 0 0—D ono 0 0—D ono 0� 0� 0� 0� 0� 0� 0� 0 4 o q o 0 o q o q o 6 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive ¢ o 15 �p 4-0 ab b�0 Ua D Os YI° 6 0� lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/13 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 27 170 Figure 14 Project (Net Increase) Evening Peak Hour Intersection Turning Movement Volumes 2� ^�0 .� 4� 2 �p o 290 ap - 19 23 �+ 6� 5 2p o 2v ap o 5 0 I 3 4 6 ebb - 10 abb o II abbso 4-1 a �bb�o �0 a �bbso �0 a abbso 4-0 a D 0� a D 0� a D Os q (° D 3s' % Y (° D Os' Y D 2� p E2�- T-1 0-D o >o D 0�0 >0 0-p 000 D 0 -0o.r,o � ID 0� 0�0. -,0 N O-D o -o o 0 ° 0—D 0� ° 0—D 0� ° 0—D 0�, a 4—D 0� ° 0 0� p—D 0� 0� 4 0� 0 4 0 10 0� 5 0� 3 1 1 6 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch street/ Campus Drive Birch street Von Kaman Avenue Jamboree Road Brirtol street North Brirtol street south Bristol street North Birch street/ Von Karman Avenue/ Von Karman Avenue/ Ba,lew place/ Jamboree Road/ Brirtol street south Campus Drive Birch street Brirtol street south Campus Drive 5- 15 �p 4-0 a�bb.�o a Os Y I° ° 0� 3 l ddb ,e Road/ B .are Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North 4839c/14 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 28 2�� 1 0 1 0 0 0 3 0 3 0 5 0 p o �0 - 10 2p o II 2p o 12 �p 13 �0 0 14 �0 a—z 0 a �bb�0 �0 a e �o a a a a �o a o- �0 '0 a E2�- 03 p D 03 1 q[B D 0� 11 `t P D 0 � ID 0� I T r D 0- 1 p o 0 ° 0—D ova ° 0—D o..ro ° 0—D 000 a 4—D o.r,o ° 0 ° p—D 0� 0� 0� 0� 0� 0� 1 6 5 0 5 5 0 3 Birch street/ Von Karman Avenue/ Von Karman Avenue/ Ba,lew place/ Jamboree Road/ Brirtol street south Campus Drive Birch street Brirtol street south Campus Drive 5- 15 �p 4-0 a�bb.�o a Os Y I° ° 0� 3 l ddb ,e Road/ B .are Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North 4839c/14 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 28 2�� 5. Existing (Year 2011) + Project Analysis The existing (Year 2011) + project analysis has been completed for the study area intersections based upon California Environmental Quality Act (CEQA) requirements (this part of the analysis is consistent with CEQA). In order to analyze a "conservative' scenario in terms of the assignment of traffic, the Existing (Year 2011) + project analysis does not credit the existing site development. Intersection Capacity Utilization The City of Newport Beach methodology used to assess the operation of a signalized intersection is known as Intersection Capacity Utilization. To calculate an Intersection Capacity Utilization value the volume of traffic using the intersection is compared with the capacity of the intersection. An Intersection Capacity Utilization value is usually expressed as a decimal. The decimal represents that portion of the hour required to provide sufficient capacity to accommodate all intersection traffic if all approaches operate at capacity. The Levels of Service for existing (Year 2011) + project traffic conditions have been calculated and are shown in Table 4. Existing (Year 2011) + project morning and evening peak hour intersection turning movement volumes have been calculated and are shown on Figures 15 and 16, respectively. Existing (Year 2011) + project Intersection Capacity Utilization worksheets and the Level of Service description are provided in Appendix D. For existing (Year 2011) + project traffic conditions, the study area intersections are projected to operate at Level of Service C or better during the morning /evening peak hours. Significance Criteria The City of Newport Beach intersection significance criteria requires an increase of one - percent or more at a study area intersection operating at worse than Level of Service D during the morning /evening peak hours. As shown in Table 4 for the existing (Year 2011) + project analysis, the project - generated traffic did not result in a significant impact at the study area intersections; therefore, no improvements are recommended at the study area intersections. 29 z72 Table 4 Existing (Year 2011) + Project Intersection Capacity Utilization and Levels of Service 'ICU I.Cri= ntervester Capacity Ublivation - Level of Service (see Appendix Di. ' L= Lek; T = Through; R = RigM;»= Free Right Tum;> = Right Turn Overlap TS =Traffic Signal 30 1-43 Peak Hour ICU -LOS' Existing (Year 2011 Intersection Approach Lanes' Northbound Southbound Eastbound Westbound Traffic Existing (Year 2011 + Project ICU Increase L T R L T R L T R L T R Morning Evening Morning Evening Morning Evening Intersection Control' MacArthur Boulevard (NS) at: Campus Driive(EW) TS 1 4 1 1 4 1 2 2.5 0.5 2 3 1» 0.435 -A 0.635 -B 0.437 -A 0.635 -B +0002 +0.000 Birch Street(EW) TS 1 3 1 1 3.5 0.5 1.5 1 0.5 1 2 1» 0.380 -A 0.457 -A 0380 -A 0.458 -A +0000 +0.001 Von Karman Avenue(EW) TS 1 3 1 1 3 1 1 2 1 2 1 1 0.552 -A 0.558 -A 0558 -A 0.564 -A +0006 +0.006 Jamboree Road(EW) TS 2 3 1> 2 3 1>> 2 3 1 2 3 1 0.601 -B 0.678 -3 0.604 -B 0.680 -B +0003 +0.002 Campus Drive /Irvine Avenue INS) at: Bristol Street North (EW) TS 2 3 0 0 4 2 0 0 0 1 3 5 0 5 0.488 -A 0.742 -C 0.490 -A 0.744 -C +0002 +0.002 Bristol Street South(EW) TS 0 4.5 05 1 3 0 1.5 2.5 2 0 0 0 0.634 -B 0.465 -A 0.635 -B 0.466 -A +0001 +0.001 Birch Street INS) at: Bristol Street North JEW) TS 2 2 0 0 1.5 2.5 0 0 0 1.5 3 05 0.532 -A 0.527 -A 0533 -A 0.527 -A +0001 +0.000 Bristol Street South(EW) TS 0 2.5 15 2 2 0 1.5 3 0.5 0 0 0 0.391 -A 0.436 -A 0391 -A 0.437 -A +0000 +0.001 Von Karman Avenue INS) at: Campus Drive(EW) TS 1 2 1» 1 1.5 0.5 1 2 1 1 15 05 0.462 -A 0.563 -A 0.463 -A 0.564 -A +0001 +0.001 Birch Street (EW) TS 1 2 1 1 2 1 1 2 1 1 2 1 0.285 -A 0.351 -A 0287 -A 0.352 -A +0002 +0.001 BaYview Place INS) at: Bristol Street South(EW) TS 0 0 2 0 0 0 0 4 1 0 0 0 0.417 -A 0.540 -A 0.417 -A 0.540 -A +0000 +0.000 Jamboree Road INS) at: Campus Drive(EW) TS 2 3.5 05 2 2.5 0.5 2 2 1>> 2 2 1 0.615 -B 0.583 -A 0.618 -B 0.584 -A +0003 +0.001 Birch Street(EW) TS 1 2.5 05 1 3 1>> 1.5 0.5 1» 0 1 0 0.514 -A 0.421 -A 0516 -A 0.423 -A +0002 +0.002 Bristol Street North(EW) TS 2 1.51.5> 0 2.5 1.5 0 0 0 0 0 0 0.426 -A 0.489 -A 0.427 -A 0.490 -A +0001 +0.001 Bristol Street South(EW) TS 0 4.5 05 0 3 0 1.5 1.5 2 0 0 0 1 0.611 -B I 0.661 -B 0.612 -B 0.662 -B +0001 +0.001 'ICU I.Cri= ntervester Capacity Ublivation - Level of Service (see Appendix Di. ' L= Lek; T = Through; R = RigM;»= Free Right Tum;> = Right Turn Overlap TS =Traffic Signal 30 1-43 Figure 15 Existing (Year 2011) + Project Morning Peak Hour Intersection Turning Movement Volumes 1299 926 461 0 504 436 386 v 256 1 >. X60 0 2 ° N X53 m 10 X12 H 4 `z 191 5 `138 .°0 6 �0 0 7 X237 ° 4-191 ° 4-154 `V `° 4 -138 ` ° - X687 = '� °' X902 `° `° 4-0 _ X988 a b b. 94 4 a b b. 31 4 s78 4 a b b x371 4 a b b .x120 4 a b b s0 4 a b b x403 4 D 316 p D 158 p F228 dl q (° D 424 �' % Y (° D Os' `h Y D 11903' p D 0� p 572 -D ,m„ -. 310 „�, 194 —D o $ 24fi4-0 868-0 w 118 —D 0� 8—D o 1623 -D o 0-D o m 49� °' "' 73� - -� `- 780� 10 � 01•,00 `V 299 °'- 0�1063 607 � 1803 0 1261 z, 1075 3084 839 - 2016 1926 996 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive 5 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/15 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 31 1-74 447 0 461 0 0 0 2262 0 2089 0 1005 0 20 0 9 "� �1I2 10 X22 H 11 12 m `? 157 .°0 13 m �6 n 14 0 �0 ° 4-0 " 4 -297 `° 4 -159 '� °' 4 -440 `° `p°° 4-6 `� �0 �0 4 �79 4 �43 4 abb dbb 267 4 bb 3 4 o-'o 4 E291 p D 2333' al p D 79D 03 ]�:O D 783 d `� lD D 1233' a Y D 0 o 309 —D �,�„ 194 —D o $ 24fi4-0 0 118 —D e 8—D o 0 564 43 � "' 48 � 420 10 � _ 482 `V 0 � m 564 607 551 0 1261 1481 3084 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive 5 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/15 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 31 1-74 Figure 16 Existing (Year 2011) + Project Evening Peak Hour Intersection Turning Movement Volumes 1354 1085 1108 0 1488 1791 1534 0 1229 0 1 ° X201 2 X170 3 2 X38 m 4 ,,, ^ `z164 ° 5 — M `�74 M IS ° �o 0 7 ., X124 b�ms 0-689 °' 4 "' �b bsu4 4-433 ^ 4 - `� �b b6665 4-129 4 `� °' ab bx623 0-939 � 4 "' ab bx200 0-1867 `" 4 b�0 4-0 '0 4 ab6x392 1187 4 D 334s�p� p D 274s�p� p D 1383'( 993' D 224s %Y(° D 0s"ryY� � T lD D 2973 F42 �p� D 0s182 zS o N 454 —D S0� ^ m '° " 195 —D 783 �, a °� e 986 -0,°„ 38�""°° o" 276 —D 164 0� 0�"`°0 4 —D 0 100 e — o '�� 053� 0 614 559 837 540 0 433 0 1529 920 1276 777 1238 1067 544 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Kaman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North 9 934 0 718 0 0 0 1566 0 1534 0 1733 0 20 X65 10 X41 m 11 20 ° 12 v-341 M IS ° �0 — 14 a �0 ° 0 �0 4 0 -515 52 4 4-235 �,9 4 0-0 �0 4 - "' ab�157 0 -237 4 b�0 4-1 4 b'0 0-0 4 p D 1483' p D 993' D 03 01 `t ID D 226 � T lD D 2973 Y D 03 1 p zS o N 454 —D S0� ^ 166 26� .^., 2591-0 142 o e '° 276 —D 164 e 4 —D 0 100 e — 0 0�'�'— 614 559 540 0 433 0 1529 1276 0 2835 Birch Street/ Von Karman Avenue/ Von Karman Avenue/ Ba,lew place/ Jamboree Road/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive �p ° p 4-0 0 1951 lamboree Road/ B .are Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/16 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 32 1715 6. TPO Analysis The Traffic Phasing Ordinance (TPO) analysis has been performed for the study area intersections. The existing site development was still occupied at the time the existing intersection turning movement volumes were obtained. Therefore, the TPO analysis has credited the existing site development and analyzes the net increase of project traffic generation. Approved Projects The City of Newport Beach staff provided the approved projects in the study area for the TPO analysis. The approved projects consist of development that has been approved but are not fully completed (see Table 5 and Appendix E). The approved project morning and evening peak hour intersection turning movement volumes have been calculated and are shown on Figures 17 and 18, respectively. An approved project is one that has been approved pursuant to the TPO, requires no further discretionary approval by the City of Newport Beach, and has received, or is entitled to receive, a building or grading permit for construction of the project or one or more phases of the project. Trips generated by approved projects shall be included subject to the following: ■ All trips generated by each approved project or that portion or phase of the approved project for which no certificate of occupancy has been issued shall be included in any traffic study conducted prior to the expiration date of that approved project. ■ In the event a final certificate of occupancy has been issued for one or more phases of a approved project, all trips shall be included in subsequent traffic studies until completion of the first field counts required by Subsection 3(d)(i) subsequent to the date on which the final certificate of occupancy was issued. Subsequent to completion of the field counts, those trips generated by phases of the approved project that have received a final certificate of occupancy shall no longer be included in subsequent traffic studies. ■ The Traffic Manager and Planning Director shall maintain a list of approved projects and, at least annually, update the list to reflect new approvals pursuant to the TPO as well as completion of all or a portion of each approved project. An approved project shall not be removed from the approved project list until a final certificate of occupancy has been issued for all phases and the field counts required by Subsection 3(d)(i) have been taken subsequent to issuance of the certificate of occupancy. ■ The total trips generated by approved projects shall be reduced by twenty (20 %) to account for the interaction of approved project trips. 33 170 Regional Growth To account for regional growth on roadways, Year 2013 traffic volumes have been calculated based on a 1 percent annual growth rate over a two -year period (see Appendix C). The regional growth rate has been obtained from the City of Newport Beach. The project is expected to open in Year 2012; therefore the traffic analysis is one year after opening year. One - Percent Methodology One - percent of the projected peak hour volumes of each approach of each study area intersection were compared with the peak hour distributed volumes from the proposed project. A summary of this TPO comparison is shown within Appendix F. If one - percent of the existing + growth (Year 2013) + approved projects traffic peak hour volumes of each approach is greater than the peak hour project generated approach volumes, no further analysis is required. Existing + growth (Year 2013) + approved projects morning and evening peak hour intersection turning movement volumes have been calculated and are shown on Figures 19 and 20, respectively. Existing + growth (Year 2013) + approved projects + project morning and evening peak hour intersection turning movement volumes have been calculated and are shown on Figures 21 and 22, respectively. If project generated peak hour approach volumes are higher than one - percent of the projected peak hour volumes on any approach of an intersection, the intersection would require analysis utilizing the Intersection Capacity Utilization methodology. Comparison of the one - percent of the existing + growth (Year 2013) + approved projects traffic peak hour approach volumes with the project generated peak hour approach volumes resulted in the following study area intersections exceeding the one - percent threshold and requiring additional analysis (see Table 6 and Appendix F): MacArthur Boulevard (NS) at: Campus Drive (EW) — Morning Peak Hour Von Karman Avenue (EW) — Morning Peak Hour & Evening Peak Hour Jamboree Road (EW) — Morning Peak Hour & Evening Peak Hour Jamboree Road (NS) at: Campus Drive (EW) — Morning Peak Hour Intersection Capacity Utilization The City of Newport Beach methodology used to assess the operation of a signalized intersection is known as Intersection Capacity Utilization. The Intersection Capacity Utilization methodology (see Appendix D) is not the only method to analyze a signalized intersection, but the preferred method per the City of Newport Beach TPO. To calculate an Intersection Capacity Utilization value the volume of traffic using the intersection is compared with the capacity of the intersection. An Intersection Capacity Utilization value is usually expressed as a decimal. The decimal represents that portion of the hour required to provide sufficient capacity to accommodate all intersection traffic if all approaches operate at capacity. 34 2�� The Levels of Service for existing + growth (Year 2013) + approved projects traffic conditions have been calculated and are shown in Table 7. Existing + growth (Year 2013) + approved projects Intersection Capacity Utilization worksheets and the Level of Service description are provided in Appendix D. For existing + growth (Year 2013) + approved projects traffic conditions, the study area intersections are projected to operate at Level of Service C or better during the morning /evening peak hours. The Levels of Service for existing + growth (Year 2013) + approved projects + project traffic conditions have been calculated and are shown in Table 7. Existing + growth (Year 2013) + approved projects + project Intersection Capacity Utilization worksheets and the Level of Service description are provided in Appendix D. For existing + growth (Year 2013) + approved projects + project traffic conditions, the study area intersections are projected to operate at Level of Service C or better during the morning /evening peak hours. Significance Criteria The City of Newport Beach intersection significance criteria requires an increase of one - percent or more at a study area intersection operating at worse than Level of Service D during the morning /evening peak hours. As shown in Table 7 for the TPO analysis, the project - generated traffic did not result in a significant impact at the study area intersections; therefore, no improvements are recommended at the study area intersections. 35 172 Table S Approved Project List Project Name Fashion Island Expansion Temple Bat Yahm Expansion Ciosa - Irvine Project Newport Dunes Hoag Hospital Phase III St. Mark Presbyterian Church OLQA Church Expansion 2300 Newport Boulevard Newport Executive Court Hoag Health Center North Newport Center Santa Barbara Condo (Marriott) Newport Beach City Hall 328 Old Newport Medical Office Coastline Community College Bayview Medical Office 36 179 Table 6 TPO Analysis One - Percent Threshold 1 Project traffic is estimated to be equal to or greater than 1% of projected peak hour traffic. Intersection Capacity Utilization analysis is required. 37 120 Peak Approach Direction' Northbound Southbound Eastbound Westbound Intersection Hour MacArthur Boulevard (NS) at: Campus Drive (EW) AM No No No Yes PM No No No No Birch Street (EW) AM No No No No PM No No No No Von Karman Avenue (EW) AM Yes Yes No Yes PM Yes Yes No No Jamboree Road (EW) AM No Yes No No PM No Yes No No Campus Drive /Irvine Avenue (NS) at: Bristol Street North (EW) AM No No No No PM No No No No Bristol Street South (EW) AM No No No No PM No No No No Birch Street (NS) at: Bristol Street North (EW) AM No No No No PM No No No No Bristol Street South (EW) AM No No No No PM No No No No Von Karman Avenue (NS) at: Campus Drive (EW) AM No No No No PM No No No No Birch Street (EW) AM No No No No PM No No No No Bayview Place (NS) at: Bristol Street South (EW) AM No No No No PM No No No No Jamboree Road INS) at: Campus Drive (EW) AM No No Yes No PM No No No No Birch Street (EW) AM No No No No PM No No No No Bristol Street South (EW) AM No No No No PM No No No No Bristol Street South (EW) AM No No No No PM No No No No 1 Project traffic is estimated to be equal to or greater than 1% of projected peak hour traffic. Intersection Capacity Utilization analysis is required. 37 120 Table 7 TPO Analysis Intersection Capacity Utilization and Levels of Service r ICU -LOS = Intersection Capanty Utillaatlan Level of service (see Appendix on. L= Leh; T= Through; R= Righp»= Free Rlght Turn; o= Right TOm Overlap 'TS = Treffc5lgnal 38 121 Peak Hour ICU -LOS' Existing +Growth Existing +Growth (Year 2013) + Intersection Approach Latest (Year 2013) + Approved Projects Northbound Southbound Eastbound Westbound Traffic Approved Projects +Project ICU Increase L T R L T R L T R L T R Morning Evening Morning Evening Morning Evening Intersection Control' MacArthur Boulevard (NS) at: Campus Drive JEW) TS 1 4 1 1 4 1 2 2.5 0.5 2 3 1» 0.45 -A 0.65 -B 0.45 -A 0.65 -8 +000 +0.00 Birch Street(EW) TS 1 3 1 1 3.5 0.5 15 1 0.5 1 2 1» 0.39 -A 0.48 -A 0.39 -A 0.48 -A +000 +0.00 Von Kerman Avenue(EW) TS 1 3 1 1 3 1 1 2 1 2 1 1 0.56 -A 057 -A 0.57 -A 057 -A +001 +0.00 Jamboree Road (EW) TS 2 3 1> 2 3 1» 2 3 1 2 3 1 0.62 -9 0.71 -C 0.63 -13 0]1 -C +001 +0.00 Campus Drive /Irvine Avenue (NS) at: Bristol Street North(EW) TS 2 3 0 0 4 2 0 0 0 1 3.5 05 0.50 -A 0.76 -C 0.50 -A 0.76 -C +000 +0.00 Bristol Street South (EW) TS 0 4.5 0.5 1 3 0 15 2.5 2 0 0 0 0.64 -B 0.47 -A 0.64 -B 0.47 -A 1 +000 +0.00 Birch Street (NS) at: Bristol Street North(EW) TS 2 2 0 0 1.5 2.5 0 0 0 1.5 3 05 0.53 -A 054 -A 0.54 -A 054 -A +001 +0.00 Bristol Street South(EW) TS 0 2.5 1.5 2 2 0 15 3 0.5 0 0 0 0.40 -A 0.46A 0.40 -A 0.46 -A +000 +0.00 Van Karman Avenue (NS) at: Campus Drive(EW) TS 1 2 1» 1 1.5 0.5 1 2 1 1 1.5 0.5 0.47 -A 057 -A 0.47 -A 057 -A +000 +0.00 Birch Street EW TS 1 2 1 1 2 1 1 2 1 1 2 1 0.29 -A 035 -A 0.29 -A 035 -A +000 +0.00 Bayview Place (NS) at: Bristol Street South JEW) TS 0 0 2 0 0 0 0 4 1 0 0 0 0.43 -A 0 55 -A 0.43 -A 0 55 -A +000 +0.00 Jamboree Road (NS) at: Campus Drive JEW) TS 2 3.5 0.5 2 2.5 0.5 2 2 1» 2 2 1 0.61 0.61 -8 0.64 -B 0.61 -B +000 +0.00 Birch Street(EW) TS 1 2.5 0.5 1 3 1» 15 0.5 1>> 0 1 0 0.54 -A 0.44 -A 0.54 -A 0.44 -A +000 +0.00 Bristol Street NorthLW) TS 2 1.51.5> 0 2.5 1.5 0 0 0 0 0 0 0.46 -A 052 -A 0.46 -A 052 -A +000 +0.00 Bristol Street South(EW) TS 0 4.5 0.5 0 3 0 15 1.5 2 0 0 0 0.65 -B 0.70 -C 0.65 -B 0.70{ +000 +0.00 r ICU -LOS = Intersection Capanty Utillaatlan Level of service (see Appendix on. L= Leh; T= Through; R= Righp»= Free Rlght Turn; o= Right TOm Overlap 'TS = Treffc5lgnal 38 121 Figure 17 Approved Projects Morning Peak Hour Intersection Turning Movement Volumes 47� 47- 340 420 0� 0 25� 1 2p o 2 �0 � 3 a0 — 4 =3 m 5 20 ° 6 �0 0 7 20 �bbb.�co �o 1-13 a �bbs1 4-0 a b.aO X66 / �bbsao �8 1 abb �o 1 �bbs50 1-1 1 D 0� P�l D 3� 4) D Os q D 11� I Y D Os' � I D 0� R�2 D 0� p 1—D 0—D° 3��5° 0—D o�— a 37 -0 -0— 0-0 Oho —o -- 26 —D 0—D 0—D ° °o 0� 0� 0� 0� 0�, 1� 0� 1� 0� 0� 0� m 0 0 15 77 72 0 30 o I 0 93 12 MacArthur Bouleva rd/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Kaman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North Birch Street/ Von Karman Avenue/ Von Karman Avenue/ Ba,lew place/ Jamboree Road/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive $7 0 �0 1-0 D 5s°Y° 4 0 111 � l ddb ,e Road/ B .are Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/17 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 39 122 1 0 1 0 0 0 690 700 990 2p o 9 20 0 10 �p r 11 20 0 12 v-0 — 13 �0 0 14 �0 ° �o a o o �bbebb 1 13 'o 1 a b b �� 1 a b b �o 1 o- b b'0 'o / E 10 D 0s 10 0 0s 0 0 0� 1 t ID 0� � I D 0� 0 D 0— ° 0—D° 3—D° 50-0° 0-0 °M 0-0 -- 0—D 0� 0� 1� 1� 0� 0� 27 m 0 1 0 2 29 0 30 0 93 Birch Street/ Von Karman Avenue/ Von Karman Avenue/ Ba,lew place/ Jamboree Road/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive $7 0 �0 1-0 D 5s°Y° 4 0 111 � l ddb ,e Road/ B .are Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/17 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 39 122 Figure 18 Approved Projects Evening Peak Hour Intersection Turning Movement Volumes MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North 00 180 21 0� 2v 15- �1 — �o .0 3 a0 0 4 =1 „ 5 ^ O 6 a0 0 7 s-0 M �0 d-8 abbso 4-0 a l C-49 4 abbs2 C-39 a abbso 4-0 a "' ol�bs31 �4 a F p D F p D Os q (° D 93' % Y (° D Os' `h Y D 0� D D 0or � 0—D ono 0—D omr., r 70 -0em� 0—D O�oo 0—D o 17 —D 0 0 0� 0� 0�, 0� 0� 0� 0� 1� 055 m 2 37 40 45 0 68 0 182 1 74 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive F0 177 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/18 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 40 l es 00 00 0 0 410 410 650 10 �p w 11 2p o 12 �0 13 �0 0 14 albb�o '0 a l 'o a al [a a b'o a J] '0 'o a E46 16 D 0s 10 D 0s 16 D 03' � I 03' � I D 03' 6 D 0— � 0—D ono 18— o-o 26—D� 0—D �� 0—D o 0 0� 0� 0� 0� I� 0� 150 m 2 0 2 0 23 0 69 0 68 182 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive F0 177 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/18 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 40 l es Figure 19 Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour Intersection Turning Movement Volumes 1367 983 716 0 542 441 392 v 280 I m ° ebb. 261 4-194 4 2 e �bb.�c31 253 4-167 4 3° '� JJ IBs79 X12 4-136 4 4 "' ebb.a `z191 4-767 379 '^�' 4 5 �bbsa120 `138 4-910 m 4 6 a bbso �0 4-0 0 4 7 a bbs453 2237 re 4-989 4 D 322 c91 D 161 4_298 D 19 �" dl q D 4373' I Y D Os' `h D 1186 d p D 0� d p 584 —D ,�,� p 313�<; 96— D e 922�mm� D 03 dl `t ID Owe 803 °; 1fi49 —Dom a Y D 0—Dg 50� o r 73� ^— — 28 �,— 797 —D 48� "—' 783 — ° O� f7,° 8a — 42,`x— 299 °'— 0o 0�°'— 0� —m 589 603 1832 548 1103 1096 1535 1099 867 2055 1958 1006 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch street/ Campus Drive Birch street Von Karman Avenue Jamboree Road Brirtol street North Brirtol street south Bristol street North Birch street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol street South Campus Drive Birch street Brirtol street south Campus Drive F1204 2p 4-0 '0 4 4) Y ° o 0 2043 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North 4839c/19 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 41 ig4 446 0 460 0 0 0 2369 0 2193 0 1120 0 20 ° 9 2114 10 222 l;!; 11 20 ° 12 � 2160 13 m 26 n 14 20 ° 4-0 �0 4 4_298 4 `° b,43 4-172 `V 4 <1 4-0 0 4 — ° bs273 4-444 4 `° bb�3 4-6 4 o-]'0 4-0 4 E31 p D 793' q D 03 dl `t ID D 803 d `� ID D 1233 a Y D 0 o r 315 —D 44� "' 797 —D 48� o � 2514-0 421 o — ° 118 —D 12� o �,� —_ 8a — 42,`x— 0o 0�°'— 589 603 548 1103 0 1311 1535 3232 Birch street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol street South Campus Drive Birch street Brirtol street south Campus Drive F1204 2p 4-0 '0 4 4) Y ° o 0 2043 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North 4839c/19 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 41 ig4 Figure 20 Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour Intersection Turning Movement Volumes 1403 1124 0 716 0 1512 1819 1104 v 1242 0 1° X206 0 2 r7 Sh X170 10 X38 4 m M `z 162 5 e X74 e 6 om' �o 0 7 ., X124 m r 4-702 '— — 4-441 4 4-127 `° "' 4-1007 `" "' 4-1906 m ° 4-0 4 ° °' 4-1191 ebb. V)3 4 eb b. M 4 993' 6665 4 �bbs636 D 4 a b bx202 4 a b bs0 03' 4 a bbx423 4 D 340 a p l0 D 292 — a p 10 F�195 °� p l° D 232 p I° D 0° p l° D 4173' a p 10 D 0 —° p l° N 288 —D e "' 200 535 N `: 1076 -0 e R g 0 m m e 1021 —D o 0 —D ,°„ 101 —� 53� '� 38, "'° 0�"`°0 430 '�— 0� 870 0 937 1414 0 824 0 1295 1083 0 616 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive 974 1095 1262 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/20 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 42 125 932 0 716 0 0 0 1631 0 1599 0 1824 0 �p 9 a X67 10 �q1 11 12 X348 e IS �0 14 a �O ° �O 4 53 4 bb4 `" "' 4 -238 sl6l 4 `° "`°' b�o 4-1 4 b'o 4-0 4 E p 10 D 1513' p D 993' 1 p 10 D O3 ]416 D 2303 dl � I2973' a p 10 D 03' alp 10 o "" e 463 —D 51� e = 0 184 —D 26� 2 2617 -0 142 ,^, '° 276 —D I67� e -- 4 —D 0 0 —D 0�'� °' 762 554 535 1621 1361 3067 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive 974 1095 1262 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/20 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 42 125 Figure 21 Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour Intersection Turning Movement Volumes 1371 991 738 0 557 445 393 v 281 I m X61 n 2 _ e ^^`53 3 ° ° X12 4 '' ° `z 197 'MP' 5 `138 m 6 �0 0 7 ° X237 ° X194 4 4-167 4 '� ^ 4 -138 4 " X767 4 `°' X910 4 bb�3 4-6 4 o-]'o re X989 ebb. 95 4 �bb.�31 a albbs79 q 4 ebb. 379 4 �bbsQo D 1233 4 a bbso 0 4 a bbsas3 4 D 322 p D 161 p D 193' dl q (° D 443 �' % Y (° D Os' `ry Y D 1190 p D 0� p 584 —D ,°,� 313 <; 96 —D o e 922 m o 0� e M 1fi49 —D o 0—D g 50, — 73� '�— — 28 �,— "—' 183 — O� 299 0� —� 0 1102 870 1853 2065 7964 1098 1008 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive F1204 �0 4-0 .�o 4 4) Y ° 0 2049 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/21 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 43 120 448 0 462 0 0 0 2375 0 2199 0 1124 0 �O ° 9 X114 16 X22 71 �O ° 12 `? 160 13 m —6 N 74 �0 ° 4-0 �o 4 abb�eo 4-302 4 ° b,43 4-172 4 <1 4-0 0 4 ° ° bs273 4-448 4 bb�3 4-6 4 o-]'o 4-0 4 E316� p D 793' q D 03 01 `t ID D 803 `� ID D 1233 a Y D 0 o "`91 315 —D 44� �� "' 797 —D 48� o .�., 2514-0 421 0 — 121—D 12� o �Sg -- 8—D — 42�`� a 0—D 0�°'— o 591 607 552 1103 015 1539 3238 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive F1204 �0 4-0 .�o 4 4) Y ° 0 2049 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/21 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 43 120 Figure 22 Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour Intersection Turning Movement Volumes 1405 1128 717 1531 1825 1106 v 1244 0 I o X206 0 2 r7 X170 10 X38 4 `z165 m 5— `�74 e 6 �o 0 7 ., X124 m r b b 4-702 ems 4 — — b b. 4-441 iml a 4 -128 6665 4 "' a b b X1007 .x636 4 a b b X1906 x202 m 4 °^' ° a b b )-0 s0 4 ° ° a b b X1191 = sa23 4 D 340s p D 292s p F�195 4I q (° D 235 �' % Y (° D 0 Y D 419 — p D 0— p N 288 —D 101 e — "' 200 53� a o N `°— `: 1076 -0 38�""° e g ,^, 0 0�" m ° 1021 —D 430 o — 0 0,1418 189 ""' S1 828 880 ` 142 0 1300 167 1086 101 938 617 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North 967 933 717 0 1634 0 1602 8 �0 0 9 �. X67 10 X41 II �p 0 12 X348 e 13 �0 — �0 o so 4 4- 523 �53 '° 4 b'19 4-243 4 4-0 so 4 °' as161 4 -240 4 `° abs0 4-1 4 s0 4 188 — p D 151 — p D 99— p ( 0— Y D 230 — p D 297 — Y F14- 1006 —D o 463 —D a o 184 —D - °; 2617 —D o ,^, 280 —D e 4 —D 189 ""' S1 "'- 26� ` 142 167 — 101 763 560 540 456 1626 1366 3070 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive F1262 �p 4-0 .�o 4 p o 0 2163 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/22 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 44 127 7. CEQA Analysis The California Environmental Quality Act (CEQA) analysis (this part of the analysis is consistent with CEQA) included analysis of the study area intersections. Cumulative Projects The City of Newport Beach staff provided the cumulative projects in the study area for the CEQA analysis. Typically, the cumulative projects are known, but not approved project developments that are reasonably expected to be completed or nearly completed at the same time as the proposed project. The cumulative projects consist of development that has been approved but are not fully completed (see Section 5, including Table 5 and Appendix E). The cumulative projects utilized were ones that added traffic to the study area intersections. The cumulative project list is shown in Table 8 and the cumulative project traffic generation is included in Appendix G. Appendix G contains the directional distributions of the cumulative project traffic. The cumulative project morning and evening peak hour intersection turning movement volumes have been calculated and are shown on Figures 23 and 24, respectively. The CECA traffic volumes were obtained by adding the cumulative projects traffic volumes to the TPO traffic volumes. In order to analyze a "conservative" scenario in terms of the assignment of traffic, the CEQA analysis does not credit the existing site development. Intersection Capacity Utilization The City of Newport Beach methodology used to assess the operation of a signalized intersection is known as Intersection Capacity Utilization. To calculate an Intersection Capacity Utilization value the volume of traffic using the intersection is compared with the capacity of the intersection. An Intersection Capacity Utilization value is usually expressed as a decimal. The decimal represents that portion of the hour required to provide sufficient capacity to accommodate all intersection traffic if all approaches operate at capacity. The Levels of Service for existing + growth (Year 2013) + approved projects + cumulative projects traffic conditions have been calculated and are shown in Table 9. Existing + growth (Year 2013) + approved projects + cumulative projects morning and evening peak hour intersection turning movement volumes have been calculated and are shown on Figures 25 and 26, respectively. Existing + growth (Year 2013) + approved projects + cumulative projects Intersection Capacity Utilization worksheets and the Level of Service description are provided in Appendix D. For existing + growth (Year 2013) + approved projects + cumulative projects traffic conditions, the study area intersections are projected to operate at Level of Service C or better during the morning /evening peak hours. The Levels of Service for existing +growth (Year 2013) + approved projects + cumulative projects + project traffic conditions have been calculated and are shown in Table 9. Existing +growth (Year 2013) + approved projects + cumulative projects + project morning and evening peak hour 45 122 intersection turning movement volumes have been calculated and are shown on Figures 27 and 28, respectively. Existing + growth (Year 2013) + approved projects + cumulative projects + project Intersection Capacity Utilization worksheets and the Level of Service description are provided in Appendix D. For existing + growth (Year 2013) + approved projects + cumulative projects + project traffic conditions, the study area intersections are projected to operate at Level of Service C or better during the morning /evening peak hours. Significance Criteria The City of Newport Beach intersection significance criteria requires an increase of one - percent or more at a study area intersection operating at worse than Level of Service D during the morning /evening peak hours. As shown in Table 9 for the CEQA analysis, the project - generated traffic did not result in a significant impact at the study area intersections; therefore, no improvements are recommended at the study area intersections. 46 189 Table 8 Cumulative Project List Project Name Mariner's Medical Arts WPI- Newport, LLC Banning Ranch Sunset Ridge Park Marina Park Pres Office Building B Koll- Conexant Mariner's Pointe Newport Coast - TAZ 1 Newport Coast - TAZ 2 Newport Coast - TAZ 3 Newport Coast - TAZ 4 47 iq0 Table 9 CEQA Analysis Intersection Capacity Utilization and Levels of Service ' ICU-L05= Intersection capatlty OHllzat[on - Level of XNia hee Appendix 0). L= Leff; T= Through; R = Also;» =Free Right Turn; >= Right Turn Overlap! = Impmvement 'TS = Traffic Signal 48 191 Peak Hour ICU -LOS' Existing +Growth Existing +Growth (Year 2013) + (Year 2013(+ Approved Projects Intersection Approach Lanes' Approved Projects 4 Cumulative Projects Northbound Southbound Eastbound Westbound Traffic Cumulative Projects +Project ICU Increase L T R L T R L T R L T R Morning Evening Morning Evening Morning Evening Intersection Control' MacArthur Boulevard (NS) at: Campus Drive(EW) TS 1 4 1 1 4 1 2 2.5 0.5 2 3 1» 0.470 -A 0.659 -B 0.471 -A 0.659 -B +0.001 +0000 Birch Street(EW) TS 1 3 1 1 3.5 0.5 15 1 0.5 1 2 1» 0.413 -A 0.495 -A 0.413 -A 0.496 -A +0.000 +0001 Von Karmen Avenue(EW) TS 1 3 1 1 3 1 1 2 1 2 1 1 0569 -A 0.601 -13 0575 -A 0.606-B +0.006 +0005 Jamboree Road(EW) TS 2 3 1> 2 3 1>> 2 3 1 2 3 1 0.682 -B 0.763 -C 0.686 -B 0.765 -C +0.004 +0002 Campus Drive /Irvine Avenue (NS) at: Bristol Street North(EW) TS 2 3 0 0 4 2 0 0 0 1 3.5 0.5 0515 -A 0.773 -C 0516 -A 0.774 -C +0.001 +0001 Bristol Street South(EW) TS 0 45 0.5 1 3 0 1.5 2.5 2 0 0 0 0.647 -B 0.486 -A 0.648 -B 0.487 -A +0.001 +0001 Birch Street (NS) at: Bristol Street North(EW) TS 2 2 0 0 1.5 2.5 0 0 0 1.5 3 0.5 0555 -A 0.549 -A 0556 -A 0.549 -A +0.001 +0000 Bristol Street South(EW) TS 1 0 25 1.5 2 2 0 1 1.5 3 0.5 0 0 0 1 0.401 -A I 0.467 -A 0.401 -A 0.467 -A 1 +0.000 +0000 Von Karman Avenue INS) at: Campus Drive(EW) TS 1 2 1» 1 1.5 0.5 1 2 1 1 1.5 0.5 0.482 -A 0.578 -A 0.483 -A 0380 -A +0.001 +0002 Birch Street(EW) TS 1 2 1 1 2 1 1 2 1 1 2 1 0295 -A 0.354 -A 0296 -A 0.354 -A +0.001 +0000 BaYview Place (NS) at: Bristol Street South(EW) TS 0 0 2 0 0 0 0 4 1 0 0 0 0.430 -A 0.568 -A 0.430 -A 0 +0000 Jamboree Road (NS) at: Campus Drive(EW) TS 2 35 0.5 2 25 0.5 2 2 1>> 2 2 1 0.665 -B 0.638 -B 0.667 -B 2 +0001 Birch Street(EW) TS 1 25 0.5 1 3 1>> 1.5 0.5 1» 0 1 0 0557 -A 0.480 -A 0558 -A 1 aC+00 +0001 Bristol Street North(EW) TS 2 1515> 0 2.5 1.5 0 0 0 0 0 0 0.484 -A 0.539 -A 0.485 -A 1 +0001 Bristol street South (EW) IS 0 45 0.5 0 3 0 1.5 1.5 2 0 0 0 0.663 -B 0.735 -C 0.664 -B 01 +0001 ' ICU-L05= Intersection capatlty OHllzat[on - Level of XNia hee Appendix 0). L= Leff; T= Through; R = Also;» =Free Right Turn; >= Right Turn Overlap! = Impmvement 'TS = Traffic Signal 48 191 Figure 23 Cumulative Projects Morning Peak Hour Intersection Turning Movement Volumes 28� 25 280 23 15- 21v po I 217 N 2 219 �°27 o 3 21 ••� 4 257 � 5 20 m 6 20 0 a 7 20 m �bb" X12 �co a abb `� �bbs1 4-0 a bas6a X157 a bsals X80 a abb 0 � 10 �bs0 X97 a D 1� 29 —D D 0� 117��- D Os q D 19 �' I Y D Os' `h D 29� R�2 D 029 —D ono 0� 0 —p„o_e 7pp -0o�o 0� 0�0, -0 0 � 2—D 00� 0 3� 0�, 0� 0� 0 141 0� 0111 133 63 31 2 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive fib 0 15 VT� 0—D 0� lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/23 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 49 � ^� 10 4b 2 42 76b 0 ll o b10 9 219 �°27 o � a 10 XII 20 3 o a b0 b � o a 12 b a 13 20 0 a 14 o- ° a 4--o 2 o '0 20�� E Da0 D D 0� D 0� D 0� " T r D 0 � 10 O—R 29 —D 0—° °° 29 —D 29— —b D ° 02 —b D ° 0� 0 0� 0� 0� 0 � 0 0 0 141 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive fib 0 15 VT� 0—D 0� lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/23 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 49 � ^� Figure 24 Cumulative Projects Evening Peak Hour Intersection Turning Movement Volumes 129 109 109 129 37 5v 146- I 0 2 �p ,a 3 a6 — 4 2p 5 2p n 13 =p 7 9 p a bb�p 33 a bb�p �0 �bb= ° ° X126 a �3b7sb' X3 5 sN 1 a abb4-6 sp a bbo �-� 3 0 4 a D 0 0 p s D 0 = P ° = P ° 0� P 25 2 0� 0 1812� 9 -0oAM os=IoYp o O 0 - 0 D o2XsoY o I6 I0�8 0 0 I6 0 "Yo ' 1 4 99 27 0 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North 0 0 0 174 206 146- a 9 ,a 10 — 12 ,a 13 =p 14 ��s° a bb�p a bb�p 3 �bb= o a a bb=Yp s a a b-bD p p a 0 s- ps ° p s 0 = P = P ° ps Po 17 - I03 -bD os=IoYp o 22 0 0 0 00 3 2 I6 0, "Yo ' 1 4 0 200 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive 713 0 15 _ R9- 0 lamboree Road/ Brrtol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/24 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 50 �n3 Figure 25 Existing + Growth (Year 2013) + Approved Projects + Cumulative Projects Morning Peak Hour Intersection Turning Movement Volumes 1395 1008 744 0 565 456 413 v 280 1 ° bb. X78 X206 91 4 2 ° ° e b b X70 4-167 s31 m `V 4 3 ° '� °'° 0Ib bs80 X13 4-136 4 4 S � b b.x447 `z242 4-924 "' e 4 S >. `� ' b bs08 ` 138 4-990 `! 4 6 a b bso �0 4-0 0 4 7 a bbx453 X237 _ X1086 = 4 D 323 D 161 4- 327 D 19 �" dl D 4563' dl D Os' a D 1215 d D 0� d m 613 —D ,�,� u°, 313�� 2373' 96 —D ,�„ m1044 -0m,; ,, dl p Owe 80� e1fi51 —po a p D 0—Dg al p 50, = "' 76� °'— — 28 �, —^ oM 783 o — .°3 0�"�0 W m,� _ 8—D 42� 299 °'— 0—D 0� 01`� 589 7270 603 978 1965 1103 2178 0 1518 1989 1758 1098 3373 1008 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch Street/ Campus Drive Birch Street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street South Bristol Street North 652 0 447 0 461 0 0 0 2411 0 2235 0 1282 0 e �0 0 9 X131 ov 10 `=22 ,; 71 �0 0 12 `? 160 m IS �5 74 �0 ° o-bb�0 4 abb�e0 4- 327 4 `° �bb,46 4-189 `V 4 <1 4-0 0 a ^ °°M' ° abbs273 4-456 m 4 °' �bb�3 4-6 4 ' ° J] 4-0 '0 4 D 6783' p D 2373' p D 793' p D 0� dl p D 80� d `� D 123 a p D 0� al p ,^0 869 —D m 316 o r "' 344 —D 44� "' 197 —D 48� oM e 2543-0 °' 421 o — .°3 747 —D 12� W m,� _ 8—D 42� n H 0—D 0� o 589 603 548 1103 0 1518 1758 3373 Birch Street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol Street South Campus Drive Birch Street Brirtol Street South Campus Drive F233 V2155 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/25 KUNZNAAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 51 to / Figure 26 Existing + Growth (Year 2013) + Approved Projects + Cumulative Projects Evening Peak Hour Intersection Turning Movement Volumes 1532 1233 1218 0 1641 1856 1109 v 1244 I >. X206 0 2 X67 3 X44 4 `z162 0 5 ° `�74 °� 6 �0 0 7 X124 ° o-bb�0 4-735 4 r7 0^ r 4 -554 re 4 - 4-127 4 _ "' 4-1133 4 �""' o-bbs161 4-1941 4 ° 4-0 4 ° ' 4-1225 b" .�ID3 4 �b It p D JJ1bx670 q 4 �1bs636 D 4 a b bs203 D 3003' 4 s0 4 1023 —D — 189 x423 4 345s p D 292s J��441 D 1383' dl q (° D 244 �' % Y (° D 0s' Y D 4393' p D 0s 310 -D e e 200 539 .., 195 -D N e 1265-0 e O� m a°, 1021 -D o 0-D ,�„ 101 -� 69� °' 199 �, '�� 38�""°° 0�"P 430 '"' 0� 1464 918 1394 1110 959 616 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch street/ Campus Drive Birch street Von Karman Avenue Jamboree Road Brirtol street North Brirtol street south Bristol street North 965 0 948 0 716 0 0 0 1805 0 1805 0 1970 0 8 �0 0 9 a X67 10 X41 11 �p 0 12 X348 °� 13 �0 14 �0 0 ° o-bb�0 4-0 4 abb�53 4 -554 re 4 abb�20 4- 243 4 �bb�0 4-0 4 �""' o-bbs161 4-271 4 a1b�o 4-1 4 J] 4-0 '0 4 D 1883' p D 1513' p D 993' q D 03 dl `t 10 D 2303 d `� ID D 3003' a Y D 03' alp 1023 —D — 189 o 0 501 —D 51� e = u' 200 26� 2720 —D m 142 o °,S l^ 298 —D 199 e -- 4—D 117 i 0 0—D 0�'� ,S; 762 555 539 0 456 1702 1439 3267 Birch street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol street South Campus Drive Birch street Brirtol street south Campus Drive 1293 15 Mg-- a b b0 1075 s ,°„ 1097 —D 11262 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North 4839c/26 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 52 �n� Figure 27 Existing + Growth (Year 2013) + Approved Projects + Cumulative Projects + Project Morning Peak Hour Intersection Turning Movement Volumes 1400 1017 463 0 581 460 414 v 281 I 278 ° 2 ° dR 270 m 10 X3 4 `z248 °' S ,� ` 138 m 6 �o 0 7 ° 237 [Src95 4-206 �' 4 rz dR �b b.sc31 0-167 `V a `° b,46 4 -138 se0 4 ° `° " eb b.a L-924 447 = 4 `�" d bbsa08 0-990 `! 4 a b bso 4-0 4 a bbx453 6 D 323 p D 161 F28 q D 4633' Y D 03' `h D 1219 d p D 0m 613— ,�,� u°, 313�� 197 —D 48� ,�„ m1044 -0m� e 150 —D 12� 0�e 8—D 42� X 1651 —Do 0"`�' 0� 050� 591 = 608 76� °'— 552 —= 1103 183 1522 0�"°0 1762 "' 299 °'— 07272 980 1988 2128 1995 1100 1011 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch street/ Campus Drive Birch street Von Karman Avenue Jamboree Road Brirtol street North Brirtol street south Bristol street North Birch street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol street south Campus Drive Birch street Brirtol street south Campus Drive F233 2p 4-0 'o 4 41 p�° 0 2161 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North 4839c/27 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 53 � n 449 0 463 0 0 0 2417 0 2241 0 1285 0 20 ° 2131 10 222 11 20 ° 12 °° 2160 m 13 26 n 14 20 4-0 �o 4 4-331 �eo 4 `° b,46 189 4 <1 4-0 0 4 ^ °°M' 4-460 s273 m 4 ' b�3 4-6 4 J] lo'o 4-0 4 E316 p D 793' q D 03' 01 `t ID D 803' `� ID D 1233' Y D 0 o "' 344 —D 44� � 197 —D 48� o e 2543-0 °' 421 o — e 150 —D 12� W o� 8—D 42� n H 0"`�' 0� 591 608 552 1103 1522 1762 3379 Birch street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol street south Campus Drive Birch street Brirtol street south Campus Drive F233 2p 4-0 'o 4 41 p�° 0 2161 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol street North 4839c/27 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 53 � n Figure 28 Existing + Growth (Year 2013) + Approved Projects + Cumulative Projects + Project Evening Peak Hour Intersection Turning Movement Volumes 1536 1241 1256 0 1666 1864 1,11 v 1246 0 I <. " e b b 5—p 2 _ r7 r J I It, X170 4-441 u4 a 3 JJ X44 4- 129 670 4 4 m _ "' - b =168 4-1133 x636 °' 4 5 m a `�74 4-1941 s2o3 4 6 ° ° a b b �0 4-0 so 0 4 7 X124 x423 4 345s J�� D 292s p D 138250 " ` abb 4-243 20 �' % Y r D 0s `ry Y D 4443' I p D 0310 abbso —D D 1883' e 200 .., 195 —D 199 �, N '�� ,� 1265-0 38�"'�° e dl Y O� 03 m "'�0 m 1021 —D 4303 o '"' Y 01013693 03 °0 1023 —D o 0 941 a °' 200 —D - 2720 —D o 961 303 —D � — < 881 1405 1117 619 MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ MacArthur Boulevard/ Campus Drive/ Campus Drive/ Birch street/ Campus Drive Birch street Von Karman Avenue Jamboree Road Brirtol Street North Brirtol Street south Bristol Street North 967 9500 718 0 0 18110 18110 19770 B 5—p 0 9 - 5-67 10 `=47 II �o 0 12 X348 m 13 �o — 14 „ �o 0 ° abbso 4-0 4 `� M a abb�53 4-558 4 " ` abb 4-243 20 4 abbso 4-0 4 °' m " abbslsl 4-275 - 4 abbs0 4-1 4 abbso 4-0 4 D 1883' p D 1513' p D 993' p (° D 03` dl Y D 230 = p D 3003' Y D °0 1023 —D o 0 501 —D a °' 200 —D - 2720 —D o Pi 303 —D � — < 4 —D e g o 513 "'� 263 ° 1423 ` 1993 1173 03 764 562 0 546 0 456 1709 1446 0 3274 Birch street/ Von Karman Avenue/ Von Kam-an Avenue/ Ba,lew place/ Jamboree Read/ Bristol street south Campus Drive Birch street Brirtol Street south Campus Drive 1300 15 �p 4-0 a�bb.�o 4 D10753dp� ,°„ 1097 —D o 12623 — 0 2265 lamboree Road/ Brstol Street South Jamboree Read/ Jamboree Road/ Birch Street Bdstol Street North 4839c/28 KUNZ AAN ASSOCIATES, INC. Intersection reference numbers are in upper left corner ofturning movement boxes. OVER 30 YEARS or Gxca i ENT SERVICE 54 �n� 8. Orange County Congestion Management Program This section discusses the Orange County Congestion Management Program (CMP). The purpose, prescribed methodology, and definition of a significant traffic impact are discussed. County Congestion Management Program (CMP) The CMP is a result of Proposition 111 which was a statewide initiative approved by the voters in June, 1990. The proposition allowed for a nine cent per gallon state gasoline tax increase over a five year period. Proposition 111 explicitly stated that the new gas tax revenues were to be used to fix existing traffic problems and was not to be used to promote future development. For a city to get its share of the Proposition 111 gas tax, it has to follow certain procedures specified by the State Legislature. The legislation requires that a traffic impact analysis be prepared for new development. The traffic impact analysis is prepared to monitor and fix traffic problems caused by new development. The Legislature requires that adjacent jurisdictions use a standard methodology for conducting a traffic impact analysis. To assure that adjacent jurisdictions use a standard methodology in preparing traffic impact analyses, one common procedure is that all cities within a county, and the county agency itself, adopt and use one standard methodology for conducting traffic impact analyses. Although each county has developed standards for preparing traffic impact analyses, requirements do vary in detail from one county to another, but not in overall intent or concept. The general approach selected by each county for conducting traffic impact analyses has common elements. According to the CMP, those proposed developments which meet the following criteria shall be evaluated: ■ Development projects that generate more than 2,400 daily trips (The threshold is 1,600 or more trips per day for development projects that will directly access a CMP highway system link). ■ Projects with a potential to create an impact of more than three percent of Level of Service E capacity. Significance Criteria To determine whether the addition of project generated trips results in a significant impact at the CMP study facility and thus requires mitigation, the Orange County CMP utilizes the following thresholds of significance: 55 19g ■ A significant project impact occurs when a proposed project increases traffic demand at a CMP study facility by more than three percent of capacity (V /C >0.03), causing or worsening Level of Service F (V /C > 1.00). Based upon the CMP thresholds above, the project - generated traffic did not result in a significant impact at the study area intersections; therefore, no improvements are recommended at the study area intersections. 56 q 19-9 9. Other Traffic Considerations As the site plan for the project becomes more definitive, the following guidelines should be incorporated into the project design. Listed below for more detailed planning are recommended guidelines for the development. Site - specific circulation and access recommendations are depicted on Figure 29. Parking The surface parking lot is shared by three parcels: the proposed site (currently vacant quality restaurant), Classic Q Billiards and Sports Club, and Saagar Fine Cuisine of India. The surface parking lot currently provides 211 shared parking spaces. In addition, the project site (Parcel 3) has obtained 32 off -site parking spaces located at a parking structure southwest of the project site. Existing Conditions The existing quality restaurant (currently vacant) required 105 parking spaces per UP2008 -043 (at one parking space per 40 square feet of net public area). The existing Sagaar Fine Cuisine of India requires 54 parking spaces per UP2005 -004 (at one parking space per 50 square feet of net public area) and the Classic Q Billiards and Sports Club requires 80 parking spaces per UP3392. A survey of the surface parking lot was conducted to establish the parking demand for the existing land uses shown in Table 10. Based upon discussions with the City of Newport Beach staff, the peak periods for parking at the project site were determined to be 6:00 AM to 12:00 AM on a Friday and 6:00 AM to 12:00 AM on a Saturday. To quantify the existing parking demand for the project site, the existing parking demand was determined by surveying the project site at 30- minute intervals on Friday (February 11, 2011) and Saturday (February 12, 2011). The project site parking area was divided into eight (8) parking zones as shown on Figure 30. The parking surveys are shown in Tables 11 and 12. The parking survey conducted on Friday (February 11, 2011) shows the maximum number of occupied parking spaces is 133 parked vehicles from 5:30 PM to 6:30 PM (see Table 11). This is a maximum parking occupancy of 63 percent. Figure 31 graphically depicts the existing conditions of the surface parking lot based upon the parking survey. City of Newport Beach Parking Code Table 13 shows the parking requirements for the proposed project per the City of Newport Beach Parking Code. The proposed 4,525 square feet of retail use would require approximately 18 parking spaces by using the parking ratio of one parking space per 250 57 200 square feet of net floor area [(4,525 sf. — 200 sf. utility room) _ 250 sf. = 17.3 = 18 parking spaces). The 4,000 gross square feet of bank use would require approximately 16 parking spaces by using the parking ratio of one parking space per 250 square feet of gross floor area (4,000 sf. _ 250 sf. = 16 parking spaces). The 4,000 gross square feet of high turn -over dining establishments would require approximately 50 parking spaces by using the parking ratio of one parking space per 40 square feet of net public area (4,000 sf. _ 2 (assuming 50% of total gross area is allocated for net public area) - 40 sf. = 2,000 sf. - 40 sf. = 50 parking spaces). The fast food restaurant use would generate a parking demand of approximately 20 parking spaces by using the parking ratio of one parking space per 50 square feet of gross floor area (1,000 sf. - 50 sf. = 20 parking spaces). The total parking demand per City of Newport Beach Parking Code for the proposed project is 104 parking spaces. Shared Parking Analysis The idea of a shared parking analysis is that if the various land uses have peak parking demands at different points in time, or on different days of the week, then the number of parking spaces required is not the sum of the parking requirements for each land use, but rather less. If the peak demands for the various land uses are non - coincidental, then there is an opportunity for sharing of parking. To determine the degree to which shared parking can occur, the cumulative hourly parking demand of the land uses is calculated at all points in time throughout the day for both weekdays and weekends. In this case, Friday has been determined to be the peak day based upon the existing parking demand survey. Kunzman Associates, Inc. has utilized time -of -day factors and the parking rates for weekday and weekend parking demand for customer /visitor and employee as developed by the Urban Land Institute Shared Parking (2005). The Urban Land Institute procedures were utilized in this study to evaluate peak parking demand that would occur for the project at any point in time when day of week and hourly factors are utilized. Per the Urban Land Institute, weekend rates and factors are applied to Friday after 5:00 PM. To conduct a shared parking analysis, it is necessary to disaggregate the parking code into weekday and weekend as well as customer /visitor /guest and employee /resident parking space demands. Based on the City of Newport Beach Parking Code and the Urban Land Institute recommended parking ratios for weekdays and weekends, the disaggregated parking rates are shown in Table 14. Table 15 shows the expected hourly peak parking demand of the proposed project land uses for both a Friday, which has been assumed as the peak day based upon the existing parking demand survey. Table 16 shows the cumulative parking demand peaks for the proposed project land uses combined with the existing parking demand for the projected peak Friday. 58 201 Based upon the shared parking analysis, the maximum parking demand for the entire site during peak hours is 225 parked vehicles (see Table 16). The proposed project site plan will reconfigure the surface parking lot layout on Parcel 1 and provide a total of 222 parking spaces for the entire site, including the 32 off -site parking spaces located in the nearby parking structure. The total maximum parking demand for the entire site is 225 parking spaces. The site does not provide sufficient parking spaces to meet the City of Newport Beach Parking Code requirements and is deficient by three (3) parking spaces. It is recommended that the project obtain a waiver to allow for the reduction of the parking spaces required by three (3) parking spaces pursuant to the supplemental parking management plan prepared by Kunzman Associates, Inc. A summary of the shared parking analysis findings is provided in Table 17. Included with this submission is a copy of the Reciprocal Parking and Maintenance Agreement that can be modified by a simple majority of the property owners. A copy of the Covenant and Agreement Regarding Maintenance of Off- Street Parking Space Affecting Parcel 1 and the License Agreement for off -site parking spaces is included for review (see Appendix 1). Access To assure smooth traffic operations for vehicles entering and exiting the site, a northbound left turn pocket on MacArthur Boulevard is recommended to accommodate a minimum pocket length of 120 feet. Install appropriate vehicular signage to ensure U -turns and eastbound left turns are prohibited at the MacArthur Boulevard /Project Driveway. A STOP sign should be installed to control outbound traffic on all site access roadways. Sight Distance The landscape plantings and signs should be limited to 36 inches in height within 25 feet of project driveways to assure good visibility. 59 202 Table 10 Existing Project Land Uses Tenant Parcel I Land Use I Quantity I Unitsl I Hours of Operation Quality Restaurant (Vacant) Parcel 1 N/A 1 7.996 1 TSF N/A Saagar Parcel 2 Restaurant 1 7.015 1 TSF 11:00 AM - 12:00 AM Daily Classic Parcel Restaurant 1 7.870 1 TSF 10:00AM- 2:00AMDaily ' TSF =Thousand Square Feet 60 203 Table 11 Friday (February 11, 2011) Parking Count 133 Maximum number of —pied arkli , aPa2s -. 133veM[Ierfr- 53OPM -SWPM One veM1l [le waslllegally parked I[mm9WAM 1130 and. besides parked In Zane H fmm600AM -J 00 PM are Ilkelyfor usesofthe offI[e EulltlingtotM1e south ofthe p[ole[tslte. Ooee nN loelutle Ibe33 otf -Si@ pafkingsparee laatetl In a nearby parking slru[ture; wbeM1 M1ave been a55umad ko beunarupietl tlue [otbeva[anry of Me exi9ingquillty IezGUranton Parcel 1. 61 204 Number of Parked Vehicles and Percentage of Occupied Parking Spaces Time Period Parking Zone A Parking Zone B Parking Zone C Parking Zone D Parkin Zone E Parking Zone F Parking Zone G Parking Zone H' Total, Parking Spa[es Provided 30 32 37 4fi 40 26 13 J 211 600 AM - 6:30AM 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 2 8% 1 14% 3 1% 6:30 AM -700 AM 1 10% 2 6% 1 3% 0 0% 2 5% 0 0% 3 12% 1 14% 10 5% 700 AM - 7:30AM 1 10% 2 6% 2 5% 1 2% 2 5% 0 0% 5 19% 3 43% 16 8% 7:30 AM - 800 AM 1 10% 2 6% 4 11% 3 7% 3 8% 1 4% 5 19% 3 43% 22 305b 800 AM- 8:30AM 1 10% 4 13% 3 8% 8 17% 3 8% 1 4% 7 27% J 100% 34 16% 8:30 AM - 9 00 AM 2 20% 5 16% 2 5% 13 28% 4 10% 1 4% 10 38% 7 100% 44 21% 900 AM - 9:30 AM 1 10% 5 Sfi% 3 8% 19 41% 7 18% 1 4% 12 46% 8 114% 56 27% 9:30 AM - 10 00 AM 2 20% 5 16% 3 e% 23 50% 9 23% 1 4% 13 50% B 114% 64 3056 . 1000 AM - 10:30 AM 2 20% 7 22% 4 11% 24 52% 9 23% 1 4% 13 50% 8 114% 68 32% 10.30 AM - 11MAM 3 30% 7 22% 4 11% 24 52% 9 23% 1 4% 13 50% 8 114% 69 33% 1100AM - 11:3DAM 5 50% 7 22% 6 16% 23 50% 8 20% 1 4% 13 50% 8 114% 71 34% 1130 AM - 1200 PM 8 80% 11 34% 13 35% 24 52% 14 35% 2 8% 13 50% 6 86% 91 43% 12:00 PM 12:30 PM 9 91 20 63% 24 65% 25 54% 16 40% 3 12% 13 50% 6 86% 115 55% 12:30 PM - 100 PM 8 80% 26 81% 22 59% 27 59% 15 38% B 31% 13 50% 7 100% 125 60 %. 1A0 PM - 1:30 PM 8 80% 14 44% 19 51% 25 54% 11 28% 5 19% 13 50% 7 100% 102 48% 1:30 PM -200 PM 8 80% 10 31% 14 38% 24 52% 10 25% 4 15% 12 46% 7 100% 89 42% 2:00 PM 2:30 PM 8 80% 9 28% 12 32% 2D 43% 10 25% 2 B% 11 42% 7 100% 79 37% 2:30 PM - 3 00 PM 8 80% 9 28% 12 32% 19 41% 9 23% 2 8% 10 38% 7 100% 76 36% 3:00 PM 3:30 PM 7 70% 14 44% 29 78% 18 39% 18 45% 4 15% 10 38% 6 86% 105 50% 3:30 PM -400 PM 8 80% 15 47% 29 78% 19 41% 18 45% 4 15% SO 38% J 100% 110 52% 4:00 PM 4:30 PM 9 91 18 56% 27 73% 18 39% 18 45% 4 15% 11 42% 5 71% 110 52% 4:30 PM -500 PM SO 100% 21 66% 29 78% 21 46% 16 40% 7 27% 11 42% 5 71% 120 57% 5:00 PM - 5:30 PM 10 100% 29 91% 33 89% 17 37% 17 43% 6 23% 11 42% 5 71% 128 61% 5:30 PM -600 PM 10 100% 31 97% 32 86% 19 41% 21 53% 9 35% 8 31% 3 43% 3 63% 6:00 PM - 630 PM 10 100% 25 78% 27 73% 16 35% 21 53% 8 31% 5 19% 1 14% 113 54% 6:30 PM - 7 00 PM 10 100% 16 5D% 29 78% 13 28% 19 48% 7 27% 3 12% 0 0% 97 46% 7:00 PM 7:30 PM 10 100% 23 72% 31 84% 16 35% 17 43% g 31% 3 12% 0 0% 108 51% 7:30 PM -800 PM 10 100% 29 91% 32 86% 18 39% 15 38% 8 31% 2 8% 0 0% 114 54% 8:00 PM 8:30 PM 9 90% 33 103% 31 84% 15 33% 15 38% 6 23% 4 15% 0 0% 113 54% 8:30 PM -900 PM 7 70% 28 88% 24 65% 16 35% 10 25% 3 12% 4 15% 1 14% 93 44% 9:OOPM- 9:30PM 6 60% 27 84% 25 68% 13 28% 8 20% 2 8% 4 15% 1 14% 86 41% 9:30 PM - 1000 PM 5 50% 27 84% 26 JD% 13 26% J 18% 2 8% 4 15% 1 14% 85 00% 10:00 PM - 10:30 PM 5 50% 21 84% 20 54% 12 26% 5 13% 2 8% 3 12% 1 14% 75 36% 10:30 PM - 1100 PM 4 40% 26 81% 19 51% 12 26% 6 15% 3 12% 3 12% 1 14% 79 35% 11:OOPM - 1130 PM 6 60% 23 72% 20 54% 12 26% 0 10% 3 SZ% 11:30 PM - 1200AM 7 70% 17 133 Maximum number of —pied arkli , aPa2s -. 133veM[Ierfr- 53OPM -SWPM One veM1l [le waslllegally parked I[mm9WAM 1130 and. besides parked In Zane H fmm600AM -J 00 PM are Ilkelyfor usesofthe offI[e EulltlingtotM1e south ofthe p[ole[tslte. Ooee nN loelutle Ibe33 otf -Si@ pafkingsparee laatetl In a nearby parking slru[ture; wbeM1 M1ave been a55umad ko beunarupietl tlue [otbeva[anry of Me exi9ingquillty IezGUranton Parcel 1. 61 204 Table 12 Saturday (February 12, 2011) Parking Count 52 Maximums number of oor.,I.ol parking apaoo- 124'ehI,I. from]. 30 PM- IIWIM. Does not Ihd.. the 32 Mfalte parking sp.,hs located in a nearby parking structure, which have been assumed W be unacupleb due to the vacanq of the existing qualt"caurant on Parcel 1. 62 205 Number of Parked Vehicles and Percentage of Occupied Parking Spaces Time Period Parking Zone Parking Zone Parking Zone Parking Zone Parking Zone Parking Zaner Parking Zone Parking Zanotti Total' Parking Spaces Provided 30 32 3] 46 40 26 13 ] 211 6 W AM - 6:30 AM 0 0% 2 6% 2 5% 0 0% 2 5% 0 0% 0 0% 0 0% 6' 3% 6:30 AM - 7:00 AM 0 0% 2 6% 2 5% 0 0% 2 5% 0 0% 0 0% 0 0% 6 3% 7:00 AM - 7:30 AM 0 0% 2 6% 2 5% 0 0% 2 5% 0 0% 0 0% 1 14% 7 3% 7:30 AM - 8:00 AM 0 0% 2 6% 2 5% 0 0% 2 5% 1 4% 0 0% 1 14% 8 4% 8:00 AM - 8:30 AM 0 0% 2 6% 1 3% 0 0% 3 8% 1 4% 1 4% 4 57% 12 6% 8:30 AM -9:00 AM 0 0% 2 6% 2 5% 1 2% 3 8% 0 0% 1 4% 5 71% 14 7% 990 AM 9:30 AM 0 0% 2 6% 2 5% 1 2% 2 5% 0 0% 1 4% 6 86% 14 7% 9:30 AM - 10:00 AM 0 0% 2 fi% 2 5% 1 2% 1 3% 0 0% 1 4% 5 71% 12 6% 10:00 AM - 10:30 AM 2 20% 4 13% 2 5% 1 2% 1 3% 0 0% 1 4% 7 100% 18 9% 10:30 AM - 11:00 AM 0 0% 2 6% 1 3% 2 4% 1 3% 0 0% 1 4% 7 100% 14 7% 1100 AM - 11:30 AM 1 10% 3 9% 3 8% 1 2% 2 5% 0 0% 1 4% 7 100% 18 9% 1130 AM - 1290 PM 0 0% 2 6% 3 8% 1 2% 2 5% 0 0% 1 4% 7 100% 16 8% 1290 PM - 12'.30 PM 5 50% 4 13% ID 27% 2 4% 3 8% 1 4% 1 4% 6 Sfi% 32 15% 12:30 PM - 1:00 PM 5 50% 3 9% 16 43% 2 4% 2 5% 2 8% 2 8% 6 86% 38 18% 100 PM - 1:30 PM 9 90% 4 13% 20 54% 1 2% 3 8% 2 8% 1 4% 4 57% 44 21% 1:30 PM - 2:00 PM 10 100% 3 9% 13 35% 1 2% 5 13% 2 8% 1 4% 5 71% 40 19% 2:00 PM -2:30 PM 8 80% 3 9% 12 32% 1 2% 4 10% 0 0% 1 4% 5 71% 34 16% 2:30 PM - 3:00 PM 7 70% 2 6% 6 16% 2 4% 3 8% 0 0% 1 4% 5 71% 26 12% 3:00 PM - 3:30 PM 4 40% 2 6% 5 14% 2 4% 3 8% 2 8% '1 4% 6 86% 25 12% 3:30 PM - 4:00 PM 3 30% 3 9% 5 14% 2 4% 1 3% 2 8% 1 4% 4 57% 21 10% 4:00 PM - 4:30 PM 4 40% 4 13% 5. 14% 2 4% 2 5% 0 0% 1 4% 6 86% 24 11% 4:30 PM - 5:00 PM 6 60% 3 9% 4 11% 2 4% 2 5% 0 0% 1 4% 5 71% 23 11% 590PM -5:30 PM 5 50% 3 9% 6 Sfi% 2 4% 1 3% 0 0% 0 0% 0 0% 17 8% 5:30 PM - 6:00 PM 5 50% 4 13% 14 38% 2 4% 1 3% 0 0% 0 0% 0 0% 26 12% 6 00 PM - 6:30 PM 6 60% 5 16% 14 38% 1 2% 1 3% 0 0% 0 0% 0 0% 27 13% 6 30 PM - 7:00 PM 4 40% 5 16% 13 35% 0 0% 3 8% 0 0% 0 0% 0 0% 25 12% 7:00 PM - 7:30 PM 5 50% 4 13% 14 38% 0 0% 2 5% 1 4% 0 0% 0 0% 26 12% 7:30 PM - 8:00 PM 5 50% 7 22% 12 32% 0 0% 4 10% 1 4% 0 0% 0 0% 29 14% 8:00 PM - 8:30 PM 4 40% 7 22% 19 51% 0 0% 4 10% 1 4% 0 0% 0 0% 35 17% 8:30 PM - 9:00 PM 4 40% 5 16% 18 49% 0 0% 4 10% 2 8% 0 0% 0 0% 33 16% 9:00 PM - 9:30 PM 5 50% 8 25% 19 51% 0 0% 4 10% 1 4% 1 4% 0 0% 38 18% 9:30 PM - 10:00 PM 9 90% 10 31% 15 41% 0 0% 6 15% 2 8% 1 4% 0 0% 43 20% 10:00 PM - 10:30 PM 10 100% 11 34% 22 59% 0 0% 5 13% 1 4% 1 4% 0 0% 50 24% 10:30 PM -11:00 PM 10 100% 11 34% 23 62% 0 0% 7 18% 1 4% 0 0% 0 0% 52 25% 1100 PM- 11:30PM 9 90% 11 34% 18 491 0 0% fi 15% 1 4% 0 0% 0 0% 45 21% 1130 PM 12u0AM 10 100% 7 22% 22 59% 2 4% 4 10% 2 8% 0 0% 0 0% 47 22% 52 Maximums number of oor.,I.ol parking apaoo- 124'ehI,I. from]. 30 PM- IIWIM. Does not Ihd.. the 32 Mfalte parking sp.,hs located in a nearby parking structure, which have been assumed W be unacupleb due to the vacanq of the existing qualt"caurant on Parcel 1. 62 205 Table 13 Parking Spaces Required By City of Newport Beach Parking Code' ' See Appendix H. TSF = Thousand Square Feet 3 TSF based upon net floor area. TSF based upon net public area. 63 20 0 Parking Code Land Use Quantity Units' Parking Code Requirement Retail3 4.325 TSF 1 parking space per 250 square feet of net floor area 18 Bank 4.000 TSF 1 parking space per 250 square feet of gross floor area 16 High- Turnover Restaurant° 2.000 TSF 1 parking space per 40 square feet of net public area 50 Fast Food Restaurant 1.000 TSF 1 parking space per 50 square feet of gross floor area 20 Total I I 1 1 104 ' See Appendix H. TSF = Thousand Square Feet 3 TSF based upon net floor area. TSF based upon net public area. 63 20 0 Table 14 Parking Cade Requirements' r Source: City of Newport Beach and Urban Land Institute Shared Parkin 2nd Edition, 2005. The Urban Land Institute's Shared Parking provides splits for customers /visitors /guests vs. employees /residents for weekdays and weekends. These splits were applied to the City Parking Code so that the sum of the splits is equal to the City Parking Code modified per TSF. ' TSF = Thousand Square Feet s Weekday is defined as 600 AM Monday through 5:00 PM Friday. 4 City Parking Code modified per TSF. 64 2o7 City Weekday Requirements' Weekend Requirements Customer/ Employee/ Customer/ Employee/ Parking Land Use Quantity Units2 Code Visitor /Guest Resident Total Visitor /Guest Resident Total Parking Rates: Retail 4.325 TSF 4.00 3.22 0.78 4.00 3.20 0.80 4.00 Bank 4.000 TSF 4.00 2.61 1.39 4.00 2.61 1.39 4.00 High- Turnover Restaurant 2.000 TSF 25.00 21.50 3.50 25.00 21.25 3.75 25.00 Fast Food Restaurant 1.000 TSF 20.00 17.00 3.00 20.00 17.14 2.86 20.00 Parking Required: Retail 4.325 TSF 18 14 4 18 14 4 18 Bank 4.000 TSF 16 10 6 16 10 6 16 High - Turnover Restaurant 2.000 TSF 50 43 7 50 43 7 50 Fast Food Restaurant 1.000 TSF 20 17 3 20 17 3 20 Total 104 84 20 104 84 20 104 r Source: City of Newport Beach and Urban Land Institute Shared Parkin 2nd Edition, 2005. The Urban Land Institute's Shared Parking provides splits for customers /visitors /guests vs. employees /residents for weekdays and weekends. These splits were applied to the City Parking Code so that the sum of the splits is equal to the City Parking Code modified per TSF. ' TSF = Thousand Square Feet s Weekday is defined as 600 AM Monday through 5:00 PM Friday. 4 City Parking Code modified per TSF. 64 2o7 Table 15 Parking Code Requirements for a Friday With Time -of -Day (TOD) Factors snura. urb,n une mmun 11-a IrA F411nn. se,Teekla. PamMingtnlneu2an uMlm�aUre weeWylseennM ec600 Am Moaeay 1. In PM Faevy, Paeking,neerepNremennane�lmw4a,y ITOOlh2nn reileaweekene �ePUeemenn otter g'.00 Pm. nme�olEey ITO01 Y,waauam ltraan 4nelnau�ve lane we "fummunlry SAOpping Cenna" nme�nlday lTOnl tiemretaeenn urmn�,nelna0wei,ne USe "Rant" 9 ` 'nm..,re.vl*aol e, mae. a, o., nu. mnunelnauvanne,,. °F,mevg,aw,.nc (OvM 'mn..nraay l*ool s.m�maeenn wmnunemawmi.ne n,e "F.rerP,e g,.�..,anc VV 65 Parking Code 9r,1111 meat ?'' Proar arnica High- Tuor—r aeReumnof Fact FOM aeetaunnta Tlme Period Customer TDO Factor Employee 1700faccor I Subtotal Customer TOO Factor Empl ee TOO Factor 6ubtcbl Customer 700Factor Employee TOD Factor Subtotal Customer TOO Factor Empwee TOO Factor Subtotal Total fi W AM - F 30 AM 34 1% 4 IOX 1 30 0% 6 0% 0 43 25% ) 50% 15 ll 5% 3 15% 2 38 fi 30 AM - ] OO AM 14 1% 4. 30% 1 10 Q1( 6 0% 0 43 2594 ] 50% 15 17 5% 3 15% 2 18 ]WAM - ] 30 AM 14 5% 4 35% 2 IO OM 6 O% 0 43 5G% ] 75% 17 17 30% 3 20% 3 32 )30 AM - 800 AM 14 5% 4 15% 2 10 O% 6 0% 0 43 50% ] 75% D 17 am 3 20% 3 32 e WAM - 930 AM 34 15% 4 40% 4 10 50% 6 60% 9 43 fi0X ] 90% 33 11 20% 3 30% 5 51 830AM -90OAM 14 15% 4. 40% 4 30 50% 6 WT 9 43 60% l 90% 33 17 20% 3 30% 5 51 9 W AM - 9 30A 14 35% 4 75% a 10 90% 6 100% IS 43 75% I 90% 39 I] 30%. 3 40% ] 69 aNAM -lO FOAM 14 35% 4 75% 8 IO am 6 100% IS A3 75% ] 90% 39 17 30% 3 40% ] 69 lO COAM - 1030AM 34 65% 4 BS% 13 30 100% 6 300% 16 43 BS% I SW% 40 11 55% 3 75% 12 85 3030 AM -I1 WAM 14 65% 4. 85% 13 10 100% 6 1W% It 0.i 85% l 1W% 44 17 55% 3 15% 12 95 11 WAM - 1130AM 14 85% 4 95% It 10 50% 6 10% Il 43 90% 71 SWX 46 171 FDa,l 3 IWX 19 91 1130 AM - 12 W PM 141 Mr% 41 ac%l 16 1.1 smi 81 Iam 11 43 90% 71 100% A6 ll 85% 3 100% 18 91 1200PM -1230 PM 14 95% 4 1W% 19 10 50% 6 SW% 11 43 3WX I SOON' 50 lI SW% 3 1W% 20 99 1230 PM -100 PM 14 95% 4 100% 18 Do 50% 6 SW% 11 43 100% I 1W% 50 17 SW% 3 16064 20 99 100 PM -130 PM 14 SW% 4 IW% 18 10 50% 6 1W%. 11 43 90% I SW% 4b 37 1W%. 3 100% 20 95 130 PM -200 PM 14 100% 4 ram I8 10 50% 6 100% 11 43 90% I 10% 46 17 1W% 3 IW% 20 95 200 PM -230 PM 34 95% 4 ram ]H 10 70% 6 100% 13 43 50% I 100% 29 lI 9%v 3 95% 19 79 230 PM -300 PM 14 95% 4. SW% 18 SO ]O% 6 100% 13 43 50% l 100% 29 11 90% 3 95% 19 ry 300 PM -330 PM 14 9. 4 1W% 17 10 50% 6 100% 11 43 45% I IS% 25 17 60%. 3 IO% 13 E6 330 PM -400 PM 14 90% 4 1W% lI 10 50% 6 SW% 11 A3 A6% I IS% 25 ll am 3 70% 13 66 4WPM -430 PM 14 90% 4 IW% 17 10 80% 6 INK 14 43 45% I 75% 25 11 55% 3 60% 12 1 68 430 PM -500 PM 14 90% 4. SW% 17 10 e0% 6 IW% 141 43 I % t 15% 251 17 55% 3 1 60% I2 68 500 PM -530 PM 14 90% 4 95% i] 30 036 6 O%. 0 43 60% I 95% 93 ll 60%. 3 ]O%. 13 63 530 PM -600 PM 10 90% 0 95% 17 10 O% 6 0% 0 43 60% I 95% 33 ll 60% 3 ID% 13 63 600 PM -630 PM 14 90% 4 95% IS 10 O% 6 0% 0 0.3 70% I 95% 37 11 &6% 3 90% 18 70 F 30 PM - ] 00 PM 14 90% 4. 85% 15 30 036 6 096 0 0.i ]G% I 95% 37 17 85% 3 am Ie 70 7 0 PM -]3o PM 14 75% 0 89% 14 10 0% 6 0% 0 43 IO% ] 95% 37 17 8036 3 90M 17 6B ] 30 PM -800 PM 14 IS% 4 80% 14 ]0 0% 6 0% 0 43 70% I 95% 37 17 80% 3 90% 17 68 800 PM -830 PM 34 65% 4 75% 13 Ia O% 6 0% 0 43 65% I 95% 35 lI $0% 3 im 31 $9 830 PM -900 PM 14 65% 4. 75% 13 30 0% 6 0% 0 43 65% I 95% 35 17 50% 3 60% Sl 59 900 PM -930 PM 14 50% 4 fi5% 10 10 0% 6 O% 0 43 3096 I W% 19 17 30%. 3 40% I 36 930 PM - 30 W PM 14 50% 4 65% 30 10 O% 6 0% 0 A3 30% I 80X 19 17 30% 3 40% I 36 1000 PM -1030 PM 14 35% 4 0.6% I 30 0% 6 0% 0 43 25% I 65X it 3I 20% 3 30% 5 28 1030 PM -3300 PM 14 35% 4 0.4% ] ID OM 6 0% 0 0.3 25% l 65% Ifi 17 20% 3 3P% 5 28 1100 PM -1130 PM 14 15% 4 15% 3 Io OM 6 IS% I 65% ]I 17 1m6. 3 20X 3 lI It 30 PM 12 W AM 34 35% 4 15% 3 10 D16 6 0% 0 43 15% I 65% 11 3] 30% 3 2G% 3. lI snura. urb,n une mmun 11-a IrA F411nn. se,Teekla. PamMingtnlneu2an uMlm�aUre weeWylseennM ec600 Am Moaeay 1. In PM Faevy, Paeking,neerepNremennane�lmw4a,y ITOOlh2nn reileaweekene �ePUeemenn otter g'.00 Pm. nme�olEey ITO01 Y,waauam ltraan 4nelnau�ve lane we "fummunlry SAOpping Cenna" nme�nlday lTOnl tiemretaeenn urmn�,nelna0wei,ne USe "Rant" 9 ` 'nm..,re.vl*aol e, mae. a, o., nu. mnunelnauvanne,,. °F,mevg,aw,.nc (OvM 'mn..nraay l*ool s.m�maeenn wmnunemawmi.ne n,e "F.rerP,e g,.�..,anc VV 65 Table 16 Projected Peak Day (Friday) Number of Parked Vehicles Time Period Peak Day Number of Parked Vehicles Projected Parking Demand' Total Retail Bank High- Turnover Restaurant Fast Food Restaurant 6:00 AM - 6:30 AM 3 1 0 15 2 21 6:30 AM - 7:00 AM 10 1 0 15 2 28 7:00 AM - 7:30 AM 16 2 0 27 3 48 7:30 AM - 8:00 AM 22 2 0 27 3 54 8:00 AM - 8:30 AM 34 4 9 33 5 85 8:30 AM - 9:00 AM 44 4 9 33 5 95 9:00 AM - 9:30 AM 56 8 15 39 7 125 9:30 AM - 10:00 AM 64 8 15 39 7 133 10:00 AM - 10:30 AM 68 13 16 44 12 153 10:30 AM - 11:00 AM 69 13 16 44 12 154 11:00 AM - 11:30 AM 71 16 11 46 18 162 11:30 AM - 12:00 PM 91 16 11 46 18 182 12:00 PM - 12:30 PM 116 18 11 50 20 215 12:30 PM - 1:00 PM 126 18 11 50 20 225 1:00 PM - 1:30 PM 102 18 11 46 20 197 1:30 PM - 2:00 PM 89 18 11 46 20 184 2:00 PM - 2:30 PM 79 18 13 29 19 158 2:30 PM - 3:00 PM 76 18 13 29 19 155 3:00 PM - 3:30 PM 106 17 11 25 13 172 3:30 PM - 4:00 PM 110 17 11 25 13 176 4:00 PM - 4:30 PM 110 17 1 14 25 12 1 178 4:30 PM - 5:00 PM 120 17 14 25 12 188 5:00 PM - 5:30 PM 128 17 0 33 13 191 5:30 PM - 6:00 PM 133 17 0 33 13 196 6:00 PM - 6:30 PM 113 15 0 37 18 183 6:30 PM - 7:00 PM 97 15 0 37 18 167 7:00 PM - 7:30 PM 108 1 14 0 37 17 176 7:30 PM - 8:00 PM 114 14 0 37 17 182 8:00 PM - 8:30 PM 113 13 0 35 11 172 8:30 PM - 9:00 PM 93 13 0 35 11 152 9:00 PM - 9:30 PM 86 10 0 19 7 122 9:30 PM - 10:00 PM 85 10 0 19 7 121 10:00 PM - 10:30 PM 75 7 0 16 5 103 10:30 PM - 11:00 PM 74 7 0 16 5 102 11:00 PM - 11:30 PM 72 3 0 11 3 89 11:30 PM - 12:00 AM 1 56 1 3 1 0 1 11 1 3 1 73 225 =Maximum projected number of occupied parking spaces - 225 vehicles from 12:30 PM -1:00 PM. I See Table 15. 66 2 0 q Table 17 Parking Demand Summary i See Table 16. 2 Includes 32 off -site parking spaces located in a nearby parking structure. 67 �2� Number of Descriptor Parking Spaces Maximum Projected Parking Demand During Peak Hours' 225 Proposed Parking Spaces Provided 222 Additional Parking Spaces Needed 3 i See Table 16. 2 Includes 32 off -site parking spaces located in a nearby parking structure. 67 �2� i I � I PARKING MIGTURE 116 Cas I °� °1epe"ruro R6 (=Il r6r lu mmd^ - EXISTING BUILDING 12 SO'-0' 1015 SO fT grain 26 bR 9_.. sm Pmw^r l;^em b PAR�CEL2 §e Pmoenr lm ,,Ceara )WO, FI °: Irol a pall rummm�d c e- �a 19 I yw l0 4� 1 R-OSn s. 1,ra isa , — _'• s I I � § c - 19 PARCELS Y -(sown PARCEL 9 VW sa � Iro n.xos son exs *Ina azl,m�rve __- _______ _ �^elamnl to ,D BE DEMIX6MED R� �, 2 § it 5 1? F 8 IF R-02 4 1- ss-} lNa9 2<O g I ea 1965 SOR da,m mA • 5 -B EXISTING BUILD ING ------------- C r ,� +so-6 aoown d�,r�,W$ Ix,^ q amoson tl 5 _ ,-- -I�Vw' PmCCIY U.- o } U109,1 2r'iW h.W n...pp: 4 sign m bb so, aro+ win, s9n Iwo Iwo i@ InfpbClbllFl Of 111YNC011WFE�iiantla]$P11111 R YACeR19011 Bomaglm `y,�:.. 65b EEb lwv NpC 50`BIASr I^IN) Ne Wl tam Lat9 PWEL I PUM1LIR IaYPrI CPnpl,'„iX1 egaNO Oatiletl rcla n L� 212 Figure 31 Parking Survey Summary Graph (Existing Conditions) 250 — ° °- 200 M 150 a par c Y d 0 v a 100 z ........................................... ............................... --------------------------------------------------------- - - - - -- \ 00""' / / \\ �,n -------------------- -- ---- \` - - -- f -------------- V ------ \`---- - - - - -' � , \ "i - -- - \ - ------------------------------------------------- - - - - -- / o Q e Q Q Q Q 0 0 i 0 §i 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ti ti M P h to' n' Qi of 6' hti —Park ni; Spaces Occupied on Friday (February 11, 2011) Parking Spaces Occupied on Saturday (February 12 2011( ......... Total Parking Spaces Provided- M (not including 32 f,ft. parking spaces) KUNZMAN ASSOCIATES, INC. 4839C/31 OVER 30 YEARS OF EXCELLENT SERVICE 70 213 Appendices Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G Appendix H Appendix Glossary of Transportation Terms Year 2008 /2009 Worksheets Regional Traffic Annual Growth Rate Explanation and Calculation of Intersection Capacity Utilization Approved Project Data TPO One - Percent Analysis Calculation Worksheets Cumulative Project Data City of Newport Beach Parking Code Requirements Parking Covenant and Agreement Please reference the included CD to view and print the Appendices. For a printed copy of the Appendices, please contact us at: KUNZMAN ASSOCIATES, INC. 1111 Toyv'u & Cou\TRv ROAD, SUITE 34 ORANGE, CA 92868 -4667 PHONE (714) 973 -8383 F,vx (714) 973 -8821 Eu.AIL: ateAIL @TRAFFIC— ENCIAEER.COS1 \/\'EB: A A'VA'VA'.TR,\FFIC— ENGINEER.COkI 214 APPENDIX A Glossary of Transportation Terms 215 GLOSSARY OF TRANSPORTATION TERMS COMMON ABBREVIATIONS AC: Acres ADT: Average Daily Traffic Caltrans: California Department of Transportation DU: Dwelling Unit ICU: Intersection Capacity Utilization LOS: Level of Service TSF: Thousand Square Feet V/C Volume /Capacity VMT: Vehicle Miles Traveled TERMS AVERAGE DAILY TRAFFIC: The total volume during a year divided by the number of days in a year. Usually only weekdays are included. BANDWIDTH: The number of seconds of green time available for through traffic in a signal progression. BOTTLENECK: A constriction along a travelway that limits the amount of traffic that can proceed downstream from its location. CAPACITY: The maximum number of vehicles which can be reasonably expected to pass over a given section of a lane or a roadway in a given time period. CHANNELIZATION: The separation or regulation of conflicting traffic movements into definite paths of travel by the use of pavement markings, raised islands, or other suitable means to facilitate the safe and orderly movements of both vehicles and pedestrians. CLEARANCE INTERVAL: Nearly same as yellow time. If there is an all red interval after the end of a yellow, then that is also added into the clearance interval. CORDON: An imaginary line around an area across which vehicles, persons, or other items are counted (in and out). CYCLE LENGTH: The time period in seconds required for one complete signal cycle. CUL -DE -SAC STREET: A local street open at one end only, and with special provisions for turning around. 210 DAILY CAPACITY: The daily volume of traffic that will result in a volume during the peak hour equal to the capacity of the roadway. DAILY TRAFFIC: Same as average daily traffic. DELAY: The time consumed while traffic is impeded in its movement by some element over which it has no control, usually expressed in seconds per vehicle. DEMAND RESPONSIVE SIGNAL: Same as traffic - actuated signal. DENSITY: The number of vehicles occupying in a unit length of the through traffic lanes of a roadway at any given instant. Usually expressed in vehicles per mile. DETECTOR: A device that responds to a physical stimulus and transmits a resulting impulse to the signal controller. DESIGN SPEED: A speed selected for purposes of design. Features of a highway, such as curvature, superelevation, and sight distance (upon which the safe operation of vehicles is dependent) are correlated to design speed. DIRECTIONAL SPLIT: The percent of traffic in the peak direction at any point in time. DIVERSION: The rerouting of peak hour traffic to avoid congestion. FIXED TIME SIGNAL: Same as pretimed signal. FORCED FLOW: Opposite off reeflow. FREE FLOW: Volumes are well below capacity. Vehicles can maneuver freely and travel is unimpeded by other traffic. GAP: Time or distance between successive vehicles in a traffic stream, rear bumper to front bumper. HEADWAY: Time or distance spacing between successive vehicles in a traffic stream, front bumper to front bumper. INTERCONNECTED SIGNAL SYSTEM: A number of intersections that are connected to achieve signal progression. LEVEL OF SERVICE: A qualitative measure of a number of factors, which include speed and travel time, traffic interruptions, freedom to maneuver, safety, driving comfort and convenience, and operating costs. �Z� LOOP DETECTOR: A vehicle detector consisting of a loop of wire embedded in the roadway, energized by alternating current and producing an output circuit closure when passed over by a vehicle. MINIMUM ACCEPTABLE GAP: Smallest time headway between successive vehicles in a traffic stream into which another vehicle is willing and able to cross or merge. MULTI - MODAL: More than one mode; such as automobile, bus transit, rail rapid transit, and bicycle transportation modes. OFFSET: The time interval in seconds between the beginning of green at one intersection and the beginning of green at an adjacent intersection. PLATOON: A closely grouped component of traffic that is composed of several vehicles moving, or standing ready to move, with clear spaces ahead and behind. ORIGIN - DESTINATION SURVEY: A survey to determine the point of origin and the point of destination for a given vehicle trip. PASSENGER CAR EQUIVALENTS (PCE): One car is one Passenger Car Equivalent. A truck is equal to 2 or 3 Passenger Car Equivalents in that a truck requires longer to start, goes slower, and accelerates slower. Loaded trucks have a higher Passenger Car Equivalent than empty trucks. PRETIMED SIGNAL: A type of traffic signal that directs traffic to stop and go on a predetermined time schedule without regard to traffic conditions. PROGRESSION: A term used to describe the progressive movement of traffic through several signalized intersections. SCREEN -LINE: An imaginary line or physical feature across which all trips are counted, normally to verify the validity of mathematical traffic models. SIGNAL CYCLE: The time period in seconds required for one complete sequence of signal indications. SIGNAL PHASE: The part of the signal cycle allocated to one or more traffic movements. STARTING DELAY: The delay experienced in initiating the movement of queued traffic from a stop to an average running speed through a signalized intersection. TRAFFIC - ACTUATED SIGNAL: A type of traffic signal that directs traffic to stop and go in accordance with the demands of traffic, as registered by the actuation of detectors. 212 TRIP: The movement of a person or vehicle from one location (origin) to another (destination). For example, from home to store to home is two trips, not one. TRIP -END: One end of a trip at either the origin or destination; i.e. each trip has two trip -ends. A trip -end occurs when a person, object, or message is transferred to or from a vehicle. TRIP GENERATION RATE: The quality of trips produced and /or attracted by a specific land use stated in terms of units such as per dwelling, per acre, and per 1,000 square feet of floor space. TRUCK: A vehicle having dual tires on one or more axles, or having more than two axles. UNBALANCED FLOW: Heavier traffic flow in one direction than the other. On a daily basis, most facilities have balanced flow. During the peak hours, flow is seldom balanced in an urban area. VEHICLE MILES OF TRAVEL: A measure of the amount of usage of a section of highway, obtained by multiplying the average daily traffic by length of facility in miles. X19 APPENDIX B Year 2008 /2009 Worksheets �?J City: NEWPORT BEACH N -S Direction: MACARTHUR BOULEVARD E -W Direction: CAMPUS DRIVE Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 C:rni me Printad_ VFHICI FR File Name : H0804094 Site Code : 00000000 Start Date :511412008 Page No : 1 08:00 AM MACARTHUR 203 CAMPUS DRIVE 14 MACARTHUR CAMPUS DRIVE 10 231 13 BOULEVARD 127 Westbcund 861 BOULEVARD Eastbound 212 46 18 Southbound 251 15 245 Northbound 13 144 77 913 Start Time Ri ht I Thru I Left Ri ht Thru 11 Left RI ,h1 Thru Left Ri ht Thru 08:45 AM Left Int. Total Factor 1.0 1.0 19 1.0 1.0 1.0 - 11 1.0 1.0 1.0 1.0 1.0. 1.0 195 1.0 185 07:00 AM 24 139 41 4 28 4 5 112 4 10 68 33 472 07:15 AM 30 130 35 12 25 4 3 94- 10 22 116 71 552 07:30 AM 49 190 48 14 34 15 5 174 - 7 - 11 114 79 740 07:45 AM 44 205 41 17 40 13 8 207 12 15 130 74 •806 Total 147 664 165 47 127 36 21 - 587 -33 58 .428 257 2570 08:00 AM 52 203 50 14 44 231 10 231 13 14 127 80 861 08:15 AM 58 212 46 18 51 251 15 245 9 13 144 77 913 08:30 AM 61 219 52 15 48 20 11 236 8 - 10 151 84 915 08:45 AM - 56 201 47 11 - 42 19 13 232 - 7 - 11 133 66 838 Total 227 835 195 58 185 87 49 944 37 48 555 307 3527 "' BREAK •.. - 04:30 PM 98 149. 41 39 173 181 5 225 - 211 28 66 761 902 05:00 PM 108 164 9 41 177 261 10 251 30 21 76 69 982 05:15 PM 104 -.182 11 51 166 241 13 272 -. 41 24 74 87 1049 05:30 PM - 121 204 10 52 182 21 15 288 39 27 57 72 1088 05:45 PM 118 219 13 48 182 27 11 274 34 21 72 88 1087 Total 451 769 43 192 687 981 49 1085 1441 93 279- 3161 4206 06:00 PM 104 - 214 11 44 159 261 10 257 - 40 24 71 77 1037 06:15 PM 88 209 14 37 169 23 11 - 250 39 30 67 68 1005 Grand Total 1233 2997 438 461 1661 309 153 3579 345 304 1527 1170 14177 - Apprch % 26.4 64.2 9.4 19.0 68.3 12.7 3.8 87.8 8.5 - 10.1 50.9 39.0 Total % 8.7 21.1 3.1 - 3.3 11.7 2.2 1.1 25.2 2.4 2.1 10.8 8.3 �m m r� 0 cm N2 �a� Q Transportation Studies, Inc. 2680 Walnut Avenue _ Suite C Tustin, CA. 92780 CAMPUS DRIVE Thru I BOULEVARD' Westbound Left Right I Southbound Left I App' Start Time Right I Thru I Left I App' <1 of 3.6 Total 11 Total Peak Hour From 07:00 AM to 08:45 AM - Pei Intersection 08:00 AM 17.6 Volume 227 835 195 1257 Percent 18.1 66.4 15.5 20 08:30 61 219 52 332 Volume 18 51 Peak Factor 94 Tom High Int. 08:30 AM 0.878 Volume 61 219 52 332 Peak Factor 910.•'. 0.947 �m m r� 0 cm N2 �a� Q Transportation Studies, Inc. 2680 Walnut Avenue _ Suite C Tustin, CA. 92780 CAMPUS DRIVE Thru I Left I Westbound Left Right I Thru I Left I App' 944- 37 1030 Total <1 of 3.6 Total 11 58 185 87 330 17.6 56.1 26.4 15 15 48 20 83 08:15 AM 0.957 18 51 25 94 Tom : T 0.878 BOULEVARD Northbound Right I Thru I Left I App. Left Tlw Ri ht 37 49 944- 37 1030 4.8 91.7 3.6 Total 11 236 - 8 255 08:15 AM Eastbound 15 245 9 269 Left 0.957 m IHUKw LtVw Out In Total 1309 F1 7fi F2566 2271 8351 195 K TM Le 1 '+ NT 142008 8:00:00 AM 14/2008 8:45:00 AM VEHICLES - - w .37 C N O rT V O b 222 R61 F+ Left Tlw Ri ht 37 944 49 970 1030 F 20-0-01 Out In Total MACARTHUR BOULEVARD - w .37 C N O rT V O b 222 R61 Site Cdd Start Date`'' Page No ; F CAMPUS. DRNE;;j- Eastbound .. ": Right Thru Left Tom : T 48 555 307 910.•'. -; 5.3 . 61.0 33.7 10 151 84 245,:. ;f 0 08:30 AM 10 151 84 245 0.929 - w .37 C N O rT V O b 222 Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0804094 Site Code : 00000000 Start Date : 5/14/2008 Page No :3 reaK nour rrom V4:;7u rM to U1i:1 b rM - Ye< MACARTHUR CAMPUS DRIVE MACARTHUR CAMPUS DRIVE Volume 447 819 BOULEVARD Westbound BOULEVARD Eastbound 3.4 52 Southbound - 121 204 Northbound 335 Volume Start Time Right Thru Left I App' Right Thru Left ApP. Right Thru Left App' Right Thru Left App. Int. Peak Factor Total Total Total Total Total reaK nour rrom V4:;7u rM to U1i:1 b rM - Ye< Intersection 05:15 PM 195 Volume 447 819 45 1311 Percent 34.1 62.5 3.4 52 05:30 121 204 10 335 Volume 52 182 Peak Factor 255 High Int. 05:45 PM Volume 118 219 13 350 Peak Factor 0.936 K1 Or 195 669 96 962 20.3 69.5 10.2 52 182 21 255 05:30 PM 52 182 21 255 0.943 49 1091 154 1294 3.8 84.3 11.9 15 288- 39 - 342 05:30 PM 15 288 39 342 0.946 96 274 324 694 13.8 39.5 46.7 -27 57 72 156 05:15 PM 24 74 87 185 0.938 Ord In Total - - 1610 1317 2921 44 679 45 Right Thru Left +' 1 '+ 129'ze�: North 7412006 i 00 142006 &Woo PM O' VEHIC4.ES Left Thr Right - - 754 1091 49 013 1294 2307 Out In Total -WCARTEURBMEVARD 223 4261 1088 0.979 rn D m O C Z v a v O n x 5 M Intersection Turning Movement by: Pre'pared n 1 DS National Data & Surveying Services TMC Summary of MacArthur Blvd /Birch St TOTAL AM NOON PM 764 ] 158 332 274 731 7 310 1 239 182 204 73 78 53 00N 01: Signalized SOUTHBOUND APPROACH LANES n F a_3g Jb� m � w z £ m M Project #: 09- 5077 -017 I I � �r�� NORTHBOUND APPROACH LANES TURNING MOVEMENT COUNT AM PEAK HOUR 815 AM NOON PEAK HOUR 1245 PM PM PEAK HOUR 500 PM 224 Intersection Turning Movement Prepared by: National Data & Surveying Services N -S STREET: MacArthur Blvd DATE: 03/05/2009 LOCATION: City of Newport Beach E -W STREET: Birch St DAY: THURSDAY PROJECT# 09 -5077 -017 NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 1 3 1 1 4 0 1.5 1.5 0 1 2 1 4566 I 6:00 AM 6:15 AM 6:30 AM 6:45 AM 7:00 AM 7:15 AM 7:30 AM 5 123 18 22 107 34 28 68 14 7 21 4 451 7:45 AM 4 195 16 23 148 37 25 61 15 5 32 10 571 8:00 AM 13 190 26 22 131 37 31 49 22 5 34 5 565 8:15 AM 7 176 20 19 167 41 31 92 20 11 30 11 625 8:30 AM 7 178 32 14 147 39 37 77 25 4 38 10 608 8:45 AM 11 170 24 34 170 49 44 68 _ 11 10 43 11 645 9:00 AM 7 165 22 33 140 47 46 73 17 6 43 21 620 9:15 AM 10 139 22 17 128 40 33 33 7 6 27 19 481 9:30 AM 9:45 AM 10:00 AM 10:15 AM 10:30 AM 10:45 AM 11:00 AM 11:15 AM 11:30 AM 11:45 AM TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL VOLUMES= 64 1336 180 184 I 1138 324 275 I 521 131 54 I 268 91 4566 I AM Peak Hr Begins at: 815 AM PEAK VOLUMES = 32 689 98 1 100 624 176 1 158 310 73 1 31 154 53 1 2498 PEAK HR. FACTOR: 1 0.944 CONTROL: Signalized W� 225 Intersection Turning Movement Prepared by: National Data & Surveying Services N -S STREET: MacArthur Blvd DATE: 03/05/2009 LOCATION: City of Newport Beach E -W STREET: Birch St DAY: THURSDAY PROJECT# 09 -5077 -017 NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND TOTAL NL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 1 3 1 1 4 0 1.5 1.5 0 1 2 1 1:00 PM 1:15 PM 1:30 PM 1:45 PM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:00 PM 3:15 PM 3:30 PM 3:45 PM 4:00 PM 4:15 PM 14 126 5 18 154 42 65 35 9 12 68 22 570 4:30 PM 18 153 6 9 167 28 56 34 9 21 84 36 621 4:45 PM 18 127 4 9 172 46 74 44 18 22 98 31 663 5:00 PM 30 188 9 14 213 37 82 58 16 23 147 48 865 5:15 PM 16 161 5 12 210 37 64 48 16 30 84 35 718 5:30 PM 16 158 7 9 208 36 78 42 11 38 113 48 764 5:45 PM 24 139 4 14 227 39 50 34 10 23 89 39 692 6:00 PM 21 134 4 11 174 38 62 38 7 23 77 39 628 6:15 PM 6:30 PM 6:45 PM TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL VOLUMES = 157 1186 44 96 1525 303 531 333 96 192 760 298 5521 PM Peak Hr Begins at: 500 PM PEAK VOLUMES = 86 646 25 1 49 858 149 1 274 182 PEAK HR. FACTOR: I 0.834 I 0.943 I 0.816 CONTROL: Signalized 53 1 114 433 170 1 3039 r, :- IYEn 220 C Z m Intersection Turning Movement Pre,nmed by: NS National Data & Surveying Services TMC Swgima MacArthur � qfMacAl LrrBlvd /Von KarmanAve /Newport Project #: 09-5077-016 TOTAL AM NOON PM 286 19 NOON PEAK HOUR 1245 PM F-471 96 180 �8 5 IgIl 1 295 28 84 183 CONTROL: Signalized SOUTHBOUND APPROACH LANES AM NOON PM TOTAL 12 46 38 136 160 127 78 223 665 966 Z U 0 rn a TURNING MOVEMENT COUNT 500M. 91'Al lip! MIM I 1 l g R� w --q OR I", (Intersection Name) lI Day Date COUNT PERIODS am 7,30 AM - 9:30 M I noon 11,45 AM - 5 PPI I Pm 4:15 PM - 6;15 PM AM PEAK HOUR 800 AM NOON PEAK HOUR 1245 PM PM PEAK HOUR 500 PM M V1 AM NOON PM TOTAL 12 46 38 136 160 127 78 223 665 966 Z U 0 rn a TURNING MOVEMENT COUNT 500M. 91'Al lip! MIM I 1 l g R� w --q OR I", (Intersection Name) lI Day Date COUNT PERIODS am 7,30 AM - 9:30 M I noon 11,45 AM - 5 PPI I Pm 4:15 PM - 6;15 PM AM PEAK HOUR 800 AM NOON PEAK HOUR 1245 PM PM PEAK HOUR 500 PM 227 Intersection Turning Movement Prepared by: National Data & Surveying Services N -S STREET: MacArthur Blvd DATE: 03/05/2009 LOCATION: City of Newport Beach E -W STREET: Von Karman Ave /Newport PI DAY: THURSDAY PROJECT# 09- 5077 -016 TOTAL NORTHBOUND SOUTHBOUND NR EASTBOUND ST WESTBOUND EL ET NIL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 1 3 1 1 3 1 1 2 1 2 1 1 6:00 AM 6:15 AM 6:30 AM 6:45 AM 7:00 AM 7:15 AM 7:30 AM 19 173 117 12 81 19 2 14 3 7 11 1 459 7:45 AM 25 219 169 17 94 38 10 23 4 19 28 1 647 8:00 AM 14 251 194 18 97 28 5 15 5 15 24 2 668 8:15 AM 27 254 165 17 122 56 8 26 11 17 31 3 737 8:30 AM 30 244 146 10 102 30 1 38 5 24 46 1 677 8:45 AM 30 239 151 13 114 49 5 17 7 22 35 6 688 9:00 AM 27 227 127 13 103 31 6 15 16 29 35 6 635 9:15 AM 21 225 86 16 86 30 6 20 7 25 22 5 549 9:30 AM 9:45 AM 10:00 AM 10:15 AM 10:30 AM 10:45 AM 11:00 AM 11:15 AM 11:30 AM 11:45 AM TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL VOLUMES = 193 1832 1155 116 799 281 43 I 168 58 158 I 232 25 5060 I AM Peak Hr Begins at: 800 AM PEAK VOLUMES = 101 988 656 1 58 435 163 1 19 96 28 1 78 136 12 1 2770 PEAK HR. FACTOR: CONTROL: 0.950 Signalized 0.841 0.794 222 i . , Intersection Turning Movement Prepared by: National Data & Surveying Services N -S STREET: MacArthur Blvd DATE: 03/05/2009 LOCATION: City of Newport Beach E -W STREET: Von Karman Ave /NewportPI DAY: THURSDAY PROJECT# 09 -5077 -016 NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND TOTAL NL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 1 3 1 1 3 1 1 2 1 2 1 1 1:00 PM 1:15 PM 1:30 PM 1:45 PM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:00 PM 3:15 PM 3:30 PM 3:45 PM 4:00 PM 4:15 PM 16 126 29 5 178 14 33 26 41 85 25 4 582 4:30 PM 22 127 18 7 194 11 35 30 37 89 25 6 601 4:45 PM 14 139 18 3 189 12 20 34 35 93 29 17 603 5:00 PM 11 186 22 5 239 19 45 55 50 151 35 6 824 5:15 PM 14 155 41 10 267 11 34 46 40 176 35 5 834 5:30 PM 9 139 32 8 244 7 33 52, 51 167 35 7 784 5:45 PM 14 144 31 6 218 15 26 42 42 171 22 20 751 6:00 PM 20 127 18 7 191 6 13 39 31 123 21 7 603 6:15 PM 6:30 PM 6:45 PM TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL VOLUMES = 120 1143 209 51 I 1720 95 239 I 324 327 1 1055 227 72 5582 I PM Peak Hr Begins at: 500 PM PEAK VOLUMES = 48 624 126 1 29 968 52 1 138 195 183 1 665 127 38 1 3193 PEAK HR. FACTOR: 1 0.911 CONTROL: Signalized 0.911 1 :. � 0.961 1 0.957 2�9 City: NEWPORT BEACH N -S Direction: JAMBOREE ROAD E -W Direction: MACARTHUR BOULEVARD Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 rirromw Printari_ VFNIr.1 rS File Name : H0903077 Site Code : 00000000 Start Date : 3/26/2009 Page No : 1 08:00 AM JAMBOREE ROAD MACARTHUR 751 JAMBOREE ROAD MACARTHUR - 38 217 90 32 Southbound 12 BOULEVARD 1222 Northbound BOULEVARD 42 157 91 125 _ 50 51 199 Westbound 24 76 -22 76 Eastbound 1320 08:30 AM 34 204 Start Time Right Thru Left Right Thru Left Right Thru Left Right - Thru Left 1196 I Ina. 45 148 102 117 306 48 44 149 104 40 94 Total Total Total Total Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.01 1.0 71 234 37 07:00 AM 25 132 57 50 166 14 17 128 63 22 44 5 44 679 723 07:15 AM 23 155 82 70 196 20 23 148 72 29 58 14 56 832 888 07:30 AM 37 157 79 105 281 42 44 208 67 28 59 18 59 1066 1125 07:45 AM 45 167 84 99 280 39 54 211 115 35 59 - 17 59 1146 1205 Total 130 611 302 324 923 115 138 695 317 - 114 218 54 218 3723 3941 08:00 AM 60 146 751 117 387 48 38 217 90 32 79 12 79 1222 1301 08:15 AM 42 157 91 125 385 50 51 199 98 24 76 -22 76 1244 1320 08:30 AM 34 204 114 115 1 280 40 33 224 107 - 30 79 - 15 79 1196 1275 08:45 AM 45 148 102 117 306 48 44 149 104 40 94 22 94 1125 1219 "'BREAK "' 230 170 120 04:45 PM 33 236 :1251 115 30I 8 225 37 80 241 231 241 982 1223 _ Total 62 418 2341 174 235 751 15 416 581 146 426 581 426 1921 2347 05:00 PM 23 218 - 140 87 131 551 6 219 521 63 212 46 212 1040 1252 05:15 PM 34 239 151 98 143 581 9 232 491 71 234 37 234 1121 1355 05:30 PM 42 227 147 107 149 55 8 239 56 83 249 41 249 1154 1403 05:45 PM 37 234 163 92 140 61 9 252 51 78 237- 42 237 1159 1396 Total 136 918 601 384 563 2291 32 942 2081 295 932 156 932 4474 5406 06:00 PM 42 221 1501 -100 146 531 1 244 58 80 245 37 245 1142 1387 06:15 PM 36 232 139 89 138 47 8 239 _42 75 237 - 34 237 1079 1316 Grand Total 587 3055 1808 1545 3363 705 370 3325 -1112 836 2386 420 2386 17126 19512 Apprch % 10.8 56.1 33.2 27.5 59.9 12.6 1 7.7 69.2 23.1 -66.6 33.4 Total % 3.4 17.8 10.6 9.0 19.6 4.1 2.2 19.4 6.5 4.9 2.5 12.2 87.8 230 Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0903077 Site Code : 00000000 Start Date : 3/26/2009 Page No : 2 reaK mour "om ut:uu AM to 116:45 AM - Peak JAMBOREE ROAD MACARTHUR BOULEVARD JAMBOREE ROAD MACARTHUR BOULEVARD Volume 181 674 Southbound Westbound Northbound Eastbound 29.9 Start Time Right Thru Left App' Right Thru Left App' Right Thru Left App' Right Left App' Int. 07:45 AM Volume 34 204 114 Peak Factor Total 0.866 Total Total Total reaK mour "om ut:uu AM to 116:45 AM - Peak Intersection 07:45 AM 121 66 456 Volume 181 674 364 1219 Percent 14.8 55.3 29.9 125 08:15 42 157 91 290 Volume 125 385 Peak Factor 560 0.966 07:45 AM High Int. 08:30 AM 07:45 AM Volume 34 204 114 352 Peak Factor 52 0.866 I Of 1 410 1437 121 66 456 1332 177 1965 23.2 67.8 9.0 125 385 50 560 08:15 AM 1244 125 385 50 560 0.966 07:45 AM 0.877 176 851 410 1437 121 66 187 4808 12.2 59.2 28.5 64.7 35.3 51 199 98 348 24 22 46 1244 0.966 07:45 AM 07:45 AM 54 211 115 380 35 17 52 0.945 0.899 Out In Total 1373 FI-21-91 F-2-5972 iBi 674 384 It Thm Left 1 TF N O S North �m J 7:45:OOAM - -2w m� N s 009 8:30:00 AM N a J �CN +1 r Left Tluu Rf M 410 B51 176 972 � 17 = 2409J Out In Total ' 2SI Transportation Studies, Inc 2680 Walnut Avenue WUJIUMEE ROAD ON In Total 1527 1667 3206 155 921 611 RI 9M Ttw Left .� 1 L4 �� or �w m � r4rnln _Cb J 95'15:00 PM < -2m -� ^3 = 9 6:00:00 PM VEHICLE ^' -a o S a to o— III h -� Left T_Iw Ri M E_219fi7 _ 37 �._T._- I 14601 ,_1218 i Total ' ' Out In Total i JAMBOREE ROAD Suite C File Name : H0903077 Tustin, CA. 92780 Site Code :00000000 Start Date : 3/26/2009 Page No :3 JAMBOREE ROAD MACARTHUR BOULEVARD JAMBOREE ROAD Southbound Westbound Northbound BOULEVARD BOULEVARD Eastbound Start Time Right Thru Left Top- Right Thru Left Right Thru Left Right Left Total Total Total Total mk Hour From 04:30 PM to 06:15 PM - Peak 1 of 1 Intersection 05:15 PM Volume 155 921 611 1687 397 578 227 1202 37 967 214 1218 312 157 469 4576 Percent 9.2 54.6 36.2 33.0 48.1 18.9 3.0 79.4 17.6 66.5 33.5 05:45 37 234 163 434 92 140 61 293 9 252 51 312 78 42 120 1159 Volume Peak Factor 0.987 High Int. 05:45 PM 05:30 PM 06:00 PM 05:30 PM Volume 37 234 163 434 107 149 55 311 11 244 58 313 83 41 124 Peak Factor 0.972 0.966 0.973 0.946 WUJIUMEE ROAD ON In Total 1527 1667 3206 155 921 611 RI 9M Ttw Left .� 1 L4 �� or �w m � r4rnln _Cb J 95'15:00 PM < -2m -� ^3 = 9 6:00:00 PM VEHICLE ^' -a o S a to o— III h -� Left T_Iw Ri M E_219fi7 _ 37 �._T._- I 14601 ,_1218 i Total ' ' Out In Total i JAMBOREE ROAD City: NEWPORT BEACH N -S Direction: CAMPUS DRIVE E -W Direction: NORTH BRISTOL STREET Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 Groups Printed- VEHICLES File Name : H0903060 Site Code : 00000000 Start Date : 3/1712009 Page No : 1 08:00 AM 08:15 AM 08:30 AM _._..._......._ 08:45 AM Total "' BREAK "' 04:30 PM 04:45 PM Total 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total 06:00 PM 06:15 PM Grand Total Apprch % Total % 36 60 47 61 204 250 221 471 259 265 250 233 1007 175 191 2209 57.1 14.9 49 0 38 61 0 29 59 0 36 51 0 35 220 0, 138 136 0 21 131 0 20 267 01 41 147 0 20 206 0 14 196 0 19 193 0 21 742 0 74 146 0 12 118 0 15 1662 0 407 42.9 0.0 7.0 11.2 0.0 2.7 240 183 242 237 902 374 393 767 543 518 423 383 1867 403 318 4884 83.7 33.0 30 35 22 33 120 31 39 70 381 59 400 200 45 37 541 9.3 3.7 0 405 82 0 378 80 0 369 89 0 381 98 0 1533 349 0 128 108 0 130 92 0 258 200 0 168 100 0 172 99 0 176 82 0 155 89 0 671 370 0 120 91 0 116 94 0 3737 1374 0.0 73.1 26.9 0.0 25.2 9.3 0 0 01 880 0 0 01 826 0 0 01 864 0 0 0 1 696 0 0 01 3466 0 0 0 1048 0 0 0 1026 0 0 01 2074 0 0 0 1275 0 0 0 1333 0 0 0 1197 0 0 _ 0 1126 0 0 0 4931 0 0 0 992 0 0 0 889 0 0 0 14814 0.0 0.0 0.0 0.0 0.0 0.0 233 CAMPUS D RIVE NORTH BRISTOL CAMPUS DRIVE NORTH BRISTOL . j STREET (ONE -WAY) STREET (ONE -WAY) � j Southbound Westbound Northbound. Eastbound Start Time Ri ht Thru 1 Left Right Thru Left R' !lt Thru __ Left Right _Thru Left Int. Total I Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 07:00 AM 31 38 0 34 100 15 0 191 47 0 0 0 _ 456 07:15 AM 39 39 0 25 128 23 0 200 65 0 0 0 519 07:30 AM 40 42 0 40 172 17 0 285 80 0 0 0 676 07:45 AM 51 50 0 28 227 14 0 363 78 0 0 0 811 Total 161 169 0 127 627 69, 0 1039 270 0 0 0 I 2462 08:00 AM 08:15 AM 08:30 AM _._..._......._ 08:45 AM Total "' BREAK "' 04:30 PM 04:45 PM Total 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total 06:00 PM 06:15 PM Grand Total Apprch % Total % 36 60 47 61 204 250 221 471 259 265 250 233 1007 175 191 2209 57.1 14.9 49 0 38 61 0 29 59 0 36 51 0 35 220 0, 138 136 0 21 131 0 20 267 01 41 147 0 20 206 0 14 196 0 19 193 0 21 742 0 74 146 0 12 118 0 15 1662 0 407 42.9 0.0 7.0 11.2 0.0 2.7 240 183 242 237 902 374 393 767 543 518 423 383 1867 403 318 4884 83.7 33.0 30 35 22 33 120 31 39 70 381 59 400 200 45 37 541 9.3 3.7 0 405 82 0 378 80 0 369 89 0 381 98 0 1533 349 0 128 108 0 130 92 0 258 200 0 168 100 0 172 99 0 176 82 0 155 89 0 671 370 0 120 91 0 116 94 0 3737 1374 0.0 73.1 26.9 0.0 25.2 9.3 0 0 01 880 0 0 01 826 0 0 01 864 0 0 0 1 696 0 0 01 3466 0 0 0 1048 0 0 0 1026 0 0 01 2074 0 0 0 1275 0 0 0 1333 0 0 0 1197 0 0 _ 0 1126 0 0 0 4931 0 0 0 992 0 0 0 889 0 0 0 14814 0.0 0.0 0.0 0.0 0.0 0.0 233 Transportation Studies, Inc. 2680 Walnut Avenue Suite C File Name : H0903060 Tustin, CA. 92780 Site Code : 00000000 Start Date : 3/17/2009 Page No : 2 Time Start Time �.--- IVVRIrIORIJI VLJIRCCI CAMPUS DRIVE CAMPUS DRIVE (ONE -WAY) I Southbound Northbound Westbound __ _ Right Thru Left r App' Right Thru Left App ht Thru 1 _ Left I Total g Total I i- -- 7__--- .lJ- -;_ IYVRIII ORIJI VL JIRCCI. (ONE -WAY) _ —� Eastbound App' Right I Thru Left App Total Total I 9 '�� Int, Total Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1 7882 Oul CAMPUS North w o Intersection 08:00 AM 17!2009 8:00:00 AM 17!2009 8:45:00 AM 05 n G« -I - VEHICLES m0' Volume 204 220 0 424 138 902 120 11601 0 - 1533. 349 1882 0 '0 0 0 3466 Percent 48.1 51.9 0.0 11.9 77.8 10.3 1 0.0 81,5 18.5 0.0 0.0 0.0 m 61 51 0 1121 l 35 237 33 3051 0 381 98 479 0 0 0 0 896 Volume e Peak Factor 1 0.967 High Int. 08:15 AM 08:00 AM 08:00 AM 6:45:00 AM Volume 60 61 0 121 38 240 30 306 0 405 82 487 Peak Factor .0.876 0.942 0.966 Out In To@ 1671 424 204 220 D Right Thru Left 4J I L4 ow__ T r T m _-T ® 7882 Oul CAMPUS North w o 17!2009 8:00:00 AM 17!2009 8:45:00 AM 05 n G« -I - VEHICLES m0' 4, T r LeIt Thru Ri ht 349 1533 0 ® 7882 Oul CAMPUS In Total DRIVE �w o0 =m r 234 CAMPUS DRIVE 1867 Southbound 2141 •,... Start Time Right', Thru r Left j 87.2 i— Total - --'---- -' —�-- Peak .— H—our From 04:30 PM to 06:15 PM - Pet Intersection 05:00 PM 59 Volume 1007 742 0 1749 Percent 57.6 42.4 0.0 05:15 543 265 206 0 Volume 471 Peak Factor High Int. 05:15 PM 0.891 Volume 265 206 - 0 471 Peak Factor 0.928 Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 (ONE -WAY) Westbound Right I Thru Left 74 1867 200 2141 3.5 87.2 9.3 :3 -14 518 59 591 05:00 PM 20 543 38 601 0.891 CAMPUS DRIVE Northbound Right-FThru 1 Left 0 671 370 1041 0.0 64.5 35.5 :3 0 172 99 271 05:15 PM 0 172 99 271 0.960 File Name : H0903060 Site Code : 00000000 Start Date : 3/17/2009 Page No :3 (ONE -WAY) Eastbound_ Right I Thru Left 0 0 0 0.0 0.0 0.0 0 0 0 Out In Total 745 F-1-74-91 _2494 1007 742 0 Rigid Thru Left l 1 T a North o� O �P 2 —� 17120095:00:00 PM 1 —� m 1712009 5:45:00 PM 2 m F o m O VEHICLES N j y T f+ Left Thru Ri M 370 671 0 942 1041 1963 Out In Total CAMPUS DRIVE 01 4931 0 1333 0.925 2S5 City: NEWPORT BEACH N -S Direction: CAMPUS DRIVE E -W Direction: SOUTH BRISTOL STREET Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 f1mi a Printed- VFHICI FS File Name : H0903059 Site Code : 00000000 Start Date : 3/17/2009 Page No : 1 08:00 AM 0 65 08:15 AM 0 75 08:30 AM 0 67 _ 08:45 AM 0 74 Total 0 281 BREAK°" 04:30 PM 0 124 04:45 PM 0 168 Total 0 292 05:00 PM 0 146 05:15 PM 0 253 05:30 PM 0 227 _ 05:45 PM _ 0 233 Total 0 859 06:00 PM 0 171 06:15 PM 0 144 Grand Total 0 1910 Apprch % 0.0 76.7 Total % 0.0 13.0 22 0 0 0 22 231 26 0 0 0 38 207 25 0 0 0 50 231 23 0 0 0 _ 42 231 96 0 0 0 152 900 31 0 0 0 I 42 182 41, 0 0 0 46 149 72 0 0 0 88 331 40 0 0 0 50 183 44 0 0 0 43 186 52 0 0 0 45 175 65 0 0 0 42 176 201 0 0 0 180 720 82 3 0 0 60 163 37 0 0 0 34 128 581 3 0 0 592 2810 23.3 100.0 0.0 0.0 17.4 82.6 3.9 0.0 0.0 0.0 4.0 19.1 0 86 0 85 0 75 0 53 0 299 0 i 113 0l 117 Oi 230 0 111 0 105 0 108 0 105 0 429 0 115 0 121 0 1418 0.0 16.1 0.0 9.6 444 412 400 367 1623 228 257 485 277 268 227 232 1004 213 200 4641 52.6 31.5 325 294 287 280 1186 102 100 202 114 105 110 88 417 110 101 2770 31.4 18.8 2s o 119: 1137 113: 1071 4537 82: 87E 1700 921 1004 944 941 3810 917 76: 1472E CAMPUS DRIVE SOUTH BRISTOL CAMPUS DRIVE SOUTH BRISTOL Southbound STREET (ONE-WAY) Northbound STREET (ONE -WAY) Westbound Eastbound Start Time Right Thru Left Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left Int. Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 07:00 AM 0 28 23 0 0 0 9 83 0 53 218 145 559 07:15 AM 0 46 20 0 0 0 21 126 0 52 223 143 631 07:30 AM 0 48 23 0 0 0 23 138 0 56 324 219 831 07:45 AM 0 41 27 0 0 0 25 221 0 63 351 247 975 Total 0 163 93 0 0 0 78 568 0 1 224 1116 754 2996 08:00 AM 0 65 08:15 AM 0 75 08:30 AM 0 67 _ 08:45 AM 0 74 Total 0 281 BREAK°" 04:30 PM 0 124 04:45 PM 0 168 Total 0 292 05:00 PM 0 146 05:15 PM 0 253 05:30 PM 0 227 _ 05:45 PM _ 0 233 Total 0 859 06:00 PM 0 171 06:15 PM 0 144 Grand Total 0 1910 Apprch % 0.0 76.7 Total % 0.0 13.0 22 0 0 0 22 231 26 0 0 0 38 207 25 0 0 0 50 231 23 0 0 0 _ 42 231 96 0 0 0 152 900 31 0 0 0 I 42 182 41, 0 0 0 46 149 72 0 0 0 88 331 40 0 0 0 50 183 44 0 0 0 43 186 52 0 0 0 45 175 65 0 0 0 42 176 201 0 0 0 180 720 82 3 0 0 60 163 37 0 0 0 34 128 581 3 0 0 592 2810 23.3 100.0 0.0 0.0 17.4 82.6 3.9 0.0 0.0 0.0 4.0 19.1 0 86 0 85 0 75 0 53 0 299 0 i 113 0l 117 Oi 230 0 111 0 105 0 108 0 105 0 429 0 115 0 121 0 1418 0.0 16.1 0.0 9.6 444 412 400 367 1623 228 257 485 277 268 227 232 1004 213 200 4641 52.6 31.5 325 294 287 280 1186 102 100 202 114 105 110 88 417 110 101 2770 31.4 18.8 2s o 119: 1137 113: 1071 4537 82: 87E 1700 921 1004 944 941 3810 917 76: 1472E Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0903059 Site Code : 00000000 Start Date : 3/17/2009 Page No : 2 FeaK flour rrom U /:UU AM m UdAt. AM - I eaK CAMPUS DRIVE SOUTH BRISTOL STREET CAMPUS DRIVE SOUTH BRISTOL STREET 52.2 Southbound (ONE -WAY) Northbound (ONE -WAY) I 855 Westbound AM Eastbound Start Time Right Thru I Left Total Right Thru Left Right Thru Left Total _ Right I Thru I Left 0 281 96 TAotal 0 Total FeaK flour rrom U /:UU AM m UdAt. AM - I eaK l Of l 1186 3108 9.6 52.2 38.2 Intersection 08:00 AM 325 855 08:00 AM 86 444 325 Volume 0 281 96 377 0 0 0 0 152 900 0 1052 Percent 0.0 74.5 25.5 0.0 0.0 0.0 14.4 85.6 0.0 08:00 0 65 22 87 0 0 0 0 22 231 0 253 Volume Peak Factor High Int. 08:15 AM 6:45:00 AM 08:30 AM Volume 0 75 26 101 0 0 0 0 50 231 0 281 Peak Factor 0.933 0.936 299 1623 1186 3108 9.6 52.2 38.2 86 444 325 855 08:00 AM 86 444 325 855 0.909 GAMPILIS DRIVE ON In Total 2086 377 2463 01 L81-1 96 Right Thru Left 4J 1 Lp �a 0� m � North s »o c° – m � c -1 17/2009 8.00:00 AM 17/2009 8:45:00 AM on ry VEHICLES J� I rp /Left Thru Ri ht 0' 900,_152 !i 580 ! 052j 1___16_3T I Out In Total RV 2S:7 Int. Total 4537 1195 0.949 Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0903059 Site Code : 00000000 Start Date : 3/17/2009 Page No :3 Peak Hour From 04:30 PM to 06:15 PM - Peak 1 of 1 SOUTH BRISTOL STREET 900 SOUTH BRISTOL STREET 05:00 PM CAMPUS DRIVE (ONE -WAY) CAMPUS DRIVE (ONE -WAY) 80.0 Southbound Westbound Northbound Eastbound _ Start Time �. Right Thru Left To°p� Right Thru Lek TAP Right Thru Left Tot2I Rght Thru Leff Total Peak Hour From 04:30 PM to 06:15 PM - Peak 1 of 1 0 900 Intersection 05:00 PM 417 1850 3810 20.0 80.0 Volume 0 859 201 1060 0 0 0 0 Percent 0.0 81.0 19.0 229 0.0 0.0 0.0 05:15 0 253 44 297 0 0 0 0 Volume 0.949 05:00 PM Peak Factor 50 183 0 High Int. 05:45 PM 277 114 502 Volume 0 233 65 298 0 0 0 0 Peak Factor 0.889 Int. Total 180 720 0 900 429 1004 417 1850 3810 20.0 80.0 0.0 23.2 54.3 22.5 43 186 0 229 105 268 105 478 1004 0.949 05:00 PM 05:00 PM 50 183 0 233 111 277 114 502 0.966 0.921 CAMPUS DPJVE ON In Total 1137 LjlTQE 1 2197 01 659 201 Rigid Tlru Left 1 o�O f j Lo North .� 17/2009 5:00:00 PM I 17/2009 5:45:00 PM 2 n m ° VEHICLES _ �W x ' Left Thru Right 0 7201_1WI I�1288; 900! 21881 Out In Total CAMPUS RI 232 City: NEWPORT BEACH N -S Direction: BIRCH STREET E -W Direction: NORTH BRISTOL STREET Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 Groups Printed- VEHICLES File Name : H0903057 Site Code : 00000000 Start Date : 3/25!2009 Page No : 1 08:00 AM BIRCH STREET NORTH BRISTOL BIRCH STREET. - NORTH BRISTOL 0 215 20 0 Southbound STREET (ONE-WAY) Northbound STREET (ONE-WAY) 687 687 08:15 AM 22 44 0 56 Westbound 79 0 241 Eastbound 0 0 0 Time Right Thru Left Right Thru Left Right Thru Le Right Thru Left Exclu. Total IncluStart Total Total Factor 1.01 1.01 1.0 1.0 1.0 l 1.0 1.01 1.0 1.0 t.o 1.0 1.0 246 110 0 07:00 AM 7 19 - 0 24 124 31 0 102 - 14 0 0 0 0 321 321 07:15 AM 12 33 0 30 133 49 0 108 19 0 0 0 0 384 384 07:30 AM 20 31 0 31 170 55 0 134 23 - 0 0 - 0 - 0 464 464 07:45 AM 11 36 0 24 248 86 0 191 27 0 0 0 0 621 621 Total 50 119 0� 109- 673 221 0 535 83 - 0 0 0 0 1790 1790 08:00 AM 23 38 0 55 226 110 0 215 20 0 0 0 0 687 687 08:15 AM 22 44 0 56 277 79 0 241 32 0 0 0 0 751 751 08:30 AM 22 33 0 62 239 104 0 243 23 0 0 0 0 726 726 08:45 AM 28 45 0 64 246 110 0 187 33 0 0 0 0 713 713 Total -95 160 0 237 988 4031 0 886 1081 0 0 ol 0 2877 2877 BREAK' "' 736 736_ 04:45 PM 134 84 -0 I 32 267 96 0 87 36 I 0 0 0 I 0 _ Total 256 174 - - 01 66 500 1731 0 182 731 0 0 01 0 1424 1424 05:00 PM 208 110 0 36 291 991 0 92 52 0 0 0 0 888 888 05:15 PM 213 140 0 28 355 102 0 99 67 - 0 0 0 0 1004 1004 05:30 PM 148 117 0 34 266 96 0 72 42 0 0 0 0 775 775 05:45 PM 174 117 0 26 275 95 0 81 37 - 0 0 - 0 0 805 805 Total 743. 484 0 - 124 1187 3921 0 344 1981 0 0 ol 0 3472 3472 06:00 PM - 135 72 01 24 225 107 0 64 42 -. 0 0 0 .0 669 669 06:15 PM 143 96 0 20 234 76 0 43 33 0 0 0 0 645 645 Grand Total 1422 1105 0 580 3807 1372 0 2054 537 0 0 0 0 10877 10877 Apprch % 56.3 43.7 - 0.0 10.1 66.1 23.8 0.0 79.3 20.7 0.0 - 0.0 Total % 13.1 10.2 0.0 5.3 35.0 12.6 0.0 18.9 4.9 - 0.0 - 0.0 0.0 100.0 239 Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0903057 Site Code : 00000000 Start Date : 3/25/2009 Page No :2 Peak hour From O /:UU AM tO ua:4b AM - reaK 7 or l BIRCH STREET NORTH BRISTOL STREET BIRCH STREET NORTH BRISTOL STREET (ONE -WAY) - Southbound (ONE -WAY) Westbound Northbound Eastbound 95 160 Start Time Right Thru Left App' Right Thru Left App• Right Thru Left App' Total Right Left pp. -Total Int. Total 66 56 277 Total 412 Volume Total Peak Factor Peak hour From O /:UU AM tO ua:4b AM - reaK 7 or l Intersection 08:00 AM - Volume 95 160 0 255 237 988 403 1628 Percent 37.3 62.7. 0.0 14.6 60.7 24.8 08:15 22 44 0 66 56 277 79 412 Volume Peak Factor High Int. 08:45 AM 08:45 AM Volume 28 45 0 73 64 246 110 420 Peak Factor 0.873 0.969 0 886 108 994 0.0 89.1 10.9 0 241 32 273 08:15 AM 0 241 32 273 0.910 ON In Total 1123 255 1378 951 16011 0 RIght Thru Left Y 0 0 0 0.0 0.0 0 0 0 6:45:00 AM lam p 5 F' North ? ° I r� o J y ° 8:00 A� M o I20098W 0 5 `VEHICLES m0.- m— t - ' Left Thru Right , i_108 886 — OJ F 563 EJEE 1557 Out In Total BIRCH STREET 240 2877 751 0.958 Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0903057 Site Code : 00000000 Start Date : 3/25/2009 Page No :3 PeaK Hour FTOM U4:30 PM l0 06:15 PM - Peak BIRCH STREET NORTH BRISTOL STREET BIRCH STREET NORTH BRISTOL Volume Southbound (ONE -WAY) Northbound STREET (ONE -WAY) 60.6 39.4 0.0 Westbound 05:15 Eastbound Start Tima Right Thru Lek App' Right Thru Lek App' Right Thru Left App' Right Left App" 213 140 0 353 Total 0.869 Total Total Total PeaK Hour FTOM U4:30 PM l0 06:15 PM - Peak Intersection 05:00 PM 124 1187 392 Volume 743 484 0 1227 Percent 60.6 39.4 0.0 05:15 PM 05:15 213 140 0 353 Volume 0.878 Peak Factor High Int. 05:15 PM Volume 213 140 0 353 Peak Factor 0.869 I Of 1 124 1187 392 1703 7.3 69.7 23.0 28 355 102 485 05:15 PM 28 355 102 485 0.878 0 344 198 0.0 63.5 36.5 0 99 67 05:15 PM 0 99 67 Int. Total 542 0 0 01 3472 0.0 0.0 166 0 0 O) 1004 0.865 166 0.816 BIRCH STREET ON In Total ® 1227 1695 743 484 0 Right Thu Leff 4-J 1 N oL T �a A �o hbnh titi o m� C J ..� 'oz 5:00:00 PM 4 -2'm o° @45:00 PM w ll�� rc IT 511 VEHICLES m W LL11I1 H On �ZN O� W� I 4 ? Leh Thru Right 1 i L 198' ==344 01 8761 L7_5 42J ! 14181 00 In Total i BIRCH STREET 241 1 Transportation Studies, Inc. 2680 Walnut Avenue City: NEWPORT BEACH Suite C N -S Direction: BIRCH STREET Tustin, CA. 92780 E -W Direction: SOUTH BRISTOL STREET Grouos Printed- VEHICLES File Name : H0903058 Site Code : 00000000 Start Date : 3/25/2009 Page No : 1 08:00 AM BIRCH STREET SOUTH BRISTOL BIRCH STREET 0 SOUTH BRISTOL 59 90 0 90. Southbound STREET (ONE -WAY) Northbound STREET (ONE -WAY) 0 81 53 0 0 0 60 Westbound 0 78 252 Eastbound 252 556 808 Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Exdu. Inclu. Int. AM 0 109 57 0 0 0 - 54 78 0 57 200 152 Total Total Total Factor 1 1.0 1.01 1.0 1.01 1.01 1.0 1.01 1.0 1.0 1.01 1.01 1.0 867 2106 2973 07:00 AM 0 33 - 17 0 0 0 25 34 0 38 108 85 108 232 340 07:15 AM 0 69 27 0 0 0 34 36 0 51 129 86 129 303 432 07:30 AM 0 61 31 0 0 0 60 54 0 _ 59 160 106 160 371 531 07_:45 AM 0 78 47 0 0 0 51 75 -0 93 172 160 172 504 676 Total 0 241 122 _ 0 0 6 170 199 0 241 569 437 569 1410 1979 08:00 AM 0 101 49 0 0 0 59 90 0 90. 216 158 216 547 763 08:15 AM 0 81 53 0 0 0 60 83 0 78 252 201 252 556 808 08:30 AM 0 88 39 0 0 0 56 82 0 66 199 165 199 496 695 AM 0 109 57 0 0 0 - 54 78 0 57 200 152 200 507 707 _08:45 Total 0 379 198 0 - 0 01 229 333 01 291 867 676 867 2106 2973 "" BREAK _ 04:45 1 TOM 0 206 1371 0 0 0 106 122 01 74 432 126 432 771 1203 05:00 PM 0 145 76 0 0 0 89 94 0 42 253 57 253 503 756 05:15 PM 0 170 78 0 0 0 67 87 0 52 261 55 261 509 770 05:30 PM 0 160 fib 0 - 0 0 68 73 0 35 239 28 239 430 669 _ 05:45 PM 0 139 85 0 - 0 0 76 58 0 45 246 481 246 451 697 Total 0 614 305 0 0 01 300 312 01 174- 999 188 999 1893 2892 06:00 PM 0 125 67 0 0 0 71 71- 0 27 229 35 229 396 625 06:15 PM 0 103 52 0 0 0 55 37 0 29 237 30 237 306 543 Grand Total 0 1668 881 0 0 0 931 1074 0 836 3333 1492 3333 6882 10215 Apprch % 0.0 65.4 34.6 0.0 0.0 0.0 46.4 53.6 0.0 35.9 64.1 Total % 0.0 24.2 12.8 0.0 0.0 0.0 13.5 15.6 0.0 12.1 21.7 32.6 67.4 242 r Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0903058 Site Code : 00000000 Start Date : 3/2512009 Page No :2 YeaK Hour Ffom Ut:UU AM TO UdAb AM - YeaK l Or l BIRCH STREET SOUTH BRISTOL STREET BIRCH STREET SOUTH BRISTOL _. STREET (ONE -WAY) 2106 40.7 59.3 Southbound (ONE -WAY) Westbound Northbound — Eastbound 0 379 _ Start Time Right Thru Left App' Total Right Thru Left App' Total Right Thru Left App' Total Right Lefl App' TOtat Int' Total YeaK Hour Ffom Ut:UU AM TO UdAb AM - YeaK l Or l 0 562 Intersection 08:OOAM 2106 40.7 59.3 0.0 30.1 69.9 Volume 0 379 198 577 0 0 0 Percent 0.0 65.7 34.3 0.0 0.0 0.0 08:15 0 81 53 134 0 0 0 Volume 149 78 201 279 Peak Factor 0.866 High Int. 08:45 AM 6:45:00 AM Volume 0 109 57 166 0 0 0 Peak Factor 0.869 0 229 333 0 562 291 676 967 2106 40.7 59.3 0.0 30.1 69.9 0 60 83 0 143 78 201. 279 556 0.947 08:00 AM 08:15 AM 0 59 90 0 149 78 201 279 0.943 0.866 Out In Total 1009 577 1588 0 379 198 Right Thru Left 41 1 L+ rpr� T -S North ° 4 J� =Q AM M 0 0.022 8:045:00 VEHICLES : F —� r'z a-qqr O ° v6 _ J 41 Left TMu Right � 0 333 229 i 6701. i_.562j 1232 - .I Out In Total 6IRCH STREET 243 Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 SUU I H tlKIJ I UL ,'j I Ktt 1 BIRCH STREET BIRCH STREET (ONE -WAY) Southbound Northbound File Name : H0903058 Site Code : 00000000 Start Date : 3/25/2009 Page No :3 SOUTH BRISTOL STREET (ONE -WAY) F�efMuM -- Start Time Right Thru Left Right Thru Lek 0.930 Right Thru Lek Total Right Lett Total T o lA'ota- 0 614 305 9191 TOIa- 0 0 0 300 312 0 612 Percent 0.0 66.8 Peak Hour I-rOm 114:su YM to U0:1D Y06 - YeaK 1 or T 48.1 51.9 52 55 107 509 0.930 Intersection 05:00 PM 52 55 107 0.846 Volume 0 614 305 9191 0 0 0 0 300 312 0 612 Percent 0.0 66.8 33.2 0.0 0.0 0.0 49.0 51.0 0.0 05:15 0 170 78 248 0 - 0 0 0 67 87 0 154 Volume Peak Factor High Int. 05:15 PM 05:00 PM Volume 0 170 78 248 0 0 0 0 89 94 0 183 Peak Factor 0.926 0.836 174 188 3621 1893 48.1 51.9 52 55 107 509 0.930 05:15 PM 52 55 107 0.846 OW In Total ® 919 ,419 01 6141 305 Right Tlau LeN 41 1 t� 1 r �o ~ N m IJatth � o CM J y 5!2009 50000 PM 4 -2 � ° 2009 5:45:00 PM a on VEHICLES N i 1-. LeN Thru __Right - _..� -- 31221_. 300 t __I ON In .Total BIRCH 244 City: NEWPORT BEACH N -S Direction: VON KARMAN AVENUE E -W Direction:.CAMPUS DRIVE Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 adMan- VrHicl ❑c File Name : H0903061 Site Code : 00000000 Start Date : 3/18/2009 Page No : 1 08:00 AM VON KARMAN AVENUE CAMPUS DRIVE 9 VON KARMAN AVENUE CAMPUS DRIVE 161 13 127 Southbound Westbound 76 Northbound Eastbound 518 08:15 AM Start Time I RightLThru 7 Left Right I Thru I Left Ri ht Thru Left R' ht I Thru Left Int. Total Factor 1 1.01 1.0 j 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 08:45 AM 07:00 AM 12 29 7 9 28 9 12 35 0 5 34 10 190 07:15 AM 10 34 8 14 31 8 2 57 2 11 40 15 232 07:30 AM 10 61 8 6 40 13 8 73 0 7 50 23 299 _ 07:45 AM 9 66 8 20 76 13 9 126 2 9 81 44 463 Total 41 190 31 49 175 43 31 291 4 32 205 92 1184 08:00 AM 22 93 9 29 64 161 13 127 4 10 76 55 518 08:15 AM 14 80 7 26 61 20 15 135 3 14 68 53 496 08:30 AM 22 81 12 31 83 21 10 141 7 8 87 63 566 08:45 AM 15 81 9 24 79 20 15 131 2 10 72 57 515 Total 73 335 37 110 287 771 53 534 161 42 303 228 2095 "' BREAK' "' 04:30 PM 41 118 14 16 101 71 17 67 5 8 71 20 1 485 04:45 PM 51 112 34 I 8 96 8 17 80 5 6 76 33 526 _ Total 92 230. 481 24 197 151 34 147 10 l 14 147 531 1011 05:00 PM 65 144 23 17 130 11 36 97 17 15 122 313 715 05:15 PM 63 182 29 17 148 15 23 92 18 14 104 38 743 05:30 PM 59 158 29 10 110 10 36 95 8 10 116 32 673 _ 05:45 PM 37 126 17 20 113 15 27 99 4 10 103 37 608 Total 224 610 98 64 501 51 122 383 47 49 445 1451 2739 06:00 PM 45 '114 15 10 92 101 19 111 4 14 106 24 564 06:15 PM 27 116 20 14 81 4 23 78 4 17 74 25 483 Grand Total 502 1595 249 271 1333 200 282 1544 85 166 1280 567 8076 Apprch % 21.4 68.0 10.6 15.0 73.9 11.1 14.8 80.6 4.4 8.3 63.5 28.1 Total % 6.2 19.7 3.1 3.4 16.5 2.5 3.5 19.1 1.1 2.1 15.8 7.0 245 Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0903061 Site Code : 00000000 Start Date :3/18/2009 Page No :2 reaK Hour tlOm U1:UU AM to UtSAb AM - reaK 7 nt l VON KARMAN AVENUE Southbound CAMPUS DRIVE Westbound VON KARMAN AVENUE Northbound CAMPUS DRIVE Eastbound 573 Start Time Right Thru Left App' Total Right Thru Left App" Total Right Thru LeR App. Total Right Thru Left App• Total Ina. Total reaK Hour tlOm U1:UU AM to UtSAb AM - reaK 7 nt l 16 603 Intersection 08:00 AM 573 2095 8.8 88.6 2.7 Volume 73 335 37 445 110 287 77 474 Percent 16.4 75.3 8.3 566 - 23.2 60.5 16.2 08:30 22 81 12 115 31 83 21 135 Volume 10 141 7 158 Peak Factor 63 158 0.954 High Int. 08:00 AM 0.907 08:30 AM Volume 22 93 9 124 31 83 21 135 Peak Factor 0.897 0.878 53 534 16 603 42 303 228 573 2095 8.8 88.6 2.7 7.3 52.9 39.8 10 141 7 158 8 87 63 158 566 - 0.925 08:30 AM 08:30 AM 10 141 7 158 8 87 63 158 0.954 0.907 AVENUE Uut In Total 872 445 1317 73 335 37 Right Thru Left m T yg ♦ u a NOI b� N North �SO � M cv"i $c —: 18/2000 a: 0000 AM �- -2m �' 1&2009 8:45:00 AM J A a r r� r VEHICLES �� Q � J N Ir J I I � I Left Thru Ri hi I -. 1057 out In Total _ VON KARMAN AVrNUE 240 Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0903061 Site Code : 00000000 Start Date : 3/18/2009 Page No : 3 Peak Hour From 04:30 PM to 06:15 PM - Peak 1 of 1 VON KARMAN AVENUE CAMPUS DRIVE VON KARMAN AVENUE, CAMPUS DRIVE 05:00 PM Southbound Westbound Northbound Eastbound Start Time Right I Thru I Left I Right Thru Left 64 Right Thru Left Total Right Thru Left Total 81.3 8.3 05:15 Total 29 Total 17 148 15 180 Volume Peak Hour From 04:30 PM to 06:15 PM - Peak 1 of 1 47 552 22.1 69.4 Intersection 05:00 PM 23 92 18 133 05:00 PM z ON Volume 224 610 98 932 64 501 51 616 Percent 24.0 65.5 10.5 10.4 81.3 8.3 05:15 63 182 29 274 17 148 15 180 Volume Peak Factor High Int. 05:15 PM 05:15 PM Volume 63 182 29 274 17 148 15 180 Peak Factor 0.850 0.856 J O m °a r —� o z 122 383 47 552 22.1 69.4 8.5 Right 23 92 18 133 05:00 PM z ON 36 97 17 150 AVENUE 122 0.920 --V� out In Total 592 932 1524 224 610 96 Right Thru Left 4J 1 Ll, NOM 116622009 :P5000 M7] M VEHICLES 49 r 145 Left Thru Right 4 3691- 122, L iT6� Cssz z ON In Total VON KARMAN AVENUE 122 49 445 145 639 7.7. 