Loading...
HomeMy WebLinkAbout09 - Harbor View Hills South & Newport Heights Pavement Rehab NOC - C-4609SEW Ppar CITY OF NEWPORT BEACH CgC1 00.N`P Cully COUIncH Staff Report Agenda Item No. 9 November 22, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Alfred Castanon, Associate Civil Engineer APPROVED: A TITLE: Harbor View Hills South & Newport Heights Pavement Rehabilitation - Completion and Acceptance of Contract No. 4609 ABSTRACT: On June 14, 2011, City Council awarded Contract No. 4609 (Harbor View Hills South & Newport Heights Pavement Rehabilitation Project) to R.J. Noble Company for a total contract cost of $1,247,650.00 plus a 10% allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATIONS: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials Bond 35 days after the Notice of Completion has been recorded in accordance with the applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contre Account Description Measure M Turnback Water Enterprise Wastewater Enterprise Total Construction Cost: ct were expended from the folio Account Number 7281- C2002039 7511- C2002039 7531- C2002039 wing accounts: Amount $1,207,879.84 $22,500.00 $19,375.00 $ 1,249,754.84 Harbor View Hills South & Newport Heights Pavement Rehabilitation - Completion and Acceptance of Contract No. 4609 November 22, 2011 Page 2 DISCUSSION: Overall Contract Cost/Time Summary Contract Award Final Cost at Benchmark Actual Contract Time Amount Completion Target Contract Time Under ( ) (days) or Over ( +) $1,247,650.00 $1,249,754.84 10% or less 0.16% 80 -36 The work necessary to complete this contract consisted of removing existing pavement, asphalt concrete overlay, reconstructing sidewalks, curb and gutters, driveway approaches, curb access ramps, pruning trees, installing tree root barriers, and adjusting utility and survey facilities in the Harbor View Hills South and Newport Heights communities. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: Actual cost of bid items constructed: Contract change orders: Final contract cost: $ 1,247,650.00 $1,218,414.84 $ 31,340.00 $ 1,249,754.84 There was one change order totaling $31,340.00. The change order was for the replacement of the driveway located at 2301 Laurel Place and a new catch basin, junction structure and 12 -inch storm drain located at 2401 Margaret Drive. This change order work was necessary because of field grade changes directed by city staff to improve drainage on these two streets. A summary of the project schedule is as follows: Estimated Completion Date per June 2010 Baseline Schedule: December 16, 2011 Project Awarded for Construction: June 14, 2011 Completion Date from Award with Approved Extensions: November 22, 2011 Actual Substantial Construction Completion Date: September 30, 2011 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. Harbor View Hills South & Newport Heights Pavement Rehabilitation - Completion and Acceptance of Contract No. 4609 November 22, 2011 Page 3 NOTICING: This agenda item has been noticed according to the Brown Act. In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Submitted by: pen,uytsaaurn lic Mrks Director Attachments: A. Location Maps �J ORFF ; M \s `B�TeFgc-��= ,p,�.1r on, }�Q Q (b�TA�voey,� w 9 SGN O Q \�� a JASMINE O (PVT) SAN T a N HILLS ROA�a ~OCEAN �T BIR p r r co (PVT) c � � O J � ✓m JCS n n n A KEY V1EW z�ON ro /v p z 2 ASOF < o z n7 z SgND�Ne - PREMER POINT (PVT) zE iV ^QQ,�� HARBOR VIEW HILLS SOUTH NAp, ui 6 eE b HARBOR VIEW HILLS SOUTH & CITY OF NEWPORT BEACH NEWPORT HEIGHTS PAVEMENT REHABILITATION PROJECT PUBLIC WORKS DEPARTMENT LOCATIONS LOCATION MAP DATE 9/14/101 SCALE N.T.S SIT 1 OF 1 DRAWN AC I C -4609 Attachment A I of 2 A- i Ea .�P P \ O � J T z� 1q �U �C gl HARBOR VIEW HILLS SOUTH & CITY OF NEWPORT BEACH NEWPORT HEIGHTS PAVEMENT REHABILITATION PROJECT PUBLIC WORKS DEPARTMENT LOCATIONS LOCATION MAP DATE 9/14/10 SCALE N.T.S SHT 1 OF 1 DRAWN AC C -4609 Attarhmpnt A 7 of 9 sN