Loading...
HomeMy WebLinkAbout05 - C-3458 Balboa Island Bayfront RepairsCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. S March 11, 2003 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Fong Tse, Associate Civil Engineer 949 -644 -3311 ftse@city.newport-beach.ca.us SUBJECT: BALBOA ISLAND BAYFRONT REPAIRS (2001- 2002), CONTRACT NO. 3458 — COMPLETION AND ACCEPTANCE RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond one -year after Council acceptance. DISCUSSION: On May 14, 2002, the City Council authorized the award of contract for the Balboa Island Bayfront Repairs to GCI Construction, Inc. of Costa Mesa, California. The contract provided for the construction of new concrete sidewalks and the installation of area drains and 6 -inch diameter PVC drainpipes at select locations along North Bay Front between Ruby Avenue and Marine Avenue. Surface drainage was re- directed toward the public bulkhead to convey the surface runoff for below grade discharge into the nearby street end catch basins. A 15 -inch diameter PVC storm drain was installed and capped below the new sidewalks between Diamond Avenue and Coral Avenue in anticipation of a future project to install an electric tide gate at the Sapphire Avenue street end. The concrete curb and the adjacent roadway pavement were reconstructed along the southerly side of Park Avenue from Collins Island to the first alley easterly thereof to improve drainage. The deteriorated sidewalk panels along the easterly side of Pearl Avenue between Park Avenue and South Bay Front were also reconstructed. SUBJECT: Balboa Island BWront Repairs, Contract No. 3458 - Completion And Acceptance March 11, 2003 Page 2 The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $198,810.00 Actual amount of bid items constructed: $193,077.00 Total amount of change orders: $5,325.27 Final contract cost: $198,402.27 Field conditions required increased quantities of Miscellaneous Below- Gracie Unsuitable Materials Removal and Disposal. Various concrete quantities were decreased due to minor changes made to the scope of work. As a result, the final overall construction cost including change orders was essentially the same as the original bid amount. One change order in the amount of $5,325.27 provided for storm drain, hardscape additions, and modifications requested during construction by bayfront residents adjacent to the work. Funds for the project were expanded in the following accounts: Description Account No. Amount Storm Drain Improvements 7012- C5100008 $ 23,483.00 Balboa Island Bay Front Repairs 7231- C5100314 $174,919.27 TOTAL $198,402.27 All work was completed November 27, 2002, the scheduled completion date Environmental Review: The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302 of the CEQA Implementing Guidelines at the time the project was authorized by the City Council. This exemption covers the maintenance and alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive:. The project involved the reconstruction of existing street and sidewalk improvements that did not impact any environmental resources. Prepar d by: Submitted b , Fong sT e S ep e, Badum Associate Civil Engineer Publjp^orks Director