69.6 22.7 14 104 38 156 05:00 PM 15 122 38 175 0.913 3> 4-2c� m r ar�N a 247 Int. Total 2739 743 0.922 Intersection Turning Movement Prreepaa Prepared d \y:: � DS National Data & Surveying Services Von Karman Ave and Birch St. City of Newoort Beach Control: Signalized Fi! 55 Project M 09- 5077 -018 AM Peak Hour: 815 AM NOON Peak Hour: 1230 PM PM Peak Hour: 1500 PM 43 242 E APM6:15 242 Intersection Turning Movement Prepared by: National Data & Surveying Services N -S STREET: Von Karman Ave DATE: 03/05/2009 LOCATION: City of Newport Beach E -W STREET: Birch St DAY: THURSDAY PROJECT# 09 -5077 -018 NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 1 2 1 1 2 1 1 2 1 1 2 1 6:00 AM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 6:15 AM 52 922 63 87 I 468 238 135 I 354 84 68 I 269 37 2777 I 6:30 AM 6:45 AM 7:00 AM 7:15 AM 7:30 AM 9 90 3 9 42 21 15 43 9 5 26 7 279 7:45 AM 0 133 8 6 54 30 15 56 11 6 30 4 353 8:00 AM 6 131 12 9 61 33 17 35 12 7 21 1 345 8:15 AM 6 137 9 8 61 25 26 49 10 19 39 4 393 8:30 AM 7 147 10 15 89 33 19 49 13 12 36 8 438 8:45 AM 9 107 4 16 63 39 15 37 7 4 42 3 346 9:00 AM 8 93 10 17 62 31 19 59 18 8 42 7 374 9:15 AM 7 84 7 7 36 26 9 26 4 7 33 3 249 9:30 AM 9:45 AM 10:00 AM 10:15 AM 10:30 AM 10:45 AM 11:00 AM 11:15 AM 11:30 AM 11:45 AM TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL VOLUMES = 52 922 63 87 I 468 238 135 I 354 84 68 I 269 37 2777 I AM Peak Hr Begins at: 815 AM 11x19 VOLUMES = ( 30 484 33 I 56 275 128 I 79 194 48 143 PEAK HR. FACTOR 0.834 0.838 0.836 0.903 CONTROL: Signalized 22 1 1551 14.1 -M 2-�9 Intersection Turning Movement Prepared by: National Data & Surveying Services N -S STREET: Von Karman Ave DATE: 03/05/2009 LOCATION: City of Newport Beach E -W STREET: Birch St DAY: THURSDAY PROJECT# 04 -5077 -018 NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 1 2 1 1 2 1 1 2 1 1 2 1 1:00 PM NL NT NR SL ST SR EL ET ER WL WR TOTAL 1:15 PM 135 674 88 52 919 239 158 311 49 35 396 63 3119 1:30 PM 1:45 PM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:00 PM 3:15 PM 3:30 PM 3:45 PM 4:00 PM 4:15 PM 15 54 10 5 66 22 11 35 6 4 39 6 273 4:30 PM 19 63 6 4 88 25 16 28 8 4 39 7 307 4:45 PM 17 63 7 5 93 35 18 40 4 6 48 7 343 5:00 PM 15 104 20 5 143 35 30 52 5 5 76 7 497 5:15 PM 26 93 8 11 129 34 32 41 3 5 39 11 432 5:30 PM 14 104 18 10 137 36 14 41 10 5 67 11 467 5:45 PM 16 106 9 8 140 28 23 32 8 4 53 12 439 6:00 PM 13 87 10 4 123 24 14 42 5 2 35 2 361 6:15 PM 6:30 PM 6:45 PM TOTAL NL NT NR SL ST SR EL ET ER WL WR TOTAL VOLUMES = 135 674 88 52 919 239 158 311 49 35 396 63 3119 PM Peak Hr Begins at: 500 PM PEAK VOLUMES = 71 407 55 34 549 133 99 166 26 19 235 41 I 1835 PEAK HR. FACTOR: I 0.954 I 0.978 I 0.836 0.838 0.923 CONTROL: Signalized 2150 City: NEWPORT BEACH N -S Direction: BAYVIEW PLACE E -W Direction: BRISTOL STREET Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 - na, oriM.rl- VrWIN as File Name : H0903056 Site Code :00000000 Start Date : 3/18/2009 Page No : 1 08:00 AM DEAD END BRISTOL STREET (ONE- BAYVIEW PLACE BRISTOL STREET (ONE - 0 0 Southbound 0 -- 0 Northbound 560 - 0 687 08:15 AM 0 0- 0 Westbound 0 0- Eastbound 0 0 Start Time R' ht Thru Left Ri ht Thru Left Ri ht Thru 0 Left Ri ht Thru Left Int Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0 1.0 1.0 1.0 1.0 0 07:00 AM 0 0 0 0 0 0 7 0 0 48 381 0 436 07:15AM 0 0 - 0 0 0 0 14 0- 0 48 457 -0 519 07:30 AM 0 0 0 0 0- 0 27 0 0 88 592 0 707 07:45 AM 0 0 - 0 0 0 0 21 - 0 0 139 675 0 835 Total - 0 0 - 0 0 0 0 - 69 0 0 323 2105 0 2497 08:00 AM 0 - 0 0 0 0 0 22 0 -- 0 105 560 - 0 687 08:15 AM 0 0- 0 - 0 0 0- - 31 0 0 88 637 0 756 08:30 AM 0 0- 0. 0 0 0 24 0 0 94 580 0 698 08:45 AM 0 0 - 0 0 0 0 34 0 0 99 656 0 789 Total 0 0 - 0 0 0 0 111 0 -. 01 386 2433 01 2930 "'BREAK - - 04:45 PM 0 0 0 0 0 01 69 0 0- 17 582 0 668 Total 0 0 01 0 0 01 155 0 01 43 1102 01 1300 05:00 PM - 0 0 0 0 0 0 136 0 0 311 608 0 782 05:15 PM 0 0 - 0 - 0 0 0 124 0 0 35 634 0 793 05:30 PM 0 0 0 0 0 0 -91 - 0 0 34 657 0 782 05:45 PM 0 0 0 0 0 0 80 0 0 37 - 692 0 809 _ Total 0 0 0 0 0 01 433 0 01 142 2591 0 3166 06:00 PM 0. 0 0 0 0 0 54 0 0 32 586 0 672 06:15 PM 0 0 0 0 - 0 0 43 0 0 26 480 0 549 Grand Total 0 0 0 0 0 0 865 0 0 952 9297 0 11114 Apprch % 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 9.3 90.7 0.0 Total % 0.0 0.0 0.0 0.0 0.0 0.0 7.8 0.0 - 0.0 - 8.6 83.7 0.0 2151- Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0903056 Site Code : 00000000 Start Date : 3/1812009 Page No :2 reaK hour rrom V7:VU AM to uC:4, AM - veaK l Of 1 DEAD END BRISTOL STREET (ONE- BAyVIEW PLACE BRISTOL STREET (ONE - —_r —� Soulhbound WeWsAY) Northbound Eastbound 0 0 i Start Time Right Thru Left APP' Total Right Thru Left APP' Total Right Thru Left App' Total Right Thru Left App. Total Int. Total reaK hour rrom V7:VU AM to uC:4, AM - veaK l Of 1 2464 Left Uj Intersection 07:30 AM —_r —� '— OZO1 E� 12 Out BA1'VIEW Volume 0 0 0 0 0 0 0 0 Percent 0.0 0.0 0.0 0.0 0.0 0.0 07:45 0 0 0 0 0 0 0 0 Volume Peak Factor High Int. 6:45:00 AM 6:45:00 AM Volume 0 0 0 0 0 0 0 0 Peak Factor r a9� } W3FN O�J Z � CNH 92 O � + 101 0 0 101 100' 0.0 0.0 0 21 0 0 21 08:15 AM 31 0 0 31 0.815 utAli LNU Out In Total F-01 F----Ol0 Right Thru Left ,- 1 Li, 1 Nolth 182009 7:30:00 AM 78/2009 8:15:00 AM VEHICLES 420 2464 Left Uj Thru Ri ht Ol 101 _ —_r —� '— OZO1 E� 12 Out BA1'VIEW In Total PLACE 420 2464 0 2884 14.6 85.4 0.0 139 675 0 814 07:45 AM 139 675 0 814 0.886 qN �G ^O H _ ~2 0 0 m H �zo Vg. 2152 2985 835 0.894 ■ Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0903056 Site Code : 00000000 Start Date : 3/18/2009 Page No : 3 DEAD END BRISTOL STREET (ONE- BAYVIEW PLACE BRISTOL STREET (ONE - Volume Southbound WAY) Westbound Northbound WAY) Eastbound 0.0 Start Time Right Thru Left App' Right Thru Leff App' Right Thru Left App' Right Thru Lett App. Total Int. Total Peak Factor 05:45 PM Total 138 0 Total 138 37 692 Total 729 0.784 Peak Hour From 94:3U PM to U6:15 PM - Pe2 Intersection 05:00 PM 142 2591 Volume 0 0 0 0 Percent 0.0 0.0 0.0 05:45 0 0 0 0 Volume Peak Factor 80 0 High Int. 80 37 692 Volume 0 0 0 0 Peak Factor 05:45 PM KI OTI 0 0 0 0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 433 0 0 433 142 2591 0 2733 100. 0.0 0.0 5.2 94.8 0.0 0 80 0 0 80 37 692 0 729 05:00 PM 05:45 PM 138 0 0 138 37 692 0 729 0.784 0.937 Out In Total 0 0 0 0 0 Right Thru Len I '-1 m T m O N o F v S �� North ° ar h _ Cr H O1i - - -� IW20095:00:00 PM 4 -2 78!20095:45:00 PM 2 0 0 vt r w-� VEHICLES K P tt L. 4i n r hru Right 0 0 4I i i` jgyl 4�J33 ---57-5] Out In Total 2153 3166 809 0.978 City: NEWPORT BEACH N-S Direction: JAMBOREE ROAD E -W Direction: CAMPUS DRIVE Transportation Studies, Inc. 2680 Walnut Avenue Suite C File Name Tustin, CA. 92780 - Si1e Code " Start Date Page No rirMlnft Printed- VFHICI FS - - JAMBOREE ROAD CAMPUS DRIVE 731 JAMBOREE ROAD CAMPUS DRIVE 661 8 - 248 - Southbound - Westbound .191 Northbound Eastbound 41 -=;'t# Start Time Right I Thru Left Ri ht -Thru 37 Left Right Thru left Right Thru 49 Left In I. Factor 1.0 1.0 1.0 t.o 1.01 4 1.0 1.01 1.01 08:45 AM 1.0 I 1.0 I 1.0 - 36 07:00 AM 23 261 44 23 67 32 9 200 21 1 18 15 - 07:15 AM 27 244 42 26 71 33 10 212 _ 27 2 17 17 66 07:30 AM 24 327 51 30 88 51 6 232 31 2 21 15 - 07:45 AM 38 418 67 41 99 62 10 267 31 2 29 51 38 Total _ 112 1250 204 120 325 178 35 911 - 110 _ 7 85 65 , 08:00 AM 44 - 464 - 731 38 109 661 8 - 248 _361. 1 - 24 .191 .1130: 08:15 AM 41 .424 74 34 111 70 - 10 262. 37 3 32 20 - 1118 08:30 AM 49 426 72 - 39 104 61 6 267 - -39 4 -27 19 ({ 1113 08:45 AM 39 411 68 - 36 108 52 10 261 33 2 26 22 1nRR "' BREAK "' 04:30 PM 40 262 51 85 56 29 29 298 - 12 33 61 51 1007 ' 04:45 PM 46 251 58 1 74 53 35 34 316 - 15 38 68 59 1047 - Total 86 513. 1091 159 109 641 63 614 271 71 129 1101 2054 05:00 PM 51 282 52 80 54 34 27 - 313 13 40 63 47 1056 - 05:15 PM 45 286 57- 90 58 39 - 38 326 16 42 72 66 1125 05:30 PM 48 271 - 53 79 63 41 31 323 - -19 40 66 61 1095 05:45 PM 39 269 fit 82 51 38 39 316 17 37 62 55 1067 Total- 183 1108 224 331 226 1521 135 1278 65 -159 263 2191 4343 06:00 PM 42 280 57 72 57 321 33 311 14 37 68 - 52 1055 06:15 PM 40 269 54 78 59 39 34 307 16 35 61 43 1035 Grand Total 636 5145 -935 907 1208 714 334 4459 319 715 569 16318 Apprch % 9.5 76.6 13.9 32.1 42.7 25.2 6.5 86.2 _377 7.3 19.9 44.6 35.5 Total % 3.9 31.5 5.7 - 5.6 7.4 4.4 2.0 27.3 - 2.3 2.0 4.4 3.5 Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : H0804093 Site Code :00000000 Start Date : 5/15/2008 Page No :2 Peak Flour From Ur:UU AM to 08:45 AM - PeaK 1 Ot 1 JAMBOREE ROAD CAMPUS DRIVE JAMBOREE ROAD CAMPUS DRIVE 07:45 AM Southbound Westbound Northbound Eastbound I Start Time (Right Thru Left 286 Right Thru Left 423 Right Thru Left I Right I Thru I, Left I 31.1 08:00 44 464 Total 581 38 Total 66 213 Volume Total Total Peak Flour From Ur:UU AM to 08:45 AM - PeaK 1 Ot 1 1044 143 1221 Intersection 07:45 AM 11.7 8 248 36 292 Volume 172 1732 286 2190 152 423 259 834 Percent 7.9 79.1 13.1 18.2 50.7 31.1 08:00 44 464 73 581 38 109 66 213 Volume Peak Factor High Int. 08:00 AM 08:15 AM Volume 44 464 73 581 34 111 70 215 Peak Factor 0.942 _ 0.970 34 1044 143 1221 2.8 85.5 11.7 8 248 36 292 08:30 AM 6 267 39 312 0.978 10 112 76 198 5.1 56.6 38.4 1 24 19 44 08:15 AM 3 32 20 55 0.900 JAMBOREE ROAU Out In Total F12721 F21901 3462 1721 1732 286 RI9M to Leek 4� 1 4 m m w T OR J Nonh 3 nNi 0 m —� 1512008 7'45:00 / -2 �°+ �' 15/2(108 6:30:00 AM o .. O n ` VEHICLES x H ti r a� m m— I F Left Thru Ri h 143 1044 34 2001 1221 3222 out In Total R AD 2151 Int. Total 4443 1130 0.983 J Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name Site Code' Start Date Page No - JAMBOREE ROAD CAMPUS DRIVE JAMBOREE ROAD CAMPUS DRNE 219 Southbound Westbound Northbound Eastbound Start Time Right I I Thru I Left App Right Thru Left Tots Right Thru Left 05:15 PM Right Thrut Left App. Pm4 Nn, ,. C. nn. an m. �.. nc.� a rsr 0.943 Total Total' Intersection 05:00 PM Volume 183 1108 224 1515 331 226 152 709 Percent 12.1 73.1 14.8 46.7 31.9 21.4 05:15 45 286 57 388 90 58 39 187 Volume Peak Factor High Int. 05:15 PM 05:15 PM Volume 45 286 57 388 90 58 39 187 Peak Factor 0.976 0.948 135 1278 65 1478 9.1 86.5 4.4 38 326 16 380 05:15 PM 38 ,326 16 380 0.972 SOREE ROAD oul In Total 1828 1515 1 3343 1831 11081 224 Right Inru Lan �f 1 Y _ T � J NwN P/15/20085:00:00 M 15/20085 :45:00 PM 2 °m P o v fy EHICLES r ; N a w 4, T r Left Thru R, hl 65 1278 135 1419 1476 2897 Out In Total JAMBOREE AD 250 159 263 219 641 - $ 24.8. 41.0 34.2 42 72 56 170 11 0 965 05:15 PM 42 72 56 170 0.943 SOREE ROAD oul In Total 1828 1515 1 3343 1831 11081 224 Right Inru Lan �f 1 Y _ T � J NwN P/15/20085:00:00 M 15/20085 :45:00 PM 2 °m P o v fy EHICLES r ; N a w 4, T r Left Thru R, hl 65 1278 135 1419 1476 2897 Out In Total JAMBOREE AD 250 City: NEWPORT BEACH. N -S Direction: JAMBOREE ROAD E -W Direction: BIRCH STREET Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 nrn„nc or„aon_ VPWIri F.q File Name : H0804090 Site Code :00000000 Start Date : 5/7/2008 Page No : 1 08:00 AM JAMBOREE ROAD 349 UCI MAINTENANCE JAMBOREE ROAD 2 BIRCH STREET 0 301 Southbound 6 YARD 37 Northbound 08:15 AM Eastbound 416 0 1 2 0 Westbound 1 307 48 11 3 36 Start Time Ri ht Thru j Left Ri ht Thru Left Ri hl Thru 281 Left Ri ht Thru 21 Left Int. Total Factor 1.0 1.0 3 1.0 1.0 1.0 1.0 1.0 1.0 11 1.0 1.0 1.0 Total 1.0 1532 07:00 AM 43 198 2 3 1 0 0 170 16 6 1 17 457 07:15 AM 66 237 2 1 0 1 0 217 25 4 2 8 563 07:30 AM 91 348 1 1 2 0 0 221 32 10 1 27 734 07:45 AM 86 403 0 2 0 1 0 339 451 16 1 29 922 Total 2861186 5 7 3 2 0 947 118 36 5 81 2676 08:00 AM 116 349 6 2 2 1 0 301 50 6 0 37 870 08:15 AM 138 416 0 1 2 0 1 307 48 11 3 36 963 08:30 AM 124 383 1 1 2 1 1 281 61 9 4 21 889 08:45 AM 102 384 1 3 1 1 0 239 104 11 4 29 879 Total 480 1532 8 7 7 3 2 1128 2631 37 11123 3601 BREAK "• I 29 0 2 I 714 04:45 PM 29 322 0 2 0 0 I 0 315 35 26 0 51 780 Total 55 613 1 1 2 0 ol 0 615 50 1 55 0 1031 ,1494 05:00 PM 25 302 2 0 0 0 0 271 15 41 3 87 746 05:15 PM 25 350 1 0 0 0 0 355 14 25 0 70 840 05:30 PM 29 283 1 0 1 0 0 262 19 24 3 75 697 05:45 PM 21 416 0 0 0 0 0 274. 8 27 1 68 815 Total 100 1351 4 0 1 01 0 1162 561 117 7 300 3098 06:00 PM 16 341 0 0 0 01 0 297 - 3 24 0 84 765 06:15 PM 18 326 0 0 0 0 0 316 9 19 0 53 741 Grand Total 955 - 5349 18 16 11 5 2 4465 499 288 23 744 12375 Apprch % 15.1 84.6 0.3 50.0 34.4 15.6 0.0 89.9 10.0 27.3 2.2 70.5 Total % 7.7 43.2 0.1 0.1 0.1 0.0 0.0 36.1 4.0 2.3 0.2 6.0 25j J Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, CA. 92780 File Name : HQ804 Site Code : OOOtkI� Start Date : 51t/2ptf ` Page No :2 .Intersection JAMBOREE ROAD 1 MAINTENANCE YARD JAMBOREE ROAD BIRCH STREET 85.6 Southbound Westbound Northbound Eastbound Start Time Right Thru Left Topta. Right Thru Left App' Total Right Thru Left gyp' RI ht Thru Left App. 9 Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1 Total Total .Intersection 07:45 AM 204 1434 0.1 85.6 14.2 Volume 464.1551 7 2022 6 6 3 15 Percent 22.9 76.7 0.3 45 40.0 40.0 20.0 36 flm 0.934 0.865 Voluume e 138 416 0 654 1 2 0 3 Peak Factor High Int. 08:15 AM 08:00 AM Volume 138 416 0 554 2 2 1 5 Peak Factor 0.912 0.750 2 1228 204 1434 0.1 85.6 14.2 11 3 1 307 48 356 07:45 AM 0.946 0 339 45 384 11 3 36 50 0.934 InL Total 42 8 123 173 3644 ,24.3 4.6 71.1 11 3 36 50 963 . 0.946 08:15 AM 11 3 36 50 0.865 Out In Total 2022 3379 464 1551 7 Ttlw Le 1 a^� 1 th —� m p /07S 4 500 4 —�z i 300 A w m H L p CLVH � y =Th�m 30 OtA In Total a RFEROAD 2152 ■ Transportation Studies, Inc. 2680 Walnut Avenue Suite C Tustin, GA. 92780 Fife Name : H0804090 Site Code : 00000000 Start Date : 5/7/2008 Page No :3 • •� JAMBOREE ROAD UCI MAINTENANCE YARD JAMBOREE ROAD BIRCH STREET 05:15 PM Southbound Westbound Northbound Eastbound Start Time Right Thru Left 1483 Right Thru Left 0 1 Right Thru Left Right Thru Left 24 0 84 108 Total 05:15 Total Total Volume 25 350 Tutu • •� ., rni lV vv. 15 FM - reart I or t 1232 0.0 96.4 Intersection 05:15 PM 0 355 14 369 05:15 PM 25 Volume 91 1390 2 1483 0 1 0 1 Percent 6.1 93.7 0.1 0.0 100. 0.0 ' 24 0 84 108 05:15 0.928 Volume 25 350 1 376 0 0 0 0 Peak Factor High Int. 05:45 PM 05:30 PM Volume 21 416 0 437 0 1 0 1 Peak Factor n RAR n otn D 1188 44 1232 0.0 96.4 3.6 24.9 0 355 14 369 05:15 PM 25 0 0 355 14 369 0.835 Int. Total 100 4 297 401 3117 24.9 1.0 74.1 25 0 70 - 95 840 0.928 06:00 PM 24 0 84 108 0.928 Out In Total 1485 I-48-31 F-2081 91 1390 2 Right Tlw Left 4 1 L4 N a� m �o w � NoAh m —� 12008 51500 PM -2 2008 6:00'00 PM o .. o � VEHICLES - 'FA y a� V +, T r Left Tlw 44 1186 0 1490 1232 2722 out In Total JAMBOREE D 2�9 Intersection Turning Movement Prepared by: N, National Data & Surveying Services - MC Summary ofJamboree Rd /Bristol St North Project #: 093077 -002 rsxa. SOUTHBOUND APPROACH LANES N3 Z .Pi N m ' G . 3 s � n v b TURNING MOVEMENT COUNT a v ImersecODn Name) P^ S N m n fi Nw- x Day Date NORTHBOUND APPROACH LANES }° COUNT PERIODS W O C TOTAL AM NOON PM AM NOON PM TOTAL Z 0 r--O-T 0 1 0 0 0 0 1 0 9 p 0 It 0 0 0 ��zaau;o 0000 ° n S Z m 3 s � n v TURNING MOVEMENT COUNT ImersecODn Name) P^ S N m n fi Nw- x Day Date NORTHBOUND APPROACH LANES }° COUNT PERIODS n pmn 4:15 PM - 6:15 PM AM PEAK HOUR 800 AM CON OL: Signalized - NOON PEAK HOUR 1230 PM PM PEAK HOUR 500 PM Intersection Turning Movement Prepared by: National Data & Surveying Services N -S STREET: Jamboree Rd DATE: 3/4/2009 LOCATION: City of Newport Beach E -W STREET: Bristol St North DAY: WEDNESDAY PROJECT# 09 -5077 -002 NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 2 2 1 0 2.5 1.5 0 0 0 0 0 0 6:00 AM 1523 2785 1327 0 I 1091 737 6:15 AM 0 0 0 0 0 7463 6:30 AM 6:45 AM 7:00 AM 7:15 AM 7:30 AM 153 366 137 135 58 849 7:45 AM 184 370 190 133 85 962 8:00 AM 225 355 175 135 92 982 8:15 AM 232 393 154 145 112 1036 8:30 AM 171 361 171 157 105 965 8:45 AM 218 400 163 133 103 1017 9:00 AM 178 284 146 129 96 833 9:15 AM 162 256 191 124 86 819 9:30 AM 9:45 AM 10:00 AM 10:15 AM 10:30 AM 10:45 AM 11:00 AM 11:15 AM 11:30 AM 11:45 AM TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL VOLUMES = 1523 2785 1327 0 I 1091 737 0 0 0 0 0 0 7463 AM Peak Hr Begins at: 800 AM PEAK VOLUMES = 846 1509 663 1 0 570 412 1 0 0 0 0 0 0 4000 PEAK HR. FACTOR: 0.966 0.937 0.000 0.000 0.965 CONTROL: Signalized Intersection Turning Movement Prepared by: National Data & Surveying Services N -S STREET: Jamboree Rd DATE: 3/4/2009 LOCATION: City of Newport Beach E -W STREET: Bristol St North DAY: WEDNESDAY PROJECT# 09 -5077 -002 NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND LANES: NL 2 NT 2 NR 1 SL ST 0 2.5 SR EL 1.5 0 ET ER WL WT WR TOTAL 0 0 0 0 0 1:00 PM ET ER WL WT WR TOTAL 1:15 PM 1389 2197 1802 0 I 2004 1151 1:30 PM 0 0 0 I 0 0 8543 1:45 PM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:00 PM 3:15 PM 3:30 PM 3:45 PM 4:00 PM 4:15 PM 187 259 244 205 115 1010 4:30 PM 174 273 226 211 142 1026 4:45 PM 173 272 194 228 128 995 5:00 PM 166 270 278 249 156 1119 5:15 PM 183 324 272 284 145 1208 5:30 PM 177 281 212 261 134 1065 5:45 PM 163 267 180 286 177 1073 6:00 PM 166 251 196 280 154 1047 6:15 PM 6:30 PM 6:45 PM TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL VOLUMES = 1389 2197 1802 0 I 2004 1151 0 I 0 0 0 I 0 0 8543 PM Peak Hr Begins at: 500 PM PEAK VOLUMES = 689 1142 942 1 0 1080 612 1 0 0 PEAK HR. FACTOR: 0.890 0.914 0.000 CONTROL: Signalized 0 0 0 0 4465 0.000 0.924 202 Intersection Turning Movement Prepare by: §, S National Data & Surveying Services TMCSummary ofJamboree Rd /Biisto /St South 1 1030 1 937 L12?L4JI 333 Project #: 09 -5077 -003 .qtr 1150 1 849 11145 Z rn SOUTHBOUND APPROACH LANES 3 . N R i TURNING MOVEMENT COUNT ay� X�il9IDusa O t INN {$ a atx -Yg 3 (Intersection Name) W x v' TOTAL AM NOON PM AM NOON PM TOTAL Z O 5 D L O s 3166 1199 1 1030 1 937 L12?L4JI 333 1 520 110711 3144 11 1150 1 849 11145 xuteaf�"r� reswum �� I I B nw?^liPBiilu» '.SL"f�TS "���. I 203 O Z rn 3 . R i TURNING MOVEMENT COUNT ay� X�il9IDusa (Intersection Name) x v' EII A- Day Date I NORTHBOUND APPROACH LANES --- t c-- am 7:30 AM - 9:30 AM noon 11:95 AM - 1:45 PM m 4:15 PM 6:15 PM AM PEAK HOUR 800 AM MWFa : Signalized ' NOON PEAK HOUR .1215 PM PM PEAK HOUR 500 PM 203 Intersection Turning Movement Prepared by: National Data & Surveying Services N -S STREET: Jamboree Rd DATE: 03/04/2009 LOCATION: City of Newport Beach E -W STREET: Bristol St South DAY: WEDNESDAY PROJECT# 09 -5077 -003 NORTHBOUND SOUTHBOUND EASTBOUND . WESTBOUND TOTAL NL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 0 4.5 .5 0 3 0 1.5 1.5 2 0 0 0 74 1 0 1089 0 2176 I 598 2206 1 0 0 6:00 AM 6:15 AM 6:30 AM 6:45 AM 7:00 AM 7:15 AM 7:30 AM 422 11 137 235 80 287 1172 7:45 AM 456 8 130 288 62 310 1254 8:00 AM 469 10 138 288 .79 249 1233 8:15 AM 460 8 144 319 98 318 1347 8:30 AM 415 10 158 288 78 287 1236 8:45 AM 473 12 131 304 78 296 1294 9:00 AM 369 9 130 239 62 271 1080 9:15 AM 393 6 121 215 61 188 984 9:30 AM 9:45 AM 10:00 AM 10:15 AM 10:30 AM 10:45 AM 11:00 AM 11:15 AM 11:30 AM 11:45 AM TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL VOLUMES= 0 3457 74 1 0 1089 0 2176 I 598 2206 1 0 0 0 9600 I AM Peak Hr Begins at: 800 AM PEAK VOLUMES = 0 1817 40 1 0 571 0 11199 333 1150 1 0 0 0 5110 PEAK HR. FACTOR: 0.957 0.903 0.912 0.000 0.948 CONTROL: Signalized 204 Intersection Turning Movement Prepared by: National Data & Surveying Services N -S STREET: Jamboree Rd DATE: 03/04/2009 LOCATION: City of Newport Beach E -W STREET: Bristol St South DAY: WEDNESDAY PROJECT# 09 -5077 -003 TOTAL NORTHBOUND SOUTHBOUND NR EASTBOUND WESTBOUND SR NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 0 4.5 .5 0 3 0 1.5 1.5 2 0 0 0 1694 2083 0 0 0 11287 1:00 PM 1:15 PM 130 PM 1:45 PM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:OO PM 3:15 PM 3:30 PM 3:45 PM 4:00 PM 4:15 PM 454 12 202 235 118 222 1243 4:30 PM 438 10 212 234 161 205 1260 4:45 PM 373 13 226 267 209 315 1403 5:00 PM 427 22 251 287 191 277 1455 5:15 PM 533 20 283 245 329 283 1693 5:30 PM 466 12 262 204 307 325. 1576 5:45 PM 408 19 284 201 244 260 1416 6:00 PM 365 15 281 249 135 196 1241 6:15 PM 6:30 PM 6:45 PM TOTAL NL NT NR SL ST SR EL ET ER WL WT WR TOTAL VOLUMES = 0 3464 123 0 2001 0 1922 1694 2083 0 0 0 11287 PM Peak Hr Begins at: PEAK VOLUMES = 0 1834 PEAK HR. FACTOR: 0.862 CONTROL: Signalized 500 PM 73 1 0 1080 0 0.951 937 1071 1145 1 0 0 . 0 6140 0.920 0.000 0.907 APPENDIX C Regional Traffic Annual Growth Rate 200 CITY OF NEWPORT BEACH REGIONAL TRAFFIC ANNUAL GROWTH RATE COAST HIGHWA East City limit to MacArthur Boulevard I% MacArthur Boulevard to Jamboree Road it Jamboree Road to Newport Boulevard it Newport Boulevard to west city limit it IRVINE AVENUE All it JAMBOREE ROAD Coast Highway to San Joaquin Hills Road it San Joaquin Hills Road to Bison it Bison to Bristol it Bristol to Campus 1% MACARTHUR BOULEVARD; Coast Highway to San Joaquin Hills'Road it San Joaquin Hills Road to north city limit it NEWPORT BOULEVARD Coast Highway to north city limit 1$ Street segments not listed are assumed to have 6% regional growth. 20 j APPENDIX D Explanation and Calculation of Intersection Capacity Utilization 202 EXPLANATION AND CALCULATION OF INTERSECTION CAPACITY UTILIZATION Overview The ability of a roadway to carry traffic is referred to as capacity. The capacity is usually greater between intersections and less at intersections because traffic flows continuously between them and only during the green phase at them. Capacity at intersections is best defined in terms of vehicles per lane per hour of green. If capacity is 1,600 vehicles per lane per hour of green, and if the green phase is 50 percent of the cycle and there are three lanes, then the capacity is 1,600 times 50 percent times 3 lanes, or 2,400 vehicles per hour for that approach. The technique used to compare the volume and capacity at an intersection is known as Intersection Capacity Utilization. Intersection Capacity Utilization, usually expressed as a decimal, is the proportion of an hour required to provide sufficient capacity to accommodate all intersection traffic if all approaches operate at capacity. If an intersection is operating at 0.800 of capacity (i.e., an Intersection Capacity Utilization of 0.800), then 0.200 of the traffic signal cycle is not used. The traffic signal could show red on all indications 0.200 of the time and the traffic signal would just accommodate approaching traffic. Intersection Capacity Utilization analysis consists of (a) determining the proportion of traffic signal time needed to serve each conflicting movement of traffic, (b) summing the times for the movements, and (c) comparing the total time required to the total time available. For example, if for north -south traffic the northbound traffic is 1,600 vehicles per hour, the southbound traffic is 1,200 vehicles per hour, and the capacity of either direction is 3,200 vehicles per hour, then the northbound traffic is critical and requires 1,600/3,200 or 0.500 of the traffic signal time. If for east -west traffic, 0.300 of the traffic signal time is required, then it can be seen that the Intersection Capacity Utilization is 0.500 plus 0.300, or 0.800. When left turn arrows (left turn phasing) exist, they are incorporated into the analysis. The critical movements are usually the heavy left turn movements and the opposing through movements. The Intersection Capacity Utilization technique is an ideal tool to quantify existing as well as future intersection operation. The impact of adding a lane can be quickly determined by examining the effect the lane has on the Intersection Capacity Utilization. 2 o9 Intersection Capacity Utilization Worksheets That Follow This Discussion The Intersection Capacity Utilization worksheet table contains the following information: 1. Peak hour turning movement volumes. 2. Number of lanes that serve each movement. 3. For right turn lanes, whether the lane is a free right turn lane, whether it has a right turn arrow, and the percent of right turns on red that are assumed. 4. Capacity assumed per lane. S. Capacity available to serve each movement (number of lanes times capacity per lane). 6. Volume to capacity ratio for each movement. 7. Whether the movement's volume to capacity ratio is critical and adds to the Intersection Capacity Utilization value. 8. The yellow time or clearance interval assumed. 9. Adjustments for right turn movements. 10. The Intersection Capacity Utilization and Level of Service. The Intersection Capacity Utilization worksheet also has two graphics on the same page. These two graphics show the following: 1. Peak hour turning movement volumes. 2. Number of lanes that serve each movement 3. The approach and exit leg volumes. 4. The two -way leg volumes. 5. An estimate of daily traffic volumes that is fairly close to actual counts and is based strictly on the peak hour leg volumes multiplied by a factor. 270 6. Percent of daily traffic in peak hours. 7. Percent of peak hour leg volume that is inbound versus outbound. A more detailed discussion of Intersection Capacity Utilization and Level of Service follows. Level of Service Level of Service is used to describe the quality of traffic flow. Levels of Service A to C operate quite well. Level of Service C is typically the standard to which rural roadways are designed. Level of Service D is characterized by fairly restricted traffic flow. Level of Service D is the standard to which urban roadways are typically designed. Level of Service E is the maximum volume a facility can accommodate and will result in possible stoppages of momentary duration. Level of Service F occurs when a facility is overloaded and is characterized by stop- and -go traffic with stoppages of long duration. A description of the various Levels of Service appears at the end of the Intersection Capacity Utilization description, along with the relationship between Intersection Capacity Utilization and Level of Service. Signalized and Unsignalized Intersections Although calculating an Intersection Capacity Utilization value for an unsignalized intersection is invalid, the presumption is that a traffic signal can be installed and the calculation shows whether the geometrics are capable of accommodating the expected volumes with a traffic signal. A traffic signal becomes warranted before Level of Service D is reached for a signalized intersection. Traffic Signal Timing The Intersection Capacity Utilization calculation assumes that a traffic signal is properly timed. It is possible to have an Intersection Capacity Utilization well below 1.000, yet have severe traffic congestion. This would occur if one or more movements is not getting sufficient green time to satisfy its demand, and excess green time exists on other movements. This is an operational problem that should be remedied. 271- Lane Capacity Capacity is often defined in terms of roadway width; however, standard lanes have approximately the same capacity whether they are 11 or 14 feet wide. Our data indicates a typical lane, whether a through lane or a left turn lane, has a capacity of approximately 1,750 vehicles per hour of green time, with nearly all locations showing a capacity greater than 1,600 vehicles per hour of green per lane. Right turn lanes have a slightly lower capacity; however 1,600 vehicles per hour is a valid capacity assumption for right turn lanes. This finding is published in the August 1978 issue of the Institute of Transportation Engineers Journal in the article entitled, "Another Look at Signalized Intersection Capacity" by William Kunzman, P.E. A capacity of 1,600 vehicles per hour per lane with no yellow time penalty, or 1,700 vehicles per hour with a 0.030 or 0.050 yellow time penalty is reasonable. Yellow Time The yellow time can either be assumed to be completely used and no penalty applied, or it can be assumed to be only partially usable. Total yellow time accounts for approximately 0.100 of a traffic signal cycle, and a penalty of 0.030 to 0.050 is reasonable. During peak hour traffic operation the yellow times are nearly completely used. If there is no left turn phasing, the left turn vehicles completely use the yellow time. Even if there is left turn phasing, the through traffic continues to enter the intersection on the yellow until just a split second before the red. Shared Lanes Shared lanes occur in many locations. A shared lane is often found at the end of an off ramp where the ramp forms an intersection with the cross street. Often at a diamond interchange off ramp, there are three lanes. In the case of a diamond interchange, the middle lane is sometimes shared, and the driver can turn left, go through, or turn right from that lane. If one assumes a three lane off ramp as described above, and if one assumes that each lane has 1,600 capacity, and if one assumes that there are 1,000 left turns per hour, 500 right turns per hour, and 100 through vehicles per hour, then how should one assume that the three lanes operate. There are three ways that it is done. 272 One way is to just assume that all 1,600 vehicles (1,000 plus 500 plus 100) are served simultaneously by three lanes. When this is done, the capacity is 3 times 1,600 or 4,800, and the amount of green time needed to serve the ramp is 1,600 vehicles divided by 4,800 capacity or 33.3 percent. This assumption effectively assumes perfect lane distribution between the three lanes that is not realistic. It also means a left turn can be made from the right lane. Another way is to equally split the capacity of a shared lane and in this case to assume there are 1.33 left turn lanes, 1.33 right turn lanes, and 0.33 through lanes. With this assumption, the critical movement is the left turns and the 1,000 left turns are served by a capacity of 1.33 times 1,600, or 2,133. The volume to capacity ratio of the critical move is 1,000 divided by 2,133 or 46.9 percent. The first method results in a critical move of 33.3 percent and the second method results in a critical move of 46.9 percent. Neither is very accurate, and the difference in the calculated Level of Service will be approximately 1.5 Levels of Service (one Level of Service is 10 percent). The way Kunzman Associates, Inc. does it is to assign fractional lanes in a reasonable way. In this example, it would be assumed that there is 1.1 right turn lanes, 0.2 through lanes, and 1.7 left turn lanes. The volume to capacity ratios for each movement would be 31.3 percent for the through traffic, 28.4 percent for the right turn movement, and 36.8 percent for the left turn movement. The critical movement would be the 36.8 percent for the left turns. Right Turn on Red Kunzman Associates, Inc. software treats right turn lanes in one of five different ways. Each right turn lane is classified into one of five cases. The five cases are (1) free right turn lane, (2) right turn lane with separate right turn arrow, (3) standard right turn lane with no right turns on red allowed, (4) standard right turn lane with a certain percentage of right turns on red allowed, and (5) separate right turn arrow and a certain percentage of right turns on red allowed. Free Right Turn Lane If it is a free right turn lane, then it is given a capacity of one full lane with continuous or 1.000 green time. A free right turn lane occurs when there is a separate approach lane for right turning vehicles, there is a separate departure lane for the right turning vehicles after they turn and are exiting the intersection, and the through cross street traffic does not interfere with the vehicles after they turn right. � 2 Separate Right Turn Arrow If there is a separate right turn arrow, then it is assumed that vehicles are given a green indication and can proceed on what is known as the left turn overlap. The left turn overlap for a northbound right turn is the westbound left turn. When the left turn overlap has a green indication, the right turn lane is also given a green arrow indication. Thus, if there is a northbound right turn arrow, then it can be turned green for the period of time that the westbound left turns are proceeding. If there are more right turns than can be accommodated during the northbound through green and the time that the northbound right turn arrow is on, then an adjustment is made to the Intersection Capacity Utilization to account for the green time that needs to be added to the northbound through green to accommodate the northbound right turns. Standard Right Turn Lane, No Right Turns on Red A standard right turn lane, with no right turn on red assumed, proceeds only when there is a green indication displayed for the adjacent through movement. If additional green time is needed above that amount of time, then in the Intersection Capacity Utilization calculation a right turn adjustment green time is added above the green time that is needed to serve the adjacent through movement. Standard Right Turn Lane, With Right Turns on Red A standard right turn lane with say 20 percent of the right turns allowed to turn right on a red indication is calculated the same as the standard right turn case where there is no right turn on red allowed, except that the right turn adjustment is reduced to account for the 20 percent of the right turning vehicles that can logically turn right on a red light. The right turns on red are never allowed to exceed the time the overlap left turns take plus the unused part of the green cycle that the cross street traffic moving from left to right has. As an example of how 20 percent of the cars are allowed to turn right on a red indication, assume that the northbound right turn volume needs 40 percent of the traffic signal cycle to be satisfied. To allow 20 percent of the northbound right turns to turn right on red, then during 8 percent of the traffic signal cycle (40 percent of traffic signal cycle times 20 percent that can turn right on red) right turns on red will be allowed if it is feasible. 274 For this example, assume that 15 percent of the traffic signal cycle is green for the northbound through traffic, and that means that 15 percent of the traffic signal cycle is available to satisfy northbound right turns. Afterthe northbound through traffic has received its green, 25 percent of the traffic signal cycle is still needed to satisfy the northbound right turns (40 percent of the traffic signal cycle minus the 15 percent of the traffic signal cycle that the northbound through used). Assume that the westbound left turns require a green time of 6 percent of the traffic signal cycle. This 6 percent of the traffic signal cycle is used by northbound right turns on red. After accounting for the northbound right turns that occur on the westbound overlap left turn, 19 percent of the traffic signal cycle is still needed for the northbound right turns (25 percent of the cycle was needed after the northbound through green time was accounted for [see above paragraph], and 6 percent was served during the westbound left turn overlap). Also, at this point 6 percent of the traffic signal cycle has been used for northbound right turns on red, and still 2 percent more of the right turns will be allowed to occur on the red if there is unused eastbound through green time. For purpose of this example, assume that the westbound through green is critical, and that 15 percent of the traffic signal cycle is unused by eastbound through traffic. Thus, 2 percent more of the traffic signal cycle can be used by the northbound right turns on red since there is 15 seconds of unused green time being given to the eastbound through traffic. At this point, 8 percent of the traffic signal cycle was available to serve northbound right turning vehicles on red, and 15 percent of the traffic signal cycle was available to serve right turning vehicles on the northbound through green. So 23 percent of the traffic signal cycle has been available for northbound right turns. Because 40 percent of the traffic signal cycle is needed to serve northbound right turns, there is still a need for 17 percent more of the traffic signal cycle to be available for northbound right turns. What this means is the northbound through traffic green time is increased by 17 percent of the cycle length to serve the unserved right turn volume, and a 17 percent adjustment is added to the Intersection Capacity Utilization to account for the northbound right turns that were not served on the northbound through green time or when right turns on red were assumed. Separate Right Turn Arrow, With Right Turns on Red A right turn lane with a separate right turn arrow, plus a certain percentage of right turns allowed on red is calculated the same way as a standard right turn lane with a certain percentage of right turns allowed on red, except the turns which occur on the 2715 right turn arrow are not counted as part of the percentage of right turns that occur on red. Critical Lane Method Intersection Capacity Utilization parallels another calculation procedure known as the Critical Lane Method with one exception. Critical Lane Method dimensions capacity in terms of standardized vehicles per hour per lane. A Critical Lane Method result of 800 vehicles per hour means that the intersection operates as though 800 vehicles were using a single lane continuously. If one assumes a lane capacity of 1,600 vehicles per hour, then a Critical Lane Method calculation resulting in 800 vehicles per hour is the same as an Intersection Capacity Utilization calculation of 50 percent since 800/1,600 is 50 percent. It is our opinion that the Critical Lane Method is inferior to the Intersection Capacity Utilization method simply because a statement such as "The Critical Lane Method value is 800 vehicles per hour" means little to most persons, whereas a statement such as "The Intersection Capacity Utilization is 50 percent" communicates clearly. Critical Lane Method results directly correspond to Intersection Capacity Utilization results. The correspondence is as follows, assuming a lane capacity of 1,600 vehicles per hour and no clearance interval. Critical Lane Method Result 800 vehicles per hour 960 vehicles per hour 1,120 vehicles per hour 1,280 vehicles per hour 1,440 vehicles per hour 1,600 vehicles per hour 1,760 vehicles per hour Intersection Capacity Utilization Result 50 percent 60 percent 70 percent 80 percent 90 percent 100 percent 110 percent 270 INTERSECTION CAPACITY UTILIZATION LEVEL OF SERVICE DESCRIPTION' Level of Service Description Volume to Capacity Ratio A Level of Service A occurs when progression is extremely 0.600 and below favorable and vehicles arrive during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay. B Level of Service B generally occurs with goad progression 0.601 to 0.700 and /or short cycle lengths. More vehicles stop than for Level of Service A, causing higher levels of average delay. C Level of Service C generally results when there is fair 0.701 to 0.800 progression and /or longer cycle lengths. Individual cycle failures may begin to appear in this level. The number of vehicles stopping is significant at this level, although many still pass through the intersection without stopping. D Level of Service D generally results in noticeable congestion. 0.801 to 0.900 Longer delays may result from some combination of unfavorable progression, long cycle lengths, or high volume to capacity ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. Individual cycle failures are noticeable. E Level of Service E is considered to be the limit of acceptable 0.901 to 1.000 delay. These high delay values generally indicate poor progression, long cycle lengths, and high volume to capacity ratios. Individual cycle failures are frequent. F Level of Service F is considered to be unacceptable to most 1.001 and up drivers. This condition often occurs when oversaturation, i.e., when arrival flow rates exceed the capacity of the intersection. It may also occur at high volume to capacity ratios below 1.00 with many individual cycle failures. Poor progression and long cycle lengths may also be major contributing causes to such delay levels. 'Source: Highway Capacity Manual special Report 209, Transportation Research Board, National Research Council Washington D.C., 2000. Existing (Year 20111 272 Default Scenario Sun May 22, 2011 13:38:19 Page 2 -1 4221 Dolphin- Striker Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length e) Method (Base Volume Alternative) ********* k* k*********************#*#*** k********* * * * * * * * * *k *k * * ** * * * * * * * * * * * * * ** Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) **********************#* k* k* k* IkI****#***** k*** k* k ** * ** ** ** *k * * * * ** ** * * * * * * # ** ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.435 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (.sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - - - I Control.: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------ --------------- II--------------- II-------------- -II---------- - - - - - I Volume Module: Base Vol: 37 944 49 195 835 227 307 555 48 87 185 58 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial B3e: 38 972 50 201 860 234 316 572 49 90 191 60 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Ad3: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 38 972 50 201 860 234 316 572 49 90 191 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 38 972 50 201 860 234 316 572 49 90 191 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Final.VOlume: 38 972 50 201 860 234 316 572 49 90 191 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ]..00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.76 0.24 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4418 382 3200 4800 1600 ------------ I --------------- II--------------- II------------- --II---------- -- - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.03 0.13 0.13 0.15 0.10 0.13 0.13 0.03 0.04 0.00 Crit Moves '1'raffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA Default Scenario Sun May 22, 2011 13:38:33 Page 2 -1 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Hour. Level Of Service Computation Report ICU 1(Loss as Cycle Length o) Method (Base Volume Alternative) Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.635 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B *****************#****** W***** W***' 4*' 4*- k##********** * * * * *' * * * * * * * ** ** * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West: Bound Movement: L - T - R L - T - R L - 'I' - R L - T - R ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 154 1091 49 45 819 447 324 274 96 98 669 195 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 159 1124 50 46 844 460 334 282 99 101 689 201 User Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 159 1124 50 46 844 460 334 282 99 101 689 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 1.59 1124 50 46 844 460 334 282 99 101 689 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 159 1124 50 46 844 460 334 282 99 101 689 0 -- - -- --------------- II--------------- II--------------- il---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.22 0.78 2.00 3.00 1.00 E'inal Sat.: 1600 6400 1600 1600 6400 1600 3200 3555 1245 3200 4800 1600 ------ - -- ---I--------------- II--------------- II--------------- II----- ----- - - - --1 Capacity Analysis Module: Vol /Sat: 0.10 0.18 0.03 0.03 0.13 0.29 0.10 0.08 0.08 0.03 0.14 0.00 Crit Moves: * * ** # * +* * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 220 Default Scenario Sun May 22, 2011 13:38:19 Page 3 -1 4221 Dolphin- Striker Project Existing (Year 2011) Morning Peak Hour. Level Of Service Computation Report ICU 1(Loss as Cycle Length `;) Method (Base Volume Alternative) Intersection $2 MacArthur Boulevard (NS) at Birch Street (EW) ***- 4************************#***#**************** * * * * * * * * * * * * * * * * ** * * * * * * * * * * * ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.380 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level. Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - 'T - R .L - T - R L - 'T - R L - T - R ------------ --------------- II----__--------- II--------------- II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Inc.l.ude Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------ --------------- II--------------- II---- ---- ------- II-- -- ------ - - - - - I Volume Module: Base Vol: 32 689 98 100 624 176 156 310 73 31. 154 53 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 33 703 100 102 636 180 158 310 73 31 154 53 User.' Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 ?HE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0100 PHF Volume: 33 703 100 102 636 180 158 310 73 31 154 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 33 703 100 102 636 180 158 310 73 31 154 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVOlume: 33 703 100 102 636 180 158 310 73 31 154 0 ------------ I--------------- II--------------- II------- -------- II-- ---- ---- - - -- - I Saturation Flow Module: Sat /Lane: 1600 1600 1.600 1,600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.12 0.88 1.00 1.60 0.40 1.00 2.00 1.00 Final. Sat.: 1600 4800 1600 1600 4992 1.406 1600 2556 644 1600 3200 1600 ------------ I --------------- II--------------- II --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.06 0.06 0.13 0.13 0.10 0.12 0.11 0.02 0.05 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 221 Default Scenario Sun May 22, 2011 13:38:33 Page 3 -1 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #2 MacArthur Boulevard (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.457 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------------ - - - - -- --------------- II--------- ------ II---------- - - - - - I Volume Module: Base Vol: B6 646 25 49 858 149 274 182 53 114 433 170 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 88 659 26 50 875 152 274 182 53 114 433 170 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 88 659 26 50 875 152 274 182 53 114 433 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 88 659 26 50 875 152 274 182 53 114 433 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Ad-j: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Final-Volume: 88 659 26 50 875 152 274 182 53 1.1.4 433 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.41 0.59 1.61 1.07 0.31 1.00 2.00 1.00 Final Sat.: 1600 4800 1600 1600 5453 947 2582 1717 500 1600 3200 1600 ------------ I--------------- II--------------- 11--------------- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.05 0.14 0.02 0.03 0.16 0.16 0.11 0.11 0.11 0.07 0.14 0.00 Crit Moves: * * ** + * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling ASSOC. Licensed to KUNZMAN ASSOC, ORANGE CA 222 Default Scenario Sun May 22, 2011 13:38:19 Page 4 -1 4221 Dolphin- Striker Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length $) Method (Base Volume Alternative) *# w*************************** w************#***** * * * * * * *W *W * * * * *# # * * * * * * * * * * * * ** Intersection #3 MacArthur Boulevard (NS) at Von Karman Avenue (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.552 Loss Time (sec): 0 (Y- FR =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - 'P - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II --------------- II--------------- I Control: Protected Protected Protected Protected. Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 --------------------------- 11--------------- II----- ---------- II-------- -- -- - - -I Volume Module: Base Vol: 101 988 656 58 435 163 19 96 28 78 136 12 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 1008 669 59 444 166 19 96 28 78 136 12 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 103 1008 669 59 444 166 19 96 28 78 136 1.2 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 103 1008 669 59 444 166 19 96 28 78 136 12 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 103 1008 669 59 444 166 19 96 28 78 136 12 ------------ --------------- II--------------- II-- ------------- II----- ----- - - - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1.600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 3200 1600 3200 1600 1600 ------------ I ------ --------- II-------------- -II --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.06 0.21 0.42 0.04 0.09 0.10 0.01 0.03 0.02 0.02 0.09 0.01 Cri1t Moves: # * ** * * ** * * ** * # ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 22S Default Scenario Sun May 22, 2011 13:38:33 Page 4 -1 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Base Volume Alternative) Intersection #3 MacArthur Boulevard (NS) at Von Karman Avenue (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.558 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R 1, - T - R L - T - R I --------------- II --------------- II--------- _----- II---------- - -- - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 - - -- I --------------- II--------------- II---- ----------- II------ ---- - - - - - I Volume Module: Base Vol: 48 624 126 29 968 52 138 195 183 665 127 38 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Ise: 49 636 129 30 987 53 138 1.95 163 665 127 38 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PINT Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 49 636 129 30 987 53 138 .1.95 183 665 127 38 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 49 636 129 30 987 53 138 195 183 665 127 38 PCP Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 49 636 129 30 987 53 138 195 183 665 127 38 ------------ --------------- II--------------- II--- ------------ II---------- -- - - - I Saturation Flow Module: Sat /Lane: 1600 1600 .1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 3200 1600 3200 1600 1600 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.13 0.08 0.02 0.21 0.03 0.09 0.06 0.11 0.21 0.08 0.02 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 224 Default Scenario Sun May 22, 2011 13:38:19 Page 5 -1 4221 Dolphin- Striker Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #4 MacArthur Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.601 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B ******#**#********#****************#*****#*#***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II-----_--------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 ]. 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------------ --------------- II--------------- II--------------- II------- --- - - -- - I Volume Module: Base Vol: 177 1332 456 66 293 121 410 851 176 364 674 181 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bse: 181 1359 465 67 299 123 418 668 180 371 687 185 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 181 1359 465 67 299 0 418 868 180 371 687 1.85 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 181 1359 465 67 299 0 418 868 180 371 687 185 PCE Ad-j: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 181 1359 465 67 299 0 418 868 180 371 687 185 Ov1Adj Vol: 279 ------------ --------------- II--------------- II-- -- ------- -- -- II---------- -- - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 4800 1600 3200 4800 1600 ------------ I ----------- ---- II----------- ---- II - - - -- ---- ------ - - - - -I Capacity Analysis Module: Vol /Sat: 0.06 0.28 0.29 0.02 0.06 0.00 0.13 0.1.8 0.11 0.12 0.14 0.12 Ov1Adj V /S: 0.17 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 225 Default Scenario Sun May 22, 2011 13:38:33 Page 5 -1 4221 Dolphin- Striker Project Existing (Year 2011) . Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length 7) Method (Base Volume Alternative) Intersection 44 MacArthur. Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.678 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R -------- - - - -I- - - - -II ------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 ]. 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------------ -------------- -II - -- -- II--------------- II---------- - - - - -I Volume Module: Base Vol: 227 578 397 157 965 312 214 967 37 611 921 155 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bse: 232 590 405 160 984 318 218 986 38 623 939 158 User Adj: 1.00 1.00 1.00 1.00 1..00 0.00 1.00 1.00 1.00 .1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 232 590 405 160 984 0 218 986 38 623 939 158 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 232 590 405 160 984 0 218 986 38 623 939 158 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Fi.nalVOlume: 232 590 405 160 984 0 218 986 38 623 939 158 Ov1AdjVOl: 93 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 4800 1600 3200 4800 1600 ------------ I --------------- II--------------- tl--- --- -- ------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.07 0.12 0.25 0.05 0.21 0.00 0.07 0.21 0.02 0.19 0.20 0.10 OvlAdjV /S: 0.06 Crit Moves: * * ** * * ** * * ** * * ** Traf£.i.x 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 220 Default Scenario Sun May 22, 2011 13:38:19 Page 6 -1 4221 Dolphin - Striker Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report ICU Moss as Cycle Length %) Method (Base Volume Alternative) Intersection #5 Campus Drive /Irvi.ne Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.488 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 1.00 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - -- --------------- II--------------- II--------------- II---------- - - - -- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol.: 349 1533 0 0 220 204 0 0 0 120 902 138 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 356 1564 0 0 224 208 0 0 0 120 902 138 User Adj: 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 356 1564 0 0 224 208 0 0 0 120 902 138 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 356 1564 0 0 224 208 0 0 0 120 902 138 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 356 1564 0 0 224 208 0 0 0 120 902 138 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.47 0.53 Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 5551 849 ------------ I --------------- --------------- --------------- 11 --------------- Capacity Analysis Module: Vol /Sat: 0.11 0.33 0.00 0.00 0.04 0.0'1 0.00 0.00 0.00 0.08 0.16 0.16 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 227 Default Scenario Sun May 22, 2011 13:38:33 Page 6 -1 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Base Volume Alternative) **** W** W*+*+**** WW+*** W* W* WW*#** W*************#** * * * * * * * * * *k *W * + # *WW *W *W * * * * * * *# Intersection #5 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.742 Loss Time (sec): 0 (Y+R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: 1, - T - R L - T - R 1, - 'I - R L - T - R ------------ --------------- II--------------- II--------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 ------------ --------------- II--------------- II----- -- -- ------ II----- ----- --- - - I Volume Module: Base Vol: 370 671 0 0 742 1007 0 0 0 200 1867 74 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 377 684 0 0 757 1027 0 0 0 200 186 °7 74 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 377 684 0 0 757 1027 0 0 0 200 1.867 74 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 377 684 0 0 757 1027 0 0 0 200 1867 74 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 377 684 0 0 757 1027 0 0 0 200 1867 74 ------------ --------------- II--------------- II--------------- II-- -------- - - - - - I Saturation Flow Module: Sat. /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.85 0.15. Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 6156 244 ------------ I --------------- II--------------- II-- ------------- II------- --- - -- - - I Capacity Analysis Module: Vol /Sat: 0.12 0.14 0.00 0.00 0.12 0.32 0.00 0.00 0.00 0.13 0.30 0.30 Crit Moves: *W ** * ##* * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 222 Default Scenario Sun May 22, 2011 13:38:19 Page 7 -1 4221 Dolphin - Striker Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report ICU 1(Los3 as Cycle Length s) Method (Base Volume Alternative) Intersection *6 Campus Drive /Irvine Avenue (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.634 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - 1' - R L - T - R ------------ --------------- II--------------- II--------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------ --------------- II--------------- II--------------- II------- --- - - - - - I Volume Module: Base Vol: 0 900 152 96 281 0 1186 1623 299 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 916 155 98 287 0 :L186 1623 299 0 0 0 User Adj: 1.00 1.00 1_00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 918 155 98 287 0 1186 1623 299 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 918 155 98 287 0 1186 1623 299 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final.VOlume: 0 918 155 98 287 0 1186 1623 299 0 0 0 --- --------------- II--------------- II--------------- II------ ---- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.28 0.72 1.00 3.00 0.00 1.69 2.31 2.00 0.00 0.00 0.00 Final Sat.: 0 6844 1156 1600 4800 0 2702 3698 3200 0 0 0 ------------ I--------------- II--------------- 11-- ------------- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.13 0.13 0.06 0.06 0.00 0.44 0.44 0.09 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Tra£fix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 2 eq Default Scenario Sun May 22, 2011 13:38:33 Page 7 -1 4221 Dolphin- Striker Project Existing (Year 2011) . Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length s) Method (Base Volume Alternative) Intersection #6 Campus Dr.i.ve /Irvine Avenue (NS) at Bristol Street South (EW) *********** ww**********#****************** ww*** wW *W * *w *w * * * * * * * * * * * # * * * * * * * * *kw* Cycle (sec): 100 Critical. Vol. /Cap.(X): 0.465 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 1.00 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II --------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1. 2 0 2 0 0 0 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 0 720 180 201 859 0 417 1004 429 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial B3e: 0 734 184 205 876 0 417 1004 429 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 734 1.84 205 876 0 417 1004 429 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 734 184 205 876 0 417 1004 429 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 '734 184 205 876 0 417 1004 429 0 0 0 ------------ --------------- II--------------- II--------------- II--- ------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.17 2.83 2.00 0.00 0.00 0.00 Final. Sat.: 0 6400 1.600 1600 4800 0 1878 4522 3200 0 0 0 ------------ I --------------- II--------------- II-- ------------- II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.11 0.11 0.13 0.18 0.00 0.22 0.22 0.13 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA ;90 Default Scenario Sun May 22, 2011 13:38:19 Page 8 -1 4221 Dolphin- Striker Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Cri.tical Vol. /Cap. W : 0.532 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East: Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---- ------ - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------ --------------- II--------------- II--------------- II------- --- - - - - - I Volume Module: Base Vol: 108 886 0 0 160 95 0 0 0 403 986 237 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 108 886 0 0 160 95 0 0 0 403 988 237 User Adj: 1.00 1_00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 108 886 0 0 1.60 95 0 0 0 403 988 237 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 108 886 0 0 160 95 0 0 0 403 988 237 PCB Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 108 886 0 0 1.60 95 0 0 0 403 988 237 ----- --------------- II--------------- II---- ---- --- ---- II- --------- - - - - - I Saturation. Flow Module: Sat /Lane: 1600 1600 1600 1600 1.600 1600 1.600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 1.16 3.26 0.58 Final Sat.: 3200 3200 0 0 3200 3200 0 0 0 1854 5217 929 ------------ I ------- -------- II------ ------ - - -II--------------- --------------- Capacity Analysis Module: Vol /Sat: 0.03 0.28 0.00 0.00 0.05 0.03 0.00 0.00 0.00 0.22 0.19 0.26 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA �9 Default Scenario Sun May 22, 2011 13:38:33 Page 8 -1 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Hour ----------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length 1) Method (Base Volume Alternative) Intersection N7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.527 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 1.00 Level Of Service: A Approach: North Bound South Bound East Round West Bound Movement: L - T - R L - T - R L - T -- R 1, - T - R ------------ I --------------- II--------------- II--------------- 11--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------ I --------------- II--------------- II--------- ------ II--------- - - - - - - I Volume Module: Base Vol: 198 344 0 0 484 743 0 0 0 392 1187 124 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 198 344 0 0 484 743 0 0 0 392 1187 124 User. Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 198 344 0 0 484 743 0 0 0 392 1187 124 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 198 344 0 0 484 743 0 0 0 392 1187 124 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ML.F Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 198 344 0 0 484 743 0 0 0 392 1187 1.24 ------------ --------------- LI--------------- II--------------- II--------------- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 1.58 2.42 0.00 0.00 0.00 1.00 3.72 0.28 Final. Sat.: 3200 3200 0 0 2525 3875 0 0 0 1600 5946 454 --------- - - - I -- ------ II--------------- II__------- ------ II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.06 0.11 0.00 0.00 0.19 0.19 0.00 0.00 0.00 0.25 0.20 0.27 Cr-it Moves: * * ** * * ** * * ** Tra£fix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA ;92 Default Scenario Sun May 22, 2011 13:38:19 Page 9 -1 4221 Dolphin - Striker Project Existing (Year 2011) Morning Peak Hour ----------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #8 Birch Street (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical. Vol. /Cap.(X): 0.391 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R 1, - T - R ------------ --------------- II-------__------ II--------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 --------------------------- 11--------------- II------- -------- II---------- - - -- -I Volume Module: Base Vol: 0 333 229 198 379 0 676 867 291 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 333 229 198 379 0 676 867 291 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 333 229 198 379 0 676 867 291 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 333 229 198 379 0 676 867 291 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fi.nalVOlume: 0 333 229 198 379 0 676 867 291 0 0 0 ------------ --------------- II------------- - -II --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.37 1.63 2.00 2.00 0.00 1.75 2.49 0.75 0.00 0.00 0.00 Final Sat.: 0 3792 2608 3200 3200 0 2804 3990 1206 0 0 0 ------------ I --------------- II------------- -- II --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.00 0.09 0.09 0.06 0.12 0.00 0.24 0.22 0.24 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA :�9 s Default Scenario Sun May 22, 2011 13:38:33 Page 9 -1 4221 Dolphin - Striker Project Existing (Year 2011) Evening Peak Hour Level Of Service Computation Report ICU 1(Los.s as Cycle Length o) Method (Base Volume Alternative) Intersection #8 Birch Street (NS) at Bristol Street South (EW) ***** W******** W*+***********#*#*********+*++*+*+ W * * * * * * * * * * * * * * * * * * * # * * * * # #W # # ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.436 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************+***********#****** * * * ** ** ** ** ** ** * * **k * * * * * * * * * *# Approach: North Bound South Bound East Bound West Bound Movement: I, - T - R L - T - R 1, - T - R L - T - R ------------ I --_------------ II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------ I ------------ - - -II- ------ II--------------- II-------- -- - - - - -I Volume Module: Base Vol: 0 312 300 305 614 0 188 999 174 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1-00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 312 300 305 614 0 168 999 174 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 312 300 305 614 0 188 999 174 0 0 0 Deduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 312 300 305 614 0 188 999 174 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 312 300 305 614 0 188 999 1.74 0 0 0 ------------ --- - -- -- II--------------- II-- ------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.04 1.96 2.00 2.00 0.00 1.00 3.56 0.45 0.00 0.00 0.00 Final Sat.: 0 3263 3137 3200 3200 0 1600 5688 712 0 0 0 ----- ------- I --------- -- ----II ------- II-- ---- --- ------ II------ ---- - -- -- I Capacity Analysis Module: Vol /Sat: 0.00 0.10 0.10 0.10 0.19 0.00 0.12 0.18 0.24 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA : 9"T Default Scenario Sun May 22, 2011 13:38:19 4221 Dolphin- Striker Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report Page 10 -1 ---------------- - - - - -- ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) *#* W************ WWW******* W***** k***** k********** WWW *W * * * * * * * * * * * * * * * * * * *W *W *W ** Intersection #9 Von Karman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.462 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal. Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --------------------------- II--------------- II--------------- II---------- - - - - -1 Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 J. 0 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II------ ------ --- II---------- - - - - - I Volume Module: Base Vol: 16 534 53 37 335 73 228 303 42 '77 287 110 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bse: 16 534 53 37 335 73 233 309 43 79 293 112 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 1.6 534 0 37 335 73 233 309 43 79 293 112 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 16 534 0 37 335 73 233 309 43 79 293 112 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 16 534 0 37 335 73 233 309 43 79 '293 112 ------------ ------ --------- II--- ---- ---- - - --II ----- II-------- -- -- - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.64 0.36 1.00 2.00 1.00 1.00 1.45 0.55 Final Sat.: 1600 3200 1600 1600 2627 573 1600 3200 1.600 1600 2313 887 ---- I --------------- II--------------- II--------------- II---------- - - - -- I Capacity Analysis Module: Vol /Sat: 0.01 0.17 0.00 0.02 0.13 0.13 0.15 0.10 0.03 0.05 0.13 0.13 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 295 Default Scenario Sun May 22, 2011 13:38:33 Page 10 -1 - -- - - -- 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Hour Level Of Service Computation Report ICU 1(Lo3s as Cycle Length %) Method (Base Volume Alternative) Intersection #9 Von Karman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.563 Loss 'time (sec): 0 (Y +R =0.0 sec) Average Delay (.sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R 1, - T - R ------------ I--------------- II--------------- II--------------- II ---------- - - - - - I Control: protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 47 383 122 98 610 224 145 445 49 51 501 64 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bee: 47 383 122 98 610 224 148 454 50 52 511 65 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 47 383 0 98 610 224 148 454 50 52 511 65 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 47 383 0 98 610 224 148 454 50 52 511 65 POE Adj: 1.00 1.00 0.00 .1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 47 383 0 98 610 224 148 454 50 52 511 65 ------------ --------------- II--------------- II--------------- II-- ---- ---- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1,600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.46 0.54 1.00 2.00 1.00 1.00 1.77 0.23 Final Sat.: 1600 3200 1600 1600 2341 859 1600 3200 1600 1600 2838 362 ------------ I --------------- II--------------- II-------------- -II-- --- ---- - - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.12 0.00 0.06 0.26 0.26 0.09 0.14 0.03 0.03 0.18 0.18 Cri't Moves: * * ** * * ** * * ** * * #* Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA ;go Default Scenario Sun May 22, 2011 13:38:19 Page 11 -1 4221 Dolphin- Striker Project Existing (Year 2011) Morning Peak Hour ----------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) *+*+******** W************ WW** W* W******###**** W** W * * * * * * * * * # * * * * * * * * * * * * *W *W * * * *# Intersection #10 Von Karman Avenue (NS) at Birch Street (EW) Cycle (sec): 1.00 Critical Vol. /Cap.(X): 0.285 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level. Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1. 1. 0 2 0 1 1 0 2 0 1 1 0 2 0 1. ------------ I --------------- II------------ - - -II--------------- --------------- Volume Module: Base Vol: 30 484 33 56 275 128 79 194 48 43 159 22 Growth Adj: 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 30 484 33 56 275 128 79 194 48 43 159 22 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 484 33 56 275 128 79 194 48 43 159 22 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 30 484 33 56 275 128 79 194 48 43 159 22 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Ad-j: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fi.nalVOlume: 30 484 33 56 275 128 79 194 48 43 159 22 ----- I--------------- II--------------- II-- --- -- -- ------ II- ---- ----- - -- - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 :1..00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------------- II-------------- -II --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.02 0.04 0.09 0.08 0.05 0.06 0.03 0.03 0.05 0.01 Crit Moves: * * ** * * ** * * ** * * ** **#*******+******#*#*#************#*****#*#*#** W* * *W * * * * # * * * # * #* * * * * * * * * * + * * * * ** Traf£ix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 297 Default Scenario Sun May 22, 2011 13:38:33 Page 11 -1 4221 Dolphin- Striker Projcct Existing (Year_ 2011) Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length °.) Method (Base Volume Alternative) * kW# X**** W* W******************* WW* X#*#* # * * * * * * #W *W *W *W * * * * * * * * * * * * * * ** *WWW * * * * ** Intersection #10 Von Farman Avenue (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.351 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ** *WWW * * * * * * * * * * * * ** WWW#********** W*******#*#** W* WW * * * * * # * * * * *# * * * * * * * * * * # * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1, 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 71 407 55 34 549 133 99 166 26 19 235 41 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 71 407 55 34 549 133 99 166 26 19 235 41 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 71 407 55 34 549 133 99 166 26 19 235 41 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 71 407 55 34 549 133 99 166 26 19 235 41 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 71 40'7 55 34 549 133 99 166 26 19 235 41 ------------ ------ --------- II------------ -- -II--------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 :L.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------------- II --------------- II--------------- il---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.13 0.03 0.02 0.17 0.08 0.06 0.05 0.02 0.01 0.07 0.03 Crit Moves: * * ** * * ** * * ** * * ** * * # * # * * * * * * * * * * * * * * * * #W *WWWWW *W * * * * * * * * * * * # * * * * # * # ** *WWWWW *W * * * * * * * * * * *W * * *# * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA �9 Default Scenario Sun May 22, 2011 13:38:19 Page 1.2 -1 4221 Dolphin - Striker Project Existing (Year 2011) Morning Peak Hour Level. Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection 411 Bayview Place (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.417 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II. --------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ --------------- II--------------- II---- ----------- II---------- -- - - - I Volume Module: Base Vol: 0 0 1.01 0 0 0 0 2464 420 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 101 0 0 0 0 2464 420 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 P11F Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 101 0 0 0 0 2464 420 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 101 0 0 0 0 2464 420 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 0 101 0 0 0 0 2464 420 0 0 0 ------------ --------------- II--------------- II---- -- -- ------- II------ ---- ----- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 l.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0 0 3200 0 0 0 0 6400 1600 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- --- - - I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.39 0.26 0.00 0.00 0.00 Cri.t Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KINSMAN ASSOC, ORANGE CA Default Scenario Sun May 22, 2011 13:38:33 Page 12 -1 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Base Volume Alternative) Intersection 411 Bayview Place (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.540 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - -- ------ --------- II----- ----- - - - - - H ---- ----------- 11------- --- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min.. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ I--------------- II--------------- II------ ------- --II--------- - - - - -- I Volume Module: Base Vol: 0 0 433 0 0 0 0 2591 142 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 433 0 0 0 0 2591 142 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 P11F Volume: 0 0 433 0 0 0 0 2591 142 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 433 0 0 0 0 2591 142 0 0 0 POE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 0 433 0 0 0 0 2591 142 0 0 0 ------------ --------------- II--------------- II------ -- ------- II------ -- -- - --- - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1.600 1600 1.600 1.600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0 0 3200 0 0 0 0 6400 1600 0 0 0 ------------ I --------------- II--------------- II--------------- II--------------- I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.14 0.00 0.00 0.00 0.00 0.40 0.09 0.00 0.00 0.00 C.rit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 300 Default Scenario Sun May 22, 2011 13:38:19 Page 13 -1 4221 Dolphin- Striker Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report ICU 1(Lo3s as Cycle Length ) Method (Base Volume Alternative) ******#*********** k**************#*************** * * * * * * * * * * * * * * * ** * * * * * * * * * * * * ** Intersection #12 Jamboree Road (NS) at Campus Drive (EW) ** k********************** kk********************** * * * * * * ** * * ** * * * * * * * * * * * * * * *k* ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.615 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level. Of Service: B *************************************{*#********* * * * * # *k * * * * * ** * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound west Bound Movement: L - T - R L - T - R L - T - R L - T - R ------- - - - - -I -------- II --------------- II -_------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 ------------ --------------- II---- ----------- II-- -- ------- - ---II -- - --I Volume Module: Base Vol: 143 1044 34 286 1732 172 '76 112 10 259 423 152 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 147 1.075 35 295 1784 177 78 115 10 267 436 157 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 1.47 1075 35 295 1784 177 78 1.15 0 267 436 157 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 147 1075 35 295 1784 177 78 115 0 267 436 157 PCE Adj: 1.00 1. 00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 0.00 1.00 1.00 1.00 FinalVolume: 147 1075 35 295 1784 177 78 115 0 267 436 157 ------------ --------------- - II--------------- II--- ----- ------ -II---------- - - - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1.600 1.600 1.600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.87 0.1.3 2.00 2.73 0.27 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 6198 202 3200 4366 434 3200 3200 1600 3200 3200 1600 ------------ I --------------- il--------------- II----------- ---- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.05 0.17 0.17 0.09 0.41 0.41 0.02 0.04 0.00 0.08 0.14 0.10 Crit Moves' Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 301 Default Scenario Sun May 22, 2011 13:38:33 Page 13 -1 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Hour. Level Of Service Computation Report ICU 1(Loss as Cycle Length a) Method (Base Volume Alternative) Intersection #12 Jamboree Road (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.583 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - 'I - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II---- ------ - - - -- I Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 ------------ I --------------- II--------------- II------- -------- II---------- - - - - - I Volume Module: Base Vol: 65 1278 135 224 1108 183 219 263 159 152 226 331 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 67 1316 139 231 1141 188 226 271 164 157 233 341 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 67 1316 139 231 1141 188 226 271 0 157 233 341 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 67 1316 139 231 1141 186 226 271 0 157 233 341 PIE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLE' Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 F:i.nalVolume: 67 1316 1.39 231 1141 188 226 271 0 157 233 341 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.62 0.38 2.00 2.57 0.43 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 5789 611 3200 4120 680 3200 3200 1600 3200 3200 1600 ------------ I --------------- II--------------- II------- --- -- -- -II------- --- - - -- - I Capacity Analysis Module: Vol /Sat: 0.02 0.23 0.23 0.07 0.28 0.26 0.07 0.08 0.00 0.05 0.07 0.21 Crit Moves: * * ** + * #* *W *W * * *# Traffi.x 7.9,0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 302 Default Scenario Sun May 22, 2011 13:38:19 Page 14 -1 4221 Dolphin- Striker. Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Base Volume Alternative) **** w****#*********************************' k*#*** * * * * * * * * * * * * * * * * * * * * * * * * * * * # # ** Intersection #13 Jamboree Road (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.514 Loss 'Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 1.00 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --- - I - - -- -- II--------------- II-_---- --------- II------ ---- - - - - -I Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1. 0 3 0 1 1 1 0 0 1 0 0 1! 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 204 1228 2 7 1551 464 123 8 42 3 6 6 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 210 1265 2 7 1598 478 123 8 42 3 6 6 User Ad-j: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 210 1265 2 7 1598 0 123 8 0 3 6 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 210 1.265 2 7 1598 0 1.23 8 0 3 6 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVOlume: 210 1265 2 7 1598 0 123 8 0 3 6 6 ------------ --------------- II--------------- II--------------- II- -- ------- -- - - - I Saturation Flow Module: Sat /Lane: 1600 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.88 0.12 1.00 0.20 0.40 0.40 Final Sat.: 1600 4792 8 1600 4800 1600 3005 195 1600 320 640 640 ------- -- --- I ------------ -- -II- ------ II----------- - - - -II -I Capacity Analysis Module: Vol /Sat: 0.13 0.26 0.26 0.00 0.33 0.00 0.04 0.04 0.00 0.01 0.01 0.01 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 303 Default Scenario Sun May 22, 2011 13:39:33 Page 14 -1 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Flour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection 413 Jamboree Road (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.421 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 1.00 Level Of Service: A *#******************##****#*****##*************** * * * * ** *# ** * * * * * + * * ** * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- It--- ------------ II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1. 0 3 0 1 1 1 0 0 1 0 0 1 0 0 ------------ --------------- II--------------- II--------------- II--------- - - - - - - I Volume Module: Base Vol: 44 1188 0 2 1390 91 297 4 100 0 1 0 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 45 1224 0 2 1432 94 297 4 100 0 1 0 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 45 1224 0 2 1432 0 297 4 0 0 1 0 Reduct. Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 45 1224 0 2 1432 0 297 4 0 0 1 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 45 1224 0 2 1432 0 297 4 0 0 1 0 ---------- - -I - -- -- -- 11-------- --- - - - -11- 11---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.97 0.03 1.00 0.00 1.00 0.00 Final Sat.: 1600 4800 0 1600 4800 1600 3157 43 1600 0 1600 0 ---------- --I------ -- ------- 11---- - - ---- ---- 11-- ------ ------- 11------ ---- -- - - -I Capacity Analysis Module: Vol /Sat: 0.03 0.25 0.00 0.00 0.30 0.00 0.09 0.09 0.00 0.00 0.00 0.00 Crit Moves: * * ** # * +* * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 304 MITIG8 - Default Scenario Sun May 22, 2011 14:22:46 Page 1 -1 4221 Dolphin- Striker Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Base Volume Alternative) Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.426 Loss Time (see_): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement.: L - T - R L - T - R L - T - R L - T - R ---- --------------- II--------------- II----- ---------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1, 0 0 0 0 0 0 0 0 0 0 ------------ --------------- II--------------- II-------- ----- --II------ ---- - - - - - I Volume Module: Base Vol: 846 1509 663 0 570 412 0 0 0 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 663 1539 676 0 581 420 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 863 1539 0 0 581. 420 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 863 1539 0 0 581 420 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 863 1539 0 0 581 420 0 0 0 0 0 0 ------------ ------ -- ------- II-------- --- ----II --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1.600 .1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 :1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.32 1.68 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1600 0 3715 2685 0 0 0 0 0 0 ------- - - - - -I ------- II-------------- -II - -- ---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.27 0.42 0.00 0.00 0.16 0.16 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * +* Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 305 Default Scenario Sun May 22, 2011 13:38:33 Page 15 -1 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Hour Level Of Service Computation Report ICU ],(Loss as Cycle Length 9;) Method (Base Volume Alternative) Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.489 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: loo Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement:: L - T - R L - T - R L - T - R L - T - R ----------_- I --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- -- - - - I Volume Module: Base Vol: 689 1142 942 0 1080 612 0 0 0 0 0 0 Growth Adj: 1.02 1.02 1..02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 703 1.165 961 0 1102 624 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PRE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 703 1165 0 0 1102 624 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 703 1165 0 0 1102 624 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 703 1165 0 0 1102 624 0 0 0 0 0 0 ------------ --------------- II--------------- II------------ --- II-------- -- - -- -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1.600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.55 1.45 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1600 0 4085 2315 0 0 0 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.22 0.36 0.00 0.00 0.27 0.2.7 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to FUNZMAN ASSOC, ORANGE CA Soo Default Scenario Sun May 22, 2011 13:38:19 Page 16 -1 4221 Dolphin- Striker Project Existing (Year 2011) Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Base Volume Alternative) Intersection $15 Jamboree Road (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.611 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B ***#*** W***#*#********+#*******#+**********#***+* * * * * # # * #* # * * * # * # * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 0 0 ------------ I-------------- II--------------- II--------------- II---------- - -- -- I Volume Module: Base Vol: 0 1.817 40 0 571 0 1199 333 1150 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1853 4.1. 0 582 0 1199 333 1150 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 PHF Volume: 0 1853 41 0 582 0 1199 333 1150 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 1853 41 0 582 0 1199 333 1150 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..D0 FinalVolume: 0 1853 41 0 582 0 1199 333 1150 0 0 0 ------------ --------------- II--------------- II--------------- II--- ------- - - -- - I Saturation Flow Module: Sat /Lane: 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.89 0.11 0.00 3.00 0.00 2.00 1.00 2.00 0.00 0.00 0.00 Final Sat.: 0 7828 172 0 4800 0 3200 1.600 3200 0 0 0 ----- ------- I -------- ------- II - -- -- --II---------------II- Capacity Analysis Module: Vol. /Sat: 0.00 0.24 0.24 0.00 0.12 0.00 0.37 0.21 0.36 0.00 0.00 0.00 Crit Moves: * *** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 30 j Default Scenario Sun May 22, 2011 13:38:33 Page 16 -1 4221 Dolphin- Striker Project Existing (Year 2011) Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length °s) Method (Base Volume Alternative) Intersection #15 Jamboree Road (NS) at Bristol Street South (EW) Cycle (sec): loo Critical Vol. /Cap.(X): 0.661 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------- - - - --I ------ II --------------- II---- ----------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 0 0 ------------ --------------- II--------------- II--------------- II- -- ------- - - - - - I Volume Module: Base Vol: 0 1834 73 0 1080 0 937 1071 1145 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial 8se: 0 1871 74 0 1102 0 937 1071 1145 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 1871 74 0 1102 0 937 1071 1145 0 0 0 Reduct: Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 1871 74 0 1102 0 937 1071 1145 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final.Volume: 0 1871 74 0 1102 0 937 1071 1145 0 0 0 ------------ --------------- II--------------- II---- ----------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1.600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.61 0.19 0.00 3.00 0.00 1.40 1.60 2.00 0.00 0.00 0.00 Final Sat.: 0 7694 306 0 4800 0 2240 2560 3200 0 0 0 ------------ I --------------- II--------------- II----------- ---- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.24 0.24 0.00 0.23 0.00 0.42 0.42 0.36 0.00 0.00 0.00 Crit Moves: * * ** * * ** * # *# ***********+************************************* * * * * * * * * * * * * * * * *# * * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to FUNZMAN ASSOC, ORANGE CA 302 Existing (Year 2011 ) + Project 309 Default Scenario Tue May 31, 2011 12:53:32 Page 4 -1 ------- ----- --- --- - -- 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour ----------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.437 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II ------------ _-- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------ I --------------- II--------------- II ------- -------- II---------- - - - - - I Volume Module: Base Vol: 37 944 49 195 835 227 307 555 48 87 185 58 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 38 972 50 201 860 234 316 572 49 90 191 60 Added Vol: 0 3 0 0 4 0 0 0 0 4 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 38 975 50 201 864 234 316 572 49 94 191 60 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 38 975 50 201 864 234 316 572 49 94 191 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 38 975 50 201 864 234 316 572 49 94 191 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVOlume: 38 975 50 201 864 234 316 572 49 94 191 0 ------------ I ------------- -- II--------------- II -- - -- I--- ------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.76 0.24 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4418 382 3200 4800 1600 ------------ I--------------- 11--------------- II--------------- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.03 0.13 0.14 0.15 0.10 0.13 0.13 0.03 0.04 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 310 Default Scenario Tue May 31, 2011 12:53:46 Page 4 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.635 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II ---------- - - -_ - I Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: C 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------ I--------------- fl--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 154 1091 49 45 819 447 324 274 96 98 669 195 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 159 1124 50 46 844 460 334 282 99 101 689 201 Added Vol: 0 5 0 0 4 0 0 0 0 4 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 159 1129 50 46 848 460 334 282 99 105 689 201 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 159 1129 50 46 848 460 334 282 99 105 689 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 159 1129 50 46 848 460 334 282 99 105 689 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 159 1129 50 46 848 460 334 282 99 105 689 0 ------------ --------------- --------------- --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.22 0.78 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 3555 1245 3200 4800 1600 ------------ I --------------- II --------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.10 0.18 0.03 0.03 0.13 0.29 0.10 0.08 0.08 0.03 0.14 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S11 Default Scenario Tue May 31, 2011 12:53:32 Page 5 -1 4221 Dolphin - Striker Project Existing (Year 2011) Plus Project Morning Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #2 MacArthur Boulevard (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.380 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II--------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------ I --------------- II--------------- II--------------- II---------- - - -- - I Volume Module: Base Vol: 32 689 98 100 624 176 158 310 73 31 154 53 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 33 703 100 102 636 160 158 310 73 31 154 53 Added Vol: 0 3 0 0 8 0 0 0 0 0 0 0 PasserByvol: 0 0 0 C 0 0 0 0 0 0 0 0 Initial Fut: 33 706 100 102 644 180 158 310 73 31 154 53 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0..00 PHF Volume: 33 706 100 102 644 180 158 310 73 31 154 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 33 706. 100 102 644 180 158 310 73 31 154 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 33 706 100 102 644 180 158 310 73 31 154 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.13 0.87 1.00 1.60 0.40 1.00 2.00 1.00 Final Sat.: 1600 4800 1600 1600 5006 1394 1600 2556 644 1600 3200 1600 - I --------------- II----- ---------- II- - - - - -- I---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.06 0.06 0.13 0.13 0.10 0.12 0.11 0.02 0.05 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 312 Default Scenario Tue May 31, 2011 12:53:46 Page 5 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Evening Peak Hour ----------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) +++++++++++++*+ ww+++++++ ww+ www+ www+ wwwwwww+ wwwwww + + + + + + + + +w *ww + + + + + + + + + + +w +www ++ Intersection #2 MacArthur Boulevard (NS) at Birch Street (EW) wwww+++++++++++++ wwww++++ w+++++++ w+ w+ w++ w+++ w++++ + + + + + +w * + + + + + + + + + + + + + +w *w +w + + *+ Cycle (sec): 100 Critical Vol. /Cap.(X): 0.458 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A +++++++++ wwww++++ w++++ w+ wwwww+ www+ w++++++ w++++ wwwwww +w + + + + + + + +www * + + + + + + +w + + + + ++ Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R I --------------- II --------------- II --------------- II ---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------ I --------------- II --------------- II------- -------- II-- -------- - - - -- I Volume Module: Base Vol: 86 646 25 49 858 149 274 182 53 114 433 170 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 88 659 26 50 875 152 274 182 53 114 433 170 Added Vol: 0 5 0 0 8 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 88 664 26 50 883 152 274 182 53 114 433 170 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 88 664 26 50 883 152 274 182 53 114 433 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 88 664 26 50 883 152 274 182 53 114 433 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 88 664 26 50 883 152 274 182 53 114 433 0 -------------------- II--------------- 11--------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.41 0.59 1.61 1.07 0.31 1.00 2.00 1.00 Final Sat.: 1600 4800 1600 1600 5460 940 2582 1717 500 1600 3200 1600 ------------ I--------------- II--------------- 11------------- -- II--- ------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.05 0.14 0.02 0.03 0.16 0.16 0.11 0.11 0.11 0.07 0.14 0.00 Crit Moves- + w++ ww+ w++ ww+ w++ w+ w+ www++++++ w++ www++ w+ ww+ w++ ww+ w + * + + + + +w + + * +wwww + + +w + + + + * + + + + ++ Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA SIS Default Scenario Tue May 31, 2011 12:53:32 Page 6 -1 4221 Dolphin - Striker Project Existing (Year 2011) Plus Project Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #3 MacArthur Boulevard (NS) at Von Karman Avenue (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.558 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------- ------ II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 101 988 656 58 435 163 19 96 28 78 136 12 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 1008 669 59 444 166 19 96 28 78 136 12 Added Vol: 0 23 0 7 15 0 0 0 0 0 2 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 103 1031 669 66 459 166 19 96 28 78 138 12 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 103 1031 669 66 459 166 19 96 28 78 138 12 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 103 1031 669 66 459 166 19 96 28 78 138 12 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 '1.00 1.00 1.00 1.00 FinalVolume: 103 1031 669 66 459 166 19 96 28 78 138 12 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 3200 1600 3200 1600 1600 ------------ I --------------- II--------------- II--- ------- ----- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.21 0.42 0.04 0.10 0.10 0.01 0.03 0.02 0.02 0.09 0.01 Crit moves:* * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S14 Default Scenario Tue May 31, 2011 12:53:46 Page 6 -1 4221 Dolphin - Striker Project Existing (Year 2011) Plus Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #3 MacArthur Boulevard (NS) at Von Karman Avenue (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.564 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II-- -------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 ------------ I --------------- II--------------- II --------------- II---------- - - -- - I Volume Module: Base Vol: 48 624 126 29 968 52 138 195 183 665 127 38' Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 49 636 129 30 987 53 138 195 183 665 127 38 Added Vol: 0 23 0 12 26 0 0 0 0 0 2 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 49 659 129 42 1013 53 138 195 183 665 129 38 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 49 659 129 42 1013 53 138 195 183 665 129 38 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 49 659 129 42 1013 53 138 195 183 665 129 38 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 49 659 129 42 1013 53 138 195 183 665 129 38 ------------ I--------------- II--------------- II------- -------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 3200 1600 3200 1600 1600 ------------ I --------------- --------------- 11 --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.03 0.14 0.08 0.03 0.21 0.03 0.09 0.06 0.11 0.21 0.08 0.02 Crit Moves * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN. ASSOC, ORANGE CA 31,5 Default Scenario Tue May 31, 2011 12:53:32 Page 7 -1 -------------------------------------------------------------------------------- 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #4 MacArthur Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.604 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II ------_--_----- II --------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 C 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------------ --------------- II--------------- II --------------- II---------- - - - - - I Volume Module: Base Vol: 177 1332 456 66 293 121 410 851 176 364 674 181 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bse: 181 1359 465 67 299 123 418 868 180 371 687 185 Added Vol: 0 11 0 4 7 4 6 0 0 0 0 6 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 181 1370 465 71 306 127 424 868 180 371 687 191 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 181 1370 465 71 306 0 424 868 180 371 687 191 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 181 1370 465 71 306 0 424 868 180 371 687 191 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 181 1370 465 71 306 0 424 868 180 371 687 191 OvlAdj VOl: 279 ------------ I --------------- II--------------- II-- ------------ -II---- ------ - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 .3200 4800 1600 3200 4800 1600 3200 4800 1600 --------------- II--------------- II----------- -- --II----- ----- - - - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.29 0.29 0.02 0.06 0.00 0.13 0.18 0.11 0.12 0.14 0.12 OvlAdjV /S: 0.17 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 310 Default Scenario Tue May 31, 2011 12:53:46 Page 7 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Evening Peak Hour ----------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 44 MacArthur Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.680 Loss Time (sec): 0 (Y+R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B #*****##****+*********+#*#+#******###*#***#***### # # * # # # * * * * * * * * * * * * * # * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ---- I--------------- II__------------- II --------------- II ------ ---- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------ - - - - -- --------------- II--------------- II---------- - - - - - H ---------- - - - - -I Volume Module: Base Vol: 227 578 397 157 965 312 214 967 37 611 921 155 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bse: 232 590 405 160 984 318 218 986 38 623 939 158 Added Vol: 0 it 0 7 12 7 6 0 0 0 0 6 PasserByVol: 0 0 0 0 0 0 0 0 - 0 0 0 0 Initial Fut: 232 601 405 167 996 325 224 986 38 623 939 164 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 232 601 405 167 996 0 224 986 38 623 939 164 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 232 601 405 167 996 0 224 986 38 623 939 164 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVclume: 232 601 405 167 996 0 224 986 36 623 939 164 OvlAdj Vol: 93 - ---- --------------- II--------------- II--------------- II---------- - - -- - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 4800 1600 3200 4800 1600 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.07 0.13 0.25 0.05 0.21 0.00 0.07 0.21 0.02 0.19 0.20 0.10 0v1Adj V /S: 0.06 - Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 317 Default Scenario Tue May 31, 2011 12:53:32 Page 8 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #5 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) *###*#*************#***************************** * * * * * * * * * * * * * * * * * * * * * * * * * # # * # ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.490 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 -- I --------------- II--------------- II------- -------- II---------- - - - - - I Volume Module: Base Vol: 349 1533 0 0 220 204 0 0 0 120 902 138 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 356 1564 0 0 224 208 0 0 0 120 902 138 Added Vol: 0 6 0 0 1 3 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 356 1570 0 0 225 211 0 0 0 120 902 136 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 356 1570 0 0 225 211 0 0 0 120 902 138 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 356 1570 0 0 225 211 0 0 0 120 902 138 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 356 1570 0 0 225 211 0 0 0 120 902 138 ------------ I --------------- --------------- --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.47 0.53 Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 5551 849 ------------ I --------------- --------------- 11 --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.11 0.33 0.00 0.00 0.04 0.07 0.00 0.00 0.00 0.08 0.16 0.16 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA SI-2 Default Scenario Tue May 31, 2011 12:53:46 Page 8 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Evening Peak Hour - -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #5 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): - 0.744 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II --------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 ------------ I--------------- il --------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 370 671 0 0 742 1007 0 0 0 200 1867 74 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 377 684 0 0 757 1027 0 0 0 200 1867 74 Added Vol: 0 6 0 0 2 5 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 377 690 0 0 759 1032 0 0 0 200 1867 74 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 377 690 0 0 759 1032 0 0 0 200 1667 74 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 377 690 0 0 759 1032 0 0 0 200 1867 74 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 377 690 - 0 0 759 1032 0 0 0 200 1867 74 ------------ --------------- II--------------- II--------------- II------ -- -- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.85 0.15 Final Sat.: 3200 4800 0 0 6400 3200 0- 0 0 1600 6156 244 ------------ I --------------- II--------------- II--------------- II----- ---- --- - - - I Capacity Analysis Module: Vol /Sat: 0.12 0.14 0.00 .0.00 0.12 0.32 0.00 0.00 0.00 0.13 0.30 0.30 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2006 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 319 Default Scenario Tue May 31, 2011 12:53:32 Page 9 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) *********####***#*#**#***#*****#*****#**#**##*##* * # * * * * * * * * * * * * * * * * * # * * * * # * * * * ** Intersection #6 Campus Drive /Irvine Avenue (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.635 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- 11--------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 '0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------ I --------------- II--------------- II----- --------- -II---------- - - - - - I Volume Module: Base Vol: 0 900 152 96 281 0 1186 1623 299 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 918 155 98 267 0 1186 1623 299 0 0 0 Added Vol: 0 2 0 0 1 0 4 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 920 155 98 288 0 1190 1623 299 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 920 155 98 286 0 1190 1623 299 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 920 155 98 288 0 1190 1623 299 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 920 155 98 288 0 1190 1623 299 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.28 0.72 1.00 3.00 0.00 1.69 2.31 2.00 0.00 0.00 0.00 Final Sat.: 0 6846 1154 1600 4600 0 2707 3693 3200 0 0 0 ------------I---------------II--------------11---------------11------- Capacity Analysis Module: Vol /Sat: 0.00 0.13 0.13 0.06 0.06 0.00 0.44 0.44 0.09 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traf£ix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 320 Default Scenario Tue May 31, 2011 12:53:46 Page 9 -1 4221 Dolphin - Striker Project Existing (Year 2011) Plus Project. Evening Peak Hour ----------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #6 Campus Drive /Irvine Avenue (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.466 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------ I ------------ - - -II- -- II----------- - - - -II --- - - - - -I Volume Module: Base Vol: 0 720 180 201 859 0 417 1004 429 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 .1.00 1.00 1.00 Initial Bse: 0 734 184 205 876 0 417 1004 429 0 0 0 Added Vol: 0 2 0 0 2 0 4 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 736 184 205 878 0 421 1004 429 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 736 184 205 878 0 421 1004 429 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 736 184 205 878 0 421 1004 429 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 736 184 205 878 0 421 1004 429 0 0 0 ------------I---------------II---------------II---------------II-------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.18 2.82 2.00 0.00 0.00 0.00 Final Sat.: 0 6403 1597 1600 4800 0 1891 4509 3200 0 0 0 ------------ I ---- ----------- II - - - -- I--------------- II-------- -- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.12 .0.11 0.13 0.18 0.00 0.22 0.22 0.13 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S21 Default Scenario Tue May 31, 2011 12:53:32 Page 10 -1 -------------------------------------------------------------------------------- 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 47 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.533 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: -100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II_--------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------ --------------- II--------------- II--------------- il---------- - - - - - I Volume Module: Base Vol: 108 886 0 0 160 95 0 0- 0 - 403 988 237 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 108 686 0 0 160 95 0 0 0 403 988 237 Added Vol: 0 2 0 0 1 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 108 888 0 0 161 95 0 0 0 403 988 237 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: - 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 108 888 0 0 161 95 0 0 0 403 988 237 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 108 688 0 0 161 95 0 0 0 403 988 237 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 108 888 0 0 161 95 0 A 0 403 988 237 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 1.16 3.26 0.58 Final Sat.: 3200 3200 0 0 3200 3200 0 0 0 1854 5217 929 ------------ I --------------- II--------------- il--------------- II--------------- 1 Capacity Analysis Module: - Vol /Sat: 0.03 0.28 0.00 0.00 0.05 0.03 0.00 0.00 0.00 0.22 0.19 0.26 Crit Moves: *******************+++*********+***************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 322 Default Scenario Tue May 31, 2011 12:53:46 Page 10 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.527 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II --------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------ I --------------- II--------------- II--------------- II------- --- -- - - - I Volume Module: Base Vol: 198 344 0 0 484 743 0 0 0 392 1187 124 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 198 344 0 0 484 743 0 0 0 392 1187 124 Added Vol: 0 2 0 0 2 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 198 346 0 0 486 743 0 0 0 392 1187 124 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .1.00 1.00 1.00 1.00 PHF Volume: 198 346 0 0 486 743 0 0 0 392 1187 124 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 198 346 0 0 486 743 0 0 0 392 1187 124 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 198 346 0 0 486 743 0 0 0 392 1187 124 -- --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 .0.00 1.58 2.42 0.00 0.00 0.00 1.00 3.72 0.28 Final Sat.: 3200 3200 0 0 2531 3869 0 0' 0 1600 5946 454 ----- I --------------- II --------------- II--------------- II---------- -- - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.11 0.00 0.00 0.19 0.19 0.00 0.00 0.00 0.25 0.20 0.27 Crit Moves: * * ** + * ** * * ** **********+*********************+***+************ * * * * * * * * * * * * + * * * * * * * * * * * *w * + * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 323 Default Scenario Tue May 31, 2011 12:53:32 Page 11 -1 9221 Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * ** * * * * * * * * ** Intersection #8 Birch Street (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.391 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound .West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------ I --------------- II------------- -- II -------------- -II - -- - - -I Volume Module: Base Vol: 0 333 229 198 379 0 676 867 291 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 333 229 198 379 0 676 867 291 0 0 0 Added Vol: 0 2 0 0 1 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 335 229 198 380 0 676 867 291 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 335 229 198 380 0 676 867 291 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 335 229 198 380 0 676 867 291 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 335 229 198 380 0 676 867 291 0 0 0 ------------ I --------------- II--------------- II--------------- II - - - -- - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.38 1.62 2.00 2.00 0.00 1.75 2.99 0.75 0.00 0.00 0.00 Final Sat.: 0 3801 2599 3200 3200 0 2809 3990 1206 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - -- - - I Capacity Analysis Module: Vol /Sat: 0.00 0.09 0.09 0.06 0.12 0.00 0.29 0.22 0.29 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 324 Default Scenario Tue May 31, 2011 12:53:46 Page 11 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #8 Birch Street (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.437 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- 11_______ _jj--- -------- ---- 11 -____ --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 -- ------ ---- I - - - - --- II --------------- II----- ---------- II- ---- ----- - - --- I Volume Module: Base Vol: 0 312 300 305 614 0 188 999 174 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 312 300 305 614 0 188 999 174 0 0 0 Added Vol: 0 2 0 0 2 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 0 314 300 305 616 0 188 999 174 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 314 300 305 616 0 188 999 174 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 C 0 Reduced Vol: 0 314 300 305 616 0 188 999 174 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 314 300 305 616 0 188 999 174 0 0 0 --------- --- I ---- -------- - - -II- ------ II-------- ------- II- --------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.05 .1.95 2.00 2.00 0.00 1.00 3.56 0.45 0.00 0.00 0.00 Final Sat.: 0 3273 3127 3200 3200 0 1600 5688 712 0 0 0 ------------ I--------------- II--------------- II--------------- I1--------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.10 0.10 0.10 0.19 0.00 0.12 0.18 0.24 0.00 0.00. 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 325 Default Scenario Tue May 31, 2011 12:53:32 Page 12 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #9 Von Karman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.463 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R -_ I --------------- II --------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected .Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 16 534 53 37 335 73 228 303 42 77 287 110 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bse: 16 534 53 37 335 73 233 309 43 79 293 112 Added Vol: 0 1 3 0 2 0 0 0 0 0 4 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 16 535 56 37 337 73 233 309 43 79 297 112 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 16 535 0 37 337 73 233 309 43 79 297 112 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 16 535 0 37 337 73 233 309 43 79 297 112 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 16 535 0 37 337 73 233 309 43 79 297 112 ------------ I--------------- II--------------- II------------- -- II---------- - - - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.64 0.36 1.00 2.00 1.00 1.00 1.45 0.55 Final Sat.: 1600 3200 1600 1600 2630 570 1600 3200 1600 1600 2322 878 ------------ I --------------- II --------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.17 0.00 0.02 0.13 0.13 0.15 0.10 0.03 0.05 0.13 0.13 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 320 Default Scenario Tue May 31, 2011 12:53:46 Page 12 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #9 Von Karman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.564 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------- _-- --- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II-------- --- ---- II---------- - - - - - I Volume Module: Base Vol: 47 363 122 98 610 224 145 445 49 51 501 64 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.02 1.02 1.02 1.02 1.02 1.02 Initial B3e: 47 363 122 98 610 224 148 454 50. 52 511 65 Added Vol: 0 2 5 0 2 0 0 0 0 0 4 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 47 385 127 98 612 224 148 454 50 52 515 65 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00. 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 47 385 0 98 612 224 148 454 50 52 515 65 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 47 385 0 98 612 224 148 454 50 52 515 65 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 47 385 0 98 612 224 148 454 50 52 515 65 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00. 2.00 1.00 1.00 1.46 0.54 1.00 2.00 1.00 1.00 1.78 0.23 Final Sat.: 1600 3200 1600 1600 2343 857 1600.3200 1600 1600 2840 360 ------------ I --------------- II --------------- II-------- -- ----- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.12 0.00 0.06 0.26 0.26 0.09 0.14 0.03 0.03 0.18 0.18 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed toKUNZMAN ASSOC, ORANGE CA 327 Default Scenario Tue May 31, 2011 12:53:32 Page 13 -1 ----------------------------------------------------------------------------- 4221 Dolphin- Striker Project - Existing (Year 2011) Plus Project Morning Peak Hour ---------------------------------------------------------- ------------- - - - - -- Level Of Service Computation Report ICU 1(LOSS as Cycle Length 8) Method (Future Volume Alternative) Intersection #10 Von Karman Avenue (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.287 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II - - -- --------------- II - _-------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I--------------- II--------------- II------ -------- -11-------- -- - - - - -I Volume Module: Base Vol: 30 484 33 56 275 128 79 194 48 43 159 22 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 30 484 33 56 275 128 79 194 48 43 159 22 Added Vol: 0 4 0 0 2 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 30 488 33 56 277 128 79 194 48 43 159 22 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 488 33 56 277 128 79 194 48 43 159 22 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 30 488 33 56 277 128 79 194 48 43 159 22 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 30 488 33 56 277 128 79 194 48 43 159 22 ------------ 1--------------- II--------------- II--------------- II- -- - - -- -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------------- II--------------- II ---- --- 11 - - - - -- - -I Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.02. 0.04 0.09 0.08 0.05 0.06 0.03 0.03 0.05 0.01 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 322 Default Scenario - Tue May 31, 2011 12:53:46 Page 13 -1 4221 Dolphin - Striker Project Existing (Year 2011) Plus Project Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 010 Von Karman Avenue (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.352 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: - 100 Level Of Service: A Approach: North Bound South Bound East Bound west Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II --------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0. 2 0 1 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 ------------ --------------- II--------------- II --------------- II---------- - - - - - I Volume Module: Base Vol: 71 407 55 34 549 133 99 166 26 19 235 41 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 71 407 55 34 549 133 99 166 26 19 235 41 Added Vol: 0 7 0 0 2 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 71 414 55 34 551 133 99 166 26 19. 235 41 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 71 414 55 34 551 133 99 166 26 19 235 41 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 71 414 55 34 551 133 99 166 26 19 235 41 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 71 414 55 34 551 133 99 166 26 19 235 41 ------------ --------------- II--------------- II--------------- II------ ---- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.13 0.03 0.02 0.17 0.08 0.06 0.05 0.02 0.01 0.07 0.03 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S �9 Default Scenario Tue May 31, 2011 12:53:32 Page 14 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour ----------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection 411 Bayview Place (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.417 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- 11 --------------- II --------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ I --------------- II--------------- II ---------- ----- II ---------- - - - - - I Volume Module: Base Vol: 0 0 101 0 0 0 0 2464 420 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 101 0 0 0 0 2464 420 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 0 101 0 0 0 0 2464 420 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 101 0 0 0 0 2464 420 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0. 0 0 Reduced Vol: 0 0 101 0 0 0 0 2464 420 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 101 0 0 0 0 2464 420 0 0 0 - - --- I --------------- II--------------- II----- ---------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0 0 3200 0 0 0 0 6400 1600 0 0 0 - -- I--------------- 11--------------- II--------------- 11---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.39 0.26 0.00 0.00 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 330 Default Scenario Tue May 31, 2011 12:53:46 Page 14 -1 4221 Dolphin - Striker Project Existing (Year 2011) Plus Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #11 Bayview Place (NS) at Bristol Street South (EW) **** FFF*** FF******************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** *EPEE* Cycle (sec): 100 Critical Vol. /Cap.(X): 0.540 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II--------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ --------------- II --------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 0 0 433 0 0 0 0 2591 142 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 433 0 0 0 0 2591 142 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 0 433 0 0 0 0 2591 142 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 433 0 0 0 0 2591 142 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 433 0 0 0 0 2591 142 0 0 C PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 '1.00 FinalVolume: 0 0 433 0 0 0 0 2591 142 0 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0 0 3200 0 0 0 0 6400 1600 0 0 0 ------------ I --------------- II--------------- II--------------- II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.14 0.00 0.00 0.00 0.00 0.40 0.09 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 331 Default Scenario Tue May 31, 2011 12:53:32 Page 15 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour Level Of Service Computation Report ICU 1(L033 as Cycle Length %) Method (Future Volume Alternative) Intersection 412 Jamboree Road (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.618 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 ------------ I --------------- II--------------- II --------------- II -------- -- - - - - - I Volume Module: Base Vol: 143 1044 34 286 1732 172 76 112 10 259 423 152 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 147 1075 35 295 1784 177 78 115 10 267 436 157 Added Vol: 0 4 0 0 6 0 0 3 0 0 4 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 147 1079 35 295 1790 177 78 118 10 267 440 157 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 i.00 1.00 1.00 PHF Volume: 147 1079 35 295 1790 177 78 118 0 267 440 157 - Reduct Vol: 0 0 0 0 0 0 0 0 0. 0 0 0 Reduced Vol: 147 1079 35 295 1790 177 78 116 0 267 440 157 POE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00.1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 147 1079 35 295 1790 177 78 118 0 267 440 157 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flaw Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.87 0.13 2.00 2.73 0.27 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 6199 201 3200 4368 432 3200 3200 1600 3200 3200 1600 ------------ I --------------- II--------------- il--------------- II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.05 0.17 0.17 0.09 0.41 0.41 0.02 0.04 0.00 0.08 0.14 0.10 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 3S2 Default Scenario Tue May 31, 2011 12:53:46 Page 15 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Evening Peak Hour ------------------------------------------------------------------------------- Leve1 Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #12 Jamboree Road (NS) at Campus Drive (EW) #*#**#+****+**+***##*************#*####****###**+ * * * * * # * # * * * * # * # * * * * * * * + * * * * + + ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.584 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - -R L - T - R L - T - R ------------ I --------------- II--------------- II---------- _---- II-------- -- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 ------------ I --------------- II--------------- II--------------- II--- ------- - - - - - I Volume Module: Base Vol: 65 1278 135 224 1108 183 219 263 159 152 226 331 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 67 1316 139 231 1141 168 226 271 164 157 233 341 Added Vol: 0 7 0 0 6 0 0 5 0 0 4 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 67 1323 139 231 1147 188 226 276 164 157 237 341 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 67 1323 139 231 1147 188 226 276 0 157 237 341 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 67 1323 139 231 1147 188 226 276 0 157 237 341 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVOlume: 67 1323 139 231 1147 188 226 276 0 157 237 341 ------------ I ----------- - - - -II -- II------- --- ----- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.62 0.38 2.00 2.58 0.42 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 5791 609 3200 4123 677 3200 3200 1600 3200 3200 1600 ------------ I--------------- II--------------- 11 - - - - -- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 0.23 0.23 0.07 0.28 0.28 0.07 0.09 0.00 0.05 0.07 0.21 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2006 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 333 Default Scenario Tue May 31, 2011 12:53:32 Page 16 -1 -------------------------------------------------------------------------------- 4221 Dolphin - Striker Project Existing (Year 2011) Plus Project Morning Peak Hour ----------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length `}) Method (Future Volume Alternative) Intersection 413 Jamboree Road (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.516 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- 11 --------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 3 0 1 1 1 0 0 1 0 0 1! 0 0 ------------ I --------------- --------------- --------------- 11 --------------- Volume Module: Base Vol: 204 1228 2 7 1551 464 123 8 42 3 6 6 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 210 1265 2 7 1598 478 123 8 42 3 6 6 Added Vol: 0 4 0 0 6 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0- 0 0 0 0 Initial Fut: 210 1269 2 7 1604 478 123 8 42 3 6 6 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00. PHF Volume: 210 1269 2 7 1604 0 123 8- 0 3 6 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 210 1269 2 7 1604 0 123 8 0 3 6 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 210 1269 2 7 1604 0 123 8 0 3 6 6 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.88 0.12 1.00 0.20 0.40 0.40 Final Sat.: 1600 4792 8 1600 4800 1600 3005 195 1600 320 640 640 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.13 0.26 0.26 0.00 0.33 0.00 0.04 0.04 0.00 0.01 0.01 0.01 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 334 Default Scenario Tue May 31, 2011 12:53:46 Page 16 -1 4221 Dolphin - Striker Project Existing (Year 2011) Plus Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #13 Jamboree Road (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.423 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- il--------------- II--------------- 11 --------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 3 0 1 1 1 0 0 1 0 0 1 0 0 ------------ I --------------- II----------- ---- II----------- - - - -II - -I Volume Module: Base Vol: 44 1188 0 2 1390 91 297 4 100 0 1 0 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 45 1224 0 2 1432 94 297 4 100 0 1 0 Added Vol: 0 7 0 0 6 0 0 0 0- 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 45 1231 0 2 1438 94 297 4 100 0 1 0 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 -0.00 1.00 1.00 1.00 PHF Volume: 45 1231 0 2 1438 0 297 4 0 0 1 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 45 1231 0 2 1438 0 297 4 0 0 1 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 45 1231 0 2 1438 0 297 4 0 0. 1 0 ------------ I --------------- il------ --------- II------------- - -II -- - -I Saturation Flow Module: Sat /.Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.97 0.03 1.00 0.00 1.00 0.00 Final Sat.: 1600 4800 0 1600 4800 1600 3157 43 1600 0 1600 0 ------------ I --------------- II--------------- II --------------- II------ ---- - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.26 0.00 0.00 0.30 0.00 0.09 0.09 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 33,5 Default Scenario Tue May 31, 2011 12:53:32 Page 17 -1 4221 - Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.427 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II --------------- II--------------- I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 --- --------------- II--------------- II--------------- II- -- ------- - - - - - I Volume Module: Base Vol: 846 1509 663 0 570 412 0 0 0- 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 863 1539 676 0 561 420 0 0 0 0 0 0 Added Vol: 0 6 0 0 4 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 863 1545 676 0 585 420 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 863 1545 0 0 585 420 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 863 1545 0 0 585 420 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 863 1545 0 0 585 420 0 0 0 0 0 0 --- ! --------------- II--------------- II------ --------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00. 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.33 1.67 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1600 0 3726 2674 0 0 0 0 0 0 --- I --------------- II--------------- II-------------- II---------- - -- - - I Capacity Analysis Module: Vol /Sat: 0.27 0.48 -0.00 0.00 0.16 0.16 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 33o Default Scenario Inc May 31, 2011 12:53:46 Page 17 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.490 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - I--------------- II--------------- 11---- ----------- II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 ------------ I --------------- II --------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 689 1142 942 0 1080 612 0 0 0 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 703 1165 961 0 1102 624 0 0 0 0 0 0 Added Vol: 0 6 0 0 7 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 703 1171 961 0 1109 624 0 0 0 0 0 0 User Adj: 1.00 1.Co 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 703 1171 0 0 1109 624 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 703 1171 0 0 1109 624 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 703 1171 0 0 1109 624 0 0 0 0 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.56 1.44 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1600 0 4094 2306 0 0 0 0 0 0 ------------ I --------------- --------------- --------------- 11 --------------- Capacity Analysis Module: Vol /Sat: 0.22 0.37 0.00 0.00 0.27 0.27 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 33:7 Default Scenario Tue May 31, 2011 12:53:32 Page 18 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection 415 Jamboree Road (NS) at Bristol Street South (EW) Cycle (sec): 100 - Critical Vol. /Cap.(X): 0.612 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- 11---------- ----- II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 0 1817 40 0 571 0 1199 333 1150 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1853 41- 0 582 0 1199 333 1150 0 0 0 Added Vol: 0 6 0 0 4 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial rut: 0 1859 41 0 586 0 1199 333 1150 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .1.00 1.00 1.00 PHF Volume: 0 1859 41 0 586 0 1199 333 1150 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 1859 41 0 586 0 1199 333 1150 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 1859 41 0 586 0 1199 333 1150 0 0 0 ------------ --------------- --------------- 11 --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.89 0.11 0.00 3.00 0.00 2.00 1.00 2.00 0.00 0.00 0.00 Final Sat.: 0 7828 172 0 4800 0 3200 1600 3200 0 0 0 ---- 1--------------- II--------------- 11--------------- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00.0.24 0.24 0.00 0.12 0.00 0.37 0.21 0.36 0.00 0.00 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling ASSOC. Licensed to KUNZMAN ASSOC, ORANGE CA 332 Default Scenario Tue May 31, 2011 12:53:46 Page 18 -1 4221 Dolphin- Striker Project Existing (Year 2011) Plus Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #15 Jamboree Road (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.662 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T- R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II -II ________I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 0 0 ------- ----- -- --------- - - - -II -------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 0 1834 73 0 1080 0 937 1071 1145 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1871 74 0 1102 0 937 1071 1145 0 0 0 Added Vol: 0 6 0 0 7 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 0 1877 74 0 1109 0 937 1071 1145 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 1877 74 0 1109 0 937 1071 1145 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 1877 74 0 1109 0 937 1071 1145 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 1877 74 0 1109 0 937 1071 1145 0 0 0 ------------ I--------------- II--------------- II--------------- II - - - - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.81 0.19 0.00 3.00 0.00 1.40 1.60 2.00 0.00 0.00 0.00 Final Sat.: 0 7695 305 0 4800 0 2240 2560 3200 0 0 0 ----- ------- I ------------ - - -II- ----- II-- -- --- -------- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.24 0.24, 0.00 0.23 0.00 0.42 0.42 0.36 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 339 Existing + Growth (Year 2013) + Approved Projects 340 Default Scenario Sun May 22, 2011 14:34:54 Page 2 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.446 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II--------------- II--- ------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------ --------------- II--------------- II--- --- --------- II----- ----- - - - - - I Volume Module: Base Vol: 37 944 49 195 835 227 307 555 48 87 185 58 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bee: 39 991, 51 205 877 238 322 583 50 91 194 61 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserEyVOl: 0 18 0 0 47 0 0 1 0 0 0 0 Initial Put: 39 1009 51 205 924 238 322 584 50 91 194 61 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 39 1009 51 205 924 238 322 584 50 91 194 0 Reduct Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 39 1009 51 205 924 238 322 584 50 91 194 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVOlume: 39 1009 51 205 924 238 322 584 50 91 194 0 ------------ --------------- II--------------- II--------------- II------- --- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.76 0.24 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 .1.600 6400 1600 3200 4419 381. 3200 4800 1600 ------------ I --------------- II---------- --- -- II-- -- ---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 0.16 0.03 0.13 0.14 0.15 0.10 0.13 0.13 0.03 0.04 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S41 Default Scenario Sun May 22, 2011 14:35:14 Page 3 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length 8) Method (Future Volume Alternative) Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ** Cycle (sec): 1.00 Critical Vol. /Cap.(X): 0.648 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level. Of Service: B_ Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II-----------_--- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ---- ----------- ---- II-- ---- ---- -----II - -- -- II--------- - - - -- -I Volume Module: Base Vol: 1.54 1091 49 45 819 447 324 274 96 98 669 195 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 162 1146 51 47 860 469 340 288 101 103 702 205 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 55 0 0 26 1 0 0 0 0 0 1 Initial Put: 162 1201 51 47 886 470 340 288 101 103 702 206 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 162 1201 51 47 886 470 340 288 101 103 702 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 162 1201 51 47 886 470 340 288 101 103 702 0 PCE Adj: 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVOlume: 162 1201 51. 47 886 470 340 288 101 103 702 0 ------------ --------------- II--------------- II------- -- -- -- - -II -- --- ---- - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.22 0.78 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 3555 1245 3200 4800 1600 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.10 0.19 0.03 0.03 0.14 0.29 0.11 0.08 0.08 0.03 0.15 0.00 Grit Moves: * * ** * * ** * * *+ * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUN2MAN ASSOC, ORANGE CA 342 Default Scenario Sun May 22, 2011 14:34:54 Page 3 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 42 MacArthur Boulevard (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.392 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - I - R L - T - R L, - T - R L - T - R ------------ --------------- II-----_--------- II_--------- -- --- II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1. 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------ --------------- II--------------- II--------------- II------- --- - - - - - I Volume Module: Base Vol: 32 689 98 100 624 176 158 310 73 31 154 53 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 33 717 102 104 649 183 156 310 73 31 154 53 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 1 14 0 0 34 13 3 3 0 0 13 0 Initial Fut: 34 731 102 104 683 196 161 313 73 31 167 53 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHE' Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 34 731 1.02 104 683 196 161 313 73 31 167 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 34 731 102 1.04 683 196 161 313 73 31 167 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVOlume: 34 731 102 104 683 196 161 313 73 31 167 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.11. 0.89 1.00 1.60 0.40 1.00 2.00 1.00 Final Sat.: 1600 4800 1600 1.600 4973 1427 1600 2560 640 1600 3200 1600 ------------ I --------------- II--------------- II---------- -- --- II----- ---- -- - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.06 0.07 0.14 0.14 0.10 0.12 0.11. 0.02 0.05 0.00 Crit Moves: * * ** * * ** * * ** * * ** 'Iraffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 343 Default Scenario Sun May 22, 2011 14:35:14 Page 4 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length 4) Method (Future Volume Alternative) Intersection #2 MacArthur Boulevard (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.475 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II--------------- 1 Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------ I --------------- II------- ---- - - - -II ------ -II---- ------ - - - - -I Volume Module: Base Vol: 86 646 25 49 858 149 274 182 53 114 433 170 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 89 672 26 51 892 155 274 182 53 114 433 170 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 37 0 0 18 8 18 18 0 0 8 0 Initial Fut: 89 709 26 51 97.0 163 292 200 53 114 441 170 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 89 709 26 51 910 163 292 200 53 114 441 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 89 709 2.6 51 910 163 292 200 53 114 441 0 PCE Adj: 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVOlume: 89 709 26 51 910 163 292 200 53 114 441 0 ------------ --------------- II--------------- II----- -- ----- --- II------ ---- - - - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.39 0.61 1.60 1.10 0.29 1.00 2.00 1.00 Final Sat.: 1600 4800 1600 1600 5428 972 2567 1764 469 1600 3200 1600 ------------ I--------------- 11--------------- II - - -- --- 11---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.06 0.15 0.02 0.03 0.17 0.17 0.11 0.1.1 0.11 0.07 0.14 0.00 Crlt Moves: * * ** * * ** * { ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 344 Default Scenario Sun May 22, 2011 14:34:54 Page 4 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) -i- Approved Projects Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #3 MacArthur Boulevard (NS) at Von Farman Avenue (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.562 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - -- ---- II--------------- II--------------- II---------- - - - -- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 7. 2 0 1 0 1 ------------ --------------- II--------------- II-- -- -- --------- II--- ----- -- - - - - - I Volume Module: Base Vol: 101 988 656 58 435 163 19 96 28 78 136 12 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 105 1028 682 60 452 170 19 96 28 78 136 1.2 Added Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 16 1 0 34 0 0 0 0 1 0 0 Initial Fut: 1.05 1044 683 60 486 170 19 96 28 79 136 12 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 105 1044 683 60 486 170 19 96 28 79 136 12 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 105 1.044 683 60 486 170 19 96 28 79 136 12 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVo.l.ume: 105 1044 683 60 486 170 19 96 28 79 136 12 --- -- -- ----- - -------- -- -- - -II ------- II---- ----------- II------ ---- - -- - - I Saturation Flow Module: Sat /Lane: 1.600 1600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1..00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1.600 4800 1600 1600 3200 1600 3200 1.600 1600 ------------ I --------------- II--------------- II------ --------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.07 0.22 0.43 0.04 0.10 0.11 0.01 0.03 0.02 0.02 0.09 0.01 Crit Moves: * * ** * * ** * * ** * * ** Traffi.x 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S45 Default Scenario Sun May 22, 2011. 1.4:35:14 Page 5 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length 4) Method (Future Volume Alternative) Intersection #3 MacArthur Boulevard (NS) at Von Korman Avenue (EW) w + + *wwwwwww *wwwww + * *ww + * + + + * + + + + +w +w +w+ www**+++ w+ + + + + + + + + + + + + ++wwww + +ww + + +wwwwww Cycle (sec): 100 Critical Vol. /Cap.(X): 0.567 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A wwwwwww+++ ww +w + + + + +wwwwwwwwwwwwwwwwwwwwwww www: tww+ w+ ww +w +w + + + +xw *,rwww +wwf:swwwwwww Approach: North Bound South Bound East Bound West Bound Movement: 1, - T - R L - T - R L - T - R L - T - R ------------ --------------- II---------- ----- II - --- II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 ------------ --------------- II--------------- II--------------- II------- _____ - - - Volume Module: Base Vol.: 48 624 126 29 968 52 138 195 183 665 127 38 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 50 649 131 30 1007 54 138 195 183 665 127 38 Added Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 38 2 0 18 0 0 0 0 0 0 0 Initial Fut: 50 687 133 30 1025 54 138 195 183 665 127 38 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 50 687 133 30 1025 54 138 195 183 665 127 38 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 50 687 133 30 1025 54 138 195 183 665 1.27 38 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Finalvolume: 50 687 133 30 1025 54 138 195 183 665 127 38 ------------ --------------- --------------- --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 3200 1600 3200 1600 1600 ------------ I --------------- II--------------- II---- ----- ------ II ---------- - - - -- I Capacity Analysis Module: Vol /Sat.: 0.03 0.14 0.08 0.02 0.21 0.03 0.09 0.06 0.11 0.21 0.08 0.02 Crit Moves: * * ** * * ** * * ** * * ** +wwwww +www *wwwwwwwwwwwwwww+ www+ www +w + + + + + + ++ www +w +wwwwww *wwwwwwww +wwwww + ++ +wwwww Traffix 7.9.021.5 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S40 Default Scenario Sun May 22, 2011 14:34:54 Page 5 -1 4221 Dolphin- Str.i.ker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length `i;) Method (Future Volume Alternative) *+#**************#****************+************** * * * * * + * + * + * * *W *W * * * * * * * * # * * * * ** Intersection #9 MacArthur Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.623 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal. Cycle: 100 Level. Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - I - R L - T - R L. - T - R L - T - R - --------------- II --------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ov1 Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------------ --------------- II--------------- II---- ----------- II- --------- - - - - - I Volume Module: Base Vol: 177 1332 456 66 293 121 410 851 176 364 674 181 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 184 1385 474 69 395 126 426 885 183 379 701 188 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 1 1.0 1 0 33 9 11 37 0 0 66 3 Initial Put: 185 1395 475 69 338 :1.35 437 922 183 379 767 191 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 185 1395 475 69 338 0 437 922 183 379 767 191 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 185 1395 475 69 338 0 437 922 183 379 767 191 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 185 1395 475 69 338 0 437 922 183 379 767 191 Ov1Adj VOl: 286 ------------ 1 - - - - -- -- II--------------- II--------- -- -- -- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1.600 3200 4800 1600 3200 4800 1600 ------------ I --------------- II--------------- II--------- ----- -II------- --- - - - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.29 0.30 0.02 0.07 0.00 0.14 0.19 0.11 0.12 0.16 0.12 OvIAdjV /S: 0.18 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S4:7 Default Scenario Sun May 22, 2011 14:35:14 Page 6 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 44 MacArthur Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.711 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 2.00 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ---------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 -------- - - - -I- ------- II------- ----- -- -II- --- ------- - - -- -I Volume Module: Base Vol: 227 578 397 157 965 312 214 967 37 611 921 155 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 236 601 413 163 1004 324 223 1006 38 635 958 161 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 6 38 1 0 14 '7 9 70 0 1 49 1 Initial Fut: 242 639 414 163 1018 331 232 1076 38 636 1007 162 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 242 639 414 163 1018 0 232 1076 38 636 1007 162 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 242 639 414 163 1018 0 232 1076 38 636 1007 162 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Fina].VOlume: 242 639 41.4 163 1018 0 232 1076 38 636 1007 162 OvlAdjvol: 96 ------------ --------------- II------------ - - -II- ---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 4800 1600 3200 4800 1600 ------------ I --------------- II--------------- II--------------- II------- --- - - - - - I Capacity Analysis Module: Vol /Sat: 0.08 0.13 0.26 0.05 0.21 0.00 0.07 0.22 0.02 0.20 0.21 0.10 Ov1AdjV /S: 0.06 Crit Moves: * * ** * *** * * ** * * ** *****#****++++#***************#*#**#*+*+**##*#*** * * * * * # * # * * * * * # * * * * * * # * * * * * + * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S42 Default Scenario Sun May 22, 2011 14:34:54 Page 6 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length 8) Method (Future Volume Alternative) Intersection #5 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical. Vol. /Cap.(X): 0.496 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I - - - - -- -- II--------------- II------ _-------- II-------- -- - - - --I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 ------------ I --------------- II--------------- II---------- ----- II---- ------ - - - - - I Volume Module: Base Vol: 349 1533 0 0 220 204 0 0 0 120 902 138 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial. Bse: 363 1594 0 0 229 212 0 0 0 120 902 138 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 1 0 0 0 0 0 0 0 0 8 0 Initial Fut: 363 1595 0 0 229 212 0 0 0 120 910 138 User Ad-j: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 363 1595 0 0 229 212 0 0 0 120 910 138 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 363 1.595 0 0 229 212 0 0 0 120 910 138 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final.Volume: 363 1595 0 0 229 212 0 0 0 120 910 138 --------------------------- II------------ - - -11- II ---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.47 0.53 Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 5557 843 ------------ I--------------- II--------------- II--------------- 11- -- ------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.11 0.33 0.00 0.00 0.04 0.07 0.00 0.00 0.00 0.08 0.16 0.16 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 3-x _q Default Scenario Sun May 22, 2011 14:35:14 Page 7 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection 45 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.75'7 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C *********#**#*****************#****w* w* w********* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II-----_------_-- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 ------------ I --------------- --------------- ---- -- II---------- - - - -- Volume Module: Base Vol: 370 671 0 0 742 1007 0 0 0 200 1867 74 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 385 698 0 0 772 1047 0 0 0 200 1867 74 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 2 39 0 Initial Fut: 385 698 0 0 772 1047 0 0 0 202 1906 74 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 385 698 0 0 772 1047 0 0 0 202 1906 74 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 385 698 0 0 772 1047 0 0 0 202 1906 74 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fina.l.Volume: 385 698 0 0 772 1047 0 0 0 202 1906 74 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.85 0.15 Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 6161 239 ------------ I --------------- II----------- - - - -II ----- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.12 0.15 0.00 0.00 0.12 0.33 0.00 0.00 0.00 0.13 0.31 0.31 Crit Moves: * * ** * * ** * * ** ************************#*#***#****************** * * * * * * * * * * * *x * * * * * * * * *w * * * *# * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 5150 Default Scenario Sun May 22, 201:1. 1.4:34:54 Page 7 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour Level Of Service Computation Report. ICU 1(Loss as Cycle Length "o) Method (Future Volume Alternative) Intersection #6 Campus Drive /Irv.ine Avenue (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.642 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 1.00 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 - ------ - - - - -I -------- II--------------- II--------------- II- --------- -- - - - I Volume Module: Base Vol: 0 900 152 96 281 0 1186 1623 299 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bee: 0 936 158 100 292 0 1186 1623 299 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 2 0 0 0 0 0 26 0 0 0 0 Initial. Fut: 0 938 158 1.00 292 0 1186 1649 299 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 938 158 100 292 0 1186 1649 299 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 938 158 1.00 292 0 1186 1649 299 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final.VOlume: 0 938 158 1.00 292 0 1186 1649 299 0 0 0 --- ------ - --I-- ---- --II--------- -- -- --II II-- -------- - - - --I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1.600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.28 0.72 1.00 3.00 0.00 1.67 2.33 2.00 0.00 0.00 0.00 Final Sat.: 0 6846 1154 1600 4800 0 2677 3723 3200 0 0 0 ------------ I --------------- --------------- -- - II--- ------- - - - - - Capacity Analysis Module: Vol /Sat: 0.00 0.14 0.14 0.06 0.06 0.00 0.44 0.44 0.09 0.00 0.00 0.00 Crit Moves: * *** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 3151 Default Scenario Sun May 22, 2011 14:35:7.4 Page 8 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length ) Method (Future Volume Alternative) ************************+****************** k***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection N6 Campus Drive /Irvine Avenue (NS) at Bristol Street South (EW) ********+************ k*************#*###********* * * * * * * * * * * * * * * * * * * * * * * + * + * + * * ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.472 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay '(sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound. Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Inc.l.ude Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------ --------------- --------------- --------------- --------------- Volume Module: Base Vol: 0 720 180 201 859 0 417 1004 429 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 749 187 209 893 0 417 1.004 429 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 1 0 0 2 0 0 17 1 0 0 0 Initial Fut: 0 750 187 209 895 0 417 1021 430 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 750 187 209 895 0 417 1021 430 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 750 187 209 895 0 417 1021 430 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVol.ume: 0 750 187 209 895 0 417 1021 430 0 0 0 ---- -------- - - -- -- II--------------- II-------- ----- --II------- --- - - - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.16 2.84 2.00 0.00 0.00 0.00 Final Sat.: 0 6402 1598 1600 4800 0 1856 4544 3200 0 0 0 ------------ I --------------- II--------------- II-------------- -II-- -------- - - -- - I Capacity Analysis Module: Vol /Sat: 0.00 0.12 0.12 0.13 0.19 0.00 0.22. 0.22 0.13 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** *********************** k* k****** k******#*#******* * * * * * * * * * * * + * * * * * * * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 3152 Default Scenario Sun May 22, 2011 14:34:54 Page 8 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour ----------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.534 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II----- --------- -II---------- -- - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ----- --------------- II--------------- II----- ---------- II---------- - - - - - I Volume Module: Base Vol: 108 886 0 0 160 95 0 0 0 403 988 237 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: :1.08 886 0 0 160 95 0 0 0 403 986 237 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 6 6 0 0 25 0 0 0 0 50 1 0 Initial Fut: 114 892 0 0 185 95 0 0 0 453 989 237 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 114 892 0 0 185 95 0 0 0 453 989 237 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 114 892 0 0 185 95 0 0 0 453 989 237 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fi.nalVOlume: 114 892 0 0 185 95 0 0 0 453 989 237 ------------ --------------- II--------------- II------- -------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 1.26 3.16 0.58 Final Sat.: 3200 3200 0 0 3200 3200 0 0 0 2011 5062 928 ------------ I -- - - - --- II --------------- II--------------- II--------- - - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.28 0.00 0.00 0.06 0.03 0.00 0.00 0.00 0.23 0.20 0.26 Cri.t Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 3153 Default Scenario Sun May 22, 2011 14:35:14 Page 9 -1 4221 Dolphin - Striker Project. Existing +- Growth (Year 2013) + Approved Projects Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.541 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II ---------_----- II-- _--------- --- II---- -- ---- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 --- --------------- II--------------- II------- _------- II---------- - - - - - I Volume Module: Base Vol: 198 344 0 0 484 743 0 0 0 392 1187 124 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 198 344 0 0 484 743 0 0 0 392 1187 124 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 37 37 0 0 15 0 0 0 0 31 4 0 Initial Fut: 235 381 0 0 499 743 0 0 0 423 1191 124 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 235 381 0 0 499 743 0 0 0 423 1191 124 Reduct Vol: 0 0 0 0 0 0- 0 0 0 0 0 0 Reduced Vol.: 235 381 0 0 499 743 0 0 0 423 1191 124 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 235 381 0 0 499 743 0 0 0 423 1191 124 ----- --------------- II--------------- II---- -- ----- ---- II---------- - - - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 1.61 2.39 0.00 0.00 0.00 1.05 3.67 0.28 Final Sat.: 3200 3200 0 0 2571 3829 0 0 0 1677 5870 453 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.07 0.12 0.00 0.00 0.19 0.19 0.00 0.00 0.00 0.25 0.20 0.27 Crit Moves: * * ** * * ** * * ** ********+**************************** W****** W* W** * * * ** * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA ��"T Default Scenario Sun May 22, 2011 14:34:54 Page 9 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #8 Birch Street (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.401 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - -- I -- -- ---- II--------------- II--------------- II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1, 0 0 0 0 0 0 ------------ I --------------- II-------- ------- II - - - -- ----- -- --- - - - - -I Volume Module: Base Vol: 0 333 229 198 379 0 676 867 291 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 333 229 198 379 0 676 867 291 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 13 14 0 75 0 0 2 25 0 0 0 Initial Fut: 0 346 243 198 454 0 676 869 316 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ?HE Volume: 0 346 243 198 454 0 676 869 316 0 0 0 Deduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 346 243 198 454 0 676 869 316 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fi.nalVolume: 0 346 243 198 454 0 676 869 316 0 0 0 --------- --- --------------- II-- -- - - -- ------ II------ -- ---- ---II-------- -- - - -- -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 :1.600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.35 1.65 2.00 2.00 0.00 1.75 2.45 0.80 0.00 0.00 0.00 Final. Sat.: 0 3760 2640 3200 3200 0 2800 3920 1280 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.09 0.09 0.06 0.14 0.00 0.24 0.22 0.25 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 3515 Default Scenario Sun May 22, 2011 14:35:14 Page 10 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length i) Method (Future Volume Alternative) Intersection 48 Birch Street (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.463 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R 1, - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------ -------------- -II------- -- ---- - -II --------------- --------------- Volume Module: Base Vol: 0 312 300 305 614 0 1.88 999 174 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 312 300 305 614 0 188 999 174 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Passer.ByVOl: 0 73 77 0 46 0 0 7 15 0 0 0 Initial Fut: 0 385 377 305 660 0 188 1006 189 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 385 377 305 660 0 188 1006 189 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 385 377 305 660 0 188 1006 189 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fina.lvolume: 0 385 377 305 660 0 188 1006 189 0 0 0 ------------ --------------- II-------------- -II --------------- --------------- Saturation Flow Module: Sat /Lane: 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.02 1.98 2.00 2.00 0.00 1.00 3.53 0.47 0.00 0.00 0.00 Final Sat.: 0 3234 3166 3200 3200 0 1600 5641 759 0 0 0 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.00 0.1.2 0.12 0.10 0.21 0.00 0.12 0.18 0.25 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 350 Default Scenario Sun May 22, 2011 14:34:54 Page 10 -1 4221 Dolphin- Striker Project Existing + Growth (Year 201.3) + Approved Projects Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle ,Length %) Method (Future Volume Alternative) Intersection 49 Von Karman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.467 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level. Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R 1, - T - R L - T - R ------------ --------------- 11 --------------- --------------- ii --------------- Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 --- --- ----- -I - - - - -- - II--------------- II------- ------- -II-------- --- - - --I Volume Module: Base Vol: 16 534 53 37 335 73 228 303 42 17 287 110 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.04 1.04 1.04 1.04 1.04 1.04 Initial. Bse: 16 534 53 37 335 '73 23'1 31.5 44 80 298 114 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 1 0 0 0 0 0 0 0 Initial. Fut: 16 534 53 37 336 73 237 315 44 80 298 114 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 16 534 0 37 336 73 237 315 44 80 298 114 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 16 534 0 37 336 73 237 315 44 80 298 114 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVclume: 16 534 0 37 336 73 237 315 44 80 298 114 ------------ --------------- II--------------- II--------------- II--------- - - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.64 0.36 1.00 2.00 1.00 1.00 1.45 0.55 Final Sat.: 1600 3200 1600 1600 2629 571 1600 3200 1600 1600 2313 887 ------------ I--------------- II--------------- II----- --------- -11---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.01 0.17 0.00 0.02 0.13 0.13 0.15 0.10 0.03 0.05 0.13 0.13 Crit Moves: * * ** * + ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S57 Default Scenario Sun May 22, 2011 14:35:14 Page 11 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length 8) Method (Future Volume Alternative) Intersection #9 Von Karmen Avenue (NS) at Campus Drive (EW) Cycle (sec): 1.00 Critical Vo.l. /Cap.(X): 0.568 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - -- I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II-- ------------- II---------- - - - - - I Volume Module: Base Vol: 47 383 122 98 610 224 145 445 49 51 501 64 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 47 383 122 98 610 224 1.51 463 51 53 521 67 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol.: 0 2 0 0 0 0 0 0 0 0 0 0 Initial Put: 47 385 122 98 610 224 151 463 51 53 521 67 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 47 385 0 98 610 224 151 463 51 53 521 67 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 47 385 0 98 610 224 151 463 51 53 521 67 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVO.lume: 47 385 0 98 610 224 151 463 51 53 521 67 ------------ --------------- II--------------- II------- ---- -- -- II----- -- --- - - - - - I Saturation Flow Module: Sat /Lane: 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.46 0.54 1.00 2.00 1.00 1.00 1.77 0.23 Final Sat.: 1600 3200 1600 1600 2341 859 1600 3200 1600 1600 2838 362 ------------ I --------------- II--- ---------- - - II -- ---- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.03 0.12 0.00 0.06 0.26 0.26 0.09 0.14 0.03 0.03 0.18 0.18 Cri.t Moves: * * ** * # ** * * ** * * ** Traf£ix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KINSMAN ASSOC, ORANGE CA Default Scenario Sun May 22, 2011 14:34:54 Page 11 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour Level. Of Service Computation Report ICU 1(Loss as Cycle Length o) Method (Future Volume Alternative) Intersection #10 Von Ka.rman Avenue (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.290 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - -- I --------------- II--------------- II----- ---------- II----- _---- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 7, 0 2 0 1 1 0 2 0 1 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 30 484 33 56 275 128 79 194 48 43 159 22 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bee: 30 484 33 56 275 7.28 79 194 48 43 159 22 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 1 0 0 1 0 0 3 0 0 13 0 Initial Fut: 30 485 33 56 276 128 79 7.97 48 43 172 22 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 485 33 56 276 128 79 7.97 48 43 172 22 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 30 485 33 56 276 128 79 197 48 43 7.72 22 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Finalvol.ume: 30 485 33 56 276 128 79 197 48 43 172 22 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 7.600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------------- II--------------- II--------- ------ fl---- ------ - - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.02 0.04 0.09 0.08 0.05 0.06 0.03 0.03 0.05 0.01 Crit Moves * } ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA &�q Default Scenario Sun May 22, 2011 14:35:14 Page 12 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak flour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #10 Von Karman Avenue (NS) at Birch Street (EW) #************#*#****** ww * * * * * * * * * * * # * * *k *# * * * * * # * * * ** *www *w * * * * * * # * * * * * * * * * * # * ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.354 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A *************************************#*#****#*#*# * * * * * * * * * * * * * * * * * * *w * * * * * * * # # #* Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - -- --------------- II--------------- II------ --------- II-- -------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 ------------ ---------- ----- II------- --- - - - - -II ---- II-------- -- - - - - -I Volume Module: Base Vol: 71 407 55 34 549 133 99 166 26 19 235 41 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 71 407 55 34 549 133 99 166 26 19 235 41 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 2 0 0 0 0 0 18 0 0 8 0 Initial Put: 71 409 55 34 549 133 99 184 26 19 243 41 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 71 409 55 34 549 1.33 99 184 26 19 243 41 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 71 409 55 34 549 133 99 184 26 19 243 41 PCE Adj: 1100 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 71 409 55 34 549 1.33 99 184 26 19 243 41 ------------ --------------- II--------------- II----- -- -- -- ---- II--- --- -- -- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------------- II------ --------- II - - -- 11------ ---- - - - - -I Capacity Analysis Module: Vol /Sat: 0.04 0.13 0.03 0.02 0.17 0.08 0.06 0.06 0.02 0.01 0.08 0.03 Crit Moves: * * ** * * ** * * ** * * ** * * * * # * * * ** www*#***********#*+*+**#****** w* w* w**** * * * * * * * # ** *# * * * * ** * + * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA Soo Default Scenario Sun May 22, 2011 14:34:54 Page 12 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour ------------- ----- - - - --- -- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #11 Bayview Place (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.425 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ***#*** k****** k*}* k** k*********#*}*** k******** k* kkkkk # * * * * * * * * * * *k *k *k *k * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - 'P - R L - T - R L - T - R ---- I -------- ------- II----------- - -- -II --- II---------- - - - --I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 - -- -- I --------------- II--------------- II------- ----- -- -II-------- -- ---- - I Volume Module: Base Vol: 0 0 101 0 0 0 0 2464 420 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 101 0 0 0 0 2464 420 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByvol: 0 0 2 0 0 0 0 50 1 0 0 0 Initial Fut: 0 0 103 0 0 0 0 2514 421 0 0 0 User Ad-j: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 103 0 0 0 0 2514 421 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 103 0 0 0 0 2514 421 0 0 0 PCE Ad-j: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 103 0 0 0 0 2514 421 0 0 0 ------------ --------------- II-_------------- II----------- -- -- II--------- - - - --- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0 0 3200 0 0 0 0 6400 1600 0 0 0 ------------ I --------------- II--------------- II------ --------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.39 0.26 0.00 0.00 0.00 Crit Moves: * * ** * * ** k******************** k** k*** k****** k* k*}*}******* * * * * * * * * * * *k * * * * *k * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 3C 1 Default Scenario Sun May 22, 2011 14:35:15 Page 13 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length o) Method (Future Volume Alternative) Intersection 411 Bayview Place (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.551 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L- T - R ------------ --------------- II--------------- II--------- ------ II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ --------------- II--------------- II---------- ---- -II------ -- -- - -- - - I Volume Module: Base Vol: 0 0 433 0 0 0 0 2591 142 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial. Bse: 0 0 433 0 0 0 0 2591 142 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 23 0 0 0 0 26 0 0 0 0 Initial Put: 0 0 456 0 0 0 0 2617 142 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 456 0 0 0 0 2617 142 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 456 0 0 0 0 2617 142 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 0 456 0 0 0 0 2617 142 0 0 0 ---- ------- -I - - -- ---- II--------------- II--------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0 0 3200 0 0 0 0 6400 1600 0 0 0 ------------ I --------------- II------- -------- II - --- I----- ----- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.14 0.00 0.00 0.00 0.00 0.41 0.09 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.021.5 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 302 Default Scenario Sun May 22, 2011 14:34:54 Page 13 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) . + Approved Projects Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection k12 Jamboree Road (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.642 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 1.00 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - P L - T - R ------------ --------------- II--------------- II--------------- II ---------- - - - -- I Control.: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 ------------ --------------- II--------------- II --- --- ---------- - - - - -I Volume Module: Base Vol: 143 1044 34 286 1732 172 76 112 10 259 423 152 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 150 1096 36 300 1819 181 80 118 11 272 444 160 Added Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 29 0 0 69 0 0 0 1 1 0 0 Initial Fut: 150 1125 36 300 1688 181 80 118 12 2 73 444 160 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 150 1.125 36 300 1888 181 80 118 0 273 444 160 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 150 1125 36 300 1888 181 80 118 0 273 444 160 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVOlume: 150 1125 36 300 1888 181 80 118 0 273 444 160 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.88 0.12 2.00 2.74 0.26 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 6203 197 3200 4381 419 3200 3200 1600 3200 3200 1600 ---- -------- I - - - - -- -- II--------------- II--------------- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.05 0.18 0.18 0.09 0.43 0.43 0.02 0.04 0.00 0.09 0.14 0.10 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA SOS Default Scenario Sun May 22, 2011 14:35:15 Page 14 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) . + Approved Projects Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length °) Method (Future Volume Alternative) Intersection #12 Jamboree Road (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.605 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound Fast Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- --------------- --------------- --------------- Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 ------------ --------------- II-- -- ------- -- -- II --------------- --------------- Volume Module: Base Vol: 65 1278 135 224 1108 163 219 263 159 152 226 331 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial. Bse: 68 1342 142 235 1163 192 230 276 167 160 237 348 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 68 1 0 41 0 0 0 0 1 1 0 Initial Put: 68 1410 143 235 1204 192 230 276 167 161 238 348 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 6e 1410 143 235 1204 192 230 276 0 161, 238 348 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 68 1410 143 235 1204 192 230 276 0 161 238 348 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 68 1410 143 235 1204 . 1.92 230 276 0 161 238 348 - - - -- --------------- II--------------- II----- ---------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.63 0.37 2.00 2.59 0.41 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 5812 588 3200 4140 660 3200 3200 1600 3200 3200 1600 ----- I --------------- II --------------- II--------------- II----- ----- - - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.24 0.24 0.07 0.29 0.29 0.07 0.09 0.00 0.05 0.07 0.22 Crit Moves * * ** * * ** * # ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA SO4 Default Scenario Sun May 22, 2011 14:34:54 Page 14 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour. _ -_--------- ----------------------- - - - - -' Level Of Service Computation Report ICU 1(LOSS as Cycle Length a) Method (Future Volume Alternative) Intersection #13 Jamboree Road (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol.. /Cap.(X): 0.538 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ---- --- --- - -I --- -- II--------------- II--------------- II---------- - - - - -I Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 3 0 1 1 1 0 0 1 0 0 1! 0 0 ------------ --------------- II--------------- II----- --- ------- II---------- - - - - - I Volume Module: Base Vol: 204 1228 2 7 1551 464 123 8 42 3 6 6 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 214 1289 2 7 1629 487 123 8 42 3 6 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 30 0 0 69 1 0 0 0 0 0 0 Initial Put: 214 1319 2 7 1698 488 123 8 42 3 6 6 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 214 1319 2 7 1696 0 123 8 0 3 6 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 214 1319 2 7 1698 0 123 8 0 3 6 6 POE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 Finalvolume: 214 1319 2 7 1698 0 123 8 0 3 6 6 ------------ --------------- II--------------- II---- ---- -- ----- II----- ---- - -- - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 7.600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.88 0.12 1.00 0.20 0.40 0.40 Final Sat.: 1600 4792 8 1600 4800 7.600 3005 195 1600 320 640 640 ------------ I --------------- II----- -- ------ -- II------ ----- ----II -- - - -- -I Capacity Analysis Module: Vol /Sat: 0.13 0.28 0.28 0.00 0.35 0.00 0.04 0.04 0.00 0.01 0.01 0.01 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 305 Default Scenario Sun May 22, 2011 14:35:15 Page 15 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length °) Method (Future Volume Alternative) Intersection #13 Jamboree Road (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.436 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R I. - T - R L - T - R ------------ I -------------- -II-------------- -II - -- ---------- - - -- -I Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 3 0 1 :I. 1 0 0 1 0 0 1 0 0 ------------ I ----- ---------- II--- ------- --- --II --------------- --------------- Volume Module: Base Vol: 44 1188 0 2 1390 91. 297 4 100 0 1. 0 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 46 1247 0 2 1460 96 297 4 100 0 1 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 68 0 0 41 0 0 0 1 0 0 0 Initial Fut: 46 1315 0 2 1501 96 297 4 101 0 1 0 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 46 1315 0 2 1501 0 297 4 0 0 1 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 46 1315 0 2 1501 0 297 4 0 0 1 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVOlume: 46 1315 0 2 1501 0 297 4 0 0 1 0 ---- --------------- II--_------------ II-------- ------- II------- --- - - - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.97 0.03 1.00 0.00 1.00 0.00 Final Sat.: 1600 4800 0 1600 4800 1600 3157 43 1600 0 1600 0 ------------ I --------------- II--------------- II--------- ------ II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.27 0.00 0.00 0.31 0.00 0.09 0.09 0.00 0.00 0.00 0.00 Crit Moves: * * ** W * ** * * ** * * ** Tra£fix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA Soo Default Scenario Sun May 22, 2011 14:34:54 Page 15 -1 4221 Dolphin - Striker Project Existing + Growth (Year_ 2013) + Approved Projects Morning Peak Hour -- -- -------------------- ----- ---- Level. Of Service Computation Report ICU 1(Eoss as Cycle Length %) Method (Future Volume Alternative) Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.459 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - '1' - R L - T - R L - T - R ------------ ---- II --------------- II ------------- -- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 ------------ --------------- II--------------- II--------- ------ II--- ------- - - - - - I Volume Module: Base Vol: 846 1509 663 0 570 412 0 0 0 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 880 1.569 690 0 593 428 0 0 0 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 29 43 21 0 86 13 0 0 0 0 0 0 Initial. Fut: 909 1612 711 0 679 441 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 THE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 909 1612 0 0 679 441 0 0 0 0 0 0 Reduct Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 909 1612 0 0 679 441 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 909 1.612 0 0 679 441 0 0 0 0 0 0 ------------ --------------- II--------------- II--------------- II------ ---- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.42 1.58 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1600 0 3878 2522 0 0 0 0 0 0 ------------ I --------------- II--------------- II ---- ----- -- -- -- II---------- -- - -- I Capacity Analysis Module: Vol /Sat: 0.28 0.44 0.00 0.00 0.18 0.1.8 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S07 MITIG8 - Default Scenario Sun May 22, 2011 14:48:49 Page 1 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) ******** w* ww* w********* * * * * * * * * * * * * * * *w * * *w * * * * * * * + + *+ *www * * * * * * # * + * * * * * * * * * * +w* Cycle (sec): 100 Critical Vol. /Cap.(X): 0.516 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A +w * * + # * * * * * ** www***+*+*++*****************+****** * * * + * * *ww *w *w * * * * *w + * * * * * * * * * *w Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ i--------------- II--------------- II--------------- II ---------- - - - -_I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 ------------ ----------- ---- II- ----- ----- ---- II --------------- --------------- Volume Module: Base Vol: 689 1142 942 0 1080 612 0 0 0 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 717 1188 980 0 1123 636 0 0 0 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 22 103 57 0 57 8 0 0 0 0 0 0 Initial Fut: 739 1291 1037 0 1180 644 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 739 1291 0 0 1180 644 0 0 0 0 0 0 Reduct. Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 739 1291 0 0 1180 644 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 739 1291 0 0 1180 644 0 0 0 0 0 0 ------------------- II--------------- II---- ----------- II- -------- --- - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.59 1.41 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1.600 0 4140 2260 0 0 0 0 0 '0 ----- I --------------- II--------------- II--------- ------ II---- ----- - - - - - - I Capacity Analysis Module: Vol /Sat: 0.23 0.40 0.00 0.00 0.29 0.29 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** **************** w* ww**+**** * * * * * **+ ** * * * * * * * * * * * *w * * * * * * ** *www * * * * * * * * * * * * * *w * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S02 Default Scenario Sun May 22, 2011 14:34:54 Page 16 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length y) Method (Future Volume Alternative) Intersection 415 Jamboree Road (NS) at Bristol Street South (EW) ************************************************* * * * * * * * * * * * * * * * * * * * * * *** * * * * * ** Cycle (sec): 100 Critical. Vol. /Cap.(X): 0.649 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ 1--------------- II--------------- II--------------- II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 0 0 ------------ I--------------- II--------------- II--------------- II-- ------ -- - - - - - I Volume Module: Base Vol: 0 1817 40 0 571 0 1199 333 1150 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1.890 42 0 594 0 1199 333 1150 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 111 0 0 87 0 5 4 111 0 0 0 In:i.tial Put: 0 2001 42 0 681 0 1204 337 1261 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHE' Volume: 0 2001 42 0 681 0 1204 337 1.261. 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2001 42 0 681 0 1204 337 1261 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 2001 42 0 681 0 1204 33'7 1261 0 0 0 ------------ --------------- II--------------- II------------- --II- -- ------- - - - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment:: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.90 0.1.0 0.00 3.00 0.00 2.00 1.00 2.00 0.00 0.00 0.00 Final Sat.: 0 7837 163 0 4800 0 3200 1600 3200 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- -- - - - I Capacity Analysis Module.: Vol /Sat: 0.00 0.26 0.26 0.00 0.14 0.00 0.38 0.21 0.39 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA s o9 Default Scenario Sun May 22, 2011 14:35:15 Page 17 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #15 Jamboree Road (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.701 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal. Cycle: 100 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II----------- ---- II-- ------ -- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 0 0 ------------ --------------- II--------------- II---- ---- ------- II---------- -- - - - I Volume Module: Base Vol: 0 1834 73 0 1080 0 937 1071 1145 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1907 76 0 1123 0 937 1071 1145 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 177 0 0 57 0 37 24 117 0 0 0 Initial Put: 0 2084 76 0 1.180 0 974 1095 1262 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 2084 76 0 1180 0 974 1095 1262 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2084 76 0 1180 0 974 1095 1262 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 2084 76 0 1180 0 974 1095 1262 0 0 0 ------------ --------- ------ II-------------- -II --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1.600 1600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 Adjustment.: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.82 0.18 0.00 3.00 0.00 1.41 1.59 2.00 0.00 0.00 0.00 Final Sat.: 0 7719 281 0 4800 0 2260 2540 3200 0 0 0 ------------ I --------------- II--------------- II ---- ----------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.27 0.27 0.00 0.25 0.00 0.43 0.43 0.39 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S70 Existing + Growth (Year 2013) + Approved Projects + Project 371 Default Scenario Tue May 31, 2011 13:38:04 Page 4 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) kkkk******* kk*+***** k***********+ k* k** k*** k*+ k** k * *k * * * *k * * * * * * * * * * * * *k * * *kk * *k* Cycle (sec): 100 Critical Vol. /Cap.(X): 0.448 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level of Service: A ** kk*********************** kk****** kk**** k******* * * * * * * *k * * *k * * * * * * * *k * * * *k * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------ I --------------- II --------------- II --------------- II ---------- - - - - - I Volume Module: Base Vol: 37 944 49 195 835 227 307 555 48 87 185 58 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 39 991 51 205 877 238 322 583 50 91 194 61 Added Vol: 0 3 0 0 4 0 0 0 0 4 0 0 PasserByVol: 0 18 0 0 47 0 0 1 0 0 0 0 Initial Fut: 39 1012 51 205 928 238 322 584 50 95 194 61 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 39 1012 51 205 928 238 322 584 50 95 194 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 39 1012 51 205 928 238 322 584 50 95 194 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVOlume: 39 1012 51 205 928 238 322 584 50 95 194 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.76 0.24 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4419 381 3200 4800 1600 ------------ I--------------- II--------------- 11------------ --- 11---------- - - -- -I Capacity Analysis Module: Vol /Sat: 0.02 0.16 0.03 0.13 0.14 0.15 0.10 0.13 0.13 0.03 0.04 .0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S72 Default Scenario Tue May 31, 2011 13:38:16 Page 4 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.648 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II ---_----------- II --------------- II ---------- - - - - - I Control: Protected- Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------ I--------------- 11--------------- II--------------- 11- --------- - - - - -I Volume Module: Base Vol: 154 1091 49 45 819 447 324 274 96 98 669 195 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 162 1146 51 47 860 469 340 288 101 103 702 205 Added Vol: 0 4 0 0 2 0 0 0 0 2 0 0 PasserByVol: 0 55 0 0 26 1 0 0 0 0 0 1 Initial Put: 162. 1205 51 47 888 470 340 288 101 105 702 206 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 162 1205 51 47 888 470 340 288 101 105 702 0 Reduct Vol: 0 C 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 162 1205 51 47 888 470 340 288 101 105 702 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 162 1205 51 47 888 470 340 288 101 105 702 0 ---------- - - I - -- ---- II--------------- II--------------- II-- -------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.22 0.78 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 3555 1245 3200 4800 1600 ------------ I--------------- II--------------- 11--------------- II---- ------ - - - - -1 Capacity Analysis Module: Vol /Sat: 0.10 0.19. 0.03 0.03 0.14 0.29 0.11 0.08 0.08 0.03 0.15 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 373 Default Scenario Tue May 31, 2011 13:38:04 Page 5 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** Intersection 42 MacArthur Boulevard (NS) at Birch Street (EW) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.392 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R -----_------ I --------------- II --------------- II--------------- II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------ I --------------- II--------------- II--------------- II---------- - - -- - I Volume Module: Base Vol: 32 689 98 100 624 176 158 310 73 31 154 53 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 33 717 102 104 649 183 158 310 73 31 154 53 Added Vol: 0 3 0 0 8 0 0 0 0 0 0 0 PasserByVol: 1 14 0 0 34 13 3 3 0 D 13 0 Initial Fut: 34 734 102 104 691 196 161 313 73 31 167 53 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 34 734 102 104 691 196 161 313 73 31 167 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 34 734 102 104 691 196 161 313 73 31 167 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 34 734 102 104 691 196 161 313 73 31 167 0 ------------ I --------------- II--------------- II--------- ------ II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.12 0.88 1.00 1.60 0.40 1.00 2.00 1.00 Final Sat.: 1600 4800 1600 1600 4986 1414 1600 2560 640 1600 3200 1600 ------------ I--------------- II--------------- 11--------------- II------- --- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.06 0.07 0.14 0.14 0.10 0.12 0.11 0.02 0.05 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA T Default Scenario Tue May 31, 2011 13:38:16 Page 5 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 42 MacArthur Boulevard (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.476 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): _ xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 86 646 25 49 858 149 274 182 53 114 433 170 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 89 672 26 51 892 155 274 182 53 114 433 170 Added Vol: 0 4 0 0 4 0 0 0 0 0 0 0 PasserByVOl: 0 37 0 0 16 8 18 18 0 0 8 0 Initial Fut: 89 713 26 51 914 163 292 200 53 114 441 170 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 -1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 89 713 26 51 914 163 292 200 53 114 441 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 69 713 26 51 914 163 292 200 53 114 441 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 89 713 26 51 914 163 292 200 53 114 441 0 ------------ I--------------- II--------------- II---------- ----- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.39 0.61 1.60 1.10 0.29 1.00 2.00 1.00 Final Sat.: 1600 4800 1600 1600 5432 968 2567 1764 469 1600 3200 1600 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis .Module: Vol /Sat: 0.06 0.15 0.02. 0.03 0.17 0.17 0.11 0.11 0.11 0.07 0.14 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) -2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S7,5 Default Scenario Tue May 31, 2011 13:38:04 Page 6 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) + www+ www+ wwwwwwwwwwwwwwwwwwwww +w +wwwwww *wwwwwwwww +www + + +wwwwwwww +wwwwww + + + +ww +ww Intersection #3 MacArthur Boulevard (NS) at Von Karman Avenue (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.567 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A wwww + +ww +wtw + *wwwwwwwwwwwwww + + +* www * + +wwwwwwwwww * +w +wwwww + +wwwwwww +www * + +wwww + +w Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- 11--------------- II--------------- II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 ------------ I--------------- II--------------- II--------------- 11---------- - - - - -I Volume Module: Base Vol: 101 988 656 58 435 163 19 96 28 78 136 12 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 105 1028 682 60 452 170 19 96 28 78 136 12 Added Vol: 0 21 0 7 15 0 0 0 0 0 2 0 PasserByVOl: 0 16 1 0 34 0 0 0 0 1 0 0 Initial Fut: 105 1065 683 67 501 170 19 96 28 79 138 12 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj:. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHE Volume: 105 1065 683 67 501 170 19 96 28 79 138 12 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 105 1065 683 67 501 170 19 96 28 79 138 12 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 105 1065 683 67 501 170 19 96 28 79 138 12 ------------ I --------------- II--------------- II--------------- II--------- - - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 3200 1600 3200 1600 1600 ------------ I --------------- II--------------- II ---------- ----- II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.07 0.22 0.43 0.04 0.10. 0.11 0.01 0.03 0.02 0.02..0.09 0.01 Crit Moves: * * ** * * ** * * ** * * ** wwww++ w+ wwwwwwwwwwwwwwwwwwwwww+ w+ wwwwwwwwww+ w +wwwwwwwwwwww +wwwwwwww +wwwwwww +www+ Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S70 Default Scenario Tue May 31, 2011 13:38:16 Page 6 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour -------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #3 MacArthur Boulevard (NS) at Von Karman Avenue (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.571 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T- R ------------ I --------------- II --------------- II --------------- II --------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 ------------ I --------------- II--------------- II --------------- II ---------- - - - - - I Volume Module: Base Vol: 48 624 126 29 968 52 138 195 183 665 127 38 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 50 649 131 30 1007 54 138 195 183 665 127 38 Added Vol: 0 10 0 9 20 0 0 0 0 0 1 0 PasserByVol: 0 38 2 0 18 0 0 0 0 0 0 0 Initial Fut: 50 697 133 39 1045 54 138 195 183 665 128 38 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 50 697 133 39 1045 54 138 195 183 665 128 38. Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 50 697 133 39 1045 54 138 195 183 665 128 38 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 50 697 133 39 1045 54 138 195 183 665 128 38 ------- -- - - -I -- II--------------- II-------- ------- II--- ----- -- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 '1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 3200 ,1600 3200 1600 1600 ---- --- - - - - -I -- II --------------- II --- ------------ II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.15 0.08 0.02 0.22 0.03 0.09 0.06 0.11. 0.21 0.0.8 0.02 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 377 Default Scenario Tue May 31, 2011 13:38:04 Page 7 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #4 MacArthur Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.626 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- 11--------------- 11 --------------- 11 --------------- 1 Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------------ I --------------- II--------------- II --------------- II ---------- - -- - - I Volume Module: Base Vol: 177 1332 Growth Adj: 1.04 1.04 Initial Bse: 184 1385 Added Vol: 0 10 PasserByvol: 1 10 Initial Fut: 185 1405 User Adj: 1.00 1.00 PHF Adj: 1.00 1.00 PHF Volume: 185 1405 Reduct Vol: 0 0 Reduced Vol: 185 1405 PCE Adj: 1.00 1.00 MLF Adj: 1.00 1.00 FinalVolume: 185 1405 OvlAdjVol: ------------I--------- Saturation Flow Module 456 1.04 474 0 1 475 1.00 1.00 475 0 475 1.00 1.00 475 286 66 293 1.04 1.04 69 305 4 7 0 33 73 345 1.00 1.00 1.00 1.00 73 345 0 0 73 345 1.00 1.00 1.00 1.00 73 345 121 410 851 1.04 1.04 1.04 126 426 885 4 6 0 9 11 37 139 443 922 0.00 1.00 1.00 0.00 1.00 1.00 0 443 922 0 0 0 0 443 922 0.00 1.00 1.00 0.00 1.00 1.00 0 443 922 176 1.04 183 0 0 183 1.00 1.00 183 0 183 1.00 1.00 183 364 674 181 1.04 1.04 1.04 379 701 188 0 0 E 0 66 3 379 767 197 1.00 1.00 1.0C 1.00 1.00 1.0C 379 767 197 0 0 C 379 767 197 1.00 1.00 1.0C 1.00 1.00 1.0C 379 767 191 Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 4800 1600 3200 4800 1600 ------------ I---- ---------- -11 - -- II -------------- - II - -- - - - -I Capacity Analysis Module: Vol /Sat: 0.06 0.29 0.30 0.02 0.07 0.00 0.14 0.19 0.11 0.12 0.16 0.12 Ov1AdjV /S: 0.18 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S72 Default Scenario Tue May 31, 2011 13:38:16 Page 7 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour _____ ____ ______ _ ____ Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #4 MacArthur Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.713 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II_-- ------------ II---------- -- - - - I Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------------ I --------------- II----------- ---- II ---- -------- --- II - - - - -- -I Volume Module: Base Vol: 227 578 397 157 965 312 214 967 37 611 921 155 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 236 601 413 163 1004 324 223 1006 38 635 958 161 Added Vol: 0 5 0 5 9 5 3 0 0 0 0 3 PasserByVol: 6 38 1 0 14 7 9 70 0 1 49 1 Initial Put: .242 644 414 168 1027 336 235 1076 38 636 1007 165 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 242 644 414 168 1027 0 235 1076 38 636 1007 165 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 242 644 414 168 1027 0 235 1076 38 636 1007 165 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 242 644 414 168 1027 0 235 1076 38 636 1007 165 Ov1AdjVol: 96 --------- - - - I -- --- II--------------- II--------------- II- --------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 .2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 4800 1600 3200 4800 1600 ------------ I --------------- II--------------- II--------------- II------ --- - - - - - - I Capacity Analysis Module: Vol /Sat: 0.08 0.13 0.26 .0.05 0.21 0.00 0.07 0.22 0.02 0.20 0.21 0.10 Ov1AdjV /S: 0.06 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S�" Default Scenario Ina May 31, 2011 13:38:04 Page 8 -1 4221 Dolphin- Striker Project. Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour ___ _____________________ ______________ _______ ___ _ _____ _____ ___ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #5 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.497 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II--------------- I Control: Protected - Protected Protected - Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 ------------ --------------- II--------------- II------ --------- II------ ---- - - - - - I Volume Module: Base Vol: 349 1533 0 0 220 204 0 0 0 120 902 138 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 363 1594 0 0 229 212 0 0 0 120 902 138 Added Vol: 0 6 0 0 1 3 0 0 0 0 0 0 PasserByvol: 0 1 0 0 0 0 0 0 0 0 8 0 Initial Put: 363 1601 0 0 230 215 0 0 0 120 910 138 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 363 1601 0 0 230 215 0 0 0 120 910 138 Reduct Vol: 0- 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 363 1601 0 0 230 215 0 0 0 120 910 138 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 363 1601 0 0 230 215 0 0 0 120 910 138 ---- I --------------- II--------------- II--------------- II---------- - - -- - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.47 0.53 Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 5557 843 ------------ I--------------- II--------------- 11------------- -- II---------- - - - --I Capacity Analysis Module: Vol /Sat: 0.11 0.33 0.00 0.00 0.04 0.07 0.00 0.00 -0.00 0.08 0.16 0.16 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 -(c) -2008 Dowling Assoc. Licensed to KUNZMAN- ASSOC, ORANGE CA S20 Default Scenario Tue May 31, 2011 13:38:16 Page 8 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects -+ Project Evening Peak Hour ____________ ______ ___ _______ _ Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #5 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.758 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 ------------ I --------------- II--------------- II------------- -- II--------- - - - - - - I Volume Module: Base Vol: 370 671 0 0 742 1007 0 0 0 200 1667 74 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 385 698 0 0 772 1047 0 0 0 200 1867 74 Added Vol: 0 3 0 0 2 4 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 2 39 0 Initial Put: 385 701 0 0 774 1051 0 0 0 202 1906 74 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 385 701 0 0 774 1051 0 0 0 202 1906 74 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 365 701 0 0 774 1051 0 0 - 0 202 1906 74 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 385 701 0 0 774 1051 0 0 0 202 1906 74 ---- I--------------- II--------------- II--- ------------ II--------- - - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600.1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.85 0.15 Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 6161 239 ---- I--------------- II--------------- II--- ------------ 11-- ----- --- - - - - -I Capacity Analysis Module: Vol /Sat: 0.12 0.15 0.00 0.00 0.12 0.33 0.00 0.00 0.00 0.13 0.31 0.31 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2006 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S21- Default Scenario Tue May 31, 2011 13:38:04. Page 9 -1 --- ------------------------------------------------- 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 06 Campus Drive /Irvine Avenue (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.643 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 0 900 152 96 281 0 1186 1623 299 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 936 158 100 292 0 1186 1623. 299 0 0 0 Added Vol: 0 2 0 0 1 0 4 0 0 0 0 0 PasserByVOl: 0 2 0 0 0 0 0 26 0 0 0 0 Initial Fut: 0 940 156 100 293 0 1190 1649 299 0 0 0 User Adj:. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 940 158 100 293 0 1190 1649 299 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 940 158 100 293 0 1190 1649 299 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 940 158 100 293 0 1190 1649 299 0 0 0 ------------ --------------- II--------------- II--------------- II--------- - - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.28 0.72 1.00 3.00 0.00 1.68 2.32 2.00 0.00 0.00 0.00 Final Sat.: 06848 1152 1600 4600 0 2683 3717 3200 0 0 0 ------------ I --------------- II --------------- II----------- ---- II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.14 0.14 0.06 0.06 0.00 0.44 0.44 0.09 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 322 Default Scenario Tue May 31, 2011 13:38:16 Page 9 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #6 Campus Drive /Irvine Avenue (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.473 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- 11 --------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------ I----------- - - - -11 - - -II ---- -- II---------- - - - - -I Volume Module: Base Vol: 0 720 160 201 859 0 417 1004 429 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 749 187 209 893 0 417 1004 429 0 0 0 Added Vol: 0 1 0 0 2 0 2 0 0 0 0 0 PasserByVOl: 0 1 0 0 2 0 0 17 1 0 0 0 Initial Fut: 0 751 187 209 897 0 419 1021 430 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00. 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 751 167 209 897 0 419 1021 430 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 751 187 209 897 0 419 1021 430 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 751 187 209 697 0 419 1021 430 0 0 0 ------------ I--------------- II--------------- II--------- ------ II-- -- ------ - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.16 2.84 2.00 0.00 0.00 0.00 Final Sat.: 0 6403 1597 1600 4800 0 1862 4538 3200 0 0 0 ------------ I --------------- II --------------- II-------- ------ - II -- -------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.12 0.12 0.13 0.19 0.00 0.23 0.22 0.13 0.00.0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA s es Default Scenario Tue May 31, 2011 13:38:04 Page 10 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour __ - - -__ -__ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.535 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- 11 --------------- II-- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------ I --------------- II--------------- II------- -------- II-- -------- - - - - - I Volume Module: Base Vol: 108 886 0 0 160 95 0 0 0 403 988 237 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .1.00 1.00 1.00 1.00 Initial Bse: 108 886 0 0 160 95 0 0 0 403 988 237 Added Vol: 0 2 0 0 1 0 0 0 0 0 0 0 PasserByVol: 6 6 0 0 25 0 0 0 0 50 1 0 Initial Fut: 114 894 0 0 186 95 0 0 0 453 989 237 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 114 894 0 0 186 95 0 0 0 453 989 237 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 114 894 0 0 186 95 0 0 0 453 989 237 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 114 894 0 0 186 95 0 0 0 453 989 237 ------------ I ----------- - -- -II --------------- -- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 1.26 3.16 0.58 Final Sat.: 3200 3200 0 0 3200 3200 0 0 0 2011 5062 928 ------------ I------------ --- II--------------- 11 - - - --- 11- - - - - -- I Capacity Analysis Module: Vol /Sat: 0.04 0.28 0.00 0.00 0.06 0.03 0.00 0.00 0.00 0.23 0.20 0.26 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC,. ORANGE CA 324 Default Scenario Tue May 31, 2011 13:38:16 Page 10 -1 4221 Dolphin - striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.542 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T R ------------ I --------------- II --------------- II --------------- II -------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------ I --------------- II--------------- II ------------ --- II---------- - - - - - I Volume Module: Base Vol: 198 344 0 0 484 743 0 0 0 392 1187 124 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 198 344 0 0 484 743 0 0 0 392 1187 124 Added Vol: 0 1 0 0 2 0 0 0 0 0 0 0 PasserByVol: 37 37 0 0 15 0 0 0 0 31 4 0 Initial Fut: 235 382 0 0 501 743 0 0 0 423 1191 124 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 235 382 0 0 501 743 0 0 0 423 1191 124 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 235 382 0 0 501 743 0 0 0 423 1191 124 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 235 382 0 0 501 743 0 0 0 423 1191. 124 ------------ I --------------- II--------------- II--------- --- --- II--- -- --- ---- -- - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 1.61 2.39 0.00 0.00 0.00 1.05 3.67 0.28 Final Sat.: 3200 3200 0 0 2577 3823 0 0 0 1677 5870 453 ------------ I --------------- II --------------- II--------------- II ---------- - - - -- I Capacity Analysis Module: Vol /Sat: 0.07 0.12 0.00 0.00 0.1.9 0.19 0.00 0.00 0.00 0.25 0.20 0.27 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S25 Default Scenario Tue May 31, 2011 13:38:04 Page 11 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour ______________________ __________ __ _______ ______ ______ __ -_ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection ff8 -Birch Street (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.401 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2- 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 - --- I --------------- II - - - -- --- II--------------- II---------- - - -- -I Volume Module: Base Vol: 0 333 229 198 379 0 676 867 291 -0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 333 229 198 379 0 676 867 291 0 0 0 Added Vol: 0 2 0 0 1 0 0 0 0 0 0 0 PasserByVOl: 0 13 14 0 75 0 0 2 25 0 0 0 Initial Fut: 0 348 243 198 455 0 676 869 316 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PRE Volume: 0 348 243 198 455 0 676 869 316 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 348 243 198 455 0 676 869 316 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 348 243 198 455 0 676 869 316 0 0 0 ------------ I--------------- II--------------- II---------- ----- II-- -------- -- - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.36 1.64 2.00 2.00 0.00 1.75 2.45 0.80 0.00 0.00 0.00 Final Sat.: 0 3769 2631 3200 3200 0 2800 3920 1280 0 0 0 ---- I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.09 0.09. 0.06 0.14 0.00 0.24 0.22 0.25 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S20 Default Scenario Tue May 31, 2011 13:38:16 Page 11 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 48 Birch Street (NS) at Bristol Street South (EW) ****+*********************** k*** k* k* k*** k******** * * * * * * * * * * * * * * * * * * * * * * * * * + + * * ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.463 Loss Time (sec): -0 (Y +R =0.0 .sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- 11--------------- 11--------------- II-------- -- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------ I --------------- II--------------- II-------------- -II - -- - - - -I Volume Module: Base Vol: 0 312. 300 305 614 0 188 999 174 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 312 300 305 614 0 188 999 174 0 0 0 Added Vol: 0 1 0 0 2 0 0 0 0 0 0 0 PasserByVol: 0 73 77 0 46 0 0 7 15 0 0 0 Initial Fut: 0 386 377 305 662 0 188 1006 189 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 386 377 305 662 0 188 1006 189 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 386 377 305 662 0 188 1006 189 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 386 377 305 662 0 188 1006 189 0 0 0 ------------ I --------------- II--------------- II--- -------- ---- II- - - - - -- -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.02 1.98 2.00 2.00 0.00 1.00 3.53 0.47 0.00 0.00 0.00 Final Sat.: 0 3238 3162 3200 3200 0 1600 5641 759 0 0 0 ------------ I--------------- II------------ --- 11 - - -- --- 11---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.12 0.12 0.10 0.21 0.00 0.12 0.18 0.25 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S27 Default Scenario Tue May 31, 2011 13:38:04 Page 12 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length `4) Method (Future Volume Alternative) Intersection 49 Von Karman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.469 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II----- ------ - - - -II --- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 --- --------------- II--------------- II------------ --- II---------- - - - - - I Volume Module: Base Vol: 16 534 53 37 335 73 228 303 42 77 287 110 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 16 534 53 37 335 73 237 315 44 60 298 114 Added Vol: 0 1 3 0 2 0 0 0 0 0 4 0 PasserByVol: C 0 0 0 1 0 0 0 0 0 0 0 Initial Fut: 16 535 56 37 338 73 237 315 44 80 302 114 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 11.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 16 535 0 37 338 73 237 315 44 80 302 114 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 16 535 0 37 338 73 237 315 44 80 302 114 PCE Adj: 1.00 1.00. 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 16 535 0 37 338 73 237 315 44 80 302 114 ------------ --------------- II--------------- II-- ------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.64 0.36 1.00 2.00 1.00 1.00 1.45 0.55 Final Sat.: 1600 3200 1600 1600 2632 568 1600 3200 1600 1600 2322 878 ------------ I --------------- II--------------- II---- ---- ------- II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.17 0.00 0.02 0.13 0.13 0.15 0.10 0.03 0.05 0.13 0.13 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA S22 Default Scenario Tue May 31, 2011 13:38:16 Page 12 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #9 Von Kaman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.569 Loss Time (sec):. 0 (Y+R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- 11--------------- 11 --------------- II_____----- - - - - - Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 47 383 122 96 610 224 145 445 49 51 501 64 Growth Adj: 1.00 1.00 .1.00 1.00 1.00 1.00 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 47 383 122 98 610 224 151 463 51 53 521 67 Added Vol: 0 2 4 0 1 0 0 0 0 0 2 0 PasserByVol: 0 2 0 0 0 0 0 0 0 0 0 0 Initial Put: 47 387 126 98 611 224 151 463 51 53 523 67 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 47 387 0 98 611 224 151 463 51 53 523 67 Deduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 47 387 0 98 611 224 151 463 51 53 523 67 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 47 387 0 98 611 224 151 463 51 53 523 67 ------------ I --------------- II--------------- II--------- --- --- II--- ------- - - --- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.46 0.54 1.00 2.00 1.00 1.00 1.77 0.23 Final Sat.: 1600 3200 1600 1600 2342 658 1600 3200 1600 1600 2839 361 ------------ I--------------- 11--------------- II-------- ------- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.03 0.12 0.00 0.06 0.26 0.26 0.09 0.14 0.03 0.03 0.18 0.18 Crit Moves * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA s eq Default Scenario TUe May 31, 2011 13:38:04 Page 13 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak flour ------------------------------------------------------------------`------------ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #10 Von Kerman Avenue (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.291 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound ,East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II --------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I --------------- II--------------- II------------- -- II---------- - - - - - I Volume Module: Base Vol: 30 484 33 56 275 128 79 194 48 43 159 22 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 30 484 33 56 275 128 79 194 48 43 159 22 Added Vol: 0 4 0 0 2 0 0 0 0 0 0 0 PasserByVOl: 0 1 0 0 1 0 0 3 0 0 13 0 Initial Put: 30 489 33 56 278 126 79 197 48 43 172 22 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 489 33 56 278 128 79 197 4B 43 172 22 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 30 489 33 56 278 128 79 197 48 43 172 22 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 30 489 33 56 278 128 79 197 48 43 172 22 ------------ --------------- II--------------- II------------ --- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I--------------- 11--------------- II--- ------------ 11---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.02 0.04 0.09 0.08 0.05 0.06 0.03 0.03 0.05. 0.01 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 39 D Default Scenario Tue May 31, 2011 13:38:16 Page 13 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #10 Von Karman Avenue (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.354 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T- R L - T - R ------------ --------------- II --------------- II--------------- II --------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 ------------ ------------- -- II--------------- II --------------- --------------- Volume Module: Base Vol: 71 407 55 34 549 133 99 166 26 19 235 41 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 71 407 55 34 549 133 99 166 26 19 235 41 Added Vol: 0 5 0 0 1 0 0 0 0 0 0 0 PasserByVol: 0 2 0 0 0 0 0 18 0 0 8 0 Initial Put: 71 414 55 34 550 133 99 184 26 19 243 41 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 71 414 55 34 550 133 99 184 26 19 243 41 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 71 414 55 34 550 133 99 184 26 19 243 41 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 71 414 55 34 550 133 99 184 26 19 243 41 ------------ --------------- II----------- - - - -II ------ II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------- ------ II--------- ------ II --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.04 0.13 0.03 0.02 0.17 0.08 0.06 0.06 0.02 0.01 0.08 0.03 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA sq j_ Default Scenario Tue May 31, 2011 13:36:04 Page 14 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour ------------------------------- ----------- - - ---- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #11 Bayview Place (NS) at Bristol Street South (EW) ******************#*#*************#************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.425 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II--------------- I Control: Protected Protected Protected Protected Rights:. Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 0 0 101 0 0 0 0 2464 420 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 101 0 0 0 0 2464 420 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 2 0 0 0 0 50 1 0 0 0 Initial Fut: 0 0 103 0 0 0 0 2514 421 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 103 0 0 0 0 2514 421 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 103 0 0 0 0 2514 421 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 103 0 0 0 0 2514 421 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0 0 3200 0 0 0 0 6400 1600 0 0 0 ------------ I --------------- II--------------- II------------- -- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.39 0.26 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2006 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA Default Scenario Tue May 31, 2011 13:38:16 Page 14 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #11 Bayview Place (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.551 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L- T - R L - T - R L - T - R L - T- R ------------ I--------------- II --------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ --------------- II--------------- II--------------- II- --------- - - - - - I Volume Module: Base Vol: 0 0 433 0 0 0 0 2591 142 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 433 0 0 0 0 2591 142 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 23 0 0 0 0 26 0 0 0 0 Initial Put: 0 0 456 0 0 0 0 2617 142 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 456 0 0 0 0 2617 142 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 456 0 0 0 0 2617 142 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 456 0 0 0 0 2617 142 0 0 0 ------------ ------------- -- II------------ - - -II--------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final .Sat.: 0 0 3200 0 0 0 0 6400 1600 0 0 0 ------------ I --------------- II--------------- II--------------- II ---------- - -- - - I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.14 0.00 0.00 0.00 0.00 0.41 0.09 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 39 s Default Scenario Tue May 31, 2011 13:38:04 Page 15 -1 -------------------------------------------------------------------------------- 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #12 Jamboree Road (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.644 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T R ------------ I------------ --- II-------------- -11 - -- ---- II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 '2 0 1 2 0 2 0 1 ------------ I--------------- II----------- -- - -11 -------- 11---------- - - - - -I Volume Module: Base Vol: 143 1044 34 286 1732 172 76 112 10 259 423 152 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 150 1096 36 300 1819 181 60 118 11 272 444 160 Added Vol: 0 4 0 0 6 0 0 3 0 0 4 0 PasserByvol: 0 29 0 0 69 0 0 0 1 1 0 0 Initial Fut: 150 1129 36 300 1694 181 80 121 12 273 448 160 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.OD PHE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 150 1129 36 300 1894 181 80 121 0 273 448 160 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 150 1129 36 300 1894 161 80 121 0 273 448 160 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 150 1129 36 300 1894 181 80 121 0 273 448 160 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.60 1.00 1.00 Lanes: 2.00 3.88 0.12 2.00 2.74 0.26 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 6204 196 3200 4382 418 3200 3200 1600 3200 3200 1600 ------------ I --------------- II -------------- -II --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.05 0.18 0.18 0.09 0.43 0.43 0.02 0.04 0.00 0.09 0.14 0.10 Crit Moves * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 394 Default Scenario Tue May 31, 2011 13:38:16 Page 15 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour ---------------- ---------- - - - --' - - ---' Level Of Service Computation Report ICU 1(Loss as Cycle Length 6) Method (Future Volume Alternative) Intersection #12 Jamboree Road (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.606 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --------- --- 1-------------- -II - - - - -- -- II--------------- II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 ------------ I--------------- 11--------------- II--------------- II- --------- - - - - -I Volume Module: Base Vol: 65 1278 Growth Adj: 1.05 1.05 Initial Bse: 68 1342 Added Vol: 0 5 PasserByVal: 0 68 Initial Fut: 68 1415 User Adj: 1.00 1.00 PHF Adj: 1.00 1.00 PHF Volume: 68 1415 Reduct Vol: 0 0 Reduced Vol: 68 1415 PCE Adj: 1.00 1.00 MLF Adj: 1.00 1.00 FinalVolume: 68 1415 ------------I--------- Saturation Flow Module 135 1.05 142 0 1 143 1.00 1.00 143 0 143 1.00 1.00 143 224 1108 1.05 1.05 235 1163 0 3 0 41 235 1207 1.00 1.00 1.00 1.00 235 1207 0 0 235 1207 1.00 1.00 1.00 1.00 235 1207 183 219 263 159 1.05 1.05 1.05 1.05 192 230 276 167 0 0 4 0 0 0 0 0 192 230 280 167 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 192 230 280 0 0 0 0 0 192 230 280 0 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 192 230 280 0 152 226 331 1.05 1.05 1.05 160 237 348 0 2 0 1 1 0 161 240 348 1.00 1.00 1.00 1.00 1.00 1.00 161 240 348 0 0 C 161 240 348 1.00 1.00 1.00 1.00 1.00 1.00 161 240 34E Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.63 0.37 2.00 2.59 0.41 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 5813 587 3200 4141 659 3200 3200 1600 3200 3200 1600 ------------ I --------------- II --------------- II --------------- II ------- --- - - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.24 0.24 0.07 0.29 0.29 0.07 0.09 0.00 0.05 0.08 0.22 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA �9 Default Scenario Tue May 31, 2011 13:38:04 Page 16 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour -------------------------- --------- Level of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection 413 Jamboree Road (NS) at Birch Street (EW) ***********#************************************* * # * * * * * * * * * * * * * * * * * * * * * * ** # * * ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.539 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R -- I --------------- II - - - -- -- 11--------------- II---------- - - - - -I Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 3 0 1 1 1 0 0 1 0 0 1! 0 0 ------------ I ----------- - - - - II -------- 11-------------- -II---------- - - - - -I Volume Module: Base Vol: 204 1228 2 7 1551 464 123 8 42 3 6 6 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 214 1289 2 7 1629 487 123 8 42 3 6 6 Added Vol: 0 4 0 0 6 0 0 0 0 0 0 0 PasserByVol: 0 30 0 0 69 1 0 0 0 0 0 0 Initial Put: 214 1323 2 7 1704 488 123 8 42 3 6 6 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 214 1323 2 7 1704 0 123 8 0 3 6 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 214 1323 2 7 1704 0 123 8 0 3 6 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 214 1323 2 7 1704 0 123 8 0 3 6 6 ----- ------- I ------------ - - -II- ---- II--------------- II---- ------ - - - --I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 .1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.88 0.12 1.00 0.20 0.40 0.40 Final Sat.: 1600 4792 8 1600 4800 1600 3005 195 1600 320 640 640 ------------ I--------------- 11- - - - - -- 11--------------- 11---------- - -- - -I Capacity Analysis Module: Vol /Sat: 0.13 0.28 0.28 0.00 0.35 0.00 0.04 0.04 0.00 0.01 0.01 0.01 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA �9 Default Scenario Tue May 31, 2011 13:38:16 Page 16 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #13 Jamboree Road (NS) at Birch Street (EW) Cycle (sec): 100 Critical VOl. /Cap.(X): 0.437 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --------- - - - I -- ------------ II--------_------ II---- _---------- II---------- - --- -I Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 3 0 1 1 1 0 0 1 0 0 1 0 0 ------------ I --------------- II --------------- II--------------- II ---------- - - - - - I Volume Module: Base Vol: 44 1188 0 2 1390 91 297 4 100 0 1 0 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 46 1247 0 2 1460 96 297 4 100 0 1 0 Added Vol: 0 5 0 0 3 0 0 0 0 0 0 0 PasserByvol: 0 68 0 0 41 0 0 0 1 0 0 0 Initial Fut: 46 1320 0 2 1504 96 297 4 101 0 1 0 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 46 1320 0 2 1504 0 297 4 0 0 1 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 46 1320 0 2 1504 0 297 4 0 0 1 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 46 1320 0 2 1504 0 297 4 0 0 1 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.97 0.03 1.00 0.00 1.00 0.00 Final Sat.: 1600 4800 0 1600 4800 1600 3157 43 1600 0 1600 0 ------------ I--------------- 11--------------- II--------------- II---------- -- - - -I Capacity Analysis Module: Vol /Sat: 0.03 0.28 '0.00 0.00 0.31 0.00 0.09 0.09 0.00 0.00 0.00 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed toKUNZMAN ASSOC, ORANGE CA Default Scenario Tue May 31, 2011 13:38:04 Page 17 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour ___________ ______________ __ _______________ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.460 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II --------------- I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 ------------ I --------------- II--------------- II---- ----------- II---------- - - - - - I Volume Module: Base Vol: 846 1509 663 0 570 412 0 0 0 0 0 0 Growth Adj: .1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 880 1569 690 0 593 428 0 0 0 0 0 0 Added Vol: 0 6 0 0 4 0 0 0 0 0 0 0 PasserByVol: 29 43 21 0 86 13 0 0 0 0 0 0 Initial Put: 909 1618 711 0 683 441 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 909 1618 0 0 683 441 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 909 1618 0 0 683 441 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 909 1618 0 0 683 441 0 0 0 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.43 1.57 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1600 0 3887 2513 0 0 0 0 0 0 ------------ I --------------- II --------------- 11 --------------- 11 --------------- I Capacity Analysis Module: Vol /Sat: 0.28 0.51 0.00 0.00 0.18 0.18 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KONZMAN ASSOC, ORANGE CA 3q2 Default Scenario Tue May 31, 2011 13:38:16 Page 17 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour ____ ---- --- --------- - - - - -- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.517 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ************************************************* * * * * * * * * * + * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- 11 --------------- I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 ------------ I--------------- II--------------- II------- -------- 11---------- - - - - -I Volume Module: Base Vol: 689 1142 942 0 1080 612 0 0 0 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 717 1188 980 0 1123 636 0 0 0 0 0 0 Added Vol: 0 3 0 0 5 0 0 0 0 0 0 0 PasserByVol: 22 103 57 0 57 8 0 0 0. 0 0 0 Initial Fut: 739 1294 1037 0 1185 644 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 739 1294 0 0 1185 644 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 739 1294 0 0 1165 644 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 739 1294 0 0 1185 644 0 0 0 0 0 0 ------------ I --------------- II--------------- II--------------- II--------------- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.59 1.41 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1600 0 4146 2254 0 0 0 0 0 0 ------------ I--------------- 11--------------- 11--------------- II-- -------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.23 0.40 0.00 0.00 0.29 0.29 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 399 Default Scenario Tue May 31, 2011 13:38:04 Page 18 -1 4221 Dolphin- Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Morning Peak Hour `----------------------------------------------------------------------- -- - - - - -- Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #15 Jamboree Road (NS) at Bristol Street South (EW) *****************#*#***************#******* W***** * * * * * * * * * * * * * * * * * * * * # * * * * * * * * ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.650 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - --- --------------- II-------_--_---- II--------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 0 1817 - 40 0 571 0 1199 333 1150 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1890 42 0 594 0 1199 333 1150 0 0 0 Added Vol: 0 6 0 0 4 C 0 0 0 0 0 0 PasserByVOl: 0 111 0 0 87 0 5 4 111 0 0 0 Initial Put: 0 2007 42 0 685 0 1204 337 1261 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 2007 42 0 685 0 1204 337 1261 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2007 42 0 685 0 1204 337 1261 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 2007 42 0 685 0 1204 337 1261 0 0 0 ---- ----- - -- I -- ------ II--------------- II--------- ------ II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.DO 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.90 0.10 0.00 3.00 0.00 2.00 1.00 2.00 0.00 0.00 0.00 Final Sat.: 0 7838 162 0 4800 0 3200 1600 3200 0 0 0 ------------ I --------------- II--------------- II--------- ------ II------- -- -- - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.26 0.26 0.00 0.14 0.00 0.38 0.21 0.39 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.9.0215. (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 400 Default Scenario Tue May 31, 2011 13:38:16 Page 18 -1 4221 Dolphin - Striker Project Existing + Growth (Year 2013) + Approved Projects + Project Evening Peak Hour _________ ____ ______________ _____________ _ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) *#***#**}*****}*#******}******}*#*#}#*##********* # * * * * * * * * * * * # # * * * * * * * * * * * * * * * ** Intersection 815 Jamboree Road (NS) at Bristol Street South (EW) #*}*#**#*#}}***#*#*#*#*#***#*#**#**}************* * * * * * * * * * * * # } * * * * * * * * * * } * * * * * ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.701 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- I -- - - - --I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 0 0 ------------ I --------------- II-------- ------- II --------------- --------------- Volume Module: Base Vol: 0 1834 73 0 1080 0 937 1071 1145 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1907 76 0 1123 0 937 1071 1145 0 0 0 Added Vol: 0 3 0 0 5 0 0 0 0 0 0 0 PasserByVal: 0 177 0 0 57 0 37 24 117 0 C 0 Initial Fut: 0 2087 76 0 1185 0 974 1095 1262 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 2087 76 0 1185 0 974 1095 1262 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2087 76 0 1185 0 974 1095 1262 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 2087 76 0 1185 0 974 1095 1262 0 0 0 ------------ I--------------- II--------------- II------------ - - -II- -- - - - --I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.82 0.18 0.00 3.00 0.00. 1.41 1.59 2.00 0.00 0.00 0.00 Final Sat.: 0 7719 281 0 4800 0 2260 2540 3200 0 0 0 ------------ I --------------- II--------------- II--------------- II ---------- - - -- - I Capacity Analysis Module: Vol /Sat: 0.00 0.27 0.27 0.00 0.25 0.00 0.43 0.43 0.39 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traf£ix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 401 Existing + Growth (Year 2013) + Approved Projects + Cumulative Projects 402 Default Scenario Sun May 22, 2011 14:53:55 Page 4 -1 4221 Dolphin- Striker ProjecL Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.470 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A *******}************+********************}******* * * * * * * * * * * * * * * + + *W * * * * * * * * * * * *} Approach: North Bound South Bound Fast Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II--------------- II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 -- ----- - --- -I -------- II--------------- II-------------- -II---------- - - - -- I Volume Module: Base Vol: 37 944 49 195 835 227 307 555 48 87 185 58 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 39 99.1. 51 205 877 238 322 583 50 91 194 61 Added Vol: 0 111 0 0 25 3 1 29 0 0 12 17 PasserByVol: 0 18 0 0 47 0 0 1 0 0 0 0 Initial Put: 39 1120 51 205 949 241 323 613 50 91 206 78 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 39 1120 51 205 949 241 323 613 50 91 206 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 39 1120 51 205 949 241 323 613 50 91 206 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 39 1120 51 205 949 241 323 613 50 91 206 0 --------- - - -I -- ------ II--------------- II---- ----------- II- --------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.77 0.23 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4435 365 3200 4800 1.600 ------------ I --------------- II--------------- II--------------- II------ ---- - - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.18 0.03 0.13 0.15 0.15 0.10 0.14 0.14 0.03 0.04 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 403 Default Scenario Sun May 22, 2011 14:54:31 Page 4 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) W+ w+ wwwWWwwww+++ WwwwW+ W+ W+*+* Ww+ wwwwwwwwwwwW+++ wwwwww * + + + +w + * +W + + + + +wwWwW *W +W +w+ Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) ww+ w+++*+ w+ wwww+ W+ W* WwW* W+++ W+ W+ w+*++**++*+ w+++** * *ww + * + * +W +W * + *wwwW + +W +W +WWW +ww Cycle (sec): 100 Critical Vol. /Cap.(X): 0.659 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B W+ W* wwww+ Www; t+ w+:++ wwwwW+ W+*+++*+*+* www wWwWwW+++++ wwww *w *Wf:w + * + * + + + + +WwWwwwWwWw ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II----------- - - -- II II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 154 1091 49 45 819 447 324 274 96 98 669 195 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 162 1146 51 47 860 469 340 288 101 103 702 205 Added Vol: 0 50 0 16 109 4 5 22 0 0 33 0 PasserByVOl: 0 55 0 0 26 1 0 0 0 0 0 1 Initial Fut: 162 1251 51 63 995 474 345 310 101 103 735 206 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 162 1251 51 63 995 474 345 310 101 103 735 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 162 1251 51. 63 995 474 345 310 101 103 735 0 POE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVOlume: 162 1251 51 63 995 474 345 310 101 103 735 0 ------------ --------------- II--------------- II--------------- II---- ------ - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.26 0.74 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 3621 1179 3200 4800 1600 ------ -- ---- I -- - - - --- II--------------- II---------- -- -- -II------- --- - - - - - I Capacity Analysis Module: Vol /Sat: 0.10 0.20 0.03 0.04 0.16 0.30 0.11 0.09 0.09 0.03 0.15 0.00 Crit Moves: * * ** * * ** * * ** * * ** w********** W+ W****************** w** W* W*+**+ wk* wwW *W *w +w * * * * * * * * * * * * * * * * * * * * * * + ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA G"a"r Default Scenario Sun May 22, 2011 . 14:53:55 Page 5 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length 's) Method (Future Volume Alternative) Intersection #2 MacArthur Boulevard (NS) at Birch Street (EW) ************#*+#***************#*#*******+******* * * * * * * * * ** * * * * * * * * * * * + * * * * * * * ** Cycle (sec): 1.00 Critical Vol. /Cap.(X): 0.413 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------ --------------- II--------------- II--- ----- ------- II-- -- ------ -- - - - I Volume Module: Base Vol: 32 689 98 100 624 176 158 310 73 31 154 53 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 33 717 102 104 649 183 158 310 73 31 154 53 Added Vol: 17 94 0 0 25 0 0 0 3 0 0 17 PasserByVOl: 1 14 0 0 34 13 3 3 0 0 13 0 Initial Fut: 51 825 102 104 708 196 161 313 76 31 167 70 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 51 825 102 104 708 196 161 31.3 76 31 167 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 51 825 102 104 708 196 161 313 76 31 167 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 51 825 102 104 708 196 161 313 76 31 167 0 ------------ --------------- II--------------- II---- -- --------- II---------- - - -- - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.13 0.87 1.00 1.58 0.42 1.00 2.00 1.00 Final Sat.: 1600 4800 1600 1600 5012 1388 1600 2533 667 1600 3200 1600 ----------- - I - - -- ---- II--------------- II------------- -- II-- -------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.03 0.17 0.06 0.07 0.14 0.14 0.10 0.12 0.11 0.02 0.05 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 405 Default Scenario Existing +Growth Sun May 22, 2011 14:54:31 Page 5 -1 --------------------------------------------------------- 4221 Dolphin- Striker Project (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour. Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #2 MacArthur Boulevard (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.495 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------- - - - --I ------ II--------------- II--------------- II ---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------ I--------------- II--------------- II--------- ---- --11-------- -- - --- -I Volume Module: Base Vol: 86 646 25 49 858 149 274 182 53 114 433 170 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 89 672 26 51 892 1.55 274 182 53 114 433 170 Added Vol.: 3 50 0 16 93 0 0 0 16 0 0 0 PasserByVOl: 0 37 0 0 18 8 18 18 0 0 8 0 Initial Fut: 92 759 26 67 1003 163 292 200 69 114 441 170 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 92 759 26 67 1003 163 292 200 69 114 441 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 92 759 26 67 1003 163 292 200 69 114 441 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVOlume: 92 759 26 67 1003 163 292 200 69 114 441 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.44 0.56 1.56 1.07 0.37 1.00 2.00 1.00 Final Sat.: 1600 4800 1600 1600 5506 894 2498 1711 590 1600 3200 1600 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.16 0.02 0.04 0.18 0.18 0.12 0.12 0.12 0.07 0.14 0.00 Crit Moves: * * ** * * ** * * ** * * ** ««********«««.*«««««««««**««««««««.««.««««««««««+ « « «* « « « « « « « « « « « « « « « « « « « « « « * « « «« Traf£i.x 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 400 Default Scenario Sun May 22, 2011 14:53:55 Page 6 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) ********************+*****************+***+****** * * * # * * * * * * * * * * * * * * * * * * * * * * * * * #* Intersection #3 MacArthur Boulevard (NS) at Von Karman Avenue (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.569 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II----- -------- -- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 - - - -- --------------- --------------- --------------- --------------- Volume Module: Base Vol: 101 986 656 58 435 163 1.9 96 28 78 136 12 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 105 1028 682 60 452 170 19 96 28 78 136 12 Added Vol: 17 110 6 6 22 0 0 0 0 1 0 1 PasserByVol: 0 16 1 0 34 0 0 0 0 7. 0 0 Initial Fut: 122 1154 689 66 508 170 19 96 28 80 136 13 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 122 1154 689 66 508 170 19 96 28 80 136 13 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 122 1154 689 66 508 170 19 96 28 80 136 13 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 122 1154 689 66 508 170 19 96 28 80 136 13 ------------ --------------- II--------------- II------ ----- --- -II----- ----- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1600 4800 1.600 7.600 3200 1600 3200 1600 1600 ------------ I --------------- II--------------- II--- -- ---------- II------ --- -- - - - - I Capacity Analysis Module: Vol /Sat: 0.08 0.24 0.43 0.04 0.11 0.11 0.01 0.03 0.02 0.03 0.09 0.01 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA Default Scenario Sun May 22, 2011 14:54:31 Page 6 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour. ________________________ _ -_ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) *#*** k**************************** k* k* k******** k* k *k * * * * * * * * # * * *k *k * * * * * * * * * # * #* Intersec:ti.on #3 MacArthur Boulevard (NS) at Von Karman Avenue (EW) ************** k*********************#************ # ** * * * * * * * * * * * * * * ** * * * * * * * * * * ** Cycle (sec): 100 Critical Vol. /Cap. M : 0.601 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --------------- --------------- 11 --------------- --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 ------------ --------------- II--------------- II--- ------------ II-- --- ----- - -- - - I Volume Module: Base Vol: 48 624 126 29 968 52 7.38 195 183 665 127 38 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 50 649 131 30 1007 54 138 195 183 665 127 38 Added Vol: 0 47 1 1 108 0 0 0 16 5 0 6 PasserByVol: 0 38 2 0 18 0 0 0 0 0 0 0 Initial Put: 50 734 134 31 1133 54 138 195 199 670 127 44 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 50 734 134 31 1133 54 138 195 199 670 127 44 Redur_t Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 50 734 134 31 1133 54 138 195 199 670 127 44 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 50 734 134 31 1133 54 138 195 199 670 127 44 ----- --- ---- -- -- - --- II--------------- II---- ---- ----- -- II---------- - ---- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final. Sat.: 1600 4800 7.600 1600 4600 1600 1600 3200 1600 3200 1600 1600 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.03 0.15 0.08 0.02 0.24 0.03 0.09 0.06 0.12 0.21 0.08 0.03 Crit Moves * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 402 Default Scenario Sun May 22, 2011 14:53:55 Page 7 -1 4221 Dolphin- Striker Project - Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour ------------------------' - - - - --- Level Of Service Computation Report ICU 1(Lo5s as Cycle Length `s) Method (Future Volume Alternative) Intersection #4 MacArthur Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.682 Loss Time (sec): 0 (Y{ -R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R 1, - T - R L - T - R ------------ --------------- II----_----_----- II--------------- II------ -- -- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------------ ------------ -- -II--------- -- --- -II - -- II--- ------- - - - - -I Volume Module: Base Vol: 177 1332 456 66 293 121 410 851 176 364 674 181 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 184 1385 474 69 305 126 426 885 183 379 701 188 Added Vol: 0 63 0 0 18 5 19 122 0 68 157 51 Passer.ByVOl: 1 10 1 0 33 9 11 37 0 0 66 3 Initial Put: 185 1458 475 69 356 140 456 1044 183 447 924 242 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 185 1458 475 69 356 0 456 1044 183 447 924 242 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 185 1458 475 69 356 0 456 1044 183 447 924 242 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 185 1458 475 69 356 0 456 1044 183 447 924 242 OvIAdj VOl: 252 ------------ --------------- II--------------- II--------------- II------ ---- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 4800 1600 3200 4800 1600 I --------------- II--------------- II---------- ----- II---------- -- - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.30 0.30 0.02 0.07 0.00 0.14 0.22 0.11 0.14 0.19 0.15 Ov1AdjV /S: 0.16 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA -409 Default Scenario Sun May 22, 2011 14:54:31 Page 7 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * + + * * * * * * ** Intersection #4 MacArthur Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.763 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C ******************+****************************** * * * * * * * * * * * * * * * * * + * + * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------------ I ------------ --- II------- ----- -- -II- -- II- ---- ----- - - - - -I Volume Module: Base Vol: 227 578 397 157 965 312 214 967 37 611 921 155 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 236 601 413 163 1004 324 223 1006 38 635 958 161 Added Vol: 0 36 63 47 62 20 12 189 0 0 126 0 PasserByVol: 6 38 1 0 14 7 9 70 0 1 49 1 Initial Fut: 242 675 477 210 1080 351 244 1265 38 636 1133 162 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 242 675 477 210 1080 0 244 1265 38 636 1133 162 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 242 675 477 210 1080 0 244 1265 38 636 1133 162 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 242 675 477 210 1080 0 244 1265 38 636 1133 162 OvlAdjVol: 159 ------------ --------------- II--------------- II------ ----- ---- II---------- -- - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 4800 1600 3200 4800 1600 ------------ --------------- --------------- H --------------- 11 --------------- I Capacity Analysis Module: Vol /Sat: 0.08 0.14 0.30 0.07 0.22 0.00 0.08 0.26 0.02 0.20 0.24 0.10 Ov1Adj V /S: 0.10 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 410 Default Scenario Sun May 22, 2011 14:53:55 Page 8 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #5 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.515 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ----_--_---- I --------------- II--------------- II------ --------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 349 1533 0 0 220 204 0 0 0 120 902 138 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 363 1594 0 0 229 212 0 0 0 120 902 138 Added Vol: 0 31 0 0 3 12 0 0 0 18 80 0 PasserByVol: 0 1 0 0 0 0 0 0 0 0 8 0 Initial Fut: 363 1626 0 0 232 224 0 0 0 138 990 138 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ]..00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 363 1626 0 0 232 224 0 0 0 138 990 138 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 363 1626 0 0 232 224 0 0 0 1.38 990 138 PCE Ad-j: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1100 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 363 1626 0 0 232 224 0 0 0 138 990 138 ------------ --- -- -- -------- II--- -- --- -- - -- - -II --- II------ ---- -- ---I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.51 0.49 Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 5617 783 ------------ I --------------- II--------------- II--------------- II----- ----- - - - - - I Capacity Analysis Module: Vol /Sat: 0.11 0.34 0.00 0.00 0.04 0.07 0.00 0.00 0.00 0.09 0.18 0.18 Crit Moves: * * ** * * ** * * ** **************++****************+**************+* + * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KONZMAN ASSOC, ORANGE CA 41-1 Default Scenario Sun May 22, 2011 14:54:31 Page 8 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length 8) Method (Future Volume Alternative) Intersection #5 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.773 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 --- --------- I-- - --- II--------------- II-------- -- -- --- II------ ---- -- - -- I Volume Module: Base Vol: 370 671 0 0 742 1007 0 0 0 200 1867 74 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 385 698 0 0 772 1047 0 0 0 200 1867 74 Added Vol: 0 27 0 0 4 33 0 0 0 1 35 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 2 39 0 Initial Fut: 385 725 0 0 776 1080 0 0 0 203 1941 74 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 385 725 0 0 776 1080 0 0 0 203 1941 74 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 385 725 0 0 776 1080 0 0 0 203 1941 74 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 385 725 0 0 776 1080 0 0 0 203 1941 74 ------------ --------------- II--------------- II--------------- II--- ------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.85 0.15 Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 6165 235 ------------ I --------------- II--------------- II----------- ---- II--- ------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.12 0.15 0.00 0.00 0.12 0.34 0.00 0.00 0.00 0.13 0.31 0.31 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 412 Default Scenario Sun May 22, 2011 14:53:55 Page 9 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour. Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) *** www#***** w** w#*#*##******** w+ w+##*****#******+ # *w * * * * * * * * * * * * * * * * * * * * *w * * * * ** Intersection N6 Campus Drive /Irvine Avenue (NS) at Bristol Street South (EW) #*#**** ww* w#*#*** w***#+***#*********** w+*** w*** w* * * * * * * * * * * * * * * * # * *ww * * * * * * * * * #w Cycle (sec): 100 Critical Vol. /Cap.(X): 0.647 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B *******#****** w*##******* w*****+**#* w******#***** * * * # # # * * * * * * * * * * * * * * * *w * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R -- --------------- II-_------------- II --------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 -------------- - - -- -- --------------- II---- ----------- II--- -- ----- - --- - I Volume Module: Base Vol: 0 900 152 96 281 0 1186 1623 299 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial. B3e: 0 936 158 100 292 0 1186 1623 299 0 0 0 Added Vol: 0 2 0 0 21 0 29 2 0 0 0 0 PasserByVOl: 0 2 0 0 0 0 0 26 0 0 0 0 Initial Fut: 0 940 158 100 313 0 1.21.5 1651 299 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 940 158 100 313 0 1215 1.651 299 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 940 158 100 313 0 1215 1651 299 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 940 158 100 313 0 1215 1651 299 0 0 0 -------- ---- - - - - -- -- II--------------- II--------------- II- --------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.28 0.72 1.00 3.00 0.00 1.70 2.30 2.00 0.00 0.00 0.00 Final Sat.: 0 6848 1152 1600 4800 0 2713 3687 3200 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.14 0.14 0.06 0.07 0.00 0.45 0.45 0.09 0.00 0.00 0.00 Cri.t Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 41-3 Default Scenario Sun May 22, 2011 14:54:31 Page 9 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour ---- --- ---- ------------------ - ----' Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #6 Campus Drive /Irvine Avenue (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.486 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------ I --------------- II--------------- II----- ---------- II-- -------- - - - - - I Volume Module: Base Vol: 0 720 180 .201 859 0 417 1004 429 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 7..00 1.00 1.00 1.00 1.00 Initial Bse: 0 749 187 209 893 0 417 1004 429 0 0 0 Added Vol: 0 5 17 0 5 0 22 0 0 0 0 0 PasserByVOl: 0 1 0 0 2 0 0 17 1 0 0 0 Initial Fut: 0 755 204 209 900 0 439 1021 430 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PRE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 755 204 209 900 0 439 1021 430 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 755 204 209 900 0 439 1021 430 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 755 204 209 900 0 439 1021 430 0 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 .1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.20 2.80 2.00 0.00 0.00 0.00 Final Sat.: 0 6400 1600 1600 4800 0 1924 4476 3200 0 0 0 ------------ I --------------- II--------------- II--------------- II-- -------- - - - -- I Capacity Analysis Module: Vol /Sat: 0.00 0.12 0.13 0.13 0.19 0.00 0.23 0.23 0.13 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 414 Default Scenario Sun May 22, 2011 14:53:55 Page 10 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length s) Method (Future Volume Alternative) Intersection #7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.555 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A **##*******#*#*#************#*****************#** * * * * * * * * * * # * * * * * * * * * * * * * * * * * * #* Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II----- ------ -- -- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------ --------------- II--------------- II--------------- II---------- -- - - - I Volume Module: Base Vol: 108 886 0 0 160 95 0 0 0 403 988 237 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 1.08 886 0 0 160 95 0 0 0 403 988 237 Added Vol: 0 2 0 0 0 0 0 0 0 0 97 0 PasserByVol: 6 6 0 0 25 0 0 0 0 50 1 0 Initial Fut: 114 894 0 0 185 95 0 0 0 453 1086 237 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 114 894 0 0 185 95 0 0 0 453 1086 237 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 114 894 0 0 185 95 0 0 0 453 1086 237 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 114 894 0 0 185 95 0 0 0 453 1086 237 ------ ------ - - - - - -- - II--------------- II-------- ------- II---------- - --- -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 1.18 3.29 0.54 Final Sat.: 3200 3200 0 0 3200 3200 0 0 0 1884 5256 860 ------------ I --------------- II--------------- II--------------- II-------- -- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.28 0.00 0.00 0.06 0.03 0.00 0.00 0.00 0.24 0.21 0.28 Crit Moves: * * ** * * ** * * ** Tra£fix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 415 Default Scenario Sun May 22, 2011 14:54:31 Page 10 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.549 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- --------------- --------------- --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------ ----- --- ------- II-------- ---- - - -II--------------- --------------- Volume Module: Base Vol: 198 344 0 0 484 743 0 0 0 392 1187 124 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 198 344 0 0 484 743 0 0 0 392 1187 124 Added Vol: 0 0 0 0 0 2 0 0 0 0 34 0 PasserByVol: 37 37 0 0 15 0 0 0 0 31 4 0 Initial Fut: 235 381 0 0 499 745 0 0 0 423 1225 124 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 235 381 0 0 499 745 0 0 0 423 1225 124 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 235 381. 0 0 499 745 0 0 0 423 1225 124 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 235 381 0 0 499 745 0 0 0 423 1225 124 ------------ --------------- II--------------- II----- ---------- II- --- ------ - - - -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 1.60 2.40 0.00 0.00 0.00 1.03 3.70 0.28 Final Sat.: 3200 3200 0 0 2567 3833 0 0 0 1643 5916 441 ------------ I --------------- II--------------- II----------- ---- II---------- - - -- - I Capacity Analysis Module: Vol /Sat: 0.07 0.12 0.00 0.00 0.19 0.19 0.00 0.00 0.00 0.26 0.21 0.28 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 410 Default Scenario Sun May 22, 2011 14:53:55 Page 11 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #8 Birch Street (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical. Vol. /Cap.(X): 0.401 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- --------------- --------------- --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1. 0 0 0 0 0 0 ----- --- --- -I - - -- ---------- II--------------- II--- ---- -------- II--- ------- --- - -1 Volume Module: Base Vol: 0 333 229 198 379 0 676 867 291 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 333 229 198 379 0 676 867 291 0 0 0 Added Vol: 0 0 0 0 0 0 2 0 0 0 0 0 PasserByVOl: 0 13 14 0 75 0 0 2 25 0 0 0 Initial Put: 0 346 243 198 454 0 678 869 316 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 346 243 198 454 0 678 869 316 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 346 243 198 454 0 678 869 316 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fi.nalVOlume: 0 346 243 198 454 0 678 869 316 0 0 0 ------------ --------------- II--------------- II-------- ------- II-- ----- --- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.35 1.65 2.00 2.00 0.00 1.75 2.45 0.80 0.00 0.00 0.00 Final Sat.: 0 3760 2640 3200 3200 0 2805 3915 1280 0 0 0 ------------ I --------------- II--------------- II----- -- -------- II--- --- --- --- - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.09 0.09 0.06 0.14 0.00 0.24 0.22 0.25 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix "7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 417 Default Scenario Sun May 22, 2011 14:54:31 Page 11 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour ---------------- ------ --- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection R8 Birch Street (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.467 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ** k****** k*********+ k* k* k* k*******+*+**** k******* k * + * * *Y * * * * * * * * * * * * * * * * # * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - - I - ------- II_______________ II__------------- II---------- - - -- -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------ I --------------- II--------------- II-------- ------- II---------- - - -- - I Volume Module: Base Vol: 0 312 300 305 614 0 188 999 174 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 312 300 305 614 0 188 999 174 0 0 0 Added Vol: 0 0 0 0 0 0 0 17 0 0 0 0 PasserByVol: 0 73 77 0 46 0 0 7 15 0 0 0 Initial Fut: 0 385 377 305 660 0 1.88 1023 189 0 - 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 385 377 305 660 0 188 1023 169 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 385 377 305 660 0 188 1023 189 0 0 0 PCP Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fi.nalVolume: 0 385 377 305 660 0 188 1023 189 0 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.02 1.98 2.00 2.00 0.00 1.00 3.53 0.47 0.00 0.00 0.00 Final Sat.: 0 3234 3166 3200 3200 0 1600 5651 749 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.12 0.12 0.10 0.21 0.00 0.12 0.18 0.25 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** ************** X********************************** * * * * * * * * * * * * * * * * * * * * * * * * * * *k *k* Traffix 7.9.0215 (c) 2008 Dowling ASSOC. Licensed to KUNZMAN ASSOC, ORANGE CA 41-2 Default Scenario Sun May 22, 2011 14:53:55 Page 12 -1 4221 Dolphin- Striker Project. Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #9 Von Farman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Cr.iti. cal Vol. /Cap.(X): 0.482 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ***************** W****************************** W * ** * *W *W * * * * * * * * * * * *W * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II----- ------ - - --II -- - - - - - -I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 ------------ --------- ------ II---- ----------- II - - -- - --------- - - - - -I Volume Module: Base Vol: 16 534 53 37 335 73 228 303 42 77 287 110 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.04 1.04 1.04 1.04 1.04 1.04 Initial B3e: 16 534 53 37 335 73 237 315 44 80 298 114 Added Vol: 0 0 0 0 1 0 0 29 0 0 29 17 PasserByVol: 0 0 0 0 1 0 0 0 0 0 0 0 Initial Put: 16 534 53 37 337 '73 237 344 44 80 327 131 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 16 534 0 37 337 73 237 344 44 80 327 131 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 16 534 0 37 337 73 237 344 44 80 327 131 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 16 534 0 37 337 73 237 344 44 80 327 131 ------------ --------------- II--------------- II--------------- II----- ----- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.64 0.36 1.00 2.00 1.00 1.00 1.43 0.57 Final Sat.: 1600 3200 1600 1600 2630 570 1600 3200 1600 1600 2284 916 --------- --- I -- ------ II--------------- II-- -------- ----- II-- --- ----- - - - - -I Capacity Analysis Module: Vol /Sat: 0.01 0.17 0.00 0.02 0.13 0.13 0.15 0.11 0.03 0.05 0.14 0.14 Crit Moves * * ** *W ** * * ** * * ** Traffi.x 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA T19 Default. Scenario Sun May 22, 2011 . 1.4:54:31 Page 12 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #9 Von Karman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.578 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ********* w+************* W************** w** w****** *w * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II-----_--------- II-_-------- ----- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II--------------- II----- ----- - - - - - I Volume Module: Base Vol: 47 383 122 98 610 224 145 445 49 51 501 64 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 47 383 122 98 610 224 151 463 51 53 521 67 Added Vol: 0 1 0 16 0 0 0 38 0 0 33 0 PasserByVol: 0 2 0 0 0 0 0 0 0 0 0 0 Initial Fut: 47 386 122 114 610 224 151 501 51 53 554 67 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 47 386 0 114 610 224 151 501 51 53 554 67 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 47 386 0 124 610 224 151 501 51 53 554 67 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fi.nalVOlume: 47 386 0 114 610 224 151 501 51 53 554 67 --- ------ - - -I -- --- --- II------------ --- II - - --- ---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.46 0.54 1.00 2.00 1.00 1.00 1.79 0.21 Final Sat.: 1600 3200 1600 1600 2341 859 1600 3200 1600 1600 2857 343 ------------ I --------------- II-------- ------- II -- -- ---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.03 0.12 0.00 0.07 0.26 0.26 0.09 0.16 0.03 0.03 0.19 0.19 Crit Moves: * * ** + * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling ASSOC. Licensed to KUNZMAN ASSOC, ORANGE CA 420 Default Scenario Sun May 22, 2011 14:53:55 Page 13 -1 --------------- ------------ 4221 Dolphin- Striker Project Existing +Growth (Year 207.3) +Approved Projects +Cumulative Projects Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #10 Von Karman Avenue (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.295 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - -- -- I --------------- II__------------- II --------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I--------------- II--------------- 11--------------- II---------- -- - - -I Volume Module: Base Vol: 30 484 33 56 275 128 79 194 48 43 159 22 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 30 484 33 56 275 128 79 194 48 43 159 22 Added Vol: 0 0 0 0 1 0 0 0 0 3 17 0 PasserByVol: 0 1 0 0 1 0 0 3 0 0 13 0 Initial Ent: 30 485 33 56 27'7 128 79 197 48 46 189 22 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 485 33 56 277 128 79 197 48 46 189 22 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 30 485 33 56 277 128 79 197 48 46 189 22 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 30 465 33 56 277 128 79 197 48 46 189 22 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------------- II--------------- II------ -- -- ----- II---- --- --- - ---- I Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.02 0.04 0.09 0.08 0.05 0.06 0.03 0.03 0.06 0.01 Crit Moves * * ** * * ** * * ** * * ** Traffix 7.9.021.5 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 421 Default Scenario Sun May 22, 2011 14:54:31 Page 13 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length �) Method (Future Volume Alternative) Intersection 410 Von Farman Avenue (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.354 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ L--------------- II--------------- II--------------- II-------- -- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1. 1 0 2 0 1 ------------ i--------------- II--------------- II------ --------- II- --- ---- --- - - - - I Volume Module: Base Vol: 71 407 55 34 549 1.33 99 166 26 19 235 41 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 71 407 55 34 549 133 99 166 26 1.9 235 41 Added Vol: 0 1 3 0 0 0 0 16 0 1 0 0 PasserByVol: 0 2 0 0 0 0 0 18 0 0 8 0 Initial Fut: 71 410 58 34 549 133 99 200 26 20 243 41 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 71 410 58 34 549 133 99 200 26 20 243 41 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 71 410 58 34 549 133 99 200 26 20 243 41 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 71 410 58 34 549 133 99 200 26 20 243 41 ------------ I--------------- II--------------- II------ --------- II------- -- - - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat..: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.13 0.04 0.02 0.17 0.08 0.06 0.06 0.02 0.01 0.08 0.03 Crit Moves: * * ** + * +* * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to FUNZMAN ASSOC, ORANGE CA 422 Default Scenario Sun May 22, 2011 14:53:55 Page 14 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour Level. Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection All Bayview Place (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.430 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II--- ------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ --------------- --------------- --------------- --------------- Volume Module: Base Vol: 0 0 101 0 0 0 0 2464 420 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 101 0 0 0 0 2464 420 0 0 0 Added Vol: 0 0 0 0 0 0 0 29 0 0 0 0 PasserByVol: 0 0 2 0 0 0 0 50 1 0 0 0 Initial Fut: 0 0 103 0 0 0 0 2543 421 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 103 0 0 0 0 2543 421 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 103 0 0 0 0 2543 421 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 103 0 0 0 0 2543 421 0 0 0 ------------ --------------- II--------------- II--------------- II---- -- - - - - -- - -I Saturation Flow Module: Sat /Lane: 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0 0 3200 0 0 0 0 6400 1600 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.40 0.26 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 423 Default Scenario Sun May 22, 2011 14:54:31 Page 14 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection 411 Bayview Place (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.568 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ************#*********+**+**************#******** * * * * * * * * * * * + * * * * * * * * * * * * * * * * # *# Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II--------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ --------------- II--------------- II-- -------- ----- II---------- - - - - - I Volume Module: Base Vol: 0 0 433 0 0 0 0 2591 142 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 433 0 0 0 0 2591 142 0 0 0 Added Vol: 0 0 0 0 0 0 0 103 0 0 0 0 PasserByVol: 0 0 23 0 0 0 0 26 0 0 0 0 Initial Fut: 0 0 456 0 0 0 0 2720 142 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PRE Volume: 0 0 456 0 0 0 0 2720 142 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 456 0 0 0 0 2720 142 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Finalvolume: 0 0 456 0 0 0 0 2720 142 0 0 0 ------------ --------------- II--------------- II---------- .----- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0 0 3200 0 0 0 0'6400 1600 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.14 0.00 0.00 0.00 0.00 0.43 0.09 0.00 0.00 0.00 Crit Moves: * * ** * + ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 424 Default Scenario Sun May 22, 2011 14:53:55 Page 15 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ***************++******************************** * ** * * * * * * * * * * * * * * * * * * * * ** * * * * ** Intersection #12 Jamboree Road (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.665 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II---- ----------- II--- --- ---- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 143 1044 34 286 1.732 172 76 112 10 259 423 152 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 150 1096 36 300 1819 181 80 118 11 272 444 160 Added Vol: 34 173 0 0 42 0 0 29 0 0 12 0 PasserByVol: 0 29 0 0 69 0 0 0 1 1 0 0 Initial Fut: 184 1298 36 300 1930 181 80 147 12 273 456 160 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 1.84 1298 36 300 1930 181 80 147 0 273 456 160 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 184 1298 36 300 1930 181 80 147 0 273 456 160 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Fina.lVolume: 184 1298 36 300 1930 181 80 147 0 273 456 160 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.89 0.11 2.00 2.74 0.26 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 6229 171 3200 4389 411 3200 3200 1600 3200 3200 1600 -------- ---- I - -- - - -- - II--------------- II----------- ---- II-------- -- - - - - -I Capacity Analysis Module: Vol /5at: 0.06 0.21 0.21 0.09 0.44 0.44 0.02 0.05 0.00 0.09 0.14 0.10 Crit Moves- * * ** * * ** * * ** * * ** Traffix 7.9.021.5 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 425 Default Scenario Sun May 22, 2011 14:54:31 Page 15 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour _______ ____________________ ___ ________ -_ Level Of Service Computation Report ICU 1(LOSS as Cycle Length 3) Method (Future Volume Alternative) *#**# w{ w##*#{#*# w*****#** w**#*##**** w***{****## w* w *w * * * *w *w * * * * * * * * * * # # # # # # # # # *w Intersection #12 Jamboree Road (NS) at Campus Drive (EW) wxw#*******#*#**** w*#*****#*** w****##*****# w* w* w* * #w # # # * * * * * * * * * * # * # * * * * * * * * * * *w Cycle (sec): 100 Critical Vol. /Cap.(X): 0.638 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B *#****#**##**##***** w* w**#*#** w**##*#####*#* w***# * # * # # * * * * * *w *www *w #w * # * * # * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II --------------- I Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 ------------ I ---------------II---------------II---------------II--- Volume Module: Base Vol: 65 1278 .135 224 1108 183 219 263 159 152 226 331 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 68 1342 142 235 11.63 192 230 276 167 160 237 348 Added Vol: 0 81 0 0 174 0 0 22 32 0 33 0 PasserByVOl: 0 68 1 0 41 0 0 0 0 1 1 0 Initial Fut: . 68 1491 143 235 1378 192 230 298 199 161 271 348 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 68 1491 143 235 1378 192 230 298 0 161 271 348 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 68 1491 143 235 1378 192 230 298 0 161 271 348 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 68 1491 143 235 1378 192 230 298 0 161 271 348 ------ ------ - -- ------------ II - -- - -- -II-- -- ----- -- -- --II I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.65 0.35 2.00 2.63 0.37 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 5841 559 3200 4213 587 3200 3200 1600 3200 3200 1600 ------------ I --------------- II--------------- II--------------- il---------- - - -- - I Capacity Analysis Module: Vol /Sat: 0.02 0.26 0.26 0.07 0.33 0.33 0.07 0.09 0.00 0.05 0.08 0.22 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2006 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA IBM Default Scenario Sun May 22, 2011. 7.4:53:55 Page 16 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulati.ve Projects Morning Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 413 Jamboree Road (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.557 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II----- ----- - - - - - i Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 3 0 1 1 1 0 0 1 0 0 1! 0 0 --------- - - - I -- ------ II--------------- II--------------- II---------- - - - - -I Volume Module: Base Vol: 204 1228 2 7 1551 464 123 8 42 3 6 6 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 214 1289 2 7 1629 487 123 8 42 3 6 6 Added Vol: 17 206 0 0 39 3 0 0 0 0 0 0 PasserByVol: 0 30 0 0 69 1 0 0 0 0 0 0 Initial Fut: 231 1525 2 7 1737 491 123 8 42 3 6 6 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 231 1525 2 7 1737 0 123 8 0 3 6 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 231 1525 2 7 1737 0 123 8 0 3 6 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 231 1525 2 7 1737 0 123 8 0 3 6 6 ----------- -I - - -- ---- II--------------- II--------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.88 0.12 1.00 0.20 0.40 0.40 Final Sat.: 1600 4793 7 1600 4800 1600 3005 195 1600 320 640 640 ------------ I --------------- II--------------- II--------------- II------ ---- - - - - - I Capacity Analysis Module: Vol /Sat: 0.14 0.32 0.32 0.00 0.36 0.00 0.04 0.04 0.00 0.01 0.01 0.01 Crit Moves: * * ** * # *# * * #* * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 427 Default Scenario Sun May 22, 2011 14:54:31 Page 16 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length o) Method (Future Volume Alternative) Intersection #13 Jamboree Road (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.480 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******##******* W#*******#*****#**********###*# W#* # # # # * *W * * * * * * * * * * * * * * * * * * # * # # ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - -- --------------- II--------------- II--------------- II ---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 3 0 1 ]. 1 0 0 1 0 0 1 0 0 ------------ --------------- II--------------- II--------------- II ---- ------ - - - - - I Volume Module: Base Vol: 44 1188 0 2 1390 91 297 4 100 0 1 0 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 46 1247 0 2 1460 96 297 4 100 0 ]. 0 Added Vol: 0 78 0 0 205 1 3 0 16 0 0 0 Passer.Byvol: 0 68 0 0 41 0 0 0 1 0 0 0 Initial Fut: 46 1.393 0 2 1706 97 300 4 117 0 1 0 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 46 1393 0 2 1706 0 300 4 0 0 1 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 46 1393 0 2 1706 0 300 4 0 0 1 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVOlume: 46 1393 0 2 1706 0 300 4 0 0 1 0 ------------ ---------------II---------------II---------------II-------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.97 0.03 1.00 0.00 1.00 0.00 Final Sat.: 1600 4800 0 1600 4800 1600 3158 42 1600 0 1600 0 ------ ------ I ------ --------- II - - --- II-- ------------- II------ --- - - - - - -I Capacity Analysis Module: Vol /Sat: 0.03 0.29 0.00 0.00 0.36 0.00 0.09 0.10 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 422 Default Scenario Sun May 22, 2011 14:53:55 Page 17 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour -------------------------------------------------------------------------------- Level. Of Service Computation Report ICU 1(Loss as Cycle Length °s) Method (Future Volume Alternative) * w*}******* w}+* w*}}**}* w* w******+ w+*+}**+*** w+ w** + * * * * * * * * * * * * *w *w +w * * * * * * * * * * ** Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) - Cycle (sec): 100 Critical. Vol. /Cap.(X): 0.484 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level. Of Service: A ww*}}* ww**}******}********* w* w*** wwx}+++**}* w+ www *w * * * * * * * * *+ * + * * * * * * * * * * } * } * } }* Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II----------- - - - -11 ---- II---------- - - - - -I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min.. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 846 1509 663 0 570 412 0 0 0 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 880 1569 690 0 593 428 0 0 0 0 0 0 Added Vol: 0 141 0 0 66 96 0 0 0 0 0 0 PasserByVol: 29 43 21 0 86 13 0 0 0 0 0 0 Initial Put: 909 1.753 711 0 745 537 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 909 1753 0 0 745 537 0 0 0 0 0 0 Reduct Vol.: U 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 909 1753 0 0 745 537 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 909 1753 0 0 745 537 0 0 0 0 0 0 ------------ --------------- II--- ---- --- ----- II- -- -- II---------- - -- - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1.600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.32 1.68 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1600 0 3717 2683 0 0 0 0 0 0 ------------ I --------------- II--------------- II----- --- ------- II----- ----- - - - - - I Capacity Analysis Module: Vol /Sat: 0.28 0.48 0.00 0.00 0.20 0.20 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** *}** w***+*********** w********}*}***} 4}*}##**+**** * * * * * * * * * * * } * * * * * * * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 4 29 Default Scenario Sun May 22, 2011 14:54:31 Page 17 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour ---------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection 414 Jamboree Road (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.539 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach:. North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R -- --- ------- --------- ---- - -II -- --------------- --------------- Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 689 1142 942 0 1080 612 0 0 0 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 717 1188 980 0 1123 636 0 0 0 0 0 0 Added Vol: 0 200 0 0 113 33 0 0 0 0 0 0 PasserByVol: 22 103 57 0 57 8 0 0 0 0 0 0 Initial Fut: 739 1491 1037 0 1.293 677 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 739 1491 0 0 1293 677 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 739 1491 0 0 1293 677 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fi.nalVOlume: 739 1491 0 0 1293 677 0 0 0 0 0 0 ------------ ---------------II---------------II---------------II------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 .1.600 1.600 1.600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.62 1.38 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1600 0 4200 2200 0 0 0 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.23 0.47 0.00 0.00 0.31 0.31 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 430 Default Scenario Sun May 22, 2011 14:53:55 Page 18 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Morning Peak Hour Level. Of Service Computation Report ICU 1(Loss as Cycle Length 2) Method (Future Volume Alternative) wxw # # * * * # * #* wxw**#**** w* xxw* xx##**#******** w* w*** * * * * * * # * *wxwwx * * * * # * * * # #xwxw * #* Intersection #15 Jamboree Road (NS) at Bristol Street South (EW) * # * * * * *w #x *x * *w *wxwx *x *x #x * *w* wxw* w*«* xxxxxxxwww* w * * * *w #w # * * # * #xxxx #ww * * * * * * # *wx Cycle (sec): 100 Critical Vol. /Cap.(X): 0.663 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B *w *xx *x * * * * * ## wxw#**#*##****** xwxxxxx** x****** x* x *xxwxxxx * * * * * * * * * * * *xxxw # * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ ------- II--------------- II--------------- II- --------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 0 1817 40 0 571 0 1199 333 1150 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial 133e: 0 1890 42 0 594 0 1199 333 1150 0 0 0 Added Vol: 0 7.12 0 0 66 0 29 0 0 0 0 0 PasserByVOl: 0 111 0 0 87 0 5 4 111 0 0 0 Initial Fut.: 0 2113 42 0 747 0 1233 337 1261 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 2113 42 0 747 0 1.233 337 1261 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2113 42 0 747 0 1233 337 1261 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 2113 42 0 747 0 1233 337 1261 0 0 0 ------------ --------------- II--------------- II-- --- ---------- II---- -- ---- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.90 0.10 0.00 3.00 0.00 2.00 1.00 2.00 0.00 0.00 0.00 Final Sat.: 0 7846 154 0 4800 0 3200 1600 3200 0 0 0 ------------ I --------------- II--------------- II--- ---- -- ------ II---- --- --- ----- I Capacity Analysis Module: Vol /Sat: 0.00 0.27 0.27 0.00 0.16 0.00 0.39 0.21 0.39 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** * * * * * * * * * # ** wxw********************* w* wxxxxxxxxxww *ww * *w * * * * * * * * * # * * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 431 Default Scenario Sun May 22, 2011 14:54:32 Page 18 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects Evening Peak Hour ---------- --- --------------- ---- ---- -- _ Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #15 Jamboree Road (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.735 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C Approach: North Bound South Bound Fast Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - -- --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 0 0 ------------ --------------- II--------------- II---- ------ ---- -II----- ----- - - - - - I Volume Module: Base Vol: 0 1834 73 0 1080 0 937 1071 1145 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1907 76 0 1123 0 937 1071 1145 0 0 0 Added Vol: 0 99 0 0 113 0 101 2 0 0 0 0 PasserByVol: 0 177 0 0 57 0 37 24 117 0 0 0 Initial Fut: 0 2183 76 0 1293 0 1.075 1097 1262 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 2183 76 0 1293 0 1075 1097 1262 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2183 76 0 1293 0 1075 1097 1262 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 2183 76 0 1293 0 1075 1097 1262 0 0 0 ------------ I--------------- II-------- --- ---- II- ----- -- ------- II -- -- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.83 0.17 0.00 3.00 0.00 1.48 1.52 2.00 0.00 0.00 0.00 Final Sat.: 0 7731 269 0 4800 0 2376 2424 3200 0 0 0 --------- --- I -------------- -II - -- --- II------- -------- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.28 0.28 0.00 0.27 0.00 0.45 0.45 0.39 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 4S2 Existing + Growth (Year 2013) + Approved Projects + Cumulative Projects + Proiect -433 Default Scenario Tue May 31, 2011 13:38:59 Page 4 -1 ----------------------------------------------------------------------------- 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +project Morning Peak Hour - ----------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Lcss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.471 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: -100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L- T - R L - T - R ------- - - - - -I--------------- II--------------- II--------------- 11 --------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------ I --------------- II--------------- II----- ---------- II ---------- - - - - - I Volume Module: Base Vol: 37 944 49 195 835 227 307. 555 - 48 87 185 58 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 39 991 51 205 877 238 322 583 50 91 194 61 Added Vol: 0 113 0 0 30 3 1 29 0 4 12 17 PasserByvol: 0 18 0 0 47 0 0 1 0 0 0 0 Initial Fut: 39 1122 51 205 954 241 323 613 50 95 206 78 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0100 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 39 1122 51 205 954 241 323 613 50 95 206 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 39 1122 51 205 954 241- 323 613 50 95 206 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 39 1122 51 205 954 241 323 613 50 95 206 0 --- --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00.1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.77 0.23 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4435 365 3200 4800 1600 ------------ 1--------------- II--------------- II--------------- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 0.18 0.03 0.13 0.15 0.15 0.10 0.14 0.14 0.03 0.04 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to- KUNZMAN ASSOC, ORANGE CA 4S4 Default Scenario Tue May 31, 2011 13:39:10 Page 4 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Evening Peak Hour _ ---------------------- ------ - - - --' Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 MacArthur Boulevard (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.659 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- 11--------------- II---- -------- --- II-------- -- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------ I--------------- 11--------------- II--------------- 11---------- - - - - -I Volume Module: Base Vol: 154 1091 - 49 45 819 447 324 274 96 96 669 195 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 162 1146 51 47 860 469 340 288 101 103 702 205 Added Vol: 0 54 0 16 113 4 5 22 C 4 33 0 PasserByVo1: 0 55 0 0 26 1 0 0 0 0 0 1 Initial Fut: 162 1255 51 63 999 474 345 310 101 107 735 206 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 162 1255 51 63 999 474 345 310 101 107 735 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 162 1255 51 63 999 474 345 310 101 107 735 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 162 1255 51 63 999 474 345 310 101 107 735 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.26 0.74 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 3621 1179 3200 4800 1600 -------- - - - - I --------------- 11 ----- 11---------- ----- 11----- ----- - - - --I Capacity Analysis Module: Vol /Sat: 0.10 0.20 0.03 0.04 0.16 0.30 0.11 0.09 0.09 0.03 0.15 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed toKUNZMAN ASSOC, ORANGE CA 4S,5 Default Scenario Tue May 31, 2011 13:38:59 - Page 5 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +project Morning Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #2 MacArthur Boulevard (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.413 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II --------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ------------ I --------------- II --------------- If- --------- - - - - - H ---------- - -- - -I Volume Module: Base Vol: 32 689 98 100 624 176 158 310 73 31 154 53 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 33 717 .102 104 649 183 158 310 73 31 154 53 Added Vol: 17 96 0 0 34 0 0 0 3 0 0 17 PasserByVol: 1 14 0 0 34 13 3 3 0 0 13 0 Initial Fut: 51 827 102 104 717 196 161 313 76 31 167 70 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .1.00 1.00 1.00 0.00 PHF Volume: 51 827 102 104 717 196 161 313 76 31 167 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 51 827 102 104 717 196 161 313 76 31 167 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 51 827 102 104 717 196 161 313 76 31. 167 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600. 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .Lanes: 1.00 3.00 1.00 1.00 3.14 0.86 1.00 1.58 0.42 1.00 2.00 1.00 Final Sat.: 1600 4800 1600 1600 5026 1374 1600 2533 667 1600 3200 1600 ------------ I ----------- ---- II--- ------------ II- - - - - -- I---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.03 0.17 0.06 0.07 0.14 0.14 0.10 0.12 0.11 0.02 0.05. 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA T so Default Scenario Tue May 31, 2011 13:39:10 Page 5 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Evening Peak Hour ------------------------------- -- - ----- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #2 MacArthur Boulevard (NS) at Birch Street (EW) ************************+ w*********************** *w * * * * * * * * * * * * * * * * * * * * * * * * * * * *w Cycle (sec): 100 Critical Vol. /Cap.(X): 0.496 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II --------------- I Control: Protected Protected Split Phase Split Phase. Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 2 0 1 ----- ---- --- I ------------- - -II -- ------ II--------------- II---------- - - - - -I Volume Module: Base Vol: 86 646 25 49 858 149 274 182 53 114 433 170 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 69 672 26 51 892 155 274 182 53 114 433 170 Added Vol: 3 54 0 16 101 0 0 0 16 0 0 0 PasserByVol: 0 37 0 0 18 8 18 18 0 0 8 0 Initial Fut: 92 763 26 67 1011 163 292 200 69 114 441 170 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 92 763 26 67 1011 163 292 200 69 114 441 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 92 763 26 67 1011 163 292 200 69 114 441 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVOlume: 92 763 26 67 1011 163 292 200 69 114 441 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.44 0.56 1.56 1.07 0.37 1.00.2.00 1.00 Final Sat.: 1600 4800 1600 1600 5512 888 2498 1711 590 1600 3200 1600 ------------ I--------------- II--------------- II----- ---------- 11---------- - - - --I Capacity Analysis Module: Vol /Sat: 0.06 0.16 0.02 0.04 0.18 0.18 0.12 0.12 0.1.2 0.07 0.14 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUN2MAN ASSOC, ORANGE CA 4S:7 Default Scenario Tue May 31, 2011 13:38:59 Page 6 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #3 MacArthur Boulevard (NS) at Von Karman Avenue (EW) Cycle (sec): .100 Critical Vol. /Cap.(X): 0.575 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100. Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- 11 --------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 ----------- I--------------- 11--------------- II--------------- II---------- - - - - -I Volume Module: Base Vol: 101 988 656 58 435 163 19 96 28 78 136 12 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 105.1028 682 60 452 170 19 96 28 78 136 12 Added Vol: 17 133 6 13 38 0 0 0 0 1 2 1 PasserByVol: 0 16 1 0 34 0 0 0 0 1 0 0 Initial Put: 122 1177 689 73 524 170 19 96 28 80 138 13 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 122 1177 689 73 524 170 19 96 28 80 138 13 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 122 1177 689 73 524 170 19 96 28 80 138 13 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00. MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 122 1177 689 73 524 170 19 96 28 80 138 13 ------------ I --------------- II--------------- II--- ------------ II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600.1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 3200 1600 3200 1600 1600 ------------ I --------------- II--------------- 11 --------------- II --------------- I Capacity Analysis Module: Vol /Sat: 0.08 0.25 0.43 0.05 0.11 0.11 0.01 0.03 0.02 0.03 0.09 0.01. Crit Moves * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 4S2 Default Scenario Tue May 31, 2011 13:39:11 Page 6 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #3 MacArthur Boulevard (NS) at Von Karman Avenue (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.606 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II-------- ------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 2 0 1 2 0 1 0 1 ------------ --------------- II--------------- II--------------- II ---------- - - - - - I Volume Module: Base Vol: 48 624 126 29 968 52 138 195 183 665 127 38 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 50 649 131 30 1007 54 138 195 183 665 127 38 Added Vol: 0 70 1 13 134 0 0 0 16 5 2 6 PasserByVol: 0 38 2 0 18 0 0 0 0 0 0 0 Initial Fut: 50 757 134 43 1159 54 138 195 199 670 129 44 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -1.00 1.00 1.00 PHF Volume: 50 757 134 43 1159 54 138 195 199 670 129 44 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 50 757 134 43 1159 54 138 195 199 670 129 44 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 50 757 134 43 1159 54 138 195 199 670 129 44 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 3200 1600 3200 1600 1600 ------------ I --------------- II--------------- II --------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.16 0.08 0.03 0.24 0.03 0.09 0.06 0.12 0.21 0.08 0.03 Crit Moves * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 439 Default Scenario Tue May 31, 2011 13:38:59 - Page 7 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project _ Morning Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) ++#++++++##++++++##+####++*##+##++++###+++###+#+# + # # + + + # + + + + # + + + * # # + + + + # + + # # # + ## Intersection #4 MacArthur Boulevard (NS) at Jamboree Road (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): - 0.686 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound - West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ignore Include - Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------------ I --------------- II--------------- 11 --------------- II---------- - - - - - Volume Module: Base Vol: 177 1332 456 66 -293 121 410 851 176 364 674 181 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 184 1385 474 69 305 126 426 885 183 379 701 188 Added Vol: 0 73 0 4 25 10 26 -122 0 68 157 57 PasserByVol: 1 10- 1 0 33 9 it 37 0 0 66 3 Initial Fut: 185 1468 475 73 363 145 463 1044 183 447 924 248 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 185 1468 475 73 363 0 463 1044 183 447 924 248 Reduct Vol: 0 .0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 185 1468 475 - 73 363 0 463 1044 183 - 447 924 248 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00. 1.00 1.00 1.00 1.00 FinalVolume: -185 1468 475 73 363 0 463 1044 183 447 924 248 0v1AdjVO1: 252 ------------ --------------- II--------------- II-------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 4800 1600 3200 4800 1600 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.31 0.30 0.02 0.08 0.00 0.14.0.22 0.11 0.14 0.19 0.16 OvlAdjV /S: 0.16 Crit Moves' * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA G"fiU Default Scenario Tue May 31, 2011 13:39:11 Page 7 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +project Evening Peak Hour ------------------------------------ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #4 MacArthur Boulevard (NS) at Jamboree Road (EW) *** k*#******************************************* * * * * * # * * * * * * * * * # * * * * * * * * * * * * * ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.765 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- 11 --------------- II --------------- I Control:. Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 '0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 2 0 3 0 1 ------------ I--------------- II------- -------- II-------------- -11 - -- - - - - -I Volume Module: Base Vol: 227 578 397 157 965 312 214 967 37 611 921 155 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 236 601 413 163 1004 324 223 1006 38 635 958 161 Added Vol: 0 47 63 54 73 27 18 189 0 0 126 6 PasserByvol: 6 38 1 0 14 7 9 70 0 1 49 1 Initial Put: 242 686 477 217 1091 358 250 1265 38 636 1133 168 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 242 686 477 217 1091 0 250 1265 38 636 1133 168 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 242 686 477 217 1091 0 250 1265 38 636 1133 168 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 242 686 477 217 1091 0 250 1265 38 636 1133 168 OvlAdjVol: 159 ------------ I -------- ------- II-- - - - - -- I------------ --- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 '1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00'3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 4800 1600 3200 4800 1600 ------------ I --------------- II----------- ---- II--------------- II - - -- --I Capacity Analysis Module: Vol /Sat: 0.08 0.14 0.30 0.07 0.23 0.00 0.08 0.26 0.02 0.20 0.24 0.11 ovlAajv /S: 0.10 Crit Moves: ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * # ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN.ASSOC, ORANGE CA 441 Default Scenario Tue May 31, 2011 13:38:59 Page 8 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects+Cumulative Projects +Project Morning Peak Hour ------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #5 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.516 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T R L - T - R ------------ I--------------- II-- ------------ -II - -- --------- - - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 ------------ --------------- II--------------- II--------------- II------- --- - - - - - I Volume Module: Base Vol: 349 1533 0 0 220 204 0 0 0 120 902 138 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 363 1594 0 0 229 212 0 0 0 120 902 138 Added Vol: 0 37 0 0 4 15 0 0 0 18 80 0 PasserByVOl: 0 1 0 0 0 0 0 0 0 0 8 0 Initial Fut: 363 1632 0 0 233 227 0 0 0 138 990 138 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 363 1632 0 0 233 227 0 0 0 138 990 138 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: .363 1632 0 0 233 227 0 0 0 138 990 138 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 363 1632 0 0 233 227 0 0 0 138 990 138 ------------ I--------------- II--------------- II---- ----------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 2.00 0.00 0.00 0.00 1.00 3.51 0.49. Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 5617 783 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.11 0.34. 0.00 0.00 0.04 0.07 0.00 0.00 0.00 0.09 0.18 0.18 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 442 Default Scenario Tue May 31, 2011 13:39:11 Page 8 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Evening Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #5 Campus Drive /Irvine Avenue (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.774 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L- T- R L- T- R L - T- R L- T- R ------------ --------------- 11 --------------- 11 --------------- --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 D 3 0 0 0 0 4 0 2 0 0 0 0 0 1 0 3 1 0 ----- --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 370 671 0 0 742 1007 0 0 0 200 1867 74 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 385 698 0 0 772 1047 0 0 0 200 1867 74 Added Vol: 0 34 0 0 7 38 0 0 0 1 35 0 PasserByVol: 0 0 0 0 0 0 0 0 0 2 39 0 Initial Fut: 385 732 0 0 779 1085 0 0 0 203 1941 74 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 385 732 0 0 779 1085 0 0 0 203 1941 74 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 385 732 0 0 779 1085 0 0 0 203 1941 74 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 385 732 0 0 779 1085 0 0 0 203 1941 74 - - -- I --------------- II--------------- II---------- ----- II-------- -- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00' 2.00 0.00 0.00 0.00 1.00 3.85 0.15 Final Sat.: 3200 4800 0 0 6400 3200 0 0 0 1600 6165 235 ---- I --------------- II--------------- II---- ----------- II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.12 0.15 0.00 0.00 0.12 0.34 0.00 0.00 0.00 0.13 0.31 0.31 Crit .Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 443 Default Scenario Tue May 31, 2011 13:38:59 Page 9 -1 -- ----------------- ---- - - -- -- ------ 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #6 Campus Drive /Irvine Avenue (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.648 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II -----------_--- II --------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------ I --------------- II --------------- II --------------- II ---------- - - - - - I Volume Module: Base Vol: 0 900 152 96 261 0 1186 1623 299 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 936 158 100 292 0 1186 1623 299 0 0 0 Added Vol: 0 4 0 0 22 0 33 2 0 0 0 0 PasserByVOl: 0 2 0 0 0 0 0 26 0 0 0 0 Initial Fut: 0 942 158 100 314 0 1219 1651 299 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 942 158 100 314 0 1219 1651 299 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 942 158 100 314 0 1219 1651 299 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 942 158 100 314 0 1219 1651 299 0 0 0 ------------ I --------------- II--------------- II----- ------ ---- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600. 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.28 0.72 1.00 3.00 0.00 1.70 2.30 2.00 '0.00 0.00 0.00 Final Sat.: 0 6850 1150 1600 4800 0 2718 3682 3200 0 0 0 ------------ 1--------------- II--------------- II--------------- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.14 0.14 0.06 0.07 0.00 0.45 0.45 0.09 0.00 0.00 0.00 Crit Moves: ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 444 Default Scenario Tue May 31, 2011 13:39:11 Page 9 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Evening Peak Hour - ------------ - - - - -- ---------- -------- - - - - -_ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #6 Campus Drive /Irvine Avenue (NS) at Bristol Street South (F.W) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.487 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II--------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 - - - -- I--------------- II--------------- 11--------------- II---------- - - - - -I Volume Module: Base Vol: 0 720 180 201 859 0 417 1004 429 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00. 1.00 Initial Bse: 0 749 187 209 893 0 417 1004 429 0 0 0 Added Vol: 0 7 17 0 7 0 27 0 0 0 0 0 PasserByVol: 0 1 0 0 2 0 0 17 1 0 0 0 Initial Fut: 0 757 204 209 902 0 444 1021 430 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 757 204 209 902 0 444 1021 430 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 757 204 209 902 0 444 1021 430 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7..00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 757 204 209 902 0 444 1021 430 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0..00 1.21 2.79 2.00 0.00 0.00 0.00 Final Sat.: 0 6400 1600 1600 4800 0 1940 4460 3200 0 0 0 ------------ I --------------- II--------------- II ---------- ----- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.12 0.13 0.13 0.19 0.00 0.23 0.23 0.13 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 445 Default Scenario Tue May 31, 2011 13:38:59 Page 10 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.556 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- 11--------------- II--------------- II--- ------- - - - --I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------ I--------------- II--------------- II--------------- 11---------- - - - - -I Volume Module: Base Vol: '108 886 0 C 160 95 0 0 0 403 988 237 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bee: 108 886 0 0 160 95 0 0 0 403 988 237 Added Vol: 0 5 0 0 1 0 0 0 0 0 97 0 PasserByVol: 6 6 0 0 25 0 0 0 0 50 1 0 Initial Fut: 114 897 0 0 186 95 0 0 0 453 1086 237 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 114 897 0 0 186 95 0 0 0 453 1086 237 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 114 897 0 0 186 95 0 0 0 453 1086 237 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 114 897 0 0 186 95 0 0 0 453 1086 237 ------------ I --------------- II--------------- II-------- ------- II---------- - -- - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 1.18 3.29 0.54 Final Sat.: 3200 3200 0 0 3200 3200 0 0 0 1884 5256 860 ------------ I--------------- II--------------- II-- ------------- 11---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.04 0.28 0.00 0.00 0.06 0.03 0.00 0.00 0.00 0.24 0.21 0.28 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA r191M Default Scenario Tue May 31, 2011 13:39:11 _ Page 10 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +project Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #7 Birch Street (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.M : 0.549 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound _West Bound Movement: L - T - R L - T - R L - T - R L - T - R - ------------I---------------II--------_------ II --------------- II --------------- I Control: Protected Protected - Protected Protected Rights: - Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------ I--------------- II--------------- II--------------- II ---------- - - - - - I Volume Module: Base Vol: 196 344 0 0 484 743 0 0 0 -392 1167 124 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 198 344 0 0 484 743 0 0 0 392 1187 124 Added Vol: 0- 3 0 0 2 2 0 0 0 0 34 0 PasserByVol: 37 37 0 0 15 0 0 0 0 31 4 0 Initial Put: 235 384 0 0 501 745 0 0 0 423 1225 124 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 235 384 0 0 501 745 0 0 0 423 1225 124 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 235 384 0 0 501 745 0 0 0 423 1225 124 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 235 384 0 0 501 745 0 0 0 423 1225 124 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 1.61 2.39 0.00 0.00 0.00 1.03 3.70 0.28 Final Sat.: 3200 3200 0 0 2573 3827 0 0 0 1643 5916 441 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.07 0.12 0.00 0.00 0.19 0.19 0.00 0.00 0.00 0.26 0.21 0.28 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC -,. ORANGE CA -4 4j Default Scenario Tue May 31, 2011 13:38:59 Page 11 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Morning Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #8 Birch Street (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.401 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II---------- - - - -- I Control: - Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 0 333 229 198 379 0 676 867- 291 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1._00 1.00 1.00 Initial Bse: 0 333 229 198 379 0 676 867 291 0 0 0 Added Vol: 0 2 0 0 1 0 2 0 0 0 0 0 PasserByVol: 0 13 14 0 75 0 0 2 25 0- 0 0 Initial Put: 0 348 243 198 455 0 678 869 316 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 348 243 198 455 0 678 869 316 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 348 243 198 455 0 678 869 316 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00.1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00. 1.00 1.00 1.00 1.00 FinalVolume: 0 348 243 198 455 0 678 869 316 0 0 0 ------------ --------------- II--------------- II--- ------------ II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.36 1.64 2.00 2.00 0.00 1.75 2.45 0..80 0.00 0.00 0.00 Final Sat.: 0 3769 2631 3200 3200 0 2805 3915 1280 0 0 0 ------------ I --------------- II--------------- II-------- ------- II---------- - - - - - I Capacity Analysis Module: - Vol /Sat: 0.00 0.09 0.09 0.06 0.14 0.00 0.24 0.22 0.25 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 442 Default Scenario Tue May 31, 2011 13:39:_11 Page 11 -1 4221 Dolphin - Striker Project _ Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects+Project- Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #8 Birch Street (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.467 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ************#************************************ * * * * * * * * * * * * * * * * # * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T -- R --_--------- I --------------- il--------------- II--------------- II---------- - - - - - I Control: Protected - Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------ I --------------- II--------------- II--------- ------ II---------- - - - - - I Volume Module: Base Vol: 0 312 300 305 614 0 188 999 174 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 312 300 305 614 0 188 999 174 0 0 0 Added Vol: 0 2 0 0 2 0 0 17 0 0 0 0 PasserByVOl: 0 73 77 0 46 0 0 7 15 0 0 0 Initial Fut: 0 387 377 305 662 0 188 1023 189 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 387 377 305 662 0 188 1023 189 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 387 377 305 662 0 188 1023 189 '0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 387. 377 305 662 0 188 1023- 189 0 0 0 ------------ --------------- II--------------- II------- --- ---- -II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.03 1.97. 2.00 2.00 0.00 1.00 3.53 0.47 0.00 0.00 0.00 Final Sat.: 0 3242 3158 3200 3200 0 1600 5651 749 0 0 0 ------------ I --------------- II--------------- II--------------- II------ ---- - - - -- I Capacity Analysis Module: Vol /Sat: 0.00 0.12 0.12 0.10 0.21 0.00 0.12 0.18 0.25 _0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE, CA T T9 Default Scenario Tue May 31, 2011 13:38:59 Page 12 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Morning Peak Hour -- --- ---- ------------ -- ---- - -_ Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #9 Von Karman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.483 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II --------------- II --------------- II--------------- I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 '0 1 1 0 1 1 0 -------------------------- II--------------- 11--------------- II---------- - - - - -I Volume Module: Base Vol: 16 534 53 37 335 73 228 303 42 77 287 110 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 16 534 53 37 335 73 237 315 44 80 298 114 Added Vol: 0 2 3 0 3 0 0 29 0 0 33 17 PasserByVol: 0 0 0 0 1 0 0 0 0 0 0 0 Initial Fut: 16 536 56 37 339 73 237 344 44 80 331 131 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 16 536 0 37 339 73 237 344 44 80 331 131 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 16 536 0 37 339 73 237 344 44 80 331 131 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 '0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 16 536 0 37 339 73 237 344 44 80 331 131 ------------ I --------------- II--------------- II--------------- II---- ------ - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.65 0.35 1.00 2.00 1.00 1.00 1.43 0.57 Final Sat.: 1600 3200 1600 1600 2633 567 1600 3200 1600 1600 2292. 908 ------------ I--------------- II--------------- II------- -------- 11-- -------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.01 0.17 0.00 0.02 0.13 0.13 0.15 0.11, 0.03 0.05 0.14 0.14 Crit Moves: *+** x+++ o-+ . t+*++: t+**+*** o-*******+*+ * + * + + + * + * * * * * * *• * * * * * * * * + * + + * ** *:to- * + + + * ** * * * +* Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA -4150 Default Scenario Tue May 31, 2011 13:39:11 Page 12 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #9 Von Karman Avenue (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.580 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L- T - R ------------ I --------------- II --_------------ II --------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ignore. Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 ------------ I--------------- 11--------------- II--------------- II----- ----- - - - - -I Volume Module: Base Vol: 47 383 122 98 610 224 145 445 49 51 501 64 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.04 1.04 1.04 1.04 1.04 1.04 Initial Bse: 47 383 122 98 610 224 .151 463 51 53 521 67 Added Vol: 0 3 5 16 2 0 0 38 0 C 37 0 PasserByVol: 0 2 0 0 0 0 0 0 0 C 0 0 Initial Fut: 47 388 127 114 612 224 151 501 51 53 558 67 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 47 388 0 114 612 224 151 501 51 53 558 67 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 47 388 0 114 612 224 151 501 51 53 558 67 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: -1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 47 388 0 114 612 224 151 501 51 53 558 67 ------------ --------------- II------------ - - -II--------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 1.46 0.54 1.00 2.00 1.00 1.00 1.79 0.21 Final Sat.: 1600 3200 1600 1600 2343 857 1600 3200 1600 1600 2859 341 ------------ I --------------- II--------------- II--------- ------ II---- ------ - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.12 0.00 0.07 0.26 0.26 0.09 0.16 0.03 0.03 0.20 0.20 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 4151- Default Scenario Tue May 31, 2011 13:38:59 Page 13 -1 ----------------------------------------------------------------------------- 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #10 Von Karman Avenue (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.296 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0. 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I -------------- II--------------- II -- ------------ -II---------- - - - - - I Volume Module: Base Vol: 30 484 33 56 275 128 79 194 48 43 159 22 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 30 484 33 56 275 128 79 194 48 43 159 22 Added Vol: 0 4 0 0 3 0 0 0 0 3 17 0 PasserByVOl: 0 1 0 0 1 0 0 3 0 0 13 0 Initial Put: 30 489 33. 56 279 128 79 197 48 46 189 22 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 489 33 56 279 128 79 197 48 46 189 22 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 30 489 33 56 279 128 79 197 4B 46 189 22 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 30 489 33 56 279 128 79 197 48 46 189 22 ------------ --------------- II--------------- II---- ----------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00' 1.00 1.00 2.00 1.00 .1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------------- II--------------- II---- -- --------- II ------ ---- - - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.15 0.02 '0.04 0.09 0.08 0.05 0.06 0.03 0.03 0.06 0.01 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 4152 Default Scenario Tue May 31, 2011 13:39:11 Page 13 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Evening Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length 8) Method (Future Volume Alternative) Intersection #10 Von Karman Avenue (NS) at Birch Street (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.354 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L T - R L - T - R L - T - R L - T - R ------------ I --------------- 11 --------------- 11 --------------- 11 --------------- I Control: Protected Protected Protected Protected Rights: .Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I --------------- II--------------- II --------------- II---------- --- - - I Volume Module: Base Vol: 71 407 55 34 549 133 99 166 26 19. 235 41 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 71 407 55 34 549 133 99 166 26 19 235 41 Added Vol: 0 8 3 0 2 0 0 16 0 1 0 0 PasserByVol: 0 2 0 0 0 0 0 18 0 0 8 0 Initial Fut: 71 417 58 34 551 133 99 200 26 20 243 41 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 71 417 58 34 551 133 99 200 26 20 243 41 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 71 417 58 34 551 133 99 200 26 20 243 41 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 71 417 58 34 551 133 99 200 26 20 243 41 ------------ I ----------- -- - -II II--------------- II------ ---- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3200 1600 1600 3200 1600 ------------ I --------------- II--------------- II--------------- II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.13 0.04 0.02 0.17 0.08 0.06 0.06 0.02. 0.01 0.08 0.03 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 4153 Default Scenario Tue May 31, 2011 13:39:00 Page 14 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #11 Bayview Place (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.430 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T- R --------- - - - I -- - II--------------- II---------- _---- II--- ---- _-- - - -_ -I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ I--------------- II--------------- II--------------- 11---------- - - - - -I Volume Module: Base Vol: 0 0 101 0 0 0 0 2464 420 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 101 0 0 0 0 2464 420 0 0 0 Added Vol: 0 0 0 0 0 0 0 29 0 0 0 0 PasserByVol: 0 0 2 0 0 0 0 50 1 0 0 0 Initial Fut: 0 0 103 0 0 0 0 2543 421 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: ,1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 103 0 0 0 0 2543 421 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 103 0 0 0 0 2543 421 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 103 0 0 0 0 2543 421 0 0 0 ------------ I ----------- - - - -II- ------- II--------- ------ II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 .0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0 0 3200 0 0 0 0 6400 1600 0 0 0 ----------- - I - --- II --------------- II --------------- II ------ ---- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.40 0.26 0.00 0.00 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA Default Scenario Tue May 31, 2011 13:39:11 Page 14 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Evening Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) *##*******#*#####*********##******#*#************ * * * * * * * * # * * * * * * * * * * # * * * * * # * * * *# Intersection #11 Bayview Place (NS) at Bristol Street South (EW) ********#*********######*******#*******#********* * * * * * * # * * * * # # * * * * # # # * * # # * * * * # ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.568 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay .(sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: - A Approach: North Bound South Bound .East Bound West Bound Movement: L - T - R L - T - R L - T - R- L - T - R ------------ I --------------- II--------------- II--------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 2 0 0 0 0 0 0 0 4 0 1 0 0 0 0 0 ------------ I--------------- II--------------- II------- -------- 11---------- - - - - -I Volume Module: Base Vol: 0 0 433 0 0 0 0 2591. 142 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 433 0 0 0 0 2591 142 0 -0 0 Added Vol: 0 0 0 0 0 0 0 103 0 0 0 0 PasserByVol: 0 0 23 0 0 0 0 26 0 0 0 0 Initial Fut: 0 0 456 0 0 0 0 2720 142 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00. 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 456 0 0 0 0 2720 142 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 456 0 0 0 0 2720 142 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 456 0 0 0 0 2720 142 0 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module:. Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600. 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 2.00 0.00 0.00 0.00 0.00 4.00 1.00 0.00 0.00 0.00 Final Sat.: 0. 0 3200 0 0 0 0 6400 1600 0 0 0 ------------ I--------------- II--------------- II--------------- 11---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.00 0.14. 0.00 0.00 0.00 0.00 0.43 0.09 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 4515 Default Scenario Tue May 31, 2011 13:39:00 Page 15 -1 4221 Dolphin- Striker Project Existing +Growth (Year- 2013)+Approved Projects +Cumulative Projects +Project Morning Peak Hour Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #12 Jamboree Road (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.667 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 143 1044 34 286 1732 172 76 112 10 - 259 423 152 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 150 1096 36 300 1819 181 80 118 11 272 444 160 Added Vol: 34 177 0 0 48 0 0 32 0 0 16 0 PasserByVol: 0 29 0 0 69 0 0 0 1 1 0 0 Initial Fut: '184 1302 36 300 1936 181 80 150 12 273 460 160 User Adj: 1.00 1.00 -1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 184 1302 36 300 1936 181 80 150 0 273 460 160 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 184 1302 36 300 1936 181 80 150 0 273 460 160 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 184 1302 36 300 1936 181 80 150 0 273 460 160 ------------ --------------- II--------------- II------------- -- II---------- -- - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.89 0.11 2.00 2.74 0.26 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 6229 171 3200 4390 410 3200 3200 1600 3200 3200 1600 ------------ I --------------- II- -------------- II------ - - - - -- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.06 0.21 0.21 0.09 0.44 0.44 0.02 0.05 0.00 0.09 0.14 0.10 Crit Moves: ******************#****************************** * # * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 450 Default Scenario Tue May 31, 2011 13:39:11 Page 15 -1 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Evening Peak Hour _ ------ ______ -_ - - -__ Level Of Service Computation Report 'ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #12 Jamboree Road (NS) at Campus Drive (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.639 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- 11 --------------- II-_ ___------ _--- II___--- _--- - - - - -I Control: Protected Protected Protected Protected Rights: Include Include Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 1 0 2 0 2 1 0 2 0 2 0 1 2 0 2 0 1 -- I--------------- 11--------------- II------ --------- fl---- ------ - - - - -I Volume Module: Base Vol: 65 1278 135 224 1108 183 219 263 159 152 226 331 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 Initial Bse: 68 1342 142 235 1163 192 230 276 167 160 237 348 Added Vol: 0 88 0 0 180 0 0 27 32 0 37 0 PasserByVol: 0 68 1 0 41 0 0 0 0 1 1 0 Initial Put: 68 1498 143 235 1384 192 230 303 199 161 275 348 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 68 1498 143 235 1384 192 230 303 0 161 275 348 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 68 1498. 143 235 1384 192 230 303 0 161 275 348 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVOlume: 68 1498 143 235 1384 192 230 303 0 161 275 348 ------- - - - - -I - - - -II -------- II-- ------ ------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.65 0.35 2.00 2.63 0.37 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 3200 5843 557 3200 4215 585 3200 3200 1600 3200 3200 1600 ------------ I--------------- II--------------- II--------------- 11--------- - - - - - -1 Capacity Analysis Module: Vol /Sat: .0.02 0.26 0.26 0.07 0.33 0.33 0.07 0.09 0.00 0.05 0.09 0.22 Crit Moves: Traffix. 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 457 Default Scenario Tue May 31, 2011 13:39:00 Page 16 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Morning Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #13 Jamboree Road (NS) at Birch Street (EW) Cycle (sec): 100 - Critical Vol. /Cap.(X): 0.558 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 - Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R- L - T - R L - T - R L - T- - R ------------ I --------------- II --------------- 11 --------------- II --------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 - 1 0 3 0 1 1 1 0 0 1 0 0 11 0 0 ------------ I --------------- II --------------- II-------- ------- II---------- - - - - - I Volume Module: Base Vol: 204 1228 2 7 1551 464 123 8 42 3 6 - - 6 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 214 1289 2 7 1629 487 123 8 42 3 6 6 Added Vol: - 17 210 0 0 45 3 0 0 0 0 0 0 PasserByVol: 0 30 0 0 69 1 0 0 0- 0 0 0 Initial Fut: 231 1529 2 7 1743 491 123 8 42 3 6 6 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF - Volume: 231 1529 2 7 1743 0 123 8 0. 3 6 6 Reduct Vol: 0 0 0 0 0 0 0 0 0. 0 0 0 Reduced Vol: 231 1529 2 7 1743 0 123 8 0 3 6. 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 11.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVOlume: 231 1529 2 7 1743 0 123 8 0 3 6 6 ------------ I --------------- II--------------- II-------- ------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.88 0.12 1.00 0.20 0.40 0.40 Final Sat.: 1600 4793 7 1600 4800 1600 3005 195 1600 320 640 640 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.14 0.32 0.32 0.00 0.36 0.00 0.04 0.04 0.00 0.01 0.01 0.01 Crit Moves: * * ** * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 'T Jig Default Scenario. Ins May 31, 2011 13:39:11 Page 16 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +project Evening Peak Hour ____ ___________ ____ _ _____ _____ ___ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #13. Jamboree Road (NS) at Birch Street (EW) Cycle (sec): - 100 Critical Vol. /Cap.(X): 0.481 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: - A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ----------- - I - - -- ---- II--------------- II---- __--------- II_--------- - - - - -I Control: Protected - Protected Split Phase Split Phase Rights: Include Ignore Ignore Include Min. Green: 0 0 - 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 3 0 1 1 1 0 0 1 0 0 1 0 0 ------------ I--------------- II--------------- II--------------- 11---------- - - - - -I Volume Module: Base Vol: 44 1188 0 2 1390 91 297 4 100 - 0 1 0 Growth Adj: 1.05 1.05 1.05 1.05 1.05 1.05 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 46 1247 0 2 1460 96 297. 4 100 0 1 0 Added Vol: 0 85 0 0 211 1 3 0 16 0 0 0 PasserByVol: 0 68 0 0 41 0 0 0 1 0 0 0 Initial Fut: 46 1400 0 2 1712 97 300 4 117 0 1 0 User Adj: L.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Volume: 46 1400 0 2 1712 0 300 4 0 0 1 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0. Reduced Vol: 46 1400 0 2 1712 0 300 4 0 0 1 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 FinalVolume: 46 1400 0 2 1712 0 300 4 0 0 1 0 --- --------------- II--------------- il--------------- II--------- - - - - - - I Saturation Flow Module: - Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 0.00 1.00 3.00 1.00 1.97 0.03 1.00 0.00 1.00 0.00 Final Sat.: 1600 4800 0 1600 4800 1600 3158 42 1600 0 1600 0 --- I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.29 0.00 0.00 0.36 0.00 0.09 0.10 0.00 0.00 0.00 0.00 Crit Moves: Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA T �9 Default Scenario Tue May 31, 2011 13:39:00 Page 17 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Morning Peak Hour ______ _______________ ____ _ Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.485 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------ - - - - -- I --------------- II--------------- 11 _-------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 ------------ I --------------- II--------------- II ------------- -- II---------- - - - - - I Volume Module: Base Vol: 846 1509 663 0 570 412 0 0 0 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 880 1569 690 0 593 428 0 0 0 0 0 0 Added Vol: 0 147 0 0 70 96 0 0 0 0 0 0 PasserByVol: 29 43 21 0 86 13 0 0 0 0 0 0 Initial Put: 909 1759 711 0 749 537 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 909 1759 0 0 749 537 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 909 1759 0 0 749 537 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 909 1759 0 0 749 537 0 0 0 0 0 0 ------------ I --------------- II--------------- II- ----------- - - -II- - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.33 1.67 0.00 0.00 0.00 0.00 0.00 0.00. Final Sat.: 3200 3200 1600 0 3726 2674 0 0 0 0 0 0 ------------ I--------------- 11--------------- 11--------------- 11---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.28 0.55 0.00 0.00 0.20 0.20 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA Iwo] Default Scenario Tue May 31, 2011 13:39:11 - Page 17 -1 4221 Dolphin- Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +project Evening Peak Hour __________ ___ __________________________ Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #14 Jamboree Road (NS) at Bristol Street North (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.540 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: A Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--_----_------- II --------------- II ----- ----- - - - - - I Control: Protected Protected Protected Protected Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 1 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 ------------ I --------------- II--------------- II- ------------ - -II -- - - - - -I Volume Module: Base Vol: 689 1142 942 0 1080 612 0 0 0 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1..00 1.00 1.00 Initial Bse: 717 1188 980 0 1123 636 0 0 0 0 0 0 Added Vol: 0 207 0 0 120 33 0 0 0 0 0 0. PasserByVol: 22 103 57 0 57 8 0 0 0 0 0 0 Initial Put: 739 1498 1037 0 1300 677 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 739 1498 0 0 1300 677 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 739 1498 0 0 1300 677 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1100 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 739 1498 0 0 1300 677 0 0 0 0' 0 0 ------------ I --------------- II-------------- -II --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 '1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 1.00 0.00 2.63 1.37 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 3200 1600 0 4208 2192 0 0 0 0 0 0 ------------ 1--------------- II--------------- II--------- -- ---- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.23 0.47 0.00 0.00 0.31 0.31 .0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: * * ** * * ** Traffix 7.9.0215 (c) - 2008 - Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 401 Default Scenario Tue May 31, 2011 13:39:00 Page 18 -1 4221 Dolphin-Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +project Morning Peak Hour Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Intersection #15 Jamboree Road (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.664 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: B Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II --------------- I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 0 1 1 1 0 2 0 0 0 '0 0 ------------ I --------------- II ------------- - -II --------------- --------------- Volume Module: Base Vol: 0 1817 40 0 571 0 1199 333 1150 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 .1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1890 42 0 594 0 1199 333 1150 0 0 0 Added Vol: 0 118 0 0 70 0 29 0 0 0 0 0 PasserByVol: 0 111 0 0 87 0 5 4 111 0 0 0 Initial Put: 0 2119 42 0 751 0 1233 337 1261 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 PHF Volume: 0 2119 42 0 751 0 1233 337 1261 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2119 42 0 751 0 1233 337 1261 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 0 2119 42 0 751 0 1233 337 1261 0 0 0 ------------ --------------- FI--------------- II--------------- II------ ---- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.90 0.10 0.00 3.00 0.00 2.00 1.00 2.00 0.00 0.00 0.00 Final Sat.: 0 7846 154 0 4800 0 3200 1600 3200 0 0 0 ------------ I --------------- II--------------- II--------------- II----- ----- - - - - - I Capacity Analysis Module: Vol /Sat: 0.00 0.27 0.27 0.00 0.16 0.00 0.39 0.21 0.39 0.00 0.00 0.00 Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 402 Default Scenario Tue May 31, 2011 13:39:11 Page 18 -1 ------ ---------- --------------- - 4221 Dolphin - Striker Project Existing +Growth (Year 2013) +Approved Projects +Cumulative Projects +Project Evening Peak Hour --------------------------------------------------------------------- ----- - - - - -- Level Of Service Computation Report ICU 1(Loss, as Cycle Length %) Method (Future Volume Alternative) Intersection #15 Jamboree Road (NS) at Bristol Street South (EW) Cycle (sec): 100 Critical Vol. /Cap.(X): 0.736 Loss Time (sec): 0 (Y +R =0.0 sec) Average Delay (sec /veh): xxxxxx Optimal Cycle: 100 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II ------------- -- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 3 0 '0 1 1 1 0 2 0 0 0 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 0 1834 73 0 1080 0 937 1071 1145 0 0 0 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1907 76 0 1123 0 937 1071 1145 0 0 0 Added Vol: 0 105 0 0 120 0 101 2 0 0 0 0 PasserByVol: 0 177 0 0 57 0 37 24 117 0 0 0 Initial Put: 0 2189 76 0 1300 0 1075 1097 1262 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PEF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 2189 76 0 1300 0 1075 1097 1262 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2189 76 0 1300 0 1075 1097 1262 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 2189 76 0 1300 0 1075 1097 1262 0 0 0 ------------ I--------------- II--------------- 11------ --------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.83 0.17 0.00 3.00 0.00 1.48 1.52 2.00 0.00 0.00 0.00 Final Sat.: 0 7732 268 0 4800 0 2376 2424 3200 0 0 0 ---------- -- I----------- - ---11 ----- 11--------------- II----- ----- - - - - -I Capacity Analysis Module: Vol /Sat: 0.00 0.28 0.28 0.00 0.27 0.00 0.45 0.45 0.39 0.00 0.00 0.00' Crit Moves: * * ** * * ** * * ** Traffix 7.9.0215 (c) 2008 Dowling Assoc. Licensed to KUNZMAN ASSOC, ORANGE CA 4 O3 APPENDIX E Approved Project Data 404 Traffic Phasing Data 28- JAN -11 Projects Less Than 100% Complete page: 1 Project Number Project Name Percent 148 FASHION ISLAND EXPANSION 40% 154 TEMPLE BAT YAHM EXPANSION 65% 555 CIOSA - IRVINE PROJECT 91% 910 NEWPORT DUNES 0% 945 HOAG HOSPITAL PHASE III 0% 949 ST. MARK PRESBYTERIAN CHU 77% 954 OLQA CHURCH EXPANSION 0% 955 2300 NEWPORT BLVD 0% 957 NEWPORT EXECUTIVE COURT 0% 958 HOAG HEALTH CENTER 75% 959 NORTH NEWPORT CENTER 0% 960 SANTA BARBARA CONDO (MARR 0% 961 NEWPORT BEACH CITY HALL$ 0% 962 328 OLD NEWPORT MEDICAL O 0% 963 COASTLINE COMMUNITY COLLE 0% 964 BAYVIEW MEDICAL OFFICE - 0% 405 28- JAN -11 Traffic Phasing Ordinance page 1 Approved Projects 80% Volume Summary Intersection Report Int. Number Int. Name 41 90 JAMBOREE RD / BRISTOL ST N 1 Hr Peak Totals 1 Hr Peak NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR - ------ -------- ---- ---- --- --- ---- -------- ----- ------- ---------- ---- ---------- ------ -- - --- -- - --------------- -- -- --- AM 93 99 29 43 21 86 13 PM 183 65 22 103 57 57 8 Int. Number Int. Name .. 4275 JAMBOREE RD / MACARTHUR BLVD 1 Hr Peak Totals NB SB EB WB NIL NT NR - - ---- - ---- ---.._----------------- AM 11 42 48 70 1 10 1 PM 45 21 79 50 6 38 1 1 Hr Peak SL ST SR EL ET ER WL WT WR --------------- -------- - -- ------ - - ------ - -- ----------------------- 33 9 11 37 66 3 14 7 9 70 1 49 1 Int. Number Int. Name 4285 MACARTHUR BLVD / NEWPORT PLACE DR VON KARMAN AVE 1 Hr Peak Totals - 1 Hr Peak NB SB EB WB NIL NT NR SL ST SR EL ET ER ....- ...-- --- ------------ -----. _-- ---•------- " °--- ----. - ------------ --------- ----- - ---- - ----- -- AM 16 34 1 16 1 34 PM 39 18 38 2 18 Int. Number Int. Name 4295 BIRCH ST / MACARTHUR BLVD 1 Hr Peak Totals T - -� -- "`` 1 Hr Peak NB SB EB WB NL NT NR SL ST SR EL ET ER -- ---- -- ----- --------- - -- ------ --- ----- - - --- -- - -- --- -------- -- --- ---------------------- AM 15 47 6 13 1 14 34 13 3 3 PM 37 26 37 8 37 18 8 18 18. WL WT WR - ------------- 1 WL WT WR -- ---- - - - - .. 13 8 28- JAN -11 Traffic Phasing Ordinance page 2 Approved Projects 80% Volume Summary Intersection Report Int. Number Int. Name 4300 CAMPUS DR! MACARTHUR BLVD 1 Hr Peak Totals 1 Hr Peak N_ B --- SB--- _-EB - - - -WB NL NT NR SL ST SR EL --ET-- - - - -ER WL WT ---- ------- - - -- -- - - -- AM 18 47 1 18 47 1 PM 55 26 1 55 26 1 1 Int. Number Int. Name 4302 CAMPUS DR / VON KARMAN AVE 1 Hr Peak Totals 1 Hr Peak NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR ..- .. ---- --- - - --- ----- ------ AM 1 PM 2 Int. Number Int. Name 4305 JAMBOREE RD / CAMPUS DR 1 Hr Peak Totals 1 Hr Peak NB SB EB WB NL NT NR SL -ST SR EL ET ER WL WT - -WR --- -------------- - - ----------- -------- AM 29 69 1 1 29 69 1 1 PM 69 41 1 68 1 41 1 1 Int. Number Int. Name - - 4308 BIRCH ST / JAMBOREE RD 1 Hr Peak Totals 1 Hr Peak NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR - -- ..- . ... -- ----- - - ---- -- ------ AM 30 69 30 69 1 PM 68 41 1 68 41 1 7� 28- JAN -11 _ _ Traffic Phasing Ordinance - - page 3 Approved Projects 80% Volume Summary Intersection Report Int. Number Int. Name 4155 IRVINE AVE /CAMPUS DR BRISTOL ST 1 Hr Peak Totals - 1 Hr Peak NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR AM 2 - -- .26 - -. ... - ----- -- ----- -- ---- - ----- - --- -------- - - .. .... 2 26 PM 1 2 18 1 2 17 1 Int. Number Int. Name - 4160 BRISTOL ST / BIRCH ST 1 Hr Peak Totals /S) -- --- - 1 Hr Peak NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR - -- ------ -- ------ - - ------- ------- - --- --- -- - --- ---- ---- ------ AM 26 75 27 13 14 75 2 25 PM 149 46 22 73 77 46 7 15 Int. Number Int. Name 4167 BRISTOL ST / BAYVIEW PL 1 Hr Peak Totals - -1 Hr Peak NB SB EB WB NL. - NT NR SL ST SR EL ET ER WL WT WR ----- -- - - ----- ------ -- -- -- AM 2 50 - 2 - 50 1 - PM 23 26 23 26 Int. Number Int. Name 4170 JAMBQREE RD / BRISTOL ST 1 Hr Peak Totals 1 Hr Peak NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR - ----- ------------ - ----------------- AM 111 87 120 111 87 5 4 111 PM 177 57 178 177 57 37 24 117 28-JAN -11 Traffic Phasing Ordinance page 4 Approved Projects 80% Volume Summary Intersection Report Int. Number Int. Name 4172 CAMPUS DR /BRISTOL ST N 1 Hr Peak Totals u 1 Hr Peak NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR ----- --- ----- - --- - -- -------- -- --- --- -------- -- - ----- ----- -- -- ----- . AM 1 8 1 8 PM 41 2 39 Int. Number Int. Name 4175 BRISTOL ST N / BIRCH ST 1 Hr Peak Totals 1 Hr Peak NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR - .... -- - - --- - -- --- ------ - - --- -- -- ---- - --- ------ - - AM 13 25 51 6 6 25 50 1 PM 74 15 35 37 37 15 31 4 Count Maker 2007 AM Northbound Peak Hour Volume 1 Southbound Peak Hour Volume PM Northbound Peak Hour Volume 2 Southbound Peak Hour Volume 0 NS Street: Von Karman Avenue EW Street: Birch Street AM Eastbound Peak Hour Volume B Westbound Peak Hour Volume 13 PM Eastbound Peak Hour Volume 18 Westbound Peak Hour Volume 8 NS Street: Von Karman Avenue EW Street: Birch Street Southbound =o ®oo ooEastbound ooiruii■r•� ® ® 'fi. AIN RYt'.�Y m m �o ®000000■o�o��vo AM Northbound Peak Hour Volume 1 Southbound Peak Hour Volume PM Northbound Peak Hour Volume 2 Southbound Peak Hour Volume 0 NS Street: Von Karman Avenue EW Street: Birch Street AM Eastbound Peak Hour Volume B Westbound Peak Hour Volume 13 PM Eastbound Peak Hour Volume 18 Westbound Peak Hour Volume 8 NS Street: Von Karman Avenue EW Street: Birch Street APPENDIX F TPO One - Percent Analysis Calculation Worksheets 471- 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: MACARTHUR BOULEVARD & CAMPUS DRIVE (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 1030 52 18 1100 11 3 Southbound 1257 63 47 1367 14 4 Eastbound 910 46 1 957 10 0 Westbound 330 17 0 347 3 4 Project Traffic is estimated to be less than 1 % of Projected Peak Hour Traffic Volumes. Project Traffc Is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: MACARTHUR BOULEVARD & CAMPUS DRIVE (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 1294 65 55 1414 14 4 Southbound 1311 66 27 1404 - 14 2 Eastbound 694 35 0 729 7 0 Westbound 962 48 1 1011 10 2 Project Traffic is estimated to be less than 1 %of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 %of Prolected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin - Striker Project DATE: 5/22/2011 472 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: MACARTHUR BOULEVARD & BIRCH STREET (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 819 33 15 867 9 3 Southbound 900 36 47 983 10 8 Eastbound 541 0 6 547 5 0 Westbound 238 1 0 1 13 251 3 0 Project Traffic is estimated to be less than 1% of Projected Peak Hour Traffic Volumes. IIProject Traffic is estimated to be equal to or greater than 1% of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required, 1 % TRAFFIC VOLUME ANALYSIS INTERSECTION: MACARTHUR BOULEVARD & BIRCH STREET (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAKHOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 757 30 37 824 8 4 Southbound 1056 42 26 1124 11 4 Eastbound 509 0 36 545 5 - 0 Westbound 1 717 1 0 1 8 725 7 0 Project Traffic is estimated to be less than 1% of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1% of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin- Striker Project DATE: 5/22/2011 47S 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: MACARTHUR BOULEVARD & VON KARMAN AVENUE (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 1745 70 17 1832 18 21 Southbound 656 26 1 34 716 - 7 22 Eastbound 143 0 0 143 1 0 Westbound 226 0 1 227 2 2 Project Traffic is estimated to be less than 1% of Projected Peak Hour Tragic Volumes. Project Traffic is estimated to be equal to or greater than 1% of Projected Peak Hour Traffic Volumes, Intersection Capacity Utilization (ICU) Analysis is required. 1 % TRAFFIC VOLUME ANALYSIS INTERSECTION. MACARTHUR BOULEVARD & VON KARMAN AVENUE (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAKHOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME i %OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 798 32 40 870 9 10 Southbound 1049 42 18 1109 11 29 Eastbound 516 0 0 516 5 0 Westbound 1 830 1 0 0 830 1 8 1 Project Tragc is estimated to be less than 1 % of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 11A of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin- Striker Project - DATE: . 512 212 01 1 T 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: MACARTHUR BOULEVARD & JAMBOREE ROAD (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAKHOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 1965 79 12 2056 21 10 Southbound 480 1 19 42 541 5 15 Eastbound 1437 57 48 1542 15 6 Westbound 1219 49 69 1337 13 6 Project Traffic is estimated to be less than 1 %of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: MACARTHUR BOULEVARD & JAMBOREE ROAD (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAKHOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 1202 48 45 1295 13 5 Southbound 1434 57 21 1512 15 19 Eastbound 1218 49 79 1346 13 3 Westbound 1687 67 51 1805 18 3 Project Traffic is estimated to be less than 1 % of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater (ban 1 % of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin- Striker Project DATE: 5/22/2011 47,5 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: CAMPUS DRIVE /IRVINE AVENUE & BRISTOL STREET NORTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 1882 75 1 1958 20 6 Southbound 424 17 0 441 4 4 Eastbound 0 0 0 0 0 0 Westbound 1160 0 8 1168 12 0 Project Traffic is estimated to be less then 1% of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to a greater than 1% of Projectetl Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. 1 % TRAFFIC VOLUME ANALYSIS INTERSECTION: CAMPUS DRIVE /IRVINE AVENUE & BRISTOL STREET NORTH (Existing Traffic Volumes Based on Average Daily TiaKc 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 1041 42 0 1083 11 3 Southbound 1749 70 0 1819 18 6 Eastbound 0 0 0 0 0 0 Westbound 2141 0 41 2182 22 0 Project Traffic is estimated to be less than 1% of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to a greater than 1% of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin - Striker Project DATE: 5/22/2011 -4.70 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: CAMPUS DRIVE/IRVINE AVENUE & BRISTOL STREET SOUTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME - PEAKHOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 1052 42 2 1096 - 11 2 Southbound 377 15 0 392 4 1 Eastbound 3108 0 26 3134 31 4 Westbound 0 1 0 1 0 0 0 0 Project Traffic is estimated to be less than 1 % of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 %of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: CAMPUS DRIVE /IRVINE AVENUE & BRISTOL STREET SOUTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 900 36 1 937 9 1 Southbound 1060 42 2 1104 11 2 Eastbound 1850 0 18 1868 19 2 Westbound 0 0 0 0 0 0 Project Traffic is estimated to be less than 1 % of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: -4221 Dolphin - Striker Project DATE: 512 212 01 1 477 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: BIRCH STREET & BRISTOL STREET NORTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAKHOUR VOLUME PEAKHOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1°/ OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 994 0 12 1006 10 2 Southbound 255 0 25 280 3 1 Eastbound 0 0 0 0 0 0 Westbound 1628 1 0 51 1 1679 17 0 Project Traffic is estimated W be less than 1 % of Protected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 % of Pmjected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. 1 % TRAFFIC VOLUME ANALYSIS INTERSECTION: BIRCH STREET & BRISTOL STREET NORTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAKHOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 542 0 74 616 6 1 Southbound 1227 0 15 1242 12 2 Eastbound 0 0 0 0 0 0 Westbound 1703 1 0 1 35 1 1730 1 17 1 0 Project Traffic is estimated to be less than 1 %of Projected Peak Hoar Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volumes. fnlersection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin - Striker Project DATE: 5/2 212 01 1 472 1% TRAFFIC VOLUME ANALYSIS INTERSECTION. BIRCH STREET & BRISTOL STREET SOUTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 562 0 27 589 6 2 Southbound 1 577 0 1 75 652 f 1 Eastbound 1834 0 27 1861 19 0 Westbound 0 0 0 0 0 0 IX JProjecl Traffic is estimated to be less then 1 %of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 %of Projected Peak Hour Traffic Vobm es. Intersection Capacity Utilization (ICU) Analysis is required. 1 % TRAFFIC VOLUME ANALYSIS INTERSECTION. BIRCH STREET & BRISTOL STREET SOUTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAKHOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 612 0 150 762 8 1 Southbound 919 0 46 965 10 2 Eastbound 1361 0 22 1383 14 0 Westbound 0 0 0 0 0 0 IX 1Pmiect Traffic is estimated to be less than 1% of Pmjected Peak Hour Traffic Volumes. ] Pmject Traffic is estimated to be equal to or greeter then 1% of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin- Striker Project DATE: 5/22/2011 4�" 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: VON KARMAN AVENUE & CAMPUS DRIVE (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound _ 603 0 0 603 6 4 Southbound 445 0 1 446 4 2 Eastbound 573 23 0 596 6 0 Westbound 474 19 0 493 5 4 Project Traffic is estimated to be less than 1% of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1% of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: VON KARMAN AVENUE & CAMPUS DRIVE (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR - APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAKHOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 552 0 2 554 6 6 Southbound 932 0 0 - 932 9 - 1 Eastbound 639 26 0 665 - 7 0 Westbound 616 25 0 641 6- 2 C� Project Traffic is estimated to be less than l % of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. - PROJECT: 4221 Dolphin - Striker Project - - DATE: 5/2212011 420 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: VON KARMAN AVENUE & BIRCH STREET (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAKHOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 547 0 1 548 - 5 4 Southbound 459 0 1 460 5 2 Eastbound 321 1 3 324 3 0 Westbound 224 0 13 237 1 2 1 0 Project Traffic is estimated to be less than 1 % of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volumes. Intersection Capacity Uthimtion(ICU) Analysis is required. I% TRAFFIC VOLUME ANALYSIS INTERSECTION: VON KARMAN AVENUE & BIRCH STREET (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING- PEAKHOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 533 0 2 535 5 5 Southbound 716 0 0 716 7 1 Eastbound 291 0 18 - 309 3 0 Westbound 295 1 0 1 8 303 3 0 Project Traffic is estimated to be less than 1% of Projected Peak Hour Traffic Volumes. �Pmjeot Traffic is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volum as. Intersection Capacity Util¢ation (ICU) Analysis is required. PROJECT: 4221 Dolphin- Striker Project DATE: 5/22/2011 421 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: BAYVIEW STREET & BRISTOL STREET SOUTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME -1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 101 - 0 2 103 1 0 Southbound 0 0 0 0 0 1 0 Eastbound 2884 0 51 2935 29 0 Westbound 0 0 0 1 0 0 0 IProject Traffic is estimated to be less than 1 % of Projected Peak Hour Traffic Volumes. IProject Traffic is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volumes, Intersection Capacity Utilization (ICU) Analysis is required. 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: BAYVIEW STREET & BRISTOL STREET SOUTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 433 0 23 456 5 0 Southbound 0 0 0 0 0 0 Eastbound 2733 0 26 2759 28 0 Westbound 0 0 0 0 0 0 Project Traffic is estimated to he less than 1 %of Projected Peak Hour Traffic Volumes. Project Traffic 6 estimated to be equal to or greater than 1 %of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin - Striker Project DATE: 5/22/2011 422 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: JAMBOREE ROAD & CAMPUS DRIVE (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 1221 61 29 1311 13 4 Southbound 2190 110 69 2369 24 6 Eastbound 198 10 1 209 2 3 Westbound 834 42 1 877 9 4 Project Traffic is estimated to be less than 1% of Projected Peak Hour Traffic Volumes. �ProjeG Traffic is estimated to be equal to or greater than 1% of Projected Peak Hour Traffic. Volumes. Intersection Capacity Utilization (ICU) Analysis is required. I% TRAFFIC VOLUME ANALYSIS INTERSECTION; JAMBOREE ROAD & CAMPUS DRIVE (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 1478 74 69 1621 16 5 Southbountl 1515 76 41 1632 16 3 Eastbound 641 32 0 673 1 7 4 Westboundt 7 1 35 2 746 7 2 Project Traffic is estimated to be less than 1 % of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater Nan 1 %of Projected Peak Hour Traffic Volumes. Imemection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin- Striker Project DATE: 5/2 212 01 1 42S 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: JAMBOREE ROAD & BIRCH STREET (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 1434 72 30 1536 15 - 4 Southbound 2022 101 70 2193- 22 6 Eastbound 173 0 0 173 2 0 Westbound 15 0 0 15 0 0 Project Traffic is estimated to be less than 1 %of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1% of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required, 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: JAMBOREE ROAD & BIRCH STREET (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR - APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAKHOUR - VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 1232 62 68 1362 14 5 Southbound 1483 74 41 1598 - 16 3 Eastbound 401 0 1 402 4 - 0 Westbound 1 0 0 1 1 0 0 Project Traffic is estimated to be less than 1% of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1% of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin- Striker Project _ DATE: 5/22/2011 424 1 % TRAFFIC VOLUME ANALYSIS INTERSECTION: JAMBOREE ROAD & BRISTOL STREET NORTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR _ APPROACH DIRECTION EXISTING PEAKHOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 3018 121 93 3232 32 6 Southbound 982 39 99 1120 11 4 Eastbound 0 0 0 0 0 0 Westbound 0 0 0 0 0 0 Project Traffic is estimated to be less than i % of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: JAMBOREE ROAD & BRISTOL STREET NORTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 2773 111 182 3066 31 3 Southbound 1692 68 65 1825 18 5 Eastbound 0 0 0 0 0 0 Westbound 1 0 1 0 1 0 0 0 0 Project Traffic is estimated to be less than 1% of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: 4221 Dolphin - Striker Project - DATE:- 512212011 425 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: JAMBOREE ROAD & BRISTOL STREET SOUTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) AM PEAK HOUR APPROACH DIRECTION EXISTING PEAKHOUR VOLUME PEAKHOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAKHOUR VOLUME PROJECTED PEAKHOUR VOLUME 1% OF PROJECTED PEAKHOUR VOLUME PROJECT PEAKHOUR VOLUME Northbound 1857 74 111 2042 20 6 Southbound 571 23 1 87 1 681 7 4 Eastbound 2682 0 120 2802 28 0 Westbound 0 0 0 0 0 0 Project Traffic is estimated to be less than 1 % of Projected Peak Hour Tref a Volumes. �Pmjed Tragic is estimated to be equal to or greater than I% of Projected Peak Hour Traffic Volumes. Intersection Capacity Utilization (ICU) Analysis is required. 1% TRAFFIC VOLUME ANALYSIS INTERSECTION: JAMBOREE ROAD & BRISTOL STREET SOUTH (Existing Traffic Volumes Based on Average Daily Traffic 2011 AM) PM PEAK HOUR APPROACH DIRECTION .EXISTING PEAK HOUR VOLUME PEAK HOUR REGIONAL GROWTH VOLUME APPROVED PROJECTS PEAK HOUR VOLUME PROJECTED PEAK HOUR VOLUME 1% OF PROJECTED PEAK HOUR VOLUME PROJECT PEAK HOUR VOLUME Northbound 1907 76 177 2160 22 3 Southbound 1080 43 1 57 1180 1 12 5 Eastbound 3153 0 178 3331 33 0 Westbound 0 0 0 0 0 1 0 Project Traffic is estimated to be less than 1 % of Projected Peak Hour Traffic Volumes. Project Traffic is estimated to be equal to or greater than 1 % of Projected Peak Hour Traffic Volume, Intersection Capacity Utili=ion(ICU) Analysis is required. PROJECT: 4221 Dolphin- Striker Project DATE: 512212011 420 APPENDIX G Cumulative Project Data 427 Table G -1 Cumulative Project Traffic Generation' Project Peak Hour Daily Morning Evening Inbound I Outbound Total Inbound Outbound I Total Mariner's Medical Arts 22 6 28 11 31 42 442 WPI- Newport, LLC 0 -28 -28 -72 -42 -114 -577 Banning Ranch 236 581 817 659 447 1,106 13,327 Sunset Ridge Park 1 1 2 29 13 42 165 Marina Park 15 0 15 7 19 26 352 Pres Office Building B 161 2 18 3 15 18 132 Koll - Conexant -348 338 -10 316 -222 94 2,764 Mariner's Pointe 13 3 16 48 36 84 1,533 Newport Coast -TAZ1 Newport Coast -TAZ2 Newport Coast -TAZ3 Newport Coast -TAZ4 74 91 51 1 56 244 327 178 186 318 418 229 242 238 327 178 184 159 183 102 113 397 510 280 297 3,928 5,105 2,794 2,960 Total 1 2271 1,838 2,065 1,9281 8541 2,782 32,925 1 Negative trips were not assigned to traffic analysis. 422 Cumulative Proiect List - November 2010 Projects of significant size to have a potential cumulative impact Note: Highlighted projects do not result in an increase in traffic generation; however, may have other cumulative impacts to consider (i.e. construction, noise, air quality). gu�t�S't"iC,t�rW fghu _ *� tf tat�����, v €tfi3�at. gtie Mariner's Medical 1901 Westcliff Dr. 12,245 g.s.f. medical office addition Arts WPI- Newport, LLC 4699 Jamboree Rd/ New office building and remodel of existing office and 5190 Campus Drive bank buildings to accommodate office space, bank, retail, and restaurant uses: Existing (To be demolished): 21,023 g.s.f. • Office: 10,800 g.s.f. • Bank:10,221 g.s.f. New: 46,044 g.s.f. • Office: 39,212 n.s.f./42,041 g.s.f. • Bank: 3,434 n.s.f. 14,003 g.s.f. Banning Ranch 4520 W. Coast Hwy 1,375 d.u., 75,000 g.s.f. commercial retail, 75 -room accommodations, parks, and open space. Sunset Ridge Park 4850 W. Coast Hwy 13.67 ac. active park Marina Park 1700 Balboa Blvd 10.45 ac. public marina, beach, park with recreational facilities as follows: • Balboa Center Complex: 26,990 g.s.f. • Visiting Vessel Marina: 23 Slips • Marina Services Building (laundry, offices, etc.): 1,328 g.s.f. • Girl Scout House: 5,500 g.s.f. • Parking 153 spaces Pres Office 4300 Von Karmen 11,960 g.s.f. office Building B (9,917 n.s.f.) Conexant 4311 Jamboree Rd New: •- 1,244 residential d.0 • 11,500 g.s.f. commercial Existing (to be demolished): • 167,000 g.s.f. office • 269,000 g.s.f. industrial Koll 4343 Von Karmen Ave New: • 260 residential d.u. • 3,400 g.s.f. commercial 0 move, WSA0006ANW-16-9- '4' e q Do p 4221 Dolphin Striker New: 15,000 g.s.f. commercial retail development- MacArthur -- – -- `_ — stktgjtc be demolished): 7,996 g.s.f. restaurant building " -- Mariner's Pointe 100 -300 West Coast New: 23,015 g.s.f commercial development and 3 -story Highway parking structure 12,722 g.s.f. restaurant • 7,293 g.s.f. retail • 3,000 g.s.f. medical Existing (to be demolished): 5,447 g.s.f. officelretail Newport Coast See David Keely in Public Works for update. \ \cnb \data \users\PBW\DKeely \dkeely \Traffic Phasing Ordinance \Cumulative Project List\20101118 Cumulative Project List .docx -T9O S U N5ET 14U0&e IIAPY- Sunset Ridge Park May, 2009 Traffic Impact Study qj- Table 5 Project Trip Generation Sunset Ridge Park Land Use ITE Code Unit Trip Generation Rates AM Peak Hour PM Peak Hour Daily t Total In I Out Total City Park 411 Acre 1.59 Soccer Complex 488 Field 71.33 0.70 0.70 1.40 14.26 1 6.41 20.67 Land Use Quantity Trip Generation Estimates AM Peak Hour PM Peak Hour Daily t Total In Out Total City Park 13.67 Acres 22 N/A I N/A N/A N/A N/A N/A Soccer Complex 2 Fields 143 1 1 2 29 13 42 TOTAL 165 1 1 2 29 13 42 Source: Institute of Transportation Engineers publication "Trip Generation ", 8th Edition * No peak hour tri p generation rates given for this land use. Sunset Ridge Park May, 2009 Traffic Impact Study qj- 20% 20% 20% a a u ? $ 5 16TH ST mJ $p� 15TH 57 iO � 2 PROJECT SITE 1p WEST - \ 0 �p COAST HIGHWgy y HOSPITAL RD e t. O 2 O O LEGEND X% TRIP DISTRIBUTION PERCENTAGE - 10 %p 20% SUNSET RIDGE PARK TRIP DISTRIBUTION MAIZ40 A )PAn-K. Table I TRIP GENERATION SUMMARY AM PEAK HOUR PM PEAK HOUR LAND USE UNITS IN OUT TOTAL IN OUT TOTAL ADT TRIP RATES Park' Acre .28 .20 .48 -.38 .92 1.30 15.70 Recreational Community Center (ITE 495)' TSF .99 .63 - 1.62 .48 1.16 1.64 22.88 Marina (ITE 420) - Berth .03 - .05 .08 .11 .08 .19 2.96 TRIP GENERATION Proposed Project Park 4.89 Acres 1 1 2 2 4 6 77 Comnumity Cu /Sailing Ctr /Cafe 21.3 TSF 21 13 34 10 25 35 487 Visitor Marina - 23 Berths I 1 2 3- 2 5 68 Sub -Total 23 15 38 15 - 31 46 632 Existing Use - Mobile Home Park 57 DU -5 - -13 -18 -7 -7 -14 - -194 Park 1.2 Acres 0 0 0 0 - -1 -1 -19 Community Ctr 2.9 TSF -3 - -2 -5 -1 -4 -5 -67 NET NEW TRIPS - 15 0 15 7 19 26 352 Notes: Park AM and PM trip rates from ITE City Park (411) rate /acre, ADT rate averaged from City (411) and Beach (415) Park ADT rate/acre. - - x ITE Recreational Community Center (495) trip rates applied to Community Center, Sailing Center, and Cafe. The Girl Scout House will be relocated on -site and results in no net change in project trips. Marina Park TPO - 5 Austin -Foust Associates, Inc. Traffic Analysis - - - - 029033tpo.doc �9 3 Figure 3 GENERAL PROJECT DISTRIBUTION Marina Park TPO 7 Austin -Foust Associates, Inc. Traffic Analysis 029033tpoFig3.dwg T_94 TABLE2 - SUMMARY OF PROJECT TRIP GENERATION - NEWPORT BANNING RANCIf TRIP RATES - Land Use ITE Coda Trips per Trip Generation Rates AM Peak Hour PMPeak Hour Dail In Out Total In I Out Total Single-Family Detached Housing 210 DU 9.57 0.19 0.56 0.75 0.64 0.37 1.01 Residential Condominiurnrrownhouse 230 - DU 5.81 0.07 0.37 0.44 0.35. 0.17 0.52 High -Rise Residential CondominiuMlownhouse 232 4.18 0.06 0.28 0.34 0.24 0.14 0.38 Resor[ Hotel 330 4.90 0.22 0.09 0.31 0.18 0.24 0.42 Park a 412 i[75.10 2.28 0.01 0.00 0.01 0.02 0.04 0.06 Shopping Center a 820 Equation • See Below PROJECT TRIP GENERATION Project Area Land Use Units Trip Generation Estimates Dail AM Peak Hour PM Peak Hour In Out Total In Out Total South Family Single -Famil Detached Housing 141 DU 1,349 27 79 106 90 52 142 Village Park 28 Acres 64 0 0 0 1 1 2 Subtotal 1,413 27 79 106 91 53 144 Resort Residential Condominium/fownhouse 87 DU 505 6 32 38 30 15 45 Colony Resort Hotel 75 Rooms 368 17 7 24 14 18 32 Subtotal 873 23 39 62 44 33 77 North Funnily Single-Family Detached Housing 282 DU 2,699 54 158 212 180 104 284 Village Residential Condominium/Townhouse 135 DU 784 9 50 59 47 23 70 Subtotal 3,483 63 208 1 271 227 127 354 Urban Colony High-Rise Residential Condominiumlfownhome 730 DU 3,051 44 204 248 175 102 277 Shopping Center 75.0 KSF 5,633 79 51 130 257 267 524 Subtotal 8,684 123 255 378 432 369 801 Total Before Internal Capture/Pass -by Internal Capture' Pass -By Redaction for Retail (34 %) s Total Project Tri 14 & 3 236 1 581 1 817 794 582 11,376 1 126 REW 55 55 110 IBM 80 80 160 13 27 236 581 - 817 659 447 1,106 Source: Institute of Transportation Engineers publication Trip Generation ", 8th Edition DU =Dwelling Unit, KSF ° 1,000 Square Feet 'ITE Land Use Category 330 Resort Hazel does not provide a daily trip rate. ITE Land Use Category 311 -All Suites Hatel was used for daily trips. 2 Trip generation is based on ITE land Use County Park (land Use 412) because this category includes peek hour trip rates. a Trip rates for Shopping Center are derived from the following regression equations: T =Trip Ends, X =units in KSF ADT: Ln(1) =0.65 Ln(X) +5.83 AM Peak How. Ln(T) -0.59 Ln(X) +2.32 - - PM Peak Hour. LaM -0.67 Ln(X) +3.37 ° Sources Institute of Transportation Engineers OM publication Trip Generation Handbook". See Internal Capture Worksheets in Appendix C. s Source: ITE publication "Trip Generation Handbook ". P reduction is taken on balance of mail in after internal Capture reduction TratBc Impact Study - _ 25 - December, 2009 Newport Banning Ranch - 4_95 (A) ° 10% 40% 5% 5% 5 % NOT TO SCALE victoria St 5% Hamilton Ave t Costa m ` > Hun mesa '_+° o Beach `m __ x o $ ° t x S Q °r omP a° m \ 2 °� pia° a caP Banning Ave m \ 19th St 10% ymC `cP C� tJm IF 5% y� j / 18th St ro`� Project \\ N ® ���� Site 17th at ryrhsr r zs% e. R ° 18th st °ware ady 10% 15th St rs 5 %sr Q`omQ" i 10% - 0 °o rysr ma0 tP 2b Ch001 Oad mro Hospital Rd t P rs gJQ ° tea° ,m Newport Beach 0A 10 Ey GEND= _ - - SON W. Coast Hwy 'al O - Study Intersection _ _ , 5% - - 1IX% = Trip Distribution Percentage - - - o - -- = City Boundary 5% 0 5 /O - -- =Future Road - °+ T ** N \y FIGURE 8 PROJECT TRIP DISTRIBUTION Con rntHruE. ow m• an°s - +osrrm Kimsey -Horn and Associates, Kali- Conexant 4311 Jamboree Road Trio Generation Rates Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Dail In Out Total In Out Total Total Office ITE -8th 167 TSF 1.36 0.19 1.55 0.25 1.24 1.49 11.01 General Light Industrial ITE -8th 269 TSF 0.81 0.11 0.92 0.12 0.85 0.97 6.97 Apartments ITE -8th DU 0.1 0.41 0.51 0.4 0.22 0.62 6.65 ITE -8th TSF 0 0 0 0 0 0 0 Total 445 61 506 74 436 510 3714 Existinst Use Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Dail In Out Total In Out Total Total Office ITE -8th 167 TSF 227 32 259 42 207 249 1839 Industrial ITE -8th 269 TSF 218 30 247 32 229 261 1875 ITE -8th TSF 0 0 0 0 0 0 0 ITE -8th TSF 0 0 0 0 0 0 0 Total 445 61 506 74 436 510 3714 Proposed Use Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Total Apartment ITE -8th 974 DU 97 399 497 390 214 604 6477 ITE -8th TSF 0 0 0 0 0 0 0 ITE -8th TSF 0 0 0 0 0 0 0 ITE -8th TSF 0 0 0 0 0 0 0 Total 97 399 497 390 214 604 6477 x\91 7� Mariner's Medical Arts 1901 Westcliff Drive Trip Generation Rates Land Use Rate T pe Size Unit AM Peak Hour PM Peak Hour Dail In Out Total In Out Total Total Medical Office ITE -8th 12.245 TSF 1.82 0.48 2.30 0.93 2.53 3.46 36.13 ITE -8th ITE -8th Total ITE -8th 0 0 0 Total 22 6 28 11 31 42 442 Existing Use Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Dail In Out Total In Out Total Total Medical Office ITE -8th 12.245 TSF 22 6 28 11 31 42 442 ITE -8th ITE -8th Total ITE -8th 0 0 0 Proposed Use Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Dail In Out Total In Out Total Total Medical Office ITE -8th 12.245 TSF 22 6 28 11 31 42 442 ITE -8th ITE -8th ITE -8th Total 22 6 28 11 31 42 442 Not Increase I I 1 1 221 61 281 ill 311 42 442 � mm � � � � " = m = " " M m m M M 1901 WestcliSurgical Center TPO Traffic Analysis Report 1 M lhna Company NEWPORT BEACH FIGURE 1901 WESTCLIFF DRIVE TRAFFIC PHASING ORDINANCE Project Trip Distribution Percentages Meyer, Mohaddes Associates, Inc. 11 WPI- Newport, LLC 4699 Jamboree Road - 5190 Campus Drive Trip Generation Rates Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Dail In Out Total In Out Total Total Office ITE -8th 10.8 TSF 1.36 0.19 1.55 0.25 124 1.49 11.01 Bank -Drive In ITE -8th 10.221 TSF 6.92 5.43 12.35 12.91 12.91 25.82 148.15 Specialty Retail Center' ITE -8th TSF 0.61 0.39 1.00 1.19 1.52 2.71 44.32 Quality Restaurant" ITE -8th TSF 0.66 0.15 0.81 5.02 2.47 7.49 89.95 Total 21.021 85 58 143 135 145 280 1633 Note' - Specialty Retail AM trip generation rate is unavailable. Shopping Center AM peak hour trip generation rate used. " - AM distribution for AM peak hour of generator used. Existing Use Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Dail In Out Total In Out Total Total Office ITE -8th 10.8 TSF 15 2 17 3 13 16 119 Bank ITE -8th 10.221 TSF 71 56 126 132 132 264 1514 ITE -8th ITE -8th Total 21.021 85 58 143 135 145 280 1633 Proposed Use Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Total Office ITE -8th 42.041 TSF 57 8 65 11 52 63 463 Bank ITE -8th 4.003 TSF 28 22 49 52 52 103 593 Total 46.044 85 30 115 62 104 166 1056 lNetlncrease I I I 1 -11 -261 -281 -721 -421 -1141 -5771 Note: Do not assign negative trips to the circulation system. 2 % �P45% 1�P O� J 15% 20% sR�3 S�. T -I S C A A r PROJECT SITE o� o oP�aJ� QGgi� sr � ay isTO �P 5% R�Sr o� sr yO LEGEND A X% TRIP DISTRIBUTION PERCENTAGE _ 10% WPI- NEWPORT, LLC 10% 15% TRIP DISTRIBUTION Pres Office Building B 4300 Von Karman Trip Generation Rates Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Total Office ITE -8th 11.96 TSF 1.36 0.19 1.55 0.25 1.24 1.49 11.01 ITE -8th ITE -8th Total ITE -8th 0 0 0 Total 16 2 19 3 15 18M Existing Use Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Dail In Out Total In Out Total Total Office ITE -8th 11.96 TSF 16 2 19 3 15 18 132 ITE -8th ITE -8th Total ITE -8th 0 0 0 Proposed Use Land Use Rate Type Size Unit AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Total Office ITE -8th 11.96 TSF 16 2 19 3 15 18 132 ITE -8th ITE -8th ITE -8th Total 16 2 19 3 15 18M Net Increase I I 1 1 161 21 191 31 151 18 132 O W 2 % 5% �P �e O� J 15% 20% T3 3 OOLF n `rT P c PROJECT SITE P m r O� 4P�J9 QG4i� ST ����0 �o 0� Sp N ' SRS S� O< y.T OLEGEND X% TRIP DISTRIBUTION PERCENTAGE 10% PRES OFFICE BUILDING B 10% 15% TRIP DISTRIBUTION Table 5 Proposed Project Trip Rates Land Use Units AM Peak Hour Rates PM Peak Hour Rates Daily Trip Rate In Out Total In Out Total Specialty Retail tsf 0.0 0.0 0.0 119 1.52 2.71 44.32 Quality Restaurant tsf 0.66 0.15 0.81 5.02. 2.47 7.49 89.95 Medical Office tsf 1.82 0.48 2.30 0.93 2.53 3.46 36.13 Source: ITE Trip Generation Manual, Edition Note: tsf = thousand square feet Table 6 summarizes the trips forecast to be generated by the proposed project utilizing the ITE trip rates shown in Table 5. Table 6 Proposed Project Trip Generation Land use AM Peak Hour Trips PM Peak Hour Trips Daily Trips In Out Total In Out Total 7.293 tsf - Specialty Retail 0 0 0 - 9 11 - - 20 323 12.722 tsf- Quality Restaurant a 2 10 64 31 95 1,144 Pass -by Discount (44% in p.m.) 0 0 0 -28 -14 -42 -42 3.000 tsf - Medical Office 5 1 6 3 8 11 108 TOTAL 13 3 16 1 48 36 84 1,533 Source: Pass -by discount determined using ITE Trip Generation Manual, 2atl Edition Note: tsf = thousand square feet As shown in Table 6, the proposed project is forecast to generate approximately 1,533 daily trips, which includes approximately 48 a.m. peak hour trips and approximately 84 p.m. peak hour trips. Since the project site is currently occupied by 5,447 square feet of specialty retail planned to be displaced by the proposed project, trips associated with the displaced land use are subtracted from the project site trip generation forecast shown in Table 6 to determine the number of net new trips forecast to be generated by the proposed project. In accordance with City analysis methodology, the net trip generation accounting for the displaced land use is only utilized for the TPO traffic analysis, not for the forecast cumulative traffic analysis (contained in the next section of this report). Table 7 summarizes the existing project site trips forecast to be displaced by the proposed project utilizing the ITE trip rates shown in Table 5. 11 " - XX% Trip Percent Distribution Not to Scale ...... Project Site Boundary H :"MI1010)8OnT.f W EWb ts\ EM08Ai DEC1201 M Project Trip Distribution TABLE 12 -1 TRIP GENERATION RATES' NEwpmr COA16T LAND USE UNITSZ PEAK HOUR DAILY AM PM IN OUT IN OUT Condominium/Townhouse DU 0.17 0.49 0.47 0.36 8.10 Multi Family Dwelling DU / .90.` 0.42 0.43 0.20 6.47 Single Family Detached Residential DU 0.20 0.70 0.70 0.40 11.00 State Park (gross acres) AC 0.21 0.90 0.29 0.31 19.15 ' Source: City of Newport Beach Trip Generation Rates 2 DU = Dwelling Units AC = Acres U: \Uciobs \00636\Excel \[00636- 02.xls]T 12 -1 12 -2 1507 TABLE 12 -2 PROJECT TRIP GENERATION TAZ PLANNING AREA LAND USE QUANTIJUNITS'l PEAK HOUR DAILY 1 AM PM IN I OUT IN OUT 1A Condominium/Townhouse 121 DU 21 59 57 44 980 1B Single Family Detached Residential 36 DU 7 25 25 14 396 1C CondominiumlTownhouse 888 DU 151 435 417 320 7,193 1 2A Single Family Detached Residential 206 DU 41 144 144 82 2,266 13C Multi Family Dwelling 116 DU 104 49 50 23 751 13D Multi Family Dwelling 116 DU 104 49 50 23 751 13E Multi Family Dwelling 116 DU 104 49 50 23 751 TOTAL FOR TAZ 1 I I 532 810 793 529 13,088 3A - Single Family Detached Residential Single Family Detached Residential 347 DU 69 243 243 139 3,817 3B 450 DU 90 315 315 180 4,950 46 Single Family Detached Residential 587 DU 117 411 411 235 6,457 2 13A - Multi Family Dwelling 117 DU 105 49 50 23 757 13B Multi Family Dwelling 117 DU 105 49 50 23 757 14 Single Family Detached Residential 26 DU 5 - 18 18 10 286 17 State Park (gross acres 2,807 AC 589 2,526 814 870 53,754 TOTAL FOR TAZ 2 1 1 1,080 1 3,611 1,901 1,480 70,778 3 211 Single Family Detached Residential 62 DU 12 43 43 25 682 4A Sin le Famil Detached Residential 784 DU 157 1 549 549 1 314 1 8,624 TOTAL FOR TAZ 3 169 592 592 1 339 1 9,306 2C ISingle Family Detached Residential 307 2 15 215 215 123 3,377 4 5 Single Family Detached Residential 300 DU 60 210 210 120 3,300 6 ISingle Family Detached Residential 75 DU 15 1 53 53 30 825 .8 Condominium/Townhouse 289 DU 49 142 136 104 2,341 TOTAL FOR TAZ 4 1 185 1 620 1 614 377 9,843 TOTAL FOR ALL ZONES 1,966 1 5,633 1 3,900 2,725 103,015 DU =Dwelling � Units AC = Acres U:tllcJobs1006361EXMA [00636 -02.xls]T 12 -2 fib'1, of Durs ON„-4 30 i 2 Luµu Svc aQ T 41e 12 -3 1502 J N V1 Q) m m m ME F-En � 10 NEWPORT COAST TRAFFIC ANALY` TRIP DISTRIBUTION PA r ,z 110 \� i �� / / l 1 \O / v \ 9 / 51 B ,E. es° 10 5 B 5 q TAZ 1 SOURCE: NEWPORT COAST PHASES IV -3 & IV-4 TRAFFIC ANALYSIS PREPARED BY AUSTIN•FOUST ASSOCIATES, INC. NEWPORT BEACH CUMULATIVE TRAFFIC ANALYSIS Newport Beach Callfomia• 00636.09 UF#BAN EXHIBI 12 -B NEWPORT COAST TRAFFIC ANALYSIS ZONE 2 TRIP DISTRIBUTION PATTERNS all ayPJt tP\ - ISD�y4 Z O I1ND ST. '\� o T TF 5'llS R 10 48 AZ 2 Lll 5 B4"OAB B< C \TR NEWPORT BEACH CUMULATIVE TRAFFIC ANALYSIS, Newport Beach, California • 00636:17 URBAN o TURTLE OR• s 16 f z cyy< rpNYON BRISTOLST. 10 all ayPJt tP\ - ISD�y4 Z O I1ND ST. '\� o T TF 5'llS R 10 48 AZ 2 Lll 5 B4"OAB B< C \TR NEWPORT BEACH CUMULATIVE TRAFFIC ANALYSIS, Newport Beach, California • 00636:17 URBAN ■ 10 N J 5 10 , , 110 NEWPORT COAST TRAFFIC AN r1f, TRIP DISTRIBUTION PA 12 18 t / / c C" 60 1 \ btir � vI Mee, y�$ R �a 10 sacs q at B< NEWPORT BEACH CUMULATIVE TRAFFIC ANALYSIS Newport Beach Califomia•00636:11 N 00 10 10 E EXHIBIT 12 -C NEWPORT COAST TRAFFIC ANALYSIS ZONE 4 TRIP DISTRIBUTION PATTERNS yam. 1U aAIaOA$ et NEWPORT BEACH CUMULATIVE TRAFFIC ANALYSIS Newport Beach, Califomia • 00636:12 - - - K TAZ 4 1 APPENDIX H City of Newport Beach Parking Code Requirements 513 Chapter 20.40 — Off- Street Parking Sections: 20.40.010 — Purpose 20.40.020 —Applicability 20.40:030 — Requirements for Off - Street Parking 20.40.040 — Off - Street Parking Spaces Required 20.40.050 — Parking Requirements for Shopping Centers 20.40.060 — Parking Requirements for f=ood Service Uses 20.40.070 — Development Standards for Parking Areas 20.40.080 — Parking for Nonresidential Uses in Residential Zoning Districts 20.40.090 — Parking Standards for Residential Uses 20.40. 100 — Off -Site Parking 20.40.110 — Adjustments to Off - Street Parking Requirements 20.40.120 — Parking Management Districts 20.40.130 — In -lieu Parking Fee 20.40.010 -- Purpose The purpose of this Chapter is to provide off - street parking and loading standards to: A. Provide for the general welfare and convenience of persons within the City by ensuring that sufficient parking facilities are available to meet the needs generated by specific uses and that adequate parking is provided, to the extent feasible; B Provide accessible, attractive, secure, and well - maintained off - street parking and loading facilities; C. Increase public safety by reducing congestion on public streets and to minimize impacts to public street parking available for coastal access and recreation; D. Ensure access and maneuverability for emergency vehicles; and E. Provide loading and delivery facilities in proportion to the needs of allowed uses. 20.40.020 — Applicability A. Off - street parking required. Each use, including a change or expansion of a use or structure, except as otherwise provided for in Chapter 20.38 (Nonconforming Uses and Structures) shall have appropriately maintained off - street parking and loading areas in compliance with the provisions of this Chapter. A use shall not be commenced and structures shall not be occupied until improvements required by this Chapter are satisfactorily completed. October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Off - Street B. Change, enlargement, or intensification of use. Changes in use and enlargement or intensification of an existing use shall require compliance with the off - street parking requirements of this Chapter, except as allowed in Chapter 20.38 (Nonconforming Uses and Structures). 20.40.030 — Requirements for Off- Street Parking A. Parking required to be on -site. Parking shall be located on the same lot or development site as the uses served, except for the following: 1. Townhouses and multi- tenant uses. Where parking is provided on another lot within the same development site, the parking shall be located within 200 feet of the units they are intended to serve. 2. Off -site parking agreement. Parking may be located off -site with the approval of an off -site parking agreement in compliance with Subsection 20.52.080.0 (Parking agreement). B. Permanent availability required. Each parking . and loading space shall be permanently available and maintained for parking purposes for the use it is intended to serve. The Director may authorize the temporary use of parking or loading spaces for other than parking or loading in conjunction with a seasonal or intermittent use allowed in compliance with Section 20.52.040 (Limited Term Permit). C. Maintenance. Parking spaces, driveways, maneuvering aisles, turnaround areas, and landscaping areas shall be kept free of dust, graffiti, and lifter. Striping, paving, walls, light standards, and all other facilities shall be permanently maintained in good condition. D. Vehicles for sale. Vehicles, trailers, or other personal property shall not be parked upon a private street, parking lot, or private property for the primary purpose of displaying the vehicle, trailer, or other personal property for sale, hire, or rental, unless the property is appropriately zoned, and the vendor is licensed to transact a vehicle sales business at that location. E. Calculation of spaces required. Fractional spaces. Fractional parking space requirements shall be rounded up to the next whole space. 2. Bench seating. Where bench seating or pews are provided, 18 linear inches of seating shall be considered to constitute a separate or individual seat. 3. Gross floor area. References to spaces per square foot are to be calculated on the basis of gross floor area unless otherwise specified. 4. Net public area. "Net Public Area" shall be defined as the total area accessible to the public within an eating and/or drinking establishment, excluding kitchens, restrooms, offices pertaining to the use, and storage areas. 5. Spaces per occupant. References to spaces per occupant are to be calculated on the basis of maximum occupancy approved by the City of Newport Beach Fire Department. Newport Beach Zoning Code, Title 20 October 26, 2010 Off- Street Parking . 20.40 6. Spaces required for multiple uses. If more than one use is located on a site, the number of required off -street parking spaces shall be equal to the sum of the requirements prescribed for each use. F. Nonconforming parking and loading. Land uses and structures that are non- conforming due solely to the lack of off - street parking or loading facilities required by this Chapter, shall be subject to the provisions of Section 20.38.060 (Nonconforming Parking). 20.40.040 -- Off- Street Parking Spaces Required Off- street parking spaces shall be provided in compliance with Table 3.11, below. These standards shall be considered the minimum required to preserve the public health, safety, and welfare, and more extensive parking provisions may be required by the review authority in particular circumstances. Unless otherwise noted parking requirements are calculated based on gross floor area. Industry Small - 5,000 sq. ft. or less 1 per 500 sq. ft. Large - Over 5,000 sq. ft. 1 per 1,000 sq. ft. Industry, Marine Related 1 per 750 sq. ft. Personal Storage (Mini Storage) 2 for resident manager, plus additional for office as required by Minor Use Permit Research and Development 1 per 500 sq. ft. Warehousing and Storage 1 per 2,000 sq. ft., plus 1 per 350 sq. ft. for offices. 9 g nn; .,ren,....,. Assembly /Meeting Facilities 1,000 sq. ft. 1 per 3 seats or 1 per 35 sq. ft. used for assembly Commercial Recreation and Entertainment As required by Conditional Use Permit Cultural Institutions 1 per 300 sq. ft. Schools, Public and Private As required by Conditional /Minor Use Permit Accessory Dwelling Units 1 per unit; a minimum of 2 covered per site. Single -Unit Dwellings - Attached 2 per unit in a garage Single -Unit Dwellings - Detached and less than A nnn -- a -. n--- ---- - 2 per unit in a garage October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Off-Street Parking Parking Spaces Required Single -Unit Dwellings - etached andn S,Oed 3 per unit in a garage sq are ft. or greater of floor area Single -Unit Dwellings - Balboa Island 2 per unit in a garage Mulb -Unit Dwellings - 3 units 2 per unit covered, plus guest parking; 1 - 2 units, no guest parking required 3 units, 1 guest parking space Multi -Unit Dwellings - 4 units or more 2 per unit covered, plus 0.5 space per unit for guest parking Two -Unit Dwellings 2 per unit; 1 in a garage and 1 covered or in a garage Livelwork units 2 per unit in a garage, plus 2 for guest/customer parking Senior Housing - market rate 1.2 per unit Senior Housin - affordable 1 er unit .- Appliances, Building Materials, Home Electronics, 1 st 10,000 sq. ft. - 1 space per 300 sq. ft. Furniture, Nurseries, and Similar Large Warehouse- Over 10,000 sq. ft, - 1 space per 500 sq. ft. type Retail Sales and Bulk Merchandise Facilities Plus 1 per 1,000 s .ft. of outdoor merchandise areas Food and Beverage Sales 1 per 200 sq. ft. Marine Rentals and Sales Boat Rentals and Sales 1 per 1,000 sq. ft. of lot area, plus 1 per 350 sq. ft of Marine Retail Sales 1 per 25D sq. ft. Retail Sales 1 per 250 sq. ft. Shopping Centers 1 per 200 sq. ft. See Section 20.40.050 Convalescent Facilities 1 per 3 beds or as required by Conditional Use Permit Emergency Health Facilities f per 200 sq. ft. Financial Institutions and Related Services 1 per 250 sq. ft. Hospitals 1 per bed; plus 1 per resident doctor and 1 per emDiovee. Offices* - Business, Corporate, General, Governmental First 50,000 sq. ft. Next 75,000 sq. ft. Floor area above 125,001 sq. ft. 1 per 250 sq. ft. net floor area 1 per 300 sq. ft. net floor area 1 per 350 sq. ft. net floor area * Not more than 20% medical office uses. Offices - Medical and Dental Offices 1 1 Der 200 sq -ft- Newnnrf Roach 7nninn Cnela Tifla 9A nPtnhor 9R 9n10 Off - Street R� 1 per 250 sq. ft. Adult -Oriented Businesses 1 per 1.5 occupants or as required by Conditional Use Permit Ambulance Services 1 1 Der 500 so. ft.: plus 2 storaqe spaces. Animal Sales and Services Animal Boarding /Kennels 1 per 400 sq. ft. Animal Grooming 1 per 400 sq. ft. Animal Hospitals /Clinics 1 per 400 sq. ft. Animal Retail Sales 1 per 250 sq. ft. Artists' Studios 1 per 1,000 sq. ft. Catering Services 1 per 400 sq. ft. Care Uses Adult Day Care — Small (6 or fewer) Spaces required for dwelling unit only. Adult Day Care -Large (7 or, more) 2 per site for drop -off and pick -up purposes (in addition to the spaces required for the dwellin unit). Child Day Care — Small (6 or fewer) Spaces required for dwelling unit only. Child Day Care - Large (9 to 14) 2 per site for drop -off and pick -up purposes (in addition to the spaces required for the dwelling unit Day Care - General 1 per 7 occupants based on maximum occupancy late hours allowed per license. Residential Care - General (7 to 14) 1 per 3 beds Eating and Drinking Establishments Accessory (open to public) I per each 3 seats or 1 per each 75 sq. ft. of net public area., whichever is greater Bars, Lounges, and Nightclubs 1 per each 4 persons based on allowed occupancy load or as required by Conditional Use Permit 1 per 30 -50 sq. ft. of net public area, including outdoor Food Service wfth/without alcohol, with /without dining areas, but excluding the first 25% or 1,000 sq. ft late hours of outdoor dining area, whichever is less. See Section *6-: 8 20, qO- 060 Food Service - Fast food 1 per 50 sq. ft., and 1 per 100 sq. ft. for outdoor dining areas Take -Out Service - Limited 1 per 250 sq. ft. Emergency Shelter As required by Conditional Use Permit Funeral Homes and Mortuaries 1 per 35 sq. ft. of assembly area Health /Fitness Facilities Small - 2,000 sq. ft or less 1 per 250 sq. fL Larqe - Over 2,000 sq. ft. 1 per 200 sq. ft. October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Off - Street Laboratories (medical, dental, and similar) 1 per 500 sq. ft Maintenance and Repair Services 1 per 500 sq. ft. Marine Services Boat Storage - Dry 0.33 per storage space or as required by Conditional Use Permit Boat Yards As required by Conditional Use Permit Dry Docks 2 per dry dock Entertainment and Excursion Services 1 per each 3 passengers and crew members Marine Service Stations As required by Conditional Use Permit Sport Fishing Charters 1 per each 2 passengers and crew members Water Transportation Services - Office 1 per 100 sq. ft., minimum 2 spaces Personal Services Massage Establishments 1 per 200 sq. ft. or as required by Conditional Use Permit Nail Salons 1 per 80 sq. ft. Personal Services, General 1 per 250 sq. ft. Studio (dance, music, and similar) 1 per 250 sq. Ft. Postal Services 1 per 250 sq. ft. Printing and Duplicating Services 1 per 250 sq. ft. Recycling Facilities Collection Facility - Large 4 spaces minimum, but more may be required by the review authority Collection Facility - Small As required by the review authority Visitor Accommodations Bed and Breakfast Inns 1 per guest room, plus 2 spaces Hotels and accessory uses As required by Conditional Use Permit Motels 1 per guest room or unit Recreational Vehicle Parks As required by Conditional Use Permit Time Shares As required by Conditional Use Permit Communication Facilities 1 per 500 sq. ft.. Heliports and Helistops As required by Conditional use Permit Marinas 0.75 per slip or 0.75 per 25 feet of mooring space Office Only 1 per 250 sq. ft. Limited 1 per 300 sq., ft., plus 1 per rental vehicle (not including Newport Beach Zoning.Code, Title 20 October 26, 2010 Off-Street Parking 20.40 Vehicles for hire I 1 per 300 sq. ft., plus 1 per each vehicle associated with the use and stored on the same site Vehicle /Equipment Repair (General and Limited) I 1 Der 300 sa. ft. or 5 Der service bav whichever is more Vehicle /Equipment Services Automobile Washing 1 per 200 sq. ft. of office or lounge area; plus queue for 5 cars per washin station Service Station 1 per 300 sq. ft. or 5 per service bay whichever is more; minimum of 4 Service Station with Convenience Market 1 per 200 sq. ft., in addition to 5 per service bay Vehicle Storage 1 per 500 sq. ft. e - Caretaker Residence 1 per unit Special Events As required by Municipal Code Chapter 11.03 Temporary Uses As required by the Limited Term Permit in compliance with Section 20.52.040 20.40.050 - Parking Requirements for Shopping Centers A. An off - street parking space requirement of 1 space for each 200 square feet of gross floor area may be used for shopping centers meeting the following criteria. 1. The gross floor area of the shopping center does not exceed 100,000 square feet; and 2. The gross floor area of all eating and drinking establishments does not exceed 15 percent of the gross floor area of the shopping center. B. Individual tenants with a gross floor area of 10,000 square feet or more shall meet the parking space requirement for the applicable use in compliance with Section 20.40.040 (Off- street Parking Spaces Required), above. C. Shopping centers with a gross floor areas in excess of 100,000 square feet or with eating and drinking establishments occupying more than 15 percent of the gross floor area of the center shall use a parking requirement equal to the sum of the requirements prescribed for each use in the shopping center. October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Off- Street 20.40.060 — Parking Requirements for Food Service Uses A. Establishment of parking requirement. The applicable review authority shall establish the off - street parking requirement for food service uses within a range of one space for each 30 to 50 square feet of net public area based upon the following considerations: The physical design characteristics: a. The gross floor area of the building or tenant space; d. The number of tables or seats and their arrangement; e. Other areas that should logically be excluded from the determination of net public area; f. The parking lot design, including the use of small car spaces, tandem and valet parking and loading areas; g. Availability of guest dock space for boats; and h. Extent of outdoor dining. 2. Operational characteristics: a. The amount of floor area devoted to live entertainment or dancing; b. The amount of floor area devoted to the sale of alcoholic beverages; C. The presence of pool tables, big screen televisions or other attractions; d. The hours of operation; and e. The expected turn over rate. 3. Location of the establishment: a. In relation to other uses and the waterfront; b. Availability of off -site parking nearby; C. Amount of walk -in trade; and Parking problems in the area at times of peak demand. B. Conditions of approval. If during the review of the application, the review authority uses any of the preceding considerations as a basis for establishing the parking requirement, the substance of the considerations shall become conditions of the permit application approval and a change to any of the conditions will require an amendment to the permit application, which may be amended to establish parking requirements within the range as noted above. Newport Beach Zoning Code, Title 20 October26, 2010 APPENDIX I Parking Covenant and Agreement �R PARKING AUTHORIZATION AND LICENSE AGREEMENT This PARKING AUTHORIZATION AND LICENSE AGREEMENT (this "License Agreement ") is made as of this April 13, 2011 by and between Ridgeway Development Company (the "Licensee ") and Ampco System Parking (the "Licensor "), pursuant to which Licensor grants Licensee the right to use certain parking spaces located at 4100 Newport Place in Newport Beach, California (the "Parking Structure")- 1. PARKING SPACES: Licensor hereby grants to Licensee a license to use on a nonexclusive basis, during the License Term (defined herein), up to SIXTEEN (16) unreserved parking spaces in the parking structure (the "Parking Spaces "). The location will be the top level of the parking structure. 2. LICENSE TERM: The term of this License Agreement (the "License Term ") shall Commence on or about May 01, 2011 and will expire on April 30, 2012. Upon Expiration of the Initial Term, the License Agreement shall continue on a month-to -month basis subject to termination by either party upon by providing a thirty (30) day written notice. 3. USE: The Parking Spaces are only to be used by the Licensee and its employees and agents. Spaces are not intended for use by Licensee's visitors, invitees, contractors, or subcontractors. Licensee acknowledges that the Parking Spaces are only to be occupied by passenger vehicles. 4. LICENSE/PARKING FEE: For the Licensee Term, Licensee shall pay to Ampco System Parking on a monthly basis $72.50 for each parking space requested by Licensee and for which a keycard is issued by Licensor ( "Licensee Spaces ") during any month. At Licensor's sole discretion, the monthly rate shall be subject to adjustment upon expiration of the initial License Term. The total parking used by Licensee will not exceed Sixteen (16) spaces. Licensee shall pay Licensor, on or before the commencement date of the License Term, Licensee's first (?) month's license /parking fee in an amount equal to $72.50 times the number of Licensee Spaces 5. KEYCARD FEES: Licensee shall pay to Licensor, concurrently with the commencement of the License Term, a non- refundable fee of Ten Dollars ($10.00) per keycard requested. Licensee acknowledges that it shall be charged a Ten Dollar ($10.00) fee by Licensor for each new or replace keycard . 523 6. LIMITATION OF LIABILITY: Upon receipt of the keycards, Licensee acknowledges that it shall be permitted to park one (1) vehicle within one (1) unreserved parking space in the Parking Structure for each parking space leased provided the use of all such Parking Spaces shall be at the risk of the Licensee. Licensor does not assume care, custody, or control of any vehicle or its contents. 7. INDEMNIFICATION: Licensee shall indemnify, defend and hold harmless Licensor and its partners and affiliated entities and their employees, partners, directors, agents, representatives, and professional consultants and its and their respective successors and assigns (collectively, the "Indemnities ") from and against any loss, damage, injury, death, accident, fire of other casualty, liability, claim, cost or expense (including but not limited to reasonable attorneys' fees) of any kind or character to any person or property, including the property of the Indemnities (collectively, the "Claims "), arising, in whole or in part, from or relating to: (a) the use of the Parking Structure and the real property upon which the Parking Structure is situated (the "Property ") by Licensee or its employees, (b) any act or omission of Licensee or any of its employees relative to the Property, (c) any bodily injury, property damage, accident, fire or other casualty to or involving Licensee or its employees and its or their property on the Property, (d) any loss of theft whatsoever of any property of anything placed or stored by Licensee or its employees on or about the Property, (e) any breach by Licensee of its obligation under this License Agreement, (f) any violation of any rule, ordinance, regulation or law, and (h) any bodily injury or property damage resulting from Licensee's access to the Property. In Addition to, and not in limitation of, Licensor's other rights and remedies under this License Agreement, should Licensee fail within thirty (30) days of written request from Licensor to acknowledge its indemnity obligation and obligation to assume the defense of the Indemnities from and against any Claim as provided in this Paragraph 7, then in any such case Licensor may, at its option, pay any such Claim or settle or discharge any action therefore or satisfy any judgment thereon, and all costs, expenses and other sums incurred by Licensor in connection therewith (including but not limited to reasonable attorneys' fees) shall be maximum contract rate permitted by law from the date incurred or paid until repaid and any default either in such initial failure to pay or subsequent repayment to Licensor shall, at Licensor's option, constitute a breach under this License Agreement. Except for Licensor's sole negligence or willful misconduct. 8. RULES AND REGULATION: Licensee shall provide to Licensor the license plate number or Vehicle Identification Number ( "VIN") and /or stock number of any and all vehicles to be parked within the Parking Structure. The use of the Parking Spaces shall be subject to the Parking Rules and Regulations contained in Exhibit "A" attached hereto and any other reasonable, non - discriminatory rules and regulations adopted by Licensor and/or Licensor's parking operators from time to time, including any system for controlled ingress and egress and charging 524 visitors and invitees, with appropriate provision for validation of such charges. Licensee shall not use more parking privileges than its allotment and shall not use any parking spaces specifically assigned by Licensor to tenants of the building situated upon the Property (the "Building ") or the project or for such other uses as visitor parking. Licensee's parking privileges shall be used only for parking by vehicles no larger than normally sized passenger automobiles or pick -up trucks. Licensee shall not permit or allow any vehicles that belong to or are controlled by Licensee or Licensee's employees to be parked in areas other than those designated by Licensor for such loading or unloading or unloading activities. If Licensee permits or allows any of the prohibited activities described herein, then Licensor shall have the right, without notice, in addition to such other rights and remedies that it may have, to remove or tow away the vehicle involved and charge the cost thereof Licensee, which cost shall be immediately payable by Licensee upon demand by Licensor. 9. ASSIGNABILITY: This license is personal to Licensee and Licensee shall not assign its rights under this License Agreement, whether voluntarily or by operation of law, and Licensee shall not permit the use of the Parking Spaces, or any part thereof, except in strict compliance with the provisions hereof, and any attempt to do so shall be null and void. 10. GOVERMENTAL REGULATIONS AND OTHER OBLIGATIONS OF LICENSEE: Licensee's use of the Parking Structure shall comply with all applicable governmental ordinances, rules, laws, and regulations. All persons who enter upon the Property pursuant to this License Agreement do so at their own risk, and shall comply with any and all instructions and directions of Licensor or Licensor's authorized representatives. Licensee shall not bring, store or use any hazardous or toxic materials or substances on the Property. 11. GOVERNING LAW: The terms of this License Agreement shall be governed by and construed according to the laws of the State of California. 12. TIME OF THE ESSENCE: Time is of the essence as to each term, provision, condition and requirement contained in the License Agreement. 13. MISCELLANEOUS: This License Agreement constitutes the entire agreement between the parties hereto pertaining to the subject matter hereof and all prior and contemporaneous agreements, representations and understandings of the parties hereto, oral or written, are herby superseded and merged herein. The headings of this License Agreement are for purpose of reference only and shall not limit or define the meaning of the provisions hereof. This License Agreement may be 1525 In Date: executed in any number of counterparts, each of which shall be an original and all of which shall constitute the same instrument. Neither this License Agreement nor a short form memorandum or assignment hereof shall be filed or recorded in any public office. Any attorneys' fees or other costs incurred in clearing such cloud on title to the Property will be Licensee's sole cost and responsibility. Please acknowledge your acceptance of these terms with your signature below. Ridgeway Development Company Ampco System Parking Date: 1520 PARKING RULES AND REGULATIONS In addition to the parking provisions contained in the License Agreement to which this Exhibit "A" is attached, the following rules and regulations shall apply with respect to the use of the Building's parking facilities. 1. Every parker is required to park and lock his/her own vehicle. All responsibility for damage to or loss of vehicles is assumed by the parker and Licensor shall not be responsible for any such damage or loss by water, fire, defective brakes, the act or omissions of others, theft, or for any other cause. 2. Licensee shall not park any vehicles in the Parking Structure other than automobiles, motorcycles, motor driven or non -motor driven bicycles or four wheeled trucks. Parking stickers, keycards or any other device or form of identification supplied by Licensor as a condition of use of the parking facilities shall remain the property of Licensor. The serial number of the parking identification device may not be obliterated. Devices are not transferable and any device in the possession of an unauthorized holder will be void. 4. Intentionally deleted 5. Vehicles must be parked entirely within painted stall lines of a single parking stall. 6. All directional signs and arrows must be observed. 7. The speed limit within all parking areas shall be five (5) miles per hour. 8. Parking is prohibited: (a) in areas not striped for parking; (b) in aisles; (c) where "no parking" signs are posted; (d) on ramps; (e) in cross - hatched areas; and (f) in reserved spaces and in such other areas as may be designated by Licensor or Licensor's parking operator. 9. Loss or theft of parking identification devices must be reported to the management office immediately, and a lost or stolen report must be filed by the Licensee or user of such parking identification device at that time. Licensor has the right to exclude any vehicle from the parking facilities that does not have an identification device. 1527 10. Any parking identification devices reported lost or stolen found on any unauthorized car will be confiscated and the illegal holder will be subject to prosecution. 11. Washing, waxing, cleaning, or servicing of any vehicle in any are not specifically reserved for such purpose is prohibited. 12. The parking operators, managers or attendants are not authorized to make or allow any exceptions to these rules and regulations. 13. Licensee's continued right to park in the parking facilities is conditioned upon Licensee abiding by these rules and regulations and those contained in this License Agreement. 14. Licensor reserves the right to establish and change parking fees, only in accordance with Section 4 of the License Agreement, and to modify and /or adopt such other reasonable and non - discriminatory rules and regulations for the parking facilities as it deems necessary for the operation of the parking facilities, and any violation of the rules shall subject the vehicle to removal, at such vehicle owner's expense. 522 dhen *recorded Return Tot the Newport Project 4101 MacArthur Blvd. tiewport Beach, CA. 92660 '.'- :'; %;r; ;.G` r`'�; ZA11044371LC r 77 • At�i RECIPROCAL PARKING AND MAINTENANCE AGREEMENT This Agreement made this _ day of •� r : 1972, by. and between THE NEWPO T P 0 GT, a joint venture composed of Emkay Development Company, Inc, and Atlas Realty. Company (hereinafter called "The Newport Project "), and- EMKAY DEVELOPMENT COMPANY, INC. (hereinafter called "Emkay "). ;t 7 RECITALS A. The Newport Project is the owner of Lot 4 of I.y�/ jgJ1,`ti Track 7770, recorded in book 299, pages 15 -16 of Miscellaneous Maps, Records of Orange County, outlined in red on the parcel analysis attached hereto as Exhibit "A" and incorporated berein by this reference (the "Development!'), B. Concurrently with the recording of this Agree- ment The_Newport Project is deeding to Emkay the portion of the Development denominated Parcel 1 and outlined in green on Exhibit "A." The ,Newport Project intends to deed to others the portions of the Development delineated Parcels- 2 and 3, outlined in yellow and in blue, respectively, on Exhibit "A." C. The Newport Project and Emkay desire to establish integrated.parkin facilities and Za dscaped areas in the Development, and to provide for the maintenance of same, for the benefit of all of the Development, and for the comrggn use and benefit of the present and, future_ovmers and Lessees of Parcels within the Development, all as more specifically hereinafter set forth. , V. tz:n m t:IR'J" +T OF V I tttcs c;a. s� li:ua� Gd. f In U.- I.'.ML r: ' -6% OF tCV:!: , CAW. 13SCtid l i•iii:' r !, 1972 LS+1::; C.i..G7LF, tacnry ��cnrGCr PA2010.135 fur GP20.10.010 P02010 -007 4221 Dolphin 8hiker'Nay R,dOeway Development ��q KV ) 06,43 FwT77 associated facilities. Each of the Parcel owners, their lessees, assigns and successors in interest, and their respective employees and invitees,shall be entitled to use the Common Areas, subject to such reasonable rules and regulations relating to such'use as a majbritX of the Parcel oc3ners may from time to time establish, including validation requirements. 3. Improvement. Each Parcel owner, or its successor in interest, shall, at its own expense, im- �P�rove, those portions of the Common Parking Areas and Landscaped Areas on its respective premises. Such work of improvement shall be performed pursuant to plans and specifications approved by Emkay and the Parcel owner. fA." 4. Maintenance. From and after the Effectit, Date as to the first restaurant to be constructe Em%a •� � `, shall, subject to the directign 9-A majors of the Parcel owners, operate, managa,,police, light, repair_ and maintain the Common Areas. S. Control. Subject to the.8irection of a f` majority of the - Parcl o gr Emkay� hall at all times during the Term hereof Lo_n.Lrol the automobile parking areas, driveways, entrances and exits, landscaped.areaa, and the sidewalks and pedestrian passageways within the Common Areas, and may at any time and from time to time during the Term hereof restrain any use or occupancy thereof except as autho- rized by the rules and regulations for the use of such areas established by a majority of the Parcel owners from time to time. Emkay may temporarily close all or portions of the Common Areas for repairs or alterations, to prevent a dedi- cation thereof or the accrual of prescriptive rights therein, -3- 1530 EfUr 10443 PuE779 (b) The proportionate share of the Common Area costs of each Parcel owner shall be as follows: (i) Upon the Effective Date as to the first owner to open for business, such owner shall pay 100% of the cost of maintaining and operating the Common Areas located on such party's Parcel. (ii) Upon the Effective Date.as to the second owner to open for business, the two owners so opened shall share the cos L- of operating and maintaining the Common Areas located on their two Parcels, in the proportion which the respective gross square footages of their two Parcels bear`to each other. (iii) Upon the Effective Date as to the third owner to open for business, and for the balance of the Term, the three Parcel owners shall share the cost of op- erating and maintaining all of the Common Areas located in the Development in the following percentages: Owner of Parcel 1 38% Owner of Parcel 2 25% Owner of Parcel 3 37% (c) Prior to the commencement of�eech calendar period of six (6,),_months_during the Term, Emkay shall give each Parcel owner a written -5- 1531 e;tr 1 C4 43 rlri jBa estimate of their respective shares of such Common Area costs for.the ensuing six (6) month period. Such estimated amount shall not exceed 110% of the actual share of such Parcel owner for the then current six (6) month period. Each Parcel owner shall pay such esti- mated amount to Emkay in equal, monthly- indtallments,, in _advance. Within ninety (90) days after the end of each such six (6) month period, Emkay shall furnish to each Parcel owner a statement showing in reasonable detail the costs and expenses incurred by Emkay for the operation and maintenance of the Common Areas during such period, and each Parcel owner shall promptly make any payment or allowance necessary to adjust each such party's estimated payment to such party's actual proportionate share of Common Area costs as shown by =such annual statement. 7. Enforcement of Assessments, (a) Failure to pay the estimated share of Common Area cost or any installment thereof, in- cluding any semi - annual adjustment, promptly and in any event within ten (10) days after written notice from Emkay of nonpayment, shall constitute a delin- quency and default with respect to the Parcel to which such share relates. A majori Parcel owners i9,authoriznd..and empowered, t4„oceed in the event of any such default to collect each such delinquent individual assessment, together with interest upon the unpaid amount thereof at ten percent (10%) per annum from the date of such notice, until the same is fully paid, together -6- 15S2 But I CAM PG«781. with recording fees, title costs, court costs, and reasonable attorney's fees. (b) If and whenever a default occurs, as provided above, the non - defaulting Parcel owners shall be entitled to alien against the Parcel to which such default relates, for' the unpaid amount of such share of Common Area costs and the cost and expenses described above. In.the event of any such default, then any non - defaulting Parcel owner may file for record in the office of the County Recorder of Orange County, California, a claim of lien, which shall contain at least: (i) A statement of the unpaid, amount of the share of Common Area cost; (ii) A description sufficient for identification of the Parcel to'which the default relates; and (iii) The name of the owner or reputed owner of the property described in (ii) above. Such claim of lien shall be effective to establish a lien against the real property described in such claim, in the amount specified therein, together with interest at ten percent (10 %) per annum from the date of notice of nonpayment; together with recording fees and reasonable costs of any title search or title policy before or after made or obtained in connection with such claim of lien or the foreclosure of the claim of lien, together with court costs and reasonable attorney's fees which may accrue in the enforcement of such lien. -7- 533 ar 10443 FwN? (c) Such lien, when so established against the real property described in said claim,. shall be prior and superior to any right, title, in- terest, lien, or claim which may be or may have been acquired in or attached to said real property sub- sequent to the time of filing such claim, except that such lien' shall in any event be' subordinate to the lien of any bona fide first trust deed upon such property. Such lien shall be for the use and benefit of the non- defaulting Parcel owners and may be enforced and fore- closed in a suit or action brought by any one or more of them in any court of competent jurisdiction', if brought within one year of the filing of such claim, in the same manner as if the amount of such lien had been evidenced by the promissory note of the person or persons who on the date of notice of nonpayment were the fee owners of the property. subjected to such lien, and as if such note were secured by a real estate mortgage upon said real property duly executed by the fee owners of such property as of the time of recording and duly recorded 'at 'the time such claim was filed for record. In any such suit or action the plaintiffs shall be entitled to a personal judgment in the full amount of such lien against each person who was such fee owner on such date of notice of nonpayment. The net amount received on account of such Lien or from any judgment with respect to such lien, if received after the close of the year for which such share was due, shall be applied against the non - defaulting Parcel owners' current shares of Common Area costs, until fully expended. M 1534 8. Binding Upon Successors. This AgTe4ment phall, be binding upon and inure to the benefit of the . p,z�ties.'and their respective successors, assigns, lessees "d ,sublessees Upon transfer of the fee title to any Parcel to aj6uccA-ssar which assumes in writing the obligations impbsed'bry this_ ti . o , as transferor shall be all 9. Parag aph Headings. The paragraph headings used herein are for reference only, and shall not enter into the interpretation of this Agreement. EXECUTED this 19 th day of October 1972. 61V ey VL r EMAY DEVELOPMENT COMPANY, INC. By BY THE NEWPORT PROJECT, By EMICAY DEVELOPMENT COMPANY, INC, A.4 B 4��. By ATLAS REALTY COMPANY By. By 1555 STATE OF .,•,XA.q,. COUNTY OF HARRIS On this 19th day of October , 19_12 , before me; the undersigned, a Notary Public for said County and State, personally appeared L. 0. Benson and W. J. Perry, Jr. known to me to be the vice president and assistant secretary respectively of Atlas Realty Company the corporation that executed the within instrument, said persons being known to me to be the persons who executed the within instrument on behalf of said corporation,- said corporation being known to me to be one-of the Joint venturers of The Newport Project the joint venture that executed the within instrument, and acknow- ledged to me that such corporation executed the same both individually and as joint venturer of said joint venture and that such toint.venture also executed the same. Name Typed or r n. ed Notary Public in and for said County and State My commission expires 6/1173 C k V O C: J5s o 181.:149743 accom" MOXIMF *Mow WHEN RECORDED, RETURN TO: LATHAN 6 WATKINS 555 South Flower Street Los Angeles, CA 90071 -2466 Attn: J. K. Hachigian i $19.00 C6 a ooufrrv, Al •3HPM MRI5'86 `* a ✓.i"'.4 � COVENANT AND AGREEMENT REGARDING MAINTENANCE OF OFF - STREET PARKING SPACE AFFECTING PARCEL 1 OF PARCEL MAP FILED IN BOOR 450 PAGE 23 AND PARCEL 1 OF PARCEL MAP FILED IN BOOK 183 PAGES 14 THROUGH 15 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER, ORANGE COUNTY, CALIFORNIA PA2010 -135 for GP2010 -010 PD2010 -007 4221 Dolphin Striker Way Ridgeway Development J5s:7 86:.149743 THIS COVENANT AND AGREEMENT FOR OFF +STREET PARKING SPACE (the "Agreement ") is made as of January 14, 1986, between STUART MITCHELL KETCHUM, JR. ( "Ketchum ") and THE DEVIL'S TRIANGLE PARTNERSHIP, a California general partner- ship ( "Devil's Triangle "), Ketchum owns the property si- tuated in the State of California, County of Orange, City of Newport Beach described as follows Parcel 1 of Parcel Hap 83 -705 as per map filed in book 183, pages 14 and 15 of Parcel Maps in the Offica of the Recor- der of said County (hereinafter the "Continental Property ") I and Devil's Triangle owns the adjoining property described as follows: Parcel 1 as shown on a Parcel Map filed in book 45, page 23 of Parcel Mape in the Office of the Recorder of said County (hereinafter the "E1 Torito Pro- perty'). RECITAL The Planning Co:mnission of the City of Newport Beach, California (the "City ") has approved, subject to certain conditions, Devil's Triangle's request to allow the use of an existingg open courtyard for dining and drinking purposes in the'El Torito Restaurant (located on the E1 for additional automobile parking spaces be established to run with the Continental Property for the benefit of the El Torito Property, and another condition requires a grant of an easement for and the construction of a sidewalk linking the covenanted parking spaces on the Continental Property to the El Torito Property. The purpose of this Agreement is to satisfy said conditions. ARTICLE 1. COVENANT AND EASEMENT Section 1.1 - GRANT OF COVENANT. The owner of the U0n_fl—n_e_n_t_aT Property hereby covenants and agrees to provide on the Continental Propertyy for the benefit of the E1 Torito Prop arty, sixteen ,9) automobile parking spaces together with a nonexclusive easement for access to, ingress to, egress from, and use and enjoyment of the parking spaces for (i) passage of vehicles, (ii) passage of pedestrian traffic, and (iii) other uses incidental to such passages 1532 86:14943 reserving, however, in favor of the owner of the Continental Property, all riyghatts of access to, ingress to, agrees from a and a inconsistent with the parking rights granted herein. Section 1.2 - GRANT OF EASEMENT. The owner of the Cos- -t nentTproperty hereby grants a nonexclusive easement for the passage of pedestrian traffic, and other uses incidental to such passage, over the Continental Property from the rito Prop overosuchnportiongoftthe Continental B1 C Ptoperty as the owner thereof Shall reasonably designate. The owner of the E1 Torito Property shall have the right, withheld, to construct a sidewalk along the easement route. Such sidewalk Shall be constructed and maintained at the sole expense of the owner of the E1 Torito Pro arty. The owner of the Continental Property ahall have tha right, at its sole expense and subject to the approval of the owner of the E1 Torito Property, which such approval shall not be unreasonably withheld, to relocate the easement and reconstruct a sidewalk along the relocated easement route. Section 1.3 - TEMPORARY LOSS OF PARKING SPACES. The owner - t e ontinental Property Shall have the right from time to time, in order to accomodate construction or other activities on the Continental Property, to temporarily relocate some or all of the covenanted parking spaces to an off -site location (not on the Continental Property) which, under the then - present circumstances, will enable the owner of the E1 Torito Pro pp arty to use the same with as little inconvenience to auch owner as is practicable under the circumstances. Section 1.4 - PARKING CHARGES. The owner of the Continental xoperty a all have the right to assess and collect from any person parking on the spaces covenanted in Section 1.1 a parking fee in the amount as follows! (a) As long as such parking spaces are surface parking the fas shall be FORTY DOLLARS (,640) per month per space. (b) if the parking spaces are located off -site on an interim basis pur- suant to Section 1.3, the fee Shall be an amount necessary to reimburse 2 X39 as =149743 the owner of the Continental Pro - party for its costs of providing each such interim parking space. (c) if the parking spaces are located within a parking structure the fee shall be the greater of M EIGHTY DOLLARS ($80) per month por space or (it) the Chan - prevailing rate for such parking. ARTICLE 2. GENERAL PROVISIONS Section 2.1 - TERM. This covenant and easement shall con - t nua n e feat until such time as the El Torito Property is no longer used as a restaurant. At the expiration of such term, the owner of the E1 Torito Property shall provide to the owner of the Continental Property a quitcleft deed or other documents necessary to eliminate of record the cove- nant and easement established by this Agreement. Section 2.2 - COVENANTS To RUN WITH LAND. The covenants and easements established herein are for the benefit of the E1 Torito Property and are intended to be and shall be con - atrued as covenants running with the Continental Property and equitable servitudes upon the Continental Property and every part thereof. Furthermore, each and all of such covenants and easements shall be binding upon and burden, and shall inure to the benefit of, all pperoons having or acquiring any right, title or interest mth oeither Continntal Property, the El Torito Property or any p a thereof, and their respective successors and assigns, all upon the terms, provisions and conditions set forth herein. Section 2.3 - GENERAL INTERPRETATION (a) If any term, provision or condition contained in this Agreement (or the application of any such term, provision or condition) shall to any extent be invalid or unenforceable, the remainder of this Agreement shall be valid and enforce- able to the 'fullest extent permitted by law. (b) When the context in which words are used herein indi- cates that ouch is the intent, words in the singular number shall include the plural and vice versa. All pronouns and any variations thereof shall be deemed to refer to all ggen- ders, and the term "person" shall include natural indivi- duala, corporations, partuarabipe, unincorporated organiza- tions, associations, trusts, estates and all other forme of 3 MI 86:149743 entities. The captions of the Articles and Sections herein are for convenience of reference only and shall not be con- sidered or referred to in resolving questions of interpre- tation or construction. IN WITNESS WHEREOF, Ketchum and Aevil'e Triangle have executed this instrument as of the day and year first above written. jARLL"RETC110t1;- THE, OBV"ate QLE P E HIP Byi tuart as a general partner By% SANTA ASSOCIATES, a California limited partnership, as general p rtnnq gy L(/ uar etc um, to sole general partner 541 66=149743 STATE OF CALIFOAN A 1 COUNTY OF Lf.L� A f 81 On ' ' fG before roe, the undeni ed, s Noa mobile in and for said State, personally appeared - , personally known to me of proved to me on the basis of sathfaetory evidence to be the pemn —whose name iS subscribed to the within instrument and acknowledged that -.&A— exe cured the same. WffNBSS mA landdoffidalscaL Simtaturo - efl f ffhb area far off kW ooutol wd) 1542 66:149743 STATIC OPCALIPORNIA COUNTY OF LOS NLAUA -S On ^ - yP.'• n7 A -- .?(on Mn p! undersigned, a Nottry Public In end for Sigeltum V known to me or to+y evidence to be Rhin Instrument u of the putnershlP and acknowledged •• theame. 1_ .. I � RTiKfxAwa[,p:.i�w :, L^SJ J etelt mster -mm omho wdl 1543 IB i 49743 STATE OR CALIFORNIA COUNTY OF I ne. /1.F�.� S3. On let�- Ware me, the under ed, a Na "Id Sone, peMnaUy appearM iuRKY .M. tuy FubUc In end for M$011 Sy known to me or Plead to me on the hat6 of radtkctoryeddeam robe the petton,:,yvho execatbd the within lntttumentat.Spr.E�K.IEAAr Av..el..a..:.._....._� V.-. �— I hih wit "�Pi 'e ;1 " iL�3' ° 1°teibtnt atme on r Ufd a. LF .•,...:.:. r +t. —.tHrP ...,� i.r3 C. WITNESSMY1p�dandopp esewtebthrrame, thae - .. •. WITMESSmyh dand efOeW tell. �'• ,; �;: i.•1 r.ti cam v 22 �+•: `• arlvgar,.anr.pu�tar,7.17ea3 G. _. . S)$netnte _ ltbauet foromtlt oetuW «eq COVERN M CODE 27361.7 certify under penalty of att by that the notaty sea] on the document to eOf this statement 3s attache reads as follows: dame of xotar. .. Lt Y&Mi ^(�. data [oa:Fs: ion kxrires �1,�. � l ��•• :ountl/-t,here bond is s F'1 _.� Date 15 EL (e Attachment No. PC 7 Reciprocal Parking & Maintenance Agreement for Existing Off -Site Parking 545 �4 � , ,-hen ' recorded Return To, rhe. Newport Project 4101 MacArthur Blvd. ii Li j) -y Newport Beach, 6A. 92660 .10j�,43P1,((.715 Bfi RECIPROCAL PARKING AND MAINTENANCE AGREEMENT This Agreement made this _�91,7 day of •� ..: -,, %L' 1972, by.and between THE NE1.7PORT PRO CT, a joint venture composed of Emkay Development Company, Inc, and Atlas Realty- company (hereinafter called "The Newport Project "), and EMKAY DEVELOPMENT COMPANY, INC. ( hereinafter called "Emkay"). L RECITALS A, The Newport Project is the owner of Lot 4 of Track 7770, recorded in book 299, pages 15 -16 of Miscellaneous I �)Lir'(y Maps, Records of Orange County, outlined in red on the parcel !) \ analysis attached hereto as Exhibit "A" and incorporated herein by this reference (the °Development'•'). B. Concurrently with the recording of this Agree - ment The Newport Project is deeding to Emkay the portion of the Development denominated Parcel 1 and outlined in green on Exhibit "A," The ,Newport Project intends to deed to others the portions of the Development delineated Parcels-2 and 3, outlined in yellow and in blue, respectively, on Exhibit "A." C. The Newport Project and Emkay desire to establish integrated parking facilities and l.andscape_d areas in the Development, and to provide for the maintenance of same, for the benefit of all of the Development, and for the co_mQn use and benefit _of_ the present .and ,_£uture_ owners and lessees of Parcels within the Development, all as more specifically hereinafter set forth. RL�COgOED AT fit'WIEST OF f Itf t' ?:'I; :AL f,:':!aJs OF i 3.SC re,} f`t0Y ,1972 1. K1St }: i.J,10.'StY, Cu�nry R�smi:r PA2010 -135 for GP2010 -010 PD2010.007 4221 Dolphin Striker f,'/ay Ridgeway Developmenl �� L� AGREEMENT .W.F. 1 0443 pl(( 776 In consideration of the foregoing recitals, the mutual covenants hereinafter set forth, and the mutual benefits to be derived by each of the parties therefrom, it is hereby agreed among the parties as follows;' 1. Definitions, (a) The "Term" of this Agreement shall commence on'the date hereof and continue until terminated by agWk7eement among a ma ority o£ the o -ane�s of the Parcels in the Development or their respective successors in :Y Interest. '(b) The "Effective Date" of this Agreement shall be, as to each of the respective Parcels, the first to occur of the opening for business of the restaurant to be constructed on such Parcel or thirty (30) days following the recording of a notice of completion of the restaurant to be constructed on such Parcel', (c) "Common Areas" shall mean those portions of the Development designated by shading on Exhibit "A," being composed of Conupgn_,Parking „areas and Common Landscaped Areas. 2. Use of Common Areas, The Newport Project and Emkay i each hereby grant to the other reciprocal easements for parking purposes and ingress and egress over, across and upon the Common Areas located upon their respective parcels. No building or structure shall be erected or maintained upon the Common Areas other than parking and landscaping areas and related sidewalks; walkways, lighting and similar _2- 54 2 E.c.r i Ot.4 3 Fata777 associated facilities. Each of the Parcel owners, their` lessees, assigns and successors in interest, and their' respective employees and invitees shall be entitled to use the Common Areas, subject to such reasonable rules and regulations relating to such 'use as a majority of the Parcel owners may from time to time,establish, including validation requirements, 3. Tmerovement, Each Parcel ormer, or its successor in interest, shall, at its own expense,. improve those portions of the Common Parking Areas and landscaped. Areas on its respective premises. Such work of improvement shall be performed pursuant to plans and specifications approved by Emkay and the Parcel owner. 4. Maintenance. From and after. the Effective. Date as to the first restaurant to be constructe EffiO sh211, subject to the direct Lo -n—Qf nip jor� of the Parcel owners o�p2rate, mana e olive light, repair and maintain the Common Areas. ;;• e 'L. 5. Control. Subject to the.4ir ction of a majority of the Par__rcel oc• rs Gmka shall at all times J Y....._ .. ?'lg Y� during the Term hereof govt o the automobile parking areas, driveways, entrances and exits, landscaped. areas, and the sidewalks and pedestrian passageways within the Common Areas, and may at any time and from time to time during the Term hereof restrain any use or occupancy thereof except as autho- rized by the rules and regulations for the use of such areas established by a majority of the Parcel owners from time to time. Emkay may temporarily close all or portions of the Common Areas for repairs or alterat,•ions, to prevent a dedi- cation thereof or the accrual of prescriptive rights therein, -3- 549 I £;'F 10443 Pitt 778 or for any other reason deemed sufficient by Emkay. The rights of each of the parties and their successors in interest in and to the Commoh Areas shall at all times be nonexclusive and subject 'to the rights of other parties and their successors in interest from time to time authorized to use the Common Areas on a nonexclusive basis. owners. In no event shall any cost or expense relating to the buildings in the Development be included in the cost of operation of the Common Areas. N ..q.. - 550 6. Costs and Expenses, s (a) Eac Parcel owner shat_ 1 pay to Emkn the manner and at the time provided below, such party's propoxtionat� earea, as .defined belw, of all costs and expenses incurred b'y Emkav for the .operation and maintenance of the Common Areas. Such costs and expenses shall include, without limiting the generality of the foregoing, gardening, land- scaping, cost of public liability, property damage, r vandalism and malicious mischief, and other insurance, j repairs, painting, lighting, cleaning, trash removal, depreciation of equipment, fire protection, and similar items, and an amount equal to ten percent all such costs and expesQr9_cover Emkay's admin- .. istrative istrative and overhead eZPenses. It is intended and agreed that all. taxes and assessments by public authority relating to real property or the ownership thereof, including the real property comprising the Common Areas, shall be paid by the respective Parcel owners. In no event shall any cost or expense relating to the buildings in the Development be included in the cost of operation of the Common Areas. N ..q.. - 550 O443 paiRq (b) The proportionate share of the Common Area costs of each Parcel owner shall be as follows: (i) Upon the Effective Date as to the first owner to open for business, such owner shall pay 1.00% of the cost of maintaining and operating the Common Areas located on Such party's Parcel, (ii) Upon the Effective Daee,as to the second owner to open, for business, the two owners so opened shall share the cost of operating and maintaining the Common Areas located on their two Parcels, in the proportion which the respective , gross square footag'es of their. two Parcels bear'to each other, (iii) Upon the Effective Date as to the third owner to open for business, and for the balance of the Term, the three Parcel owners shall share the cost of op- crating and maintaining all of the Common Areas located in the Development in the .Eollowing percentages: Owner of Parcel 1 38% Owner of Parcel 2 25% Owner of Parcel 3 (c) Prior to the commencement of e,C calendar period of six (6,)._monehs_ during the Term, Emkay shall give each Parcel owner a written i• I -5- i 10443r�([r80 estimate of their respective shares of such Common Area costs for the ensuing six (6) month period, Such estimated amount shall not exceed 110% of the actual' share of such Parcel owner for the then current six (6) month period. Each Parcel owner shall pay such esti- mated amount to Emkay in_equal monthly installments in advance. Within ninety (90) days after the end of each such six (6) month period, Emkay shall furnish to each Parcel owner a statement showing in.reasonabl.e detail the costs and expenses incurred by Emkay for the operation and maintenance of the Common Areas during such period, and each Parcel owner shall promptly make any payment or allowance necessary to adjust each such party's estimated payment to such party's actual proportionate share of Common Axea costs as shown by such annual statement. 7. Enforcement of Assessments. (a) Failure to pay the estimated share of Common Area cost or any installment thereof, in- cluding any semi - annual adjustment, promptly and in any event within ten (10) days after written notice from Emkay of nonpayment, shall constitute a delin- quency and default with respect to the Parcel to which such share relates, A majority of the Parcel owners is, authorize ,.and em�o�gexea 2xoceed in the event: of any such default to collect each such delinquent individual assessment, together witli interest upon the unpaid amount thereof at ten percent (10 %) per annum from the date of such notice, until the same is fully paid, together -6- v-v 10443 PALT8 1, with recording fees, title costs, court costs, and reasonable attorney's fees, (b) If and whenever a default occurs,. as provided above, the non - defaulting Parcel owners shall be entitled to a lien against the Parcel to which such default relates, for'the unpaid amount of such share of Common Area costs and the cost and expenses described above. In.the event of any such default, then any non - defaulting Parcel owner may file for record in the office of the County Recorder of orange County, California, a claim of lien, which shall contain at least;' (l.) A statement of the unpaid. amount of the share of Common Area cost; (ii) A description sufficient for identification of the Parcel to which the default relates; and (iii) The name of the owner, or reputed owner of the property described in (ii) above. Such claim of lien shall be effective to establish . a lien against the real property described in such claim, in the amount specified therein, together with interest at ten percent (10 %) per annum from the date of, notice of nonpayment, together with recording fees and reasonable costs of any title search or title policy before or after made or obtained in connection with such claim of lien or the foreclosure of the claim of lien, together with court costs and reasonable attorney's fees which may accrue in the enforcement of such lien, -7- J�JT� E v:104113 FwM? (c) Such lien, when so established against the zeal property described in said claim,• shall be prior and superior to any right, title, in- terest, lien, or claim which may be or may have been acquired in or attached to said real property sub- sequent to the time of.filing such claim, except: that such lien'shall in any event be' subordinate to the lien of any bona fide first trust deed upon such property. Such lien shall be for the use and benefit of the non- defaulting Parcel owners and may be enforced and fore- closed in a suit or action brought by any one or more of them in any court of competent jurisdiction, if ' brought within one year of the filing of such claim, in the same manner as if the amount of such lien had been evidenced by the promissory note of the person or persons who on the date of notice of nonpayment wiere the fee owners of the property subjected to such lien, and as if such note were secured by a real estate mortgage upon said real property duly executed by the fee owners of such property as of the time o£ recording and duly recorded 'at 'the 'time such claim was filed for record. In any such suit or action the plaintiffs shall be entitled to a personal judgment in the full amount of such lien against each person who was such -fee owner on such date of notice of nonpayment. The net amount received on account of such lien or from any judgment with respect to such lien, if received after the close of the year for which such share was due, shall be applied against the non - defaulting Parcel owners' current shares of Common Area costs, until fully expended, 10443 783 S, Binding Upon Successors. This Agreement shall be binding upon and inure to the benefit of the parties and their respective successors, assigns, lessees and sublessees, Upon transfer of the fee title to any Parcel. to a successor which assumes in writing the obligations impdsed,by this. Agreement, the transferor shall be relieved from all obliga- tions accruing hereunder subsequent to the _date of transfer. 9. Paragraph Headings, The paragraph headings used herein are for reference only, and shall not enter into the interpretation of this Agreement. EXECUTED this 19th day of October , 1972. -e 07"A414' s;�H7ley r EMKAY DEVELOPMENT COMPANY, INC. x% �J / THE NEWPORT PROJECT. By EM[AY DEVELOPMENT COMPANY, INC. By By By ATLAS REALTY COMPANY By /%;/ STATE OF CALIFORNIA oft) 10443PHfLry COtf,Wy OF ORANGE / C�4 On 'this 19th day of October 1972 before me, the undersigned, a t(otary Public for said County and State, personally appeared Robezt A; Alleborn and Edward J. Ruwaldt known to me to be the president slid 'vice - president respectively of Emkay Development CO,j Inc. the corporation that executed-the within instyument, said persons being known to me to be the persons who executed the within instrument'on behalf of said corporation, said corporation being known to be to be one of the joint *venturers of TJIE NEWPORT PROJECT. the joint venture that executed the within instrument and acknowledged to me that such corporation executed the same both individually and as joint venturer of said joint venture and that such joint venture also executed the same, (SEAL). Virginia M. White / Name (Typed or Printed) Notary Public in and for 104id County and State STATE OF CALIFORNIA' COUNTY Or ..... ..O]C,an a S5. On..00'tObeT, ,,,14th,,_ „1 $, 7, ;,,,,,,,, before tic, Ilse ondersigucd, a Notnry Puilic in and for said Slate, personally appeared R, A. ,rllleborn known to nit to bo Iht..'.`.T.,:1,C:5:..7...`.'. �. Prc.•ideut, and.... ) P. 6�4 /.a,rSl .... S.. .... RUV.td1C1C, known to mo l0 5e Ihe.,. ,vice,_ presiden„�,�Nnry of Ilia Cospornuon that excorkd the Millin InSlpmlenl, known to me to be the persons who executed the within Instrument on behalf of the Corporation fhcrein naincd, and acknowledged to nm that such Corporation executed the name, and acknowledged to me that auch Corporation executed f is within Instrument pursuant to Its by lam or a resolution of Its board of director,. WITNESS my hand And official seal. i'f� - y�� 4• f �� (Not !..... Public's (Seal) �• (Notary Pubilei S¢naturc) , virgxnia M, White . �Tyjed tlr Printrdy W Notary Public In and for said Slate ,soy situ atll} nue n rary«oih„N,i.dA Mir».hd,naM f, STATE OF .,41S,. . COUNTY of HARRIS On this 1901 day of October , 19 72 , before me ] the undersigned, a Notary Public for said County and State, personally appeared L. 0. Jbenson and W. J. Perry, Jr. known to me to be the vice president and assistant secretary respectively of Atlas Realty Company ' the corporation that executed the within instrument, said persons being known to me to be the persons who executed the within instrument on behalf of said corporation,- said corporation being known to me to bo, one,of the joint venturers of The Newport Proiect ' the joint venture that executed the within instrument, and acknow- ledged to me that such corporation executed the same both individually and as joint venturer of said joint venture and that such joint•venture also executed the same. (SEAL) 'Name, .a'�f �� 2 Typed or r= Yn ,tled) Notary Public in and for said County and State My commission expires 6/1/73 1557 C k V O U V �.�.� -JCrfl „IJ S�'F3C Jl!!hJ- _ _ _• •� _ ;* -y PARCEL 2 xS �13 �I—'( ` {. Oil I I i I _�_.L 1_...L1__f_i.s __.rry,� _ f 11'l:I f 1 t'-a;:!,i; -� E j 1 -� �p' '€ ` 1 {:!, re - {'{ {�:l {•'1.17 ! i.! /` I 11F PARCEL 2 . !_ ��4J It .i- 1 . I'�{ (I =��s• J I- 1 -t I s. /J PARCEL 48263 SO. 'IT F1i395Q.F7,. Q • J+ / /,// NGY I, IF �I. JO FP %'% > ^�,,(r % 7� 1 ewer• "I• irJ��Ju- JirGf; B.ryl� I �€ l 66.149743 46AIFF1F0 � WHEN RECORDED, RETURN T0s LATHAM 6 WATKINS 555 South Flower Street Los Angeles, CA 90071 -2466 Attn: J. K. Hachigian $iBrUO CB 0"MWODUMY.CAIWORM •s HPm Aral5'88 COVENANT AND AGREEMENT REGARDING MAINTENANCE OF OFF- STREET PARKING SPACE AFFECTING PARCEL 1 OF PARCEL MAP FILED IN BOOK 45, PAGE 23 AND PARCEL 1 OF PARCEL MAP FILED IN BOOK 183 PAGES 14 THROUGH 15 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER, ORANGE COUNTY, CALIFORNIA PA2010 -135 for GP2010.010 PD2010.007 4221 Dolphin Striker Way Ridgeway Development J�J�9 86.-4149743 THIS COVENANT AND AGREEMENT FOR OFF,STRERT PARKING SPACE (the "Agreement ") is made as of January 14, 1986, between STUART MITCHELL KETCHUM, JR. ( "Ketchum ") and THE DEVIL'S TRIANGLE PARTNERSHIP, a California general partner- ship ( "Devil's Triangle "). Ketchum owns the property si- tuated in the State of California, County of Orange, City of Newport Beach described as follows$ Parcel 1 of Parcel Map 83 -705 as per map filed in book 183, pages 14 and 15 of Parcel Maps in the Office of the Recor- der of said County (hereinafter the "Continental Property ") I and Devil's Triangle owns the adjoining property described as followa$ Parcel 1 as shown on a Parcel Map filed in book 45, page 23 of Parcel Maps in the Office o£ the Recorder of said Counter (hereinafter the "E1 Torito Pro- perty') . RECITAL The Planning Commission of the City of Newport Beach, California (the "City ") has approved, subject to certain conditions , Devil's Triangle'a request to allow the use of an existing open courtyard for dining and drinking purposes in the El Torito Restaurant (located on the E1 Torito Property). One condition requires that it covenant for additional automobile parking spaces be establishad to run with the Continental Property for the benefit of the El Torito Property, and another condition requires a grant of an easement for and the construction of a sidewalk linking the covenanted parking spaces on the Continental Property to the El Torito Property. The purpose of this Agreement is to satisfy said conditions. ARTICLE 1. COVENANT AND EASEMENT Section 1.1 - GRANT OF COVENANT. The owner of the onnenta'I' Property hereby covenants and agrees to provide on the Continental Property for the benefit of the E1 Torito Property, sixteen (1A) automobile parking spaces together with a nonexclusive easement for access to, ingress to, egress from, and use and enjoyment of the parking spaces for (i) passage of vehicles, (ii) passage of pedestrian traffic, and (iii) other uses incidental to such passages 1500 86-0149743 reserving,_ however, in favor of the owner of the Continental Property, all rights of access to, ingress to, agresa from and use and enjoyment of the parking spaces not otherwise inconsistent with the parking rights granted herein. Section 1,2 - GRANT OF EASEMENT. The owner of the Con- tinentAl Pr oparty hereby grants a nonexclusive easement for the passage of pedestrian traffic, and other uses incidental to such passage, over the Continental Property from the parking spaces, as covenanted in Section 1.1, to the El Torito Property over such portion of the Continental Property as the owner thereof shall reasonably designate. The owner of the El Torito Property shall have the right, after obtaining the approval of the Continental Property owner, which such approval shall not be unreasonably withheld, to construct a sidewalk along the easement route. Such sidewalk shall be constructed and maintained at the sole expense of the owner of the E1 Torito Property. The owner of the Continental Property shall have the right, at its sole expense and subject to the approval of the owner of the El Torl.to Property, which such approval shall not be unreasonably withhold, to relocate the easement and reconstruct a sidewalk along the relocated easement routs. Section 1.3 - TEMPORARY LOSS OF PARKING SPACES, The owner o t e ontinental Property shall have the right from time to time, in order to accomodate construction or other activities on the Continental Property, to temporarily relocate some or all of the covenanted parking spaces to an off -site location (not on the Continental Property) which, under the then - present circumstances, will enable the owner of the El Torito Property to use the same with as little inconvenience to such owner as is practicable under the circumstances. Section 1,4 - PARKING CHARGES. The owner of the Continental Propparty aKall have the right to assess and collect from any person parking on the spaces eovenanted in Section 1,1 a perking fee in the amount as followat (a) As long as such parking spaces are surface parking the fee shall be FORTY DOLLARS ( 640) per month per apace. (b) If the parking spaces are located off-site on an interim basis pur- suant to Section 1.3, the fee shall be an amount necessary to reimburse 1501 flE�149743 the owner of the Continental Pro- perty for its costs of providing each such interim parking space. (c) If the parking spaces are located within a parking structure, the fee shall be the greater of (i) EIGHTY DOLLARS ($80) per month per space or (ii) the then - prevailing rate for such parking. ARTICLE 2, GENERAL PROVISIONS Section.2.1 - TFal. This covenant and easement shall con- tinue in effect until such time as the E1 Torito Property is no longer used as a restaurant. At the expiration of such term, the owner of the E1 Torito Property shall provide to the owner of the Continental Property a quitclaim deed or other documents necessary to eliminate o£ record the cove- nant and easement established by this Agreement. Section 2.2 - COVENANTS TO RUN WITH LAND. The covenants and easements established herein aro for the benefit of the El Torito Property and are intended to be and shall be con- strued ae covenants running with the Continental Property and equitable servitudes upon the Continental Property and every part thereof, Furthermore, each and all of such covenants and easements shall be binding upon and burden, and shall inure to the benefit of, all persons having or acquiring any right, title or interest in the Continental Property, the El Torito Property or any part of either thereof, and their respective successors and assigns, all upon the terms, provisions and conditions not forth herein. Section 2.3 - GENERAL INTERPRETATION (a) If any term, provision or condition contained in this Agreement (or the application of any ouch term, provision or condition) ahAll to any extent be invalid or unenforceable, the remainder of this Agreement shall be valid and enforce- able to the fullest extent permitted by law. (b) when the context in which words are used herein indi- cates that such is the intent, words in the singular number shall include the plural and vice versa. All pronouns and any variations thereof shall be deemed to refer to all ggon- dere, and the term "person" shall include natural indivi- dual,, corporations, partnerships, unincorporated organiza- tions, associations, trusts, estates and all other forms of 1502 entities. The captions of the Articles and Sections herein are for convenience of reference only and shah not be con- sidered or referred to in resolving questions of interpre- tation or construction. IN WITNESS WHEREOF, Ketchum and Devil's Triangle have executed this instrument as of the day and year first above written. . THE AEVI,L'S T12zAN0 LE P E -H-xnP Bye / �/ /✓+�/. t� usx-t ete ium as a general partner By: SANTA ASSOCIATES, a California limited partnership, as general p rtn By � t roar Ketchum, to sole general partner 503 85=149743 STATE OP CALII�ORN A j COUNTY OF On e -e1 i'G befom me, the underd ed. a Nou Public in and for said State, personally appmed - �rlAR"% - MlTCIi fa; ,rl' I&W K, , pcnontUy known to me or proved to me on the bull of aatisftetory ovldenoc to be the pesson_ whom nuha 1.5 subscribed to the within Innmment and teknowiedged that -L vu, cuted the same. WITNSSSmyha danndd�offlelal". Signature CfhG vea for offkal oeudrl rral) 1504 a B&I49743 STATE OF CALIFORNIA COUNPYOF LOS a 4aj5 —S J 3S. on . yf'.e boforc mc, the undotslgoed, s Notary vublIc In and for said State, peisonslly appeared - Signature perrondiy known to me or of sathfactory evidence to be ncd the whhln instrument as e partners of the pannershlp utrument, and acknowlodgcd exetated the same. ..A �n�d•Sls..n•�LV i `i.., w• /ttti.roun Li.:.si'd �. L1aJ.. (T8h am (aofrydJ rronrW cell 1505 MzI49743 STATE OF CAf.7F0M t COUNTYOP �t)rS•FU% f On We me, the undenlgned, a Notuy Public In and for "Id Snte,personallytppeared r (�T' -M. KF :1SNIJtt. _ _ personally known to me or proved tome on the bub of sadsfoctory evidence to be the person_,)vho executed thewithininstrumentu�ru_e �- 'eJarAt�lAxf <£Iyfshapwsnnsof . +iA,UYA A��!rn7'E__i . b no f S o • _.._.____ ...- .... cut ..___..._ v acknowled to ma hat tfi�y a toted the same on eh ... r V� J pYIAA jiaFc�- -�78 eedsrm Ip, and that stid uenamedpattne"hl exeeut the me. WITNMmyh dsndofftcidsed, Signttute - - GOYERN)IFNT CODD 27361.7 i....,. • v 1}. `�::• � Li }Gmn•�rnon.. r.reF:ar.3.lete� (Thh ute fat o(fteid not/rbl uel) .! certify under penalty of perjury that the notary seal on the document to which this statement is attache reads as foliva% `;bmo of xotar) ) L t -Y&Mp ( ^� ante CoLe:i.�sion hxriros 1111_.t -_ count )••where bond is filed2T.ft-y1( /.l�r•G� . (lascofil:SccutJon 1. Zvi r a 1500 Attachment No. PC 9 Waiver Request for Development Agreement '50:7 502 July 26, 2011 Rosalinh Ung City of Newport Beach 3300 Newport Blvd. Newport Beach, CA 92663 Re: 4221 Dolphin Striker PD 2010 -007 and TD2010 -002 Request for waiver of Development Agreement Dear Rosalinh: Chapter 15.45 provides that development agreements shall be required in conjunction with the City approval of a project that requires a General Plan Amendment or other legislative act, and includes non - residential development in Statistical Area L4 (Airport Area). The above referenced project meets these requirements. Please accept this letter as a request to waive the requirement for a development agreement pursuant to the provisions of NBMC Section 15.45.020.C. This section of the NBMC provides that the City Council may waive the requirement for a development agreement, except for one required by General Plan Policy, if it finds one of the following: -The project provides significant public benefits to the City; or -The nature of the project is such that neither the City nor the developer would benefit from a development agreement. Please accept the following factors in support of each of the above findings that could justify a waiver of the requirement for a development agreement. The project is minor in nature because it consists of a transfer of usage from Hotel Site 2 -B of 54 rooms in the Newport Place Planned Community to be used as an increase of 5,525 in the square footage to newly created Commercial Site 8. Because there is a transfer of development rights, the traffic impacts of the project are mitigated to both the Newport Place Planned Community and to the City of Newport Beach. Further, because of the transfer the 15'9 project does not exceed the criteria for a major General Plan Amendment as defined in Charter Section 423. The project provides significant public benefits to the City as follows: -The project would provide short-term employment opportunities in construction and long -term employment opportunities for up to 30 employees on site. Further, vendors will be hired to maintain the property and landscaping. Approval of the project would help to maintain the City's jobs -to- housing balance as commercial uses are replaced with mixed -use residential villages. -The project would generate additional sales and property tax for the City. -The project would accommodate to patrons that are in close proximity to the site that will walk to eat and shop and thereby not burden the road system. Further, the ingress and egress is vastly superior to the original project and will decrease vehicle miles traveled by lost patrons and vehicular confusion in the area. -The project would be adequately served by existing public facilities, infrastructure and services. The increased floor area would not exceed existing service levels for the public services or facilities. Neither the City nor the development would benefit from a development agreement due the nature of the project. -The development agreement provides a developer a vested right to proceed and complete a project without the uncertainty of future changes in policies or regulations. This factor is important with larger or long -term projects. A development agreement also allows the City greater latitude to advance local planning policies and it provides flexibility in addressing project- related impacts that may occur in the future or those that might occur across jurisdiction boundaries. This finding can be made given the nature of the project in that it is small, no significant environmental impacts would be created, and adequate infrastructure presently exists. There is a transfer of development rights and therefore no traffic impacts to the Newport Place Planned Community and the commercial use is compatible with the surrounding restaurant site and office buildings. The project is not a long -tern project and would be constructed in a single phase. For all the reasons expressed in this letter, please waive the requirement for a development agreement. In the meantime if you should have any questions, please do not hesitate to call. Very truly yours, Tod W. Ridgeway J_ Ridgeway /Whitney Partnership 570 Attachment No. CC 6 Planning Commission Resolution for Denial 521 ��2 RESOLUTION NO. 1856 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH DENYING WITHOUT PREJUDICE PLANNED COMMUNITY DEVELOPMENT PLAN AMENDMENT NO. PD2010 -007, TRANSFER OF DEVELOPMENT RIGHTS NO. TD2010 -002; CONDITIONAL USE PERMIT NO. 2011 -026, MODIFICATION PERMIT NO. 2011 -014, AND TRAFFIC STUDY NO. TS2011 -002 FOR A NEW COMMERCIAL DEVELOPMENT LOCATED AT 4221 DOLPHIN - STRIKER WAY (PA2010 -135) THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Ridgeway/Whitney, Partnership, with respect to property located at 4221 Dolphin- Striker Way, and legally described as Parcel 1 of Portion of Lot 4 of Tract No. 7770, requesting approval of an amendment to the Newport Place (PC -11) Planned Community Development Plan to accommodate the development of two new commercial buildings of 13,525 square feet total. The following applications are requested in order to implement the project as proposed: a) An amendment to Newport Place (PC -11) Planned Community Development Plan to change the zoning designation of the subject property from "Restaurant Site 1" to "General Commercial Site 8 ", pursuant to Chapters 20.56 (Planned Community District Procedures) and 20.66 (Amendments) of the Municipal Code. b) A transfer of development rights to allow the transfer of 48 unbuilt hotel units, which equates to an approximately 3,909 square feet of specialty retail, from Hotel Site 2 -B (Fletcher Jones Vehicle Storage Facility at 1301 Quail Street) and 1,620 square feet from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) for a total of 5,529 square feet to the subject site, pursuant to Chapter 20.46 (Transfer of Development Rights) of the Minicipal Code. c) A traffic study approval pursuant to Chapter 15.40 (Traffic Phasing Ordinance) as the project will generate in excess 300 average daily trips (ADT). d) A conditional use permit to modify the off - street parking requirements, allow for the use of off -site parking, and to establish a parking management plan for the site, pursuant to Chapter 20.40 (Off- Street Parking) of the Municipal Code. e) A modification permit to deviate from the landscaping requirements of the Newport Place (PC -11) Planned Community Development Plan, pursuant to Section 20.52.050 of the Municipal Code. f) A waiver of the requirement for a development agreement pursuant to the provisions of Chapter 15.45 (Development Agreements) of the Municipal Code. 52S Planning Commission Resolution No. 1856 Paqe 2 of 3 2. The subject property has zoning designation of Restaurant Site 1 of the Newport Place (PC -11) Planned Community Zoning District and the General Plan Land Use Element category is Mixed -Use Horizontal 2 ( "MU -H2 "). 3. The subject property is not located within the coastal zone. 4. A public hearing was held on September 22, 2011, in the City Hall Council Chambers, 3300 Newport Boulevard, Newport Beach, California. A notice of time, place and purpose of the meeting was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this meeting. SECTION 2. REQUIRED FINDINGS. In accordance with the Traffic Phasing Ordinance and Zoning Code the proposed project can only be approved after making each of the required findings set forth in Chapter 15.40 (TPO) and Sections 20.40.100.B (Off -Site Parking), 20.52.050F (Use Permit) and 20.52.050.E (Modification Permits) of the Zoning Code. In this case, the Planning Commission was unable to make the required findings based upon the following: 1. The purpose and intent of parking standards is to provide adequate parking for development. The applicant requests a change in the allowable use and an increase in the intensity of use while inadequately addressing parking through a waiver and off - site parking request. 2. The 1 -year term of the applicant's off -site parking lease does not satisfy the Zoning Code that requires off -site parking be permanently available. 3. The applicant's justification for the modification permit to allow relief from the landscaping standards is based upon the request for increased intensity of use and proposed design rather than a practical difficulty of the property and that the project can be redesigned to comply with the landscape requirement. 4. The proposed primary access to the subject property is inconsistent with the existing design of MacArthur Boulevard that does not provide direct access into commercial parking lots and may interrupt traffic flow along MacArthur Boulevard. SECTION 3. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Planning Commission of the City of Newport Beach does hereby deny without prejudice Planned Community Text Amendment No. PD2010 -007, Transfer of Development Rights No. TD2010 -002, Conditional Use Permit No. UP2011 -026, Modification Permit No. MN2011 -014, and Traffic Study No. TS2011 -002. Tmplt: 03/08/11 524 Planning Commission Resolution No. 1856 Paqe 3 of 3 2. This action shall become final and effective fourteen days after the adoption of this Resolution unless within such time an appeal is filed with the City Clerk in accordance with the provisions of Title 20 Planning and Zoning, of the Newport Beach Municipal Code. PASSED, APPROVED AND ADOPTED THIS 22 "d DAY OF SEPTEMBER, 2011. AYES: Ameri, Hawkins, Hillgren, and Toerge NOES: Kramer, Myers, and Unsworth ABSTAIN: None. /TA1 04 Rrin AIN ISI F77MoSWI.7iii��7iF]IiiF1� BY: Bradley Hillgren, Secretary Tmplt: 03/08111 525 5g� Attachment No. CC 7 Draft September 22, 2011 PC Minutes 527 egg NEWPORT BEACH PLANNING COMMISSION MINUTES Chair Unsworth closed the Public Hearing. 09/22/2011 Commissioner Ameri inquired as to the methods utilized for the review of the setback requests. Benjamin Zdeba, Planning Technician, commented that inconsistencies between adjacent Floor Area Ratios (FAR) and setbacks were considered and stated that maximum floor area is a function of the lot size. Commissioner Toerge requested that the side yard setbacks be three (3) feet each and the front and rear yard setback be ten (10) feet each. Commissioner Hawkins stated he was in support of staff's recommendations as the properties at both 1412 and 1400 are affected by the drive aisle, and that a Resolution was not necessary as he previously had mentioned. He confirmed his support of the three (3) foot setback and moved to approve this time as recommended. Motion made by Commissioner Hawkins and seconded by Commissioner Kramer, to approve staff's recommendation with the alternative setbacks as presented. Substitute motion made by Commissioner Toerge and seconded by Hillgren to approve Alternative Setback No. SA2011 -019 with the attached Alternative Setback Determination letter and modified rear setback of ten (10) feet with the recommended front setback of ten (10) feet and side setbacks of three (3) feet on the East and West side. The substitute motion carried (4 — 3). AYES: Ameri, Hillgren, Myers, and Toerge NOES: Hawkins, Kramer, and Unsworth ABSENT(RECUSED): None. ABSTAIN: None. Community Development Director Brandt announced that this decision becomes final within fourteen (14) days unless appealed to the City Council. ITEM NO. 5 MacArthur at Dolphin- Striker (PA2010 -135) 4221 Dolphin- Striker Way The applicant proposes a planned community development plan amendment to allow the construction of two, single -story commercial buildings with 13,525 combined square feet. The following approvals are requested or required in order to implement the project as proposed 1. An amendment to the Newport Place (PC -11) Planned Community Development Plan to change the zoning designation of the subject property from "Restaurant Site 1" to "General Commercial Site 8 ", pursuant to Chapters 20.56 (Planned Community District Procedures) and 20.66 (Amendments) of the Municipal Code. 2. Transfer of Development Rights to allow the transfer of 48 unbuilt hotel units, which equate to 3,909 square feet of specialty retail, from Hotel Site 2 -13 (Fletcher Jones Vehicle Storage Facility at 1301 Quail Street) and 1,620 square feet from General Commercial Site 7 (Lexus Dealership at 3901 MacArthur Boulevard) for a total of 5,529 square feet to the subject site, pursuant to Chapter 20.46 (Transfer of Development Rights) of the Municipal Code. 3. Traffic Study approval pursuant to Chapter 15.40 (Traffic Phasing Ordinance) as the project will generate in excess 300 average daily trips (ADT). Page 4 of 10 NEWPORT BEACH PLANNING COMMISSION MINUTES 09/22/2011 A staff report was presented by James Campbell, Principal Planner, and a PowerPoint Presentation was displayed. Commissioner Hawkins confirmed with Mr. Campbell that there are currently two (2) access points, one (1) driveway off Dolphin Way, and one (1) driveway off Martindale. There is also a cooperative agreement among three (3) properties for parking and access. In response to an inquiry from Commissioner Hawkins related to donor sites, Mr. Campbell stated that consent is not necessary from the donor sites; however, staff would prefer consent so there would be no objection. In addition, Mr. Campbell stated that there are three hundred and four (304) units remaining at the Fletcher Jones site and that these units would generate occupancy tax if built. Commissioner Hillgren stated that the number of access points to the commercial properties seems small and that MacArthur was designed such that the abutting properties were not to take direct access from the highway. In response to an inquiry from Commissioner Hillgren relative to the proposed driveway, Mr. Campbell stated that the applicant's proposal includes retail components that would benefit from having driveway access to MacArthur. Mr. Campbell went on to note that intent to prohibit direct vehicular access to MacArthur was not memorialized in the Newport Place Planned Community but it could be inferred that it was the intent given the current lack of direct access. Commissioner Hawkins expressed concerns regarding the proposed left turn, stated that he spoke with applicant and visited the site, and spoke about safety concerns in the parking lot, as well as the backing up of traffic on MacArthur. Mr. Campbell described the variety of gaps in access on MacArthur that would allow for a left turn. City Traffic Engineer Tony Brine responded to a number of questions related to direct access to the project site from MacArthur Boulevard. Commissioner Hawkins indicated that the proposed one -year off -site parking agreement is not what the Zoning Code requires in that it does not provide permanent availability of the parking spaces. In response, Mr. Campbell indicated that the Conditional Use Permit requires the applicant to permanently provide the parking spaces. The proposed parking plan would be effective for one (1) year given the term of the off -site lease, but the applicant would have to provide a new lease, potentially at an alternative site subject to the review and approval by the Director. Commissioner Hawkins requested that the Conditions of Approval reflect that this project makes the parking plan permanently available rather than having a Condition that requires the plan to be reviewed annually. Chair Unsworth estimated that a direct path from Dolphin /Striker to MacArthur would result in creating more of a thoroughfare. In response to an inquiry from Commissioner Toerge relative to the permanent parking issue, Mr. Campbell stated that the applicant would have to advise the City of any loss of off -site parking and how it would be replaced. In the worst case if the lost off -site parking could not be provided, the applicant could reduce the intensity of use to comply with minimum parking standards. Commissioner Toerge expressed concerns relating to how the City would advise an applicant who has invested a significant amount in developing their property that they must reduce the intensity of use of their property because of a lack of parking. Page 5 of 10 59 D NEWPORT BEACH PLANNING COMMISSION MINUTES 09/22/2011 Commissioner Ameri provided comments on his perspective relative to the original concept of MacArthur Boulevard and that it was intended as an arterial without direct vehicular access to individual parking areas. He expressed concerns that opening one access point for one project would ruin the intent and suggested extending Dolphin- Striker through the site creating a new roadway access point at MacArthur. In response to an inquiry from Commissioner Hawkins relative to his concerns about the traffic impacts, Mr. Campbell mentioned that the General Plan does not envision MacArthur to become a pedestrian friendly street, given the volume of traffic. Commissioner Hawkins expressed concern over the Director's discretionary authority over the one (1) year parking agreement, which was not a permanent plan, and that the City would have a series of one (1) year off site parking agreements not contemplated by the original study. In response to an inquiry from Commissioner Myers relative to the differences between the access points at the nearby Newport Beach Lexus dealer, Mr. Campbell stated that that there are no left turns into that site and that there is no exiting. He further stated that each driveway request would be considered independently so that they do not inadvertently create hazards, preclude future requests, or if approved, there would be no precedents sets for future approvals. Commissioner Ameri suggested that the access point allow pedestrian access or extend the cul -de -sac to create another street intersection. Chair Unsworth stated that without the reciprocal parking agreement the project is eight (8) spaces short, and with the reciprocal agreement it is only one (1) short. Chair Unsworth suggested that Condition Number 7, relative to the alternative off -site parking agreement, should have a requirement of being recorded with the County Recorder and that a finding of substantial conformance with the permit would have to be made. Community Development Director Brandt stated that any finding of substantial conformance with the permit would be provided in the weekly Planning activity report. Ms. Brandt also stated that in regard to Condition No. 9, any significant changes, would be referred back to the Planning Commission. In regard to inquiries made by Chair Unsworth relative to Conditions 10 and 49, Ms. Brandt stated that the intent of the application was to have all employees parking off site at all times, and that although the Planning Commission has no jurisdiction over sprinklering those requirements will be reviewed through the plan check process. Chair Unsworth opened the Public Hearing. Tod Ridgeway, applicant, provided a general overview of the project, that the MacArthur arterial has changed significantly over the past twenty (20) years, the proposed access point was popular and approved by the Police and Fire representatives, a restaurant presence was required for the project, the parking structure would be managed by AMCO, and that there is a current deficiency of thirteen (13) spaces. Mr. Ridgeway mentioned that he will require all employees to park in the structure, that his insurance requirements state that the project must be sprinklered, and that he is not contemplating a residential component to this project. In conclusion, he would live within existing community text, will go immediately to AMCO and have them amend an agreement to be a recordable document, and if terminated, there would be a notice provision to the City of Newport Beach. Page 6 of 10 591 NEWPORT BEACH PLANNING COMMISSION MINUTES 09/22/2011 In response to an inquiry from Chair Unsworth relative to the massing of the project, Mr. Ridgeway stated that he does not contemplate building a six story building and that an alternate parking plan would require him to change his uses of which he is not planning on doing. In response to inquiries on various aspects of the project made by Commissioner Hawkins, Mr. Ridgeway noted that he agreed with Condition No. 10 and that he would be comfortable with adding a notice provision to the City of Newport Beach. He did express that he was not in agreement with restricting the MacArthur access to a right turn in and right turn out. In response to an inquiry from Commissioner Hawkins regarding the waiver of development rights, Mr. Ridgeway stated that he does not have any intention of building hotel units. Commissioner Hawkins did state that someone else could use the units as part of a transfer to their project and that the City, if, could potentially lose this course of occupancy tax since the hotel units would not be built. Community Development Director Brandt stated that Condition 2 should be deleted as the transfer of development rights agreement would be more appropriate if there were a vested property right on the donor properties. Mr. Ridgeway affirmed that this deletion would be acceptable. Tod Stoutenborough, project architect, made a brief presentation, mentioned that he had worked significantly with the Traffic Engineer and noted that MacArthur had been designed for four (4) lanes of traffic. He mentioned a deceleration lane and acceleration lane, could still maintain three (3) lanes, and there was plenty of visibility and ease of access to the project. Commissioner Myers, after reviewing the striping of the road exhibit, expressed support for a left hand turn lane. Commissioner Ameri stated support for the project, with the exclusion of the driveway. He proposed widening the drive aisle to create a street, or to extend Dolphin- Striker and connect it to MacArthur. Commissioner Ameri also envisioned a pedestrian connection. In response to an inquiry from Commissioner Hawkins relating to the project design, Mr. Stoutenborough detailed the modern design elements of the proposed development and indicated they would be compatible with adjacent projects. Dan Purcell, resident, requested that the Planning Commission ensure that all aspects of this project and the applicant's proposal be memorialized in such as way as to avoid any potential for deviation from the original project as submitted. Chair Unsworth closed the Public Hearing. Mr. Ridgeway stated that he believed the public speaker's comments were directed to the previous owner's nightclub operation and not the proposed project. Motion made by Commissioner Ameri and seconded by Commissioner Hawkins, for discussion purposes, to approve the project as submitted with the additional Condition to modify the site plan to either: 1) Reflect a through street to MacArthur or 2) creating pedestrian access from MacArthur to the project site. In response to an inquiry from Commissioner Hawkins, Mr. Brine stated that the City did not have the jurisdiction to require a public roadway through the site. Page 7 of 10 �9 2 NEWPORT BEACH PLANNING COMMISSION MINUTES 09/22/2011 Commissioner Hawkins stated that if the City is conditioning a project to have a road, it is no longer a private roadway, and that it would be a public roadway for which there would be payment of just compensation. Community Development Director Brandt stated that the imposition of this type of condition would require a significant redesign of the project and would recommend that the Planning Commission make a motion to deny the project as submitted. Commissioner Ameri did not withdraw his motion. Second to the motion was withdrawn by Commissioner Hawkins. The motion failed due to lack of a second to the motion. Commissioner Toerge expressed the following concerns with the project: 1) the transfer increases the development intensity resulting in the need for a parking waiver and modification permit for deviations from the required 2) the one -year duration of the off -site parking agreement does not comply with the code requirements that it be available permanently and 3) the proposed access from MacArthur is inconsistent with the existing design. Motion to deny based upon inability to make the findings made by Commissioner Toerge and seconded by Commissioner Hawkins for discussion purposes. Commissioner Hillgren stated that he does want to encourage redevelopment of the property as long as the uses are appropriate and right for the area, and that his only concern with the project as presented was that the uses were just too intense. He stated that the project would create a significant traffic challenge and danger and that he supports redesign of the project to avoid the access point on MacArthur. Commissioner Hawkins agreed that the site is underutilized; however, he did state that when "Fury Rock and Roll" was at this site there was no need for an access point and people found the location easily. He also stated his concerns with transferring income generating units to this site. Commissioner Kramer supported the project as presented, as he did not have a problem with the parking, and could easily make the finding that the MacArthur corridor does not have the same standing as it did prior. Commissioner Kramer stated that for the overall good of the community /city and for local businesses /residents, this project should be approved. Substitute motion made by Commissioner Kramer and seconded by Commissioner Myers to approve the project, as recommended by staff. Chair Unsworth agreed with the maker of the alternative motion that the motion language would include the following amendments to the proposed Conditions as articulated by Community Development Director Brandt: • Condition No. 2 — deleted Condition No. 7 (handwritten page 73) modified to include a notice provision of any termination of the long term availability of the off -site parking requirements require the require notification to the Community Development Director Condition No. 8, corrected to state, "....in the event of loss of off -site parking" In response to an inquiry from Chair Unsworth regarding clarification of "footnote 36" Commissioner Hawkins confirmed staff's report that this referred to the number of times the PC text had been amended. Page 8 of 10 593 NEWPORT BEACH PLANNING COMMISSION MINUTES 09/22/2011 In response to an inquiry from Chair Unsworth regarding matters relative to Conditions 6 through 9, Community Development Director Brandt stated that if a finding of substantial conformance was made, the item would be included in the weekly report. Community Development Director Brandt also noted that if the application was approved and sent forward to the City Council, the condition language item related to "prior to final" would be corrected to reflect plain English. These amendments were acceptable to Commissioner Kramer, the maker of the substitute motion. The substitute motion failed (4 - 3). AYES: Kramer, Myers, and Unsworth NOES: Ameri, Hawkins, Hillgren, and Toerge ABSENT(RECUSED): None. ABSTAIN: None. Motion to deny based upon inability to make the findings made by Commissioner Toerge and seconded by Commissioner Hawkins, and carried (4 — 3) to deny approval of the project. AYES: Ameri, Hawkins, Hillgren, and Toerge NOES: Kramer, Myers, and Unsworth ABSENT(RECUSED): None. ABSTAIN: None. Community Development Director Brandt stated that the approval to deny the project was final subject to a fourteen (14) day appeal period. H. NEW BUSINESS: None Commissioner Hawkins suggested a report in connection with Corona Del Mar bluff conditions. Commissioner Toerge did not support a study in that location. Commissioner Ameri suggested writing a letter to the homeowners notifying them of some problems relative to the slope conditions so that the City could go on record as being aware of the slope conditions; however, not being responsible for the conditions. Assistant City Attorney Mulvihill stated that the City's position would not support such a recommendation and would put the City in the position of evaluating private property rights. Commissioner Ameri withdrew his recommendation. Discussion ensued among Commissioner Hillgren, Commissioner Toerge, Commissioner Ameri, Commissioner Hawkins, and legal counsel relative to the volume of paperwork given to members of the Commission related to their review of project staff reports and supporting documentation. Assistant City Attorney Mulvihill stated that as part of the official record all documents must be transmitted to the legislative body. I. STAFF AND COMMISSIONER ITEMS Page 9 of 10 �"4 Attachment No. CC 8 Revised Shared Parking Analysis 595 SJ° 0 October 7, 2011 Mr. David Keely, Senior Civil Engineer CITY OF NEWPORT BEACH 3300 Newport Boulevard Newport Beach, CA 92663 -3884 Dear Mr. Keely: INTRODUCTION The firm of Kunzman Associates, Inc. is pleased to provide this parking analysis as an addendum to the 4221 Dolphin Striker Traffic Impact Analysis (May 31, 2011) prepared by Kunzman Associates, Inc. for the 4221 Dolphin Striker project in the City of Newport Beach. The purpose of this addendum is to update the parking analysis (Section 9) of the traffic impact analysis due to changes on the site plan. The project site is located at 4221 Dolphin Striker Way in the City of Newport Beach and the revised site plan is shown on Figure 1. EXISTING CONDITIONS The surface parking lot is shared by three parcels: the proposed site (currently vacant quality restaurant), Classic Q Billiards and Sports Club, and Saagar Fine Cuisine of India. The surface parking lot currently provides 211 shared parking spaces. In addition, the project site (Parcel 3) has obtained 16 off - site parking spaces located at a parking structure southwest of the project site. The project proposes to provide a total of 214 parking spaces (including 16 off -site parking spaces). The existing quality restaurant (currently vacant) required 105 parking spaces per UP2008 -043 (at one parking space per 40 square feet of net public area). The existing Sagaar Fine Cuisine of India requires 54 parking spaces per UP2005 -004 (at one parking space per 50 square feet of net public area) and the Classic Q Billiards and Sports Club requires 80 parking spaces per UP3392. A survey of the surface parking lot was conducted to establish the parking demand for the existing land uses shown in Table 1. Based upon discussions with the City of Newport Beach staff, the peak periods for parking at the project site were determined to be 6:00 AM to 12:00 AM on a Friday and 6:00 AM to 12:00 AM on a Saturday. To quantify the existing parking demand for the project site, the existing parking demand was determined by surveying the project site at 30- minute intervals on Friday (February 11, 2011) and Saturday (February 12, 2011). �97 CITY OF NEWPORT BEACH October 7, 2011 The project site parking area was divided into eight (8) parking zones as shown on Figure 2. The parking surveys are shown in Tables 2 and 3. The parking survey conducted on Friday (February 11, 2011) shows the maximum number of occupied parking spaces is 133 parked vehicles from 5:30 PM to 6:30 PM (see Table 2). This is a maximum parking occupancy of 63 percent. Figure 3 graphically depicts the existing conditions of the surface parking lot based upon the parking survey. CITY OF NEWPORT BEACH PARKING CODE Table 4 shows the parking requirements for the proposed project per the City of Newport Beach Parking Code. The proposed 3,351 square feet of retail use would require approximately 14 parking spaces by using the parking ratio of one parking space per 250 square feet of net floor area [ 3,351 _ 250 sf. = 13.4 = 14 parking spaces). The 4,000 gross square feet of bank use would require approximately 16 parking spaces by using the parking ratio of one parking space per 250 square feet of gross floor area (4,000 sf. _ 250 sf. = 16 parking spaces). The 4,000 gross square feet of high turn -over dining establishments would require approximately 50 parking spaces by using the parking ratio of one parking space per 40 square feet of net public area (4,000 sf. _ 2 (assuming 50% of total gross area is allocated for net public area) = 40 sf. = 2,000 sf. _ 40 sf. = 50 parking spaces). The take -out service (limited) use would generate a parking demand of approximately 4 parking spaces by using the parking ratio of one parking space per 250 square feet of gross floor area (1,000 sf. _ 250 sf. = 4 parking spaces). The total parking demand per City of Newport Beach Parking Code for the proposed project is 84 parking spaces. Per the City of Newport Beach Parking Code, the proposed parking provided will be deficient three (3) parking spaces (133 maximum occupied parking spaces on Friday + 84 parking spaces required per City Parking Code = 217 parking spaces). SHARED PARKING ANALYSIS The idea of a shared parking analysis is that if the various land uses have peak parking demands at different points in time, or on different days of the week, then the number of parking spaces required is not the sum of the parking requirements for each land use, but rather less. If the peak demands for the various land uses are non - coincidental, then there is an opportunity for sharing of parking. To determine the degree to which shared parking can occur, the cumulative hourly parking demand of the land uses is calculated at all points in time throughout the day for both weekdays and weekends. In this case, Friday has been determined to be the peak day based upon the existing parking demand survey. Kunzman Associates, Inc. has utilized time -of -day factors and the parking rates for weekday and weekend parking demand for customer /visitor and employee as developed by the Urban Land Institute Shared Parking (2005). The Urban Land Institute procedures were utilized in this study to evaluate peak W W W.TRAFFIC-ENGINEER.COM I = CITY OF NEWPORT BEACH October 7, 2011 parking demand that would occur for the project at any point in time when day of week and hourly factors are utilized. Per the Urban Land Institute, weekend rates and factors are applied to Friday after 5:00 PM. To conduct a shared parking analysis, it is necessary to disaggregate the parking code into weekday and weekend as well as customer /visitor /guest and employee /resident parking space demands. Based on the City of Newport Beach Parking Code and the Urban Land Institute recommended parking ratios for weekdays and weekends, the disaggregated parking rates are shown in Table 5. Table 6 shows the expected hourly peak parking demand of the proposed project land uses for a Friday, which has been assumed as the peak day based upon the existing parking demand survey. Table 7 shows the cumulative parking demand peaks for the proposed project land uses combined with the existing parking demand for the projected peak Friday. Based upon the shared parking analysis, the maximum parking demand for the entire site during peak hours is 205 parked vehicles (see Table 7). The proposed project site plan will reconfigure the surface parking lot layout on Parcel 1 and provide a total of 214 parking spaces for the entire site, including the 16 off -site parking spaces located in the nearby parking structure. The total maximum parking demand for the entire site is 205 parking spaces. Per the shared parking analysis, the total maximum projected parking demand of 205 occupied parking spaces will allow for parking on -site and provide sufficient additional parking for the existing and proposed land uses based upon the proposed 198 on -site parking spaces and 16 off -site parking spaces. It is recommended that the 16 off -site parking spaces be maintained. Although the shared parking analysis demonstrates there will be sufficient parking as proposed, it is still recommended that a waiver of the three (3) deficient parking spaces (per City of Newport Beach Parking Code) be required in conjunction with implementation of the parking management plan prepared by Kunzman Associates, Inc. A summary of the shared parking analysis findings is provided in Table 8. Included with this submission is a copy of the Reciprocal Parking and Maintenance Agreement that can be modified by a simple majority of the property owners. Appendix A contains a copy of all off -site and shared parking agreements. CONCLUSIONS Per the shared parking analysis, the total maximum projected parking demand of 205 occupied parking spaces will allow for parking on -site and provide sufficient additional parking for the existing and proposed land uses based upon the proposed 198 on -site parking spaces and 16 off -site parking spaces. It is recommended that the 16 off -site parking spaces be maintained. Although the shared parking analysis demonstrates there will be sufficient parking as proposed, it is still recommended that a waiver of the three (3) deficient parking spaces (per City of Newport Beach Parking Code) be required in conjunction with implementation of the parking management plan prepared by Kunzman Associates, Inc. A summary of the shared parking analysis findings is provided in Table 8. W W W.TRAFFIC-ENGINEER.COM 3 X99 Mr. David Keely, Senior Civil Engineer CITY OF NEWPORT BEACH October 7, 2011 The City of Newport Beach should periodically review parking operations in the vicinity of the project once the project is constructed to assure that the parking operations are satisfactory. It has been a pleasure to service your needs on the 4221 Dolphin Striker project. Should you have any questions or if we can be of further assistance, please do not hesitate to call at (714) 973 -8383. Sincerely, KUNZMAN ASSOCIATES, INC. Q '�J A Carl Ballard I Principal Associate #4839d jPpFESS /p'V A. K12,y2 etK`ZC v z W 3 No. TR0056 Z d * TRAFF\9 \Q* \NFCAL. W W W.TRAFFIC-ENCINEER.COM KUNZMAN ASSOCIATES, INC. William Kunzman, P.E. Principal 4 000 Table 1 Existing Project Land Uses Tenant Parcel I Land Use I Quantity I Units' I Hours of Operation Quality Restaurant (Vacant) Parcel N/A 1 7.996 1 TSF N/A Saagar Fine Cuisine of India Parcel 2 Restaurant 1 7.015 1 TSF 11:00 AM - 12:00 AM Daily Classic Q Parcel 3 1 Restaurant 1 7.870 1 TSF 10:00 AM - 2:00 AM Daily 1 TSF =Thousand Square Feet "m Table 2 Friday (February 31, 2011 ) Parking Count 133 =Maximum numberof ocupied parking spaces -133 vehicles from 5:30 PM -6:00 PM 'One vehicle was illegally parked fmm9g0 AM - 11:30AM. Vehicles parked In Zane H from 6:W AM -]:00 PM are Ilkelyfor users of the office building to the south of the project site. Don not crude the 32oH-sne parking spans located In a nearhy parking accepted, which haw been auumed to be unoaupled due to Ne vacanrya the cans eg quality restaurant an Parcel 1, "A Number of Parked Vehicles and Percentage of Occupied Parking Spaces Time Period Parking Zone TParklngZone B Parking ZoneC Parking Zone Parking ZOneE Parking Zone Parking Zone Parking Zone Total' Parking Spaces Provided 10 32 37 46 40 26 13 ] 211 6:00 AM 6:30 AM 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 2 B% 1 14% 3 1% 6:30AM - 7:00 AM 1 10% 2 6% 1 3% 0 0% 2 5% 0 0% 3 12% 1 14% 10 5% ]:00 AM -]:30 AM 1 10% 2 6% 2 5% 1 2% 2 5% 0 0% 5 19% 3 43% 16 8% ]:30 AM -890 AM 1 10% 2 6% 4 11% 3 ]% 3 8% 1 4% 5 19% 3 43% 22 10% 8:110 AM -8:311 AM 1 10% 4 13% 3 8% 8 17% 3 8% 1 4% ] 27% ] 100% 34 16% 8:30 AM 9:W AM 2 20% 5 16% 2 5% 13 28% 4 10% 1 4% 30 38% 7 100% 44 21% 9:DO AM 9:30 AM 1 10% 5 16% 3 B% 19 41% 7 18% 1 4% 12 46% 8 114% 56 27% 9:30 AM - 30:00AM 2 20% 5 16% 3 8% 23 50% 9 23% 1 4% 13 50% 8 114% 64 30% 1090 AM - 10:30 AM 2 20% ] 22% 4 11% 24 52% 9 23% 1 4% 13 50% 8 114% 68 32% 10:30 AM - 11:00AM 3 30% 7 22% 4 11% 24 52% 9 23% 1 4% 13 50% 8 114% 69 33% 1190 AM - 1130 AM 5 50% ] 22% 6 16% 23 50% 8 20% 1 4% 13 50% 8 114% 71 34% 11:30 AM - 12:00 PM 8 80% 11 34% 13 35% 24 52% 14 35% 2 8% 13 50% 6 86% 91 43% 12:00 PM - 12:30 PM 9 90% 20 63% 24 65% 25 54% 16 40% 3 12% 13 50% 6 86% 116 55% 1230 PM - 1:00 PM 8 80% 26 81% 22 59% 27 59% 15 38% 8 31% 13 50% ] 100% 126 60% 1:00 PM - 130 PM 8 80% 14 44% 19 51% 25 54% 11 28% 5 19% 13 50% 7 100% 102 48% 1:30 PM - 2011 PM 8 80% 10 31% 14 38% 24 52% 10 25% 4 15% 12 46% ] l00% 89 42% 2:00 PM - 2:30 PM 8 80% 9 28% 12 32% 20 43% 10 25% 2 8% 11 42% ] 100% 79 37% 2:30 PM - 3:00 PM 8 80% 9 28% 12 32% 19 41% 9 23% 2 8% 10 38% ] 100% 76 36% 3:00 PM - 3:30 PM 7 70% 14 44% 29 78% 18 39% 18 45% 4 15% 10 38% 6 86% 106 50% 3:30 PM - 4:00 PM 8 80% 15 47% 29 78% 19 41% 18 45% 4 15% 30 38% ] 100% 110 52% 4:00 PM - 4:30 PM 9 90% 18 56% 27 73% 18 39% 18 45% 4 15% 11 42% 5 71% 110 52% 4:30 PM - 5:011 PM 10 100% 21 66% 29 78% 21 46% 16 40% ] 27% 11 42% 5 71% 120 57% 5:00 PM - 5:313 PM 10 l00% 29 91% 33 89% 17 37% 17 43% 6 23% it 42% 5 71% 128 61% 5:30 PM - 6:00 PM 30 100% 31 97% 32 86% 19 41% 21 53% 9 35% 8 31% 3 43% 133 63% 6:00 PM - 6:30 PM 10 100% 25 78% 27 73% 16 35% 21 53% 8 31% 5 19% 1 14% 113 54% 6:30 PM - 7:00 PM 10 100% 16 50% 29 78% 13 28% 19 48% 7 27% 3 12% 0 0% 97 46% 7:00 PM - 7:30 PM 10 100% 23 72% 31 84% 16 35% 17 43% 8 31% 3 12% 0 0% 108 51% 7:30 PM - 8911 PM 10 10G% 29 91% 32 86% 18 39% 15 38% 8 31% 2 8% 0 D% 114 54% 8:00 PM - 8:311 PM 9 90% 33 103% 31 84% 15 33% 15 38% 6 23% 4 15% 0 D% 113 54% 8:30 PM - 9:00 PM ] 70% 28 88% 24 65% 16 35% 10 25% 3 12% 4 15% 1 14% 93 44% 9:00 PM - 9:30 PM 6 60% 27 84% 25 68% 13 28% 8 20% 2 8% 4 15% 1 14% 86 41% 9:30 PM - 30:00 PM 5 50% 27 84% 26 70% 13 28% ] 18% 2 8% 4 15% 1 14% 85 40% 30:00 PM - 10:30 PM 5 50% 27 84% 20 54% 12 26% 5 13% 2 8% 3 12% 1 14% 75 36% 1030 PM - 11:00 PM 4 40% 26 81% 19 51% 12 26% 6 15% 3 12% 3 12% 1 14% 74 35% 1100 PM - 1130 PM 6 60% 23 ]2% 20 54% 12 2fi% 4 10% 3 12% 3 12% 1 14% 72 34% 11:30 PM - 12:00 AM ] 70% 17 53% 16 43% 6 13% 3 8% 3 12% 3 12% 1 14% 56 27% 133 =Maximum numberof ocupied parking spaces -133 vehicles from 5:30 PM -6:00 PM 'One vehicle was illegally parked fmm9g0 AM - 11:30AM. Vehicles parked In Zane H from 6:W AM -]:00 PM are Ilkelyfor users of the office building to the south of the project site. Don not crude the 32oH-sne parking spans located In a nearhy parking accepted, which haw been auumed to be unoaupled due to Ne vacanrya the cans eg quality restaurant an Parcel 1, "A Table 3 Saturday (February 12, 2012) Parking Count i2= Maximum numb., of occupied parking spares -32 vehlclesfcom 1630 PM -11'W PMi s noes not include the 32 off site parkingspaces located in a nearby parking 4ruccure, which have been assum N to be unoccupied due to the varancy Pf the existing quality restaurant on Parcel u. ,/ I Number of Parked Vehicles and Percentage of Occupied Parking Spaces Time Period Parking Zone Parking Zone Parking Zone Parking Zone Parking Zone Parking Zone Parking Zone Parking Zone Total' Parking Spaces Provided 10 32 3] 46 4D 26 13 ] 211 6:00 AM - 6:30 AM 0 0% 2 6% 2 5% 0 0% 2 5% 0 0% 0 0% 0 0% 6 3% 6:30 AM 7:0 AM 0 0% 2 6% 2 5% 0 0% 2 5% 0 0% 0 0% 0 0% 6 3% 7:00 AM - 7:30 AM 0 0% 2 6% 2 5% 0 0% 2 5% 0 0% 0 0% 1 14% ] 3% 7:30 AM - 890 AM 0 0% 2 6% 2 5% 0 0% 2 5% 1 4% 0 0% 1 14% 8 4% 8:00 AM 8:30 AM 0 0% 2 6% 1 3% 0 0% 3 8% 1 4% 1 4% 4 57% 12 6% 8:30 AM 9:0 AM 0 0% 2 6% 2 5% 1 2% 3 8% 0 0% 1 4% 5 71% 14 ]% 9:00 AM - 9:30 AM 0 0% 2 6% 2 5% 1 2% 2 5% 0 0% 1 4% 6 86% 14 ]% 9:30 AM - 10:00AM 0 0% 2 6% 2 5% 1 2% 1 3% 0 0% 1 4% 5 71% 12 6% 10:00 AM - 10:30AM 2 20% 4 13% 2 5% 1 2% 1 3% 0 0% 1 4% ] 100% 18 9% 10:30 AM - 11:00AM ❑ 1 0% 1 2 6% 1 3% 2 4% 1 3% 0 0% 1 1 4% 1 ] 1 100% 14 1 ]% 11:00 AM - 1130 AM 1 10% 3 9% 3 8% 1 2% 2 5% 0 0% 1 4% ] 100% 18 9% 1130 AM - 12:00 PM 0 0% 2 6% 3 8% 1 2% 2 5% 0 0% 1 4% ] 100% 16 8% 12:00 PM - 12:30 PM 5 50% 4 13% 10 27% 2 4% 3 8% 1 4% 1 4% 6 86% 32 15% 12:30 PM - 1:00 PM 5 50% 3 9% 16 43% 2 4% 2 5% 2 8% 2 8% 6 86% 38 18% 1:00 PM - 1:30 PM 9 90% 4 13% 20 54% 1 2% 3 8% 2 8% 1 4% 4 57% 44 21% 1:30 PM - 2:❑0PM 10 100% 3 9% 13 35% 1 2% 5 13% 2 8% 1 4% 5 71% 40 19% 2:00 PM - 2:30 PM 8 80% 3 9% 12 32% 1 2% 4 10% 0 0% 1 4% 5 71% 34 16% 2:30 PM - 3:00 PM ] 70% 2 6% 6 16% 2 4% 3 8% 0 0% 1 1 4% 5 71% 26 12% 3:00 PM - 3:30 PM 4 40% 2 6% 5 14% 2 4% 3 8% 2 8% 1 4% 6 86% 25 12% 3:30 PM 4:W PM 3 30% 3 9% 5 14% 2 4% 1 3% 2 8% 1 4% 4 57% 21 30% 4:00 PM - 4:30 PM 4 40% 4 13% 5 14% 2 4% 2 5% 0 0% 1 4% 6 86% 24 11% 4:30 PM - S:GD PM 6 60% 3 9% 4 11% 2 4% 2 5% 0 0% 1 4% 5 71% 23 11% 5:00 PM - 5:30 PM 5 50% 3 9% 6 16% 2 4% 1 3% 0 0% 0 0% ❑ 0% 17 8% 5:30 PM - 6 D PM 5 50% 4 13% 14 38% 2 4% 1 3% 0 0% 0 0% 0 0% 26 12% 6:00 PM - 6:30 PM 6 60% 5 16% 14 38% 1 2% 1 3% 0 0% 0 0% 0 0% 27 13% 6:30 PM - 7:00 PM 4 40% 5 16% 13 35% 0 0% 3 8% 0 0% 0 0% 0 0% 25 12% 7:00 PM - 7:30 PM 5 50% 4 13% 14 38% 0 0% 2 5% 1 4% 0 0% 0 0% 26 12% 7:30 PM - 890 PM 5 50% ] 22% 12 32% 0 0% 4 10% 1 4% 0 0% 0 0% 29 14% 8:00 PM - 8:30 PM 4 40% ] 22% 19 51% 0 0% 4 10% 1 4% 0 0% 0 0% 35 17% 8:30 PM - 9:00 PM 4 40% 5 16% 18 49% 0 0% 4 10% 2 8% 0 0% 0 0% 33 16% 9:OOPM- 9:30PM 5 50% 8 25% 19 51% 0 0% 4 30% 1 4% 1 4% 0 0% 38 18% 9:30 PM - 10:00 PM 9 90% 30 31% 15 41% 0 0% 6 15% 2 8% 1 4% 0 0% 43 20% 10:00 PM - 10:30 PM 10 100% 11 34% 22 59% 0 0% 5 13% 1 4% 1 4% 0 0% 50 24% 10:30 PM - 11:00 PM 10 100% it 34% 23 62% 0 0% ] 18% 1 4% 0 0% ❑ 0% 52 25% 11:00 PM - 11:30 PM 9 90% 11 34% 18 49% 0 0% 6 15% 1 4% 0 0% 0 0% 45 21% 11:30 PM - 12:00 AM 10 100% ] 22% 22 59% 2 4% 4 10% 2 8% 0 0% 0 0% 47 22% i2= Maximum numb., of occupied parking spares -32 vehlclesfcom 1630 PM -11'W PMi s noes not include the 32 off site parkingspaces located in a nearby parking 4ruccure, which have been assum N to be unoccupied due to the varancy Pf the existing quality restaurant on Parcel u. ,/ I Table 4 Parking Spaces Required By City of Newport Beach Parking Code' ' See Appendix B. 2 TSF = Thousand Square Feet ' TSF based upon net floor area. TSF based upon net public area. 5 Limited to a maximum of six seats. 0 Parking Code Land Use Quantity Units' Parking Code Requirement Retail' 3.351 TSF 1 parking space per 250 square feet of net floor area 14 Bank 4.000 TSF 1 parking space per 250 square feet of gross floor area 16 High- Turnover Restaurant° 2.000 TSF 1 parking space per 40 square feet of net public area 50 Take -Out Service - Limited' 1.000 TSF 1 parking space per 50 square feet of gross floor area 4 Total F 1 84 ' See Appendix B. 2 TSF = Thousand Square Feet ' TSF based upon net floor area. TSF based upon net public area. 5 Limited to a maximum of six seats. 0 Table 5 Parking Code Requirements` ' Source: City of Newport Beach and Urban land Institute, Shared Parking. 2nd Edition, 2005. The Urban Land Institute's Shared Parkin e provides splits for customers /visitors /guests vs. employees /residents for weekdays and weekends. These splits were applied to the City Parking Code so thatme sum of the splits is equal to the City Parking Code modified per TSF. ' TSF = Thousand Square Feet I Weekday is defined as 6:00 AM Monday through 5:00 PM Friday. ' City Parking Code modified per TSF. Nr, _. City Weekday Requirements' Weekend Requirements Customer/ Employee/ Customer/ Employee/ Parking Land Use Quantity Units Cod e4 Visitor /Guest Resident Total Visitor /Guest Resident Total Parking Rates: Retail 3.351 TSF 4.00 3.22 0.78 4.00 3.20 0.80 4.00 Bank 4.000 TSF 4.00 2.61 1.39 4.00 2.61 1.39 4.00 High- Turnover Restaurant 2.000 T51F 25.00 21.50 3.50 25.00 21.25 3.75 25.00 Take -Out Service - Limited 1.0001 TSF 1 4.00 3.40 0.60 4.00 3.43 0.57 4.00 Parking Required: Retail 3.351 TSF 14 11 3 14 11 3 14 Bank 4.000 TSF 16 10 6 16 10 6 16 High- Turnover Restaurant 2.000 TSF 50 43 7 50 43 7 50 Take -Out Service - Limited 1.000 TSF 4 3 1 21 21 1 4 Total 84 67 17 84 67 17 84 ' Source: City of Newport Beach and Urban land Institute, Shared Parking. 2nd Edition, 2005. The Urban Land Institute's Shared Parkin e provides splits for customers /visitors /guests vs. employees /residents for weekdays and weekends. These splits were applied to the City Parking Code so thatme sum of the splits is equal to the City Parking Code modified per TSF. ' TSF = Thousand Square Feet I Weekday is defined as 6:00 AM Monday through 5:00 PM Friday. ' City Parking Code modified per TSF. Nr, _. O S a C E s`- 3 y�y E� 3 °s C S s 3 r O N t4 4oXX „BaXXXe�XXXao �o E� E ti �o F fifi 3 °oF b E i O E 9 o °o R R R a 8 8 8 S 8 8 8 8 8 S 8 8 8 8 8 8 8 8' R R R R R. R R X R R R R X E E o °o XX�Xe Oe��e��g�����voXXX�X��XXXXX���X E g . 8 £ `& R £ . M R... `R 'NR N . M R'`R R £ . 8 £ o 'NR N . M M . . X a _ E °o E S £ a £ a s £ £ £ £ £ a 8 8 8 8 8 8 8 8 8 S S 8 8 8 m 8 E £ £ Q £ £ £ £ £ £ £ £ £ £ E £ £ £ £ £ 6 £ £ £ s a 6 £ £ £ s £ £ £ o £ £ e A o e R o m 8 m 8 m 8 A 8 8 m 8 A 8 m 8 8 m 8 m y�y E� 3 °s C S s 3 r O N Table 7 Projected Peak Day (Friday) Number of Parked Vehicles Time Period Peak Day Number of Parked Vehicles Projected Parking Demand' Total Retail Bank High- Turnover Restaurant Fast Food Restaurant 6:00 AM - 6:30 AM 3 1 0 15 1 20 6:30 AM - 7:00 AM 10 1 0 15 1 27 7:00 AM - 7:30 AM 16 1 0 27 1 45 7:30 AM - 8:00 AM 22 1 0 27 1 51 8:00 AM - 8:30 AM 34 3 9 33 1 80 8:30 AM - 9:00 AM 44 3 9 33 1 90 9:00 AM - 9:30 AM 56 7 15 39 2 119 9:30 AM - 10:00 AM 64 7 15 39 2 127 10:00 AM - 10:30 AM 68 10 16 44 3 141 10:30 AM - 11:00 AM 69 10 16 44 3 142 11:00 AM - 11:30 AM 71 13 11 46 4 145 11:30 AM - 12:00 PM 91 13 11 46 4 165 12:00 PM - 12:30 PM 116 14 11 50 4 195 12:30 PM - 1:00 PM 126 14 11 50 4 205 1:00 PM - 1:30 PM 102 14 11 46 4 177 1:30 PM - 2:00 PM 89 14 11 46 4 164 2:00 PM - 2:30 PM 79 14 13 29 4 139 2:30 PM - 3:00 PM 76 14 13 29 4 136 3:00 PM - 3:30 PM 106 13 11 25 3 158 3:30 PM - 4:00 PM 110 13 11 25 3 162 4:00 PM - 4:30 PM 110 13 14 25 3 165 4:30 PM - 5:00 PM 120 13 14 25 3 175 5:00 PM - 5:30 PM 128 13 0 33 3 177 5:30 PM - 6:00 PM 133 13 0 33 3 182 6:00 PM - 6:30 PM 113 12 0 37 4 166 6:30 PM - 7:00 PM 97 12 0 37 4 150 7:00 PM - 7:30 PM 108 11 0 37 4 160 7:30 PM - 8:00 PM 114 11 0 37 4 166 8:00 PM - 8:30 PM 113 10 0 35 3 161 8:30 PM - 9:00 PM 93 10 0 35 3 141 9:00 PM - 9:30 PM 86 8 0 19 2 115 9:30 PM - 10:00 PM 85 8 0 19 2 114 10:00 PM - 10:30 PM 75 6 0 16 1 98 10:30 PM - 11:00 PM 74 6 0 16 1 97 11:00 PM - 11:30 PM 72 3 0 11 1 87 1130 PM - 12700 AM 56 3 1 0 1 11 1 71 2Q_5 = Maximum projected number of occupied parking spaces - 205 vehicles from 12:30 PM -1:00 PM. ' See Table 6. 11 OQ7 Table 8 Shared Parking Demand Summary i See Table 7. 2 Includes 16 off -site parking spaces located in a nearby parking structure. 12 002 Number of Descriptor Parking Spaces Maximum Projected Parking Demand During Peak Hours' 205 Proposed Parking Spaces Provided 214 Additional Parking Spaces Needed -9 i See Table 7. 2 Includes 16 off -site parking spaces located in a nearby parking structure. 12 002 Figure 1 Site Plan NTS KUNZMAN ASSOCIATES, INC. u—N PMA+Iw .N�NuGA 10 MEW W.,.1 N.) 3AIW3 dJY MIN 4839d/1 OVER 35 YEARS OF EXCEU ENT SERVICE 13 C9 09 • `` �, �` 56 LA `.. _ LW CUR 1 i El • L -'. OvER 35 VEARS OF EXCELLENT SERVILE 14 ��I.LJ 250 200 N 150 a m c 's a `o a 100 z 50 Figure 3 Parking Survey Summary Graph (Existing Conditions) .......................................................... ............................... /\ � / /\ \ � ---------------- - - - - -- - -- - - - - -- f ------- - - - - -- V------ � f `1114%, I ------------/-------------------------------------------------------- / 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Parking Spaces Occupied on Friday (February 11, 2011) Parking Spaces Occupied on Saturday (February 12, 2011) 9—poe— Total Parking Spaces Provided= 211 (not including 16 off-site parking spaces) KUNZMAN ASSOCIATES, INC. 4839d/3 OVER 35 YEARS Or EXCEU ENT SERVICE 15 021 APPENDIX A Parking Agreements /-112 :,'hen Recorded Return Tor Phe Newport Project - 4101 MacArthur 91vd. , .r /1 ev 1 CC Newport Beach, 6A. 92660 '.��� r: 'Ir ,;;,� �;}}:,O�,C�3PlCC7�,} RECIPROCAL PARKING AND MAINTENANCE AGREEMENT This Agreement made this z *7 day of 1972, by and between THE` CRT P ", a joint venture composed of Emkay Development Company, Inc. and Atlas Realty- company (hereinafter called "The Newport Project "), and EMKAX� DEVELOPMENT COMPANY, INC. ( hereinafter called "Emkay'r). RECITALS �..F 1r 1..•, pi ! r A. The Newport Project is the owner of Lot 4 of ile. pages 15 -16 of Miscellaneous �i Track 7770, recorded in book 299, p g f 1,;W:4 Maps, Records of Orange County, outlined in red on the parcel )' analysis attached hereto as Exhibit "A" and incorporated hArein by this reference (the "Development"). B. Concurrently with the recording of this Agree- ment The Newport Project is deeding to Emkay the portion of the Development denominated Parcel 1 and outlined in green on Exhibit "A." The .Newport Project intends to deed to others the portions of the Development delineated Parcels 2 and 3, outlined in yellow and in blue, respectively, on Exhibit "A." C. The Newport Project and Emkay desire to establish integrated parking facilities and pgd a ea in the Development, and to provide for the maintenance of same, for the benefit of all of the Development, and for the commgn use a.- nd benefit of the present and future owners and leasees of Parcels within the Development, all as more specifically hereinafter set forth. ReCO:t.1EU nT I.i R'JFST OF m rear ^.;a� r: •sas eF 1972 PA20-10 -135 for GP2010.010 P02010-007 4221 Dolphin Striker Nay R09eway Developrnenl 013 e;�,1 0443 Fia777 associated facilities. Each of the Parcel owners, their lessees, assigns and successors in interest, and their respective employees and invitees shall be entitled to use the Common Areas, subject to such reasonable rules and regulations relating to such'use as a majbritrLof the LFare may from time to time,establish, including validation requirements. 3, Improvement, Each Parcel owne , or its successor in interest, shall, at its own expense, im_ 'prove those portions of the Common Parking Areas and Landscaped Areas on its respective premises. Such work of improvement shall be performed pursuant to plans and specifications approved by Emkay and the Parcel owner. ,,r14 k. Maintenance. From and after the Effecti., to `r6Jj Date as to the first restaurant to be con structe Em &a shall, subject to the d_irectioR Qf a ma -j01W of the Parcel Sri °2 owners, operate, manage, p olice, ' light, repair , and maintain ....._.�_., the Common Areas. 5. Control. Subject to the.ilirection of a r , L �"N majority of the_Parcel owners Gmkay� hall at all times t during the Term hereof So_n.Lrol the automobile parking areas, ;} driveways, entrances and exits, landscaped. area s, and the f - sidewalks and pedestrian passageways within the Common Areas, and may at any time and from time to time during the Term hereof restrain any use or occupancy thereof except as autho- rized by the rules and regulations for the use of such areas established by a majority of the Parcel owners from time to time. Emkay may temporarily close all or portions of the Common Areas for repairs or alterations, to prevent a dedi- cation thereof or the accrual of prescriptive rights therein, -3- 014 vu 10443 PmM (b) The proportionate share of the Common Area costs of each Parcel owner shall be as follows: (1) Upon the Effective Date as to the first owner to open for business, such owner shall pay 100% of the cost of maintaining and operating the Common Areas located on such party's Parcel. (ii) Upon the Effective Date.,as to the second owner to open-for business, the two owners so opened shall share the cos L- of operating and maintaining the Common Areas located on their two Parceld, in the proportion which the respective gross square footages of their two Parcels bear,to each other. (iii) Upon the Effective Date as to the third owner to open for business, and for the balance of the Term, the three Parcel owners shall share the cost of op- erating and maintaining all of the Common Areas located in the Development in the following percentages; Owner of Parcel 1 38% Owner of Parcel 2 25% Owner of Parcel 3 37% (c) Prior to the commencement of�e� calendar period of six (6)_months- during the Term, Emkay shall give each Parcel owner a written -5- 015 ?;4,10443Fi«TSo estimate of their respective shares of such Common Area costs for.the ensuing six (6) month period. Such estimated amount shall not exceed 110% of the actual share of such Parcel owner for the then current six (6) month period. Each Parcel owner shall pay such esti- mated amount to EmkaYin equal „monthly - installments, in advance. Within ninety (90) days after the end of each such six (6) month period, Emkay shall furnish to each Parcel owner a statement showing in reasonable detail the costs and expenses incurred by Emkay for the operation and maintenance of the Common Areas during such period, and each Parcel owner shall promptly make any payment or allowance necessary to adjust each such party's estimated payment to such party's actual Proportionate share of Common Area costs as shown by -such annual statement. 7. Enforcement of Assessments. (a) Failure to pay the estimated share of Common Area cost or any installment thereof, in- eluding any semi- annual adjustment, promptly and in any event within ten (10) days after written notice from Emkay of nonpayment, shall constitute a delin- quency and default with respect to the Parcel to *�hich such share relates. A maior&�y of the Parcel owners is. authorized -and empocueted„�t,�o,Moceed in the event of any such default to collect_ each such delinquent individual assessment, together with interest upon the unpaid amount thereof at ten percent (10 %) per annum from the date of such notice, until the same is fully paid, together -6- 010 8(6I ! C443 P1f781. with recording fees, title costs, court costs, and reasonable attorney's fees. (b) If and whenever a default occurs, as provided above, the non - defaulting Parcel owners Ahall be entitled to a Lr i�en against the Parcel to which such default relates, for' the unpaid amount of such share of Common Area costs and the cost and expenses described above. In.the event of any such default, then any non- defaulting Parcel owner may file for record in the office of the County Recorder of orange County, California, a claim of lien, which shall contain at least; (ij A statement of the unpaid amount of the share of Common Area cost; (ii) A description sufficient for identification of the Parcel to which the default relates; and (iii) The name of the owner or reputed owner of the property described in (ii) above. Such claim of lien shall be effective to establish a lien against the real property described in such claim, in the amount specified therein, together with interest at ten percent (10 %) per annum from the date of notice of nonpayment, together with recording fees and reasonable costs of any title search or title policy before or after made or obtained in connection with such claim of lien or the foreclosure of the claim of lien, together with court costs and reasonable attorney's fees which may accrue in the enforcement of such lien. -7- ar f D443 F.u78Z (c) Such lien, when so established against the real property described in said claim,. shall be prior and superior to any right, title, in- terest, lien, or claim which may be or may have been acquired in or attached to said real property sub- sequent to the time of filing such claim, except that such lien' shall in any event be' subordinate to the lien of any bona fide first trust deed upon such property. Such lien shall be for the use and benefit of the non- defaulting Parcel owners and may be enforced and fore- closed in a suit or action brought by any one or more of them in any court o£ competent jurisdiction, if brought within one year of the filing of such claim, in the same manner as if the amount of such lien had been evidenced by the promissory note of the person or persons who on the date of notice of nonpayment were the be owners of the property . subjected to such lien, and as if such note were secured by a real estate mortgage upon said real property duly executed by the fee owners' of such property as of the time of recording and duly recorded 'at 'the time such claim was filed for record. In any such suit or action the plaintiffs shall be entitled to a personal judgment in the full amount of such lien against each person who was such fee owner on such date of notice of nonpayment. The net amount received on account of such lien or from any judgment with respect to such lien, if received after the close of the year for which such share was due, shall be applied against the non - defaulting Parcel owners' current shares of Common Area costs, until fully expended. 10 01g 10;431 u7 &3 S. Binding Upon Successors. This Agreement phall be binding upon and inure to the benefit of the.paltties and their respective successors, assigns, lessees iiid'publessees Upon transfer of the fee title _to, any Parcel to a huccdssor which assumes in writing the obligations impel: -,tbN this. Agreement,_the_ transferor shall be relieved from all obligA tions accruing hereunder subsequent Co�the date of transfer. r 9. Paragraph He The paragraph headings used herein are for reference only, and shall not enter into the interpretation of this Agreement. EXECUTED this _19th day of October , 1972. Arx Er: > -t EMMY DEVELOPMENT COMPANY, INC. BY _ WE THE NEWPORT PROJECT By EMKAY DEVELOPMENT COMPANY, INC. f �1 By ATLAS REALTY COMPANY B y STATE OF .cXAS: COUNTY OF HARRIS On this 19th day of October , 19_22 , before mei the undersigned, a Notary Public for said County and State, personally appeared L. 0. Henson and w. J. Perry, Jr. known to me to be the vice president and assistant secretary respectively of Atlas Realty Company the corporation that executed the within instrument, said persons being known to me to be the persons who executed the within instrument on behalf of said corporation,• said corporation being known to me to be ono-of the Joint venturers of The Newport Project the joint venture that executed the within instrument, and acknow- ledged to me that such corporation executed the same both individually and as ,joint venturer of said joint venture and that such Aoint•venture also executed the same. (SEAL) �•'(}Jfit•C�.�` JY7 �lJ....✓, -�• 'Name` (Typed or r n. ed Notary Public in and for said County and State My commission expires 6/1173 C -F= V r O C; 020 $x:149743 MCC" 04"FI NY WHEN RECORDED, RETURN TO: LATHAM 6 WATKINS 555 South Flower Street Los Angeles, CA 90071 -2466 Attn: J. K. Hachigien I $19.00 C6 •3�4pM APRIS'86 COVENANT AND AGREEMENT REGARDING MAINTENANCE OF OFF- STREET PARKING SPACE AFFECTING PARCEL 1 OF PARCEL MAP FILED IN BOOR 45, PAGE 23 AND PARCEL I OF PARCEL MAP FILED IN BOOK 183 PAGES 14 THROUGH 15 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER, ORANGE COUNTY, CALIFORNIA PA2010.135 for GP2010 -010 PD2010.007 4221 Dolphin Striker Way Ridgeway Development 021 85 :149143 THIS COVENANT AND AGREENENT FOR OFF - STREET PARKING SPACE (the "Agreement ") is made as of January 14, 1986, between STUART MITCHELL KETCHUN, JR. ( "Ketchum ") and THE DEVIL'S TRIANGLE PARTNERSHIP, a California general partner- ship ( "Devil's Triangle "). Ketchum owns the property si- tuated in the State of California, County of Orange, City of Newport Beach described as followas Parcel 1 of Parcel Nap 83 -705 as per map filed in book 183, pa es 14 and 15 of Parcel Maps in the Office of the Recor- der of said County (hereinafter the "Continental Property "), and Devil's Triangle owns the adjoining property described as follows Parcel 1 as shown on a Parcel Map filed in book 45, page 23 of Parcel Nape in the Off Los o£ the Recorder of said County (hereinafter the "E1 Torito Pro- perty') . RECITAL The Planning Commission of the City of Newport Beach, California (the "City ") has a?proved, subject to certain conditions, Devil's Triangle a request to allow the use of an existing open courtyard for dining and drinking purposes in the'El Torito Restaurant (located on the E1 Torito Property). One condition requires that a covenant for additional automobile parking spaces be established to run with the Continental Property for the benefit of the El Torito Property, and another condition requires a grant of an easement for and the construction of it sidewalk linking the covenanted parking spaces on the Continental Property to the E1 Torito Property. The purpose of this Agreement is to satisfy said conditions. ARTICLE 1. COVENANT AND BASEMENT Section 1.1 - GRANT OF COVENANT. The owner of the 055tiffental Property hereby covenants and agrees to provide on the Continental Propertyp for the benefit of the E1 Torito Property, sixteen M) automobile parking spaces together with a nonexclusive easement for access to, ingress to, agrees from, and use and enjoyment of the parkins spaces for W passage of vehicles, (i ) panes is of pedestrian traffic, and (iii) other uses incidental to such passages 022 '5.149743 reserving, however, in favor of the owner Of the continental Property, all rights of access to, ingrase to, egress from and use and enjoyment paking ganted berein parkin rezwiee inconsistent with the r Section 1.2 - GRANT OF EASEMENT. The owner of the CO" t ne�lroperty hereby grants a nonexclusive easement for the passage of pedestrian traffic, and other uses incidental prito to such passage, over the Continental Property from the arking spaces, covenanted in Continental BL Property as the owner thereof shall reasonably designate. The owner of the E1 Torito Property shall have the right, withheld, to construct a sidewalk along the easement route. Such sidewalk shall be constructed and maintained at the sole expense of the owner of the E1 Torito Pro 811. The owner of the Continental Property aball have tha right, at its sole expense and subject to the approval of the owner of the E1 Torito Property, which such appproval shall not be unreasonably withheld, to relocate tt�e easement and reconstruct a sidewalk along the relocated easement route. Section 1.3 - TEMPORARY LASS OF PARKING SPACES. The owner o t e ontinental Property shall have the right from time to time in order to accomodate construction or other activities on the Continental Property, to temporarily relocate Boma or all of the covenanted parking spaces to an off -site location (not on the Continental Property) which, under the then - present circumstances, will enable the owner of the E1 Torito Ptogarty to use the same with as little inconvenience to such owner as is practicable under the circumstances. Section 1.4 - PARKING CLIARGES. The owner of the Continental ropli party fiall have the right to aeaeaa and collect from any person parking on the spaces covenanted in Section 1.1 a parking fee in the amount as followes (a) As long as such parking spaces are surface parking the fee shell be FORTY DOLLARS (640) per month per apace. (b) If the parking spaces are located of on an interim basis Pur- suant to Section 1.3, the fee shall be an amount necessary to reimburse 2 023 a5 =149743 the owner of the Continental Pro - party for its costs of providing each such interim parking apace - (c) If the Parking spaces are located within a parking structure the fee shall be the greater of M RIGRTY DOLLARS ($80) per month per space or (ii) the than - prevailing rate for such parking. ARTICLE 2. GENERAL PROVISIONS Section 2.1 - TERM. This covenant and easement shall con - nue n e feet until such time as the El Torito Propperty is no longer used as a restaurant. At the expiration of such term, the owner of the E1 Torito Property shall provide to the owner of the Continental Property a quitclaim deed or other documents neceeeatyy to eliminate of record the cove- nant and easement established by this Agreement. Section 2.2 - COVENANTS TO RUN WITH LAND. The covenants and easements established herein are for the benefit of the El Torito Property and are intended to be and shall be con- strued as covenants running with the Continental Property and equitable servitudes upon the Continental Property and every part thereof. Furthermore, each and all of such covenants and easements shall be binding upon and burden, and shall inure to the benefit of, all parsons having or acquiring any right, title or interest in the Continental Property, the El Torito Property or any part of either thereof, and their respective successors and assigns, all upon the terms, provisions and conditions eat forth heroin. Section 2.3 - GENERAL INTERPRETATION (a) If any term, provision or condition contained in this Agreement (or the application of any such term, provision or condition) shall to any extent be invalid or unenforceable, the remainder of this Agreement shall be valid and enforce - able to the fullest extent permitted by law. (b) When the context in which words are used herein indi- cates that such is the intent, words in the singular number shall include the plural and vice versa. All pronouns and any variations thereof shall be deemed to refer to all ggen- ders, and the term "person" shall include natural indivi- duals, corporations, partnerships, unincorporated organisa- tions, aesociations, trusts, estates and all other forms of 3 024 66:;149743 entities. The captions of the Articles and Sections herein are for convenience of reference only and shall not be con - sidered or referred to in rasolving questions of interpre- tation or construction. IN WITNESS WHEREOF, Retchum and Devil's Triangle have executed this instrument as of the day and year first above written. 'L�ABLL -RETL7 THE DBVOLE P B KIP By dzL _ Stuart M.-Ketchum as a general partner Byi SANTA ASSOCIATES, a California limited partnexabip, as�� general �t wart e c uta, e sole general partner 025 $3=149743 STATE OF CALIFO_ gNJA COUNTY OF �GF s � - } [.CL1 � On *4-r, iG before roe, the underd ed, a Non Pnblic in and for sild Suite, penona0y appeared - - - , penonaUy known to me or proved to me on the basis of atisfaetory eaidenrc to be the person —whoa name tubavibed tothe within instrument and aekno;4d that -AL exr toted the same. WfCNBSSmyh danduffietalseaL S�natum ('fhb am fm ollktY aoudst eN) 020 96.149743 STAT4 OP CALIPORNfA - )) Collmyor Sq. .' . On - - yJ~:rG ))before mq tde undenigeed. a Notuy Public in and far Sigmtum penonulp known to m or Hof sst4hao++yy addenae to be rated the instrument within as o putnen of the pameohip mtmmmt. and atknowtedged . .. • ,',;:? )muted the Scum - • ...� liddfell. T `i•• ••� 4YtttW.aa.ahR:.s�•.'�,IWJ J mIs aeara -m-w eemw ad) 027 STATE OF CODNTVC On aid State, l Sipature 66=149743 undmiSned, a Notary Public in and for (:Ats"fat o8?tld oetuW sea?) CoVED44Nf CODE 27361.7 certify under penalty of perjury that the notary seal on the document to which this statement is attache reads as follows: 1:amr of %otar. t -T L t .tote Com- .6rdo:t hxrires J :ounty when bond fs filed Fla a of i,eOutlon 5 f R b •`�_,_., Date �J G - sFC D r. - 022 1 • • �. W- . ♦A a JSAA • Y I 11 ' �. �: e` .. W: Tgt.Y R'la•T ty1,1111gtLplt.pgittl.�f,taaa ) (:Ats"fat o8?tld oetuW sea?) CoVED44Nf CODE 27361.7 certify under penalty of perjury that the notary seal on the document to which this statement is attache reads as follows: 1:amr of %otar. t -T L t .tote Com- .6rdo:t hxrires J :ounty when bond fs filed Fla a of i,eOutlon 5 f R b •`�_,_., Date �J G - sFC D r. - 022 /e\U910111D79 City of Newport Beach Parking Code 0:�9 Chapter 20.40 — Off - Street Parking Sections: 20.40.010 — Purpose 20.40.020 — Applicability 20.40.030 — Requirements for Off - Street Parking 20.40.040 — Off - Street Parking Spaces Required 20.40.050 — Parking Requirements for Shopping Centers 20.40.060 — Parking Requirements for Food Service Uses 20.40.070 — Development Standards for Parking Areas 20.40.080 — Parking for Nonresidential Uses in Residential Zoning Districts 20.40.090 — Parking Standards for Residential Uses 20.40. 100 — Off -Site Parking 20.40.110 — Adjustments to Off - Street Parking Requirements 20.40.120 — Parking Management Districts 20.40.130 — In -lieu Parking Fee 20.40.010 — Purpose The purpose of this Chapter is to provide off - street parking and loading standards to: A. Provide for the general welfare and convenience of persons within the City by ensuring that sufficient parking facilities are available to meet the needs generated by specific uses and that adequate parking is provided, to the extent feasible; B Provide accessible, attractive, secure, and well- maintained off - street parking and loading facilities; C. Increase public safety by reducing congestion on public streets and to minimize impacts to public street parking available for coastal access and recreation; D. Ensure access and maneuverability for emergency vehicles; and E. Provide loading and delivery facilities in proportion to the needs of allowed uses. 20.40.020 — Applicability A. Off - street parking required. Each use, including a change or expansion of a use or structure, except as otherwise provided for in Chapter 20.38 (Nonconforming Uses and Structures) shall have appropriately maintained off - street parking and loading areas in compliance with the provisions of this Chapter. A use shall not be commenced and structures shall not be occupied until improvements required by this Chapter are satisfactorily completed. October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Off - Street B. Change, enlargement, or intensification of use. Changes in use and enlargement or intensification of an existing use shall require compliance with the off - street parking requirements of this Chapter, except as allowed in Chapter 20.38 (Nonconforming Uses and Structures). 20.40.030 — Requirements for Off - Street Parking A. Parking required to be on -site. Parking shall be located on the same lot or development site as the uses served, except for the following: 1. Townhouses and multi- tenant uses. Where parking is provided on another lot within the same development site, the parking shall be located within 200 feet of the units they are intended to serve. 2. Off -site parking agreement. Parking may be located off -site with the approval of an off -site parking agreement in compliance with Subsection 20.52.080.0 (Parking agreement). B. Permanent availability required. Each parking and loading space shall be permanently available and maintained for parking purposes for the use it is intended to serve. The Director may authorize the temporary use of parking or loading spaces for other than parking or loading in conjunction with a seasonal or intermittent use allowed in compliance with Section 20.52.040 (Limited Term Permit). C. Maintenance. Parking spaces, driveways, maneuvering aisles, turnaround areas, and landscaping areas shall be kept free of dust, graffiti, and litter. Striping, paving, walls, light standards, and all other facilities shall be permanently maintained in good condition. D. Vehicles for sale. Vehicles, trailers, or other personal property shall not be parked upon a private street, parking lot, or private property for the primary purpose of displaying the vehicle, trailer, or other personal property for sale, hire, or rental, unless the property is appropriately zoned, and the vendor is licensed to transact a vehicle sales business at that location. E. Calculation of spaces required. 1. Fractional spaces. Fractional parking space requirements shall be rounded up to the next whole space. 2. Bench seating. Where bench seating or pews are provided, 18 linear inches of seating shall be considered to constitute a separate or individual seat. 3. Gross floor area. References to spaces per square foot are to be calculated on the basis of gross floor area unless otherwise specified. 4. Net public area. "Net Public Area" shall be defined as the total area accessible to the public within an eating and /or drinking establishment, excluding kitchens, restrooms, offices pertaining to the use, and storage areas. 5. Spaces per occupant. References to spaces per occupant are to be calculated on the basis of maximum occupancy approved by the City of Newport Beach Fire Department. Newport Beach Zoning Code, Title 20 Octobo_gJ2010 Off - Street Parking 20.40 6. Spaces required for multiple uses. If more than one use is located on a site, the number of required off - street parking spaces shall be equal to the sum of the requirements prescribed for each use. F. Nonconforming parking and loading. Land uses and structures that are non- conforming due solely to the lack of off- street parking or loading facilities required by this Chapter, shall be subject to the provisions of Section 20.38.060 (Nonconforming Parking). 20.40.040 — Off - Street Parking Spaces Required Off- street parking spaces shall be provided in compliance with Table 3.11, below. These standards shall be considered the minimum required to preserve the public health, safety, and welfare, and more extensive parking provisions may be required by the review authority in particular circumstances. Unless otherwise noted parking requirements are calculated based on gross floor area. Industry Small - 5,000 sq. ft. or less 1 per 500 sq. ft. Large - Over 5,000 sq. ft. 1 per 1,000 sq. ft. Industry, Marine Related 1 per 750 sq. ft. Personal Storage (Mini Storage) 2 for resident manager, plus additional for office as required by Minor Use Permit Research and Development 1 per 500 sq. ft. Warehousing and Storage 1 per 2,000 sq. ft., plus 1 per 350 sq. ft. for offices. Minimum of 10 spaces per use Wholesaling 1 per 1,000 sq. ft. Assembly /Meeting Facilities 1 per 3 seats or 1 per 35 sq. ft. used for assembly Commercial Recreation and Entertainment As required by Conditional Use Permit Cultural Institutions 1 per 300 sq. ft. Schools, Public and Private As required by Conditional /Minor Use Permit Accessory Dwelling Units 1 per unit; a minimum of 2 covered per site. Single -Unit Dwellings - Attached 2 per unit in a garage Single -Unit Dwellings - Detached and less than 2 per unit in a garage A nnn cn ft of ti= U flnnr.rc. 2DSS October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Land Use Off - Street T' U Parking Spaces Required Single -Unit Dwellings - k7etached and 4,000ya L 3 per unit in a garage square ft. or greater of floor area }]ASP�m2n 1 a Gmm't Single -Unit Dwellings - Balboa Island 2 per unit in a garage Multi -Unit Dwellings - 3 units 2 per unit covered, plus guest parking; 1 - 2 units, no guest parking required 3 units, 1 guest parking space Multi -Unit Dwellings - 4 units or more 2 per unit covered, plus 0.5 space per unit for guest parking Two -Unit Dwellings 2 per unit; 1 in a garage and 1 covered or in a garage Live /work units 2 per unit in a garage, plus 2 for guest/customer Senior Housing - market rate 1.2 per unit Appliances, Building Materials, Home Electronics, 1st 10,000 sq. ft. - 1space per 300 sq. ft. Furniture, Nurseries, and Similar Large Warehouse- Over 10,000 sq. ft. - 1 space per 500 sq. ft. type Retail Sales and Bulk Merchandise Facilities Plus 1 per 1,000 s .ft. of outdoor merchandise areas Food and Beverage Sales 1 per 200 sq. ft. Marine Rentals and Sales Boat Rentals and Sales 1 per 1,000 sq. ft. of lot area, plus 1 per 350 sq. ft of Marine Retail Sales 1 per 250 sq. ft. Retail Sales 1 Der 250 so. ft. Shopping Centers 1 per 200 sq. ft. Convalescent Facilities 1 per 3 beds or as required by Conditional Use Permit Emergency Health Facilities 1 per 200 sq. ft. Financial Institutions and Related Services 1 per 250 sq. ft. Hospitals 1 per bed; plus 1 per resident doctor and 1 per emDlovee. Offices* - Business, Corporate, General, Governmental First 50,000 sq. ft. Next 75,000 sq. ft. Floor area above 125,001 sq. ft. 1 per 250 sq. ft. net floor area 1 per 300 sq. ft. net floor area 1 per 350 sq. ft. net floor area * Not more than 20% medical office uses. Offices - Medical and Dental Offices I 1 per 200 sqrft:- Newport Beach Zoning Code, Title 20 October2 , 10 Off- Street 20.40 1 per 250 so. ft. Adult- Oriented Businesses I 1 per 1.5 occupants or . as required by Conditional Use Permit Ambulance Services 1 per 500 sq. ft., plus 2 storage spaces Animal Sales and Services Animal Boarding /Kennels 1 per 400 sq. ft. Animal Grooming 1 per 400 sq. ft. Animal Hospitals /Clinics 1 per 400 sq. ft. Animal Retail Sales 1 per 250 sq. ft. Artists' Studios 1 per 1,000 sq. ft. Catering Services 1 per 400 sq. ft. Care Uses Adult Day Care — Small (6 or fewer) Spaces required for dwellina unit onlv. Adult Day Care - Large (7 or more) 2 per site for drop -off and pick -up purposes (in addition to the spaces required for the dwelling unit). Child Day Care — Small (6 or fewer) Spaces required for dwelling unit only. Child Day Care - Large (9 to 14) 2 per site for drop -off and pick -up purposes (in addition to the spaces required for the dwelling unit). Day Care - General 1 per 7 occupants based on maximum occupancy allowed per license. Residential Care - General (7 to 14) 1 per 3 beds Eating and Drinking Establishments Accessory (open to public) 1 per each 3 seats or 1 per each 75 sq. ft. of net public area., whichever is greater Bars, Lounges, and Nightclubs 1 per each 4 persons based on allowed occupancy load or as required by Conditional Use Permit 1 per 30 -50 sq. ft. of net public area, including outdoor Food Service with /without alcohol, with /without dining areas, but excluding the first 25% or 1,000 sq. ft late hours of outdoor dining area, whichever is less. See Section 20, qo. 0 6 Food Service - Fast food 1 per 50 sq ft., and 1 per 100 sq. ft. for outdoor dining areas Take -Out Service - Limited 1 per 250 sq. ft. Emergency Shelter As required by Conditional Use Permit Funeral Homes and Mortuaries 1 per 35 sq. ft. of assembly area Small - 2,000 sq. ft or less 1 per 250 sq. ft. Large - Over 2,000 sq. ft. 1 per 200 so. ft. October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Off- Street Laboratories (medical, dental, and similar) 1 per 500 sq. ft Maintenance and Repair Services 1 per 500 sq ft Marine Services Boat Storage - Dry 0.33 per storage space or as required by Conditional Use Permit Boat Yards As required by Conditional Use Permit Dry Docks 2 per dry dock Entertainment and Excursion Services 1 per each 3 passengers and crew members Marine Service Stations As required by Conditional Use Permit Sport Fishing Charters 1 per each 2 passengers and crew members Water Transportation Services - Office 1 per 100 sq. ft., minimum 2 spaces Persol lal Services Massage Establishments 1 per 200 sq. ft. or as required by Conditional Use Permit Nail Salons 1 per 80 sq. ft. Personal Services, General 1 per 250 sq. ft. Studio (dance, music, and similar) 1 per 250 sq. Ft. Postal Services 1 per 250 sq. ft. Printing and Duplicating Services 1 per 250 sq. ft. Facilities Collection Facility - Large 4 spaces minimum, but more may be required by the review authority Collection Facility - Small As required by the review authority Visitor Accommodations Bed and Breakfast Inns 1 per guest room, plus 2 spaces Hotels and accessory uses As required by Conditional Use Permit Motels 1 per guest room or unit Recreational Vehicle Parks As required by Conditional Use Permit Time Shares As required by Conditional Use Permit Communication Facilities 1 per 500 sq. ft.. Heliports and Helistops As required by Conditional use Permit Marinas 0.75 per slip or 0.75 per 25 feet of moorina soace Office Limited Rentals 1 per 250 sq. ft. 1 per 300 sq. ft., plus 1 per rental vehicle (not including Newport Beach Zoning.Code, Title 20 Octobe6e2510 Off - Street 01Q11 IG Vehicle/Equipment Rentals and Sales 1 per 1,000 sq. ft. of lot area Vehicles for hire 1 per 300 sq. ft., plus 1 per each vehicle associated with the use and stored on the same site Vehicle Sales, Office Only 1 per 250 sq. ft., plus 1 as required by DMV Vehicle /Equipment Repair (General and Limited) 1 per 300 sq. ft. or 5 per service bay whichever is more Services Automobile Washing 1 per 200 sq. ft. of office or lounge area; plus queue for Service Station 1 per 300 sq. ft. or 5 per service bay whichever is more; minimum of 4 Service Station with Convenience Market 1 per 200 sq. ft., in addition to 5 per service bay Vehicle Storage 1 per 500 sq. ft. er Residence 1 per unit Special Events As required by Municipal Code Chapter 11.03 Temporary Uses As required by the Limited Term Permit in compliance with Section 20.52.040 20.40.050 — Parking Requirements for Shopping Centers A. An off - street parking space requirement of 1 space for each 200 square feet of gross floor area may be used for shopping centers meeting the following criteria: 1. The gross floor area of the shopping center does not exceed 100,000 square feet; and 2. The gross floor area of all eating and drinking establishments does not exceed 15 percent of the gross floor area of the shopping center. B. Individual tenants with a gross floor area of 10,000 square feet or more shall meet the parking space requirement for the applicable use in compliance with Section 20.40.040 (Off- street Parking Spaces Required), above. C. Shopping centers with a gross floor areas in excess of 100,000 square feet or with eating and drinking establishments occupying more than 15 percent of the gross floor area of the center shall use a parking requirement equal to the sum of the requirements prescribed for each use in the shopping center. October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Off - Street 20.40.060 — Parking Requirements for Food Service Uses A. Establishment of parking requirement. The applicable review authority shall establish the off - street parking requirement for food service uses within a range of one space for each 30 to 50 square feet of net public area based upon the following considerations: The physical design characteristics: a. The gross floor area of the building or tenant space; d. The number of tables or seats and their arrangement; e. Other areas that should logically be excluded from the determination of net public area; f. The parking lot design, including the use of small car spaces, tandem and valet parking and loading areas; g. Availability of guest dock space for boats; and Extent of outdoor dining. 4. vperationai characteristics: a. The amount of floor area devoted to live entertainment or dancing; b. The amount of floor area devoted to the sale of alcoholic beverages; C. The presence of pool tables, big screen televisions or other attractions; d. The hours of operation; and e. The expected turn over rate. 3. Location of the establishment: a. In relation to other uses and the waterfront; b. Availability of off -site parking nearby; C. Amount of walk -in trade; and d. Parking problems in the area at times of peak demand B. Conditions of approval. If during the review of the application, the review authority uses any of the preceding considerations as a basis for establishing the parking requirement, the substance of the considerations shall become conditions of the permit application approval and a change to any of the conditions will require an amendment to the permit application, which may be amended to establish parking requirements within the range as noted above. Newport Beach Zoning Code, Title 20 OctobeOG`510 OS2 Attachment No. CC 9 Revised Parking Management Plan O39 Muo KUNZMAN ASSOCIATES, INC. OVER 35 YEARS OF EXCELLENT SERVICE October 4, 2011 Mr. Tod Ridgeway RIDGEWAY DEVELOPMENT 2804 Lafayette Avenue Newport Beach, CA 92663 Dear Mr. Ridgeway: INTRODUCTION The firm of Kunzman Associates, Inc. is pleased to provide this parking management plan for the 4221 Dolphin Striker project in the City of Newport Beach. The purpose of this parking management plan is to determine existing conditions, anticipate peak parking demand, and describe the implementation of a parking management strategy that will develop optimal parking conditions at the 4221 Dolphin Striker project site. The project site is located at 4221 Dolphin Striker Way in the City of Newport Beach (see Figure 1). This report summarizes our methodology, analysis and findings. We trust that the findings, which are summarized in the front of the report, will be of immediate as well as continuing value to you and the City of Newport Beach in evaluating the proposed development. FINDINGS 1. The project site is located at 4221 Dolphin Striker Way in the City of Newport Beach. The project proposes to provide a total of 214 parking spaces. 2. A total of 211 on -site shared parking spaces are currently provided for the entire site. The project site also has obtained an additional 16 off -site parking spaces. 3. The maximum number of occupied parking spaces at the 4221 Dolphin Striker project is 133 parked vehicles on a Friday from 5:30 PM to 6:00 PM. 4. The maximum number of occupied parking spaces at the 4221 Dolphin Striker project is 52 parked vehicles on a Saturday from 10:30 PM to 11:00 PM. 5. Based upon the City of Newport Beach Parking Code requirements, a total of 84 parking spaces are required for the proposed project land uses. Per the City of Newport Beach Parking Code, the proposed parking provided will be deficient three (3) parking spaces. 1111 TowN & COUNTRY ROAD, Sum 34 ORANGE. CALIFORNIA 92868 (714) 973 -8383 W W W.TRAFFIC-ENGINEER.COM WN Mr. Tod Ridgeway RIDGEWAY DEVELOPMENT October 4, 2011 6. Based upon the shared parking analysis, the total maximum likely parking demand of 205 occupied parking spaces will allow for parking on -site and provide sufficient additional parking for the existing and proposed land uses based upon the proposed 198 on -site parking spaces and 16 off -site parking spaces. 7. Employees of the proposed project land uses should be required to park in the off -site parking structure. Incentives such as a parking cash -out for employees who choose not to drive to work may help reduce the cost of maintaining off -site parking spaces. 8. Install and enforce parking regulation signs, such as "Customer Only", to prevent spillover from adjacent land uses. Parking regulation must be enforced to be effective. 9. Based upon the parking management plan, the projected peak parking demand of 174 occupied parking spaces will allow for parking on -site and provide sufficient additional parking for the existing and proposed land uses based upon the proposed 198 on -site parking spaces and 16 off -site parking spaces. 10. It is recommended that the 16 off -site parking spaces be maintained as needed and a waiver of the three (3) deficient parking spaces be allowed in conjunction with implementation of the parking management plan. PROJECT DESCRIPTION The project site is located at 4221 Dolphin Striker Way in the City of Newport Beach (see Figure 1). The proposed project site plan is shown on Figure 2. As shown on Figure 2, the proposed project will consist of two free - standing, single -story buildings. The approximately 12,351 square foot development will consist of 3,351 gross square feet of retail, 4,000 gross square feet of bank, 4,000 gross square feet of high- turnover restaurant, and 1,000 gross square feet of take -out service (limited) land uses. The project proposes to provide a total of 214 parking spaces (including 16 off -site parking spaces). EXISTING CONDITIONS The project site is currently developed with a vacant quality restaurant. Parking is provided via a surface parking lot shared by three parcels: 1) The proposed project site (currently vacant quality restaurant) —78 parking spaces 2) Saagar Fine Cuisine of India — 59 parking spaces 3) Classic Q Billiards and Sports Club — 74 parking spaces The surface parking lot currently provides a total of 211 shared parking spaces. In addition, the project site has existing parking agreements for 16 off -site parking spaces located at a parking structure southwest of the project site. Appendix A contains a copy of all off -site and shared parking agreements. W W W.TRAFFIC-ENGINEER.COM LAG! Mr. Tod Ridgeway RIDGEWAY DEVELOPMENT October 4, 2011 The existing quality restaurant (currently vacant) required 105 parking spaces per UP2008 -043 (at one space per 40 square feet of net public area). Saagar Fine Cuisine of India requires 54 parking spaces per UP2005 -004 (at one space per 50 square feet of net public area) and Classic Q Billiards and Sports Club requires 80 parking spaces per UP3392. PARKING SURVEY The surface parking lot is shared by three land uses (see Table 1). A survey of the shared surface parking lot was conducted to establish the parking demand for the existing land uses. Based upon discussions with City of Newport Beach staff, the study periods for parking at the project site were determined to be 6:00 AM to 12:00 AM on a Friday and 6:00 AM to 12:00 AM on a Saturday. To quantify the existing parking demand for the project site, the existing parking demand was determined by surveying the project site at 30- minute intervals on Friday (February 11, 2011) and Saturday (February 12, 2011). For purposes of the parking survey, the shared surface project parking lot was divided in eight (8) parking zones as shown on Figure 3. The number of existing parking spaces in each parking zone was field inventoried and included within Tables 2 and 3. Based upon the field inventory, a total of 211 parking spaces are currently provided at the surface parking lot (not including 16 off -site parking spaces). The existing parking surveys are shown in Tables 2 and 3. As indicated in Table 2, the parking survey conducted on Friday (February 11, 2011) shows the maximum number of occupied parking spaces is 133 parked vehicles from 5:30 PM to 6:00 PM. This is a maximum parking occupancy of 63 percent (133/211 = 63 %). As indicated in Table 3, the parking survey conducted on Saturday (February 12, 2011) shows the maximum number of occupied parking spaces is 52 parked vehicles from 10:30 PM to 11:00 PM. This is a maximum parking occupancy of 25 percent (52/211 = 25 %). Figure 4 illustrates a graphical summary of the parking survey. It should be noted that one vehicle was illegally parked in Zone H from 9:00 AM - 11:30 AM. Vehicles parked in Zone H from 6:00 AM - 7:00 PM are likely for users of the office building to the south of the project site. PARKING CODE The City of Newport Beach Parking Code requirements are included within Appendix B. Based upon the City of Newport Beach Parking Code requirements, a total of one (1) parking space for every 250 square feet of net floor area is required for retail, one (1) parking space for every 250 square feet of gross floor area is required for financial institutions, one (1) parking space for every 40 square feet of net public area is required for high- turnover restaurant, and one (1) parking space for every 250 square feet of gross floor area is required for take -out service (limited). Table 4 calculates the number of parking spaces required for the project site based upon the City of Newport Beach Parking Code. The proposed land uses at the project site were calculated utilizing the W W W.TRAFFIC-ENGINEER.COM � 6] Mr. Tod Ridgeway RIDGEWAY DEVELOPMENT October 4, 2011 retail, financial institution, high- turnover restaurant, and take -out service (limited) parking code requirements. The proposed 3,351 square feet of retail use would require approximately 14 parking spaces by using the parking ratio of one space per 250 square feet of net floor area [3,351 s.f. + 250 sf. = 13.4 = 14 spaces). The 4,000 gross square feet of bank use would require approximately 16 parking spaces by using the parking ratio of one space per 250 square feet of gross floor area (4,000 sf. + 250 sf. = 16 spaces). The 4,000 gross square feet of high turn -over dining establishments would require approximately 50 parking spaces by using the parking ratio of one space per 40 square feet of net public area (4,000 sf. + 2 (assuming 50% of total gross area is allocated for net public area) +40 sf. = 2,000 sf. + 40 sf. = 50 spaces). The take -out service (limited) use would generate a parking demand of approximately 4 spaces by using the parking ratio of one space per 250 square feet of gross floor area (1,000 sf. + 250 sf. = 4 spaces). The total parking demand per City of Newport Beach Parking Code for the proposed project is 84 parking spaces. Per the City of Newport Beach Parking Code, the proposed parking provided will be deficient three (3) parking spaces (133 maximum occupied spaces on Friday + 84 parking spaces required per City Parking Code = 217 parking spaces). SHARED PARKING ANALYSIS The idea of a shared parking analysis is that if the various land uses have peak parking demands at different points in time, or on different days of the week, then the number of parking spaces required is not the sum of the parking requirements for each land use, but rather less. If the peak demands for the various land uses are non - coincidental, then there is an opportunity for sharing of parking. To determine the degree to which shared parking can occur, the cumulative hourly parking demand of the land uses is calculated at all points in time throughout the day for both weekdays and weekends. In this case, Friday has been determined to be the peak day based upon the existing parking demand survey. Kunzman Associates, Inc. has utilized time -of -day factors and the parking rates for weekday and weekend parking demand for customer /visitor and employee as developed by the Urban Land Institute Shared Parking (2005). The Urban Land Institute procedures were utilized in this study to evaluate peak parking demand that would occur for the project at any point in time when day of week and hourly factors are utilized. Per the Urban Land Institute, weekend rates and factors are applied to Friday after 5:00 PM. To conduct a shared parking analysis, it is necessary to disaggregate the parking code into weekday and weekend as well as customer /visitor /guest and employee /resident parking space demands. Based on the City of Newport Beach Parking Code and the Urban Land Institute recommended parking ratios for weekdays and weekends, the disaggregated parking rates are shown in Table 5. Table 6 shows the expected hourly peak parking demand of the proposed project land uses for both a Friday, which has been assumed as the peak day based upon the existing parking demand survey. Table W W W.TRAFFIC-ENGINEER.COM =1941 Mr. Tod Ridgeway RIDGEWAY DEVELOPMENT October 4, 2011 7 shows the cumulative parking demand peaks for the proposed project land uses combined with the existing parking demand for the projected peak Friday. Based upon the shared parking analysis, the maximum parking demand for the entire site during peak hours is 205 parked vehicles. The proposed project site plan will reconfigure the surface parking lot layout on Parcel 1 to provide 65 on -site parking spaces. The total proposed on -site parking spaces for the entire site is 198 spaces. Including the 16 off -site parking spaces and the entire surface parking lot, the proposed project will provide a total of 214 parking spaces for the entire site. The total maximum likely parking demand of 205 occupied parking spaces will allow for parking on -site and provide sufficient additional parking for the existing and proposed land uses based upon the proposed 198 on -site parking spaces and 16 off -site parking spaces. PARKING MANAGEMENT PLAN The goal of any parking management plan is to develop policies or programs that result in more efficient use of parking resources. A common misconception is that an abundant parking supply is always desirable. While having too much parking will guarantee sufficient parking supply, it can also have adverse effects such as encouraging automobile use when other modes of transportation are available. In this case, many of the nearby office buildings may choose to drive because there is excess parking supply whereas walking would be a more viable option under optimal parking conditions. The price to provide additional parking can also prove costly to developers, tenants, and users. In many cases, the peak parking demand only occurs once a week, or even a few times per year. The remainder of the time, excess parking is unused and wasteful. Sufficient parking supply should be provided; however, many of the standards used to determine parking supply err towards oversupply. The following paragraphs describe how to make the proposed parking supply most efficient. Pedestrian Accessibility Based upon transportation planning experience, 1,000 feet is considered to be a convenient pedestrian walking distance. Figure 5 highlights the pedestrian walkways and demonstrates that the project site has a high pedestrian potential. The same requirements in the City of Newport Beach Parking Code would be applied to a location that has limited pedestrian accessibility. Because of the high pedestrian accessibility and potential of the project site, the parking demand is expected to be less than required by the City of Newport Beach Parking Code; however, sufficient parking is expected to be provided with implementation of the parking management plan and no reductions have been made for high pedestrian accessibility. W W W.TRAFFIC-ENGINEER.COM 5 045 Mr. Tod Ridgeway RIDGEWAY DEVELOPMENT October 4, 2011 Spillover From Adiacent Land Uses The existing parking survey seemed to indicate the possibility that users of the adjacent land uses were occupying parking spaces at the project site. Specifically, parking zones D, G, and H are closest to the vacant project, but still showed occupied parking spaces. Furthermore, these parking zones are easily accessible to the office building located south of the project site. To verify these conditions, spot checks of the parking conditions at the parking zones in question were conducted on a Friday (June 10, 2011) by noting the first four digits of parked vehicle license plates (see Appendix Q. An initial spot check between 7:30 AM and 8:30 AM witnessed at least ten (10) drivers that parked in zones D, G, or H and entered the adjacent office building. Two more spot checks were taken at 12:30 PM and 5:00 PM and noted several vehicles parked near the adjacent office building during at least two of the spot checks. It should also be noted that two people who entered the office building walked from the direction of parking zone B and at least two vehicles were parked in Zone B during all three spot checks. It is possible that other parking zones may have experienced spillover. Based upon the spot checks, it can be concluded that spillover from adjacent land uses is a significant factor in the existing parking conditions of the project site and the existing parking demand is believed to be overstated by approximately 15 -20 vehicles during the projected peak period. Parking Management Strategies The following parking management strategies are recommended to ensure the proposed parking resources are used efficiently: 1) Employees of the proposed project land uses should be required to park in the off -site parking structure. Incentives such as a parking cash -out for employees who choose not to drive to work may help reduce the cost of maintaining off -site parking spaces. 2) Install and enforce parking regulation signs, such as "Customer Only ", to prevent spillover from adjacent land uses. Parking regulation, such as tow -away, should be enforced to be effective. Tow -away enforcement of parking regulation will ensure that spillover does not occur upon project completion. As shown on Table 9, the projected peak parking demand of 174 occupied parking spaces will allow for parking on -site and provide sufficient additional parking for the existing and proposed land uses based upon the proposed 198 on -site parking spaces and 16 off -site parking spaces with implementation of the parking management plan. Alternatives The parking supply is not anticipated to be deficient with the above measures; however, one or more of the following alternatives may be implemented to further manage parking demand should it be necessary upon project completion: W W W.TRAFFIC-ENGINEER.COM Mr. Tod Ridgeway RIDGEWAY DEVELOPMENT October 4, 2011 1) Rope off an area of the parking lot for tandem parking during the peak parking periods. This will require a parking attendant. A tandem parking operation plan shall be provided if this is proposed. 2) Provide a complimentary valet system during peak parking periods. Valeted vehicles should be parked off -site. A valet operation plan shall be provided if this is proposed. CONCLUSIONS Based upon the parking management plan, the projected peak parking demand of 174 occupied parking spaces will allow for parking on -site and provide sufficient additional parking for the existing and proposed land uses based upon the proposed 198 on -site parking spaces and 16 off -site parking spaces. It is recommended that the 16 off -site parking spaces be maintained as needed and a waiver of the three (3) deficient parking spaces be allowed in conjunction with implementation of the parking management plan. The City of Newport Beach should periodically review parking operations in the vicinity of the project once the project is constructed to assure that the parking operations are satisfactory. Should it be deemed necessary upon project completion, one or more of the alternative measures may be implemented to further manage parking demand at the proposed project site. It has been a pleasure to service your needs on the 4221 Dolphin Striker project. Should you have any questions or if we can be of further assistance, please do not hesitate to call at (714) 973 -8383. Sincerely, KUNZMAN ASSOCIATES, INC. Q� '0 A Carl Ballard I Principal Associate #4902b jPpF ESS/pN\ 9 A.KU,y�I�Z C w 3 No, TFr0056 Z d \� AAFF�G OF CA1 KUNZMAN ASSOCIATES, INC. W W W'FRAFFIC-ENGINEER.COM William Kunzman, P.E. Principal 7 047 Table 1 Existing Project Land Uses Tenant Parcel I Land Use I Quantity I Units' I Hours of Operation Quality Restaurant (Vacant) Parcel N/A 1 7.996 1 TSF N/A Saagar Fine Cuisine of India Parcel 2 Restaurant 1 7.015 1 TSF 11:00 AM - 12:00 AM Daily Classic Q Parcel 3 1 Restaurant 1 7.870 1 TSF 10:00 AM - 2:00 AM Daily 1 TSF =Thousand Square Feet i Table 2 Friday (February 31, 2011 ) Parking Count 133 =Maximum numberof ocupied parking spaces -133 vehicles from 5:30 PM -6:00 PM 'One vehicle was illegally parked fmm9g0 AM - 11:30AM. Vehicles parked In Zane H from 6:W AM -]:00 PM are Ilkelyfor users of the office building to the south of the project site. Don not crude the 32oH-sne parking spans located In a nearhy parking accepted, which haw been auumed to be unoaupled due to Ne vacanrya the cans eg quality restaurant an Parcel 1, 0-" Number of Parked Vehicles and Percentage of Occupied Parking Spaces Time Period Parking Zone TParklngZone B Parking ZoneC Parking Zone Parking ZOneE Parking Zone Parking Zone Parking Zone Total' Parking Spaces Provided 10 32 37 46 40 26 13 ] 211 6:00 AM 6:30 AM 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 2 B% 1 14% 3 1% 6:30AM - 7:00 AM 1 10% 2 6% 1 3% 0 0% 2 5% 0 0% 3 12% 1 14% 10 5% ]:00 AM -]:30 AM 1 10% 2 6% 2 5% 1 2% 2 5% 0 0% 5 19% 3 43% 16 8% ]:30 AM -890 AM 1 10% 2 6% 4 11% 3 ]% 3 8% 1 4% 5 19% 3 43% 22 10% 8:110 AM -8:311 AM 1 10% 4 13% 3 8% 8 17% 3 8% 1 4% ] 27% ] 100% 34 16% 8:30 AM 9:W AM 2 20% 5 16% 2 5% 13 28% 4 10% 1 4% 30 38% 7 100% 44 21% 9:DO AM 9:30 AM 1 10% 5 16% 3 B% 19 41% 7 18% 1 4% 12 46% 8 114% 56 27% 9:30 AM - 30:00AM 2 20% 5 16% 3 8% 23 50% 9 23% 1 4% 13 50% 8 114% 64 30% 1090 AM - 10:30 AM 2 20% ] 22% 4 11% 24 52% 9 23% 1 4% 13 50% 8 114% 68 32% 10:30 AM - 11:00AM 3 30% 7 22% 4 11% 24 52% 9 23% 1 4% 13 50% 8 114% 69 33% 1190 AM - 1130 AM 5 50% ] 22% 6 16% 23 50% 8 20% 1 4% 13 50% 8 114% 71 34% 11:30 AM - 12:00 PM 8 80% 11 34% 13 35% 24 52% 14 35% 2 8% 13 50% 6 86% 91 43% 12:00 PM - 12:30 PM 9 90% 20 63% 24 65% 25 54% 16 40% 3 12% 13 50% 6 86% 116 55% 1230 PM - 1:00 PM 8 80% 26 81% 22 59% 27 59% 15 38% 8 31% 13 50% ] 100% 126 60% 1:00 PM - 130 PM 8 80% 14 44% 19 51% 25 54% 11 28% 5 19% 13 50% 7 100% 102 48% 1:30 PM - 2011 PM 8 80% 10 31% 14 38% 24 52% 10 25% 4 15% 12 46% ] l00% 89 42% 2:00 PM - 2:30 PM 8 80% 9 28% 12 32% 20 43% le 25% 2 8% 11 42% ] 100% 79 37% 2:30 PM - 3:00 PM 8 80% 9 28% 12 32% 19 41% 9 23% 2 8% 10 38% ] 100% 76 36% 3:00 PM - 3:30 PM 7 70% 14 44% 29 78% 18 39% 18 45% 4 15% 10 38% 6 86% 106 50% 3:30 PM - 4:00 PM 8 80% 15 47% 29 78% 19 41% 18 45% 4 15% 30 38% ] 100% 110 52% 4:00 PM - 4:30 PM 9 90% 18 56% 27 73% 18 39% 18 45% 4 15% 11 42% 5 71% 110 52% 4:30 PM - 5:011 PM 10 100% 21 66% 29 78% 21 46% 16 40% ] 27% 11 42% 5 71% 120 57% 5:00 PM - 5:313 PM 10 l00% 29 91% 33 89% 17 37% 17 43% 6 23% it 42% 5 71% 128 61% 5:30 PM - 6:00 PM 30 100% 31 97% 32 86% 19 41% 21 53% 9 35% 8 31% 3 43% 133 63% 6:00 PM - 6:30 PM 19 100% 25 78% 27 73% 16 35% 21 53% 8 31% 5 19% 1 14% 113 54% 6:30 PM - 7:00 PM 10 100% 16 50% 29 78% 13 28% 19 48% 7 27% 3 12% 0 0% 97 46% 7:00 PM - 7:30 PM 10 100% 23 72% 31 84% 16 35% 17 43% 8 31% 3 12% 0 0% 108 51% 7:30 PM - 8911 PM le l00% 29 91% 32 86% 18 39% 15 38% 8 31% 2 8% 0 D% 114 54% 8:00 PM - 8:311 PM 9 90% 33 103% 31 84% 15 33% 15 38% 6 23% 4 15% 0 D% 113 54% 8:30 PM - 9:00 PM ] 70% 28 88% 24 65% 16 35% 10 25% 3 12% 4 15% 1 14% 93 44% 9:00 PM - 9:30 PM 6 60% 27 84% 25 68% 13 28% 8 20% 2 8% 4 15% 1 14% 86 41% 9:30 PM - 30:00 PM 5 50% 27 84% 26 70% 13 28% ] 18% 2 8% 4 15% 1 14% 85 40% 30:00 PM - 10:30 PM 5 50% 27 84% 20 54% 12 26% 5 13% 2 8% 3 12% 1 14% 75 36% 1030 PM - 11:00 PM 4 40% 26 81% 19 51% 12 26% 6 15% 3 12% 3 12% 1 14% 74 35% 1100 PM - 1130 PM 6 60% 23 ]2% 20 54% 12 2fi% 4 10% 3 12% 3 12% 1 14% 72 34% 11:30 PM - 12:00 AM ] 70% 17 53% 16 43% 6 13% 3 8% 3 12% 3 12% 1 14% 56 27% 133 =Maximum numberof ocupied parking spaces -133 vehicles from 5:30 PM -6:00 PM 'One vehicle was illegally parked fmm9g0 AM - 11:30AM. Vehicles parked In Zane H from 6:W AM -]:00 PM are Ilkelyfor users of the office building to the south of the project site. Don not crude the 32oH-sne parking spans located In a nearhy parking accepted, which haw been auumed to be unoaupled due to Ne vacanrya the cans eg quality restaurant an Parcel 1, 0-" Table 3 Saturday (February 12, 2011) Parking Count i2= Maximum numb., of occupied parking spares -32 vehlclesfcom 1630 PM -11'W PMi s noes not include the 32 off site parking spaces located in a nearby parking 4ruccure, which have been assum N to be unoccupied due to the varancy Pf the existing quality restaurant on Parcel u. 10 050 Number of Parked Vehicles and Percentage of Occupied Parking Spaces Time Period Parking Zone Parking Zone Parking Zone Parking Zone Parking Zone Parking Zone Parking Zone Parking Zone Total' Parking Spaces Provided 10 32 3] 46 4D 26 13 ] 211 6:00 AM - 6:30 AM 0 0% 2 6% 2 5% 0 0% 2 5% 0 0% 0 0% 0 0% 6 3% 6:30 AM 7:0 AM 0 0% 2 6% 2 5% 0 0% 2 5% 0 0% 0 0% 0 0% 6 3% 7:00 AM - 7:30 AM 0 0% 2 6% 2 5% 0 0% 2 5% 0 0% 0 0% 1 14% ] 3% 7:30 AM - 890 AM 0 0% 2 6% 2 5% 0 0% 2 5% 1 4% 0 0% 1 14% 8 4% 8:00 AM 8:30 AM 0 0% 2 6% 1 3% 0 0% 3 8% 1 4% 1 4% 4 57% 12 6% 8:30 AM 9:0 AM 0 0% 2 6% 2 5% 1 2% 3 8% 0 0% 1 4% 5 71% 14 ]% 9:00 AM - 9:30 AM 0 0% 2 6% 2 5% 1 2% 2 5% 0 0% 1 4% 6 86% 14 ]% 9:30 AM - 10:00AM 0 0% 2 6% 2 5% 1 2% 1 3% 0 0% 1 4% 5 71% 12 6% 10:00 AM - 10:30AM 2 20% 4 13% 2 5% 1 2% 1 3% 0 0% 1 4% ] 100% 18 9% 10:30 AM - 11:00AM ❑ 1 0% 1 2 6% 1 3% 2 4% 1 3% 0 0% 1 1 4% 1 ] 1 100% 14 1 ]% 11:00 AM - 1130 AM 1 10% 3 9% 3 8% 1 2% 2 5% 0 0% 1 4% ] 100% 18 9% 1130 AM - 12:00 PM 0 0% 2 6% 3 8% 1 2% 2 5% 0 0% 1 4% ] 100% 16 8% 12:00 PM - 12:30 PM 5 50% 4 13% 10 27% 2 4% 3 8% 1 4% 1 4% 6 86% 32 15% 12:30 PM - 1:00 PM 5 50% 3 9% 16 43% 2 4% 2 5% 2 8% 2 8% 6 86% 38 18% 1:00 PM - 1:30 PM 9 90% 4 13% 20 54% 1 2% 3 8% 2 8% 1 4% 4 57% 44 21% 1:30 PM - 2:❑0PM 10 100% 3 9% 13 35% 1 2% 5 13% 2 8% 1 4% 5 71% 40 19% 2:00 PM - 2:30 PM 8 80% 3 9% 12 32% 1 2% 4 10% 0 0% 1 4% 5 71% 34 16% 2:30 PM - 3:00 PM ] 70% 2 6% 6 16% 2 4% 3 8% 0 0% 1 1 4% 5 71% 26 12% 3:00 PM - 3:30 PM 4 40% 2 6% 5 14% 2 4% 3 8% 2 8% 1 4% 6 86% 25 12% 3:30 PM 4:W PM 3 30% 3 9% 5 14% 2 4% 1 3% 2 8% 1 4% 4 57% 21 30% 4:00 PM - 4:30 PM 4 40% 4 13% 5 14% 2 4% 2 5% 0 0% 1 4% 6 86% 24 11% 4:30 PM - S:GD PM 6 60% 3 9% 4 11% 2 4% 2 5% 0 0% 1 4% 5 71% 23 11% 5:00 PM - 5:30 PM 5 50% 3 9% 6 16% 2 4% 1 3% 0 0% 0 0% ❑ 0% 17 8% 5:30 PM - 6 D PM 5 50% 4 13% 14 38% 2 4% 1 3% 0 0% 0 0% 0 0% 26 12% 6:00 PM - 6:30 PM 6 60% 5 16% 14 38% 1 2% 1 3% 0 0% 0 0% 0 0% 27 13% 6:30 PM - 7:00 PM 4 40% 5 16% 13 35% 0 0% 3 8% 0 0% 0 0% 0 0% 25 12% 7:00 PM - 7:30 PM 5 50% 4 13% 14 38% 0 0% 2 5% 1 4% 0 0% 0 0% 26 12% 7:30 PM - 890 PM 5 50% ] 22% 12 32% 0 0% 4 10% 1 4% 0 0% 0 0% 29 14% 8:00 PM - 8:30 PM 4 40% ] 22% 19 51% 0 0% 4 10% 1 4% 0 0% 0 0% 35 17% 8:30 PM - 9:00 PM 4 40% 5 16% 18 49% 0 0% 4 10% 2 8% 0 0% 0 0% 33 16% 9:OOPM- 9:30PM 5 50% 8 25% 19 51% 0 0% 4 30% 1 4% 1 4% 0 0% 38 18% 9:30 PM - 10:00 PM 9 90% 30 31% 15 41% 0 0% 6 15% 2 8% 1 4% 0 0% 43 20% 10:00 PM - 10:30 PM 10 100% 11 34% 22 59% 0 0% 5 13% 1 4% 1 4% 0 0% 50 24% 10:30 PM - 11:00 PM 10 100% it 34% 23 62% 0 0% ] 18% 1 4% 0 0% ❑ 0% 52 25% 11:00 PM - 11:30 PM 9 90% 11 34% 18 49% 0 0% 6 15% 1 4% 0 0% 0 0% 45 21% 11:30 PM - 12:00 AM 10 100% ] 22% 22 59% 2 4% 4 10% 2 8% 0 0% 0 0% 47 22% i2= Maximum numb., of occupied parking spares -32 vehlclesfcom 1630 PM -11'W PMi s noes not include the 32 off site parking spaces located in a nearby parking 4ruccure, which have been assum N to be unoccupied due to the varancy Pf the existing quality restaurant on Parcel u. 10 050 Table 4 Parking Spaces Required By City of Newport Beach Parking Code' ' See Appendix H. 2 TSF = Thousand Square Feet ' TSF based upon net floor area. TSF based upon net public area equal to 50 %. 5 Limited to a maximum of six seats. 11 051 Parking Code Land Use Quantity Units' Parking Code Requirement Retail' 3.351 TSF 1 parking space per 250 square feet of net floor area 14 Bank 4.000 TSF 1 parking space per 250 square feet of gross floor area 16 High- Turnover Restaurant° 2.000 TSF 1 parking space per 40 square feet of net public area 50 Take -Out Service - Limited' 1.000 TSF 1 parking space per 250 square feet of gross floor area 4 Total F 1 84 ' See Appendix H. 2 TSF = Thousand Square Feet ' TSF based upon net floor area. TSF based upon net public area equal to 50 %. 5 Limited to a maximum of six seats. 11 051 Table 5 Parking Code Requirements` ' Source: City of Newport Beach and Urban land Institute, Shared Parking. 2nd Edition, 2005. The Urban Land Institute's Shared Parkin e provides splits for customers /visitors /guests vs. employees /residents for weekdays and weekends. These splits were applied to the City Parking Code so thatme sum of the splits is equal to the City Parking Code modified per TSF. ' TSF = Thousand Square Feet I Weekday is defined as 6:00 AM Monday through 5:00 PM Friday. ' City Parking Code modified per TSF. 12 0152 City Weekday Requirements' Weekend Requirements Customer/ Employee/ Customer/ Employee/ Parking Land Use Quantity Units Cod e4 Visitor /Guest Resident Total Visitor /Guest Resident Total Parking Rates: Retail 3.351 TSF 4.00 3.22 0.78 4.00 3.20 0.80 4.00 Bank 4.000 TSF 4.00 2.61 1.39 4.00 2.61 1.39 4.00 High- Turnover Restaurant 2.000 T51F 25.00 21.50 3.50 25.00 21.25 3.75 25.00 Take -Out Service - Limited 1.0001 TSF 1 4.00 3.40 0.60 4.00 3.43 0.57 4.00 Parking Required: Retail 3.351 TSF 14 11 3 14 11 3 14 Bank 4.000 TSF 16 10 6 16 10 6 16 High- Turnover Restaurant 2.000 TSF 50 43 7 50 43 7 50 Take -Out Service - Limited 1.000 TSF 4 3 1 21 21 1 4 Total 84 67 17 84 67 17 84 ' Source: City of Newport Beach and Urban land Institute, Shared Parking. 2nd Edition, 2005. The Urban Land Institute's Shared Parkin e provides splits for customers /visitors /guests vs. employees /residents for weekdays and weekends. These splits were applied to the City Parking Code so thatme sum of the splits is equal to the City Parking Code modified per TSF. ' TSF = Thousand Square Feet I Weekday is defined as 6:00 AM Monday through 5:00 PM Friday. ' City Parking Code modified per TSF. 12 0152 O S � C E s 3 y�y E� 3 °s C S s 3 r 0153 M N t4 4oXX „BaXXXe�XXXao �o E� �E ti �o F fifi 3 °oF b E i O E 9 t 6 °o R a R o 8 8 8 8 8 8 8 8 S 8 8 8 8 8 BIB 8 8 o R R R R R R R X R R R R X E E oXX�Xe °o Oe��e��g�����voXXX�X��XXXXX���X E g . 8 £ `& R £ . M R... `R 'NR N . M R'`R R £ . 8 £ o 'NR N . M M . . X a _ E e E S £ a £ a s £ £ £ £ £ a 8 8 8 8 8 8 8 8 8 S S 8 8 8 m 8 8 A e 8 R e m 8 m 8 m 8 A 8 8 m 8 A 8 m 8 8 m 8 m y�y E� 3 °s C S s 3 r 0153 M N Table 7 Projected Peak Day (Friday) Number of Parked Vehicles Time Period Peak Day Number of Parked Vehicles Projected Parking Demand Total Retail Bank High- Turnover Restaurant Take -Out Service - Limited 6:00 AM - 6:30 AM 3 1 0 15 1 20 6:30 AM - 7:00 AM 10 1 0 15 1 27 7:00 AM - 7:30 AM 16 1 0 27 1 45 7:30 AM - 8:00 AM 22 1 0 27 1 51 8:00 AM - 8:30 AM 34 3 9 33 1 80 8:30 AM - 9:00 AM 44 3 9 1 33 1 90 9:00 AM - 9:30 AM 56 7 15 39 2 119 9:30 AM - 10:00 AM 64 7 15 39 2 127 10:00 AM - 10:30 AM 68 10 16 44 3 141 10:30 AM - 11:00 AM 69 10 16 44 3 142 11:00 AM - 11:30 AM 71 13 11 46 4 145 11:30 AM - 12:00 PM 91 13 11 46 4 165 12:00 PM - 12:30 PM 116 14 11 50 4 195 12:30 PM - 1:00 PM 126 14 11 50 4 205 1:00 PM - 1:30 PM 102 14 11 46 4 177 1:30 PM - 2:00 PM 89 14 11 46 4 164 2:00 PM - 2:30 PM 79 14 13 29 4 139 2:30 PM - 3:00 PM 76 14 13 29 4 136 3:00 PM - 3:30 PM 106 13 11 25 3 158 3:30 PM - 4:00 PM 110 13 11 25 3 162 4:00 PM - 4:30 PM 110 13 14 25 3 165 4:30 PM - 5:00 PM 120 13 14 25 3 175 5:00 PM - 5:30 PM 128 13 0 33 3 177 5:30 PM - 6:00 PM 133 13 0 33 3 182 6:00 PM - 6:30 PM 113 12 0 37 4 166 6:30 PM - 7:00 PM 97 12 0 37 4 150 7:00 PM - 7:30 PM 108 11 0 37 4 160 7:30 PM - 8:00 PM 114 11 0 37 4 166 8:00 PM - 8:30 PM 113 10 0 35 3 161 8:30 PM - 9:00 PM 93 10 0 35 3 141 9:00 PM - 9:30 PM 86 8 0 19 2 115 9:30 PM - 10:00 PM 85 8 0 19 2 114 10:00 PM - 10:30 PM 75 6 0 16 1 98 10:30 PM - 11:00 PM 74 6 0 16 1 97 11:00 PM - 1130 PM 72 3 0 11 1 87 11:30 PM - 12:00 AM 56 3 0 11 1 71 M= Maximum projected number of occupied parking spaces - 205 vehicles from 12:30 PM - 1:00 PM. ' See Table 6. 14 054 Table 8 Parking Demand Summary Descriptor Number of Parking Spaces Maximum Projected Parking Demand During Peak Hours' 205 Proposed Parking Spaces Provided On -Site 198 Proposed Parking Spaces Provided Off -Site 16 Total Proposed Parking Spaces 214 Additional Parking Spaces Needed -9 i See Table 7. 15 0155 Table 9 Parking Management Plan Demand Summary Descriptor Number of Parking Spaces Maximum Projected Parking Demand During Peak Hours' 205 Spillover From Adjacent Land Uses -15 Proposed Project Employees to Park Off -Site -16 Projected Peak Parking Demand On -Site 174 Proposed Parking Spaces Provided On -Site 198 i See Table 7. 16 050 • . .. � tea' ' ,•T!— [� a '�� �,'`, /f 1 alt . 4. ' . T � ` .. {• �- L" i r 1. � ,,�� � �. it .. OPER 70 )'E/\RE of EXCELLENT SERVICE 17 057 Figure 2 Site Plan SAM C:3 � AIY M0IMCCJ a F I ai I I 0 .RAIL djit d'91 t l F I � p P g xrY q� Wy� � r�noa' o � Y '�sti ? �`� .o-e1 ,• Iii�`o-e � _ d _ nYz a.cz owl 4-se; Jo-a 1 vx 1 � I I U= C Gu 8P main .r.¢I d. WZ:2 88 'O a nia 1� uroww w 'PMA+ w Now 10 ME 0 W. 1 N.) iAIWO dJY MIN NTS 4902b/2 KUNZMAN ASSOCIATES, INC. OVER 30 YEARS OF EXCELLEM SERVICE 18 052 • `` �, �` 56 LA `.. _ LW 1 i El ID • I 0 OVER 30 YEAR, OF FXCELLENT tiERVICE 19 ��^ Figure 4 Parking Survey Summary Graph (Existing Conditions) 250 — ° °- 200 M 150 a par c Y d 0 v a 100 z ........................................... ............................... --------------------------------------------------------- - - - - -- \ 00""' / / \\ �,n -------------------- -- ---- \` - - -- f -------------- V ------ \`---- - - - - -' � , \ "i - -- - \ - ------------------------------------------------- - - - - -- / o Q e Q Q Q Q 0 0 i 0 §i 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ti ti M P h to' n' Qi of 6' hti —Park ni; Spaces Occupied on Friday (February 11, 2011) Parking Spaces Occupied on Saturday (February 12 2011( ......... Total Parking Spaces Provided- M (not including 32 f,ft. parking spaces) KUNZMAN ASSOCIATES, INC. OVER 30 YEARS OF EXCELLENT SERVICE 20 4902b/4 •� � - ; / / .. i C II 11.,1 r,F a`` .• / • 1 \ Y ,ti 1 \ All4 v / V 11 Ov "ER SU YE,\RG OE EXCELLENT SERVICE 21 ��2 APPENDIX A Parking Agreements 002 PARKING AUTHORIZATION AND LICENSE AGREEMENT This PARKING AUTHORIZATION AND LICENSE AGREEMENT (this "License Agreement ") is made as of this April 13, 2011 by and between Ridgeway Development Company (the "Licensee ") and Ampco System Parking (the "Licensor "), pursuant to which Licensor grants Licensee the right to use certain parking spaces located at 4100 Newport Place in Newport Beach, California (the "Parking Structure "). 1. PARKING SPACES: Licensor hereby grants to Licensee a license to use on a nonexclusive basis, during the License Term (defined herein), up to SIXTEEN (16) unreserved parking spaces in the parking structure (the "Parking Spaces "). The location will be the top level of the parking structure. 2. LICENSE TERM: The term of this License Agreement (the "License Term ") shall Commence on or about May 01, 2011 and will expire on April 30, 2012. Upon Expiration of the Initial Tern, the License Agreement shall continue on a month -to -month basis subject to termination by either party upon by providing a thirty (30) day written notice. 3. USE: The Parking Spaces are only to be used by the Licensee and its employees and agents. Spaces are not intended for use by Licensee's visitors, invitees, contractors, or subcontractors. Licensee acknowledges that the Parking Spaces are only to be occupied by passenger vehicles. 4. LICENSE/PARKING FEE: For the Licensee Tenn, Licensee shall pay to Ampco System Parking on a monthly basis $72.50 for each parking space requested by Licensee and for which a keycard is issued by Licensor ( "Licensee Spaces ") during any month. At Licensoe's sole discretion, the monthly rate shall be subject to adjustment upon expiration of the initial License Term. The total parking used by Licensee will not exceed Sixteen (16) spaces. Licensee shall pay Licensor, on or before the commencement date of the License Term, Licensee's first (1St) month's license /parking fee in an amount equal to $72.50 times the number of Licensee Spaces 5. KEYCARD FEES: Licensee shall pay to Licensor, concurrently with the commencement of the License Term, a non - refundable fee of Ten Dollars ($10.00) per keycard requested. Licensee acknowledges that it shall be charged a Ten Dollar ($10.00) fee by Licensor for each new or replace keycard. 003 6. LINIITATION OF LIABILITY: Upon receipt of the keycards, Licensee acknowledges that it shall be permitted to park one (1) vehicle within one (1) unreserved parking space in the Parking Structure for each parking space leased provided the use of all such Parking Spaces shall be at the risk of the Licensee. Licensor does not assume care, custody, or control of any vehicle or its contents. 7. INDEMNIFICATION: Licensee shall indemnify, defend and hold harmless Licensor and its partners and affiliated entities and their employees, partners, directors, agents, representatives, and professional consultants and its and their respective successors and assigns (collectively, the "Indemnities "1 from and against any loss, damage, injury, death, accident, fire of other casualty, liability, claim, cost or expense (including but not limited to reasonable attorneys' fees) of any kind or character to any person or property, including the property of the Indemnities (collectively, the "Claims "), arising, in whole or in part, from or relating to: (a) the use of the Parking Structure and the real property upon which the Parking Structure is situated (the "Property ") by Licensee or its employees, (b) any act or omission of Licensee or any of its employees relative to the Property, (c) any bodily injury, property damage, accident, fire or other casualty to or involving Licensee or its employees and its or their property on the Property, (d) any loss of theft whatsoever of any property of anything placed or stored by Licensee or its employees on or about the Property, (e) any breach by Licensee of its obligation under this License Agreement, (f) any violation of any rule, ordinance, regulation or law, and (h) any bodily injury or property damage resulting from Licensee's access to the Property. In Addition to, and not in limitation of, Licensor's other rights and remedies under this License Agreement, should Licensee fail within thirty (30) days of written request from Licensor to acknowledge its indemnity obligation and obligation to assume the defense of the Indemnities from and against any Claim as provided in this Paragraph 7, then in any such case Licensor may, at its option, pay any such Claim or settle or discharge any action therefore or satisfy any judgment thereon, and all costs, expenses and other sums incurred by Licensor in connection therewith (including but not limited to reasonable attorneys' fees) shall be maximum contract rate permitted by law from the date incurred or paid until repaid and any default either in such initial failure to pay or subsequent repayment to Licensor shall, at Licensor's option, constitute a breach under this License Agreement. Except for Licensor's sole negligence or willful misconduct. 8. RULES AND REGULATION: Licensee shall provide to Licensor the license plate number or Vehicle Identification Number ( "VIN") and /or stock number of any and all vehicles to be parked within the Parking Structure. The use of the Parking Spaces shall be subject to the Parking Rules and Regulations contained in Exhibit "A" attached hereto and any other reasonable, non - discriminatory rules and regulations adopted by Licensor and/or Licensor's parking operators from time to time, including any system for controlled ingress and egress and charging 004 visitors and invitees, with appropriate provision for validation of such charges. Licensee shall not use more parking privileges than its allotment and shall not use any parking spaces specifically assigned by Licensor to tenants of the building situated upon the Property (the "Building ") or the project or for such other uses as visitor parking. Licensee's parking privileges shall be used only for parking by vehicles no larger than normally sized passenger automobiles or pick -up trucks. Licensee shall not permit or allow any vehicles that belong to or are controlled by Licensee or Licensee's employees to be parked in areas other than those designated by Licensor for such loading or unloading or unloading activities. If Licensee permits or allows any of the prohibited activities described herein, then Licensor shall have the right, without notice, in addition to such other rights and remedies that it may have, to remove or tow away the vehicle involved and charge the cost thereof Licensee, which cost shall be immediately payable by Licensee upon demand by Licensor. 9. ASSIGNABILITY: This license is personal to Licensee and Licensee shall not assign its rights under this License Agreement, whether voluntarily or by operation of law, and Licensee shall not permit the use of the Parking Spaces, or any part thereof, except in strict compliance with the provisions hereof, and any attempt to do so shall be null and void. 10. GOVERMENTAL REGULATIONS AND OTHER OBLIGATIONS OF LICENSEE: Licensee's use of the Parking Structure shall comply with all applicable governmental ordinances, rules, laws, and regulations. All persons who enter upon the Property pursuant to this License Agreement do so at their own risk, and shall comply with any and all instructions and directions of Licensor or Licensor's authorized representatives. Licensee shall not bring, store or use any hazardous or toxic materials or substances on the Property. 11. GOVERNING LAW: The terms of this License Agreement shall be governed by and construed according to the laws of the State of California. 12. TIME OF THE ESSENCE: Time is of the essence as to each term, provision, condition and requirement contained in the License Agreement. 13. MISCELLANEOUS: This License Agreement constitutes the entire agreement between the parties hereto pertaining to the subject matter hereof and all prior and contemporaneous agreements, representations and understandings of the parties hereto, oral or written, are herby superseded and merged herein. The headings of this License Agreement are for purpose of reference only and shall not limit or define the meaning of the provisions hereof. This License Agreement may be 005 executed in any number of counterparts, each of which shall be an original and all of which shall constitute the same instrument. Neither this License Agreement nor a short form memorandum or assignment hereof shall be filed or recorded in any public office. Any attorneys' fees or other costs incurred in clearing such cloud on title to the Property will be Licensee's sole cost and responsibility. Please acknowledge your acceptance of these terms with your signature below. Ridgeway Development Company Ampco System Parking LE Date: 000 PARKING RULES AND REGULATIONS In addition to the parking provisions contained in the License Agreement to which this Exhibit "A" is attached, the following rules and regulations shall apply with respect to the use of the Building's parking facilities. 1. Every parker is required to park and lock his/her own vehicle. All responsibility for damage to or loss of vehicles is assumed by the parker and Licensor shall not be responsible for any such damage or loss by water, fire, defective brakes, the act or omissions of others, theft, or for any other cause. 2. Licensee shall not park any vehicles in the Parking Structure other than automobiles, motorcycles, motor driven or non -motor driven bicycles or four wheeled trucks. Parking stickers, keycards or any other device or form of identification supplied by Licensor as a condition of use of the parking facilities shall remain the property of Licensor. The serial number of the parking identification device may not be obliterated. Devices are not transferable and any device in the possession of an unauthorized holder will be void. 4. Intentionally deleted 5. Vehicles must be parked entirely within painted stall lines of a single parking stall. 6. All directional signs and arrows must be observed. 7. The speed limit within all parking areas shall be five (5) miles per hour. 8. Parking is prohibited: (a) in areas not striped for parking; (b) in aisles; (c) where "no parking" signs are posted; (d) on ramps; (e) in cross - hatched areas; and (f) in reserved spaces and in such other areas as may be designated by Licensor or Licensor's parking operator. 9. Loss or theft of parking identification devices must be reported to the management office immediately, and a lost or stolen report must be filed by the Licensee or user of such parking identification device at that time. Licensor has the right to exclude any vehicle from the parking facilities that does not have an identification device. X07 10. Any parking identification devices reported lost or stolen found on any unauthorized car will be confiscated and the illegal holder will be subject to prosecution. 11. Washing, waxing, cleaning, or servicing of any vehicle in any are not specifically reserved for such purpose is prohibited. 12. The parking operators, managers or attendants are not authorized to make or allow any exceptions to these rules and regulations. 13. Licensee's continued right to park in the parking facilities is conditioned upon Licensee abiding by these rules and regulations and those contained in this License Agreement. 14. Licensor reserves the right to establish and change parking fees, only in accordance with Section 4 of the License Agreement, and to modify and/or adopt such other reasonable and non - discriminatory rules and regulations for the parking facilities as it deems necessary for the operation of the parking facilities, and any violation of the rules shall subject the vehicle to removal, at such vehicle owner's expense. 06�1g .lhen *Recorded Return Tor The Newport Project 4101 MacArthur Blvd.KU C Newport Beach, CA 92660 RECIPROCAL PARKING AND MAINTENANCE AGREEMENT This Agreement made this 217 day of 1972, by. and between THE NES•fpCLg P 0 ;r�C�, a joint venture composed of Emkay Development Company, Inc. and Atlas Realty- Company (hereinafter called "The Newport Project "), and EMRAY DEVELOPMENT COMPANY, INC. (hereinafter called "Emkay "). ,t '+ RECITALS Ji' + A. The Newport Project is the owner of Lot 4 of a 1,7d - Track 7770, recorded in book 299, pages 15 -16 of Miscellaneous I �1.A'I Maps, Records of Orange County, outlined in red on the parcel •;)• analysis attached hereto as Exhibit "A" and incorporated hArein by this reference (the "Development!'). B. Concurrently with the recording of this Agree- ment The .Newport Project is deeding to Emkay the portion of the Development denominated Parcel 1 and outlined in green on Exhibit "A," The Newport Project intends to deed to others the portions of the Development delineated Parcels 2 and 3, outlined in yellow and in blue, respectively, on Exhibit "A." C. The Newport Project and Emkay desire to establish integra ted . parking facilities and 1andcrapji4 areas in the Development, and to provide for the maintenance of same, for the benefit of all of the Development, and for the co'mmn use - and benefit of -the present and future owners and Lessees of Parcels within the Development, all as more specifically hereinafter set forth. R'cGDnDED Al G "'AU-s ur In. & 1207 1.11 01 f?:Iu:AL l': '::aJu OF ... :n r.:v:'..1CAALY. J+u LFI Nll� � IJ %4 l.�:n2:T.i,H;'ltF, Cc:nn.•ro:i PA20'10 -135 for GP2010 -010 P02010 -001 4221001ph1nstfiker'Nay 0 o9 k'dgeway 0evelopmew AGREMENT .afire 1 0443 ?4«lr6 In consideration of the foregoing recitals, the mutual covenants hereinafter set forth, and the mutual benefits to be derived by each of the parties therefrom, it is hereby agreed among the parties as follows: 1. Definitions. (a) The "Term" of this Agreement shall commence on the date hereof and continue until terminated by •y agreement among a majority of the owners of the Parcels �yt in the Development or their respective successors in interest. '(b) The "Effective Date" of this Agreement shall be, as to each of the respective Parcels, the first to occur of the opening for business of the restaurant to be constructed on such Parcel or .shirty (30) days following the recording of a notice of completion of the restaurant to be constructed on such Parcel. (c) "Common Areas" shall mean those portions of the Development designated oy shading on Exhibit "A," being composed of Commgn_Parking..Areas, and Common Landscaped Areas. 2.- Use of Common Areas. The Newport Project and Emkay each hereby grant to the other reciprocal easements for parking purposes and ingress and egress over, across and upon the Common Areas located upon their respective Parcels. No building or structure shall be erected or maintained upon the Common Areas other than parking and landscaping areas and related sidewalks; walkways, lighting and similar -2- 070 t,U 10443F"-1777 associated facilities. Each of the Parcel owners, their lessees, assigns and successors in interest, and their respective employees and invitees,shall be entitled to use the Common Areas, subject to such reasonable rules and regulations relating to such'use as a majority of the Pa`ceeL o�mers may from time to time establish, including validation requirements. 3. Improvement. Each Pam rcel o mer, or its successor in interest, shall, at its own expense, improve those portions of the Common Parking Areas and Landscaped Areas on its respective premises. Such work of improvement shall be performed pursuant to plans and specifications approved by Emkay and the Parcel ovmer. 'A, 4. Maintenance. From and after the EffectiN Date as to the first restaurant to be constructe EmYca �'I S shall, subject to the direct3qa—Q9 a nla„joriry of the Parcel T owners, operate, manage,, police; light, repair and maintain the Common Areas. 5. Control. Subject to the.direction of a r t, {j majority of the Parcel owned Cmkay� hall at all times during the Term hereof control the automobile parking areas, x driveways, entrances and exits, landscaped. areas, and the sidewalks and pedestrian passageways within the Common Areas, and may at any time and from time to time during the Term hereof restrain any use or occupancy thereof except as autho- rized by the rules and regulations for the use of such areas established by a majority of the Parcel owners from time to time. Emkay may temporarily close all or portions of the Common Areas for repairs or alterations, to prevent a dedi- cation thereof or the accrual of prescriptive rights therein, -3- 071 tw 10443 Fat 778 or for any other reason deemed sufficient by Emkay. The rights of each of the parties and their successors in interest in and to the Common Areas shall at all times be nonexclusive, and subject -to the rights of other parties and their successors in interest from time to. time authorized to use the Common Areas on a nonexclusive basis. 6. Costs and Expenses. 3 J (a) Eag.4 Pa_ reel owner shall pay to n the manner and at the time provided below, MAGI �SV' L such party's proportionate share -,, as defined below, 1610 °' of all costs and expenses incurred b y E for the .operation and maintenance of the Common Areas. Such costs and expenses shall include, without limiting the. generality of the -foregoing, gardening, land- scaping, cost of public liability, property dainage, vandalism and malicious mischief, and other insurance, repairs, painting, lighting, cleaning, trash removal, depreciation of equipment, fire protection, and similar items, and an amount equal to ten percent (10%) of all such costs and e-6 pgngg o cover Emkay's admin- istrative and overhead a -Uenses_ It is intended and agreed that all. taxes and assessments by public authority relating to real property or the ownership thereof, including the real property comprising the Common Areas, shall be paid by the respective Parcel owners. In no event shall any cost or expense relating to the buildings in the Development be included in the cost of operation of the Common Areas. -4- 072 -2 ME 10443 Pt6E779 (b) The proportionate share of the Common Area costs of each Parcel owner shall be as follows: (i) Upon the Effective Date as to the first owner to open for business, such owner shall pay 100% of the cost of maintaining and operating the Common Areas located on such party's Parcel. (ii.) Upon the Effective Date as to the second owner to open for business, the two owners so opened shall share the cost of operating and maintaining the Common Areas located on their two Parceld, in the proportion which the respective gross square footages of their two Parcels bear•to each other. (iii) Upon the Effective Date as to the third owner to open for business, and for the balance of the Term, the three Parcel owners shall share the cost of op- erating and maintaining all of the Common Areas located in the Development in the following percentages: Owner of Parcel 1 38% Owner of Parcel 2 25% Owner of Parcel 3 37% (c) Prior to the commencement of�e3Ch calendar period of s _(6,)_,moaths..duri.ng the Term, Emkay shall give each Parcel owner a written -5- 073 10443 Flu Teo estimate of their respective shares of such Common Area costs for.the ensuing six (6) month period. Such estimated amount shall not exceed 110% of the actual share of such Parcel owner for the then current six (6) month period. Each Parcel owner shall pay such esti- mated amount to Emka.�in_equal_ monthly installments, in advance. Within ninety (90) days after the end of each such six (6) month period, Emkay shall furnish to each Parcel owner a statement showing in reasonable detail the costs and expenses incurred by Emkay for the operation and maintenance of the Common Areas during such period, and each Parcel owner shall promptly make any payment or allowance necessary to adjust each such party's estimated payment to such party's actual proportionate share of Common Area costs as shown by •such annual statement. 7. Enforcement of Assessments. (a) Failure to pay the estimated share of Common Area cost or any installment thereof, in- cluding any semi - annual adjustment, promptly and in any event within ten (10) days after written notice from Emkay of nonpayment, shall constitute a delin- quency and default with respect to the Parcel to Which such share relates. A majority of the Parcel .. owners is authorize¢ „and empowered �g -oceed in the event of any such default toI collect each such delinquent individual assessment, together with interest upon the unpaid amount thereof at ten percent (10 %) per annum from the date of such notice, until the same is fully paid, together -6- 074 Mr.. I 0a43 ?1(E781. with recording fees, title costs, court costs, and reasonable attorney's fees. (b) If and whenever a default occurs,, as provided above, the non - defaulting Parcel owners dha11 be entitled to alien against the Parcel to which such default relates, for' the unpaid amount of such share of Common Area costs and the cost and expenses described above. In.the event of any such default, then any non - defaulting Parcel owner may file for record in the office of the County Recorder of Orange County, California, a claim of lien, which shall contain at least' (i) A statement of the unpaid amount of the share of Common Area cost; (ii) A description sufficient for identification of the Parcel to which the default relates; and (iii) The name of the owner or reputed owner of the property described in (ii) above. Such claim of lien shall be effective to establish a lien against the real property described in such claim, in the amount specified therein, together with interest at ten percent (10 %) per annum from the date of. notice of nonpayment, together with recording fees and reasonable costs of any title dearth or title policy before or after made or obtained in connection with such claim of lien or the foreclosure of the claim of lien, together with court costs and reasonable attorney's fees which may accrue in the enforcement of such lien. -7- Cp75 ar f 0443 FaE 782 (c) Such lien, when so established against the real property described in said claim,. shall be prior and superior to any right, title, in- terest, lien, or claim which may be or may have been acquired in or attached to said real property sub- sequent to the time of filing such claim, except that such lien' shall in any event be' subordinate to the lien of any bona fide first trust deed upon such property. Such lien shall be for the use and benefit of the non - defaulting Parcel owners and may be enforced and fore- closed in a suit or action brought by any one or more of them in any court of competent jurisdiction, if brought within one year of the filing of such claim, in the same manner as if the amount of such lien had been evidenced by the promissory note of the person or persons who on the date of notice of nonpayment were the fee owners of the property subjected to such lien, and as if such note were secured by a real estate mortgage upon said real property duly executed by the fee owners of such property as of the time of recording and duly recorded 'at 'the 'time such claim was filed for record. In any such suit or action the plaintiffs shall be entitled to a personal judgment in the full amount of such lien against each person who was such fee owner on such date of notice of nonpayment. The net amount received on account of such Lien or from any judgment with respect to such lien, if received after the close of the year for which such share was due, shall be applied against the non - defaulting Parcel owners' current shares of Common Area costs, until fully expended. M (�,70 e:q.10143 F.'a783 . -.:. f U 8. Binding Upon Successors. This Agree!merxt phall% be binding upon and inure to the benefit of thd:'p,at ties. and their respective successors, assigns, lessees ?Sublessees Upon transfer of the fee title to any Parcel to dibuccissor which assumes in writing the obligations i, :bry this Agreement, the transferor shall be relieved from all ob liga ......... . tions accruing hereunder subsequent to the date'of transfer. 9. Paragraph Headings. The used herein are for reference only, and shall ndt'enter into the interpretation of this Agreement. EXECUTED this 19th day of October —, 1972. 2�y EMY DEVELOPMENT COMPANY, .INC. THE NEWPORT PROJECT. By EMKAY DEVELOPMENT COMPANY, INC. By, B By ATLAS REALTY COMPANY 6177 STATE OF CALIFORNIA p . 10443 tu(c764 u4d COUrTY OF ORANGE On this 19th day of October , 1972 , before me, the undersigned, a notary Public for said County and State, personally appeared Robert A. Alleborn and Edward J. Ruwaldt known to we to be the president and vice- president ieepectively of Emkay Development CO., Inc. the corporation that executed -the within instrument, said persons being known to me to be the persons who executed the within instrument on behalf of said corporation, said corporation being known to be to be one of the joint'venturers of THE NEWPORT PROJECT. the joint venture that executed the within instrument and acknowledged to me that such corporation executed the came both individually and as joint venturer of said joint venture and that such joint venture also executed the same, (gfpL�. Virginia M. White, Name (Typed or Printed) Notary Public in and for id County and State STATE OF CALIPORNIA 1 5S. COUNTY OF... 2_0..........._._._...._j . On...00tObEr „19thx_197........ ' fidorense, the nndersigncl,a Notary Pabllc in and forsaitl Stale. Personally apptarcd .r _•...... R. A. Aileborn knwvn to me to be known to me to be lhe_..Vl CB•�TeBZden �yay. of rho CorQo atinn that ewaecd the n•116(n Inatnmwnl, known to me to be Ih< Persons wba exeeumeJ tLC within Dlejrumenl en bd,xif of the Corporation Ihwein nnm<d, and acknowledged to nit that such Corporation excepted the same, and acknowledged to me that aucb Corporation executed the within Inalmment pursuant to its by- I.,,, or a resolution of its board of dkedors. \VITNESSmyhandandomelalaeal. /� y1� L'•/ y %�• ..rf v: Leaks ota,.y Pub /lic -...4L zlulc) . (Seal) �/ (Notary Public's Signature) Virginia N. White (Warne •iytrd or Prinlyd) Nutary Public In and for said Slate 2407 Hle self wean re Gs«.Ibn Hn,dtl A,lawlylnrM 072 STATE OF .aXA5. COUNTY OF HARRIS On this 19th day of October 19 72 , before maj the undersigned, a Notary Public for said County and State, personally appeared _ L. 0. Henson and W. J. Perry, Jr. known to me to be the vice president and assistant secretary respectively of Atlas Realty Company the corporation that executed the within instrument, said persons being known to me to be the persons who executed the within instrument on behalf of said corporation,, said corporation being known to me to be one-of the point venturers or The Newport Project the Joint venture that executed the within instrument, and acknow- ledged to me that such corporation executed the same both individually and as Joint venturer of said Joint venture and that such .ioint.venture also executed the same. )1 ( (SEAL) .C.f'2h -� l77 ��C�•�r..�c+� - Name Typed or rrxnxeai Notary Public in and for said County and State My commission expires 6/1173 C .c: V O U 0�" I MY1721 EXHIBIT "A" tl rl 020 I 6:149743 moo" Amommw 14HEN RECORDED, RETURN TO: LATHAN & WATKINS 555 South Flower Street Los Angeles, CA 90071 -2466 Attn: J. K. Hachigian i ysig.00 OF Dµ40!000 CAI I P9PM APAI5166 COVENANT AND AGRREMENT REGARDING MAINTENANCE OF OFF - STREET PARKING SPACE AFFECTING PARCEL 1 OF PARCEL MAP FILED IN BOOK 45, PAGE 23 AND PARCEL 1 OF PARCEL MAP FILED IN BOOK 183 PAGES 14 THROUGH 15 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER, ORANGE. COUNTY, CALIFORNIA PA2010 -135 for GP2010 -010 PD2010 -007 4221 Dolphin Stdker Way 021 Ridgeway Development BE-149743 THIS COVENANT AND AGREEMENT FOR OFF-STREET PARKING SPACE (the "Agreement ") is made as of January 14, 1986, between STUART MITCHELL KETCHUN, JR. ( "Ketchum ") and THE DEVIL'S TRIANGLE PARTNERSHIP, a California general partner- ship ( "Devil's Triangle "). Ketchum owns the property si- tuated in the State of California, County of Orange, City of Newport Beach described as follows: Parcel 1 of Parcel Hap 83 -705 as per map filed in book 153, pages 14 and 15 of Parcel Maps in the Offica of the Recor- der of said County (hereinafter the "Continental Property ") j and Devil's Triangle owns the adjoining property described as follows: Parcel 1 as shown on a Parcel Map filed in book 45, page 23 of Parcel Maps in the Office of the Recorder of said County (hereinafter the "E1 Torito Pro- perty') . RECITAL The Planning Commission of the City of Newport Beach, California (the "City ") has approved, subject to certain conditions, Devil's Triangle s request to allow the use of an existingg open courtyard for dining and drinking puxposee in tha'El Torito Restaurant (located on the E1 Torito Property). One condition requires that a covenant for additional automobile parking spaces be establiahed to run with the Continental Property for the benefit of the El Torito Property, and another condition requires a grant of an easement for and the construction of a sidewalk linking the covenanted parking spaces on the Continental Property to the E1 Torito Property. The purpose of this Agreement is to satisfy said conditions. ARTICLE 1. COVENANT AND EASEMENT Section 1.1 - GRANT OF COVENANT. The owner of the on nentsr Property hereby covenants and agrees to provide on the Continental Property for the benefit of the El Torito Pro arty, sixteen (lb) automobile parking spaces together w1.th a nonexclusive easement for access to, ingress to, egress from, and use and enjoyment of the parking spaces for (i) passage of vehicles, (li) passege of pedestrian traffic, and (iii) other uses incidental to such passages 022 85:149743 reserving, however, in favor of the owner of the Continental Property, all rights of access to, ingress to, egress from and use and ontoyment of the parking spaces not othervioe inconsistent with the parking rights granted herein. Section 1.2 - GRANT OF EASSRENT. The owner of the Con - t nenta roperty hereby grants a nonexclusive easement for the passage of pedestrian traffic, and other uses incidental to such passage, over the Continental Property from the garking spaces, as covenanted in Section 1.1, to the E1 oxit0 Property over ouch portion of the Continental Property as the owner thereof shall reasonably designate. The owner of the E1 Torito Property shall have the right, after obtaining the approval of the Continental Property owner, which such approval shall not be unreasonably withheld, to construct a sidewalk along the easement route. Such sidewalk shall be constructed and maintained at the sole expense of the owner of the El Torito Property. The owner of the Continental Property shall have the right, at its sole expense and subject to the approval of the owner of the El Torito Ptoperty, which such approval shall not be unreasonably withheld, to relocate the easement and reconstruct a sidewalk along the relocated easement route. Section 1.3 - TEMPORARY LOSS OF PARKING SPACES, The owner o- £"CFe-Continental Property shall have the right from time to time, in order to accomodate construction or other activities on the Continental Property, to temporarily relocate some or all of the. covenanted parking spaces to an off -site location (not on the Continental Property) which, under the then - present circumstances, will enable the owner of the E1 Torito Property to use the same with as little inconvenience to such owner as is practicable under the circumstances. Section 1.4 - PARKING CHARGES. The owner of the Continental Property shall have the right to assess and collect from any person parking on the spaces covenanted in Section 1.1 a parking fee in the amount as follows: (a) As long as such parking spaces are surface parking the fee shall be FORTY DOLLARS ( 40) per month per apace. (b) If the parking spaces are located off -site on an interim basis pur- suant to Section 1.3, the fee shall be an amount necessary to reimburse 023 65.:149743 the owner of the Continental Pro- perty for its costs of providing each such interim parking apace. (c) If the parking spaces are located within a parking structure the fee shall be the greater of M EIGHTY DOLLARS (680) per month par apace or (ii) the then - prevailing rate for such parking. ARTICLE 2. GENERAL PROVISIONS Section,2.I - TERM. This covenant and easement shall can- e n e feet until such time as the E1 Torito Property is no longer used as a restaurant. At the expiration of such term, the owner of the E1 Torito Property shall provide to the owner of the Continontal Property a quitclaim deed or other documents necessary to eliminate of record the cove- nant and easement established by this Agreement. Section 2.2 - COVENANTS To RUN WITH LAND. The covenants and easements established herein are for the benefit of the El Torito Property and are intended to be and shall be con- strued as covenants running with the Continental Property and equitable servitudes upon the Continental Property and every part thereof, Furthermore, each and all of such covenants and easements shall be binding upon and burden, and shall inure to the benefit of, all persons having or acquiring any right, title or interest in the Continental Property, the E1 Torito Property or any part of either thereof, and their respective successors and assigns, all upon the terms, provisions and conditions set forth herein. Section 2.3 - GENERAL INTERPRETATION (a) If any term, provision or condition contained in this Agreement (or the application of any such term, provision or condition) shall to any extent be invalid or unenforceable, the remainder of this Agreement shall be valid and enforce- able to the fullest extent permitted by law. (b) When the context in which words are used herein indi- totes that such is the intent, words in the singular number shall include the plural and vice versa. All pronouns and any variations thereof shall be deemed to refer to all gen- dera, and the term "person" shall include natural indivi- duals, corporations, partnerships, unincorporated organize - tione, associations, Cruets, estates and all other forms of 024 EB:149743 entities. The captions of the Articles and Sections herein are for convenience of reference only and shall not be con- sidered or referred to in resolving questions of interpre- tation or construction. IN WITNESS WHEREOF, Ketchum and Devil' e Triangle have executed this instrument as of the day and year first shove written. THE DEV 'S TRIANGLE P 9E SHIP tuart ate sum as a general partner Sys SANTA ASSOCIATES, a California limited parcnership, ae Byne pprtn ST—uart M. Ketchum, its sole general partner 025 SOUNT.V CALIFO_ gNIA so. AA)GELF4i COUNTY OP LCLS � • On Qom` fG befor said Stare, personally Appeared _..._.S» f lV rr personally known to me or proved to me on the Writ of ntbfaetoryevldena to be the person —whose nainey- tubrcrlbed to the within Instrvmant and aeknowledged that —&L exe• cuted the same. WITNESS Zce'-L� and offitW teal. SISnature efl f 85=149743 Mlle in and for , 4. 1.11 (76uvn fa oflktd aoudel avp 020 85:149743 STATE OF CALIFOj{NIA COUNTYOF _ Amt/ FS _ "s- on -f' bcfom me, the undenipcd, a Notay Public in and for Gild Stue,personJly tppecred — _ ppeene nJly knovm to me or t to me an e - IMUrcaoty eddente to be to me thtt WITNESS Sivitum ..r 1 w, X1 t .IV, 1 wYttn•r,umbia. s.a :.W.W ffbls sm fae(gdd m1srW sell 'BBZ149743 STATE OF CALIFORNIA COUNTY OF I ne. iJ, m-af s SL On G before me, the undm ntd, a Notary FubDc In and for "Id State, pemalay appeued - -- personally known to me or proved to me on the bub of udefactory addehce to be the pmon_,Who exeouttd the within hummenr as Sa:4 -.r6tA ,n debtktfa�nen of .. �A i!} A9We IA7 Signtrute •\ • IY �• \ �• Yi I.� i 1.4 efjYll'Y �1`•.r' ette \ur.1:..alnne;aar,zlOCea (Thb aln foro(0ebi nombl wd) COYERNNEN'f CODE 27361.7 certify under penalty of perjury that the notary seal on the document to which this statement is attach !f reads as follows: `:ome of sotar. ..�I 9' L a _Y &Mja1_,LQ . .late Costelsrion l:xrlres WAVe -1 - :2, j IjRj .ounty•whorr bond Is filed!_1{- teli�Lr•G. PIageofP, cut loll - -F�� Date iJ 1 G " 022 P_1]]IL110D7: City of Newport Beach Parking Code Chapter 20.40 — Off - Street Parking Sections: 20.40.010 — Purpose 20.40.020 — Applicability 20.40.030 — Requirements for Off - Street Parking 20.40.040 — Off - Street Parking Spaces Required 20.40.050 — Parking Requirements for Shopping Centers 20.40.060 — Parking Requirements for Food Service Uses 20.40.070 — Development Standards for Parking Areas 20.40.080 — Parking for Nonresidential Uses in Residential Zoning Districts 20.40.090 — Parking Standards for Residential Uses 20.40. 100 — Off -Site Parking 20.40. 110 — Adjustments to Off - Street Parking Requirements 20.40.120 — Parking Management Districts 20.40.130 — In -lieu Parking Fee 20.40.010 — Purpose The purpose of this Chapter is to provide off - street parking and loading standards to: A. Provide for the general welfare and convenience of persons within the City by ensuring that sufficient parking facilities are available to meet the needs generated by specific uses and that adequate parking is provided, to the extent feasible; B Provide accessible, attractive, secure, and well- maintained off- street parking and loading facilities; C. Increase public safety by reducing congestion on public streets and to minimize impacts to public street parking available for coastal access and recreation; D. Ensure access and maneuverability for emergency vehicles; and E. Provide loading and delivery facilities in proportion to the needs of allowed uses. 20.40.020 — Applicability A. Off - street parking required. Each use, including a change or expansion of a use or structure, except as otherwise provided for in Chapter 20.38 (Nonconforming Uses and Structures) shall have appropriately maintained off- street parking and loading areas in compliance with the provisions of this Chapter. A use shall not be commenced and structures shall not be occupied until improvements required by this Chapter are satisfactorily completed. October 26, 2010 Newport Beach Zoning Code, Title 20 %l ,1 Off - Street Parki B. Change, enlargement, or intensification of use. Changes in use and enlargement or intensification of an existing use shall require compliance with the off - street parking requirements of this Chapter, except as allowed in Chapter 20.38 (Nonconforming Uses and Structures). 20.40.030 — Requirements for Off - Street Parking A. Parking required to be on -site. Parking shall be located on the same lot or development site as the uses served, except for the following: Townhouses and multi- tenant uses. Where parking is provided on another lot within the same development site, the parking shall be located within 200 feet of the units they are intended to serve. 2. Off -site parking agreement. Parking may be located off -site with the approval of an off -site parking agreement in compliance with Subsection 20.52.080.0 (Parking agreement). B. Permanent availability required. Each parking and loading space shall be permanently available and maintained for parking purposes for the use it is intended to serve. The Director may authorize the temporary use of parking or loading spaces for other than parking or loading in conjunction with a seasonal or intermittent use allowed in compliance with Section 20.52.040 (Limited Term Permit). C. Maintenance. Parking spaces, driveways, maneuvering aisles, turnaround areas, and landscaping areas shall be kept free of dust, graffiti, and litter. Striping, paving, walls, light standards, and all other facilities shall be permanently maintained in good condition. D. Vehicles for sale. Vehicles, trailers, or other personal property shall not be parked upon a private street, parking lot, or private property for the primary purpose of displaying the vehicle, trailer, or other personal property for sale, hire, or rental, unless the property is appropriately zoned, and the vendor is licensed to transact a vehicle sales business at that location. E. Calculation of spaces required. 1. Fractional spaces. Fractional parking space requirements shall be rounded up to the next whole space. 2. Bench seating. Where bench seating or pews are provided, 18 linear inches of seating shall be considered to constitute a separate or individual seat. 3. Gross floor area. References to spaces per square foot are to be calculated on the basis of gross floor area unless otherwise specified. 4. Net public area. "Net Public Area" shall be defined as the total area accessible to the public within an eating and /or drinking establishment, excluding kitchens, restrooms, offices pertaining to the use, and storage areas. 5. Spaces per occupant. References to spaces per occupant are to be calculated on the basis of maximum occupancy approved by the City of Newport Beach Fire Department. EMNewport Beach Zoning Code, Title 20 Octobq rrSO10 Off - Street Parking . 20.40 6. Spaces required for multiple uses. If more than one use is located on a site, the number of required off - street parking spaces shall be equal to the sum of the requirements prescribed for each use. F. Nonconforming parking and loading. Land uses and structures that are non- conforming due solely to the lack of off - street parking or loading facilities required by this Chapter, shall be subject to the provisions of Section 20.38.060 (Nonconforming Parking). 20.40.040 — Off - Street Parking Spaces Required Off- street parking spaces shall be provided in compliance with Table 3.11, below. These standards shall be considered the minimum required to preserve the public health, safety, and welfare, and more extensive parking provisions may be required by the review authority in particular circumstances. Unless otherwise noted parking requirements are calculated based on gross floor area. Industry Small - 5,000 sq. ft. or less 1 per 500 sq. ft. Large - Over 5,000 sq. ft. 1 per 1,000 sq. ft. Industry, Marine Related 1 per 750 sq. ft. Personal Storage (Mini Storage) 2 for resident manager, plus additional for office as required by Minor Use Permit Research and Development 1 per 500 sq. ft. Warehousing and Storage 1 per 2,000 sq. ft., plus 1 per 350 sq. ft. for offices. Minimum of 10 spaces peruse Wholesaling 1 per 1,000 sq. ft. Assembly /Meeting Facilities 1 per 3 seats or 1 per 35 sq. ft. used for assembly purposes Commercial Recreation and Entertainment As required by Conditional Use Permit Cultural Institutions 1 per 300 sq. ft. Schools, Public and Private As required by Conditional /Minor Use Permit Accessory Dwelling Units 1 per unit; a minimum of 2 covered per site. Single -Unit Dwellings - Attached 2 per unit in a garage Single -Unit Dwellings - Detached and less than 2 per unit in a garage 4,000 sq. ft. of floor area geoss October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Off - Street T' U Parking Spaces Required Single -Unit Dwellings - etached and 4,000 e 3 per unit in a garage s uare ft. or greater of floor area bOnl ri a Single -Unit Dwellings - Balboa Island 2 per unit in a garage Multi -Unit Dwellings - 3 units 2 per unit covered, plus guest parking; 1 - 2 units, no guest parking required 3 units, 1 guest parking space Multi -Unit Dwellings - 4 units or more 2 per unit covered, plus 0.5 space per unit for guest parking Two -Unit Dwellings 2 per unit; 1 in a garage and 1 covered or in a garage Live /work units 2 per unit in a garage, plus 2 for guest/customer parking Senior Housing - market rate 1.2 per unit Senior Housin - affordable 1 Eer unit Appliances, Building Materials, Home Electronics, 1st 10,000 sq. ft. - 1space per 300 sq. ft. Furniture, Nurseries, and Similar Large Warehouse- Over 10,000 sq. ft. - 1 space per 500 sq. ft. type Retail Sales and Bulk Merchandise Facilities Plus 1 per 1,000 s .ft. of outdoor merchandise areas Food and Beverage Sales 1 per 200 sq. ft. Marine Rentals and Sales Boat Rentals and Sales 1 per 1,000 sq. ft. of lot area, plus 1 per 350 sq. ft of office area Marine Retail Sales 1 per 250 sq. ft. Retail Sales 1 per 250 sq. ft. in Centers 1 per 200 sq. ft. Shopping 9 0-- c a: �n nn ncn Convalescent Facilities 1 per 3 beds or as required by Conditional Use Permit Emergency Health Facilities 1 per 200 sq. ft. Financial Institutions and Related Services 1 per 250 sq. ft. Hospitals 1 per bed; plus 1 per resident doctor and 1 per emolovee. Offices* - Business, Corporate, General, Governmental First 50,000 sq. ft. Next 75,000 sq. ft. Floor area above 125,001 sq. ft. 1 per 250 sq. ft. net floor area 1 per 300 sq. ft. net floor area 1 per 350 sq. ft. net floor area * Not more than 20% medical office uses. Offices - Medical and Dental Offices 1 1 Der 200 so. -ft:- Newport Beach Zoning Code, Title 20 October Off- Street 20.40 Outpatient 1 Der 250 so. ft. Adult- Oriented Businesses 1 per 1.5 occupants or as required by Conditional Use Permit Ambulance Services 1 per 500 sq. ft., plus 2 storage spaces. Animal Sales and Services Animal Boarding /Kennels 1 per 400 sq. ft. Animal Grooming 1 per 400 sq. ft. Animal Hospitals /Clinics 1 per 400 sq. ft. Animal Retail Sales 1 per 250 sq. ft. Artists' Studios 1 per 1,000 sq. ft. Catering Services 1 per 400 sq. ft. Care Uses Adult Dav Care — Small (6 or fewer) Spaces required for dwelling unit only. Adult Day Care - Large (7 or more) 2 per site for drop -off and pick -up purposes (in addition to the spaces required for the dwelling unit). Child Day Care — Small (6 or fewer) Spaces required for dwelling unit only. Child Day Care - Large (9 to 14) 2 per site for drop -off and pick -up purposes (in addition to the spaces required for the dwellin unit), Day Care - General 1 per 7 occupants based on maximum occupancy late hours allowed per license. Residential Care - General (7 to 14) 1 per 3 beds Eating and Drinking Establishments Accessory (open to public) 1 per each 3 seats or 1 per each 75 sq. ft. of net public area., whichever is greater Bars, Lounges, and Nightclubs 1 per each 4 persons based on allowed occupancy load or as required by Conditional Use Permit 1 per 30 -50 sq. ft. of net public area, including outdoor Food Service with /without alcohol, with /without dining areas, but excluding the first 25% or 1,000 sq. ft late hours of outdoor dining area, whichever is less. See Section *1348- 2a • 'Fo, 0 6 Food Service - Fast food 1 per 50 sq. ft., and 1 per 100 sq. ft. for outdoor dining areas Take -Out Service - Limited 1 per 250 sq. ft. Emergency Shelter As required by Conditional Use Permit Funeral Homes and Mortuaries 1 per 35 sq. ft. of assembly area Health /Fitness Facilities Small - 2,000 sq. ft or less 1 per 250 sq. ft. October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Off - Street Laboratories (medical, dental, and similar) 1 per 500 sq. ft Maintenance and Repair Services 1 per 500 sq. ft. Marine Services Boat Storage - Dry 0.33 per storage space or as required by Conditional Use Permit Boat Yards As required by Conditional Use Permit Dry Docks 2 per dry dock Entertainment and Excursion Services 1 per each 3 passengers and crew members Marine Service Stations As required by Conditional Use Permit Sport Fishing Charters 1 per each 2 passengers and crew members Water Transportation Services - Office 1 per 100 sq. ft., minimum 2 spaces Personal Services Massage Establishments 1 per 200 sq. ft. or as required by Conditional Use Permit Nail Salons 1 per 80 sq. ft. Personal Services, General 1 per 250 sq. ft. Studio (dance, music, and similar) 1 per 250 sq. Ft. Postal Services 1 per 250 sq. ft. Printing and Duplicating Services 1 per 250 sq. ft. Recycling Facilities Collection Facility - Large 4 spaces minimum, but more may be required by the review authority Collection Facility - Small As required by the review authority Visitor Accommodations Bed and Breakfast Inns 1 per guest room, plus 2 spaces Hotels and accessory uses As required by Conditional Use Permit Motels 1 per guest room or unit Recreational Vehicle Parks As required by Conditional Use Permit Time Shares Communication Facilities As required by Conditional Use Permit 1 per 500 sq. ft. Heliports and Helistops As required by Conditional use Permit Marinas 0.75 oer slip or 0.75 oer 25 feet of moorina space Office ( Limited 1, 1 per 300 sq. ft., plus 1 per rental vehicle (not including Newport Beach Zoning.Code, Title 20 Octob 10 Off - Street Parking 20.40 Vehicle/Equipment Rentals and Sales 1 per 1,000 sq. ft. of lot area Vehicles for hire 1 per 300 sq. ft., plus 1 per each vehicle associated with the use and stored on the same site Vehicle Sales, Office Only 1 per 250 sq. ft., plus 1 as required by DMV Vehicle /Equipment Repair (General and Limited) 1 per 300 sq. ft. or 5 per service bay whichever is more nt Services Automobile Washing Service Station 1 per 200 sq. ft. of office or lounge area; plus queue for 1 per 300 sq. ft. or 5 per service bay whichever is Service Station with Convenience Market 1 per 200 sq. ft., in addition to 5 per service bay Vehicle Storaoe 1 per 500 sq. ft. Caretaker Residence 1 per unit Special Events As required by Municipal Code Chapter 11.03 Temporary Uses As required by the Limited Term Permit in compliance with Section 20.52.040 20.40.050 — Parking Requirements for Shopping Centers A. An off - street parking space requirement of 1 space for each 200 square feet of gross floor area may be used for shopping centers meeting the following criteria: 1. The gross floor area of the shopping center does not exceed 100,000 square feet; and 2. The gross floor area of all eating and drinking establishments does not exceed 15 percent of the gross floor area of the shopping center. B. Individual tenants with a gross floor area of 10,000 square feet or more shall meet the parking space requirement for the applicable use in compliance with Section 20.40.040 (Off- street Parking Spaces Required), above. C. Shopping centers with a gross floor areas in excess of 100,000 square feet or with eating and drinking establishments occupying more than 15 percent of the gross floor area of the center shall use a parking requirement equal to the sum of the requirements prescribed for each use in the shopping center. October 26, 2010 Newport Beach Zoning Code, Title 20 20.40 Off - Street 20.40.060 — Parking Requirements for Food Service Uses A. Establishment of parking requirement. The applicable review authority shall establish the off - street parking requirement for food service uses within a range of one space for each 30 to 50 square feet of net public area based upon the following considerations: 1. The physical design characteristics: a. The gross floor area of the building or tenant space; d. The number of tables or seats and their arrangement; e. Other areas that should logically be excluded from the determination of net public area; f. The parking lot design, including the use of small car spaces, tandem and valet parking and loading areas; g. Availability of guest dock space for boats; and h. Extent of outdoor dining. L. Operational characteristics: a. The amount of floor area devoted to live entertainment or dancing; b. The amount of floor area devoted to the sale of alcoholic beverages; C. The presence of pool tables, big screen televisions or other attractions; d. The hours of operation; and e. The expected turn over rate. 3. Location of the establishment: a. In relation to other uses and the waterfront; b. Availability of off -site parking nearby; C. Amount of walk -in trade; and d. Parking problems in the area at times of peak demand. B. Conditions of approval. If during the review of the application, the review authority uses any of the preceding considerations as a basis for establishing the parking requirement, the substance of the considerations shall become conditions of the permit application approval and a change to any of the conditions will require an amendment to the permit application, which may be amended to establish parking requirements within the range as noted above. MNewport Beach Zoning Code, Title 20 Octob " *10 APPENDIX C Spillover Spot Checks 4�9 2 Spillover Spot Check 6/10/2011 * =Driver of parked vehicle entered adjacent office building # # # #* = Vehicle belongs to office user and parked during morning, midday, and evening spot check # # # #= Vehicle parked during at least two of the spot checks WI Zone D Zone G Zone H 4UGJ 3WOF 4PIL 2ZKT* 8E81* 6MAN 6HRM* 5TFH* 3GZP 5SDS 4KK7* 5VFJ* 7:30 AM - 8:30 AM 3HIT* 4CBY* 3PZC* 6DOC* 4BLB 4ZZP 5KNM 5SDS 6AO6 5VFJ* 3HIT* 6DLU 5HBL 5MXA 3WOF 4PIL 6HRM* 4CBY* 6MAN 12:30 PM SYCN 8E81* 4VHD 4KK7* 2ZKT* 5TFH* 6HPT 6MIT 6GAU 3HIT* 4CBY* SVF1* 5MXA 8E81* 5KNM 6HRM* 3SYL 5HBL 4VHD 7Y18 2KQC 5:00 PM 2ZKT* 4DLB 6MHT 5KNM 6GER 3PZC* STWS SSFB 5SDS * =Driver of parked vehicle entered adjacent office building # # # #* = Vehicle belongs to office user and parked during morning, midday, and evening spot check # # # #= Vehicle parked during at least two of the spot checks WI 700 Attachment No. CC 10 Revised Plans 701 702 X 0 a i a 'o g c 3 W m U y� �� � A� _ ` �5` on °� � s F y, a � � � � w w Q � � . � C Q � :a 3 � .. u g w - re � o � � � � .._ 0 0 1 � .III( 1 —_ �I ��❑ �` m � _ I a T a �O3Y as tt a� J g E m 3 PQ is r i n m L (((( I it tl, 'P't3�a�yyooaryo.u�oy u�,� io O[L to cvo� mod pad - - � a Q w O N O ^ Q 3 z ;d 2 J, E8 e 00 3< 3� o„ �g 0 a� E -- N C _ O o a a a c 'o —a Zrp _ ITV �y � LL F t] n m L (((( I it tl, 'P't3�a�yyooaryo.u�oy u�,� io O[L to cvo� mod pad - - � a Q w O N O ^ Q 3 z ;d 2 J, E8 e 00 3< 3� o„ �g 0 a� E -- N C _ O o a a a c 'o n� M1irl � i 41. 9 L7 N U 0 I c 0 v C Z m 6 n n T Q N O R n a IN M vi z � a TO LNG LD a Q o g w ,yp 0 Te N O v OC V N Er 1 1 n T N Y 9 l v� FIB IS I 1 a 0 a 1 PN a i O N � u® s n L7 N U 0 I c 0 v C Z m 6 n n T Q N O R n a IN M vi z � a TO LNG LD a Q o g w ,yp 0 Te N O v OC V N Er 1 1 n T N Y 9 l v� FIB IS I a m' L7 N U 0 I c 0 v C Z m 6 n n T Q N O R n a IN M vi z � a TO LNG LD a Q o g w ,yp 0 Te N O v OC V N Er 1 1 n T N Y Q V R �D� PN i n --- y a 4 o c 4 A >y 01111 Rlladmd LL A 8I I.0'.s .0'.£i .0 zl o. F .o-.oz Q V R �D� 4tC — FJ tl O N W e O Z m d L A 1 a C 0 W W m W Q d N 2 Y �fiBf _ dm - c =` a _- ® g ° 1® p V�ol7 b s K o m N' a 6 yT d / D� e i� itl 11,E tl O N W e O Z m d L A 1 a C 0 W W m W Q d N 2 Y �fiBf _ dm - c =` a _- ® g ° 1® p V�ol7 b s K o m N' a 6 yT d / D� e m 4 °n � N a '4 tai i LLI a� o 0 a.11 Syadwd 2 n ..11Apadmd m A � i o-.oz m 4 °n � N a '4 tai i LLI a� o 0 a.11 Syadwd 2 n ..11Apadmd m A � r CL o-.oz I A+ a TO r -i- .6 -.e L6,5i .o-.zl 7 y y I , 3 I� I Jv N t =v, of n NI d v Y 4 N In 4 _ I W� I _ Q y a f 1 4 0 .0,64 ^ n L! ti N i U m v.0 r —i -M Nlad Id - — - Q � b O v ^ a a _N W a a Y C o° J b N J c a a w m oif ¢ a — � A = a a m A � r CL — c A+ a TO - 7 y y I , 3 I� n Jv N t =v, d v Y Y C o° J b N J c a a w m oif ¢ a — � A = a a �i 1 i- .0,64 log Attachment No. CC 11 Mitigated Negative Declaration (Distributed Separately Due to Bulk) 709 710 CITY OF NEWPORT BEACH ENVIRONMENTAL CHECKLIST FORM 1. Project Title: MacArthur at Dolphin- Striker Way (PA2010 -135) 2. Lead Agency Name and Address: City of Newport Beach Planning Department 3300 Newport Boulevard, Newport Beach, CA 92658 -8915 3. Contact Person and Phone Number: Rosalinh Ung, Planning Department Rung(cDnewportbeachca.gov (949) 644 -3208 4. Project Location: 4221 Dolphin - Striker Way Newport Beach, CA 92660 5. Project Sponsor's Name and Address: Tod Ridgeway Ridgeway Development 2804 Lafayette Avenue Newport Beach, CA 92663 6. General Plan Designation: MU -H2 (Mixed Use Horizontal) 7. Zoning: Restaurant Site 1 of PC -11 Newport Place Planned Community District 8. Description of Project: The proposed project is redevelopment of an approximately 48,221 square -foot (1.11 acres) site. An approximately 13,525 gross square feet of new general commercial and food uses are being proposed to replace the existing single -story 7,996 square -foot, vacant restaurant. The new development will consist of two, free - standing single -story buildings. Building Pad A will be approximately 4,000 square feet in size and Building Pad B will be approximately 9,525 square feet in size. Each building has a maximum building height of 29 feet. The proposed development is designed to be compatible with the existing commercial neighborhood of contemporary structures. The proposed materials for the project are smooth troweled integral tan color plaster, simulated wood composite siding, glass and metal. 1 Approximately 5,000 gross square feet of the proposed new development will be allocated for food service use. Of that, 1,000 gross square feet will be allocated for a fast -food service use i.e., Subway Restaurant, while the remaining 4,000 square feet will be allocated for high turn -over dining establishments i.e., small sit -down boutique restaurants. Anticipated hours of operation for the fast -food service use would be from 7 a.m. to 11 p.m., daily; and from 11 a.m. to 10 p.m. for the high turn -over dining establishments. The proposed 1,000 square foot fast -food use would require an approximately 20 parking spaces by using the parking ratio of one space per 50 square feet of gross floor area. The remaining 4,000 gross square feet of high turn -over dining establishments would require an approximately 50 parking spaces, by using the parking ratio of one space per 40 square feet of net public area [(4,000 sf. /2 (assuming 50 percent of total gross area is allocated for net public area) = 2,000 = 40 = 50 spaces]. The total required parking for food service use would be 70 spaces. The remaining 8,525 gross square feet of new development will be allocated for general commercial i.e. financial institution (4,000 square feet) and computer electronic service and cellular service retail stores. It is anticipated the general commercial uses would have hours of operation from 9:00 a.m. to 7 p.m., daily. The general commercial uses would generate a parking demand of approximately 34 spaces, by using the parking ratio of one space per 250 net square feet [(8,525 sf. — 200 sf. of utility room) _ 250 sf. = 33.3 = 34 spaces]. It is anticipated that a total of 30 employees will be working at the proposed development. The total parking requirement for the proposed development would be 104 spaces (70 spaces for food uses and 34 for retail uses). The project provides a total of 89 spaces (57 on -site and 32 off - site), resulting a parking shortage of 15 spaces per the PC -11 parking standards for the subject site. A use permit is being requested for the additional of 16 -space off -site parking provision (a total of 32 spaces) and reduction of the required off - street parking in accordance with Sections 20.40.100 and 20.40.110 of the Municipal Code. A parking study is required to analyze the existing common parking arrangement of the Restaurant Site 1 and the proposed new uses and hours of operation of Parcel 1. Also included is the proposed parking management plan per Section 20.40.110.0 of the Municipal Code. The project site is located within the PC -11 Newport Place Planned Community District and has a "Restaurant Site 1" zoning designation. "Restaurant Site 1" consists of three separate parcels, of which the project site is known as Parcel 1. Parcel 2 is currently improved with a 7,015 square -foot restaurant (Saagar Indian Restaurant) and Parcel 3 is currently improved with a 7,870 square foot sports club and restaurant (Classic Q). Parcels 2 and 3 are not a part of the proposed project, even though all three parcels have a shared parking arrangement. The 2 project site's common parking lot is currently accessed from Dolphin- Striker Way and Martingale Way, along the western portion of the site. The proposed redevelopment includes creation of a new vehicular access onto MacArthur Boulevard. The project would introduce new general commercial uses to the subject site which results in the requirement of an amendment to the Newport Place Planned Community Development Plan. The amendment would create new statistical analysis standards, permitted uses and development standards by changing the subject site (Parcel 1) from "Restaurant 1" to "General Commercial Site 8 ". The proposed project also requires a transfer of development intensity to allow the transfer of 54 un -built hotel units from Hotel Site 2 -B located at 1301 Quail Street (donor site) to the subject site to accommodate a net increase of approximately 5,529 square feet of new development. 9. Surrounding Land Uses and Setting: (Briefly describe the project's surroundings.) Current Development: 7,996 square -foot vacant restaurant To the north: 7,870 square -foot sports club and restaurant (Classic Q) To the east: MacArthur Boulevard To the south: Office development Glidewell Laboratories To the west: 7,015 square -foot restaurant ( Saagar Indian Restaurant) and Dolphin-Striker Way The existing 48,221 square -foot (1.11 acres) project site is located on the westerly side of MacArthur Boulevard, between Martingale Way and Newport Place Drive, in the Airport Area of the City of Newport Beach. The project site is within the Newport Place Planned Community; a 135 -acre master planned commercial and light industrial park and has a zoning designation of "Restaurant Site 1 ". Restaurant Site 1 is consisted of three separate parcels, of which the project site is known as Parcel 1. Parcel 1 is currently improved with a 7,996 square -foot single -story commercial building and a 78 -space surface parking lot. The existing building was originally constructed in 1972 and last expanded in 1985. Parcel 2 is currently improved with a 7,015 square -foot restaurant known as Saagar Indian Restaurant and a surface parking lot of 59 spaces. Parcel 3 is currently improved with a 7,870 square -foot sports club and restaurant known as Classic Q and has a surface parking lot of 74 spaces. Parcel and 2 and 3 are not a part of the proposed project, even though all three parcels have a shared parking arrangement under a reciprocal parking and maintenance agreement. Vehicular access to all three parcels is currently from Dolphin- Striker Way and Martingale Way. 3 10. Other public agencies whose approval is required (e.g., permits, financing approval, or participation agreement.) - Airport Land Use Commission (ALUC) for Consistency Review 21 0 250 500 Vicinity Map Feet Project Title: MacArthur at Dolphin- Striker Way e 4221 Dolphin- Striker Way (PA2010 -135) PA2010 -135_ Newport _Place.mxd February/2011 .- ao �F S, o� J5 as �. AO�G 0` 0 Q9 sl 9~ 6", O CO -G yQ 5� OI,q( Sp MU -H2 QZI CDRGyrh�N wqV m n 5^ ep a`, e� � sro sTti 40 �Q %R sr RS -Dy CG �G�o y9aR yQ2-P f� A ��PJO GS�R MU-H2sRcysr PF Receiver Site (Subject Site) 4221 Dolphin- Striker Way Mixed -Use Horizontal (MU -H2) o m I � c NEWPORT PLACE DR O MU -H2 MU -H2 Donor Site 1301 Quail Street Mixed -Use Horizontal (MU -H2) e� Fopew +op on General Plan Project Title: MacArthur at Dolphin- Striker Way .ysoc.. 4221 Dolphin- Striker Way (PA2010 -135) PA2010- 135_Newport_Place.mA February/2011 0 z 0 FO D� �P 0 250 500 Feet e: OOL1�ST °pRiryrHgN SAY PC 15 �Pp�� 0,9�ApSpR Gee OA s5 PC 11 Receiver Site (Subject Site) 4221 Dolphin- Striker Way X09 <S Newport Place Planned Community (PC 11) JQ 9A b o � i C NEWPORT PLACE OR � PC 11 Q° PC 15 0° P� 4 Lq< S' Donor Site 5^ 1301 Quail Street eRSr �J° Newport Place Planned Community (PC 11) �� p s 5Q 0" rev n SP -7 sr p 0 0 260 520 Zoning Map Feet Project Title: MacArthur at Dolphin- Striker Way e „a 4221 Dolphin- Striker Way (PA2010 -135) PA2010- 135_Newport_Placenk February/2011 IK DOVE STREET EXISTING PARKING STRUCTURE (16 Cars) existing walkway to remain EXISTING BUILDING TO BE DEMOLISHED 6' -0" 50' Buffer (min) New Lett I urn Lane NORTH Ground Level on Site 0' 20' 40' 60' May 31, 2011 80' 1 100' 1 120' SCALE: 1" = 20' a w x z a A I Property Line 4x6 Sign new striping 1209-011 Intersection Line of Site shall comply with Standard STD -1 10 -L CL MACARTHUR BOULEVARD 860' Note: PARCEL 1 Parking layout shall comply with existing painted median Standards STD - 805 -L -A and STD - 805 -L -B. L / \IJIII I`.1 VVI N Property Line TABULATION SUMMARY Parking Parcel Name Building Area Provided (sf) (cars) PARCEL 1 48,221 sf Existing Building to be removed Proposed Buildings Pad A (Retail Use) Pad B (Retail Use) (Food Use) Total Area MARTINGALE WAY Existing Parking to be modified and /or removed 7 L \\ _") Existing Sign z x z 0 I a111 4,525 5,000 8,000 sf � 111 9,525 13,525 sf IWA Proposed Parking (On -Site) 57 cars Existing Off -Site Parking 16 cars New Off -Site Parking 16 cars Total Parking (including Off -Site) 89 cars PARCEL 2 31,364 sf Existing Building 7,015 sf Existing Parking (On -Site) PARCEL 3 (not part) 47,205 sf Existing Building 8,000 sf Existing Parking (On -Site) Total Building Area 28,540 sf Total On -Site Parking (Total On -Site & Off -Site Parking For Parcel 1, 2 & 3 MacArthur Location Map 59 cars 74 cars 190 cars 222 cars) Not to Scale MacArthur at Dolphin Striker 4221 Dolphin Property Newport Beach, CA m Line S T 0 U B 0 0� G H A r c h i t e c t s 50' Buffer (min) New Lett I urn Lane NORTH Ground Level on Site 0' 20' 40' 60' May 31, 2011 80' 1 100' 1 120' SCALE: 1" = 20' a w x z a A I Property Line 4x6 Sign new striping 1209-011 Intersection Line of Site shall comply with Standard STD -1 10 -L CL MACARTHUR BOULEVARD 860' Note: PARCEL 1 Parking layout shall comply with existing painted median Standards STD - 805 -L -A and STD - 805 -L -B. L / \IJIII I`.1 VVI N Property Line TABULATION SUMMARY Parking Parcel Name Building Area Provided (sf) (cars) PARCEL 1 48,221 sf Existing Building to be removed Proposed Buildings Pad A (Retail Use) Pad B (Retail Use) (Food Use) Total Area MARTINGALE WAY Existing Parking to be modified and /or removed 7 L \\ _") Existing Sign z x z 0 I a111 4,525 5,000 8,000 sf � 111 9,525 13,525 sf IWA Proposed Parking (On -Site) 57 cars Existing Off -Site Parking 16 cars New Off -Site Parking 16 cars Total Parking (including Off -Site) 89 cars PARCEL 2 31,364 sf Existing Building 7,015 sf Existing Parking (On -Site) PARCEL 3 (not part) 47,205 sf Existing Building 8,000 sf Existing Parking (On -Site) Total Building Area 28,540 sf Total On -Site Parking (Total On -Site & Off -Site Parking For Parcel 1, 2 & 3 MacArthur Location Map 59 cars 74 cars 190 cars 222 cars) Not to Scale MacArthur at Dolphin Striker 4221 Dolphin Striker Way Newport Beach, CA RIDGEWAY DEVELOPMENT 2804LaCA926 3:Tel.1 949)723-5854 S T 0 U B 0 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 Alta Vista T 949 715 3257 Way Suite 1 00 Laguna Beach 1 F 949 715 3256 I www.stoulenboroughinc.com � u 92651 2 S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 Alfa Vista Way, Suite 100, La puno Bea y�. Lo 92651 T 949 715 3257 F 949 715 3256 www.sleule oroughin c.rom S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 Alfa Vista Way, Suite 100, La puns Beac . La 92651 T 949 715 3257 F 949 715 3256 www.sI auI roughi oc.rom S T 0 U T E N B 0 R 0 U G H A r c h i t e c t s a n d P l a n n e r s 420 Alfa Vista Way, Suite 100, La punn Beac . Fa 92651 T 949 715 3257 1 F 949 715 3256 1 www.s I a ufe o r o u 9 h i oc.rom G �r 7 F ` I.1' y iiY 1 r J rl IL �� Y a n T 0 U T E N B 0 R 0 U G H A r c h 1 t e c t s a n d P l a n n e r s 420 Alta V i s I a W V, Suite 100, Laguna 3 , Co 92651 T 949 715 3257 1 F 949 715 3256 1 www.sfa or o u g hi n<.ram IIAW e G �r 7 F ` I.1' y iiY 1 r J rl IL �� Y a n T 0 U T E N B 0 R 0 U G H A r c h 1 t e c t s a n d P l a n n e r s 420 Alta V i s I a W V, Suite 100, Laguna 3 , Co 92651 T 949 715 3257 1 F 949 715 3256 1 www.sfa or o u g hi n<.ram I� PAD B i lr 3 W Y oC 1- IZ ;I 1 1 =1 a. I J I 1O I 10 1 tx� 9 1 r 1 1 4 t PAD A l �N�•• r ) yy Ur�F•'A _ -_ - -.''i` h (Y I T i i: : �w DY l y I I -T MacARTHUR BLVD. Preliminary Plant Palette Landscape Documentation Package Note: F_Swtn_Ilw.f. Cwr,+n x.w bi AYMeMbusY511m Yb.Y. b1'H V1M514WM b14M.EbM � WnIIbObH pyPlMwml exN qrw! b..bbn t 1 bH WMw �� —��F FIFda.OVlleru &.rtlbb � �� xlews.v..wrx. err Landscape Areas. .1... F.P...SPP. 'd TOTAL SOE ANEA '. 1y.lA SP .ww ?PY9!P TMF AREA 1.735 3 F �I +miler ToA.Ppp.bro Fy. use Ob.YeM rawpPrl aF. TS...». On Y.aP.s b/. NWRO lAV0.Y WE �� NiEA TOTa TK '. B.YA eF MWVbP7WGM M•PnM• FM file.nllSAwl p�l'F>•M ..e W fiF.M15SIB1ECTb NAMC 17VAE%CEE082.sm N • 4 C. 1..1 T 1YATEA EFFICMM lA1OHGpE Cf 1pNFNCE' ..µnr O•l�•l• .x5�+w FP Mni.P lF. Preliminay Planting & Irrigation Concept Statement 1. PmMe Prro,e. avn uace plenl,re ceSMI •mice wnw^^,e %nw»'me. ..,w •.v�.e Fa I'mP.'.m5m.�y��.�ne.•o.w.br w.•'m... nNY E.°•°l,w�`Wwo fi 2, flwlEe. wMytlpa.mN'Ii YUp....'2n sA m.m'.n.'mta inu. . Pw 6r mbgnrinEamWOY wINHN�Ib 4vY Hm. ]. T room. op. •'N.cena.mwlaa.ybampoweHmm+enwem nF M'u.ml0 T4rY bQe.b.�b Inrd.bm wM MP 11Y bbtl IWI(igy b N'M y/bp Wl..ry.ppn U.na��b+.••� +pl V.�Ln 1. ea .. NIIWraq mpN.MM�b wlvmM NSrpwemenb mSY»in H O,a 4" rwIPM SP IMI.P>iBW PNUwe•NU pm Yb. M.Nn 6P .ww.nm'n+..We P. ASrn. Iw s. T1r Cmao.w tabSUw Fw �e.n p'.M.. h.,yl.MSe L�q.W •m.len W.n1"w�eN'IM•w.. / d.A.rb.YSbsbs Water Quality. Best Management Practices (B.M.P.) 1. Prlw.r nW.e..'.mpbwmHn.crap. blest ll.le.en FMl96.b.Ib Hlbll.oM.a. WFww Ws4M. 2 91Nf16WPj.bCFFfY011bHMYCpFYW bTWFIpMyIIYIOu awwolwF > rcF1ao+. noblbaao . >�F.berlaSOP....l..l...pwm. u..abxrPm.mprHI+Hl . wbbwn . blo.E.'I bNelpabY. a bbmlbleA'ybl'nFSp.mu.IU1M�bW NbFIW..Pb YYIOyrt RM9 MJSDesign Group. 1dW5 mA'tlIMC11Fe I.NbWS r.IWIOFbN Mx.+rwemn np.Cr MacArthur at Dolphin Striker 4221 adphin Slrr'.r Way N•wpprl emd. G Ridgeway Development 28041okWU Aw, Nw.ppn 0.6 wary ��ia7 `tE FF 41.T 1,11 3 leru. wr NW bombe OWMM NnNr Upl' 4 IIIF'�I' TN PREMILINARY LANDSCAPE PLAN P..b LS �>W C ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact' as indicated by the checklist on the following pages. ❑ Aesthetics • Biological Resources • Greenhouse Gas Emissions • Land Use & Planning • Population & Housing • Transportation/ Circulation ❑ Agriculture & Forest Resources • Cultural Resources • Hazards & Hazardous Materials ❑ Mineral Resources ❑ Public Services ❑ Utilities & Service Systems ❑ Air Quality ❑ Geology & Soils ❑ Hydrology & Water Quality ❑ Noise ❑ Recreation ❑ Mandatory Findings of Significance DETERMINATION (To be completed by the Lead Agency.) On the basis of this initial evaluation: ❑ I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. 21 1 find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. ❑ 1 find that the proposed project MAY have a significant effect on the environment, and ENVIRONMENTAL IMPACT REPORT is required. ❑ I find that the proposed project MAY have a significant effect(s) on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets, if the effect is a "potentially significant impact' or "potentially significant unless mitigated." An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. ❑ 1 find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards and (b) have been avoided or mitigated pursuant to 2� WI that earlier EIR, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. 15 CITY OF NEWPORT BEACH ENVIRONMENTAL CHECKLIST I. AESTHETICS Would the project: a) Have a substantial adverse effect on a scenic vista? b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? C) Substantially degrade the existing visual character or quality of the site and its surroundings? d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? II. AGRICULTURE AND FOREST RESOURCES Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non - agricultural use? b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? Potentially Less Than Significant Significant Impact with Mitigation Incorporated Less than No Significant Impact Impact ❑ ❑ ❑ 0 ❑ ❑ 2 ❑ ❑ ❑ 0 ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ 0 10 C) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))? d) Result in the loss of forest land or conversion of forest land to non - forest use e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non- agricultural use or conversion of forest land to non - forest use? III. AIR QUALITY Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? b) Violate any air quality standard or contribute to an existing or projected air quality violation? C) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non - attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? d) Expose sensitive receptors to substantial pollutant concentrations? e) Create objectionable odors affecting a substantial number of people? IV. BIOLOGICAL RESOURCES Would the Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated ❑ ❑ ❑ Z ❑ ❑ ❑ 0 ❑ ❑ ❑ 0 ❑ ❑ ❑ 2 ❑ ❑ Q ❑ ❑ ❑ Q ❑ ❑ ❑ 0 ❑ ❑ ❑ 0 ❑ 17 Would the project: W Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated a) Have a substantial adverse effect, ❑ ❑ ❑ 0 either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? b) Have a substantial adverse effect ❑ ❑ ❑ 0 on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? C) Have a substantial adverse effect on ❑ ❑ ❑ 2 federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? d) Interfere substantially with the ❑ ❑ ❑ D movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impeded the use of native wildlife nursery sites? e) Conflict with any local policies or ❑ ❑ ❑ 0 ordinances protecting biological resources, such as a tree preservation policy or ordinance? f) Conflict with the provisions of an ❑ ❑ ❑ adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? V. CULTURAL RESOURCES Would the project: W 19 Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated a) Cause a substantial adverse ❑ ❑ ❑ Q change in the significance of a historical resource as defined in §15064.5? b) Cause a substantial adverse ❑ Q ❑ ❑ change in the significance of an archaeological resource pursuant to §15064.5? C) Directly or indirectly destroy a ❑ Q ❑ ❑ unique paleontological resource or site or unique geologic feature? d) Disturb any human remains, ❑ ❑ Q ❑ including those interred outside of formal cemeteries? VI. GEOLOGY AND SOILS Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake ❑ ❑ ❑ Q fault, as delineated on the most recent Alquist - Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. ii) Strong seismic ground shaking? ❑ ❑ Q ❑ iii) Seismic - related ground failure, ❑ ❑ Q ❑ including liquefaction? iv) Landslides? ❑ ❑ ❑ Q b) Result in substantial soil erosion or ❑ ❑ Q ❑ the loss of topsoil? 19 C) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project and potentially result in on- or off -site landslide, lateral spreading, subsidence, liquefaction or collapse? d) Be located on expansive soil, as defined in Table 18- 1 -B of the Uniform Building Code (1994), creating substantial risks to life or property? e) Have soils incapable of adequately supporting the use septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? VII. GREENHOUSE GAS EMISSIONS Would the project: a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases? VIII. HAZARDS AND HAZARDOUS MATERIALS Would the project: a) Create a significant hazard to the public or the environment through routine transport, use, or disposal of hazardous materials? b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated ❑ ❑ Rl ❑ ❑ D ❑ ❑ ❑ ❑ ❑ 0 ❑ ❑ 2 ❑ ❑ ❑ Q ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ 21 ME Would the project: a) Violate any water quality standards ❑ ❑ Q ❑ or waste discharge requirements? 21 Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated C) Emit hazardous emissions or ❑ ❑ ❑ handle hazardous or acutely hazardous materials, substances, or waste within one - quarter mile of an existing or proposed school? d) Be located on a site which is ❑ ❑ ❑ 0 included on a list of hazardous materials sites which complied pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? e) For a project within an airport land ❑ ❑ D ❑ use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? f) For a project within the vicinity of a ❑ ❑ ❑ 2 private airstrip, would the project result in a safety hazard for people residing or working in the project area? g) Impair implementation of or ❑ ❑ ❑ 2 physically interfere with an adopted emergency response plan or emergency evacuation plan? h) Expose people or structures to a ❑ ❑ ❑ 0 significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? IX. HYDROLOGY AND WATER QUALITY Would the project: a) Violate any water quality standards ❑ ❑ Q ❑ or waste discharge requirements? 21 22 Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated b) Substantially deplete groundwater ❑ ❑ B ❑ supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre- existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? C) Substantially alter the existing ❑ ❑ 0 ❑ drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off -site? d) Substantially alter the existing ❑ ❑ 0 ❑ drainage pattern of the site or area, including through the alteration of a course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on or off -site? e) Create or contribute runoff water ❑ ❑ Q ❑ which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? f) Otherwise substantially degrade ❑ ❑ Q ❑ water quality? g) Place housing within a 100 -year ❑ ❑ ❑ 0 flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? h) Place within a 100 -year flood ❑ ❑ ❑ hazard area structures which would impede or redirect flood flows? 22 i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam? j) Inundation by seiche, tsunami, or mudflow? X. LAND USE AND PLANNING Would the proposal: a) Physically divide an established community? b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? C) Conflict with any applicable habitat conservation plan or natural community conservation plan? XI. MINERAL RESOURCES Would the project: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? b) Result in the loss of availability of a locally- important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? XII. NOISE Would the project result in: Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated ❑ ❑ ❑ Z ❑ ❑ ❑ 0 ❑ ❑ ❑ 2 ❑ ❑ ❑ 0 ❑ ❑ ❑ 0 23 rr Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated a) Exposure of persons to or ❑ Q ❑ ❑ generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? b) Exposure of persons to or ❑ ❑ Q ❑ generation of excessive groundborne vibration or groundborne noise levels? C) A substantial permanent increase in ❑ ❑ Q ❑ ambient noise levels in the project vicinity above levels existing without the project? d) A substantial temporary or periodic ❑ ❑ Q ❑ increase in ambient noise levels in the project vicinity above levels existing without the project? e) For a project located within an ❑ ❑ Q ❑ airport land use land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? f) For a project within the vicinity of a ❑ ❑ ❑ Q private airstrip, would the project expose people residing or working in the project area to excessive noise levels? XIII. POPULATION AND HOUSING Would the project: a) Induce substantial population ❑ ❑ Q ❑ growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? b) Displace substantial numbers of ❑ ❑ ❑ Q existing housing, necessitating the construction of replacement housing elsewhere? rr C) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? XIV. PUBLIC SERVICES Would the project: a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered government facilities, need for new or physically altered government facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? Police protection? Schools? Other public facilities? XV. RECREATION Would the project: a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? b) Does the project include recreational facilities or require the construction of or expansion of recreational facilities which might have an adverse physical effect on the environment? opportunities? XVI. TRANSPORTATION /TRAFFIC Would the project: Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated ❑ ❑ ❑ z ❑ ❑ lz ❑ ❑ ❑ lz ❑ ❑ ❑ lz ❑ ❑ ❑ Q ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ z 25 a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass transit and non - motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit? b) Conflict with an applicable congestion management program, including, but not limited to level of service standard and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways? C) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? e) Result in inadequate emergency access. f) Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities? XVII. UTILITIES & SERVICE SYSTEMS Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated ❑ ❑ Q ❑ ❑ ❑ Q ❑ ❑ ❑ ❑ Q ❑ ❑ Q ❑ Would the project: a) Exceed wastewater treatment ❑ ❑ Q ❑ requirements of the applicable Regional Water Quality Control Board? 20 b) Require or result in the construction of new water or wastewater Potentially treatment facilities or expansion of Less than No existing facilities, the construction of Significant which could cause significant Impact environmental effects? C) Require or result in the construction Incorporated of new storm water drainage ❑ facilities or expansion of existing B ❑ facilities, the construction of which could cause significant environmental effects? d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? e) Result in a determination by the wastewater treatment provider, which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? g) Comply with federal, state, and local statutes and regulation related to solid waste? XVIII. MANDATORY FINDINGS OF SIGNIFICANCE. Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated ❑ ❑ B ❑ ❑ ❑ 0 ❑ ❑ ❑ 0 ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ 0 27 This section of the Initial Study evaluates the potential environmental impacts of the proposed project and provides explanations of the responses to the Environmental Checklist. The environmental analysis in this section is patterned after the questions in the Environmental Checklist. Under each issue area, a general discussion of the existing conditions is provided according to the environmental analysis of the proposed Project's impacts. To each question, there are four possible responses: No Impact. The proposed project will not have any measurable environmental impact on the environment. Less -Than Significant Impact. The proposed project will have the potential for impacting the environment, although this impact will be below thresholds that may be considered significant. Mod Potentially Less Than Less than No Significant Significant Significant Impact Impact with Mitigation Impact Incorporated a) Does the project have the potential ❑ ❑ ❑ z to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self - sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major period of California history or prehistory? b) Does the project have impacts that ❑ ❑ 0 ❑ are individually limited, but cumulatively considerable? ( "Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.) C) Does the project have ❑ ❑ 0 ❑ environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? This section of the Initial Study evaluates the potential environmental impacts of the proposed project and provides explanations of the responses to the Environmental Checklist. The environmental analysis in this section is patterned after the questions in the Environmental Checklist. Under each issue area, a general discussion of the existing conditions is provided according to the environmental analysis of the proposed Project's impacts. To each question, there are four possible responses: No Impact. The proposed project will not have any measurable environmental impact on the environment. Less -Than Significant Impact. The proposed project will have the potential for impacting the environment, although this impact will be below thresholds that may be considered significant. Mod Less -Than Significant With Mitigation Incorporated. The proposed project will have potentially significant adverse impacts which may exceed established thresholds; however, mitigation measures or changes to the proposed project's physical or operational characteristics will reduce these impacts to levels that are less than significant. Those mitigation measures are specified in the following sections. Each recommended mitigation measure has been agreed to by the applicant. Potentially Significant Impact. The proposed project will have impacts that are considered potentially significant and additional analysis is required to identify mitigation measures that could reduce these impacts to insignificant levels. When an impact is determined to be potentially significant in the preliminary analysis, the environmental issue will be subject to detailed analysis in an environmental impact report (EIR). �9 I. AESTHETICS. a) Have a substantial adverse effect on a scenic vista? No Impact. The proposed project would not affect a scenic vista. The project site is not identified as a public view point by the City of Newport Beach General Plan. The project site is located within a business park developed with a mixture of low -, medium -, and high -rise offices, retail, restaurant, hotel uses, and surface parking and parking structures. The proposed demolition of an existing 7,996 square -foot restaurant and construction of the single -story, 13,525 square -foot commercial buildings would not obstruct views from any public viewpoint. Therefore, as there are no scenic vistas in the general proximity of the project site, no impacts would occur. b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? Less -Than Significant Impact. The project site contains a number of mature, ornamental trees in landscaped medians and parkways. Some of the trees will be removed by the development. However, this will not significantly reduce the number of trees in the project area and the Newport Place Planned Community Development Standards require trees to be planted in setback and parking areas. Trees in parking areas are to be planted at a ratio of one (1) tree per each five (5) parking stalls. The project site and the surrounding project area does not contain of any rock outcroppings or historic buildings. Furthermore, there are no designated scenic highways in the vicinity of the proposed project (California Department of Transportation 2009). Therefore, the proposed project would not damage a scenic resource along a scenic highway, and no impacts would occur. c) Substantially degrade the existing visual character or quality of the site and its surroundings? Less -Than Significant Impact. The proposed project would not adversely affect the existing visual character or quality of the site and its surroundings because the project site is located within a business park developed with a mixture of low -, medium -, and high -rise offices, retail, restaurant, hotel uses, and surface parking and parking structures. The proposed construction of two, single -story commercial buildings totaling 13,525 square feet would blend in with the existing character of the area and surrounding land uses. The proposed materials for the project are smooth troweled integral tan color plaster, simulated wood composite siding, glass and metal, which are compatible with the contemporary materials and architectural styles of the surrounding development. 3D d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? Less -Than Significant Impact. The proposed project is located in an area that is developed with a mixture of low -, medium -, and high -rise offices, retail, restaurant, hotel uses, and surface parking and parking structures. The existing parking lot is lighted for nighttime parking for safety purposes. Any lighting associated with the proposed project would be similar to the existing lighting in the area, and would not add substantial amounts of lighting to the area. Impacts would be less than significant. IL AGRICULTURE AND FOREST RESOURCES. In determining whether impacts to agricultural resources are significant effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Department of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state's inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non - agricultural use? No Impact. The proposed project would not convert any farmland to a non- agricultural use. The project site is not designated as Prime Farmland, Farmland of Statewide Importance, Unique Farmland, or Farmland of Local Importance (California Department of Conservation 2009). The project site and the surrounding land are identified as "urban and built -up land" by the California Department of Conservation's Farmland Mapping and Monitoring Program. The project site is located within an existing fully developed commercial setting with no agricultural uses on or surrounding the site. Therefore, no impacts would occur. b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? No Impact. The Williamson Act applies to parcels consisting of at least 20 acres of Prime Farmland or at least 40 acres of farmland not designated as Prime Farmland. The project site is approximately 1.11 acres in area and is not designated as Prime Farmland. It is located within a fully developed commercial area and is currently zoned for Restaurant Use within the Newport Place Planned 31 Community. Additionally, upon approval of the proposed amendment to change the Zoning designation of the subject site from Restaurant Site 1 to General Commercial Site 8, Agricultural uses are and will not be allowed within these zoning designations. Because the site is not eligible to be placed under a Williamson Act contract, no impacts would occur. c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))? No Impact. The proposed project would not conflict with existing zoning or cause rezoning of forest land. The project site is located within a fully developed commercial area, which is not near any forested lands. Therefore, no impacts would occur. d) Result in the loss of forest land or conversion of forest land to non - forest use? No Impact. The project site is located within a fully developed commercial area, which is not near any forested lands. Therefore, no impacts would occur. e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non- agricultural use or conversion of forest land to non - forest use? No Impact. The proposed project would not result in the conversion of farmland to non - agricultural use, nor result in the conversion of forest land to non - forest use. The project site is not currently used for agriculture and is not located within any forested lands. It is not located near or adjacent to any areas that are actively farmed or used for forest land. Therefore, the proposed project would not disrupt or damage the operation or productivity of any areas designated as farmland or forest land, and no farmland or forest land would be affected by the proposed project. Therefore, no impacts would occur. III. AIR QUALITY. The proposed project site is located in the South Coast Air Basin (Basin). The air quality assessment includes estimating emissions associated with short -term construction and long -term operation of the proposed project. Long -term impacts include impacts from pollutants with regional effects and pollutants with localized impacts. The impact analysis contained in this section was prepared in accordance with the methodologies provided by the SCAQMD in its CEQA Air Quality Handbook. Air quality model data are provided in Appendix G (South Coast AQMD Air District, CalEEMod Emissions Data (Summer, Winter & Annual Emissions) June 15, 2011). 32 a) Conflict with or obstruct implementation of the applicable air quality plan? No Impact. The South Coast Air Quality Management District (SCAQMD) is required, pursuant to the Federal Clean Air Act, to reduce emissions of criteria pollutants for which the Basin is in nonattainment (i.e., ozone [03], and particulate matter equal to or less than 10 and less than 2.5 microns in diameter [PM10 and PM2.e, respectively]). As such, the project would be subject to the SCAQMD's 2007 Air Quality Management Plan (AQMP). The AQMP contains a comprehensive list of pollution control strategies directed at reducing emissions and achieving ambient air quality standards. These strategies are developed, in part, based on regional population, housing, and employment projections prepared by the Southern California Association of Governments (SCAG). SCAG is the regional planning agency for Los Angeles, Orange, Ventura, Riverside, San Bernardino, and Imperial Counties and addresses regional issues relating to transportation, economy, community development, and the environment. With regard to air quality planning, SCAG has prepared the Regional Comprehensive Plan (RCP), which includes Growth Management and Regional Mobility chapters that form the basis for the land use and transportation control portions of the AQMP. These documents are used in the preparation of the air quality forecasts and consistency analysis included in the AQMP. Both the RCP and AQMP are based, in part, on projections originating with County and City General Plans. The proposed project is redevelopment of an approximately 48,221 square -foot site. Approximately 13,525 square feet of new retail and food uses will replace an existing single -story 7,996 square -foot vacant restaurant. Site grading for the subject property will include the importation of 407 cubic yards of soil to prepare the project site for construction. The SCAQMD has established methods to quantify air emissions associated with construction activities such as air pollutant emissions generated by operation of on -site construction equipment; fugitive dust emissions related to grading and site work activities; and mobile (tailpipe) emissions from construction worker vehicles and haul /delivery truck trips. Emissions would vary from day to day, depending on the level of activity, the specific type of construction activity occurring, and, for fugitive dust, prevailing weather conditions. Projects, such as this one, that are consistent with the local general plan are considered consistent with the Air Quality Management Plan (AQMP). The proposed project would not emit either short- or long -term quantities of criteria pollutants which exceed the SCAQMD's air quality significance thresholds (See Appendix H, SCAQMD Air Quality Significance Thresholds, Revised March, 2011). The thresholds in III(b) and (c) are based on the AQMP and are designed to bring the Basin into attainment for the criteria pollutants for which it is in nonattainment. The SCAQMD does not consider projects which result in 33 emissions below the SCAQMD significance thresholds to interfere with the goals established in the AQMP. Emissions generated by construction and operation would not exceed SCAQMD thresholds as demonstrated in Table 3.1, Table 3.2, and the analysis in III (b). Therefore, because the proposed project does not exceed any of the thresholds it will not conflict with SCAQMD's goal of bringing the Basin into attainment for all criteria pollutants and, as such, is consistent with the AQMP. Therefore, no significant impact to the AQMP will occur as a result of the proposed project. No mitigation measures are necessary. b) Violate any air quality standard or contribute to an existing or projected air quality violation? Less -Than Significant Impact. As discussed in Response III (a), the proposed project site is located in the Basin. State and federal air quality standards often are exceeded in many parts of the Basin. The proposed project involves amendments to the planned community text and a transfer of development rights which would not in themselves result in any construction or operational impacts. However, the proposed project would result in the construction of two commercial retail buildings totaling 13,525 square feet in area. For the purposes of estimating construction and operational emissions, the project plans as described in the project description are used to determine potential impacts on air quality. A mass emissions inventory for the construction period was compiled based on an estimate of construction equipment as well as scheduling and phasing assumptions. More specifically, the mass emissions analysis takes into account: ❑ combustion emissions from operating on -site construction equipment, ❑ fugitive dust emissions from moving soil on site, and ❑ mobile- source combustion emissions from worker commute travel. For the purpose of estimating emissions associated with the construction activities, a project time frame of January 2012 through July 2012 was assumed. The quantity, duration, and the intensity of construction activity have an effect on the amount of construction emissions, and related pollutant concentrations, occurring at any one time. As such, the emission forecasts provided herein reflect a specific set of conservative assumptions based on the expected construction scenario wherein a relatively large amount of construction is occurring in a relatively intensive manner. Because of this conservative assumption, actual emissions could be less than those forecasted. If construction is delayed or occurs over a longer time period, emissions could be reduced because of (1) a more modern and cleaner- burning construction equipment fleet mix, and /or (2) a less intensive build -out schedule (i.e., fewer daily emissions occurring over a longer time interval). Air pollutant emissions associated with the project could occur over the short- term for site preparation and construction activities. In addition, emissions would 3-¢ result from the long -term operation of the completed project from facility - related energy consumption and automobile traffic traveling to and from the project site. A discussion of the project's potential short-term construction - period and long- term operational - period air quality impacts is provided below. Short-Term Air Quality Impacts With respect to the proposed project, construction activities are expected to begin in January of 2012, and extend over a period of approximately seven months. Construction activities during this period would be completed in five main phases. The first phase would consist of the demolition of the existing restaurant building over a period of two weeks. The second phase would consist of general grading and site preparation over a period of approximately three weeks. The third phase would consist of the construction of the two new retail and restaurant, and bank buildings over a 16 -week duration. The fourth phase would consist of asphalting of the project site and the fifth and final phase would consist of architectural finishing including stucco and paint for the newly constructed buildings. Phase four and five would take two weeks and five weeks, respectively. These construction emissions were estimated using the SCAQMD's CaIEEMod.2011.1.1 and are included in Table 3.1; the model run is included in Appendix G. Table 3.1 Maximum Daily Construction Emissions Source Pollutants (Ibs /day) (Construction Phase) CO NOX VOC S02 PM10 PM2.5 Demolition 19 34 5 <0.1 3 2 Grading & Site Preparation Building Construction Asphalting Architectural Finishing SCAQMD Regional Emissions Threshold (Ibs /day) Exceed Threshold? 26 42 6 <0.1 8 6 19 28 6 <0.1 2 2 13 20 4 <0.1 2 2 2 4 47 <0.1 1 1 550 100 75 150 150 55 No Yes No No No No CO = carbon monoxide. NOX = oxides of nitrogen. VOC = volitile organic compounds (ref: CalEEMod ROG: Reactive Organic Gases) S02 = sulfer oxides. PM10 = particulate matter equal to or less than 10 microns in diameter. PM2.5 = particulate matter less than 2.5 microns in diameter. • Source: CalEEMod 2011 Version 1.1. • N /A: Not Applicable • Construction equipment mix provided by the applicant in the Construction Phasing Table. S5 . Fugitive dust emissions assumes application of Rule 403, which includes replacing ground cover as quickly as possible, watering exposed surfaces two times daily, equipment loading /unloading measures, and reducing vehicle speeds on unpaved roads to less than 15 miles per hour. As shown in the table above, all emissions are less than their respective SCAQMD threshold values. Short-term impacts due to daily construction impacts are less than significant and no mitigation measures are necessary. Long -Term Operational - Related Impacts Long -term air pollutant emissions generated by the project would be associated with project - related vehicle trips and stationary- source emissions generated on- site by sources such as fireplaces, paint, gas stoves, and fuel consumed for landscaping activities. Long -term air quality impacts are typically associated with the emissions produced by project - generated vehicle trips which are estimated by the Institute of Transportation Engineers (ITE). The proposed development will not exceed the threshold for SCAQMD air quality significance as pointed out in Table 3.2 for operational emissions. Table 3.2 Maximum Daily Operational Emissions Source Pollutants (Ibs /day) PM2. (Construction Phase) CO NOX VOC S02 PM10 5 Vehicle Emissions 100 27 11 1 16 2 SCAQMD Regional Emissions Threshold (Ibs /day) 550 55 55 150 150 55 Exceed Threshold? No No No No No No CO = carbon monoxide. NOx = oxides of nitrogen. VOC = volitile organic compounds (ref: CalEEMod ROG: Reactive Organic Gases) S02 = sulfer oxides. PMto = particulate matter equal to or less than 10 microns in diameter. PM2.5 = particulate matter less than 2.5 microns in diameter. . Source: CalEEMod 2011 Version 1.1. . N /A: Not Applicable • VOC: Volatile Organic Compounds (ref: CalEEMOd ROG: Reactive Organic Gases) • Construction equipment mix provided by the applicant in the Construction Phasing Table. • Fugitive dust emissions assumes application of Rule 403, which includes replacing ground cover as quickly as possible, watering exposed surfaces two times daily, equipment loading /unloading measures, and reducing vehicle speeds on unpaved roads to less than 15 miles per hour. so Long -term impacts due to daily operational emissions are less than significant and no mitigation measures are necessary. c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? Less -Than Significant Impact. SCAQMD's approach for assessing cumulative impacts is based on the AQMP forecasts of attainment of ambient air quality standards in accordance with the requirements of the Federal and State Clean Air Acts. In accordance with SCAQMD methodology, any project that does not exceed or can be mitigated to less than the daily threshold values does not add significantly to a cumulative impact. The South Coast Air Basin (SoCAB) is designated as a non - attainment area for ozone and particulates (PM10 and PM2.5) under the state and federal Ambient Air Quality Standards (AAQS). Air pollutant modeling for construction emissions demonstrates that the project implementation would not exceed the SCAQMD's construction phase pollutant thresholds. As discussed earlier in Response III(a), the proposed project would be consistent with the AQMP, which is intended to bring the Basin into attainment for all criteria pollutants. The operational emissions, which include vehicular trips, will not exceed the SCAQMD thresholds as pointed out in the Operational Emissions in Table 3.2. No mitigation measures are necessary. d) Expose sensitive receptors to substantial pollutant concentrations? Less -Than Significant Impact. The subject site is located in a planned community surrounded by commercial office and retail buildings. Although sensitive receptors are located in the vicinity of the site, the greatest amount of pollutants generated by the proposed project will occur during the construction phase. The emissions will be comprised of mostly dirt and dust particles as the subject site is graded and the new building are constructed. However, such emissions will be controlled through the implementation of standard conditions, best management practices, and rules prescribed by the South Coast Air Quality Management District and will be short-term. As described in Response III(b) above, construction and operation of the proposed project would not result in any substantial localized or regional air pollution impacts; and therefore, would not expose any nearby sensitive receptors to substantial pollutant concentrations. The emissions released from operations after the construction phase is completed will predominantly be comprised by vehicle trips which will not be a significant impact as pointed out in the Maximum Daily Operational Emissions, Table 3.2, above. Therefore, project implementation will not adversely affect sensitive receptors and no mitigation measures are necessary. 37 e) Create objectionable odors affecting a substantial number of people? Less -Than Significant Impact. Project construction would involve the use of heavy equipment creating exhaust pollutants from on -site earth movement and from equipment bringing materials to the site. With regard to nuisance odors, any air quality impacts would be confined to the immediate vicinity of the equipment itself. According to the SCAQMD CEQA Air Quality Handbook, land uses associated with odor complaints typically include agricultural uses, wastewater treatment plants, food processing plants, chemical plants, composting, refineries, landfills, dairies, and fiberglass molding. The proposed project includes the construction of 13,525 square feet of retail, restaurant, and bank development within two single - story freestanding buildings. Therefore, the proposed project does not include any uses listed above and identified by the SCAQMD as being associated with odors. The proposed project would not produce objectionable odors per the SCAQMD Handbook. Potential sources of odors during construction activities include equipment exhaust and the use of architectural coatings and solvents. Odors from these sources would be localized and generally confined to the proposed project site. The proposed project would utilize typical construction techniques, and the odors would be typical of most construction sites. Additionally, the odors would be temporary, occurring when equipment is operating and during painting activities. Construction activities associated with the proposed project would be required to comply with SCAQMD Rule 402 on nuisances. Additionally, SCAQMD Rule 1113 limits the amount of volatile organic compounds in architectural coatings and solvents. Through mandatory compliance with SCAQMD rules, no construction activities or materials are proposed that would create a significant level of objectionable odors. As such, potential impacts during short-term construction would be less than significant. By the time such emissions or odors reach any sensitive receptor sites away from the project site, they are typically diluted to well below any level of air quality concern. Such emissions and odors are an adverse, but not significant impact. Mitigation measures are not necessary as the impacts of emissions and odors are less than significant. IV. BIOLOGICAL RESOURCES. a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? ON No Impact. Although the proposed project would remove some of the existing ornamental trees and hedges existing on the site, it would not have a substantial adverse effect on any candidate, sensitive, or special- status species. The project site is adjacent to MacArthur Boulevard and consists of a surface parking area with landscaped medians and a vacant 7,996 square foot building. It is located within a fully developed commercial and office park development with a mixture of low -, medium -, and high -rise offices, retail, restaurant, hotel uses, and surface parking and parking structures. According to Figure NR2 of the City of Newport Beach General Plan Natural Resources Element, the project site is not located within an Environmental Study Area (City of Newport Beach 2006). A visit to the site confirmed that the project site is void of any native vegetation or wildlife habitat. Therefore, the proposed project would not modify habitat or adversely affect sensitive biological resources, and no impacts would occur. b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? No Impact. The proposed project would not have an adverse effect on any riparian habitat. Per Figure NR2 of the City of Newport Beach General Plan Natural Resources Element, the project site is not located within an Environmental Study Area (City of Newport Beach 2006). The project site is a fully developed site consisting of a surface parking area, narrow strips of landscaped areas, and an existing building. It is void of any riparian habitat or other sensitive natural community and no impacts would occur. c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? No Impact. The project site is fully developed and consists of a surface parking area, narrow strips of landscaped areas, and an existing building. There are no federal wetlands or jurisdictional waters present on site or in the general vicinity. Therefore, no impacts would occur. d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impeded the use of native wildlife nursery sites? No Impact. The proposed project would not interfere with the movement of fish or wildlife. The project site is located within a fully developed commercial and office park area and is not connected to other undeveloped lands. According to Figures NR1 and NR2 of the City of Newport Beach General Plan Natural Resources Element, the project site is not identified as a biological resources area, nor is it located in an Environmental Study Area (City of Newport Beach 3J° 2006) and the site is not connected to any wildlife corridors. Therefore the project site is not considered a part of a regional wildlife corridor that would facilitate movement of wildlife species from one area to another. Therefore, no impacts would occur. e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? No Impact. The project site does not contain any biological resources that are protected by local policies. According to the City off Newport Beach General Plan Natural Resources Element, the project site is not located in an area where sensitive and rare terrestrial and marine resources occur (City of Newport General Plan 2006). Furthermore, according to the County of Orange General Plan Resources Element, the project site is not located within the boundaries of the Orange County Natural Communities Conservation Plan or Habitat Conservation Plan (NCCP /HCP), (County of Orange 2005). The proposed project would not conflict with any local policies or ordinances protecting biological resources; therefore, no impacts would occur. f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? No Impact. The City of Newport Beach is a signatory to a Natural Resource Community Conservation Plan agreement. However, according to Figure VI -5 of the Resources Element of the Orange County General Plan, the project site is not located within a designated Natural Communities Conservation Plan area or Habitat Conservation Plan (NCCP /HCP), (City of Newport Beach General Plan 2006, County of Orange 2005). Therefore, the proposed project would not be subject to the provisions of any local, regional, or state habitat conservation plan or Natural Communities Conservation Plan or Habitat Conservation Plan area, and no impacts would occur. VR01111k i11:L10 N *ie111:Zd N" a) Cause a substantial adverse change in the significance of a historical resource as defined in §15064.5? No Impact. The 1.11 -acre project site is developed with a single -story, 7,996 - square -foot restaurant, surface parking, and landscaped areas. Aerial photographs depict the project site and surrounding area as vacant grassland in 1952; rough - graded for the existing development in 1972; and as currently developed in 1980. These changes correlate in time with the approval of the Newport Place Planned Community in December 1970 by the City, which includes the project site. Building permits were issued in 1972 for the construction of the existing restaurant building according to the City's building records and was completed in 1973 per County Tax Assessor records. Thus, the existing building and surrounding buildings are at most 40 years old. Built LUP environment resources constructed after 1960, unless extraordinarily important, are not considered of sufficient age to warrant listing in the California Register of Historic Resources. There are no historical structures on the project site listed on any local, state, or national historical registers, nor any determined to be eligible for listing as a significant historical resource, according to the Historical Resources Element of the Newport Beach General Plan (City of Newport Beach 2006). Because there are no historical structures on the project parcel, no impacts would occur. b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5? Less -Than Significant Impact with Mitigation Incorporated. Because there is no surface exposure in the project site, no archaeological resources survey was performed for this project. The project site has undergone grading for construction of the existing restaurant building and surface parking lot, as well as for the other, adjacent buildings and surface parking lots. A geotechnical engineering investigation (Appendix B) conducted for the project indicated artificial fill over native soils on the existing pads varying from 0.5 feet to 1.5 feet. Ground disturbances from these previous developments likely would have inadvertently destroyed any unknown archeological resources present. The proposed project would involve limited surface soil disturbance and grading to an approximate depth of 3 feet to prepare for the building foundations. Therefore, it is highly unlikely the proposed project would disturb any unknown archaeological resources, and impacts would be less than significant. However, adhering to the following mitigation measure would ensure compliance with state historical guidelines. Impacts would be less than significant with incorporation of mitigation. Mitigation Measure 5.1. The project applicant shall have a qualified professional archaeologist on site to monitor for any potential impacts to archaeological or historic resources throughout the duration of any demolition and ground disturbing activities. The professional archeologist shall have the authority to halt any activities adversely impacting potentially significant cultural resources until the resources can be formally evaluated. The archaeologist must have knowledge of both prehistoric and historical archaeology. Additionally, the archaeological monitoring program shall include the presence of a local Native American representative (Gabrielino and /or Juaneno). Resources must be recovered, analyzed in accordance with CEQA guidelines, and curated. Suspension of ground disturbance in the vicinity of the discoveries shall not be lifted until the archaeologist has evaluated discoveries to assess whether they are classified as historical resources or unique archaeological sites, pursuant to CEQA. c) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? 41 Less -Than Significant Impact with Mitigation Incorporated. The project site is situated on late to middle Pleistocene marine deposits, which can be highly fossiliferous, containing vertebrate, invertebrate, and plant fossil specimens. The project site has undergone grading for construction of the existing restaurant building and surface parking lot, as well as for the other, adjacent buildings and surface parking lots. A geotechnical engineering investigation (Appendix B) conducted for the project indicated artificial fill over native soils on the existing pads varying from 0.5 feet to 1.5 feet. Therefore, it is highly unlikely the proposed project would disturb any paleontological resources. With adherence to the mitigation measure below, impacts would be less than significant and impacts would be less than significant. Mitigation Measure 5.2. The project applicant shall retain a qualified professional paleontologist for periodic monitoring for any potential impacts to paleontological resources throughout the duration of ground disturbing activities. In the event paleontological resources are uncovered, the professional paleontologist shall have the authority to halt any activities adversely impacting potentially significant fossil resources until the resources can be formally evaluated. If potentially significant fossils are uncovered they must be recovered, analyzed in accordance with CEQA guidelines, and curated at facilities at the Natural History Museum of Los Angeles County, or other scientific institution accredited for curation and collection of fossil specimens. Suspension of ground disturbances in the vicinity of the discoveries shall not be lifted until the paleontologist has evaluated the significance of the resources pursuant to CEQA. d) Disturb any human remains, including those interred outside of formal cemeteries? Less - Than - Significant Impact. The project site is not a formal cemetery and is not adjacent to a formal cemetery. The project site is not known to contain human remains interred outside formal cemeteries, nor is it known to be located on a burial ground. The proposed project would involve limited surface soil disturbance and grading to an approximate depth of 3 feet to prepare for the building foundations. A geotechnical engineering investigation (Appendix B) conducted for the project indicated artificial fill over native soils on the existing pads varying from 0.5 feet to 1.5 feet. Therefore, it is highly unlikely that construction of the proposed project would disturb any human remains. Should human remains be uncovered during construction, as specified by State Health and Safety Code Section 7050.5, no further disturbance will occur until the County Coroner has made the necessary findings as to origin and disposition pursuant to Public Resources Code 5097.98. If such a discovery occurs, excavation or construction will halt in the area of the discovery, the area will be protected, and consultation and treatment will occur as prescribed by law. If the Coroner recognizes the remains to be Native American, he or she will contact the 4 Native American Heritage Commission, who will appoint the Most Likely Descendent. Additionally, if the bones are determined to be Native American, a plan will be developed regarding the treatment of human remains and associated burial objects, and the plan will be implemented under the direction of the Most Likely Descendent. Therefore, impacts would be less than significant. VI. GEOLOGY AND SOILS. a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist - Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. No Impact. The project site is not included in any earthquake fault zones as delineated by the Alquist - Priolo Earthquake Fault Zone Act. The principal seismic hazard to the subject property and proposed project is strong ground shaking from earthquakes produced by local faults. Secondary effects such as surface rupture, lurching, or flooding are not considered probable (Appendix B). Therefore, no impacts on the project would result from fault rupture. ii) Strong seismic ground shaking? Less -Than Significant Impact. Southern California is located in an active seismic region. Moderate to strong earthquakes can occur on numerous faults. The United States Geological Survey, California Division of Mines and Geology, private consultants, and universities have been studying earthquakes in Southern California for several decades. The purpose of the code seismic design parameters is to prevent collapse during strong ground shaking. Cosmetic damage should be expected. The principal seismic hazard to the subject property and proposed project is strong ground shaking from earthquakes produced by local faults. Secondary effects such as surface rupture, lurching, or flooding are not considered probable (Appendix B). An approximately 13,525 gross square feet of new commercial retail and food uses are proposed to replace the existing single -story 7,996 square -foot vacant restaurant. The new development will consist of two, free - standing, single -story buildings. Each has a maximum building height of 29 feet. All demolition and construction would occur in accordance with building and safety standards as specified by the City. The proposed buildings would be constructed in compliance with the latest earthquake- resistant design available and relevant codes. All proposed project components would be in compliance with the most up -to -date building codes. Plans would be reviewed and approved by the City prior to issuance of grading and building permits and construction activities. Furthermore, the proposed buildings would be evaluated prior to occupation to 2M ensure that the construction has been completed in accordance with the approved plans and applicable codes. Therefore, impacts would be less than significant. iii) Seismic - related ground failure, including liquefaction? Less -Than Significant Impact. Liquefaction is a geologic process that causes ground failure and typically occurs in loose, saturated sediments primarily of sandy composition (City of Newport Beach 2006a). Figure S -2 of the Newport Beach General Plan (Seismic Hazards) identifies areas of potential liquefaction in the City of Newport Beach. The project site is not located in an area identified as having a potential for soil liquefaction when subject to a seismic event (City of Newport Beach 2006). Native soils consisted of a silty residual clayey soil to a maximum depth explored of 13.5 feet in test pit 1. Groundwater was not encountered in any of the geotechnical pits during the field investigation on December 29, 2010 (Appendix B). Therefore, impacts on people or structures as a result of seismic - related ground failure, including liquefaction, would be less than significant. iv) Landslides? No Impact. The proposed project would have no impact related to landslides. Figure S -2 of the Newport Beach General Plan 2006 (Seismic Hazards) identifies areas with landslide potential. The project site is not located in any area with landslide potential (City of Newport Beach 2006). The project site is generally flat and implementation of the proposed project would not require slope cuts that could result in landslides. Therefore, no impacts associated with landslides would occur. b) Result in substantial soil erosion or the loss of topsoil? Less -Than Significant Impact. The project site is currently developed with a single -story, 7,996- square -foot restaurant, surface parking, and landscaped areas. As required by the City's Municipal Code, the project applicant would obtain a grading permit from the City's Building Official. Chapter 15.10 contains grading, fill, drainage, and erosion control standards that would be applied to the corresponding construction activity. The project applicant would implement standard erosion control measures and construction best management practices (BMPs) that would minimize impacts. Therefore, impacts would be less than significant. c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project and potentially result in on- or off -site landslide, lateral spreading, subsidence, liquefaction or collapse? Less -Than Significant Impact. The project site has been developed and is not located in an area identified by the City of Newport Beach General Plan as having a potential for soil liquefaction or landslides. Subsidence over the site during grading is anticipated to be on the order of 0.5 feet. Shrinkage of reworked materials should be in the range of 10 to 15 percent (Appendix B). All proposed project components would occur in accordance with building and safety standards. Impacts on people or structures as a result of seismic - related ground failure, lateral spreading, subsidence, liquefaction, or collapse would be less than significant. d) Be located on expansive soil, as defined in Table 18- 1 -B of the Uniform Building Code (1994), creating substantial risks to life or property? Less -Than Significant Impact with Mitigation Incorporated. Based on the geotechnical engineering investigation, results of expansion tests indicate that the near surface soils exhibit a medium expansion potential. The surface soils are non - plastic with a medium expansion potential (Appendix B). Therefore, impacts associated with expansive soils would be less than significant with mitigation incorporated. Mitigation Measures: 6.1 Prior to issuance of grading permits, a detailed design- engineering -level geotechnical investigation report shall be prepared and submitted with engineered grading plans to further evaluate expansive soils, soil corrosivity, settlement, foundations, grading constraints, and other soil engineering design conditions, and to provide site - specific recommendations to address these conditions, if determined necessary. The engineering -level report shall include and address each of the recommendations included in the geotechnical reports prepared by Strata - Tech, Inc. (Appendix B). The geotechnical reports shall be prepared and signed /stamped by a Registered Civil Engineer specializing in geotechnical engineering and a Certified Engineering Geologist. Geotechnical rough grading plan review reports shall be prepared in accordance with the City of Newport Beach Grading Ordinance. e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? No Impact. No septic tanks or alternative wastewater disposal systems are included as part of the proposed project. The project site would tie into the existing sewer line. Therefore, no impacts would occur. VII. GREENHOUSE GAS EMISSIONS. a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? Less -Than Significant Impact. Greenhouse gases emitted by human activity are implicated in global climate change or global warming. The principal 45 greenhouse gases (GHGs) are carbon dioxide, methane, nitrous oxide, ozone, and water vapor. Fossil fuel consumption in the transportation sector (on -road motor vehicles, off- highway mobile sources, and aircraft) is the single largest source of GHG emissions, accounting for approximately one -half of GHG emissions globally. Industrial and commercial sources are the second largest contributors of GHG emissions with about one -fourth of total emissions. Some greenhouse gases such as carbon dioxide occur naturally and are emitted to the atmosphere through natural processes and human activities. Other greenhouse gases (e.g., fluorinated gases) are created and emitted solely through human activities. The principal greenhouse gases that enter the atmosphere as a result of human activities are Carbon Dioxide (CO2), Methane (CH4), Nitrous Oxide (N2O), and Fluorinated Gases. For purposes of analysis the global warming potential of each gas is equated to Carbon Dioxide (CO2e) and the Carbon Dioxide equivalent is identified in metric tons for each GHG. SCQAMD's Significance Thresholds: On December 5, 2008, the South Coast Air Quality Management District (SCAQMD) adopted a GHG significance threshold for Stationary Sources, Rules and Plans where the SCAQMD is the lead agency. The threshold utilizes a tiered approach, with a screening significance threshold of 10,000 MTCO2EQ, if the project was not part of a general plan's GHG reduction plan. The SCAQMD has also developed draft thresholds for commercial and residential projects, where it is not the lead. The draft recommends a 3,000 MTCO2EQ per year screening threshold. The SCAQMD's working group has not set a date for finalizing the recommendations. Until more guidance is provided from the expert agencies (GARB and /or SCAQMD), the City of Newport Beach intends to consider projects emitting 3,000 metric tons of CO2e per year or less to be a less- than - significant contribution to greenhouse gasses, thereby not requiring further analysis. For projects exceeding the screening threshold of 3,000 metric tons of CO2e per year, the City will consider projects to have significant impacts if they either 1) are not substantially consistent with policies and standards set out in federal, state, and local plans designed to reduce GHGs; or 2) would emit more than 3,000 metric tons of CO2e per year. Projects that do not meet these thresholds would be considered to have significant impacts, and thus could be expected to exceed the State's mandatory requirement under Assembly Bill 32 to reduce statewide GHG emissions to 1990 levels by 2020. A conservative estimate of the project's CO2e emissions during construction and operation is presented in Table 7 -1. As shown, emissions would remain well below the City's screening threshold of 3,000 metric tons of CO2e per year; therefore, impacts would be less than significant. 40 Table 7.1. Estimate of Proiect - Related Greenhouse Gas Emissions (DOunds Der dav) a Value includes total annual operational emissions plus total construction emissions amortized over 30 years. Source: City of Newport Beach 2011. CalEEMod 2011.1.1 outputs provided in Appendix G. b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases? Less -Than Significant Impact. California has passed several bills and the Governor has signed at least three executive orders regarding greenhouse gases. The Governor's Office of Planning and Research recently published suggested changes to the CEQA Guidelines that would require that greenhouse gases be evaluated in environmental documents. The recommended approach for GHG analysis included in the Governor's Office of Planning and Research (OPR) June 2008 Technical Advisory (TA) is to: 1) identify and quantify GHG emissions, 2) assess the significance of the impact on climate change, and 3) if significant, identify alternatives and /or mitigation measures to reduce the impact below significance. Neither the CEQA Statute nor Guidelines prescribe thresholds of significance or a particular methodology for performing an impact analysis. Presently, there are no adopted federal plans, policies regulations or laws setting a mandatory limit on GHG emissions. CARB (California Air Resources Board) has published draft preliminary guidance to agencies on how to establish interim significance thresholds for analyzing GHG emissions (California Air Resources Board 2008). That guidance, while still in draft form, does provide some assistance to the City in evaluating whether the project would impede the State's 47 Carbon Dioxide Equivalent California Statewide Average Daily Emissions (year 2006) 479,800,000 Project Emissions Construction- Period Emissions 2012 182 Operations - period Emissions Area Sources 0 Energy 86 Mobile 1,948 Waste 31 Water 11 Total Operations - Period Emissions 2,076 Total Project Emissions a 2,258 City of Newport Beach Screening Level Threshold 3,000 Exceed Threshold? I No a Value includes total annual operational emissions plus total construction emissions amortized over 30 years. Source: City of Newport Beach 2011. CalEEMod 2011.1.1 outputs provided in Appendix G. b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases? Less -Than Significant Impact. California has passed several bills and the Governor has signed at least three executive orders regarding greenhouse gases. The Governor's Office of Planning and Research recently published suggested changes to the CEQA Guidelines that would require that greenhouse gases be evaluated in environmental documents. The recommended approach for GHG analysis included in the Governor's Office of Planning and Research (OPR) June 2008 Technical Advisory (TA) is to: 1) identify and quantify GHG emissions, 2) assess the significance of the impact on climate change, and 3) if significant, identify alternatives and /or mitigation measures to reduce the impact below significance. Neither the CEQA Statute nor Guidelines prescribe thresholds of significance or a particular methodology for performing an impact analysis. Presently, there are no adopted federal plans, policies regulations or laws setting a mandatory limit on GHG emissions. CARB (California Air Resources Board) has published draft preliminary guidance to agencies on how to establish interim significance thresholds for analyzing GHG emissions (California Air Resources Board 2008). That guidance, while still in draft form, does provide some assistance to the City in evaluating whether the project would impede the State's 47 mandatory requirements under AB 32 to reduce statewide GHG emissions to 1990 levels by 2020. The City of Newport Beach does not have any plans, policies, regulations, significance thresholds, or laws addressing climate change at this time. As discussed in Response VII(a) above, the estimated CO2 greenhouse gas emissions by the project will be below and not exceed the preliminary SCAQMD screening threshold of 3,000 MTCO2EQ /year. As such, the proposed project would be consistent with the state's goals of reducing GHG emissions to 1990 levels by 2020; therefore, the proposed project's contribution to cumulative climate change GHG emissions would be less than significant. The project will not conflict with any adopted greenhouse gas plan, policy, or regulation. As a result, the project will not have any significant impacts to greenhouse gas plans or policies that are applicable to the project. VIII. HAZARDS AND HAZARDOUS MATERIALS. a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Less -Than Significant Impact. The construction and operation of the proposed project would not result in the reasonably foreseeable upset or release of any hazardous materials. Construction equipment that would be used to build the proposed project has the potential to release oils, greases, solvents, and other finishing materials through accidental spills. Spill or upset of these materials would have the potential to affect surrounding land uses. However, the consequences of construction - related spills are generally reduced in comparison to other accidental spills and releases because the amount of hazardous material released during a construction - related spill is small as the volume in any single piece of construction equipment is generally less than 50 gallons. Construction - related spills of hazardous materials are not uncommon, but the enforcement of construction and demolition standards, including BMPs by appropriate local and state agencies, would minimize the potential for an accidental release of petroleum products and /or hazardous materials or explosions during construction. Federal, state, and local controls have been enacted to reduce the effects of potential hazardous materials spills. The Newport Beach Fire Department is an all -risk fire department and enforces city, state, and federal hazardous materials regulations for Newport Beach. It has the resources to respond and provide services to all types of emergencies, including fires, medical emergencies, hazardous materials problems, beach rescues, traffic accidents, high rise incidents, wildland fires, major flooding, and disaster (City of Newport Beach 2009b. City regulations include Unified Hazardous Waste and Hazardous Materials Management Regulatory Program, Chapter 9.04 of the City's Municipal Code, and implementation of the California Accidental Release Prevention Program (City of Newport Beach 2006b). Elements of these programs include spill mitigation, and containment and no securing of hazardous materials containers to prevent spills. Compliance with these requirements is mandatory as standard permitting conditions, and would minimize the potential for the accidental release or upset of hazardous materials, helping to ensure public safety. The occupancies of restaurants and retail uses are not associated with the use or storage of large amounts of hazardous substances. The proposed project would not use or store large amounts of hazardous substances and an upset of those types of materials would not be reasonably foreseeable. The construction and operation of the proposed project would not create significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment. Therefore, impacts would be less than significant. b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? No Impact. Development of the project includes the demolition of a 7,996 square -foot restaurant building and construction of two, new single -story buildings of 13,525 gross square feet with uses allocated to food uses and general commercial uses. The age of the building to be demolished (pre -1980) suggests the possibility of asbestos - containing building materials; however, a major remodel in 1995 had a permit indicating that either there was no asbestos in the building or that it had been removed and disposed of appropriately. A Phase I Environmental Assessment (Appendix C) for the Evaluation of Hazardous Materials was performed by Centec Engineering (Phase I EA Centec, 2003) for the subject property. During the on -site inspection, no damaged suspect friable materials were noted and all materials appeared to be in good condition. No samples were contained for analysis. Asbestos does not appear to be a significant issue relative to a perceived asset value. No stored lead -based paints were noted during inspection of the building and no use of lead -based paint is suspected. No sampling or laboratory analyses were completed during this investigation to verify the presence or absence of lead in any building materials. No hazardous materials other than what would be contained in "household" cleaning supplies were noted at the existing restaurant and there is an in- ground grease trap. The grease is removed by Baker Commodities. No significant stains or signs of hazardous material spills were noted and the landscaping at the property appeared healthy with no evidence of toxic materials dumping or abandonment. No stains or signs of leakage were noted on the ground near pad - mounted Southern California Edison (SCE) transformers which serve the subject property and its neighbors. Federal law has prohibited the manufacture of transformers utilizing PCB since 1977 and SCE maintains that it is "highly unlikely" that the transformers contain polychlorinated biphenyl (PCB) at 49 concentration levels requiring special management under the Environmental Protection Agency's (EPA) rules (Phase I EA Centec, 2003). There was no documentary or physical evidence of former or current underground or aboveground storage tanks on the subject property. No evidence of ponds, pits, lagoons, clarifiers, groundwater monitoring wells, or other possible conduits for contamination was found. There was no evidence of sensitive environmental receptors such as wetlands, marshes, endangered species, etc., in the immediate vicinity although the Newport Back Bay is located one mile southwest of the property. No high -power electricity transmission towers were noted in the immediate vicinity. Radon is not considered a significant area of concern for Southern California and has not been tested for. Although site - specific information regarding radon levels can only be obtained through direct testing, the potential for elevated radon levels at the subject property is low (Phase I EA Centec, 2003). The proposed project would operate as take -out restaurant food uses and general office and retail uses. A common grease interceptor will be built to accommodate the restaurant uses. These uses would not routinely transport, use, or dispose of hazardous materials. Therefore, no impacts would occur. c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one - quarter mile of an existing or proposed school? No Impact. There are several adult training schools, and a couple of music and dance schools within one - quarter mile. However, the proposed project would not emit hazardous emissions or require handling hazardous or acutely hazardous materials, substances, or waste. Therefore, the proposed project would not emit hazardous emissions within one - quarter mile of a school. No impacts would occur. d) Be located on a site that is included on a list of hazardous materials sites that complied pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? No Impact. The project site is not included on any list of hazardous materials sites pursuant to Government Code Section 65962.5 (Phase I EA Centec, 2003). An environmental records database search report was completed on April 14, 2003, by Vista Information Solutions, Inc. (Vista) in San Diego, California. The Vista database searched pertinent federal, state, and local lists of public information, according to appropriate ASTM standards, to identify and geographically locate sites of concern within a maximum radius of one mile of the subject property. The subject property is not identified on the database for any reason (Phase I EA Centec, 2003). 50 There are three different locations of contamination within the critical 1/4 —mile radius. Koll Center and Koll Co /Sanwa Bank, both of which are on the east side of MacArthur Blvd. and beyond 1,000 feet away from the subject property, had leaking underground storage tanks (USTs) that affected "soil only" (Phase I EA Centec, 2003). They have both been remediated and have a "case closed" status and are therefore of no realistic concern to the subject property. Beacon Bay Auto Wash, located 1,200 feet to the northwest, had a UST leak that affected groundwater, but it is currently undergoing remediation, is hydrologically cross gradient to the subject property, and is unlikely to have any impact on the subject property (Phase I EA Centec, 2003). Of the remaining 21 listed locations of contamination, seven have a "case closed" status, six are currently either under remediation or post - remedial monitoring, and the remainder are currently under investigation. All of these sites are too distant and lack adequate significance to likely have an adverse environmental impact on the subject property. There are no NPL of State "Superfund" sites or other significant sources of contamination in the study (Phase I EA Centec, 2003). Since the project site is not located on a list of hazardous materials sites, the proposed project would not create a significant hazard to the public or the environment and no impact would occur. e) For a project within an airport land use plan or, where such a plan has not been adopted, within 2 miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? Less -Than Significant Impact. The closest airport is John Wayne Airport, which is approximately within 0.38 miles northwest of the project site. The project site is located within the boundaries of the Airport Environs Land Use Plan (AELUP) for John Wayne Airport. The proposed project is within the height restriction zone for the John Wayne Airport and the notification area of the Federal Aviation Regulation (FAR) Part 77 Imaginary Surfaces aeronautical obstruction area. Section 77.13 of the FAR requires the notification of the Federal Aviation Administration (FAA) for any construction or alteration which are identified as follows: 1) exceeds 200 feet in height about the ground level at its site; 2) exceeds a height greater than an imaginary surface extending outward and upward at specific slope characteristics at 20,000 feet, 10,000 feet, and 5,000 feet from the nearest point of the airport runway; or 3) is a highway with specific characteristics, and /or ,is occurring at an airport. The proposed project includes the construction of two, free - standing single -story buildings with a maximum height of 29 feet. The project site is approximately 50 feet above mean sea level (Phase I EA Centec, 2003). The proposed project does not require notification to the FAA in accordance with Section 77.13 of the 51 FAR because the proposed project would not be more than 200 feet above ground level and not more than 206 feet above mean sea level; the proposed project would not exceed a height greater than the imaginary surface planes identified within Section 77.13; the proposed project is not a highway; and the proposed project is not a modification to an existing airport. Therefore, the filing of Form 7460 -1 with the FAA is not required. Although the proposed project is exempt from filing the Form 7460 -1 notice, a referral by the City to the Airport Land Use Commission for Consistency Review is required due to the location of the proposal within the AELUP Planning Area and due to the nature of the required City approvals (i.e. planned community development amendment) under PUC Section 21676(b). The subject property is within Noise Impact Zone "2" as identified in the AELUP which considers land uses including commercial as normally consistent meaning conventional construction methods can be used and there are no special noise reduction requirements. The subject property is not within the Runway Protection Zone. The proposed project would comply and be compatible with the land use standards established in the City's Municipal Code and the AELUP (Airport Land Use Commission 2008). The AELUP vicinity height guidelines would protect public safety, health, and welfare by ensuring that aircraft could fly safely in the airspace around the airport. Although the proposed project is located within an airport land use plan, it would comply with all established standards, requirements, and plans. Therefore, impacts would be less than significant. f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area? No Impact. As described above in (e), the John Wayne Airport is located approximately 0.38 miles northwest of the project site. There is no private airstrip in the vicinity of the proposed project. Therefore, the proposed project would not result in a safety hazard for people working in the project area from operations of a private airstrip. No impacts would occur. g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? No Impact. The proposed project would not impair or physically affect any adopted emergency response plan or evacuation plan. The proposed project would not interfere with the implementation of the City's Emergency Response Plan. The City's Emergency Management Plan also establishes safety procedures with respect to aviation hazards to promote the safety of persons on the ground while reducing risks of serious harm to aircraft crews and passengers that may need to make emergency landings in the immediate airport vicinity. The proposed project would not require the closure of any public or private streets or roadways, and would not impede access of emergency vehicles to the project rl" site, or any surrounding areas in the event of an aviation emergency or other emergency. Finally, the proposed project would provide all required emergency access in accordance with the requirements of the Newport Beach Fire Department during plan review by the Fire Department. No impacts on emergency response would occur. h) Expose people or structures to a significant risk of loss, injury, or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? No Impact. The project site is not located in an area adjacent to or intermixed with wildlands, and is surrounded by office buildings. Furthermore, the City of Newport Beach General Plan Safety Element Figure S4 (City of Newport Beach 2006a) identifies the project site as Low /None Fire Susceptibility. Therefore, people or structures would not be exposed to a significant risk of loss, injury, or death involving wildland fires as a result of the proposed project. No impacts would occur. IX. HYDROLOGY AND WATER QUALITY. a) Violate any water quality standards or waste discharge requirements? Less -Than Significant Impact. Land within the City of Newport Beach is included in three watersheds: Newport Bay, Newport Coastal Streams, and Santa Ana (County of Orange 2011). Each of these watersheds is under the jurisdiction of the Santa Ana Regional Water Quality Control Board (SARWQCB) and subject to the objectives, water quality standards, and BMP requirements established in the Santa Ana River Basin Plan and Orange County Drainage Area Management Plan (DAMP). The project site is located in the Newport Bay Watershed, within the San Diego Creek Subwatershed. The EPA and Santa Ana Regional Water Control Board have identified San Diego Creek as an impaired water body. The main tributary of the San Diego Creek Watershed, San Diego Creek, drains directly into Upper Newport Bay (City of Newport Beach 2006b). Under the provisions of Chapter 14.36 (Water Quality) of the City of Newport Beach Municipal Code, any discharge that would result in or contribute to degradation of water quality via stormwater runoff is prohibited. New development or redevelopment projects are required to comply with provisions set forth in the DAMP, including the implementation of appropriate BMPs identified in the DAMP to control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing beneficial uses of water. Furthermore, a municipal separate storm sewer system (MS4) permit is provided to the City by SARWQCB under the National Pollutant Discharge Elimination System (NPDES) to regulate the amount of stormwater contaminants that are delivered into the City's waterways. MS4 permits require 53 an aggressive water quality ordinance, specific municipal practices to maintain City facilities like the MS4, and use of BMPs in many residential, commercial, and development - related activities to further reduce the amount of contaminants in urban runoff (City of Newport Beach 2006b). The proposed project will comply with the required water quality standards; therefore, impacts would be less than significant. b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre- existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? Less -Than Significant Impact. The project site is currently developed and is not considered a location for groundwater recharge (City of Newport Beach 2006b). The proposed project would not substantially increase impervious surfaces on the site, thereby interfering substantially with groundwater recharge. Furthermore, the proposed project would not directly withdraw groundwater from beneath the site, thereby substantially depleting groundwater supplies. Impacts would be less than significant. c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off - site? Less -Than Significant Impact. No streams or rivers are located on the project site; therefore, construction and operation of the proposed project would not directly affect the flow of a stream or river. The project would involve some minor grading for construction. These activities would minimally alter the existing drainage pattern of the site. The proposed project would not increase the impervious area on the site as the existing site is currently developed with surface parking and a 7,996 square -foot building. During construction, an Erosion Control Plan will be implemented. Therefore, impacts from erosion or siltation, either on site or off site would be less than significant. d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of a course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on or off -site? Less -Than Significant Impact. No streams or rivers are located on site, and therefore, construction and operation of the proposed project would not directly affect the flow of a river or stream. Substantial amounts of stormwater are not readily absorbed into the soil because of the urban character of the area and the existing use of the project site for surface parking and a restaurant building. The proposed project would minimally alter the existing drainage pattern of the site, 154 but would not increase the impervious area. During construction, runoff from the proposed project site would be managed by the Erosion Control Plan and Water Quality Management Plan. The BMPs from the preliminary landscape plan include retention of significant amounts of water on -site. Storm runoff generated through the project operations would be diverted into the existing stormwater drainage system. Therefore, impacts would be less than significant. e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? Less -Than Significant Impact. Overall, urban street flooding is rarely considered a problem in the City of Newport Beach (City of Newport Beach 2003). The urban character of the area and the existing use of the project site would not allow stormwater to be readily absorbed into the soil. The proposed project would minimally alter the existing drainage pattern of the site but would not substantially increase the impervious area; therefore, the proposed project would not substantially increase the amount of stormwater runoff generated. Finally, the proposed project would comply with the policies outlined in the General Plan to minimize runoff - related flooding impacts. These policies include NR 3.11, NR 3.20 and NR 4.4 and implementation would reduce the volume of runoff generated and potential for flooding. As discussed in Section IX (d), runoff from the proposed project site would be managed by the Erosion Control Plan and Water Quality Management Plan. Therefore, impacts on stormwater would be less than significant. f) Otherwise substantially degrade water quality? Less -Than Significant Impact. The proposed project would not substantially degrade water quality. The proposed project would comply with all General Plan policies minimizing flooding impacts. The proposed food service uses will require the installation of grease interceptors. As discussed in Sections IX (a -d), the project site would be managed by the Erosion Control Plan and Water Quality Management Plan and the proposed project will comply with required water quality standards. Impacts on water quality would be less than significant. g) Place housing within a 100 -year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? No Impact. Based on Figure S3 (Flood Hazards) of the City of Newport Beach General Plan, the project site is not located in a flood hazard area. The proposed project does not include the construction of housing; therefore, the proposed project would not place housing within a 100 -year flood hazard area, and no impacts would occur. h) Place within a 100 -year flood hazard area structures which would impede or redirect flood flows? 515 No Impact. The project site is not located in a flood hazard area (City of Newport Beach 2006a). Therefore, the proposed project would not impede or redirect 100 -year flood flow, and no impacts would occur. i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam? No Impact. The proposed project is not located in a flood hazard area (City of Newport Beach 2006a). The project site is not located near a levee or dam. Various flood control measures have helped mitigate flood damage in the City. Administered by the Orange County Resources & Development Management Department, the Orange County Flood Control District ( OCFCD) provides, operates, and maintains public facilities and regional resources for the residents of Orange County. OCFCD operates and maintains flood control channels, dams, retarding basins, pump stations, and other flood control infrastructure that the OCFCD designs and constructs. Specifically, OCFCD is responsible for maintaining the regional drainage facilities such as the Santa Ana River, San Diego Creek, and Buck Gully. These structures help regulate flow in the Santa Ana River, San Diego Creek, and smaller streams, and hold back some of the flow during intense rainfall periods that could otherwise overwhelm the storm drain system in Newport Beach. Therefore, no impacts would occur. j) Inundation by seiche, tsunami, or mudflow? No Impact. Implementation of the proposed project would not increase exposure to inundation by seiche, tsunami, or mudflow. Due to the elevation of the site (approximately 50 feet) and absence of nearby waterfront, impacts from a tsunami would be negligible. Seiches result from the rhythmic movement of water within a lake or other enclosed or semi - enclosed body of water, generally caused by earthquakes. A small body of water, approximately 1.3 acres in area, is located over 300 feet from the project site between MacArthur Boulevard and Von Karman Avenue. Because no large lakes or other bodies of water lie on or near the project site, the potential hazard from seiches is very low at the project site. Based on Figure S1 (Coastal Hazards) of the City of Newport Beach General Plan, the project site is not located in a 100- or 500 -year zone for tsunami inundation at extreme high tide (City of Newport Beach 2006a). The site is relatively flat and is not subject to a high risk of mudflow. The project site is not in an area with landslide potential (City of Newport Beach 2006a), per Figure S2 (Seismic Hazards) of the City of Newport Beach General Plan. Therefore, no impacts would occur. 150 X. LAND USE AND PLANNING. a) Physically divide an established community? No Impact. The project sites are located in a planned community district. The proposed change in use from restaurant to general commercial use, transfer of hotel room entitlement to the project site location, and reduction in the hotel room allocation of the off -site location will not create a physical division of or between the established general office uses, hotel site, and the existing restaurant uses in the vicinity; and will increase the types of commercial uses permitted to include those that provide service or convenience for the benefit of persons visiting or working in the vicinity. Therefore, no mitigation measures are required by CEQA. b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? Less Than Significant Impact. The project involves two sites designated as Mixed Use — Horizontal Land Use (MU -H2) per the Land Use Element of the General Plan, which provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed -use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses. The development limits for the project sites are identified in Table LU2 of the General Plan Land Use Element as a portion of Anomaly Number 12 with a development limit of 457,880 square feet; and a portion of Anomaly Number 17 with a development limit of 33,392 square feet and 304 hotel rooms. Both sites involved in the project are currently zoned PC -11, Newport Place Planned Community District as Restaurant Site 1 (Project Site) and Hotel Site 2 -B (Donor Site). The project as proposed includes a code amendment to change the designation of a portion of Restaurant Site 1 to General Commercial Site 8 designation. Also included in the project is a request to transfer 54 hotel rooms from Hotel Site 2 -B (donor site) to the project site. The transfer of 54 hotel rooms will be converted to a comparable amount of commercial floor area (8,000 square feet) to establish the total amount of the project site, designated as General Commercial Site 8, to 13,525 square feet, and change the entitlement of Anomaly No. 12 from 457,880 square feet to 463,409 square feet to accommodate the proposed construction of a new commercial shopping center. Conversely, the hotel room entitlement of the donor site within Statistical Area L-4, Anomaly Number 17 will be reduced from 304 to 250 hotel rooms. The proposed activities will amend the zoning to allow for general commercial uses and will not conflict with land use plans, policies, or zoning of the City of Newport Beach, since the commercial square footage increase is offset by the 57 transfer and reallocation of hotel rooms located within the same Statistical Area L4. Land use policy consistency analysis (Appendix 1) has been conducted and is on file and available for review at the Planning Division at City Hall. Therefore, no mitigation measures are required by CEQA. c) Conflict with any applicable habitat conservation plan or natural community conservation plan? No Impact. As referenced in Section IV (Biological Resources), the project site and the donor site are not within a habitat conservation area that supports any specific species of flora or fauna on the property. Furthermore, the project site is currently developed with a restaurant use and related surface parking that will be demolished prior to construction of the new development; and the donor site is occupied by an interim use, rental vehicle storage facility, with hotel room entitlement that will be reduced in total number. The project will not conflict with any applicable habitat conservation plan or natural community conservation plan. Therefore, no mitigation measures are required by CEQA. XI. MINERAL RESOURCES. a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? No Impact. Per Section 4.5.6: Mineral Resources of the Draft EIR of the Newport Beach General Plan 2006 Update, other than known active oil and gas resources generally concentrated within the western portions of Newport Beach, there is no active mining within the Newport Beach area. Based on guidelines adopted by the CGS (California Geological Survey) areas known as Mineral Resource Zones (MRZ) are classified according to the presence or absence of significant deposits. The City is required to respond to mineral resource recovery areas that have been designated by the State as MRZ -2 (significant existing or likely mineral deposits). All areas within the City are either classified as containing no significant mineral deposits (MRZ -1), or the significance of mineral deposits has not been determined (MRZ -3). The proposed project site lies within an MRZ -3 zone (Figure 4.5 -4 Mineral Resource Zones, Draft EIR of the Newport Beach General Plan 2006 Update). Therefore, the proposed project would not result in the loss of the availability of known mineral resources that would be of value to the region and the residents of the State, and no impact would occur. b) Result in the loss of availability of a locally- important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? No Impact. The subject site is not delineated in the City of Newport Beach General Plan as containing a locally important mineral resource (City of Newport Beach 2006a). Therefore, no impacts would occur. W XII. NOISE. Existina Conditions Noise - sensitive receptors in the vicinity of the project site include the Tutor Time daycare center approximately 2,100 feet to the southwest at 1550 Bristol Street North, the University of California Irvine Child Development Center located approximately 2,100 feet to the east at 19262 Jamboree Road in the City of Irvine, and high- density residences approximately 3,000 feet to the northeast at the intersection of Campus Drive and Jamboree Road (Alford, pers. comm.). The project site is also located within an area planned for future mixed residential /commercial uses. However, no residential uses currently exist in this area nor are they have any mixed residential /commercial development projects been approved in this area (City of Newport Beach 2006). Regulatory Background: Noise Standards and Thresholds of Significance The proposed project is subject to the policies and standards contained in the Noise Element of the Newport Beach General Plan and the Community Noise Control Ordinance and the Loud and Unreasonable Noise Ordinance, Chapters 10.26 and Chapter 10.28, respectively, of the Newport Beach Municipal Code (NBMC). The Noise Element establishes standards for exterior sound levels based on land use categories. The City also has established policies and regulations concerning the generation and control of noise that could adversely affect its citizens and noise - sensitive land uses. The Noise Element states that an outdoor noise exposure level of 60 to 65 dBA community noise equivalent level (CNEL) is considered "normally compatible" for single -unit and multi -unit residential development. The Noise Element also sets interior and exterior noise standards, based on land use: 59 Land Use Categories Allowable Noise Levels (dBA) Interior "b Exterior"b Interior Interior Exterior Exterior Noise Noise Noise Noise Categories Uses Level Level Level Level (Leg) (Leq) 10 (Leq) (Leq) 7am to pm to 7 7am to 10 pm 10pm am 10pm to 7 am Single Family, Two Family, 45 40 55 50 Multiple Family (Zone 1) Residential Residential Portions of Mixed 45 40 60 50 Use Developments (Zone III) Commercial N/A N/A 65 60 (Zone 11) Commercial Industrial or Industrial Manufacturing N/A N/A 70 70 (Zone IV) Schools, Day Care Centers, Churches, Institutional Libraries, 45 40 55 50 Museums, Health Care Institutions (Zone 1) a. If the ambient noise level exceeds the resulting standard, the ambient shall be the standard. b. It shall be unlawful for any person at any location within the incorporated area of the City to create any noise or to allow the creation of any noise on property owned, leased, occupied or otherwise controlled by such a person which causes the noise level when measured on any other property, to exceed either of the following: • The noise standard for the applicable zone for any fifteen - minute period; • A maximum instantaneous noise level equal to the value of the noise standard plus twenty dBA for any period of time (measured using A- weighted slow response). • In the event the ambient noise level exceeds the noise standard, the noise standard applicable to said category shall be increased to reflect the maximum ambient noise level. • The noise standard for the residential portions of the residential property falling within one hundred feet of a commercial property, if the intruding noise originates from that commercial property. .I • If the measurement location is on a boundary between two different noise zones, the lower noise level standard applicable to the noise zone shall apply. The City of Newport Beach General Plan's Noise Element (General Plan Policy N 1.8) identifies a significant impact as follows: A significant noise impact occurs when there is an increase in the ambient CNEL produced by new development impacting existing sensitive uses. The CNEL increase is shown in the table below: CNEL dBA Increase 55 3 60 2 65 1 70 1 Over 75 Any increase is significant Noise Policy N 1.1 requires that all proposed developments be compatible with the noise environment through the use of a land use noise compatibility matrix contained in Table N2 of the Noise Element. Section 10.26.025 NBMC specifies the following exterior noise standards: NOISE ALLOWABLE NOISE LEVEL (Equivalent ZONE TYPE OF LAND USE Noise Level Leq) 7 a.m. to 10 p.m. 10 p.m. to 7 a.m. I Single -, two -or multiple- 55 dBA 50 dBA family residential II Commercial 65 dBA 60 dBA Residential portions of III 60 dBA 50 dBA mixed -use properties IV Industrial or 70 dBA 70 dBA manufacturing Construction noise is exempt from the above noise standards, pursuant to Section 10.26.035 NBMC. However, Section 10.28.040 NBMC specifies permitted hours for construction activities. Construction or other noise - generating activity that would disturb a person of normal sensitivity who works or resides in the vicinity may occur only between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday, and 8:00 a.m. to 6 p.m. on Saturdays. No construction that would disturb a person of normal sensitivity may occur on Sundays or federal holidays. a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less -Than Significant Impact with Mitigation Incorporated. Although sensitive receptors in the area would be exposed to temporary increases in noise 01 from construction activities, City noise standards would not be exceeded. The construction and operational noise impacts and required mitigation measures are discussed below. Construction Noise Construction of the proposed project is anticipated to last for approximately seven months, beginning in January 2012 and continue through June, 2012. Noise from construction activity is generated by a broad array of powered mechanical equipment. In order to assess the potential noise effects of construction, this noise analysis used a list of construction equipment provided for the proposed project to assess noise levels during construction phases. During the demolition phase of construction, noise levels are estimated to be approximately 92 dBA Leq at the project site. Construction noise levels of this magnitude would attenuate at the closest sensitive receptor (UCI Child Development Center) to approximately 55 dBA Leq (Noise attenuates at a rate of 6 dB per doubling distance). Because existing noise levels at the closest sensitive receptor were measured at approximately 63 dBA Leq, the noise levels would be marginally higher at this location during the loudest phase of construction. Therefore, construction noise would likely be perceptible, but would not dominate the noise environment at the sensitive receptor (Alford pers. comm.). The City's Municipal Code exempts construction from the noise restrictions discussed above as long as it occurs between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday; and between 8:00 a.m. and 6 p.m. on Saturdays and does not occur at any time on federal holidays or on Sundays. In addition to the City's construction restrictions, the following mitigation measures would ensure construction noise results in a less- than - significant impact: Mitigation Measures: 12.1. All noise - producing project equipment and vehicles using internal combustion engines shall be equipped with mufflers, air -inlet silencers where appropriate, and any other shrouds, shields, or other noise - reducing features in good operating condition that meet or exceed original factory specification. Mobile or fixed "package' equipment (e.g., arc welders, air compressors) shall be equipped with shrouds and noise control features that are readily available for that type of equipment. 12.2. All mobile and fixed noise - producing equipment used on the proposed project that is regulated for noise output by a local, state, or federal agency shall comply with such regulation while in the course of project activity. 12.3. Electrically powered equipment shall be used instead of pneumatic or internal combustion- powered equipment, where feasible. 02 12.4. Mobile noise - generating equipment and machinery shall be shut off when not in use. 12.5. Material stockpiles and mobile equipment staging, parking, and maintenance areas shall be located as far as practical from noise - sensitive receptors. 12.6. Construction site and access road speed limits shall be established and enforced during the construction period. 12.7. The use of noise - producing signals, including horns, whistles, alarms, and bells, shall be for safety warning purposes only. 12.8. No project - related public address or music system shall be audible at any adjacent receptor. 12.9. The on -site construction supervisor shall have the responsibility and authority to receive and resolve noise complaints. A clear appeal process to the project proponent shall be established prior to construction commencement that shall allow for resolution of noise problems that cannot be immediately solved by the site supervisor. Operational Noise The proposed project would generate some operational noise through stationary noise sources such as HVAC units. However, the project would be required to comply with Chapter 10.26 of the NBMC, which addresses Community Noise Control, and these units would be properly enclosed or shielded to minimize noise impacts. Furthermore, commercial uses surround the project site and these uses are not considered sensitive noise receptors. Therefore, any slight increase in operational noise associated with the HVAC units would not represent a significant impact. Traffic Noise Figure N2 of the City of Newport Beach General Plan shows that the project site is located within the Existing 60 -65 dBA CNEL Roadway Noise Contours and within the 60 -65 dBA CNEL Roadway Noise Contours projected for 2025. The Noise Element establishes that commercial land uses located with 60 -65 dBA CNEL are "Clearly Compatible" based upon the assumption that any buildings involved are of normal conventional construction without any special noise insulation requirements. The proposed project would generate vehicle trips on the surrounding roadways. Based on generation rates for specific land use types, the project is proposed to generate 942 more daily vehicle trips, 67 more of which would occur during the morning peak hour and 55 more of which would occur during the evening peak hour. X03 Peak hour traffic volumes are considered to have the highest noise levels due to the largest traffic volume. The PM peak hour trips were used for the analysis of the surrounding roadways because traffic volume is highest during these hours. Therefore, to be consistent, the PM peak hour trips generated by the proposed project were also used in the analysis. The proposed project is anticipated to add approximately 55 PM peak hour trips to the surrounding roadway network. Noise is not additive in a linear sense; doubling the noise energy of a source (for example, doubling the traffic volume on a roadway) does not result in a perceived doubling of the noise level, nor does it result in a doubling of the noise level as expressed in decibels. All other factors being held constant, a doubling of the power from a noise source results in an increase of 3 dBA in the noise level. The City of Newport Beach General Plan Policy N 1.8 states that an increase of 2 dBA would be considered significant in an area with where existing land uses are exposed to noise levels between 60 and 65 dBA CNEL. In the case of this proposed project, the addition of approximately 55 additional vehicle trips to the surrounding roadways would result in a very small increase in the traffic noise. Such a change in the noise level would be imperceptible. The proposed project's traffic would not significantly increase noise from the existing roadway network. Therefore, noise impacts would be less than significant. b) Exposure of persons to or generation of excessive ground borne vibration or ground borne noise levels? Less -Than Significant Impact. Construction activities associated with grading and excavation may result in minor levels of ground vibration. Construction of the proposed project would not involve special construction methods such as pile driving or blasting. Vibration from conventional construction activity is typically below a level of human perception and well under levels that would cause damage to existing buildings when the activity is more than approximately 50 feet from the receiver. For this proposed project, construction activities would take place at distances greater than 50 feet from sensitive receptors. Based on data from the Federal Transit Administration (FTA), small bulldozers (which are representative of the size of construction equipment that would be on site) produce vibration levels of 0.003 inch per second (IPS) peak particle velocity (PPV) at a distance of 25 feet. This level is well below widely accepted levels of perception thresholds (for example, California Department of Transportation [Caltrans] has identified a PPV of between 0.0059 and 0.019 IPS PPV as the threshold of human perception.) The FTA maintains a 0.12 IPS PPV threshold for potential damage to "extremely fragile historic buildings" (U.S. Department of Transportation 2006). Additionally, vibration from these activities would be short- term and would end when construction is completed. Therefore, this impact is considered less than significant. c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? 04 Less -Than Significant Impact. The proposed project would generate some operational noise through stationary equipment such as HVAC units. However, the project would be required to comply with Chapter 10.26 of the NBMC, which addresses Community Noise Control, and these units would be properly enclosed or shielded to minimize noise impacts. Furthermore, office and commercial uses surround the project site and these uses are not considered sensitive noise receptors, therefore, any slight increase in operational noise associated with the project would not represent a significant impact. Noise associated with the operation of the proposed project would be generated primarily by traffic. The proposed project would increase traffic volumes marginally by adding 55 trips during the PM peak hour. As discussed above, the increase in noise from the proposed project would not be perceptible. Therefore, noise from traffic associated with the proposed project would be less than significant. d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? Less -Than Significant Impact. Construction of the proposed project would result in a temporary increase in noise levels. These levels could be perceptible but would not dominate the noise environment. The City exempts noise from construction provided that it occurs only between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday, and 8:00 a.m. and 6:00 p.m, on Saturdays and at no time on federal holidays or Sundays. Therefore, impacts from construction would be less than significant. e) For a project located within an airport land use land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? Less -Than Significant Impact. The project site is located approximately 0.38 - mile from John Wayne Airport. Figure N2 of the City of Newport Beach General Plan shows the existing 65 dBA CNEL noise contour for John Wayne Airport. Figure N2 shows that the project site is located approximately 970 feet outside the 65 dBA CNEL noise contour for John Wayne Airport. The Noise Element establishes that commercial land uses located with 60 -65 dBA CNEL are "Clearly Compatible" based upon the assumption that any buildings involved are of normal conventional construction without any special noise insulation requirements. Therefore, noise impacts related to air traffic would be less than significant. f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? No Impact. The project site is not located in the vicinity of an airstrip, private or public. No impacts would occur (Alford, per. comm..). W XIII. POPULATION AND HOUSING. a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? Less -Than Significant Impact. The proposed project would not induce substantial population growth in the area, either directly or indirectly. The project does not propose the development of any residences. The project involves the development of approximately 13,525 square feet of restaurant and retail uses which will replace the existing 7,996 square -foot restaurant. The proposed project will provide new employment opportunities; however, the size and scope of the development would not be of a regional scale that would directly induce substantial population growth within the City of Newport Beach. Therefore, no significant impacts to population growth are anticipated and no mitigation measures are necessary. b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? No Impact. No housing is currently on -site. Therefore, the project would not displace any existing housing and no impacts would occur. c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? No Impact. No housing is currently located on -site. Therefore, the project would not displace any people and would not necessitate construction of replacement housing elsewhere. XIV. PUBLIC SERVICES a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered government facilities, need for new or physically altered government facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? Police protection? Schools? Other public facilities? 00 Less -Than Significant Impact. The proposed project is replacing a 7,996 square -foot vacant restaurant with a new 13,525 square -foot development consisting of new multi- tenant commercial retail and food uses (5,000 square feet for a food use and 8,525 square feet for general commercial). The public services that could be required by the project upon construction include emergency medical and /or fire protection or police calls. The proposed development is designated for a retail and food service use and is not anticipated to significantly impact the current levels of service provided by the fire and police departments. Because many other public services (i.e., schools, libraries and senior centers) cater to the population and no increase in the surrounding population is anticipated due to the proposed project, the impacts will be less than significant. XV. RECREATION a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? No Impact. The proposed project would not affect neighborhood or regional parks or other recreational facilities. An increase in the use of parks is generally associated with an increase of housing or population in an area. As discussed in Section XIII (a), Population and Housing, the proposed project is not expected to substantially induce population growth. The short-term construction jobs and retail and office - related jobs generated by the project are expected to be fulfilled by the local population and it is unlikely that a substantial number of employees would need to be relocated from outside the region. Furthermore, according to Figure R1 of the City of Newport Beach General Plan, there are no existing recreational facilities in the project vicinity (City of Newport Beach 2006a). Therefore, the proposed project would not increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facilities would occur. No impacts would occur. b) Does the project include recreational facilities or require the construction of or expansion of recreational facilities which might have an adverse physical effect on the environment? No Impact. As discussed in Section XIII (a), Population and Housing, the proposed project is not expected to substantially induce population growth. The proposed project would not include recreational facilities or require the construction of or expansion of recreation facilities that might have an adverse physical effect on the environment. No impacts would occur. XVI. TRANSPORTATIONITRAFFIC a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, 07 taking into account all modes of transportation including mass transit and non - motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit? Less -Than Significant Impact. A traffic impact analysis was prepared by Kunzman Associates, Inc., (dated May 31, 2011) to evaluate the potential traffic impacts resulting from implementation of the project. The traffic impact analysis is presented in full in Appendix E (this appendix is on file and available for review at the Planning Division at City Hall), and summarized below. The traffic generated by the project is determined by multiplying an appropriate trip generation rate by the quantity of land use. Trip generation rates are derived from the Institute of Transportation Engineers, Trip Generation, 8`h Edition (2008). Pursuant to the City's Traffic Phasing Ordinance (TPO), trips that would be generated by the existing 7,996 square -foot restaurant building are credited against the total trips that would be generated by the proposed project. As shown in Table 16 -1, the resulting net trips of 942 average daily vehicle trips would be utilized only for the TPO traffic analysis (forecast year 2013 with project conditions). However, in order to analyze a conservative scenario in terms of trip generation and assignment of traffic, the CEQA analysis does not provide trip credit for the existing 7,996 square -foot restaurant building. Without the credit, the project (up to 13,525 sq. ft. of commercial retail and food uses) is forecast to generate 70 morning peak -hour trips, 89 evening peak -hour trips, and 1,352 average daily vehicle trips (see Table 16 -1). N: TABLE 16 -1: PROJECT TRIP GENERATION Traffic Phasing Ordinance (TPO) Peak Hour Morning Evening Inbound Outbound Total Inbound Outbound Total Land Use Quantity Units' Dail Existing Use Quality Restaurant 7.996 TSF 5 1 6 40 20 60 719 Pass -By 43% -2 -1 -3 -17 -9 -26 1 -309 Total 3 0 3 23 11 34 410 Proposed Uses Retail 4.325 TSF NOM2 NOM NOM 5 7 12 192 Fast Food Restaurant 1.000 TSF 26 18 44 13 13 26 716 High Turnover (Sit -Down) Restaurant 4.000 TSF 24 22 46 26 18 44 509 Bank 4.000 TSF 17 7 24 19 29 48 600 Subtotal 13.325 TSF 67 47 114 63 67 130 2,017 Pass -B Y3 -25 -19 -44 -21 -20 -41 -665 Total 1 42 28 70 42 47 89 1,352 Difference t 39 28 67 19 36 55 942 California Environmental Quality Act CEQA AMRW IV Peak Hour Morning Evening Inbound Outbound Total Inbound Outbound Total Land Use Quantity Units' Daily Proposed Uses 4.325 TSF NOM2 NOM NOM 5 7 12 192 Retail Fast Food Restaurant 1.000 TSF 26 18 44 13 13 26 716 High Turnover (Sit -Down) Restaurant 4.000 TSF 24 22 46 26 18 44 509 Bank 4.000 TSF 17 7 24 19 29 48 600 Subtotal 13.325 TSF 67 47 114 63 67 130 2,017 Pass -B Y3 -25 -19 -44 -21 -20 -41 -665 Total 42 1 28 1 70 1 42 47 1 89 1,352 1 TSF= Thousand Square Feet 2 NOW Nominal. It is anticipated the retail commercial uses would have hours of operation from 9:00 AM to 7:00 PM, daily. 3 The traffic volumes from the fast -food and high turn -over sit down restaurants have been reduced by 43% as a result of pass -by -trips obtained from the Institute of Transportation Engineers and the bank has been reduced by 23% as a result of pass -by trips obtained from the San Diego Association of Governments. The intersection impacts analysis is based on the Intersection Capacity Utilization (ICU) methodology as utilized by the City of Newport Beach. To calculate an ICU value, the volume of traffic using the intersection is compared with the capacity of the intersection. An ICU value is usually expressed as a decimal. The decimal represents that portion of the hour required to provide sufficient capacity to accommodate all intersection traffic if all approaches operate at capacity. The traffic impact analysis measures intersection performance by using levels of service (LOS), a qualitative measure describing the efficiency of traffic flow on a roadway or at an intersection. LOS range from A, indicating free flow with minimal delays, to F, indicating severely congested conditions. The City of Newport Beach target for peak hour intersection operation is LOS D or better. To determine whether the addition of project - generated trips at a signalized study intersection results in a significant impact, the City of Newport Beach has established the following threshold of significance: • A significant impact occurs when the addition of project - generated trips causes the level of service at a study intersection to deteriorate from an acceptable LOS (LOS D or better in most cases) to a deficient LOS (LOS E or F); or • For intersections operating at LOS E or F under existing conditions, a significant impact occurs when the addition of project - generated trips increases the ICU value by one percent (0.01) or more. Existing Conditions (Year 2011) and Existing + Project Currently (2011), all study intersections operate at Level of Service (LOS) C or better during both morning and evening peak hours. The addition of project traffic would not result in a significant impact at the study area intersections (increase of one - percent or more at a study area intersection operating at worse than LOS D during the morning /evening peak hours); therefore, no mitigation is required (see Table 16 -2). 70 TABLE 16 -2: EXISTING AND EXISTING PLUS PROJECT CAPACITY UTILIZATION AND LOS 71 Peak Hour ICU -LOS' Existing (Year 2011) Existing (Year Traffic 2011) +Project ICU Increase MoEatL Evening Morning Evening Morning Evening Intersection Contro12 MacArthur Boulevard (NS) at: Campus Drive (EW) TS 0.435 -A 0.635 -13 0.437 -A 0.635 -13 +0.002 +0.000 Birch Street (EW) TS 0.380 -A 0.457 -A 0.380 -A 0.458 -A +0.000 +0.001 Von Karman Avenue (EW) TS 0.552 -A 0.558 -A 0.558 -A 0:564 -A +0.006 +0.006 Jamboree Road EW TS 0.601 -13 0.678 -13 0.604 -13 0.680 -13 +0.003 +0.002 Campus Drive /Irvine Avenue (NS) at: Bristol Street North (EW) TS 0.488 -A 0.742 -C 0.490 -A 0.744 -C +0.002 +0.002 Bristol Street South EW TS 0.634 -B I 0.465 -A 0.635 -13 0.466 -A +0.001 +0.001 Birch Street (NS) at: Bristol Street North (EW) TS 0.532 -A 0.527 -A 0.533 -A 0.527 -A +0.001 +0.000 Bristol Street South EW TS 0.391 -A 0.436 -A 0.391 -A 0.437 -A +0.000 +0.001 Von Kerman Avenue (NS) at: Campus Drive (EW) TS 0.462 -A 0.563 -A 0.463 -A 0.564 -A +0.001 +0.001 Birch Street (EW) TS 0.285 -A 0.351 -A 0.287 -A 0.352 -A +0.002 +0.001 Bayview Place (NS) at: Bristol Street South EW TS 0.417 -A 0.540 -A 0.417 -A 0.540 -A +0.000 +0.000 Jamboree Road (NS) at: Campus Drive (EW) TS 0.615 -13 0.583 -A 0.618 -13 0.584 -A +0.003 +0.001 Birch Street (EW) TS 0.514 -A 0.421 -A 0.516 -A 0.423 -A +0.002 +0.002 Bristol Street North (EW) TS 0.426 -A 0.489 -A 0.427 -A 0.490 -A +0.001 +0.001 Bristol Street South EW TS 0.611 -13 0.661 -13 0.612 -B 0.662 -13 +0.001 +0.001 1 ICU - LOS = Intersection Capacity Utilization - Level of Service 2 TS= Traffic Signal 71 Existing + Ambient Growth (Year 2013) + Approved Projects'. With and Without Project (Traffic Phasing Ordinance -- TPO Scenario) One - percent of the projected peak hour volumes of each approach of each study area intersection were compared with the peak hour distributed volumes from the proposed project. If one - percent of the existing + growth (Year 2013) + approved projects traffic peak hour volumes of each approach is greater than the peak hour project generated approach volumes, no further analysis is required. If project generated peak hour approach volumes are higher than one - percent of the projected peak hour volumes on any approach of an intersection, the intersection would require analysis utilizing the Intersection Capacity Utilization methodology. Comparison of the one - percent of the existing + growth (Year 2013) + approved projects traffic peak hour approach volumes with the project generated peak hour approach volumes resulted in the following study area intersections exceeding the one - percent threshold and requiring additional analysis: MacArthur Boulevard (NS): Campus Drive (EW) — Morning Peak Hour Von Karman Avenue (EW) _ Morning Peak Hour & Evening Peak Hour Jamboree Road (EW) — Morning Peak Hour & Evening Peak Hour Jamboree Road (NS) at: Campus Drive (EW) — Morning Peak Hour In the future (2013), with the addition of ambient growth and approved projects to existing conditions, all intersections would continue to operate as in 2010 -- at LOS C or better during the morning and evening peak hours. The addition of project traffic would not result in a significant impact at the study area intersections (increase of one - percent or more at a study area intersection operating at worse than LOS D during the morning /evening peak hours); therefore, no mitigation is required (see Table 16 -3). ' Approved Project- An approved project is one that has been approved, requires no further discretionary approval, and has received, or is entitled to receive, a building permit or grading permit for construction of the project or one or more phases of the project. See Table 5 of Appendix E (Traffic Impact Analysis) for Approved Projects List. 72 TABLE 16 -3: TPO INTESECTION CAPACITY UTILIZATION AND LOS + Aooroved Pmiects + In 2013, with approved projects, ambient growth and cumulative projects added to existing conditions, all intersections would continue to operate at LOS C or 2 Cumulative Projects- Cumulative projects are known, but not yet approved developments that are reasonably expected to be completed or nearly completed at the same time as the proposed project. See Appendix J for Cumulative Projects List. 73 Peak Hour ICU -LOS' Existing + Growth Existing + Growth (Year 2013) + (Year 2013) + Approved Projects Traffic Approved Projects + Project ICU Increase Morning Evening Morning Evening Morning Evening Intersection Contro12 MacArthur Boulevard (NS) at: Campus Drive (EW) TS 0.45 -A 0.65 -B 0.45 -A 0.65 -B +0.00 +0.00 Birch Street (EW) TS 0.39 -A 0.48 -A 0.39 -A 0.48 -A +0.00 +0.00 Von Karman Avenue (EW) TS 0.56 -A 0.57 -A 0.57 -A 0.57 -A +0.01 +0.00 Jamboree Road EW TS 0.62 -B 0.71 -C 0.63 -B 0.71 -C +0.01 +0.00 Campus Drive /Irvine Avenue (NS) at: Bristol Street North (EW) TS 0.50 -A 0.76 -C 0.50 -A 0.76 -C +0.00 +0.00 Bristol Street South EW TS 0.64 -B 0.47 -A 0.64 -B 0.47 -A +0.00 +0.00 Birch Street (NS) at: Bristol Street North (EW) TS 0.53 -A 0.54 -A 0.54 -A 0.54 -A +0.01 +0.00 Bristol Street South EW TS 0.40 -A 0.46 -A 0.40 -A 0.46 -A +0.00 +0.00 Von Kerman Avenue (NS) at: Campus Drive (EW) TS 0.47 -A 0.57 -A 0.47 -A 0.57 -A +0.00 +0.00 Birch Street EW TS 0.29 -A 0.35 -A 0.29 -A 0.35 -A +0.00 +0.00 Bayview Place (NS) at: Bristol Street South EW TS 0.43 -A 0.55 -A 0.43 -A 0.55 -A +0.00 +0.00 Jamboree Road (NS) at: Campus Drive (EW) TS 0.64 -B 0.61 -13 0.64 -B 0.61 -B +0.00 +0.00 Birch Street (EW) TS 0.54 -A 0.44 -A 0.54 -A 0.44 -A +0.00 +0.00 Bristol Street North (EW) TS 0.46 -A 0.52 -A 0.46 -A 0.52 -A +0.00 +0.00 Bristol Street South EW TS 0.65 -B 0.70 -C 0.65 -13 0.70 -C +0.00 +0.00 1 ICU-LOS= Intersection Capacity Utilization - Level of Service 2 TS= Traffic Signal + Aooroved Pmiects + In 2013, with approved projects, ambient growth and cumulative projects added to existing conditions, all intersections would continue to operate at LOS C or 2 Cumulative Projects- Cumulative projects are known, but not yet approved developments that are reasonably expected to be completed or nearly completed at the same time as the proposed project. See Appendix J for Cumulative Projects List. 73 better during the morning and evening peak hours. The addition of project traffic would not result in a significant impact at the study area intersections (increase of one - percent or more at a study area intersection operating at worse than LOS D during the morning /evening peak hours); therefore, no mitigation is required. Table 16 -4 shows with and without capacity utilization and LOS for the Cumulative Analysis scenario. TABLE 16 -4: CEQA INTERSECTION CAPACITY UTILIZATION AND LOS Peak Hour ICU -LOS' Existing + Growth Existing + Growth (Year 2013) + Approved Projects (Year 2013) + + Approved Projects Cumulative + Projects Cumulative Traffic Projects + Project ICU Increase Morning Evening Morning Evening Morning Evening Intersection Contro12 MacArthur Boulevard (NS) at: Campus Drive (EW) TS 0.470 -A 0.659 -13 0.471 -A 0.659 -B +0.001 +0.000 Birch Street (EW) TS 0.413 -A 0.495 -A 0.413 -A 0.496 -A +0.000 +0.001 Von Karman Avenue (EW) TS 0.569 -A 0.601 -B 0.575 -A 0.606 -B +0.006 +0.005 Jamboree Road EW TS 0.682 -B 0.763 -C 0.686 -B 0.765 -C +0.004 +0.002 Campus Drive /Irvine Avenue (NS) at: Bristol Street North (EW) TS 0.515 -A 0.773 -C 0.516 -A 0.774 -C +0.001 +0.001 Bristol Street South EW TS 0.647 -B 0.486 -A 0.648 -B 0.487 -A +0.001 +0.001 Birch Street (NS) at: Bristol Street North (EW) TS 0.555 -A 0.549 -A 0.556 -A 0.549 -A +0.001 +0.000 Bristol Street South EW TS 0.401 -A 0.467 -A 0.401 -A 0.467 -A +0.000 +0.000 Von Karman Avenue (NS) at: Campus Drive (EW) TS 0.482 -A 0.578 -A 0.483 -A 0.580 -A +0.001 +0.002 Birch Street EW TS 0.295 -A 0.354 -A 0.296 -A 0.354 -A +0.001 +0.000 Bayview Place (NS) at: Bristol Street South EW TS 0.430 -A 0.568 -A 0.430 -A 0.568 -A +0.000 +0.000 Jamboree Road (NS) at: Campus Drive (EW) TS 0.665 -B 0.638 -B 0.667 -B 0.639 -B +0.002 +0.001 Birch Street (EW) TS 0.557 -A 0.480 -A 0.558 -A 0.481 -A +0.001 +0.001 Bristol Street North (EW) TS 0.484 -A 0.539 -A 0.485 -A 0.540 -A +0.001 +0.001 Bristol Street South EW TS 0.663 -B 0.735 -C 0.664 -B 0.736 -C +0.001 +0.001 1 ICU-LOS= Intersection Capacity Utilization - Level of Service 2 TS= Traffic Signal b) Conflict with an applicable congestion management program, including, but not limited to level of service standard and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways? Less -Than Significant Impact. The Congestion Management Plan (CMP) is the program by which agencies in Orange County have agreed to monitor and report on the status of regional roadways. In the County, the CMP uses ICU intersection analysis methodology to analyze its operations. According to the Orange County CMP, the addition of project generated trips results in a significant impact at the study intersections if traffic demand is increased by more than three percent of capacity (V /C >0.03), causing or worsening LOS F. Based upon the CMP significance threshold, the project - generated traffic did not result in a significant impact at the study area intersections. No significant impact would occur and no mitigation measures are necessary. d) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? No Impact. The commercial nature of the project would not result in a population increase in the City of Newport Beach. Thus, the project is not expected to result in a substantial increase in air traffic levels. The proposed project is located approximately 0.38 miles from John Wayne Airport (JWA) and is located within the Airport Environs Land Use Plan (AELUP) for JWA. The AELUP contains policies governing the land uses within the JWA area. Specifically, these policies establish development criteria that protect sensitive receptors from airport noise, persons from risk of operations, and height guidelines to ensure aircraft safety. The proposed project would be required to implement the guidelines contained in the AELUP. The airspace over the project site could be used by commercial aircraft and helicopters; however, both would be at sufficient altitude so as not to be affected by the proposed project. In addition, the proposed project site is outside the noise contours and safety zones for JWA. Therefore, there would be no impacts from implementation of the proposed project and no mitigation measures are necessary. d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Less -Than Significant Impact. Although no significant impacts or hazards were identified in the traffic study as a result of project implementation, several improvements were recommended to avoid conflicts related to on -site circulation and site access. To assure smooth traffic operations for vehicles entering and exiting the site, the northbound left turn pocket on MacArthur Boulevard is recommended to accommodate a minimum pocket length of 120 feet. Vehicular signage is recommended to be installed to ensure U -turns and eastbound left 75 turns are prohibited at the MacArthur Boulevard /Project Driveway. Also, a STOP sign is recommended to be installed to control outbound traffic on all site access roadways. To maintain sight distance, the landscape plantings and signs should be limited to 36 inches in height within 25 feet of project driveways to assure good visibility. In order to ensure no circulation hazards occur, sight distance will be established at the time final grading, landscaping, and street improvement plans are submitted. Sight distance will comply with the City of Newport Beach standards. As a result, no significant impacts are anticipated and no mitigation measures are required. e) Result in inadequate emergency access? Less -Than Significant Impact. California Fire Code, Section 503 requires approved fire access roads within 150 feet of the exterior walls of the first story of each building. Such roads must be at least 20 feet wide, have a minimum of 13.5 feet of vertical clearance, and must provide all- weather driving capabilities for firefighting vehicles. The project site plans have been designed in coordination with the NBFD to ensure that the project would provide adequate access for firefighting and emergency vehicles and to meet the requirements of CFC Section 503. Therefore, impacts would be less than significant and no mitigation measures are necessary. f) Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities? Less -Than Significant Impact. The proposed project would not conflict with adopted policies supporting alternative transportation. The project is located within walking distance of several high and moderate intensity commercial office buildings, and the proposed restaurant uses would provide a convenient location for dining. Public transportation is readily available in and around the project area. Also, the proposed project would not impact the existing Class I Bikeway located on the northbound side of MacArthur Boulevard. Therefore, no significant impacts are anticipated and no mitigation measures are required. 70 XVII. UTILITIES & SERVICE SYSTEMS a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? Less - than - Significant Impact. The City of Newport Beach is the wastewater service provider for the project site. Wastewater from the City's sewer system is treated by the Orange County Sanitation District (OCSD). Wastewater treatment at the OCSD facility is required to meet applicable Santa Ana Regional Water Quality Control Board standards. The project would not exceed wastewater treatment requirements and impacts would be less than significant. No mitigation measures are necessary. b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? Less - than - Significant Impact. Wastewater from the City's sewer system is treated by the Orange County Sanitation District (OCSD). The two sewage water treatment plans operated by the OCSD include Treatment Plant No. 2 in Huntington Beach and the Reclamation Plant No. 1 in Fountain Valley. The proposed project is located north of State Route 73; therefore, wastewater would be treated by Plant No. 1. The OCSD Reclamation Plant No.1 currently maintains a design capacity of 174 million gallons per day and treats an average of 90 million gallons per day. Therefore, it operates at 52 percent of its capacity (City of Newport Beach 2006b). The existing use generates 2,581,909 gallons of wastewater per year as shown in Table 17 -1 below. This accumulates to about 7,074 gallons per day. The proposed project would generate the following amounts of wastewater as shown in Table 17 -2 below. Table 17 -1 Existing Project's Wastewater Generation Wastewater Wastewater Generation Rate Generated (gal/year) all earls Land Use Square Indoor Outdoor Indoor Outdoor Total (gal/year) Feet Restaurant 7,996 303.53 19.37 2,427,026 154,883 2,581,909 Total 2,581,909 Notes: Calculated from wastewater generation rates used in CaIEEMOD 77 Table 17 -2 Pro osed Project's Estimated Wastewater Generation Wastewater Wastewater Generation Rate Generated (gal /year) (gal /year /sf) Land Use Square Indoor Outdoor Indoor Outdoor Total (gal /year) Feet Restaurant 5,000 303.53 19.37 1,517,650 96,850 1,614,500 Commercial- 8,525 74.07 45.40 631,446 387.035 1,018,481 Retail Total 2,632,981 Notes: Calculated from wastewater generation rates used in CalEEMOD As shown in Table 17 -2, the project would generate 2,632,981 gallons of wastewater per year or about 7,213 per day. This is 140 gallons per day more than the existing use which is about .004 percent of the design capacity of Plant No. 1. There is adequate treatment capacity in the region for the amount of wastewater the project would generate. Project development would not require building new or expanding existing wastewater treatment facility and impacts would be less than significant. c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? Less - than - Significant Impact. The project site consists mostly of impervious surfaces. The proposed project would not substantially alter the existing drainage pattern of the site and would not increase the pervious area as described in Section IX, Hydrology and Water Quality. Currently, a small portion of the site drains to Dolphin Striker Way. Approximately two - thirds of the remainder of the site drains to a grate inlet located north of the existing building and then southeasterly to a catch basin located on the westerly side of MacArthur Boulevard. The proposed project would continue to be directed to the existing storm drain connecting to the catch basin. However, a portion of the drainage from Parcel 3 and a small portion of Parcel 1 will be diverted into MacArthur Boulevard 180 feet north of the existing catch basin then drain southerly into subject catch basin. During construction, runoff from the project site would be managed by BMPs and as directed in the City's stormwater protection requirements. BMPs would be incorporated into the proposed project as part of a SWPPP to prevent discharges of polluted stormwater from construction sites from entering the storm drains. Therefore, the proposed project would not require or result in the construction of new stormwater drainage facilities or expansion of existing facilities. Impacts would be less than significant. d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? M Less - than - Significant Impact. Water services for the project site are provided by the City of Newport Beach. Domestic water for the project site is supplied by both groundwater and imported surface water. Currently, a majority of water supplied to the City, including the project site, is supplied by groundwater from the Lower Santa Ana Basin (Basin). Specifically, approximately 75 percent of the water supplied by the City's service area, including the project site, is supplied by groundwater from the Basin, and the remaining 25 percent of water is imported and purchased from the Municipal Water District (MWD). According to the City of Newport Beach, there are sufficient existing water supplies in the City to meet the project's estimated water demand, and project development would not require new or expanded water supplies (Parks 2011)3. Impacts would be less than significant and no mitigation measures are necessary. e) Result in a determination by the wastewater treatment provider, which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? Less -Than Significant Impact. See Response XVII(b). f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? Less -Than Significant Impact. The City of Newport Beach is under contract with Waste Management of Orange County for solid waste hauling and disposal. The Frank R. Bowerman Sanitary Landfill, located at 11002 Bee Canyon Access Road in Irvine, is the closest facility for solid waste disposal. The Frank R. Bowerman Sanitary Landfill, which is owned and operated by the Orange County Integrated Waste Management Department (IWMD), opened in 1990 and is scheduled to operate until approximately 2053. The current average disposal rate at the landfill is roughly 4,660 tons per day, and the maximum permitted disposal rate is 11,500 tons per day. The landfill's remaining capacity is approximately 118.5 million tons of solid waste (Hull 2011)4. Table 17 -3 shows the estimated solid waste generation by the proposed project, using solid waste generation rates from CALRecycle. ' Parks, Casey (Utilities Supervisor). 2011, July 12. Personal communication with City of Newport Beach Utilities Department. 4 Hull, Ray (Administrative Manager). 2011, July 12. Personal communication with OC Waste & Recycling. 7� Notes: *Calculated from solid waste generation rates used in CaIEEMOD and obtained from CalRecycle: Quality Restaurant: 11.65 tons /1,000 square feetlyear Specialty Retail: 7.6 tons /1,000 square feet/year 1 ton /1,000 square feet = .00548 pounds /square foot/day As shown in Table 17 -3, development of the proposed project would result in .339 tons per day of solid waste to be disposed of at the Frank R. Bowerman Sanitary Landfill, representing approximately .003 percent of the amount of solid waste the landfill is allowed to accept daily. With the remaining capacity of 118.5 million tons, as well as a 42 -year lifespan at the Frank R. Bowerman Sanitary Landfill, the increase in solid waste generated by the proposed development would not exceed the capacity of the landfill. No deficiencies currently exist at the Frank R. Bowerman Sanitary Landfill, as there is adequate daily surplus capacity to accept the additional solid waste generated from the proposed project. Therefore, as the Frank R. Bowerman Sanitary Landfill would have sufficient capacity to service the proposed project, impacts associated with solid waste disposal would be less than significant and no mitigation measures are necessary. g) Comply with federal, state, and local statutes and regulation related to solid waste? No Impact. The proposed project would comply with all regulations related to solid waste, such as the California Integrated Waste Management Act and City recycling programs; therefore, no impacts would occur. :I Table 17 -3 Estimated Project Solid Waste Generation Solid Waste Generation, pounds/day Generation Rate Total (Ibs /day) Land Use Square Feet Ibs /s * Restaurant 5,000 .064 320 Commercial - Retail 8,525 .042 358 Total 678 Ibs /day 339 tons /day) Notes: *Calculated from solid waste generation rates used in CaIEEMOD and obtained from CalRecycle: Quality Restaurant: 11.65 tons /1,000 square feetlyear Specialty Retail: 7.6 tons /1,000 square feet/year 1 ton /1,000 square feet = .00548 pounds /square foot/day As shown in Table 17 -3, development of the proposed project would result in .339 tons per day of solid waste to be disposed of at the Frank R. Bowerman Sanitary Landfill, representing approximately .003 percent of the amount of solid waste the landfill is allowed to accept daily. With the remaining capacity of 118.5 million tons, as well as a 42 -year lifespan at the Frank R. Bowerman Sanitary Landfill, the increase in solid waste generated by the proposed development would not exceed the capacity of the landfill. No deficiencies currently exist at the Frank R. Bowerman Sanitary Landfill, as there is adequate daily surplus capacity to accept the additional solid waste generated from the proposed project. Therefore, as the Frank R. Bowerman Sanitary Landfill would have sufficient capacity to service the proposed project, impacts associated with solid waste disposal would be less than significant and no mitigation measures are necessary. g) Comply with federal, state, and local statutes and regulation related to solid waste? No Impact. The proposed project would comply with all regulations related to solid waste, such as the California Integrated Waste Management Act and City recycling programs; therefore, no impacts would occur. :I SOURCE LIST The following enumerated documents are available at the offices of the City of Newport Beach, Planning Division, 3300 Newport Boulevard, Newport Beach, California 92660. 1. Final Program EIR — City of Newport Beach General Plan 2006 2. California Agricultural Land Evaluation and Site Assessment Model (1997) 3. California Department of Conservation (2009) 4. California Department of Conservation, Farmland Mapping and Monitoring Program 5. California Department of Forestry and Fire Protection, Forest and Range Assessment Project, Forest Legacy Assessment project 6. City of Newport Beach General Plan, City of Newport Beach, adopted July 25, 2006. 7. County of Orange (2005), General Plan Natural Resources Element 8. PC -11 Newport Place Planned Community. 9. Title 20, 2010 Zoning Code of the Newport Beach Municipal Code. 10. City Excavation and Grading Code, Newport Beach Municipal Code. 11. Chapters 10.26 & 10.28, Community Noise Ordinance of the Newport Beach Municipal Code. 12. South Coast Air Quality Management District, Air Quality Management Plan 1997. 13. South Coast Air Quality Management District, Air Quality Management Plan EIR, 1997. 14. Airport Environs Land Use Plan (AELUP) for John Wayne Airport 15. California Air Resources Board. 2008. Preliminary Draft Staff Proposal: Recommended Approaches for Setting Interim Thresholds for Greenhouse Gases Under the California Environmental Quality Act. October 24, 2008. 16. Santa Ana River Basin Plan and Orange County Drainage Area Management Plan. 21 17. U.S. Department of Transportation. 2006. Transit Noise and Vibration Impact Assessment. Prepared for the Federal Transit Authority. 18. California Department of Transportation. 2009. Officially Designated State Scenic Highways and Historic Parkways. The following appendices contained documents that have been prepared specially for this project, and are incorporated by reference within this initial study. These documents are available at the Planning Division, City of Newport Beach. A. Environmental Information Form, Ridgeway Development, November 1, 2010. B. Geotechnical Engineering Investigation, Stata -Tech, Inc., January 18, 2011. C. Phase 1 Environmental Assessment, CENTEC Engineering, April 24, 2003. D. Construction Phasing, Ridgeway Development, April 5, 2011. E. Traffic Impact Analysis (Revised), Kunzman Associates, Inc. May 31, 2011 F. Parking Management Plan, Kunzman Associates, Inc. June 16, 2011. G. The South Coast AQMD Air District, CaIEEMod Emissions Data (Summer, Winter & Annual Emissions) June 15, 2011. H. SCAQMD Air Quality Significance Thresholds, Revised March, 2011. I. Land Use Consistency Analysis J. Cumulative Projects List K. Approved Projects List Personal Communications 1. Alford, Patrick. Planning Manager. City of Newport Beach. Newport Beach, CA. July 7, 2011. 22 List of Preparers Environmental Sections Planner Aesthetics P. Alford Agriculture and Forest Resources K. Sims Air Quality M. Nova Biological Resources K. Sims Cultural Resources P. Alford Geology and Soils F. Nueno Greenhouse Gas Emissions M. Nova Hazards and Hazardous Materials M. Whelan Hydrology and Water Quality F. Nueno Land Use and Planning J. Garcia Mineral Resources K. Sims Noise P. Alford Population and Housing G. Ramirez Public Services B. Zdeba Recreation E. Steffen Transportation/Traffic J. Murillo Utilities and Services Systems E. Steffen Mandatory Findings of Significance Management & Project R. Ung Errata to the Draft IS /MND MacArthur at Dolphin- Striker (PA2010 -135) Introduction This document addresses modifications to the draft IS /MND for the proposed MacArthur at Dolphin- Striker project. It presents all revisions related to public comments and added transfer of development rights location, as determined necessary by the City of Newport Beach. Only sections that had revisions are included, and sections that had no revisions are not included. Readers are referred to the IS /MND to view complete sections. The changes to the draft IS /MND in revision -mode text (i.e., deletions are shown with stFik�c,,.cethreugh, and additions are shown with underline). These notations are meant to provide clarification, corrections, or minor revisions as needed as a result of public comments or because of changes in the project since the publication and distribution of the draft IS /MND. Changes to the Draft IS /MND The following changes to the text as presented below are incorporated into the final IS /MNS. 8. Description of Project (Page 3) The project would introduce new general commercial uses to the subject site which results in the requirement of an amendment to the Newport Place Planned Community Development Plan. The amendment would create new statistical analysis standards, permitted uses and development standards by changing the subject site (Parcel 1) from "Restaurant 1" to "General Commercial Site 8 ". The proposed project also requires a transfer of development intensity to allow the transfer of 54 48 un -built hotel units from Hotel Site 2 -13 located at 1301 Quail Street and 1,620 square feet from General Commercial Site 7 located at 3901 MacArthur Boulevard (donor sites) to the subject site to accommodate a net increase of approximately 5,529 square feet of new development. VIII. HAZARDS AND HAZARDOUS MATERIALS (Page 51 -52) e) For a project within an airport land use plan or, where such a plan has not been adopted, within 2 miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? Less -Than Significant Impact. The closest airport is John Wayne Airport, which is approximately within 0.38 miles northwest of the project site. The project site is located within the boundaries of the Airport Environs Land Use Plan (AELUP) for John Wayne Airport. The proposed project is within the height restriction zone for the John Wayne Airport and the notification area of the Federal Aviation Regulation (FAR) Part 77 Imaginary Surfaces aeronautical obstruction area. Section 77.13 of the FAR requires the notification of the Federal Aviation Administration (FAA) for any construction or alteration which are identified as follows: 1) exceeds 200 feet in height about the ground level at its site; 2) exceeds a height greater than an imaginary surface extending outward and upward at specific slope characteristics at 20,000 feet, 10,000 feet, and 5,000 feet from the nearest point of the airport runway; or 3) is a highway with specific characteristics, and /or ,is occurring at an airport. The proposed project includes the construction of two, free - standing single -story buildings with a maximum height of 29 feet. The project site is approximately 50 feet above mean sea level (Phase I EA Centec, 2003). The proposed project does not require notification to the FAA in accordance with Section 77.13 of the FAR because the proposed project would not be more than 200 feet above ground level and not more than 286 86 feet above mean sea level at which the Notification Surface Height at the subject property is determined. The proposed building height is an approximately 79 feet above mean sea level and is therefore, below the Notification Surface Height by 7 proposed building and is therefore, below the Obstruction Imaginary Surface height. -, the proposed prejeGt would not exGeed a height greateF than the am _i I I se panes identified ,.; +hin Semi,. :7 ��,. tThe proposed project is not a highway; and the proposed project is not a modification to an existing airport. Therefore, the filing of Form 7460 -1 with the FAA is not required. X. LAND USE AND PLANNING (Page 57) Less Than Significant Impact. The project involves We three sites (the donor sites and receiver site) designated as Mixed Use — Horizontal Land Use (MU -H2) per the Land Use Element of the General Plan, which provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed - use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses. The development limits for the project sites are identified in Table LU2 of the General Plan Land Use Element as a portion of Anomaly Number 12 with a development limit of 457,880 square feet (Receiver Site which is the subject property); and a portion of Anomaly Number 17 with a development limit of 33,392 square feet and 304 hotel rooms (donor site at 1301 Quail Street) and Anomaly Number 19 with a development limit 228,530 square feet (donor site at 3901 MacArthur Boulevard). 4eth These sites ;,,. G'Ved OR the pF eet are currently zoned PC -11, Newport Place Planned Community District as Restaurant Site 1 (Project Site), and Hotel Site 2 -13 (Donor Site at 1301 Quail Street) and General Commercial Site 7 (Donor Site at 3901 MacArthur Boulevard). The 2 project as proposed includes a code amendment to change the designation of a portion of Restaurant Site 1 to General Commercial Site 8 designation. Also included in the project is a request to transfer 54 48 un -built hotel rooms from Hotel Site 2 -B (Donor Site) and 1,620 square feet from General Commercial Site 7 (Donor Site) to the project site. The transfer of 54 48 un -built hotel rooms and 1,620 square feet will be converted to a comparable amount of commercial floor area (8 088 5,529 square feet) to establish the total amount of the project site, designated as General Commercial Site 8, to 13,525 square feet, and change the entitlement of Anomaly No. 12 from 457,880 square feet to 463,409 square feet to accommodate the proposed construction of a new commercial shopping center. Conversely, the hotel room entitlement of the donor site within Statistical Area L -4, Anomaly Number 17 will be reduced from 304 to 250 256 hotel rooms and Anomaly Number 19 will be reduced from 228,530 to 256,910 square feet. The proposed activities will amend the zoning to allow for general commercial uses and will not conflict with land use plans, policies, or zoning of the City of Newport Beach, since the commercial square footage increase is offset by the transfer and reallocation of hotel rooms located within the same Statistical Area L4. Land use policy consistency analysis (Appendix 1) has been conducted and is on file and available for review at the Planning Division at City Hall. Therefore, no mitigation measures are required by CEQA. Appendix I — Land Use Consistency Analysis (Pages 1 -5, 8 & 9) See attachment 3 Appendix I - Land Use Consistency Analysis Page 1 of 18 POLICY CONSISTENCY ANALYSIS General Plan -Land Use Element Policy LU 1.4 Growth Management The proposed project is consistent with this policy. Implement a conservative growth strategy that enhances the quality of The proposed project does not increase the development entitlement of the fife of resident and balances the needs of all constituencies with the statistical area but only converts and moves portions (converts hotel rooms preservation of open space and natural resources. to commercial floor are) from one anomaly area to another within the same Statistical Area. Policy LU 1.5 Economic Health The proposed project is consistent with this policy. Encourage a local economy that provides adequate commercial, office, The proposed project would allow for the construction and operation of industrial, and marine - oriented opportunities that provide employment two, free - standing, single -story commercial buildings. Each has a and revenue to support high - quality community services. maximum building height of 29 feet. As discussed in Section XIII, Population and Housing, of the Initial Study Environmental Checklist, it would provide additional temporary construction worker jobs, as well as projected retail, and service jobs (27 jobs projected). Therefore, the proposed project would support the provision of adequate retail and service opportunities that would provide construction and operation employment and stimulate the local economy. Policy LU 2.2 Sustainable and Complete Community The proposed project is consistent with this policy. Emphasize the development of uses that enable Newport Beach to The proposed project would allow for the construction and operation of continue as a self- sustaining community and minimize the need for two commercial buildings that would provide short-term and long -term residents to travel outside of the community for retail, goods and employment opportunities for area residents. The construction and services, and employment. operation jobs provided by the proposed project could potentially be fulfilled by the local workforce residing in the City of Newport Beach. Therefore, the proposed project would enable Newport Beach to continue as a self- sustaining community and minimize the need for residents to travel outside of the community for employment in the retail and service fields. Policy LU 3.1 Neighborhoods, Districts, Corridors, and Open The proposed project is consistent with this policy. Spaces The proposed project would amend the General -Plan -and Newport i Maintain Newport Beach's pattern of residential neighborhoods, Planned Community text to increase the allowable development s business and employment districts, commercial centers, corridors, and footage of the subject roe through a transfer of develo ment F: \USERS \PLN \Shared \PA's \PAS - 2010\PA2010 -135 \Environmental \Dolphin Striker MND - Land Use - GP Analysis Appendix 09-08 - 11.dOCx 201011 Onan Stpike^ nnvn Land Use Go Analysis A....endix 09 09 Appendix I - Land Use Consistency Analysis POLICY harbor and ocean districts. Policy LU 3.2 Growth and Change Enhance existing neighborhoods, districts, and corridors, allowing for re -use and infill with uses that are complementary in type, form, scale, and character. Changes in use and /or density/intensity should be considered only in those areas that are economically underperforming, are necessary to accommodate Newport Beach's share of projected regional population growth, improve the relationship and reduce commuting distance between home and jobs, or enhance the values that distinguish Newport Beach as a special place to live for its residents. The scale of growth and new development shall be coordinated with the provision of adequate infrastructure and public services, including standards for acceptable traffic level of service. Commission Refer the adoption or amendment of the General Plan, Zoning Code, specific plans, and Planned Community development plans for land Page 2 of 18 CONSISTENCY ANALYSIS re guest. Howevecr-,-- itt- wil l- rapt- +ncreas� the- developmewt- of- tAe- SiatisiieaF Area - The proposed project would be for the construction and operation of two, free - standing, single -story commercial buildings within the existing developed Newport Place Planned Community, which encompasses a large portion of the Citys business and employment district. Furthermore, it would blend in with the existing architectural characteristics. Therefore, it would maintain Newport Beach's pattern of business and employment districts in that area. The proposed project is consistent with this policy. The proposed project would amend the General-- Plafl-a{ad- Newport Place Planned Community text to increase the allowable development square footage, and would allow for the new development of two, free- standing, single -story commercial buildings on a site that is currently occupied by a 7,996 square -foot vacant restaurant and related surface parking. The proposed amendments will not change the density/intensity in the Newport Place Planned Community, but would be largely consistent with surrounding land use designations and existing zoning, and would be consistent with the density of the proposed land use designations and the surrounding business district. As discussed in Section XIV, Public Services, and Section XVII, Utilities and Service Systems, of the Initial Study Environmental Checklist, the proposed project would have adequate infrastructure and public services and would not exceed existing service levels for public services or utilities. Furthermore, as discussed In Section XVI, Transportation and Traffic, of the Initial Study Environmental Checklist, the slight increase in trips that would result during the construction and operation of the proposed project would not result in a significant deterioration of surrounding intersections or the roadway network. Therefore, the proposed project would result in complementary type, form, and scale of the existing neighborhood, and would be adequately served by the existing infrastructure and public services. The proposed project is consistent with this policy. As discussed in Section VIII (e) and (f), Hazards and Hazardous F: \USERS \PLN \Shared \PA's \PAS - 2010 \PA2010 -135 \Environmental \Dolphin Striker MND - Land Use - GP Analysis Appendix 09-08 - 1LdOG% : c....:........,..,...n n,.�.,6:.. c +.o.,.. nnnvn iAind iqe ro Analy.:. A..nendix 09 08 Appendix I - Land Use Consistency Analysis POLICY wltnin the John Wayne Airport planning area, as established In the JWA Airport Environs Land Use Plan ( AELUP), to the Airport Land Use Commission (ALUC) for Orange County for review, as required by Section 21676 of the California Public Utilities Code. In addition, refer all development projects that include buildings with a height greater than 200 feet above ground level to the ALUC for review. Page 3 of 18 CONSISTENCY ANALYSIS ( AELUP) jurisdiction of John Wayne Airport. Furthermore, the proposed project is within the height restriction zone for the John Wayne Airport and the notification area of the Federal Aviation Regulation (FAR) Part 77 Imaginary Surfaces aeronautical obstruction area. The proposed project includes construction of a two, freestanding single -story. buildings with a maximum height of 29 feet, on a site that is approximately 50 feet above mean sea level (AES Due Diligence 2004) for an overall height of 79 feet above Mean Sea Level. The proposed project does not require notification to the FAA in accordance with Section 77.13 of the FAR because the proposed project would not be more than 200 feet above ground level and not more than the calculated Notification Surface Height requirement of 86 feet above mean Sea Level ; the Project's calculated surface height of 50 feet plus the building height of 29 feet for a total of 79 feet above Mean Sea Level does not exceed the applicable Obstruction Imaginary Surface Height of 116 feet above Mean Sea Level at the subject property, the project would not create any imaginary surfaces with any of the specific slope characteristics identified within Section 77.13; the proposed project is not a highway; and the proposed project is not a modification to an existing airport. As discussed in Section VIII, Hazards and Hazardous Materials, the proposed project is exempt from fling the Form 7460 -1 notice, however, a referral by the City to the Airport Land Use Commission for Consistency Review is required because of the location of the project site within the AELUP Planning Area and because of the nature of the required City approvals (i.e,. Newport Place Planned Community Text GeRerai -Ran Amendment) under PUC Section 21676(b). The proposed project would comply and be compatible with the land use standards established in the City's Municipal Code and the Airport Land Use Commission's John Wayne AELUP. The Citys Emergency Management Plan also establishes safety procedures with respect to aviation hazards to promote the safety of persons on the ground while F: \USERS \PLN \Shared \PA's \PAS - 2010 \PA2010 -135 \Environmental \Dolphin Striker MIND - Land Use - GP Analysis Appendix 09-08 - 11.docX ._. __- D9Iohin ctFikeF n4NQ i.nd'-se GP Analysis e......mEk 09 08 IzandUse GP Analysis Appendix.deex Appendix I - Land Use Consistency Analysis POLICY Accommodate land use development consistent with the Land Use Plan, Figure LU1 depicts the general distribution of uses throughout the City and Figure LU2 through Figure LU15 depicts specific use categories for each parcel within defined Statistical Areas. Table LU1 (Land Use Plan Categories) specifies the primary land use categories, types of uses, and, for certain categories, the densities/ntensities to be permitted. The permitted densities/intensities or amount of development for land use categories for which this is not included in Table LU1, are specified on the Land Use Plan, Figure LU4 through Figure LU15. These are intended to convey maximum and, in some cases, minimums that may be permitted on any parcel within the designation or as otherwise specified by Table LU2 (Anomaly Locations). The density /intensity ranges are calculated based on actual land area, actual number of dwelling units in fully developed residential areas, and development potential in areas where the General Plan allows additional development. To determine the permissible development, the user should: a. Identify the parcel and the applicable land use designation on the Land Use Plan, Figure LU4 through Figure LU15 b. Refer to Figure LU4 through Figure LU15 and Table LU1 to identify the permitted uses and permitted density or intensity or amount of development for the land use classification. Where densities /intensities are applicable, the maximum amount of development shall be determined by multiplying the area of the parcel by the density/intensity. c. For anomalies identified on the Land Use Map by a symbol, refer to Table LU2 to determine the precise development limits. d. For residential development in the Airport Area., refer to the policies prescribed by the Land Use Element that define how development may occur. Page 4 of 18 CONSISTENCY ANALYSIS may need to make emergency landings in the immediate airport vicinity. The proposed project is consistent with this policy. The project site is located in the Airport Area (Statistical Area 1-4) in the northern portion of the City of Newport Beach. The project site is designated as Mixed Use Horizontal -2 (MU -1-12) per the General Plan Land Use Element. The development limit for the project site is identified in Table LU2 of the General Plan Land Use Element as Anomaly Number 12. The development limit for Anomaly Number 12 is 457,880 gross square feet, as identified in Table LU2. The project site is currently zoned PC Newport Place Planned Community. The project site is located within a development site identified as Restaurant Site 1 in the Newport Place Planned Community. The allowable Building Area for Restaurant Site 1 is 15,000 square feet as defined by the Newport Place Planned Community Text. the new zoning designation (General Commercial Site 8) would limit the Property to 13,525 square feet. The proposed project involves ^ "^ncrc. °cn ^mendme cnd a Newport Place Planned Community text amendment to increase the allowable development square footage on the project site. The General ^ 29- grass- °.� -,mot; -- d -the General Newport Place Planned Community text amendment would establish the allowable building area of General Commercial Site 8 at 13,525 gross square feet. The Genpial Plan n^'^^^'^^ -^' "^ Newport Place Planned Community text amendment would accommodate the land use development of the proposed commercial shopping center that is consistent with the land use designation and zoning. "Require that adequate parking be provided and is conveniently The total parking requirement for the proposed development would be located to serve tenants and customers. Set open parking lots 104 spaces (70 spaces for food uses and 34 for general commercial F: \USERS \PLN \Shared \PA's \PAs - 2010\ PA2010 -135 \Environmental \Dolphin Striker MIND - Land Use - SP Analysis Appendix 09-08 - 11.dOCx 20104A2010 StFik,.. N404D Land Use r_nn.,a'ysis n....endix QA 02 hand'-se GPAnalysisAppendix.deex Appendix I - Land Use Consistency Analysis POLICY back from public streets and pedestrian ways and screen with buildings, architectural walls, or dense landscaping. (Imp 2.1)" Require that new and renovated office and retail development projects be planned to exhibit a high - quality and cohesive "campus environment," characterized by the following: • Location of buildings around common plazas, courtyards, walkways, and open spaces • Incorporation of extensive on -site landscaping that emphasizes special features such as entryways • Use of landscape and open spaces to break the visual continuity of surface parking lots • Common signage program for tenant identification and way finding • Common streetscapes and lighting to promote pedestrian activity • Readily observable site access, entrance drives and building entries and minimized conflict between service vehicles, private Require that new development of business park, office, and supporting buildings be designed to convey a unified and high - quality character in consideration of the following principles: s Modulation of building mass, heights, and elevations and Page 5 of 18 CONSISTENCY ANALYSIS uses). The project provides a total of 9188 spaces (5967 on -site and 32 off - site), resulting in a parking deficit of 15 spaces. A use permit is requested for the use of 134-6 -space off -site parking spaces to satisfy a portion of the requirement (a total of 32 spaces) and a request for reduction of the required off - street parking In accordance with Sections 20.40.100 and 20.40.110 of the Municipal Code, for all three parcels that share reciprocal rights for parking, ingress and egress. A waiver of a portion of the overall required parking (three spaces) based on a parking study that takes into consideration the shared reciprocal /common use parking of the neighboring Restaurant Site (Parcels 2 and 3) and the hours of operation of Parcel 1 uses, including restaurants. A parking management plan per Section 20.40.110.C. of the municipal code is also proposed as a part of the project The proposed project is consistent with this policy. The proposed project would be located within an existing "commercial environment" in the Newport Place Planned Community and will convert a portion of the Restaurant Site 1 to General Commercial Site 8. The site will provide the code required landscaping in and around the buildings and parking lot. Furthermore, the 30 -foot street side setback will be landscaped. The proposed project would use the new site access off of MacArthur Boulevard, which would be appropriately signed with the proposed project addresses. Therefore, the proposed commercial complex would complement the restaurant site environment. The proposed project is consistent with this policy. The proposed project would be designed to blend in with the existing character of the area and surrounding land uses. As described in Section I, Aesthetics in the Initial Study Environmental Checklist, the F: \USERS \PLN \Shared \PA's \PAS - 2010 \PA2010 - 135 \Environmental \Dolphin Striker MND - Land Use - GP Analysis Appendix 09-08 - 11.docx: nna monnna n crikei : NOW _ nd Use GP Anal,,sisAppendix nn no Appendix I - Land Use Consistency Analysis Page 8 of 18 POLICY CONSISTENCY ANALYSIS 65 dBA CNEL noise contour specified by the 1985 JWA Master Plan. Administration, Federal Aviation Regulations, and Caltrans Division of Aeronautics. The proposed project does not include residential development and therefore would not be subject to the 65 dBA CNEL noise contour specified by the 1985 JWA Master Plan. GENERAL PLAN CIRCULATION ELEMENT Policy CE 2.1.1 Level of Service Standards The proposed project is consistent with this policy. Plan the arterial roadway system to accommodate projected traffic at As discussed in Section XVI (a), Traffic and Transportation, in the Initial the following level of service standards: "D" Study Environmental Checklist, construction and operation of the A. Level of Service (LOS) throughout the City, unless otherwise proposed project would generally represent an increase of less than 2% noted B. LOS "E" at any intersection in the Airport Area shared with Irvine of the existing AM and PM trips on the roadway network. It would not create substantial traffic that would downgrade the level of service at any of the intersections analyzed within the Initial Study Environmental Checklist. Surrounding intersections currently operate at acceptable levels of service, and the minimal traffic generated from the proposed project would not downgrade the LOS at any intersections in the vicinity of the project site. Therefore, the proposed project would continue to accommodate projected traffic at the designated LOS. Policy CE 6.2.1 Alternative Transportation Modes The proposed project is consistent with this policy. Promote and encourage the use of alternative transportation modes, The proposed project would encourage the use of alternative modes of such as ridesharing, carpools, vanpools, public transit, bicycles, and transportation, bicycle racks will be provided on site. The project site is walking; and provide facilities that support such alternate modes. located near bus transit routes along MacArthur Boulevard. Policy CE 7.1.1 Required Parking The proposed project is consistent with this policy. Require that new development provide adequate, convenient parking The total parking requirement for the proposed development would be for residents, guests, business patrons, and visitors. 104 spaces (70 spaces for food uses and 34 for retail and service uses). The project provides a total of 9189 spaces (5932 on -site and 32 off - site), resulting in a parking shortage of 13-15 spaces based on the Municipal Code Reauirements� a shortage of 8 spaces based on peak demand under a shared parking scenario within the overall project site• and a shortage of 1 space based on a shared parking scenario that includes the adjacent restaurant sites. A use permit is being requested for the additional of 16 -space off -site parking provision (a total of 32 spaces) and reduction of the required off - street parking in accordance with Sections 20.40.100 and 20.40.110 of the Municipal Code. A waiver of a portion of the required parking for threes aces is included in the F: \USERS \PLN \Shared \PA's \PAS - 2010 \PA2010 -135 \Environmental \Dolphin Striker MND - Land Use - GP Analysis Appendix 09-08 - 11.dOCX SRVi.........eAtann..i. A1-44k.. NIND land;,.,, cn 0 ...1- 4; n,....... a:.. nn no Appendix I - Land Use Consistency Analysis Page 9 of 18 POLICY CONSISTENCY ANALYSIS project and is based on shared use of the on -site parking lot and the neighboring parcels. A parking study shall be required and take into consideration the common parking of the Restaurant Site and the hours of operation of Parcel 1 uses, including restaurants to justify the waiver of a portion of the required parking. Also included is the proposed parking management plan per Section 20.40.110.C. Based on the requirements, the proposed project would provide adequate, convenient parking for guests, employees, and business patrons with the 595 spaces on site and the shared use of the parking spaces on the neighboring restaurant properties. Policy CE 7.1.8 Parking Configuration The proposed project is consistent with this policy. Site and design new development to avoid use of parking configurations The proposed project includes the shared ingress, egress and use of or management programs that are difficult to maintain and enforce. the on -site parking of the three parcels that make up the existing restaurant site and the proposed commercial site and does not include a parking management program. The proposed project would include sufficient parking spaces, as discussed above in CE 7.1.1. Therefore, site design would provide an adequate and safe parking configuration. Policy CE 7.1.9 Parking Configuration The proposed project is consistent with this policy. Consider revised parking requirements for small scale neighborhood The commercial shopping center will serve neighboring commercial serving commercial uses in areas that derive most of their trade from properties that are generally within walking distance and there is limited walk -in business, especially where on- street or other public parking is on street parking in the vicinity, therefore it is anticipated that a large available. number of patrons will walk to the site from the neighboring commercial properties. The parking lot will be striped in accordance with City Requirements. GENERAL PLAN NATURAL RESOURCES ELEMENT Policy NR 1.1 Water Conservation in New Development The proposed project is consistent with this policy. Enforce water conservation measures that limit water usage, prohibit The proposed project would include design features for water activities that waste water or cause runoff, and re uire the use of conservation. Efficient landscaping features would be incorporated, F: \USERS \PLN \Shared \PA's \PAS - 2010 \PA2010 - 135 \Environmental \Dolphin Striker MIND - Land Use - GP Analysis Appendix 09-08 - 11dOCX ' P0410 StFik.. RAND i and i se cn eAaly.:. A...,...,a:., nn no CCRPACalifornia Cultural Resource Preservation Alliance, inc. P.O. Box 54132 An alliance of American Indian and scientific communities working for Irvine, CA 92619 -4132 the preservation of archaeological sites and other cultural resources. August 3, 2011 Rosalinh Ung Associate Planner City of Newport Beach 3300 Newport Boulevard, P.O. Box 1768 Newport Beach, CA 92658 -8915 Re: MacArthur at Dolphin- Striker Way (PA2010 -135) Notice of Intent to Adopt a Mitigated Negative Declaration (July 15, 2011) Thank you for the opportunity to review this document. It was unclear to me whether the Checklist Form was meant to include both the MacArthur- Striker Way Site and the Quail Street "Donor Site." If the Donor Site is to provide fill or be otherwise disturbed, it should be included in the environmental analysis and mitigation plans. Please note that though it was not possible to do an archaeological survey of the project areas, a literature search should have been done to determine whether there are any recorded archaeological sites located there or nearby. If the literature search was not done in connection with the environmental check list, it should be completed before the negative declaration is granted to determine whether the project is in an archaeologically sensitive area. It appears that whereas it is possible that culturally significant remains may exist, the proposed project includes adequate monitoring and a provision for cessation of work should cultural remains be encountered. The planned mitigation and protection provisions are consistent with standard practice. They should be appropriate for routine measures as well as unanticipated occurrences. The CCRPA is pleased to work with the City of Newport Beach on cultural resource issues. Please let us know if we can be of further help. You may contact me at (562) 493 5169 or by email at vbickfl23 @aol.com. Sincerely, Virginia Bickford Secretary, CCRPA on behalf of the Board of Directors Sent on August 10, 2011 by email. Ung, Rosalinh From: vbickf123 (vbickf123 @aol.com] Sent: Wednesday, August 10, 2011 1:02 PM To: Ung, Rosalinh Subject: MacArthur at Dolphin- Striker Way Attachments: CCRPA MacArthur at Dolphin- Striker Way NOI Neg Dec review.doc Dear Ms Ung, I apologize for being so late in sending the attached letter in response to the NOI concerning PA2010 -135. I hope it will . still be of use and the comments taken into consideration. CCRPA would appreciate the opportunity to review future documents. Virginia Bickford GRANGE I COUNTY wren's August 2, 2011 AIRPORT LAND USE COMMISSION FOR ORANGE COUNTY 3160 Airway Avenue • Costa Mesa, California 92626 - 949.2523170 fax: 949.252.6012 COMMUNrrY AUG 0 2 2011 Rosalinh Ung, Associate Planner City of Newport Beach DEVELOPMENT GZ 3300 Newport Boulevard of N&�WOIXI or Newport Beach, CA 92658 -8915 Subject: NOI to Adopt a MND for MacArthur at Dolphin- Striker Way (Commercial Retail and Food Uses) Dear Ms. Ung: Thank you for the opportunity to review the Initial Study for the proposed Dolphin - Striker Way ProjeePin the context of the Airport Land Use Commission's Airport Environs Land Use Plan for John Wayne Airport (JWA AELUP). The proposed project is redevelopment of an approximately 1. 11 acres site. New general commercial and food uses are being;proposed,to replace an existing single- story,vacant restaurant. The new development will consist of two,'free standing single -story buildings: Baoh building has a maximum building height of 29 feet. We wish to offer the following comments and respectfully request consideration of these.coriments as you proceed with preparation of your Mitigated Negative Declaration (MND) y h As discussed;in.the initial study, the pioposed project is-'located within the Federal gut _r { ) _ al study states Aviation Re anon FAR Part 77 Notification Area for JWA. The inch that the proposed project does, notiequtre the - filing ±of For1:1480-1; wrth'the FAA. We suggest that the,MND discuss the height-at which the notification surface,_would be penetrated compared-.to ,the ..proposed'building heights. We also.recommend that the MND include a discussion of the proposed project's location "thin the.F 4R Part 77 Obstruction Imaginary Surfaces foi.UWA ,tThe imtial`s2udy,discusses that the project does not surpass 206 feet above mean sea level and that height is related to the Obstruction Imaginary Surfaces for JWA and not the notification surface. In addition, we recommend the MND discuss whether the development of heliports will be pail of the proposed project. Should the development of heliports occur within your jurisdiction, proposals to develop new heliports must be submitted through the City to the ALUC for review and action pursuant to Public Utilities Code Section 21661.5. Proposed heliport projects must comply fully with the State permit procedure provided by law and with all conditions of approval imposed or recommended by the FAA, by the ALUC for Orange County, and by Caltrans/Division of Aeronautics, ALUC Comments -City of Newport Beach Dolphin - Striker Way Commercial Project August 2, 2011 Page 2 A referral by the City to the ALUC may be required for this project due to the location of the proposal within an AELUP Planning Area and due to the nature of the required City approvals (i.e. Planned Community Amendment) under PUC Section 21676(b). In this regard, please note that the Commission suggests such referrals to be submitted to the ALUC for a determination, between the Local Agency's expected Planning Connnission and City Council hearings. Since the ALUC meets on the third Thursday afternoon of each month, submittals must be received in the ALUC office by the first of the month to ensure sufficient time for review, analysis, and agendizing. Thank you for the opportunity to comment on this initial study, Please contact Lea Choum at (949) 252 -5123 or via email at IchoumOocair.coin if you need any additional details or information regarding the future referral of your project. Sincerely, Kari A. Rigom Executive Officer August 16, 2011 Community Development City of Irvine, One Civic Center Plaza, PO. Box 19575, Irvine, California 92623 -9575 Ms. Rosalinh Ung Associate Planner City of Newport Beach 3300 Newport Boulevard Irvine, CA 92618 wvvvv.cityofirvine.org A,e ybodAA91V _YO 1N3W61013A3e�0 1101 f t d3S AlINnWWOo "7 03A13oS't' Subject: First Screencheck Review of the Notice of Intent to Adopt a Negative Declaration — MacArthur at Dolphin- Striker Way Project Dear Ms. Ung: The City of Irvine staff has received and reviewed the information on the above - referenced project, and offers the following comment: The traffic analysis for the project analyzes an "Existing Plus Project" scenario and an interim year "2013 Plus Project' scenario to determine potential traffic impacts and mitigation. However, it is unclear why a build -out scenario is not analyzed to determine whether traffic impacts are identified and resulting mitigation necessary in the build -out condition; especially considering that land use intensity is being transferred from an off -site location in order to implement the proposed project. The City of Irvine staff recommends that a build -out analysis be prepared that analyzes the four intersections listed below that lie Naiiidi`� y "aui° 1. vino city in is to d_term+r;e i i mHart_ f Imi tir,in _. ..inns result from the project: • MacArthur /Campus • Jamboree /MacArthur • Von Karman /Campus • Jamboree /Campus. Thank you for the opportunity to review and comment on the proposed project. Staff would appreciate the opportunity to review any further information regarding this project as the planning process proceeds. If you have any questions, I can be (949) 724 -6000 Ms. Rosalinh Ung August 16, 2011 Page 2 reached at (949) 724 -6521, or by email at biacobs cDcityofirvine.org. For assistance, you may also contact Sun -Sun Murillo at (949) 724- 6262, or by email at smurillo .ci.irvine.cams. erely BILL JACOBS, AICP Principal Planner cc: Sun -Sun Murillo, Supervising Transportation Analyst